Transcript of FDOT District 1 ITS Project Update Katherine Duvall ITS Project Manager.
FDOT District 1FDOT District 1ITS Project UpdateITS Project Update
Katherine Duvall
ITS Project Manager
OutlineOutline
RTMC and Related Projects
Future ITS Projects
RTMC and Related ProjectsRTMC and Related Projects I-75 Collier & Lee Counties FMS and Regional
Transportation Management Center (RTMC) DB FPN: 416412-1, 416413-1, 414733-1 Under Construction (NTP Jan. 2, 2006) FMS
79 CCTV cameras, 111 microwave detectors, 26 dynamic message signs and 2 roadway weather information system units
Safety barrier cable system ITS improvements ~98 miles of fiber cable, Ethernet communications Video wall and integration of all control center and field
devices RTMC
Located in rest area off of I-75 and Daniels Parkway Multiple agencies: FDOT FMS Operations, FDOT MCCO,
FHP Dispatch and FHP District Building construction is almost complete
Completion of the Entire Project: Estimated end of this Summer
SSouthouthWWest est IInteragency nteragency FFacility for acility for TTransportation (SWIFT) SunGuide™ Centerransportation (SWIFT) SunGuide™ Center
SWIFT SunGuide™ CenterSWIFT SunGuide™ Center
SWIFT SunGuide™ CenterSWIFT SunGuide™ Center
SWIFT SunGuide™ CenterSWIFT SunGuide™ Center
RTMC and Related ProjectsRTMC and Related Projects
SWIFT SunGuide™ Center Facilities Management Contract FPN: N/A Contract to be Advertised: April 2008 Building Management Support Services Contract Project Highlights:
Provides for general maintenance and services for SWIFT SunGuide™ Center including:
Air conditioning/heating Elevator and machine room equipment Janitorial services Pest control services Lawn maintenance Fire alarm monitoring and maintenance Security services
Future ITS ProjectsFuture ITS Projects
Charlotte County I-75 FMS Design-Build Construction FPN: 414738-1 Letting Date: Scheduled November 2008 Project Highlights
Extension of the Lee-Collier FMS based on Conceptual ITS Plan for Charlotte County
Includes: Finalize design based on Preliminary Plans Package Fiber optic communication network deployment CCTV camera system (26) DMS system (10) HAR system RWIS Vehicle detection system (32) Integration at the RTMC
Future ITS ProjectsFuture ITS Projects
Manatee County ATMS Design-Build Construction FPN: 416119-1 Letting Date: June 2008 Project Highlights
Finalize design based on Preliminary Plans Package Construction of ATMS Upgrade will include:
New central hardware and software New controllers and cabinets at 143 signalized
intersections 40 CCTV cameras
Existing communications upgraded to fiber with Ethernet communications
Integration at the TMC including video wall, consoles, work stations, and all other ITS equipment
Future ITS ProjectsFuture ITS Projects
Sarasota County ATMS Construction FPN: 420974-1 & 420974-2 New Project – Transportation Regional Incentive
Program (TRIP) Growth Management Funds Upgrade Existing Signal System to be Compatible with
Manatee County ATMS Requirements Construction Letting to be Determined by Sarasota
County County Hiring System Manager
Future ITS ProjectsFuture ITS Projects City of Winter Haven ATMS Design-Build Construction
FPN: 408043-2 Letting Date: March 2009 Construction Funding: 2010/2011
City will advance funds to start construction in Fiscal Year 08/09
Project Highlights Finalize design based on Preliminary Plans Package Construction of ATMS Upgrade will include:
New central hardware and software New controllers and cabinets at 48 signalized
intersections 15 CCTV cameras
Existing communications upgraded to fiber with Ethernet communications
Integration at the TMC including video wall, consoles, work stations, and all other ITS equipment