Fdot d1

22
Presentation of Qualifications Orlando, Florida

description

General Presentation of METRO's FDOT Pre-Qualifications

Transcript of Fdot d1

Page 1: Fdot d1

Presentation of Qualifications

Orlando, Florida

Page 2: Fdot d1

Agenda

Firm Background

Professional Staff

Pre Qualifications

Page 3: Fdot d1

Firm Background

• Essential Firm Ingredients– Founding Principal – Former Corporate VP\– Incorporated in 2010– Strong FDOT Pre-Qualifications–Core Professional Services Under One Roof– Experienced / Engaged Staff – “Cost Efficient” Business Model

Page 4: Fdot d1

Recognition / Accountability Model

Productivity

Engagement

Retention

Achieve Client and Firm Expectations

Page 5: Fdot d1

Accountability /Quality Process

PD&E Studies

Engineering

Environmental Science

Quality Manager

Constructability Engineer

LEVEL 1 REVIEW LEVEL 2 REVIEW

Planning

Page 6: Fdot d1

Agenda

Firm Background

Pre Qualifications

Professional Staff

Page 7: Fdot d1

Pre-Qualifications

•2.0 - PD&E Studies

•3.1 - Minor Roadway Design

•3.2 - Complex Roadway Design

•3.3 - Controlled Access Roadway Design

•7.1 - Signing and Pavement Marking Plans

(FUTURE)•6 – Traffic Engineering

•7 - Signalization

•13 – Planning

•15 – Landscape Architecture

Page 8: Fdot d1

Professional Services

Page 9: Fdot d1

Agenda

Firm Background

Professional Staff

Pre Qualifications

Page 10: Fdot d1

Organization

George Botner, AICP, RLAPlanning

Richard Bobletz, PE Engineering

Ray Emmett, PhDEnvironmental Science

Dwayne Darbonne, PEQuality Manager

Nader Moghadas, EIConcepts Engineer

Nathan Kreuser, EIProject Engineer

Kevin HamiltonGIS / Designer

Project Manager

Fraser Howe, Jr, PEPD&E Studies

Page 11: Fdot d1

Dwayne Darbonne, PEPrincipal – Sr. Transportation Engineer

• BS Civil Engineering, LA Tech University• FES Leadership Institute Graduate• Jacobs Sr. Project Manager Training• D1 Transp. Engineering Contracts– Districtwide Design – I-4 / US 27 Interchange Reconstruction– I-75 Peace River Crossing– SR 84 Widening

Page 12: Fdot d1

Dwayne Darbonne, PEPrincipal – Sr. Transportation Engineer

PD&E Projects• Alton Road Flyover• NW 12th Ave Bridge• NW 21st / NW 32 Ave Bridge

Controlled Access Projects• Eller Drive ICTF• I-75 Peace River Crossing• I-4 / US 27 Interchange• SR 826 (Palmetto Expwy.)• I-595 Construction Management• I-49 Urban Segment• Greater NO Bridge No. 2• Westbank Expressway• I-10 / LA 3188 Interchange

Alternative Transportation Facilities• I-4 Pedestrian Bridge Gateway at Lake Ivanhoe• South Lake Trail• Ormond Beach Sidewalks

Page 13: Fdot d1

Fraser Howe, Jr., PE, F. ASCESr. Transportation / PD&E Engineer

• BS Civil Engineering, Michigan State University• Fellow American Society of Civil Engineers• Chairman for Florida’s Infrastructure Report Card• 30 years of experience in:– PD&E Studies– Arterial Investment Studies– Public Involvement– Preliminary Engineering Studies

Page 14: Fdot d1

Fraser Howe, Jr., PE, F. ASCESr. Transportation / PD&E Engineer

Project Development and Environmental Studies• US 1 Arterial Investment Study (District 5)• US 98 (District 3)• Polk County Parkway (Turnpike Enterprise)• Northern Extension of Turnpike (Turnpike Enterprise)• Central Connector Expressway (OOCEA)

Public Involvement Projects• SR 40 PD&E Study (District 5)• I-4 Pedestrian Bridge – Gateway at Lake Ivanhoe (District 5)• SR 70 PD&E Study (District 1)

Preliminary Engineering Studies• Oak Street (City of Kissimmee)• Martin Luther King, Jr. Blvd. (City of Kissimmee)• Wallace Road (Orange County)• Cherry Lake Road (Lake County)• Kurt Street (Lake County)• Old US 441 (City of Mount Dora)• CR 579 (Mango Road) Improvements (Hillsbourgh County)

Page 15: Fdot d1

George Botner, AICP, RLASr. Planner / Landscape Architect

• MA Landscape Architecture, Cornell University• BA Landscape Architecture, University of Florida• 20 National and State Awards– Downtown Redevelopment– Street Network Planning– Land Use Plans– Streetscapes / /Gateways– Park Planning– Walkability Master Plans

Page 16: Fdot d1

Planning Services

• PD&E Studies• Public Involvement• Toll Facility Planning • Land Planning• Park Planning• Streetscapes / Gateways• Downtown Redevelopment

Page 17: Fdot d1

Richard Bobletz, PESr. Roadway / Stormwater Engineer

• BS Civil Engineering, University of Florida• Jacobs Project Manager Training• Roadway Experience– Pavement Design– Roadway Design– Drainage Design– Traffic Control Design– Utility Design / Coordination– Stormwater Permitting– Roadway Plan Development

Page 18: Fdot d1

Richard Bobletz, PESr. Roadway / Stormwater Engineer

• Roadway – Minor Projects

• D5 Drainage Districtwide • Stimulus Brevard / Osceola

– Major Projects• I-4 Braided Ramps• SR 25 / US 27 Widening• North Hancock Road

– Stormwater Projects• I-75 PD&E Study• Little Lake Howell Basin Study• Bridge Hydraulics

Page 19: Fdot d1

Engineering Services

• Minor Roadway • Complex Roadway • Controlled Access • Trails / Sidewalks• Drainage Design• Stormwater Permitting• Utility Coordination• Signing and Pavement Markings

Page 20: Fdot d1

Raymond Emmett, Ph.D.Sr. Environmental Scientist

• BA, MA and PhD Botany, University of Texas• NEPA, Section 4 (f), Ecological Surveys, Permitting• Texas Experience– Categorical Exclusions to Environmental Impact Statements

• Florida Experience– New Regional Airport– Districtwide Environmental Services– SR 40 ( Ocala to Barberville )– I-95 ( SR 50 to I-4 )– I-4 ( Kennedy to Ivanhoe )

Page 21: Fdot d1

Environmental Services

• Social– Community– Historical Screening

• Physical– Noise Assessments– Phase I Contamination

• Natural – Wetland Surveys

• Environmental Permitting• Public Involvement• GIS Services

Page 22: Fdot d1

• Firm / Professional Staff–Strong Pre-Qualifications–Services Under One Roof–FDOT Experienced Staff–Cost Efficient Business Model