FDT.xlsx

3
CLIENT CONSULTANT CONTRACTOR 49/2012-Construction and Execution of Ras Al Khaimah Ring Road INSITU DENSITY TEST BS 1377 Part 9 Cl 2.2 LOCATION : 15+660-15+880 Main Road REQUEST NO.: ARC-EW-0837 LAYER NO. Gatch Layer (40th Layer) DATE : 7/8/2013 A) GENERAL INFORMATION BFRL (mm) 2.12 MATERIAL REF. NO. GATCH-04 13992 MDD / OMC 2.06 11.0% DEPTH OF LAYER (m) 0.15 BULK DENSITY OF SAND (g/cc 1.440 2098.8 WT. OF SAND IN CONE (gm) 3290 CONE NO 1 PLATE NO 01 TEST PIT NO 1 2 3 4 5 SPOT CHAINAGE 15+670 15+680 15+690 15+710 15+720 OFF SET CL LHS RHS LHS CL DEPTH OF TEST (mm) 120 130 130 120 120 LAYER TOP TOP TOP TOP TOP WT. OF SAND+BAG BEFORE POURING(gm) 20000 20000 20000 20000 20000 WT. OF SAND+BAG AFTER POURING(gm) 10649 10490 10435 10815 10642 WT. OF SAND IN HOLE+CONE (gm) 9351 9510 9565 9185 9358 WT. OF SAND IN HOLE (gm) 6061 6220 6275 5895 6068 WT. OF WET SOIL FROM HOLE (gm) 8935 9330 9240 8955 9275 VOLUME OF HOLE (cc) 4209 4319 4358 4094 4214 WET DENSITY (g/cc) 2.123 2.160 2.120 2.187 2.201 CONTAINER NO S10 S3 S24 S17 S18 WT. OF WET SOIL+CONTAINER (gm) 435.1 381.9 367.9 333.1 379.4 WT. OF DRY SOIL+CONTAINER (gm) 401.8 352.9 341.2 309.6 350.0 WT. OF CONTAINER (gm) 29.9 30.1 30.9 30.3 31.0 WT. OF MOISTURE (gm) 33.3 29.0 26.7 23.5 29.4 WT. OF DRY SOIL (gm) 371.9 322.8 310.3 279.3 319.0 MOISTURE CONTENT (%) 9.0 9.0 8.6 8.4 9.2 DRY DENSITY (g/cc) 1.948 1.982 1.952 2.018 2.015 % COMPACTION OBTAINED 95 96 95 98 98 REQUIRED COMPACTION 95% 95% 95% 95% 95% REMARKS Previous Layer Ref. 40th Layer (RFA No. ARC-EW-0635, BFRL-2.27) ME / CONTRACTOR MATERIALS INSPECTOR MATERIALS ENGINEER AREA (m 2 ) QUANTITY (m 3 )

Transcript of FDT.xlsx

Page 1: FDT.xlsx

1 / 3

CLIENT CONSULTANT CONTRACTOR

49/2012-Construction and Execution of Ras Al Khaimah Ring Road

INSITU DENSITY TESTBS 1377 Part 9 Cl 2.2

LOCATION : 15+660-15+880 Main Road REQUEST NO.: ARC-EW-0837

LAYER NO. Gatch Layer (40th Layer) DATE : 7/8/2013

A) GENERAL INFORMATION

BFRL (mm) 2.12 MATERIAL REF. NO. GATCH-04

13992 MDD / OMC 2.06 11.0%

DEPTH OF LAYER (m) 0.15 BULK DENSITY OF SAND (g/cc) 1.440

2098.8 WT. OF SAND IN CONE (gm) 3290

CONE NO 1 PLATE NO 01

TEST PIT NO 1 2 3 4 5

SPOT CHAINAGE 15+670 15+680 15+690 15+710 15+720

OFF SET CL LHS RHS LHS CL

DEPTH OF TEST (mm) 120 130 130 120 120

LAYER TOP TOP TOP TOP TOP

WT. OF SAND+BAG BEFORE POURING(gm) 20000 20000 20000 20000 20000

WT. OF SAND+BAG AFTER POURING(gm) 10649 10490 10435 10815 10642

WT. OF SAND IN HOLE+CONE (gm) 9351 9510 9565 9185 9358

WT. OF SAND IN HOLE (gm) 6061 6220 6275 5895 6068

WT. OF WET SOIL FROM HOLE (gm) 8935 9330 9240 8955 9275

VOLUME OF HOLE (cc) 4209 4319 4358 4094 4214

WET DENSITY (g/cc) 2.123 2.160 2.120 2.187 2.201

CONTAINER NO S10 S3 S24 S17 S18

WT. OF WET SOIL+CONTAINER (gm) 435.1 381.9 367.9 333.1 379.4

WT. OF DRY SOIL+CONTAINER (gm) 401.8 352.9 341.2 309.6 350.0

WT. OF CONTAINER (gm) 29.9 30.1 30.9 30.3 31.0

WT. OF MOISTURE (gm) 33.3 29.0 26.7 23.5 29.4

WT. OF DRY SOIL (gm) 371.9 322.8 310.3 279.3 319.0

MOISTURE CONTENT (%) 9.0 9.0 8.6 8.4 9.2

DRY DENSITY (g/cc) 1.948 1.982 1.952 2.018 2.015

% COMPACTION OBTAINED 95 96 95 98 98

REQUIRED COMPACTION 95% 95% 95% 95% 95%

REMARKS Previous Layer Ref. 40th Layer (RFA No. ARC-EW-0635, BFRL-2.27)

ME / CONTRACTOR MATERIALS INSPECTOR MATERIALS ENGINEER

AREA (m2)

QUANTITY (m3)

B) FIELD DENSITY

Page 2: FDT.xlsx

2 / 3

CLIENT CONSULTANT CONTRACTOR

49/2012-Construction and Execution of Ras Al Khaimah Ring Road

INSITU DENSITY TESTBS 1377 Part 9 Cl 2.2

LOCATION : 15+660-15+880 Main Road REQUEST NO.: ARC-EW-0837

LAYER NO. Gatch Layer (40th Layer) DATE : 7/8/2013

A) GENERAL INFORMATION

BFRL (mm) 2.12 MATERIAL REF. NO. GATCH-04

13992 MDD / OMC 2.06 11.0%

DEPTH OF LAYER (m) 0.15 BULK DENSITY OF SAND (g/cc) 1.440

2098.8 WT. OF SAND IN CONE (gm) 3290

CONE NO 1 PLATE NO 01

TEST PIT NO 6 7 8 9 10

SPOT CHAINAGE 15+740 15+760 15+780 15+790 15+800

OFF SET RHS CL RHS LHS CL

DEPTH OF TEST (mm) 130 130 120 110 120

LAYER TOP TOP TOP TOP TOP

WT. OF SAND+BAG BEFORE POURING(gm) 20000 20000 20000 20000 20000

WT. OF SAND+BAG AFTER POURING(gm) 10429 10295 10540 11016 10860

WT. OF SAND IN HOLE+CONE (gm) 9571 9705 9460 8984 9140

WT. OF SAND IN HOLE (gm) 6281 6415 6170 5694 5850

WT. OF WET SOIL FROM HOLE (gm) 9335 9455 9255 8625 8775

VOLUME OF HOLE (cc) 4362 4455 4285 3954 4063

WET DENSITY (g/cc) 2.140 2.122 2.160 2.181 2.160

CONTAINER NO S14 S34 S11 S26 S25

WT. OF WET SOIL+CONTAINER (gm) 396.7 382.4 388.6 370.1 439.4

WT. OF DRY SOIL+CONTAINER (gm) 366.5 353.3 360.4 343.8 404.8

WT. OF CONTAINER (gm) 31.4 29.7 32.1 30.6 28.6

WT. OF MOISTURE (gm) 30.2 29.1 28.2 26.3 34.6

WT. OF DRY SOIL (gm) 335.1 323.6 328.3 313.2 376.2

MOISTURE CONTENT (%) 9.0 9.0 8.6 8.4 9.2

DRY DENSITY (g/cc) 1.963 1.947 1.989 2.012 1.978

% COMPACTION OBTAINED 95 95 97 98 96

REQUIRED COMPACTION 95% 95% 95% 95% 95%

REMARKS Previous Layer Ref. 40th Layer (RFA No. ARC-EW-0635, BFRL-2.27)

ME / CONTRACTOR MATERIALS INSPECTOR MATERIALS ENGINEER

AREA (m2)

QUANTITY (m3)

B) FIELD DENSITY

Page 3: FDT.xlsx

3 / 3

CLIENT CONSULTANT CONTRACTOR

49/2012-Construction and Execution of Ras Al Khaimah Ring Road

INSITU DENSITY TESTBS 1377 Part 9 Cl 2.2

LOCATION : 15+660-15+880 Main Road REQUEST NO.: ARC-EW-0837

LAYER NO. Gatch Layer (40th Layer) DATE : 7/8/2013

A) GENERAL INFORMATION

BFRL (mm) 2.12 MATERIAL REF. NO. GATCH-04

13992 MDD / OMC 2.06 11.0%

DEPTH OF LAYER (m) 0.15 BULK DENSITY OF SAND (g/cc) 1.440

2098.8 WT. OF SAND IN CONE (gm) 3290

CONE NO 1 PLATE NO 01

TEST PIT NO 11 12 13 14 15

SPOT CHAINAGE 15+820 15+830 15+840 15+860 15+870

OFF SET RHS LHS CL LHS RHS

DEPTH OF TEST (mm) 130 130 120 120 120

LAYER TOP TOP TOP TOP TOP

WT. OF SAND+BAG BEFORE POURING(gm) 20000 20000 20000 20000 20000

WT. OF SAND+BAG AFTER POURING(gm) 10261 10469 10901 10789 10777

WT. OF SAND IN HOLE+CONE (gm) 9739 9531 9099 9211 9223

WT. OF SAND IN HOLE (gm) 6449 6241 5809 5921 5933

WT. OF WET SOIL FROM HOLE (gm) 9495 9365 8715 8840 8940

VOLUME OF HOLE (cc) 4478 4334 4034 4112 4120

WET DENSITY (g/cc) 2.120 2.161 2.160 2.150 2.170

CONTAINER NO S16 S9 S12 S29 S37

WT. OF WET SOIL+CONTAINER (gm) 384.9 412.2 360.0 255.5 380.1

WT. OF DRY SOIL+CONTAINER (gm) 357.4 380.5 331.9 237.0 349.7

WT. OF CONTAINER (gm) 30.3 32.6 30.2 31.0 29.7

WT. OF MOISTURE (gm) 27.5 31.7 28.1 18.5 30.4

WT. OF DRY SOIL (gm) 327.1 347.9 301.7 206.0 320.0

MOISTURE CONTENT (%) 8.4 9.1 9.3 9.0 9.5

DRY DENSITY (g/cc) 1.956 1.980 1.976 1.973 1.982

% COMPACTION OBTAINED 95 96 96 95.8 96

REQUIRED COMPACTION 95% 95% 95% 95% 95%

REMARKS Previous Layer Ref. 40th Layer (RFA No. ARC-EW-0635, BFRL-2.27)

ME / CONTRACTOR MATERIALS INSPECTOR MATERIALS ENGINEER

AREA (m2)

QUANTITY (m3)

B) FIELD DENSITY