Feasibility analysis of offshore wind power plants with DC collection grid

33
Feasibility analysis of offshore wind power plants with DC collection grid Authors Mikel De Prada Gil , J.L. Domínguez-García , F. Díaz- Gonzalez , M. Aragües-Penalba , Oriol Gomis-Bellmunt , Presented By Taher, Md. Iktiham Bin (15-98378-1) Nazneen, Rifat (15-98878-3) Khan, Mohammad Irfan (15-98393-1) Khan, Md. Rabiul Islam (15-98279-1)

Transcript of Feasibility analysis of offshore wind power plants with DC collection grid

Page 1: Feasibility analysis of offshore wind power plants with DC collection grid

Feasibility analysis of offshore wind power plants with DC collection grid

Authors • Mikel De Prada Gil , J.L. Domínguez-García , F. Díaz-Gonzalez , M. Aragües-Penalba , Oriol Gomis-Bellmunt ,

Presented By

Taher, Md. Iktiham Bin (15-98378-1)Nazneen, Rifat (15-98878-3)Khan, Mohammad Irfan (15-98393-1) Khan, Md. Rabiul Islam (15-98279-1)

Page 2: Feasibility analysis of offshore wind power plants with DC collection grid

What actually Authors Tired And What’s New Here?

OWPP To Onshore Grid Power Transfer

Page 3: Feasibility analysis of offshore wind power plants with DC collection grid

Introduction

Offshore And Onshore

HVDC and HVAC

Issue Regarding HVDC Implementation

A sensitivity analysis of the cost and efficiency of the components, OWPP rated power, export cable lengths and some economic data is carried out.

An OWPP based on Horn's Rev wind farm is selected as base case.

For this study, a methodology is proposed and implemented in DIgSILENT Power Factory®.

Page 4: Feasibility analysis of offshore wind power plants with DC collection grid

AC and DC offshore wind power plant configurations analyzed

Schematic representation of offshore wind power plant connection to the main grid.

Page 5: Feasibility analysis of offshore wind power plants with DC collection grid

Current offshore wind power plant design: AC case

b

(a) Radial collection configuration and layout of the AC offshore wind power plant. (b) Ring collection configuration. (c) Star collection configuration.

ca

Page 6: Feasibility analysis of offshore wind power plants with DC collection grid

DC OWPP Topology

Generally DC offshore collection grids can be classified into three

different designs based on the connection of wind turbines:• Parallel • Series• Hybrid

In this paper, four DC offshore wind power plant topologies are

proposed on the base of parallel configuration as these are

similar to the radial design of AC OWPP to ease the comparison

between AC and DC technologies.

Page 7: Feasibility analysis of offshore wind power plants with DC collection grid

DC offshore wind power plant Topology 1

Fig: Simplified representation of the DC OWPP configuration 1 proposal (DC1).

Page 8: Feasibility analysis of offshore wind power plants with DC collection grid

Benefits of Topology 1

• Avoiding the use of an intermediate collector platform can

save capital costs.

• The considerable distance between the OWPP feeders and

the main platform leads to increase cross-section of inter-

array cables in order to avoid large power losses .

Page 9: Feasibility analysis of offshore wind power plants with DC collection grid

DC offshore wind power plant Topology 2

Fig: Proposal scheme of the DC OWPP configuration 2 proposal (DC2).

Page 10: Feasibility analysis of offshore wind power plants with DC collection grid

Benefits of Topology 2• Saving both the investment costs and energy costs due to the

absence of DC/DC converter in offshore collector platform.

• It enables the installation of a smaller intermediate offshore

platform in comparison with a conventional AC offshore

platform with step-up transformer

Drawback of Topology 2• Large amount of power dissipated in the export cable for

OWPP voltage level.

Page 11: Feasibility analysis of offshore wind power plants with DC collection grid

DC offshore wind power plant Topology 3

Fig: Proposal Scheme of the DC OWPP configuration 3 (DC3).

Page 12: Feasibility analysis of offshore wind power plants with DC collection grid

Benefit of Topology 3

• Reduce the losses in the export cable due to the

voltage increase.

Drawback of Topology 3

• If the DC/DC converter fails, the generated power

of the whole wind power plant cannot be delivered.

Page 13: Feasibility analysis of offshore wind power plants with DC collection grid

DC offshore wind power plant Topology 4

Fig : Proposal scheme of the DC OWPP configuration 4 (DC4).

Page 14: Feasibility analysis of offshore wind power plants with DC collection grid

Benefit of Topology 4

• The reliability of the topology is increased because of the step-up converter redundancy.

Drawbacks of Topology 4

• Larger capital expenditures associated with the higher required number of DC/DC power converters.

• The collector platforms that allocate all the DC/DC converters may be increased in size and cost.

Page 15: Feasibility analysis of offshore wind power plants with DC collection grid

Analysis methodology

Page 16: Feasibility analysis of offshore wind power plants with DC collection grid

Technical analysis

Considering this, the steady-state energy losses of each WPP configuration over a period of time T may be computed as

Pg (n)= power delivered by the WPP, PPCC (n)=net active power transferred to the grid at the Point of CommonCoupling (PCC),N=maximum number of generation statespwb (n)=probability of occurrence of each state according to the Weibull distribution function

Page 17: Feasibility analysis of offshore wind power plants with DC collection grid

Cost Analysis

Calculation of the total cost of a wind power plant (WPP).

Used to compare between AC and DC (WPP).

Cost function for both capital expenditures and energy losses.

Total cost = Capital expenditures + Energy losses

$$ $$ $$

Page 18: Feasibility analysis of offshore wind power plants with DC collection grid

Cost Analysis$$ $$ $$

Page 19: Feasibility analysis of offshore wind power plants with DC collection grid

Capital expenditures - AC

Components:wind turbine (wt),cables (cab),switchgears (sg),transformers (tr),converters (DCDC).

Page 20: Feasibility analysis of offshore wind power plants with DC collection grid

Components:wind turbine (wt),cables (cab),switchgears (sg),transformers (tr),converters (DCDC).

……

Capital expenditures - AC

Page 21: Feasibility analysis of offshore wind power plants with DC collection grid

Components:wind turbine (wt),cables (cab),switchgears (sg),transformers (tr), In – cable ampacity (in A)converters (DCDC). L – cable length (in km)

…..

Capital expenditures - AC

Page 22: Feasibility analysis of offshore wind power plants with DC collection grid

Components:wind turbine (wt),cables (cab),switchgears (sg),transformers (tr), Vn – nominal voltage converters (DCDC).

……

Capital expenditures - AC

Page 23: Feasibility analysis of offshore wind power plants with DC collection grid

Components:wind turbine (wt),cables (cab),switchgears (sg),transformers (tr),converters (DCDC). At – transformer rated power

……….

Capital expenditures - AC

Page 24: Feasibility analysis of offshore wind power plants with DC collection grid

Components:wind turbine (wt),cables (cab),switchgears (sg),transformers (tr),converters (DCDC).

Pr – power rating of the transformer

……….

Capital expenditures - AC

Page 25: Feasibility analysis of offshore wind power plants with DC collection grid

Capital expenditures - DC

Page 26: Feasibility analysis of offshore wind power plants with DC collection grid

Capital expenditures - DC

Page 27: Feasibility analysis of offshore wind power plants with DC collection grid

Energy Losses

Ke – slope of the equation

where, Pe is the energy price for the year t.

Page 28: Feasibility analysis of offshore wind power plants with DC collection grid

Sensitivity Analysis

No novel concept of Offshore Wind Power Plant based on DC discovered yet.

Uncertainties arise in electrical efficiency and manufacturing cost.

A sensitivity analysis is done by modifying the parameters proving a wide

range of feasible solutions.

Page 29: Feasibility analysis of offshore wind power plants with DC collection grid

Sensitivity Analysis (Contd…)

Page 30: Feasibility analysis of offshore wind power plants with DC collection grid

Case Study From the output of this methodology, the cost-effectiveness of DC OWPP configurations

in comparison with the conventional AC solutions can be determined.

Each DC OWPP topology analysed is studied as two different cases depending on its collection grid voltage rating (A-±20 kV and B-±50 kV).

In with this regard, the general wind farm designs are based on the well-known Horns Rev wind farm which is composed of 80 wind turbines laid out in a regular matrix form of 10 columns and 8 rows. The spacing among wind turbines is 7 rotor diameters (D) in both directions.

Page 31: Feasibility analysis of offshore wind power plants with DC collection grid

Technical Comparison

DC1x DC2x DC3x DC4x

No collectorplatform

No DC/DC oncollectorplatform

One DC/DC conv.per WF on collectorplatform

One DC/DC conv.per feeder oncollector platform

where x represents both A and B cases which are based on ±20 kV and ±50 kV,respectively

Page 32: Feasibility analysis of offshore wind power plants with DC collection grid

Cost Comparison

So it is clear from graph that we have a higher initial cost but the cost of energy loss is lower for DC proposed system.

Page 33: Feasibility analysis of offshore wind power plants with DC collection grid

Comparative analysis gist At short export cable length (10 km), generally DC1 and DC2 are of

interest, since no extra investment must be done for the DC/DC converter. However, it does not occur where the large number of cables required, as it leads to larger power losses and significant increase of the investment cost.

On the other hand, for long export cables (70 km), DC3 and DC4 appear to be economical due to reduced energy losses and lower number of cables needed.

• Finally, it can be stated that assuming the optimistic case DC OWPPs are usually cheaper than AC.