STS-130/20A FD 05 Execute Package MSG Page(s) Title 046A 1 - 14 FD05 Flight Plan Revision 047B 15 - 16 FD05 Mission Summary 048 --- Daily Summary (Electronic Only) 049 17 - 22 FD05 Transfer Message 050 23 FD05 Crew Choice Downlink 051 24 - 32 Stowage Locations for FD 05 (GMT 043) 052 33 IFM Tool Locker (MA16D) List 053A 34 - 40 CBCS Installation/Removal-Prep For 20A 054 --- IMMT Results - 2/11/10 (Electronic Only) Approved by FAO: L. Knowlton Last Updated: Feb 11 2010 8:41 PM GMT JEDI (Joint Execute package Development and Integration), v3.0

Transcript of FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision:...

Page 1: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

STS-130/20A FD 05 Execute Package MSG Page(s) Title

046A 1 - 14 FD05 Flight Plan Revision

047B 15 - 16 FD05 Mission Summary

048 --- Daily Summary (Electronic Only)

049 17 - 22 FD05 Transfer Message

050 23 FD05 Crew Choice Downlink

051 24 - 32 Stowage Locations for FD 05 (GMT 043)

052 33 IFM Tool Locker (MA16D) List

053A 34 - 40 CBCS Installation/Removal-Prep For 20A

054 --- IMMT Results - 2/11/10 (Electronic Only) Approved by FAO: L. Knowlton Last Updated: Feb 11 2010 8:41 PM GMT JEDI (Joint Execute package Development and Integration), v3.0

 

Page 2: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

MSG 046A (22-0673A) - FD05 FLIGHT PLAN REVISION

1 MSG INDEX 2

3 MSG NO. TITLE 4

5 6 7 8 9

10 11 12 13 14 15

MSG-046 FD05 Flight Plan Revision MSG-047 FD05 Mission Summary MSG-048 Daily Summary MSG-049 FD05 Transfer Message MSG-050 FD05 Crew Choice Downlink MSG-051 Stowage Locations for FD 05 (GMT 043) MSG-052 IFM Tool Locker (MA16D) List MSG-053 CBCS Installation/Removal-Prep For 20A MSG-054 IMMT Results - 2/11/10 1. Post-Sleep Cryo Config 16

17

18

19 20

21 22 23

24 25

26 27

For today's Post-Sleep cryo config, O2 tanks 1, 3 & 4 will be active and H2 Tanks 1 and 4 will be active. R1 O2,H2 MANF VLV TK1 (two) - OP (tb-OP) O2 TK3 HTRS A,B (two) - AUTO A11 CRYO TK4 HTRS O2 A,B (two) - AUTO A15 CRYO TK5 HTR O2 A - OFF

Pre-Sleep Cryo Config 28 29

30 31

32

33 34

35

36

37

38

39

40 41 42 43 44 45 46 47 48 49 50

√MCC for deltas prior to configuring for Pre-Sleep. For tonight's Pre-Sleep cryo config, Manifold 1 will be closed with O2 tanks 1 and 5 and H2 Tanks 1 and 4 active. A15 CRYO TK5 HTR O2 A - AUTO A11 CRYO TK4 HTRS O2 A,B (two) - OFF R1 O2 TK3 HTRS A,B (two) - OFF O2,H2 MANF VLV TK1 (two) - CL (tb-CL)

END OF PAGE 1 OF 14, MSG 046A (22-0673A) 1

Page 3: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

MSG 046A (22-0673A) - FD05 FLIGHT PLAN REVISION

END OF PAGE 2 OF 14, MSG 046A (22-0673A)

1 2. OIU Troubleshooting using PCS 2

In order to break down the AFD PCS and set it back up again, the following procedures should be performed. Please notify MCC-H prior to performing this activity:

3 4 5 6 7

8

9

10 11 12 13 14 15 16 17 18

1. US_SODF; JOINT OPERATIONS: 6.COMM/DATA; 2.303 PCS Deactivation;

Steps 1-3, 5 (Disconnecting the Power Cables between the PDIP panel and the laptop is NOT required)

2. Disconnect the 1553 PC Card from the Adapter Cable. Inspect for FOD, and reconnect the 1553 PC Card to the Adapter cable.

3. Inspect connections for FOD or bent pins. 4. US_SODF; JOINT OPERATIONS: 6.COMM/DATA; 6.107 PCS Setup-Shuttle; All 5. If a PCS connection to the MDM is not established, please notify MCC-H and

check for further actions.

Pending the results of this troubleshooting, further troubleshooting may be requested by MCC and will be scheduled accordingly.

3. Defer Post-Sleep LiOH Changeout 19

PPCO2 continues to track predicts. Therefore, as discussed preflight, a LiOH can changeout is not required this morning. MCC will continue to monitor PPCO2 levels to determine if a changeout is required during the day.

20 21 22 23

4. IFM Tool Locker 24 Please reference MSG 052 for a list of pre-approved tools, available for use on ISS, as needed for assembly procedures. Tools must be returned to Endeavour prior to sleep each day.

25 26 27 28

5. Outlook Mail Cleanup 29 The problems with the MUX prevent us from performing the OCA 48 Mbps reconfig. Post-undocking we will be using the 2 Mbps link to bring down your crew images, email (OSTs, PSTs), and IDC images from late inspection. To help us get all the items down prior to KU Stow, please keep your OSTs small by deleting your sent mail, inbox items and any unnecessary contacts. Also, keep those image cards coming by inserting them into a machine whenever possible and notifying MCC.

30 31 32 33 34 35 36

38 39 40 41 42 43 44 45 46 47 48 49 50 51

6. REPLACE PAGES 2-14 THROUGH 2-17 and 3-44 THROUGH 3-51. 37

2

Page 4: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

FLT PLN/130/FLT

FD05

ZAMK

A

VIRT

S

HIRE

PATR

ICK

ROBI

NSON

10.2

DPRS

14.7

RPRS

EVA 1 (6:30)

NO EXERCISE

[FROM PRE-INSTL UNTIL A-BOLTS COMPLETE]

BEHN

KEN

EV1

EV2

NO UNISOLATED EXERCISE

[DURING OTP REMOVAL]

NO ARED/T2

[WHEN SSRMS IN MOTION W/HEAVY P/L]

REPLANNED

2-14

S T S - 1 3 0 S T S ISS

22

2302/12

0102

0304

0506

0708

09GMT 02/

11/10 (042)

12

1314

1516

1718

1920

2122

23004/00

MET

Day 003

CDR

POST

SLE

EP

HYG

BRK/

HATC

HCL

S

EVA-PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

P - R P S

C _ L K

R P R S

P O S T

E V A

W / H 2 0

P/TV07 EVA OPS

MEAL

PMC

A/G

P/TV

07 EVA OPS

P R L A @

L O G

C W C - I

F I L L # 6

C W C - I

F I L L # 7

C W C - I

F I L L # 8

P/TV07

EVA OPS

PLT

POST

SLE

EP

L I M P

B R A K E

P / T V 0 7

E V A S / U

NODE 3

MNVR

PREINSTL

H A T C H

MEAL

I N H B T

P A DNODE

3 GRPL

H2O

CWC

SETUP

I M UXFER OPS

L O GARED

D A P *

NODE 3

MNVR TO RTL

CWC-I

XFER (3)

MS1

POST

SLE

EP

C B C S *

1ST

STG

CAP

L I M P

2ND

STG

CAP

V E R F Y

B R A K E

NODE 3

MNVR

PREINSTL

N3 VEST

LK CK

PT1

EXERCISE

C B C S ^

C B C S #

NODE

3 GRPL

X F E R

U P D A T E

NODE

3 LK CK S/U

N O D E 3

V E S T

A C C E S S

NODE 3

MNVR TO RTL

XFER OPS

XFER OPS

MEAL

MS2

POST

SLE

EPIVA SUPPORT

P _ D P S

P - R P S

EXERCISE

XFER OPS

XFER

OPS

EVA

TOOL

CHECK

M D D K C K

PCS

T/S

MS3

POST

SLEE

PHY

GIEN

E BR

EAK

EVA-PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

NODE 3 PREP

UNBERTH

CLNUP

&INGRS

C _ L K

R P R S

P - R P S

P O S T

E V A

W / H 2 0

NH3 BAG

OPS

OTP REMOVAL

LTA CABLE

INSTL

EVA

EGRS/

SETUP

GET

AHEAD

MS4

POST

SLEE

PHY

GIEN

E BR

EAK

EVA-PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

NODE 3

PREP

UNBERTH

CLNUP

&INGRS

P - R P S

C _ L K

R P R S

P O S T

E V A

W / H 2 0

NH3 BAG OPS

OTP REMOVAL

AVIONICS CABLE

INSTL

EVA

EGRS/

SETUP

G E T

A H E A D

DAY/NIGHT

ORBIT

5657

5859

6061

6263

64

TDRS

W E ZBIAS -XLV -ZVV

ORB ATT

TDRS

AVAIL

@OPEN

*EDIT

*POWER UP

^POWERDOWN

#TEMP STOW

NOTES

2-14

FD05

ZAMK

A

VIRT

S

HIRE

PATR

ICK

ROBI

NSON

10.2

DPRS

14.7

RPRS

EVA 1 (6:30)

NO EXERCISE

[FROM PRE-INSTL UNTIL A-BOLTS COMPLETE]

BEHN

KEN

EV1

EV2

NO UNISOLATED EXERCISE

[DURING OTP REMOVAL]

NO ARED/T2

[WHEN SSRMS IN MOTION W/HEAVY P/L]

REPLANNED

S T S - 1 3 0 S T S ISS

22

2302/12

0102

0304

0506

0708

09GMT 02/

11/10 (042)

12

1314

1516

1718

1920

2122

23004/00

MET

Day 003

CDR

POST

SLE

EP

HYG

BRK/

HATC

HCL

S

EVA-PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

P - R P S

C _ L K

R P R S

P O S T

E V A

W / H 2 0

P/TV07 EVA OPS

MEAL

PMC

A/G

P/TV

07 EVA OPS

P R L A @

L O G

C W C - I

F I L L # 6

C W C - I

F I L L # 7

C W C - I

F I L L # 8

P/TV07

EVA OPS

PLT

POST

SLE

EP

L I M P

B R A K E

P / T V 0 7

E V A S / U

NODE 3

MNVR

PREINSTL

H A T C H

MEAL

I N H B T

P A DNODE

3 GRPL

H2O

CWC

SETUP

I M UXFER OPS

L O GARED

D A P *

NODE 3

MNVR TO RTL

CWC-I

XFER (3)

MS1

POST

SLE

EP

C B C S *

1ST

STG

CAP

L I M P

2ND

STG

CAP

V E R F Y

B R A K E

NODE 3

MNVR

PREINSTL

N3 VEST

LK CK

PT1

EXERCISE

C B C S ^

C B C S #

NODE

3 GRPL

X F E R

U P D A T E

NODE

3 LK CK S/U

N O D E 3

V E S T

A C C E S S

NODE 3

MNVR TO RTL

XFER OPS

XFER OPS

MEAL

MS2

POST

SLE

EPIVA SUPPORT

P _ D P S

P - R P S

EXERCISE

XFER OPS

XFER

OPS

EVA

TOOL

CHECK

M D D K C K

PCS

T/S

MS3

POST

SLEE

PHY

GIEN

E BR

EAK

EVA-PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

NODE 3 PREP

UNBERTH

CLNUP

&INGRS

C _ L K

R P R S

P - R P S

P O S T

E V A

W / H 2 0

NH3 BAG

OPS

OTP REMOVAL

LTA CABLE

INSTL

EVA

EGRS/

SETUP

GET

AHEAD

MS4

POST

SLEE

PHY

GIEN

E BR

EAK

EVA-PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

NODE 3

PREP

UNBERTH

CLNUP

&INGRS

P - R P S

C _ L K

R P R S

P O S T

E V A

W / H 2 0

NH3 BAG OPS

OTP REMOVAL

AVIONICS CABLE

INSTL

EVA

EGRS/

SETUP

G E T

A H E A D

DAY/NIGHT

ORBIT

5657

5859

6061

6263

64

TDRS

W E ZORB ATT

BIAS -XLV -ZVV

TDRS

AVAIL

NOTES

@OPEN

*EDIT

*POWER UP

^POWERDOWN

#TEMP STOW

3

Page 5: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

FLT PLN/130/FLT

FD05

WILL

IAMS

SURA

EV

KOTO

V

CREA

MER

NOGU

CHI

FD05

REPLANNED

NO UNISOLATED EXERCISE

[DURING OTP REMOVAL]

NO ARED/T2

[WHEN SSRMS IN MOTION W/HEAVY P/L]

NO EXERCISE

[FROM PRE-INSTL UNTIL A-BOLTS COMPLETE]

2-15

I S S E X P 2 2 STS

22

2302/12

0102

0304

0506

0708

09GMT 02/

11/10 (042)

12

1314

1516

1718

1920

2122

23004/00

MET

Day 003

TDRS

AVAIL

DAY/NIGHT

DAILY ORBIT

1415

12

34

56

711

114

1141

111

TLM FORMAT

-XVV +ZLV TEA

-XVV +ZLV TEA

ATTITUDE

ALL VHF

TDRS

W E ZBIAS -XLV -ZVV

ORB ATT

ISS

CDR

S L E E P

POST

SLEE

PHY

GIEN

E BR

EAK

EVA-PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

WRS RFTA

FILL

MEAL

V E R F Y

1ST

STG

CAP

2ND

STG

CAP

ARED

N3 VEST

LK CK

PT1

FE-1

М Б И - 1 2

М Б И - 1 2

POST

SLE

EPPW

Т Е Х - 3 8

TVIS

ФГБ-КОНСТР-TREATMENT

MEAL

СУБА-БРИ-КАБ-INSTL

ТЕХ-15

DLARED

FE-4

Э Л К Т

POST

SLE

EP⊕

♦VELO

TVIS

MEAL

СУБА-БРИ-КАБ-INSTL

С О Ж - M N T

FE-5

POST

SLE

EP

T E S TL A B

C U C U

ARED

PW∆

R F T A

A C C S S

R F T A

A C C S S

M V 1RFTA

CLS

RFTA

CLS

WRS RFTA

FILL

QD CNFG

MEAL

N S I N S ^

CSA-CP

MNT

♠XFER OPS

G L O V E

XFER

CEVIS

FE-6

S A L V A

S L E E P

POST

SLEE

PHY

GIEN

E BR

EAK

EVA-PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

ARED

φMEAL

CEVIS

P - R P S

C _ L K

R P R S

P O S T

E V A

W / H 2 0

♣UPA FILL

⊕ТЕ

Х-38

-XFER-INSTL

♦ТЕХ-38-REC

ТЕХ-38-STRT2-OFF

♥СУБА-ИУС-АСП-INSTALL

∆EHS-TEPC-RELOCATE

♠FOREST-CULTIVATE

φEMCS-HW-LOCATE

^MELFI

*PBA RELOCAT

ENOTES

2-15

FD05

WILL

IAMS

SURA

EV

KOTO

V

CREA

MER

NOGU

CHI

FD05

REPLANNED

NO UNISOLATED EXERCISE

[DURING OTP REMOVAL]

NO ARED/T2

[WHEN SSRMS IN MOTION W/HEAVY P/L]

NO EXERCISE

[FROM PRE-INSTL UNTIL A-BOLTS COMPLETE]

I S S E X P 2 2 STS

22

2302/12

0102

0304

0506

0708

09GMT 02/

11/10 (042)

12

1314

1516

1718

1920

2122

23004/00

MET

Day 003

TDRS

AVAIL

DAY/NIGHT

DAILY ORBIT

1415

12

34

56

7TLM FORMAT

111

141

141

111

ATTITUDE

-XVV +ZLV TEA

-XVV +ZLV TEA

ALL VHF

TDRS

W E ZORB ATT

BIAS -XLV -ZVV

ISS

CDR

S L E E P

POST

SLEE

PHY

GIEN

E BR

EAK

EVA-PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

WRS RFTA

FILL

MEAL

V E R F Y

1ST

STG

CAP

2ND

STG

CAP

ARED

N3 VEST

LK CK

PT1

FE-1

М Б И - 1 2

М Б И - 1 2

POST

SLE

EPPW

Т Е Х - 3 8

TVIS

ФГБ-КОНСТР-TREATMENT

MEAL

СУБА-БРИ-КАБ-INSTL

ТЕХ-15

DLARED

FE-4

Э Л К Т

POST

SLE

EP⊕

♦VELO

TVIS

MEAL

СУБА-БРИ-КАБ-INSTL

С О Ж - M N T

FE-5

POST

SLE

EP

T E S TL A B

C U C U

ARED

PW∆

R F T A

A C C S S

R F T A

A C C S S

M V 1RFTA

CLS

RFTA

CLS

WRS RFTA

FILL

QD CNFG

MEAL

N S I N S ^

CSA-CP

MNT

♠XFER OPS

G L O V E

XFER

CEVIS

FE-6

S A L V A

S L E E P

POST

SLEE

PHY

GIEN

E BR

EAK

EVA-PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

ARED

φMEAL

CEVIS

P - R P S

C _ L K

R P R S

P O S T

E V A

W / H 2 0

NOTES

♣UPA FILL

⊕ТЕ

Х-38

-XFER-INSTL

♦ТЕХ-38-REC

ТЕХ-38-STRT2-OFF

♥СУБА-ИУС-АСП-INSTALL

∆EHS-TEPC-RELOCATE

♠FOREST-CULTIVATE

φEMCS-HW-LOCATE

^MELFI

*PBA RELOCAT

E

4

Page 6: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

FLT PLN/130/FLT

FD05

ZAMK

A

VIRT

S

HIRE

PATR

ICK

ROBI

NSON

BEHN

KEN

FD05

EV2

EV1

REPLANNED

2-16

S T S - 1 3 0 S T S ISS

10

1112

1314

1516

1718

1920

21GMT 02/

12/10 (043)

004/00

0102

0304

0506

0708

0910

1112

MET

Day 004

CDR

SLEEP

PRE SLEEP

POST

EVA

W/H2

0BS

AIN

ITPM

CA/

G

F D C O N F

PS

PLT

SLEEP

PRE

SLEEP

FLTR

CLN

- IN

SPEC

T

MS1

SLEEP

PRE SLEEP

N3 LK CK PT2

X F E R

T A G U P

X F E R

B R I E F

MS2

SLEEP

PRE

SLEEP

XFER

OPS

M D D K C K

MS3

SLEEP

PRE

SLEEP

POST

EVA

W/H2

0

MS4

SLEEP

PRE

SLEEP

POST

EVA

W/H2

0

DAY/NIGHT

ORBIT

6465

6667

6869

7071

72

TDRS

W E ZBIAS -XLV -ZVV

ORB ATT

TDRS

AVAIL

NOTES

2-16

FD05

ZAMK

A

VIRT

S

HIRE

PATR

ICK

ROBI

NSON

BEHN

KEN

FD05

EV2

EV1

REPLANNED

S T S - 1 3 0 S T S ISS

10

1112

1314

1516

1718

1920

21GMT 02/

12/10 (043)

004/00

0102

0304

0506

0708

0910

1112

MET

Day 004

CDR

SLEEP

PRE SLEEP

POST

EVA

W/H2

0BS

AIN

ITPM

CA/

G

F D C O N F

PS

PLT

SLEEP

PRE

SLEEP

FLTR

CLN

- IN

SPEC

T

MS1

SLEEP

PRE SLEEP

N3 LK CK PT2

X F E R

T A G U P

X F E R

B R I E F

MS2

SLEEP

PRE

SLEEP

XFER

OPS

M D D K C K

MS3

SLEEP

PRE

SLEEP

POST

EVA

W/H2

0

MS4

SLEEP

PRE

SLEEP

POST

EVA

W/H2

0

DAY/NIGHT

ORBIT

6465

6667

6869

7071

72

TDRS

W E ZORB ATT

BIAS -XLV -ZVV

TDRS

AVAIL

NOTES

5

Page 7: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

FLT PLN/130/FLT

FD05

WILL

IAMS

SURA

EV

KOTO

V

CREA

MER

NOGU

CHI

FD05

REPLANNED

2-17

I S S E X P 2 2 STS

10

1112

1314

1516

1718

1920

21GMT 02/

12/10 (043)

004/00

0102

0304

0506

0708

0910

1112

MET

Day 004

TDRS

AVAIL

DAY/NIGHT

DAILY ORBIT

78

910

1112

1314

1511

112

2122

112

TLM FORMAT

-XVV +ZLV TEA

ATTITUDE

ALL VHF

TDRS

W E ZBIAS -XLV -ZVV

ORB ATT

ISS

CDR

N3 LK CK PT2

CEVI

SPR

E SLEEP-ISS

SLEEP

FE-1

ARED

♣PW

PRE

SLEEP-ISS

SLEEP

FE-4

С О Ж - M N T

Э Л К Т

PWPR

E SL

EEP-ISS

SLEEP

FE-5

C E V I S

⊕E V A *

PWPR

E SL

EEP-ISS

SLEEP

FE-6

POST

EVA

W/H2

0PW

PRE

SLEEP-ISS

SLEEP

♣ТЕХ

-15-

DAKO

N-CK

⊕EH

S-CS

A-O2

-LBL

-INS

T*D

/LNOTES

2-17

FD05

WILL

IAMS

SURA

EV

KOTO

V

CREA

MER

NOGU

CHI

FD05

REPLANNED

I S S E X P 2 2 STS

10

1112

1314

1516

1718

1920

21GMT 02/

12/10 (043)

004/00

0102

0304

0506

0708

0910

1112

MET

Day 004

TDRS

AVAIL

DAY/NIGHT

DAILY ORBIT

78

910

1112

1314

15TLM FORMAT

111

122

122

112

ATTITUDE

-XVV +ZLV TEA

ALL VHF

TDRS

W E ZORB ATT

BIAS -XLV -ZVV

ISS

CDR

N3 LK CK PT2

CEVI

SPR

E SLEEP-ISS

SLEEP

FE-1

ARED

♣PW

PRE

SLEEP-ISS

SLEEP

FE-4

С О Ж - M N T

Э Л К Т

PWPR

E SL

EEP-ISS

SLEEP

FE-5

C E V I S

⊕E V A *

PWPR

E SL

EEP-ISS

SLEEP

FE-6

POST

EVA

W/H2

0PW

PRE

SLEEP-ISS

SLEEP

NOTES

♣ТЕХ

-15-

DAKO

N-CK

⊕EH

S-CS

A-O2

-LBL

-INS

T*D

/L

6

Page 8: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

FLT PLN/130/FLT

ZAMK

AVI

RTS

HIRE

05

FD05 EZ ACTIVITIES:

√O

CAC

FILT

ER &

MDD

K DU

CT S

CREE

N

TEPC

(ST

ATUS

CHE

CK)

(

ORB

OPS,

CRE

W SY

S)

HARD

REB

OOT

ALL

PGSC

s EX

CEPT

:

STS

-6(W

LES)

,STS

-5(R

POP2

),&

O

CA R

OUTE

R. Return all Shuttle IFM tools

used on ISS, per

MSG

052,

to

E

ndea

vour

pri

or to sleep.

REPLANNED

3-44

STS-

130

FD

22:00

23:00

00:00

01:00

GMT

Date

02/11

(042)

12:00

13:00

14:00

15:00

16:00

MET

Day 00

3W

EZ

T D R S

~~ ~~

D / N

O R B 5 6 5 7 5 8 5 9

~ ~B I A S - X L V - Z V VS T S A T T

CDR

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS)

EVA

SYST

EMS:

1.2

11 H

YGIE

NE BREAK

EVA

SYST

EMS:

1.2

16 E

VA P

REP

EVA

SYST

EMS:

1.2

20 E

MU P

URGE

EVA

SYST

EMS:

1.2

25 E

MU P

REBREATHE

~

PRIV

ATE

MEDI

CAL

CONF

ERENCE

L9

PAYL

OAD

STAT

ION

A/G

(two) - OFF

Per

form

via

A/G

2

SLEE

P LO

GBOO

K (O

RB O

PS,

SDBI)

PLT

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

P/TV07 EVA (PHOTO/TV, SCENES)

Perform SETUP

EVA 1 INHIBIT PAD

(EVA, TIMELINES)

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

SLEEP LOGBOOK (ORB OPS, SDBI)

MED OPS: 2.1.175 ARED - EXERCISE

Login as ARED Guest and refer to MSG 030

how to deviate using the ARED Display.

Verify X-Rotation Dashpot Inspection

Complete.

~

MS1

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS) EXERCISE

~

TRANSFER UPDATE

Ref. Transfer List & MSG 049

Notes

3-44

ZAMK

AVI

RTS

HIRE

05

FD05 EZ ACTIVITIES:

√O

CAC

FILT

ER &

MDD

K DU

CT S

CREE

N

TEPC

(ST

ATUS

CHE

CK)

(

ORB

OPS,

CRE

W SY

S)

HARD

REB

OOT

ALL

PGSC

s EX

CEPT

:

STS

-6(W

LES)

,STS

-5(R

POP2

),&

O

CA R

OUTE

R. Return all Shuttle IFM tools

used on ISS, per

MSG

052,

to

E

ndea

vour

pri

or to sleep.

REPLANNED

STS-

130

FD

22:00

23:00

00:00

01:00

GMT

Date

02/11

(042)

12:00

13:00

14:00

15:00

16:00

MET

Day 00

3W

EZ

T D R SD / N

O R B 5 6 5 7 5 8 5 9

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS)

EVA

SYST

EMS:

1.2

11 H

YGIE

NE BREAK

EVA

SYST

EMS:

1.2

16 E

VA P

REP

EVA

SYST

EMS:

1.2

20 E

MU P

URGE

~

EVA

SYST

EMS:

1.2

25 E

MU P

REBREATHE

PRIV

ATE

MEDI

CAL

CONF

ERENCE

L9

PAYL

OAD

STAT

ION

A/G

(two) - OFF

Per

form

via

A/G

2

SLEE

P LO

GBOO

K (O

RB O

PS,

SDBI)

PLT

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

P/TV07 EVA (PHOTO/TV, SCENES)

Perform SETUP

EVA 1 INHIBIT PAD

(EVA, TIMELINES)

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

SLEEP LOGBOOK (ORB OPS, SDBI)

~

MED OPS: 2.1.175 ARED - EXERCISE

Login as ARED Guest and refer to MSG 030

how to deviate using the ARED Display.

Verify X-Rotation Dashpot Inspection

Complete.

MS1

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

TRANSFER UPDATE

Ref. Transfer List & MSG 049

Notes

7

Page 9: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

FLT PLN/130/FLT

ROBI

NSON

PATR

ICK

BEHN

KEN

05 REPLANNED

3-45

STS-

130

FD

22:00

23:00

00:00

01:00

GMT

Date

02/11

(042)

12:00

13:00

14:00

15:00

16:00

MET

Day 00

3W

EZ

T D R S

~~ ~~

D / N

O R B 5 6 5 7 5 8 5 9

~ ~B I A S - X L V - Z V VS T S A T T

MS2

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS) EXER

CISE

EVA

TOOL

CHE

CK R

ef.

EVA

1 TO

OL C

ONFI

G (E

VA, TIMELINES)

GLAC

IER

STAT

US C

HECK (

ASSY OPS,CC)

AFT

FD P

CS T

ROUB

LESH

OOT Re

f MSG 046,Item 2

~

MS3

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA SYSTEMS: 1.211 HYGIENE BREAK

EVA SYSTEMS: 1.216 EVA PREP

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 1.225 EMU PREBREATHE

~

MS4

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA SYSTEMS: 1.211 HYGIENE BREAK

EVA SYSTEMS: 1.216 EVA PREP

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 1.225 EMU PREBREATHE

~

Notes

3-45

ROBI

NSON

PATR

ICK

BEHN

KEN

05 REPLANNED

STS-

130

FD

22:00

23:00

00:00

01:00

GMT

Date

02/11

(042)

12:00

13:00

14:00

15:00

16:00

MET

Day 00

3W

EZ

T D R SD / N

O R B 5 6 5 7 5 8 5 9

S T S A T T ~ ~B I A S - X L V - Z V V

MS2

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS) EXER

CISE

EVA

TOOL

CHE

CK R

ef.

EVA

1 TO

OL C

ONFI

G (E

VA, TIMELINES)

GLAC

IER

STAT

US C

HECK (

ASSY OPS,CC)

~

AFT

FD P

CS T

ROUB

LESH

OOT Re

f MSG 046,Item 2

MS3

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA SYSTEMS: 1.211 HYGIENE BREAK

EVA SYSTEMS: 1.216 EVA PREP

EVA SYSTEMS: 1.220 EMU PURGE

~

EVA SYSTEMS: 1.225 EMU PREBREATHE

MS4

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA SYSTEMS: 1.211 HYGIENE BREAK

EVA SYSTEMS: 1.216 EVA PREP

EVA SYSTEMS: 1.220 EMU PURGE

~

EVA SYSTEMS: 1.225 EMU PREBREATHE

Notes

8

Page 10: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

FLT PLN/130/FLT

ZAMK

AVI

RTS

HIRE

05

P/TV

07 E

VA (

PHOT

O/TV

, SC

ENES)

Per

form

OPS

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3

(ASSY OPS, ACT&C/O)

Step 1.1

MED OPS: 2.1.175 ARED - EXERCISE

Ref. pg 3-44

~

NO UNISOLATED

EXERCISE

DURING OTP

REMOVAL

NO ARED/T2

WHEN SSRMS IN

MOTION W/HEAVY

PAYLOAD

REPLANNED

~3-46

STS-

130

FD

02:00

03:00

04:00

05:00

GMT

Date

02/12

(043)

16:00

17:00

18:00

19:00

20:00

MET

Day 00

3W

EZ

T D R S

~

~~

D / N

O R B 5 9 6 0 6 1

~ ~B I A S - X L V - Z V VS T S A T T

CDR

EVA

SYST

EMS:

1.2

25 E

MU P

REBREATHE

~

EVA

SYST

EMS:

CRE

WLOC

K DE

PRESS/REPRESS (CC)

EVA

SYST

EMS:

CRE

WLOC

K PO

ST DEPRESS (CC)

P/TV

07 E

VA (

PHOT

O/TV

, SC

ENES)

Per

form

OPS

~

ROBO

: 1.

220

SSRM

S NO

DE 3

UNBERTH TO INSTL

Ste

ps 4

-7 E

XERC

ISE

CONS

TRAINTS

PLT

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL

Steps 1-13

EXERCISE CONSTRAINTS ~

ROBO: 1.210 SSRMS BERTHED NODE 3 GRAPPLE

TRANSFER OPS

Ref. Transfer List & MSG 049

~

MS1

CBCS INSTL/RMVL-PREP FOR 20A (PWRUP)

Ref. MSG 053, Verify cables connected per

Figure 1,then steps 9,10.3-10.5

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL

Steps 1-13

EXERCISE CONSTRAINTS ~

EXERCISE

~

ROBO: 1.210 SSRMS BERTHED NODE 3 GRAPPLE

1.117 NODE 1/NODE 3 VEST PRESS & LEAK CK

(ASSY OPS, ACT&C/O)

Steps 1-4

TRANSFER OPS

Ref. Transfer List & MSG 049

Notes

3-46

ZAMK

AVI

RTS

HIRE

05

P/TV

07 E

VA (

PHOT

O/TV

, SC

ENES)

Per

form

OPS

1.104 VESTIBULE OUTFITTING NOD1 TO NOD3

(ASSY OPS, ACT&C/O)

Step 1.1

MED OPS: 2.1.175 ARED - EXERCISE

Ref. pg 3-44

~

NO UNISOLATED

EXERCISE

DURING OTP

REMOVAL

NO ARED/T2

WHEN SSRMS IN

MOTION W/HEAVY

PAYLOAD

REPLANNED

~

STS-

130

FD

02:00

03:00

04:00

05:00

GMT

Date

02/12

(043)

16:00

17:00

18:00

19:00

20:00

MET

Day 00

3W

EZ

T D R SD / N

O R B 5 9 6 0 6 1

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

~EV

A SY

STEM

S: 1

.225

EMU

PREBREATHE

EVA

SYST

EMS:

CRE

WLOC

K DE

PRESS/REPRESS (CC)

EVA

SYST

EMS:

CRE

WLOC

K PO

ST DEPRESS (CC)

P/TV

07 E

VA (

PHOT

O/TV

, SC

ENES)

Per

form

OPS

~

ROBO

: 1.

220

SSRM

S NO

DE 3

UNBERTH TO INSTL

Ste

ps 4

-7 E

XERC

ISE

CONS

TRAINTS

PLT

~

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL

Steps 1-13

EXERCISE CONSTRAINTS

ROBO: 1.210 SSRMS BERTHED NODE 3 GRAPPLE

TRANSFER OPS

Ref. Transfer List & MSG 049

~

MS1

CBCS INSTL/RMVL-PREP FOR 20A (PWRUP)

Ref. MSG 053, Verify cables connected per

Figure 1,then steps 9,10.3-10.5

~

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL

Steps 1-13

EXERCISE CONSTRAINTS~

EXERCISE

ROBO: 1.210 SSRMS BERTHED NODE 3 GRAPPLE

1.117 NODE 1/NODE 3 VEST PRESS & LEAK CK

(ASSY OPS, ACT&C/O)

Steps 1-4

TRANSFER OPS

Ref. Transfer List & MSG 049

Notes

9

Page 11: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

FLT PLN/130/FLT

ROBI

NSON

PATR

ICK

BEHN

KEN

05 REPLANNED

~

NO UNISOLATED

EXERCISE

DURING OTP

REMOVAL

~NO ARED/T2

WHEN SSRMS IN

MOTION W/HEAVY

PAYLOAD

3-47

STS-

130

FD

02:00

03:00

04:00

05:00

GMT

Date

02/12

(043)

16:00

17:00

18:00

19:00

20:00

MET

Day 00

3W

EZ

T D R S

~

~~

D / N

O R B 5 9 6 0 6 1

~ ~B I A S - X L V - Z V VS T S A T T

MS2

IVA

SUPP

ORT

FOR EVA

~

EVA

SYST

EMS:

CRE

WLOC

K PO

ST DEPRESS (CC)

TRAN

SFER

OPS

Ref

. Tr

ansf

er L

ist

& MS

G 049

AFT

FD P

CS T

ROUB

LESH

OOT Re

f MSG 046,Item 2

~

MS3

EVA SYSTEMS: 1.225 EMU PREBREATHE

~

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

NODE 3 PREP UNBERTH

NH3 BAG OPS

OTP REMOVAL

~

EVA 1 SETUP

MS4

EVA SYSTEMS: 1.225 EMU PREBREATHE

~

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

NODE 3 PREP UNBERTH

NH3 BAG OPS

OTP REMOVAL

~

EVA 1 SETUP

Notes

3-47

ROBI

NSON

PATR

ICK

BEHN

KEN

05 REPLANNED

~

NO UNISOLATED

EXERCISE

DURING OTP

REMOVAL

~NO ARED/T2

WHEN SSRMS IN

MOTION W/HEAVY

PAYLOAD

STS-

130

FD

02:00

03:00

04:00

05:00

GMT

Date

02/12

(043)

16:00

17:00

18:00

19:00

20:00

MET

Day 00

3W

EZ

T D R SD / N

O R B 5 9 6 0 6 1

S T S A T T ~ ~B I A S - X L V - Z V V

MS2

~

IVA

SUPP

ORT

FOR EVA

EVA

SYST

EMS:

CRE

WLOC

K PO

ST DEPRESS (CC)

TRAN

SFER

OPS

Ref

. Tr

ansf

er L

ist

& MS

G 049

~AF

T FD

PCS

TRO

UBLE

SHOO

T Re

f MSG 046,Item 2

MS3

~EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

NODE 3 PREP UNBERTH

NH3 BAG OPS

~

OTP REMOVAL

EVA 1 SETUP

MS4

~EV

A SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

NODE 3 PREP UNBERTH

NH3 BAG OPS

~

OTP REMOVAL

EVA 1 SETUP

Notes

10

Page 12: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

FLT PLN/130/FLT

ZAMK

AVI

RTS

HIRE

05

NO EXERCISE

FROM PRE-INSTL

UNTIL A-BOLTS

COMPLETE

~ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL

Steps 1-13, EXERCISE CONSTRAINTS

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL

Steps 1-13, EXERCISE CONSTRAINTS

CWC-I TRANSFER

Transfer 3 CWC-Is to ISS

NO UNISOLATED

EXERCISE

DURING OTP

REMOVAL

REPLANNED

N1P HATCH LATCH A

A 1. Verify Node 1 Port Ratchet

in LATCH position.

2. Engage Crank Handle.

3. Turn Crank Handle in LATCH

direction until fully latched.

4. Stow Crank Handle.

MEAL

NO ARED/T2

WHEN SSRMS IN

MOTION W/HEAVY

PAYLOAD

S&M: 1.506 NODE 1 CBM CAPTURE/ABOLT

Steps 5-end

EXERCISE CONSTRAINTS

TRANSFER OPS

Ref. Transfer List & MSG 049

3-48

STS-

130

FD

06:00

07:00

08:00

09:00

GMT

Date

02/12

(043)

20:00

21:00

22:00

23:00

00:00

MET

Day 00

3W

EZ

T D R S

~

~~

D / N

O R B 6 1 6 2 6 3 6 4

~ ~B I A S - X L V - Z V VS T S A T T

CDR

EVA

SYST

EMS:

PRE

REP

RESS (

CC)

EVA

SYST

EMS:

CRE

WLOC

K DE

PRESS/REPRESS (CC)

EVA

SYST

EMS:

1.2

40 P

OST

EVA

Per

form

Wat

er R

echa

rge,

No Metox Regen

Ref

. ST

S-13

0 Co

nsum

able

s Tracking CC(EVA)

Ref

. ST

S-13

0 Ba

tter

y Re

charge Plan (EVA)

~

MEAL

P/TV

07 E

VA (

PHOT

O/TV

, SC

ENES)

Per

form

OPS

~

CWC-

I FI

LL (

ORB

OPS,

CWC

OPS)

Fil

l #6

Ref

. MS

G 02

7

CWC-

I FI

LL (

ORB

OPS,

CWC

OPS)

Fil

l #7

R

ef.

MSG

027

CWC-

I FI

LL (

ORB

OPS,

CWC

OPS)

Fil

l #8

Ref

. MS

G 02

7

P/TV

07 E

VA (

PHOT

O/TV

, SC

ENES)

Per

form

OPS

PLT

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL

Step 15 EXERCISE CONSTRAINTS

ROBO:1.220 SSRMS N3 UNBRTH TO INSTLStep 16

~

MEAL

CWC FILL (ORB OPS, CWC OPS)

Perform EQUIP PREP

and

WATER TRANSFER HOSE PURGE

After NODE 3 INSTALL:

√A/FREE/VERN

Permanent DAP Edit: A11,A12,B12,B13:CA=7

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL

Step 14

EXERCISE CONSTRAINTS

MS1

S&M: 1.506 NODE 1 CBM CAPTURE/ABOLT

Steps 1-4

EXERCISE CONSTRAINTS

RO

BO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL

Step 15 EXERCISE CONSTRAINTS

S&M: 1.505 NODE 1 CBM VERIF PREMATE STATUS

ROBO:1.220 SSRMS N3 UNBRTH TO INSTLStep 16

~

On MCC GO:

Verify Node 1 Port Hatch Latched, then:

1.117 NODE 1/NODE 3 VEST PRESS & LEAK CK

(ASSY OPS, ACT&C/O) Steps 5-7.4

Leave ISA/VAJ setup connected to the

Node 1 Port MPEV.

CBCS INSTL/RMVL-PREP FOR 20A (PWRDN)

Ref. MSG 053, Step 11

CBCS INSTL/RMVL-PREP FOR 20A

(TEMP STOW)

Ref. MSG 053, Step 12, In step 12.3,

Node 1 Port Inner hatch window cover

is temp-stowed at Node 2 AFT hatch window.

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL

Step 14

EXERCISE CONSTRAINTS

Notes

3-48

ZAMK

AVI

RTS

HIRE

05

NO EXERCISE

FROM PRE-INSTL

UNTIL A-BOLTS

COMPLETE

~ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL

Steps 1-13, EXERCISE CONSTRAINTS

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL

Steps 1-13, EXERCISE CONSTRAINTS

CWC-I TRANSFER

Transfer 3 CWC-Is to ISS

NO UNISOLATED

EXERCISE

DURING OTP

REMOVAL

REPLANNED

N1P HATCH LATCH A

A 1. Verify Node 1 Port Ratchet

in LATCH position.

2. Engage Crank Handle.

3. Turn Crank Handle in LATCH

direction until fully latched.

4. Stow Crank Handle.

MEAL

NO ARED/T2

WHEN SSRMS IN

MOTION W/HEAVY

PAYLOAD

S&M: 1.506 NODE 1 CBM CAPTURE/ABOLT

Steps 5-end

EXERCISE CONSTRAINTS

TRANSFER OPS

Ref. Transfer List & MSG 049

STS-

130

FD

06:00

07:00

08:00

09:00

GMT

Date

02/12

(043)

20:00

21:00

22:00

23:00

00:00

MET

Day 00

3W

EZ

T D R SD / N

O R B 6 1 6 2 6 3 6 4

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

EVA

SYST

EMS:

PRE

REP

RESS (

CC)

EVA

SYST

EMS:

CRE

WLOC

K DE

PRESS/REPRESS (CC)

~

EVA

SYST

EMS:

1.2

40 P

OST

EVA

Per

form

Wat

er R

echa

rge,

No Metox Regen

Ref

. ST

S-13

0 Co

nsum

able

s Tracking CC(EVA)

Ref

. ST

S-13

0 Ba

tter

y Re

charge Plan (EVA)

MEAL~

P/TV

07 E

VA (

PHOT

O/TV

, SC

ENES)

Per

form

OPS

CWC-

I FI

LL (

ORB

OPS,

CWC

OPS)

Fil

l #6

Ref

. MS

G 02

7

CWC-

I FI

LL (

ORB

OPS,

CWC

OPS)

Fil

l #7

R

ef.

MSG

027

CWC-

I FI

LL (

ORB

OPS,

CWC

OPS)

Fil

l #8

Ref

. MS

G 02

7

P/TV

07 E

VA (

PHOT

O/TV

, SC

ENES)

Per

form

OPS

PLT

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL

Step 15 EXERCISE CONSTRAINTS

ROBO:1.220 SSRMS N3 UNBRTH TO INSTLStep 16

~

MEAL

CWC FILL (ORB OPS, CWC OPS)

Perform EQUIP PREP

and

WATER TRANSFER HOSE PURGE

After NODE 3 INSTALL:

√A/FREE/VERN

Permanent DAP Edit: A11,A12,B12,B13:CA=7

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL

Step 14

EXERCISE CONSTRAINTS

MS1

S&M: 1.506 NODE 1 CBM CAPTURE/ABOLT

Steps 1-4

EXERCISE CONSTRAINTS

RO

BO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL

Step 15 EXERCISE CONSTRAINTS

S&M: 1.505 NODE 1 CBM VERIF PREMATE STATUS

ROBO:1.220 SSRMS N3 UNBRTH TO INSTLStep 16

~

On MCC GO:

Verify Node 1 Port Hatch Latched, then:

1.117 NODE 1/NODE 3 VEST PRESS & LEAK CK

(ASSY OPS, ACT&C/O) Steps 5-7.4

Leave ISA/VAJ setup connected to the

Node 1 Port MPEV.

CBCS INSTL/RMVL-PREP FOR 20A (PWRDN)

Ref. MSG 053, Step 11

CBCS INSTL/RMVL-PREP FOR 20A

(TEMP STOW)

Ref. MSG 053, Step 12, In step 12.3,

Node 1 Port Inner hatch window cover

is temp-stowed at Node 2 AFT hatch window.

ROBO: 1.220 SSRMS NODE 3 UNBERTH TO INSTL

Step 14

EXERCISE CONSTRAINTS

Notes

11

Page 13: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

FLT PLN/130/FLT

ROBI

NSON

PATR

ICK

BEHN

KEN

05

NO EXERCISE

FROM PRE-INSTL

UNTIL A-BOLTS

COMPLETE

~

REPLANNED

NO ARED/T2

WHEN SSRMS IN

MOTION W/HEAVY

PAYLOAD

NO UNISOLATED

EXERCISE

DURING OTP

REMOVAL

3-49

STS-

130

FD

06:00

07:00

08:00

09:00

GMT

Date

02/12

(043)

20:00

21:00

22:00

23:00

00:00

MET

Day 00

3W

EZ

T D R S

~

~~

D / N

O R B 6 1 6 2 6 3 6 4

~ ~B I A S - X L V - Z V VS T S A T T

MS2

IVA

SUPP

ORT

FOR EVA

~

EVA

SYST

EMS:

PRE

REP

RESS (

CC)

TRAN

SFER

OPS

Ref

. Tr

ansf

er L

ist

& MS

G 049

~

MS3

EVA CLEANUP & INGRESS

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: PRE REPRESS (CC)

EVA SYSTEMS: 1.240 POST EVA

Perform Water Recharge, No Metox Regen

Ref. STS-130 Consumables Tracking CC(EVA)

Ref. STS-130 Battery Recharge Plan (EVA)

~

OTP REMOVAL

~

LTA CABLE INSTALL

GETAHEAD

MS4

EVA CLEANUP & INGRESS

EVA SYSTEMS: PRE REPRESS (CC)

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: 1.240 POST EVA

Perform Water Recharge, No Metox Regen

Ref. STS-130 Consumables Tracking CC(EVA)

Ref. STS-130 Battery Recharge Plan (EVA)

~

OTP REMOVAL

~

AVIONICS CABLE INSTALL

GETAHEAD

Notes

3-49

ROBI

NSON

PATR

ICK

BEHN

KEN

05

NO EXERCISE

FROM PRE-INSTL

UNTIL A-BOLTS

COMPLETE

~

REPLANNED

NO ARED/T2

WHEN SSRMS IN

MOTION W/HEAVY

PAYLOAD

NO UNISOLATED

EXERCISE

DURING OTP

REMOVAL

STS-

130

FD

06:00

07:00

08:00

09:00

GMT

Date

02/12

(043)

20:00

21:00

22:00

23:00

00:00

MET

Day 00

3W

EZ

T D R SD / N

O R B 6 1 6 2 6 3 6 4

S T S A T T ~ ~B I A S - X L V - Z V V

MS2

~

IVA

SUPP

ORT

FOR EVA

EVA

SYST

EMS:

PRE

REP

RESS (

CC)

~

TRAN

SFER

OPS

Ref

. Tr

ansf

er L

ist

& MS

G 049

MS3

EVA CLEANUP & INGRESS

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: PRE REPRESS (CC)

~

EVA SYSTEMS: 1.240 POST EVA

Perform Water Recharge, No Metox Regen

Ref. STS-130 Consumables Tracking CC(EVA)

Ref. STS-130 Battery Recharge Plan (EVA)

~

OTP REMOVAL

LTA CABLE INSTALL

GETAHEAD

MS4

EVA CLEANUP & INGRESS

EVA SYSTEMS: PRE REPRESS (CC)

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

~

EVA SYSTEMS: 1.240 POST EVA

Perform Water Recharge, No Metox Regen

Ref. STS-130 Consumables Tracking CC(EVA)

Ref. STS-130 Battery Recharge Plan (EVA)

~

OTP REMOVAL

AVIONICS CABLE INSTALL

GETAHEAD

Notes

12

Page 14: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

FLT PLN/130/FLT

ZAMK

AVI

RTS

HIRE

05

CREW WAKE AT 04/12:00

REPLANNED

3-50

STS-

130

FD

10:00

11:00

12:00

13:00

GMT

Date

02/12

(043)

00:00

01:00

02:00

03:00

04:00

MET

Day 00

4W

EZ

T D R S

~

~~ ~

D / N

O R B 6 4 6 5 6 6

~ ~B I A S - X L V - Z V VS T S A T T

CDR

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

EVA

SYST

EMS:

1.2

40 P

OST

EVA

Per

form

Wat

er R

echa

rge,

No Metox Regen

Ref

. ST

S-13

0 Co

nsum

able

s Tracking CC(EVA)

Ref

. ST

S-13

0 Ba

tter

y Re

charge Plan (EVA)

~

EVA

SYST

EMS:

1.6

05 B

SA B

ATTERY RECHARGE

INI

TIAT

E R

ef.

STS-

130

Cons

umab

les Tracking CC(EVA)

Ref

. ST

S-13

0 Ba

tter

y Re

charge Plan (EVA)

PRIV

ATE

MEDI

CAL

CONF

ERENCE

L9

PAYL

OAD

STAT

ION

A/G

(two) - OFF

Per

form

via

A/G

2

FLIG

HT D

IREC

TOR

CONFERENCE

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

PLT

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√ILLUMINATORS OFF - ALL

FILTER CLEANING

(IFM, SCHEDULED MAINTENANCE)

Inspect filters and clean as necessary

MS1

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

1.117 NODE 1/NODE 3 VEST PRESS & LEAK CK

(ASSY OPS, ACT&C/O) Steps 7.6-9.5

Leave ISA/VAJ setup connected to the

Node 1 Port MPEV.

TRANSFER TAGUP

Coordinate with transfer counterpart

TRANSFER BRIEF

Call down status to MCC

Notes

3-50

ZAMK

AVI

RTS

HIRE

05

CREW WAKE AT 04/12:00

REPLANNED

STS-

130

FD

10:00

11:00

12:00

13:00

GMT

Date

02/12

(043)

00:00

01:00

02:00

03:00

04:00

MET

Day 00

4W

EZ

T D R SD / N

O R B 6 4 6 5 6 6

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

~EV

A SY

STEM

S: 1

.240

POS

T EVA

Per

form

Wat

er R

echa

rge,

No Metox Regen

Ref

. ST

S-13

0 Co

nsum

able

s Tracking CC(EVA)

Ref

. ST

S-13

0 Ba

tter

y Re

charge Plan (EVA)

EVA

SYST

EMS:

1.6

05 B

SA B

ATTERY RECHARGE

INI

TIAT

E R

ef.

STS-

130

Cons

umab

les Tracking CC(EVA)

Ref

. ST

S-13

0 Ba

tter

y Re

charge Plan (EVA)

PRIV

ATE

MEDI

CAL

CONF

ERENCE

L9

PAYL

OAD

STAT

ION

A/G

(two) - OFF

Per

form

via

A/G

2

FLIG

HT D

IREC

TOR

CONFERENCE

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

PLT

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√ILLUMINATORS OFF - ALL

FILTER CLEANING

(IFM, SCHEDULED MAINTENANCE)

Inspect filters and clean as necessary

MS1

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

1.117 NODE 1/NODE 3 VEST PRESS & LEAK CK

(ASSY OPS, ACT&C/O) Steps 7.6-9.5

Leave ISA/VAJ setup connected to the

Node 1 Port MPEV.

TRANSFER TAGUP

Coordinate with transfer counterpart

TRANSFER BRIEF

Call down status to MCC

Notes

13

Page 15: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

FLT PLN/130/FLT

ROBI

NSON

PATR

ICK

BEHN

KEN

05

CREW WAKE AT 04/12:00

REPLANNED

3-51

STS-

130

FD

10:00

11:00

12:00

13:00

GMT

Date

02/12

(043)

00:00

01:00

02:00

03:00

04:00

MET

Day 00

4W

EZ

T D R S

~

~~ ~

D / N

O R B 6 4 6 5 6 6

~ ~B I A S - X L V - Z V VS T S A T T

MS2

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

TRAN

SFER

OPS

Ref

. Tr

ansf

er L

ist

& MS

G 049

~

GLAC

IER

STAT

US C

HECK (

ASSY OPS,CC)

MS3

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA SYSTEMS: 1.240 POST EVA

Perform Water Recharge, No Metox Regen

Ref. STS-130 Consumables Tracking CC(EVA)

Ref. STS-130 Battery Recharge Plan (EVA)

~

MS4

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA SYSTEMS: 1.240 POST EVA

Perform Water Recharge, No Metox Regen

Ref. STS-130 Consumables Tracking CC(EVA)

Ref. STS-130 Battery Recharge Plan (EVA)

~

Notes

3-51

ROBI

NSON

PATR

ICK

BEHN

KEN

05

CREW WAKE AT 04/12:00

REPLANNED

STS-

130

FD

10:00

11:00

12:00

13:00

GMT

Date

02/12

(043)

00:00

01:00

02:00

03:00

04:00

MET

Day 00

4W

EZ

T D R SD / N

O R B 6 4 6 5 6 6

S T S A T T ~ ~B I A S - X L V - Z V V

MS2

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

~TR

ANSF

ER O

PS R

ef.

Tran

sfer

Lis

t &

MSG 049

GLAC

IER

STAT

US C

HECK (

ASSY OPS,CC)

MS3

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~EVA SYSTEMS: 1.240 POST EVA

Perform Water Recharge, No Metox Regen

Ref. STS-130 Consumables Tracking CC(EVA)

Ref. STS-130 Battery Recharge Plan (EVA)

MS4

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~EV

A SYSTEMS: 1.240 POST EVA

Perform Water Recharge, No Metox Regen

Ref. STS-130 Consumables Tracking CC(EVA)

Ref. STS-130 Battery Recharge Plan (EVA)

Notes

14

Page 16: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

MSG 047B - FD05 MISSION SUMMARY

1 2 3 4 5 6 7 8 9

10 11

Good Morning Endeavour!!!! The amount of transfer you have already accomplished is amazing! Thanks for all of your extra effort! Have a great room addition, EVA day!!! YOUR CURRENT ORBIT IS: 188 X 182 NM NOTAMS: NO CHANGES 12

13 14 15 16 17 18 19 20 21 22 23 24 25 26

EDW - TEMP RWY IN USE. PERM RWY CLOSED FOR CONSTRUCTION. EDW - LAKEBED RWYS RED. NOR - LAKEBED RWYS USABLE. DRYING OUT. DOV - CLOSED. FOK - CLOSED. WAL- CLOSED. ZZA - ARRESTING NET INSTALLED 40M FROM END OF RWY 30L. ESN - RWY 03R/21L CLOSED. 03L/21R USABLE. GUA - RWY 06L/24R RWY END LIGHTS OTS. PTN - CLOSED FOR RUNWAY CONSTRUCTION. IKF - NOT USABLE. NO AGREEMENT. BEN - NOT RECOMMENDED/NOT SUPPORTED.

NEXT 2 PLS OPPORTUNITIES: 27

28 29 30 31

EDT22R ORB 64 – 4/00:17 SKC 7 260/4P6 EDT22R ORB 79 – 4/23:04 SKC 7 270/5P7 OMS TANK FAIL CAPABILITY: 32

33 34 35 36

L OMS FAILS: NO R OMS FAILS: NO LEAKING OMS PRPLT BURN: 37

38 39 40 41

L OMS LEAK: ALWAYS BURN RETROGRADE R OMS LEAK: ALWAYS BURN RETROGRADE OMS QUANTITIES(%) 42

43 44 45 46 47 48 49 50 51

L OMS OX = 30.2 R OMS OX = 31.4 FU = 29.9 FU = 31.2 Subtract interconnect counter for current OMS quantities.

END OF PAGE 1 OF 2, MSG 047B 15

Page 17: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

MSG 047B - FD05 MISSION SUMMARY

END OF PAGE 2 OF 2, MSG 047B

1 DELTA V AVAILABLE: 2

3 4

OMS 320 FPS ARCS (TOTAL ABOVE QTY1) 44 FPS 5

6 7 8 9

10 11 12 13 14

TOTAL IN THE AFT 364 FPS ARCS (TOTAL ABOVE QTY2) 78 FPS FRCS (ABOVE QTY 1) 31 FPS AFT QTY 1 82 % AFT QTY 2 44 % SYSTEM FAILURE IMPACT WORK AROUND

EVA During EVA 1 Tool Config (GMT 042/06:37), the screw that holds the MWS EE on the MWS T-bar was found to be hand tight only with threads showing.

The loose screw could cause the MWS EE to come off, which has happened in the past. The MWS EE is used as a local tether and for worksite stablization.If unresolved, the EV crewmember would not have hardware they trained with, possibly effecting crew efficiency.

Spare T-BAR with MWS EE (s/n 1031) was located and used in place of original T-Bar with MWS EE (s/n 1030). Remember to stow EE on the MWS when not in use.

15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

16

Page 18: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

MSG 049 (22-0674) - FD05 TRANSFER MESSAGE Page 1 of 6

1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

Good morning Kay, Terry, & Steve, Wow, that calldown yesterday tells us that you must have really been paying attention in your transfer classes! You are now 43 percent complete overall, and ahead of schedule. For today, you again have a day of open transfer time. We have provided words for Soichi’s time so he can help with packing some of the more difficult ISS items. For the other time, you can continue working on resupply – you will probably finish all the resupply items you are able to do (others are constrained by activities). After that, continue with return as you have time available. You have shown that you are very capable of finding things ready to transfer! As a heads up, the middeck bags are weight-limited (not volume-limited) so even though the bags may not look full as you are packing them for return, they cannot accommodate much more. To follow up from our discussion yesterday, we did have a couple questions. We can get your answers to these in the Transfer Brief tonight. The Transfer List Excel file, FD05_Transfer_List_STS130.xls, is located on the KFX machine in C:\OCA-up\transfer (and available via the PGSC homepage). For ISS, the Transfer List Excel file, FD05_Transfer_List_STS130.xls, is located in K:\OCA-up\transfer. Questions/Comments for Kay 28

30 31 32 33 34 35

37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

1. You mentioned that you had a comment about the returning Food Warmer but we did 29 not discuss it since we were coming up on ratty comm. I believe you were wondering about whether the item should be in a CTB as noted in the Transfer List. We were anticipating this item being transferred later, when a CTB would have already been there. A CTB will be arriving on FD06 via one of Jeff’s activities, and the food warmer can be put inside that CTB at that time. (There will be other items going to this locker as well.)

2. ISS stowage location follow-ups: 36 a. For items 5 and 13, you reported these stowed at JLP1A1_S. The “S” is not a

known location for JLP1A1. Can you confirm where in the JLP these items were placed?

b. For item 4, you reported this stowed at LAB1D6_K2. “K2” is not a known location in this rack. Can you confirm the location?

Page 1 of 6, MSG 049 (22-0674) 17

Page 19: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

MSG 049 (22-0674) - FD05 TRANSFER MESSAGE Page 2 of 6

1 Change Pages 2

3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19

Please incorporate changes as follows: In the Transfer List RESUPPLY tab

Pen and Ink the following page: Resupply – 14: For item 801: in the notes field, change “FD05” to “FD06”

In the Transfer List RETURN tab

Replace the following pages: Return – 2, 6

Pen and Ink the following page:

Return – 7: For item 732: in the notes field, change “FD11” to “FD10” For item 735: in the notes field, change “FD05” to “FD06”

FD05 Choreography 20

21 22 23 24 25 26 27 28

• XFER OPS for Kay, Terry and Steve: o Robinson: Prep items needed for N3 vestibule outfitting (Items 6.1, 6.2, and

6.3). Move foam from these items per return items 716 and 717. o Complete CDRA bed swap (Items 8.1 and 608) o Complete resupply items 20, 28, and 38. This will complete all the resupply

you are able to do (all other items are constrained by activities). o Work on return items per your preference

FD05 Choreography for Soichi 29

30

31 32 33 34 35

36 37 38

39 40 41 42 43 44 45 46 47 48 49 50

• Transfer items with special packing (Items 610, 611, 711, and 723) • Some of these items contain Tox 2 fluid, and you will need to don PPE – Dust Mask,

Silver Shield Gloves, and Goggles. You will find these items in CCPK s/n 1004 located in LAB1O5_D2. If the PPE items become contaminated, please let us know how many you used. If they do not become contaminated, you can restow them in their original location when complete with the packing activities.

• Note that Item 610 (the Pump/Separator Assy) has orientation requirements for return, so we have asked you to label the outside of the Hefty bag. This will allow the shuttle crew to verify orientation later in the mission.

• To reiterate the answer to the question yesterday, Pre-Treat Tank s/n 802025 is the only one returning on 20A (please leave 802023 on ISS).

Have a great day! - The 20A Transfer Team

Page 2 of 6, MSG 049 (22-0674) 18

Page 20: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

MSG 049 (22-0674) - FD05 TRANSFER MESSAGE Page 3 of 6

1

2 3 4 5

20A Transfer Choreography

FD06 (no xfer brief) 6

9

10 11

12 13

14

15 16 17

• Williams: Transfer GSC per EHS-N3 AIR-SAMPLE activity (Item 719) 7

• Noguchi: Retrieve PEPS items from N3 CTBs per PEPS UNSTOW activity (Items 8 42.1 and 45.1)

• Creamer: Retrieve NPV and S0 cable from N3 CTB per EVA H/W UNSTOW activity (Items 48.1 and 48.2)

• Virts: Transfer LiOH between Node 3, Middeck, and ISS stockpile per LiOH TRANSFER activity (Items 44, 44.1, 48, 48.3, 802, 803, and 736)

• Hire: Begin to relocate D4 and D5 ISP CTBs per ISP STOWAGE TRANSFER activity • Patrick: Transfer CGBAs per CGBA UNIT SWAP activity (Items 29 and 706)

FD07 18

19 20

21 22 23 24

• Virts & Hire: Relocate D4 and D5 ISP CTBs per ISP STOWAGE TRANSFER activity (Items 41, 42, 43, 45, 46, 47, 49, 49.1, and 50)

• XFER OPS: o Swap portable sample adapters (Items 801 and 735)

FD08 25

26 27

28 29

30 31 32 33

• Creamer: Transfer Node 3 ITCS sample per N3-LTL-ITCS-SAMPLE activity (Item 740)

• Behnken & Williams: Transfer cold samples from ISS MELFI to shuttle Glacier per MLF GLCR 20A SMP XFR activity (Item 721)

• XFER OPS: o Continue return transfers

FD09 (no xfer brief) 34

35 36 37

• Virts: Return old C&W panel per C&W PANEL COVER DEPLOY activity (Item 705) FD10 38

39 40 41 42 43 44 45

• XFER OPS: o Transfer returning RFTA to shuttle after Soichi’s WRS-RFTA-R&R activity

(Item 732) o After EVA3 A/L egress, transfer CSA-O2s (Items 707 and 708) o Swap MPCs (Items 40 and 720)

FD11 46

47

48

49

50

• Williams: Transfer returning blood sample per BLD STW activity (Item 704) • Creamer: Transfer returning saliva sample per SLV STW activity (Item 728) • Robinson: Transfer AFD PCS per AFT PCS XFER activity (Item 39) • Robinson: Transfer SSC back to ISS during SSC RETURN activity (Item 804)

Page 3 of 6, MSG 049 (22-0674) 19

Page 21: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

MSG 049 (22-0674) - FD05 TRANSFER MESSAGE Page 4 of 6

Page 4 of 6, MSG 049 (22-0674)

3

7 8 9

10 11

• Behnken: Transfer SAFER to shuttle per SAFER XFER activity (Item 714) 1

• Patrick & Behnken: Transfer EVA items to shuttle per EVA RECONFIG & XFER 2 activity (Items 702, 712, 713, and 715)

• Noguchi: Transfer returning RAMs to shuttle per RAM INSTALL activity (Item 726) 4

• Noguchi: Transfer DCBs to shuttle per DCB XFR activity (Item 709 and 710) 5

• XFER OPS: 6 o Complete water hardware transfers (Items 24, 25, and 729) o Transfer Return to Houston Imagery ziplock (Item 727) o Transfer remaining 5 MLE bags (Items 408, 701, and 703)

5 MLE Bag Plan (9 total) 12

13

14

15

16

17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

• Bags B & H: to Columbus for temp stow (FD03-11) • Bag F: to Columbus permanently (return prepacked 5 MLE in its place FD11) • Bags C, D & E: remain on shuttle for unpacking/repacking • Bag A: contains UPA DA, temp stow in JEM for FD04 • Bags G & I: handled via EVA procedures (G will be temp stowed in Node 1)

20

Page 22: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

MS

G 0

49 (2

2-06

74) -

- FD

05 T

rans

fer M

essa

geST

S-13

0 / 2

0A R

etur

n Tr

ansf

er L

ist

CH

NG

FDIn

itial

sIte

m #Ite

m N

ame

Qty

Initi

al S

tow

age

Tem

p St

owag

eSt

owag

e at

U

ndoc

kW

t (lb

s)AC

TIVI

TY /

Con

stra

ints

/ **

Com

men

ts

600

20A

Ret

urn

Item

600

[WR

S R

ecyc

le F

ilter

Tan

k A

ssem

bly

s/n

005]

1N

OD

2D2

CO

L1D

3(in

Bag

B)

148.

00**

Foam

cap

tran

sfer

s w

ith it

em.

X

601

20A

Ret

urn

Bag

601

[Sw

ab E

xper

imen

t Kit]

Item

Del

eted

1.0

CTB

NO

D2D

2M

F57C

21.2

5

602

20A

Ret

urn

Bag

602

[Thi

rsk

for r

etur

n]0.

5 C

TBN

OD

2D2

MD

CE

IL

PO

RT

1 (in

Bag

E)

11.0

0

603

20A

Ret

urn

Bag

603

[Sto

tt fo

r ret

urn]

0.5

CTB

NO

D2D

2M

D C

EIL

P

OR

T 1

(in B

ag E

)

11.0

0

604

20A

Ret

urn

Bag

604

[DeW

inne

for r

etur

n]0.

5 C

TBN

OD

2D2

NO

D1

(in B

ag G

)11

.00

605

20A

Ret

urn

Bag

605

1.0

CTB

NO

D2D

2M

F14E

4.00

608

20A

Ret

urn

Item

608

[CD

RA

Des

sica

nt/S

orbe

nt B

ed (o

ld)]

1N

OD

2D2

CO

L1D

2(in

Bag

H)

102.

00C

onta

in o

ld C

DR

A b

ed in

new

CD

RA

be

d fo

am a

nd th

en w

rap

in 2

jetti

son

tb

JSB

stow

age

bags

. JS

Bs

are

preg

athe

red

near

the

CD

RA

bed

.

X60

920

A R

etur

n B

ag 6

091.

0 C

TBN

OD

2D2

MF5

7C4.

00

X

610

20A

Ret

urn

Item

610

[Pum

p/S

epar

ator

OR

U]

1 fo

am b

oxN

OD

2D2

MD

FLO

OR

P

OR

T 2

(in B

ag A

)

60.8

0Ta

pe th

e fo

am c

ushi

on c

lam

shel

l se

am, t

hen

plac

e th

e as

sem

bly

in a

H

efty

bag

. Lab

el H

efty

bag

"FW

D

FOR

LA

UN

CH

" to

mat

ch la

bel o

n fo

am.

Secu

re, t

ie o

pen

end

of b

ag

and

grey

tape

.

611

20A

Ret

urn

Item

611

[Rec

ycle

to F

CPA

]1

NO

D2D

2S

huttl

e A

/L

(in B

ag D

)3.

00**

Item

is b

agge

d an

d ta

ped.

2/11

/201

0[ ]

- no

tes

incl

uded

by

trans

fer t

eam

, - n

ot o

n ac

tual

labe

l

Ret

urn

Pag

e - 2

21

Page 23: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

MS

G 0

49 (2

2-06

74) -

- FD

05 T

rans

fer M

essa

geST

S-13

0 / 2

0A R

etur

n Tr

ansf

er L

ist

CH

NG

FDIn

itial

sIte

m #Ite

m N

ame

Qty

Initi

al S

tow

age

Tem

p St

owag

eSt

owag

e at

U

ndoc

kW

t (lb

s)AC

TIVI

TY /

Con

stra

ints

/ **

Com

men

ts

X

723

Pre

-Tre

at T

ank

(E-K

)[s

/n 8

0202

5]0.

5 C

TBJL

P1P

2_C

1M

D C

EIL

S

TBD

1(in

Bag

I)

5.84

Don

PPE

- To

x 2

fluid

. Ve

rify

PY-4

, PY

-5 c

onne

ctor

s cl

osed

(pos

ition

“3

”).

Verif

y PY

-4 c

appe

d. W

rap

Pret

reat

Tan

k an

d ho

se in

bub

ble

wra

p to

pre

vent

dam

age

to H

efty

B

ag d

urin

g re

turn

. B

ag P

retr

eat

Tank

and

atta

ched

hos

e in

Hef

ty

Bag

. Se

cure

, tie

ope

n en

d of

bag

an

d gr

ey ta

pe.

Plac

e as

sem

bly

into

a

0.5

CTB

(use

em

pty

CTB

from

N

OD

1D2)

.

725

PW

R1.

0 C

TBM

F14K

MD

FLO

OR

S

TBD

1

(in B

ag C

)

5.50

**O

nly

CTB

and

foam

retu

rn in

shu

ttle;

th

e P

WR

that

laun

ched

insi

de

trans

ferr

ed to

ISS

. R

efer

ence

resu

pply

ite

m #

17.

726

Rad

iatio

n A

rea

Mon

itors

1 zi

ploc

kIS

S in

stal

led

MF5

7O(in

CTB

)0.

55Tr

ansf

er o

n FD

11 a

fter R

AM

IN

STA

LL a

ctiv

ity.

727

Ret

urn

to H

oust

on Im

ager

y1

zipl

ock

NO

D2P

4 (in

0.5

CTB

s/n

13

60)

MF1

4K

(in it

em 4

03)

1.61

Tran

sfer

on

FD11

.

**Ta

pes

will

cont

inue

to b

e ad

ded

until

ft

EV

A3

afte

r EV

A3.

728

Sal

iva

Sam

ple

Ret

urn

Pou

ch1

in u

seM

F57O

(in C

TB)

0.26

Tran

sfer

on

FD11

per

SA

LIVA

STO

W

activ

ity.

729

Silv

er B

ioci

de S

yrin

ge K

it[s

/n 1

001]

1N

OD

2O2

(in M

-02

Bag

s/

n 10

26)

MF5

7K1.

34Tr

ansf

er o

n FD

11 a

fter f

inal

CW

C fi

ll.

Swap

s w

ith re

turn

item

25.

**U

se p

er w

ater

ops

cue

car

d, th

en

trans

fer t

o sh

uttle

.

2/11

/201

0[ ]

- no

tes

incl

uded

by

trans

fer t

eam

, - n

ot o

n ac

tual

labe

l

Ret

urn

Pag

e - 6

22

Page 24: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

MSG 050 - FD05 CREW CHOICE DOWNLINK

1

TDRS AOS LOS Delta (min) Notes W-171 4/00:41 4/01:11 30 E-275 4/01:55 4/02:09 14 Gimbal flip at 4/02:09; Analog only W-171 4/02:15 4/02:47 32 W-171 4/03:51 4/04:22 31

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

Note: Please notify MCC-H 10 minutes prior to the event to allow for ground network configuration.

END OF PAGE 1 OF 1, MSG 050 23

Page 25: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

22-0

677

(MSG

051

) – S

tow

age

Loca

tions

for F

D 0

5 (G

MT

043)

Pa

ge 1

of 9

P

age

1 of

9, 2

2-06

77 (

MS

G 0

51)

Con

tent

s:

1

Tim

elin

e Pr

oced

ures

: 2

WR

S-R

FTA-

ACC

ESS

 3

WR

S-R

FTA-

CLO

SE

OU

T 4

WR

S-M

V1-

OP

EN 

5

WR

S-R

FTA-

FILL

 6

WR

S-R

FTA

QD

-CN

FG 

7

**N

OD

E 3

VES

T A

CC

ESS 

8

NS

-20A

-ME

LFI I

NS 

9

EH

S-C

SA

-CP

-MN

T 10

WR

S-U

PA-

FILL

 11

**N

OD

E 3

LK

CK

S/U

 12

N3

VE

ST L

K C

K P

T1 

13

N3

VE

ST L

K C

K P

T2 

14

ESA

Tim

elin

e Pr

oced

ures

: 15

Non

e 16

JAXA

Tim

elin

e Pr

oced

ures

: 17

FOR

ES

T-C

ULT

IVA

TE 

18

Task

list P

roce

dure

s: 

19

BC

AT3

-CR

YST

AL-

CH

EC

20

WH

C-K

TO-R

EPLA

CE 

21

WH

C-ЕДВ-У-

R&

22

PW

D-B

EV

AD

PTR

-R&R

 23

JAXA

Tas

klis

t Pro

cedu

res: 

24

Non

e 25

ESA

Tas

klis

t Pro

cedu

res: 

26

Non

e 27

28

29

30

31

32

24

Page 26: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

22-0

677

(MSG

051

) – S

tow

age

Loca

tions

for F

D 0

5 (G

MT

043)

Pa

ge 2

of 9

P

age

2 of

9, 2

2-06

77 (

MS

G 0

51)

Tim

elin

e Pr

oced

ures

: 1

2

WR

S-R

FTA

-AC

CES

S W

RS-

RFT

A-C

LOSE

OU

T 21

-014

0 1.

291

WR

S A

CC

ESS

Type

: Sta

ndar

d

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

NO

D1D

4 Ta

pe M

easu

re

SK

G33

1175

62-9

20

- -

3

WR

S-M

V1-O

PEN

W

RS-

RFT

A-F

ILL

WR

S-R

FTA

QD

-CN

FG

2.90

7 U

PA R

FTA

CH

AN

GEO

UT

- BA

CK

FILL

MET

HO

D

Type

: Sta

ndar

d

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

LAB

1P2

0.5

CTB

, S/N

12

21, B

/C

0104

02J

Reg

en E

CLS

S T

ox-2

PPE

Kit

SE

G42

1037

02-3

02

1002

C

HC

CP

K02

J

2

Saf

ety

Gog

gles

50

3R

- -

3

S

urgi

cal M

asks

82

10

- -

4

S

ilver

Shi

eld

Glo

ves

SS

104M

-

-

5 LA

B1S

1 Te

SS

Sto

wag

e A

rea

Крышка

ЕДВ

(ED

V C

over

) 11Ф

615.

8711

-180А1

5-1

916

0004

7825

R

6

Корпус ЕДВ

(ED

V B

ucke

t) 11Ф

615.

8711

-120А1

5-1

2 п.

34

0004

3103

R

7

Крышка

ЕДВ

(ED

V C

over

) 11Ф

615.

8711

-180А1

5-1

917

0004

7826

R

8

Корпус ЕДВ

(ED

V B

ucke

t) 11Ф

615.

8711

-120А1

5-1

429

0009

8520

R

Ty

pe: R

esto

w

9

LAB

1S1

TeS

S S

tow

age

Are

a

Крышка

ЕДВ

(ED

V C

over

) 11Ф

615.

8711

-180А1

5-1

908

0004

7144

R

10

Корпус ЕДВ

(ED

V B

ucke

t) 11Ф

615.

8711

-120А1

5-1

440

0004

7816

R

11

Tem

p St

ow n

ear

WR

S R

ack

Крышка

ЕДВ

(ED

V C

over

) 11Ф

615.

8711

-180А1

5-1

917

0004

7826

R

Pre

posi

tione

d fo

r Ins

tall

12

Корпус ЕДВ

(ED

V B

ucke

t) 11Ф

615.

8711

-120А1

5-1

429

0009

8520

R

4

5

25

Page 27: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

22-0

677

(MSG

051

) – S

tow

age

Loca

tions

for F

D 0

5 (G

MT

043)

Pa

ge 3

of 9

P

age

3 of

9, 2

2-06

77 (

MS

G 0

51)

**N

OD

E 3

VEST

AC

CES

S 1.

104

VEST

IBU

LE O

UTF

ITTI

NG

NO

D1

TO N

OD

3 Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 Pr

egat

here

d To

olSe

t “J

eff”

or “

TV”

Rat

chet

, 1/4

" Driv

e;

- -

-

2 5/

32" H

ex H

ead,

1/4

" Driv

e -

- -

Type

: Res

tow

3 Te

mp

Stow

Fo

r FD

07

NO

D1

Clo

seou

t pan

els

-

- -

1

2

3

NS-

20A

-MEL

FI IN

S 2.

014

MEL

FI In

sert

ion

of S

ampl

e In

to B

ox M

odul

e-IM

S G

ener

ic

Type

: Sta

ndar

d

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

JPM

1D4_

B1

Dew

ar A

SE

Pou

ch

0329

8 03

J M

EFD

AP

03J

2

W

hite

Glo

ves

0329

1-1

Any

A

ny

3

JPM

1D4

(at M

ELFI

-1)

Col

dpla

te/W

irew

ay C

over

03

000

- -

4 JP

M1D

5 R

ack

fron

t 1.

0 C

TB,

EM

CS

/NAN

O-

SK

ELE

TON

, S

/N 1

133,

B/C

00

4127

J

ES

D B

ubbl

e W

rap

Bag

[QTY

: 3]

- -

-

5

BA

G C

ARTR

IDG

E A

[Q

TY:3

] (N

anos

kele

ton)

C

NS

KL1

1000

00

1 00

2 00

3

CB

ES

1201

N

CB

ES

1202

N

CB

ES

1203

N

Type

: Res

tow

6 JP

M1D

4 M

ELFI

-1

Dew

ar 1

, Tra

y B

, Sec

tion

1-2

BA

G C

ARTR

IDG

E A

[QTY

:2]

(Nan

oske

leto

n)

CN

SK

L110

00

001

002

CB

ES

1201

N

CB

ES

1202

N

26

Page 28: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

22-0

677

(MSG

051

) – S

tow

age

Loca

tions

for F

D 0

5 (G

MT

043)

Pa

ge 4

of 9

P

age

4 of

9, 2

2-06

77 (

MS

G 0

51)

7 JP

M1D

4 M

ELFI

-1

Dew

ar 1

, Tra

y C

, Sec

tion

2-3

BA

G C

ARTR

IDG

E A

[QTY

:1]

(Nan

oske

leto

n)

CN

SK

L110

00

003

CB

ES

1203

N

8 JP

M1O

3_C

2 1.

0 C

TB, J

AX

A

#4

S/N

104

8, B

/C

0029

33J

ES

D B

ubbl

e W

rap

Bag

[QTY

: 3]

- -

- R

emov

ed fr

om B

AG

C

AR

TRID

GE

A

1

EHS-

CSA

-CP-

MN

T 20

-085

4 2.

6.00

0 C

SA-C

P - R

outin

e M

aint

enan

ce

Type

: Sta

ndar

d

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

LAB

1O5_

B2

CS

A-C

P R

esup

ply

Kit

SJG

4612

0020

-301

10

37

0010

4569

J

2 C

SA

-CP

/CD

M B

atte

ry P

ack

SE

D46

1158

02-3

04

Any

-

Rep

ort S

/N to

MC

C-H

. Fo

r Prim

e C

SA-C

P S

/N

1042

3

Zero

Filt

er

KLS

D21

0047

-301

10

14

-

4 N

OD

1S4-

03

Dep

loye

d C

SA

-CP

[QTY

: 2]

SE

D46

1158

01-3

04

1052

10

56

0012

4908

J 00

1249

09J

5 C

SA

-CP

Sam

plin

g P

ump

SE

D46

1158

03-3

03

1024

B

CC

0008

6J

6

SM 2

08

Dep

loye

d

CS

A-C

P

SE

D46

1158

01-3

04

1042

00

1249

06J

Prim

e C

SA-C

P 7

CS

A-C

P

SE

D46

1158

01-3

04

1049

00

1249

07J

Ty

pe:

Res

tow

8 LA

B1O

5_B

2 C

SA

-CP

Res

uppl

y K

it S

JG46

1200

20-3

01

1037

00

1045

69J

9

CS

A-C

P/C

DM

Bat

tery

Pac

k S

ED

4611

5802

-304

11

05

- Th

is b

atte

ry w

ill be

re

mov

ed fr

om th

e P

rime

CS

A-C

P (S

/N 1

042)

.

2

3

4

5

6

27

Page 29: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

22-0

677

(MSG

051

) – S

tow

age

Loca

tions

for F

D 0

5 (G

MT

043)

Pa

ge 5

of 9

P

age

5 of

9, 2

2-06

77 (

MS

G 0

51)

WR

S-U

PA-F

ILL

21-0

223

1.90

4 U

PA A

CTI

VATI

ON

Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 LA

B1P

2 0.

5 C

TB, S

/N

1221

, B/C

01

0402

J

Reg

en E

CLS

S T

ox-2

PP

E K

it S

EG

4210

3702

-302

10

02

CH

CC

PK

02J

2

Saf

ety

Gog

gles

50

3R

- -

3

Mes

s-U

p M

itts

RM

UM

-12

- -

4

Silv

er S

hiel

d G

love

s S

S10

4M

- -

5

Sur

gica

l Mas

ks

8210

-

-

1

**N

OD

E 3

LK C

K S

/U

N3

VEST

LK

CK

PT1

N

3 VE

ST L

K C

K P

T2

1.11

7 N

OD

E 1/

NO

DE

3 VE

STIB

ULE

PR

ESSU

RIZ

ATI

ON

AN

D L

EAK

CH

ECK

Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 Te

mp

Stow

ed

NO

D2

FWD

H

atch

from

FD

3

MP

EV

Inte

rnal

Sam

plin

g A

dapt

er IS

A

97M

5583

0-1

2 00

0002

M

2 S

cope

met

er P

ress

ure

Pro

be

SE

G39

1302

44-3

02

- 00

4461

J In

stal

led

on IS

A

3 V

AJ-

78-1

5ft

683-

1711

1-1

- 00

0026

77J

4

Mul

timet

er K

it 10

118-

1001

8-04

10

17

-

5 M

ultim

eter

87

10

10

0008

8636

J H

appy

Ty

pe: R

esto

w

6

Rem

ain

atta

ched

to

NO

D1

Port

H

atch

MPE

V

MP

EV

Inte

rnal

Sam

plin

g A

dapt

er IS

A

97M

5583

0-1

2 00

0002

M

7 S

cope

met

er P

ress

ure

Pro

be

SE

G39

1302

44-3

02

- 00

4461

J In

stal

led

on IS

A

8 V

AJ-

78-1

5ft

683-

1711

1-1

- 00

0026

77J

9

Mul

timet

er K

it 10

118-

1001

8-04

10

17

-

10

Mul

timet

er

87

1010

00

0886

36J

Hap

py

2

28

Page 30: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

22-0

677

(MSG

051

) – S

tow

age

Loca

tions

for F

D 0

5 (G

MT

043)

Pa

ge 6

of 9

P

age

6 of

9, 2

2-06

77 (

MS

G 0

51)

ESA

Tim

elin

e Pr

oced

ures

: 1

Non

e 2

3

JAXA

Tim

elin

e Pr

oced

ures

: 4

5

FOR

EST-

CU

LTIV

ATE

2.

014

DEW

EY'S

FO

RES

T PL

AN

T C

ULT

IVA

TIO

N

Type

: Sta

ndar

d

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

JPM

1O2_

C2

1.0

CTB

: CTB

-U-

S3,

S/N

149

0,

B/C

CTB

0031

4N

Zipl

ock

bag

”Dew

ey’s

For

est

Sup

plie

s”

- -

-

2 W

ater

Tap

E

PO

DF1

3310

-

JEP

0314

1N

3

Syr

inge

Kit

EP

OD

F132

00

001

JEP

0313

1N

4

Zipl

ock

bag

- -

-

5 W

ater

Bag

Sm

all

EP

OD

F133

20

005

JEP

0316

5N

Ty

pe:

Res

tow

6 JP

M1A

7 R

yuta

i Sto

rage

Je

ttiso

n S

tow

age

Bag

S/N

000

4,

B/C

JS

B00

004N

Zipl

ock

bag

“For

futu

re tr

ash”

-

- -

7

Wat

er B

ag S

mal

l E

PO

DF1

3320

00

5 JE

P03

165N

8 W

ater

Tap

[QTY

: 1]

EP

OD

F133

10

- -

6

Task

list P

roce

dure

s:

7

8

BC

AT3

-CR

YSTA

L-C

HEC

K

2.03

4 B

CA

T-4

CR

YSTA

L C

HEC

K F

OR

SA

MPL

ES 8

,9, a

nd 1

0 Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 LA

B1O

7 R

ack

Fron

t BC

AT-3

Slo

w G

row

th S

ampl

e M

odul

e 67

041F

SM

2200

-

0003

0426

L

2 LA

B1O

4_J1

0.

5 C

TB B

CAT

S/N

12

40, B

/C 0

1042

1J

LED

Min

i Mag

light

60

107M

FA20

17

- 00

1052

56L

3

1.5V

Bat

tery

Siz

e A

A

528-

4135

0-3

- -

(if re

quire

d)

29

Page 31: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

22-0

677

(MSG

051

) – S

tow

age

Loca

tions

for F

D 0

5 (G

MT

043)

Pa

ge 7

of 9

P

age

7 of

9, 2

2-06

77 (

MS

G 0

51)

1

WH

C-K

TO-R

EPLA

CE

2.30

5 W

HC

[KTO

] R&

R

Type

: Sta

ndar

d

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

FGB

Pan

el 2

20 o

r FG

B F

loor

or

N

OD

1O2

Sol

id W

aste

Con

tain

er –

Bod

y (a

ka K

TO B

ody)

11Ф

615.

8720А

55-2

0 25

7 26

3 26

4 26

5 27

2 27

5 27

8 28

2 30

4 30

7 30

8 30

9 31

0 32

5

- 00

1127

22J

0011

2724

J 00

1127

35J

0011

6316

J 00

1163

13J

0011

6302

J 00

1163

11J

0011

2744

J 00

1127

38J

- 00

1127

46J

0011

2748

J 00

1127

36J

This

is th

e lis

t of a

vaila

ble

KTO

Bod

ies.

R

EPO

RT

S/N

and

B/C

2 S

olid

Was

te C

onta

iner

– L

id

(aka

KTO

Bot

tom

) 11Ф

615.

8720А

55-1

0 25

7 25

8 26

3 26

5 27

2 27

4 27

5 27

8 28

2 30

7 30

8 30

9 31

0 32

5

0009

8427

R

0009

8428

R

0011

2721

J 00

1127

33J

0009

8472

R

0009

8474

R

0009

8475

R

0009

8438

R

0009

8442

R

0011

2737

J -

0011

2745

J 00

1127

47J

-

This

is th

e lis

t of a

vaila

ble

KTO

Lid

s.

REP

OR

T S/

N a

nd B

/C

3 LA

B1D

1 S

olid

Was

te C

onta

iner

– B

ody

(aka

KTO

Bod

y)

11Ф

615.

8720А

55-2

0 30

5 00

1127

30J

Pre

posi

tione

d fo

r Ins

tall

30

Page 32: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

22-0

677

(MSG

051

) – S

tow

age

Loca

tions

for F

D 0

5 (G

MT

043)

Pa

ge 8

of 9

P

age

8 of

9, 2

2-06

77 (

MS

G 0

51)

4 S

olid

Was

te C

onta

iner

Lid

(aka

KTO

Bot

tom

)11Ф

615.

8720А

55-1

0 27

6 00

0984

36R

5 N

OD

1D4

Rat

chet

, 1/4

" Driv

e S

KG

3311

7562

-939

-

-

6 10

mm

6 P

t Soc

ket,

1/4"

Driv

e S

KG

3311

7562

-657

-

-

7 (1

0-50

in-lb

s) T

rq W

renc

h, 1

/4"

Driv

e S

EG

3311

2395

-301

M

2064

22

-

Type

: Res

tow

8 LA

B1S

1 Te

SS

S

olid

Was

te C

onta

iner

Body

(a

ka K

TO B

ody)

11Ф

615.

8720А

55-2

0 -

- R

EPO

RT

S/N

and

B/C

9 S

olid

Was

te C

onta

iner

– L

id

(aka

KTO

Bot

tom

) 11Ф

615.

8720А

55-1

0 -

-

1

WH

C-ЕДВ

-У-R

&R

2.

302

WH

C ЕДВ

R&

R

Type

: Sta

ndar

d

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

LAB

1P2

0.5

CTB

S

/N 1

221,

B

/C 0

1040

2J

Reg

en E

CLS

S T

ox-2

PPE

KIT

SE

G42

1037

02-3

02

1002

C

HC

CP

K02

J

2

S

afet

y G

oggl

es

1664

4-00

000

- -

3

Silv

er S

hiel

d G

love

s S

SG

/10

- -

4

Dus

t Mas

k 92

11

- -

5

LAB

1D1

ЕДВ

Кры

шка

(ED

V L

id)

11Ф

615.

8711

-180А1

5-1

93

5 00

1255

49J

Pre

posi

tione

d

6 ЕДВ

Корпус

(ED

V B

ucke

t)11Ф

615.

8711

-120А1

5-1

459

0012

5565

J 7

NO

D1O

2 ЕД

В Кры

шка

(ED

V L

id)

11Ф

615.

8711

-180А1

5-1

90

2 00

0985

92R

8 ЕД

В Кры

шка

(ED

V L

id)

11Ф

615.

8711

-180А1

5-1

90

4 00

0985

94R

9

ЕДВ

Кры

шка

(ED

V L

id)

11Ф

615.

8711

-180А1

5-1

92

2 00

0478

31R

10

FG

B

ЕДВ

Кры

шка

(ED

V L

id)

11Ф

615.

8711

-180А1

5-1

-

- R

EPO

RT

S/N

and

B/C

11

ЕД

В Корпус

(ED

V B

ucke

t) 11Ф

615.

8711

-120А1

5-1

- -

Type

: Res

tow

12

LAB

1S1

ЕДВ

Кры

шка

(ED

V L

id)

11Ф

615.

8711

-180А1

5-1

93

1 00

1163

26J

13

ЕДВ

Корпус

(ED

V

Buc

ket)

11Ф

615.

8711

-120А1

5-1

455

0011

6319

J

2

31

Page 33: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

22-0

677

(MSG

051

) – S

tow

age

Loca

tions

for F

D 0

5 (G

MT

043)

Pa

ge 9

of 9

P

age

9 of

9, 2

2-06

77 (

MS

G 0

51)

PWD

-BEV

AD

PTR

-R&

R

22-0

309

PWD

Bev

erag

e A

dapt

er M

odifi

catio

n an

d In

stal

l Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 LA

B1O

4_D

1 P

WD

Bev

erag

e A

dapt

er

SE

G33

1203

33-3

02

1002

-

2

NO

D1D

4 R

atch

et, 1

/4” D

rive

SKG

3311

7562

-939

-

-

3 5/

32” H

ex H

ead,

1/4

” Driv

e S

KG

3311

7562

-742

-

-

Type

: Res

tow

4 LA

B1O

4_D

1 PW

D B

ever

age

Adap

ter

SEG

3312

0333

-301

-

-

1

2

JAXA

Tas

klis

t Pro

cedu

res:

3

Non

e 4

5

ESA

Tas

klis

t Pro

cedu

res:

6

Non

e 7

32

Page 34: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

MSG 052 - IFM TOOL LOCKER (MA16D) LIST

1 2 3 4 5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

Per pre-flight agreement, use the following tools from the IFM Tool Locker (MA16D) as needed on ISS for assembly procedures. For convenience, keep tools together and place in Ziplock Bag (MF71K). Label the bag "Shuttle Tools" with a Sharpie. Return all Shuttle IFM tools used on ISS to Endeavour prior to sleep.

4-Inch Ratchet Wrench (1/4” Drive) 4" Ext, 1/4" Drive 6" Ext, 1/4" Drive Driver Handle, 1/4" Drive 1/4" to 3/8" Adapter 3/16" Hex Head, 3/8" Drive 5/32" Hex Head, 1/4" Drive 7/16" Deep Socket, 1/4" Drive 3/8" Socket, 1/4" Drive 9/16" Socket, 3/8" Drive Flat Tip Screwdriver, Long Vise Grips 4-1/2 Inch Diagonal Cutters Anti-Static Wrist Tether

END OF PAGE 1 OF 1, MSG 052 33

Page 35: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

22-0354A (MSG 053A) CBCS INSTALLATION/REMOVAL - PREP FOR 20A Page 1 of 7 pages

15 JAN 10

OBJECTIVE: Power up CBCS for PMA relocate to Node 2 Zenith on day of operations. Power down, then

transfer Centerline Berthing Camera System (CBCS) and all related avionics from Node 2 to Node 1, for the Node 3 Installation to Node 1 Port on 20A.

LOCATION: Node 2 Node 1 DURATION: Power up for Day of PMA3 Relocate - 10 minutes (step 1) Transfer/Install from Node 2 to Node 1 - 45 minutes (steps 3 to 10) Powerdown/Temp Stow - 15 minutes (steps 10 to 11) CREW: One PARTS:

NOTE

CBCS String One and Two installations will be alternated to ensure functionality of each string. Strings One and Two contain identical hardware distinguished by Serial Number (S/N).

Table 1. Parts List.

Part P/N S/Ns Notes Camera Bag SEG33112759-

301 1001

(1002) Blue bag that holds the

camera CBCS Camera

Assembly SEG33112576-

301 1001

(1002) Stored in Camera Bag

Ku-Band Power Supply SEG46116711-302

1004 (1008)

Marked "For CBCS Use Only"

LED Control Unit SEG33112643-301

1001 (1002)

Video Interface Unit SEG33112646-301

1003 (1002)

CBCS Camera Cable SEG33112641-301

1002 (1001)

13 ft cable; Violet, gold, orange connectors

CBCS Electronics Cable

SEG33112638-301

1002 (1001)

20 ft cable; Pink, red, yellow, blue connectors

UOP Power PSA Cable, 120VDC

SEG46116745-301

1008 (1007) 21 ft cable

MATERIALS: Velcro Straps (as required for securing cabling) TOOLS: Digital camera

34

Page 36: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

22-0354A (MSG 053A) CBCS INSTALLATION/REMOVAL - PREP FOR 20A Page 2 of 7 pages

15 JAN 10

REFERENCED PROCEDURE: 6.114 LAB (CUP) RWS UOP BYPASS CABLE RECONFIGURATION

Figure 1. - Example CBCS Installation Diagram.

NOTE

Figure 1 shows an example CBCS installation. For PMA3 relocate, the N2 Internal Camera Port (ICP) will be used, along with Node 2 UOP 1. For N3 install, the N1 Internal Camera Port (ICP) will be used along with Node 1 UOP 1.

1. APPLYING POWER TO CBCS FOR PMA 3 RELOCATE TO N2 ZEN

1.1 √All CBCS cables mated per Figure 1. NOD2P6 1.2 Enabling Node 2 UOP 1

√POWER OUT – F (green ENABLE) √Fault/Test – OK illuminated (green)

P3P3 P4

P4

35

Page 37: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

22-0354A (MSG 053A) CBCS INSTALLATION/REMOVAL - PREP FOR 20A Page 3 of 7 pages

15 JAN 10

1.3 Ku-Band Power Supply OUTPUT 28V → ON

1.4 √Ku-Band Power Supply Input/Output LEDs (two) – illuminated (green)

2. CHECKING OUT CBCS VIDEO ON RWS MONITOR 2.1 √MCC-H - Ground complete with video routing to RWS

2.2 Routing CBCS video from ICP

DCP Configure RWS monitor as specified below:

Monitor 2 72: CBCS

2.3 Verify CBCS video displayed on RWS.

2.4 Verify MCC-H complete with ground video check.

3. POWERING DOWN

3.1 Ku-Band Power Supply OUTPUT 28 → OFF √Ku-Band Power Supply Output LED – dark

NOD2P6 3.2 Removing power from Node 2 UOP 1

√POWER OUT – F (blue RESET) √Fault/Test – dark

3.3 Leave all CBCS cables, hardware connected for future CBCS operations.

4. TRANSFER CBCS TO NODE 1

NOD2P6 4.1 UOP Power PSA Cable, 120VDC P2 ←|→ J3 on Node 2 UOP 1 CBCS Electronics cable P1 (red) ←|→ Node 2 Internal Camera Port

(ICP) Retrieve Node 2 Video Cap J01 from stowage. Replace Video Cap J01 VCP to Video Port located at NOD2S4.

4.2 Remove CBCS Camera Assembly from Hatch Standoff Fittings on

Node 2 Zenith Hatch (1/4 Turn Fasteners). Leave Gray Tape (four pieces) on LEDs. Leave Hatch Standoff Fittings installed on Node 2 Zenith hatch. Place CBCS Camera Assembly in Camera Bag face down to protect

during transfer to Node 1. 4.3 If N2 Zenith Inner Hatch Window Shield was removed when CBCS

was installed on N2 Zenith Hatch, reinstall (Velcro).

4.4 If Handrail Clamp and/or Multi-use Bracket was used to secure LED Control Unit and/or Video Interface Unit, remove and temporarily stow.

36

Page 38: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

22-0354A (MSG 053A) CBCS INSTALLATION/REMOVAL - PREP FOR 20A Page 4 of 7 pages

15 JAN 10

4.5 Gather and relocate all CBCS hardware to Node 1.

Ku-Band Power Supply CBCS Camera Assembly (stowed in blue Camera Bag) Video Interface Unit (VIU) LED Control Unit (LCU) All cabling

5. SAFING

NOD1SD4 Verifying no power applied to Node 1 UOP 1 J3. √POWER OUT – F (blue RESET) √Fault/Test – dark

6. INSTALLING CBCS HARDWARE

6.1 UOP Power PSA Cable, 120VDC P2 →|← J3 on Node 1 UOP 1 NOD1SD3 6.2 CBCS Electronics cable P1 (red) →|← Node 1 Internal Camera Port

(ICP)

NOTE 1. Handrail Clamp and/or Multi-use Bracket may be used to secure LED

Control Unit, Video Interface Unit if desired.

2. CBCS Extension Cable is not required. 6.3 Secure LED Control Unit, Video Interface Unit near N1 Port hatch.

7. CONFIGURING LED CONTROL UNIT SETTINGS

Figure 2. - LED Control Unit.

37

Page 39: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

22-0354A (MSG 053A) CBCS INSTALLATION/REMOVAL - PREP FOR 20A Page 5 of 7 pages

15 JAN 10

Brightness Dial → 10 (was previously set at 5 for PMA 3 Relocate) sw Mode Switch → STEADY sw System Select Switch → SYS 1&2 Refer to Figure 2.

8. INSTALLING CAMERA ASSEMBLY

Figure 3. - Hatch Standoff Fitting Installed.

Figure 4. - LEDs Covered with Gray Tape.

CAUTION Ensure that all 1/4 Turn Fasteners are fully seated in Hatch Standoff Fittings before engaging. Improper alignment could cause captive rubber grommet to disengage from CBCS Camera Assembly and affect centerline alignment.

8.1 If N1 Port Inner Hatch Window Shield is installed on hatch window,

remove (Velcro). Temporarily stow.

Camera “Tail”

38

Page 40: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

22-0354A (MSG 053A) CBCS INSTALLATION/REMOVAL - PREP FOR 20A Page 6 of 7 pages

15 JAN 10

8.2 Mount CBCS Camera Assembly to Hatch Standoff Fittings with

Camera tail oriented tail pointing ISS Aft, 1/4 Turn Fasteners (four). Refer to Figures 3 and 4.

8.3 Photo document CBCS Camera orientation, showing complete hatch

in camera view (Digital Camera).

9. APPLYING POWER TO CBCS 9.1 √All CBCS cables mated per Figure 1.

NOD1SD4 9.2 Enabling Node 1 UOP 1

√POWER OUT – F (green ENABLE) √Fault/Test – OK illuminated (green)

9.3 Ku-Band Power Supply OUTPUT 28V → ON

9.4 √Ku-Band Power Supply Input/Output LEDs (two) – illuminated (green)

10. CHECKING OUT CBCS VIDEO ON RWS MONITOR

10.1 If required, perform Display Control Panel (DCP) Cable Mate 6.114 LAB(CUP) RWS UOP BYPASS CABLE RECONFIGURATION, step 2 (SODF: RBT GEN: NOMINAL: RWS HARDWARE OPERATIONS), then:

10.2 √MCC-H - Ground complete with video routing to RWS

10.3 Routing CBCS video from ICP

DCP Configure RWS monitor as specified below:

Monitor 2 17: CBCS

10.4 Verify CBCS video displayed on RWS.

10.5 Verify MCC-H complete with ground video check.

11. POWERING DOWN

11.1 Ku-Band Power Supply OUTPUT 28 → OFF √Ku-Band Power Supply Output LED – dark

NOD1SD4 11.2 Removing power from Node 1 UOP 1

√POWER OUT – F (blue RESET) √Fault/Test – dark

39

Page 41: FD05 FLIGHT PLAN REVISION - NASA · 2010. 2. 11. · Title 046A : 1 - 14 FD05 Flight Plan Revision: 047B 15 - 16: FD05 Mission Summary 048 : Daily Summary--- (Electronic Only) 049

22-0354A (MSG 053A) CBCS INSTALLATION/REMOVAL - PREP FOR 20A Page 7 of 7 pages

15 JAN 10

12. TEMPORARILY STOWING CBCS 12.1 Leave all CBCS cables, hardware connected for future CBCS

operations. 12.2 Remove CBCS Camera Assembly from Hatch Standoff Fittings (1/4

Turn Fasteners). Leave Gray Tape (four pieces) on LEDs. Leave Hatch Standoff Fittings installed on Node 1 Port hatch. Place CBCS Camera Assembly in Camera Bag face down, then temp

stow in safe location in Node 1.

12.3 If N1 Port Inner Hatch Window Shield was installed on hatch window, reinstall (Velcro).

40