STS-117/13A FD 04 Execute Package MSG Page(s) Title 020B 1 - 12 FD04 Flight Plan Revision (pdf) 018 13 FD04 Mission Summary (pdf) 021 14 FD4 SVS S3S4 VIEWING LIGHTING PREDICTIONS (pdf) 023 15 Status of Regions of Interest (pdf) 022 --- FD03 MMT Summary (pdf - Electronic Only) Approved by FAO: Linda Delapp Last Updated: Jun 11 2007 11:48AM GMT JEDI (Joint Execute package Development and Integration), v2.04.0003

Transcript of FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3,...

Page 1: FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 16 valve should have been re-opened per step 8 of N2 REPRESS

STS-117/13A FD 04 Execute Package

MSG Page(s) Title 020B 1 - 12 FD04 Flight Plan Revision (pdf) 018 13 FD04 Mission Summary (pdf) 021 14 FD4 SVS S3S4 VIEWING LIGHTING PREDICTIONS (pdf) 023 15 Status of Regions of Interest (pdf) 022 --- FD03 MMT Summary (pdf - Electronic Only)

Approved by FAO: Linda Delapp Last Updated: Jun 11 2007 11:48AM GMT JEDI (Joint Execute package Development and Integration), v2.04.0003

Page 2: FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 16 valve should have been re-opened per step 8 of N2 REPRESS

MSG 020 - FD04 FLIGHT PLAN REVISION

1 2

MSG INDEX

3 4 5 6 7 8 9

10

12 13 14

MSG NO. TITLE 018 FD04 Mission Summary 020 FD04 Flight Plan Revision 021 FD4 SVS S3S4 VIEWING LIGHTING PREDICTIONS 022 FD03 MMT Summary (Electronic Only) 023 Status of Regions of Interest 1. Message 15-0393 should be referenced by the ISS crew for EVA battery charging 11

operations during the docked timeframe. This message is identical to the STS-117 Battery Recharge Plan Cue Card from the EVA FDF Flight Supplement.

2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 15

valve should have been re-opened per step 8 of N2 REPRESS USING PAYLOAD N2 16 VALVES (ORB OPS, ECLS) p-5-56. O2 pressures indicate that both the System 1 and 2 valves were opened. Configure the O2 REG INLET SYS 2 valve at the earliest crew convenience:

17 18 19 20 21 22 23 24

26 27 28 29 30 31 32

34 35 36

MO10W O2 REG INLET SYS 2 vlv - CL

Report to MCC if valve is already in closed position.

3. The IWIS data take for the Russian Thruster Firing has been postponed until MCC-M 25

successfully validates the cyclogram. For today, we will only be capturing the S3/S4 berthing. In preparation for getting the Russian Thruster Firing later in the mission, we’re going to have MS2 go ahead with most of the IWIS Accelerometer installation in the Shuttle Airlock. He'll need to skip a couple of steps, since we're delaying the RSU setup activity until we have a plan for the thruster test. This will leave the IWIS Accelerometer extension cable positioned in the ODS but unconnected to the RSU.

4. ROBO requires camera C be routed to ISS on video channel 92 (Monitor 2) to monitor 33

SAW deploy. CCTV monitor 2 and the DTV system will need to be left on overnight. Please make the following changes:

In PRE-SLEEP ACTIVITY Perform step 7 with the following deltas 37

38 39 40 41 42 43 44 45 46 47 48 49 50

A3 TV MON 2 On A7 TV PWR CNTR UNIT - ON

VID OUT MON 2 pb - push IN C pb - push

L10(MUX) MUX/VTR/CC PWR - on (LED on)

√ MUX BYPASS - ACT √ CHANNEL 3 DATA LED - on √ VIP PWR - on

5. Flight Day 4 Exercise Constraints 51

END OF PAGE 1 OF 12, MSG 020

Page 3: FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 16 valve should have been re-opened per step 8 of N2 REPRESS

MSG 020 - FD04 FLIGHT PLAN REVISION

1 2 3 4

The table below summarizes the Shuttle and ISS exercise constraints for today. Except as noted, these constraints are also denoted in your timelines for your reference.

Exercise Constraints Activity Shuttle ISS

S3/S4 INSTALL (during USTO maneuver)*

Shuttle Ergometer limited to 65 RPM during ISS commanded maneuvers while SSRMS with S3/S4 grappled is in motion

None

S3/S4 INSTALL (mnvr to RTL)

No exercise while S3/S4 is in RTL position until capture latch is fully closed

SSAS NOMINAL MATE (after capture latch closed)

No exercise while S3/S4 is in RTL position until any three SSAS bolts are tight

None

EVA 1 (during APFR operations from a structure-mounted WIF)

None No IRED or HC-1 exercise allowed during APFR operations from a structure-mounted WIF (umbilical connections, SABB restraint releases, and DLA install)

PVR DEPLOY No exercise while PVR is being deployed

No exercise while PVR is being deployed

SARJ LAUNCH LOCK REMOVALS**

Unisolated exercise may prevent EVA removal of launch locks and launch restraints

Unisolated exercise may prevent EVA removal of launch locks and launch restraints

5 6 7 8 9

11 12 13 14 15 16 17 18 19 20 21 22 23 24

* The exercise constraints for this task are not reflected in your timelines since they only apply if the USTO maneuver slips to the S3/S4 Install timeframe. ** The exercise constraints for this task are not reflected in your timelines but may be imposed if EV crew has problem with task completion.

6. REPLACE PAGES 2-10, 2-12, AND 3-32 THROUGH 3-39. 10

END OF PAGE 2 OF 12, MSG 020

Page 4: FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 16 valve should have been re-opened per step 8 of N2 REPRESS

06/11/07 06:10:21

FLT PLN/117/FLIGHT

FD04

10.2DPRS

A/LREP

EVA 1 (6:30)

PREPARE SAW/PVR DEPLOY

>

>

β = 56

REILLY

STURCKOW

ARCHAMBAULT

SWANSON

FORRESTER

OLIVAS

NO IRED/HC-1 EXERCISENO ERGO NOEXERCISE

WILLIAMS

ЮРЧИХИН

КОТОВ

ANDERSON

NOEXER

REPLANNED

2-10

STS-117

DN

EXP-15

UP

STS

12 13 14 15 16 17 18 19 20 21 22 23GMT 06/11/07 (162) 12 13 14 15 16 17 18 19 20 21 22 23 003/00

MET Day 002

CDRDAP

COMM

INHBT

PADIMU

MNVR

UPDAT

P/TVSPRT

P/TV07S/U

POST SLEEP

POST

SLEEP

POST SLEEPSLEEPSRMS

SRMS

P/TV SPRTN2INIT

P/TV

SPRT

PMCA/G

PLT/R2/M1 POST SLEEPPVR

DPLY

SLEEPSRMS

SSRMSEVA 1PARK

VIEW

SSRMS SPRTLIMP

SSRMS S3/S4 INSTLUNGRPL

SAFE

MNVRTORTL

AVU*

MS1/EV3/R1AVU*

IVA SUPPORTMCIU

POSTSLEEPPOST SLEEPSLEEP

SRMS

LIMP

SSRMSS3/S4INSTL

AVU*

MNVRTORTL

AVU TGTACQ

MS2/EV4/M2CWC 2

TERM

CWC 2

INIT

CWC 3

TERM

CWC 3

INIT

P_DPS

C_LKDPRS

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREP EMU RCNFGEXERCISE MEALPOST SLEEPPVR

DPLY

SLEEP

HYGBRK/HATCHCLS

IWISSNSRINSTL

MS3/EV2/R1

UNSTW

AFT

SABB

P_DPS

C_LKDPRS

EMUPREBREATHE

EMU

PURGE

SORTIEEGRESS& S/U

CAMPOUT EVA PREP REL AFT/FWD SABB RESAJISSTRUTS(4)

POSTSLEEPSLEEP (8.5 HOURS)

RELPVR

CINCH/WINCH

RMVMLI

HYG BRK/PREBREATHE

MS4/EV1REL1A/3ASABGARES

UNSTW

FWD

SABB

P_DPS

C_LKDPRS

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREPHYG BRK/PREBREATHE

SARJ

PREP

EGRSS

& S/U

S3 MDMSHRDRMVL

KEELPIN

ROTATE

POSTSLEEP

S1-S3ZT

UTIL

S1-S3NT

UTIL

SARJ DLA2INSTLSLEEP (8.5 HOURS)

FE-2 SLEEP POST SLEEPPREP

PREP

DPC

HYGBRK/HATCHCLS

CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS SSRMS

SPRTMIDDAY-MEAL H/O TVIS

IWIS-

ISS CDR SLEEP POST SLEEPHAMPS DPC PREP ♣ ЕДВ FILL СОЖ GSC

FMK

EXERCISE TVIS MIDDAY-MEAL ВКД-ИНСТР-STOW1 VELO ВКДSTOW

FE-1 SLEEP POST SLEEPPREPDPC SSRMS S3/S4 INSTL MNVR

TORTL

LIMP

ГАНК

UNGRPL

SSRMSEVA 1PARK

MIDDAY-MEAL SOKOLLK CK

SOKOL

DRY ВКД-STOW CEVIS

GLOVE

ВКДSTOW

FE-2 SLEEP POST SLEEPPREPDPCPREP

WORK

WATCH

CGBA

1-CAP

3-CAP

S1S3SSAS

BOLTINGMIDDAY-MEAL SOKOL

LK CK H/O ADAPT

WS2 PDGF2SSRMSDAY/NIGHTORBIT 41 42 43 44 45 46 47 48

TDRSW -171E -46Z -275

BIAS -XLV -ZVV BIAS -XLV -ZVVORB ATT♣ВКД-825-DSCHRG1-INIT *CLNUP*PWRUP

*CALIBRATIONNOTES

2-10

FD04

10.2DPRS

A/LREP

EVA 1 (6:30)

PREPARE SAW/PVR DEPLOY

>

>

β = 56

REILLY

STURCKOW

ARCHAMBAULT

SWANSON

FORRESTER

OLIVAS

NO IRED/HC-1 EXERCISENO ERGO NOEXERCISE

WILLIAMS

ЮРЧИХИН

КОТОВ

ANDERSON

NOEXER

REPLANNED

STS-117

DN

EXP-15

UP

STS

12 13 14 15 16 17 18 19 20 21 22 23GMT 06/11/07 (162) 12 13 14 15 16 17 18 19 20 21 22 23 003/00

MET Day 002

CDRDAP

COMM

INHBT

PADIMU

MNVR

UPDAT

P/TVSPRT

P/TV07S/U

POST SLEEP

POST

SLEEP

POST SLEEPSLEEPSRMS

SRMS

P/TV SPRTN2INIT

P/TV

SPRT

PMCA/G

PLT/R2/M1 POST SLEEPPVR

DPLY

SLEEPSRMS

SSRMSEVA 1PARK

VIEW

SSRMS SPRTLIMP

SSRMS S3/S4 INSTLUNGRPL

SAFE

MNVRTORTL

AVU*

MS1/EV3/R1AVU*

IVA SUPPORTMCIU

POSTSLEEPPOST SLEEPSLEEP

SRMS

LIMP

SSRMSS3/S4INSTL

AVU*

MNVRTORTL

AVU TGTACQ

MS2/EV4/M2CWC 2

TERM

CWC 2

INIT

CWC 3

TERM

CWC 3

INIT

P_DPS

C_LKDPRS

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREP EMU RCNFGEXERCISE MEALPOST SLEEPPVR

DPLY

SLEEP

HYGBRK/HATCHCLS

IWISSNSRINSTL

MS3/EV2/R1

UNSTW

AFT

SABB

P_DPS

C_LKDPRS

EMUPREBREATHE

EMU

PURGE

SORTIEEGRESS& S/U

CAMPOUT EVA PREP REL AFT/FWD SABB RESAJISSTRUTS(4)

POSTSLEEPSLEEP (8.5 HOURS)

RELPVR

CINCH/WINCH

RMVMLI

HYG BRK/PREBREATHE

MS4/EV1REL1A/3ASABGARES

UNSTW

FWD

SABB

P_DPS

C_LKDPRS

EMUPREBREATHE

EMU

PURGE

CAMPOUT EVA PREPHYG BRK/PREBREATHE

SARJ

PREP

EGRSS

& S/U

S3 MDMSHRDRMVL

KEELPIN

ROTATE

POSTSLEEP

S1-S3ZT

UTIL

S1-S3NT

UTIL

SARJ DLA2INSTLSLEEP (8.5 HOURS)

FE-2 SLEEP POST SLEEPPREP

PREP

DPC

HYGBRK/HATCHCLS

CAMPOUT EVA PREP

EMU

PURGE

EMUPREBREATHE

C_LKDPRS SSRMS

SPRTMIDDAY-MEAL H/O TVIS

IWIS-

ISS CDR SLEEP POST SLEEPHAMPS DPC PREP ♣ ЕДВ FILL СОЖ GSC

FMK

EXERCISE TVIS MIDDAY-MEAL ВКД-ИНСТР-STOW1 VELO ВКДSTOW

FE-1 SLEEP POST SLEEPPREPDPC SSRMS S3/S4 INSTL MNVR

TORTL

LIMP

ГАНК

UNGRPL

SSRMSEVA 1PARK

MIDDAY-MEAL SOKOLLK CK

SOKOL

DRY ВКД-STOW CEVIS

GLOVE

ВКДSTOW

FE-2 SLEEP POST SLEEPPREPDPCPREP

WORK

WATCH

CGBA

1-CAP

3-CAP

S1S3SSAS

BOLTINGMIDDAY-MEAL SOKOL

LK CK H/O ADAPT

SSRMS WS2 PDGF2DAY/NIGHTORBIT 41 42 43 44 45 46 47 48

TDRSW -171E -46Z -275

ORB ATT BIAS -XLV -ZVV BIAS -XLV -ZVV

NOTES♣ВКД-825-DSCHRG1-INIT *CLNUP*PWRUP

*CALIBRATION

Page 5: FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 16 valve should have been re-opened per step 8 of N2 REPRESS

06/11/07 06:10:21

FLT PLN/117/FLIGHT

FD04

β = 53

REILLY

STURCKOW

ARCHAMBAULT

SWANSON

FORRESTER

OLIVAS

NO EXER

WILLIAMS

ЮРЧИХИН

КОТОВ

ANDERSON

NO IRED/HC-1

REPLANNED

2-12

STS-117

DN

EXP-15

UP

STS

06/12 01 02 03 04 05 06 07 08 09 10 11GMT 06/11/07 (162) 003/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 003

CDRN2TERM

PMCS/G

PRE SLEEP

PRE

SLEEP

SLEEPPRE SLEEPEXERCISEP/TVSPRTP/TV SPRT

PLT/R2/M1 EXERCISEPVR

DPLY

PRE SLEEP SLEEPSSRMS SPRT

MS1/EV3/R1 IVA SUPPORT PRESLEEP

PRESLEEP PRE SLEEP SLEEP

DOCK

AUDIO

BSAINIT

MS2/EV4/M2 CWCXFER

P_RPS

RPRS

PVR

DPLY

PRE SLEEP SLEEPPOST EVA W/H20METOX

MS3/EV2/R1RPRS

P_RPS

SARJ PREPLOCKS

SORTIEC/U &INGRS

POST EVA W/H20METOX PRE SLEEP SLEEP

MS4/EV1

P_RPS

RPRS

SARJ PREPSORTIEC/U &INGRS

POST EVA W/H20METOX PRE SLEEP SLEEP

FE-2 PREP CEVIS

PRE

SLEEP

PRE SLEEPPOST EVA W/H20METOX SLEEP

ISS CDR ВКД STOW IMS PREPWORK PREP

WORK

CHRG

D/L

♣ DPC PRE SLEEP SLEEP

FE-1 ВКД STOW

SOKOL

CLS VELO

EXER

PREP

WORKDPC PRE SLEEP SLEEP

FE-2 ADAPTJRNL

CGBA

PREP

WORK

PREP WORKPMC DPC PRE SLEEP SLEEP

WS2 PDGF2SSRMSDAY/NIGHTORBIT 49 50 51 52 53 54 55 56

TDRSW -171E -46Z -275

BIAS -XLV -ZVVORB ATT♣ВКД-825-DSCHRG2-INIT

NOTES

2-12

FD04

β = 53

REILLY

STURCKOW

ARCHAMBAULT

SWANSON

FORRESTER

OLIVAS

NO EXER

WILLIAMS

ЮРЧИХИН

КОТОВ

ANDERSON

NO IRED/HC-1

REPLANNED

STS-117

DN

EXP-15

UP

STS

06/12 01 02 03 04 05 06 07 08 09 10 11GMT 06/11/07 (162) 003/00 01 02 03 04 05 06 07 08 09 10 11 12

MET Day 003

CDRN2TERM

PMCS/G

PRE SLEEP

PRE

SLEEP

SLEEPPRE SLEEPEXERCISEP/TVSPRTP/TV SPRT

PLT/R2/M1 EXERCISEPVR

DPLY

PRE SLEEP SLEEPSSRMS SPRT

MS1/EV3/R1 IVA SUPPORT PRESLEEP

PRESLEEP PRE SLEEP SLEEP

DOCK

AUDIO

BSAINIT

MS2/EV4/M2 CWCXFER

P_RPS

RPRS

PVR

DPLY

PRE SLEEP SLEEPPOST EVA W/H20METOX

MS3/EV2/R1RPRS

P_RPS

SARJ PREPLOCKS

SORTIEC/U &INGRS

POST EVA W/H20METOX PRE SLEEP SLEEP

MS4/EV1

P_RPS

RPRS

SARJ PREPSORTIEC/U &INGRS

POST EVA W/H20METOX PRE SLEEP SLEEP

FE-2 PREP CEVIS

PRE

SLEEP

PRE SLEEPPOST EVA W/H20METOX SLEEP

ISS CDR ВКД STOW IMS PREPWORK PREP

WORK

CHRG

D/L

♣ DPC PRE SLEEP SLEEP

FE-1 ВКД STOW

SOKOL

CLS VELO

EXER

PREP

WORKDPC PRE SLEEP SLEEP

FE-2 ADAPTJRNL

CGBA

PREP

WORK

PREP WORKPMC DPC PRE SLEEP SLEEP

SSRMS WS2 PDGF2DAY/NIGHTORBIT 49 50 51 52 53 54 55 56

TDRSW -171E -46Z -275

ORB ATT BIAS -XLV -ZVV

NOTES♣ВКД-825-DSCHRG2-INIT

Page 6: FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 16 valve should have been re-opened per step 8 of N2 REPRESS

06/11/07 06:10:07

FLT PLN/117/FLIGHT

FD04

STURCKOW ARCHAMBAULT FORRESTER

FD04 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES and RPOP2 (STS6,7)

REPLANNED

3-32

STS-117 (FD )

12:00

13:00

14:00

15:00

GMT

Date06/11(162)

12:00

13:00

14:00

15:00

16:00

MET

Day 002W E Z

TDRS

~

~

~

~

DORB

14

15

1

ORB

41

42

43

~

BIAS -XLV -ZVV

~

BIAS -XLV -ZVV

STS ATT

CDR

EVA COMM CNFG (EVA,EVA PREP) Steps 1 & 5MNVR (TRK) UPDATE (Post S3/S4 Install) TG=2 BV=5 P=159 Y=2 OM=181 A15/FREE/VERN Init TRK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

S3/S4 INSTALL VIEWING (PDRS, VIEWING SUPPORT) Steps 4-5

PRIVATE MEDICAL CONFERENCE Perform via A/G 2

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

ROBOTICS: 1.102 S3/S4 INSTALL Steps 1-5

~

MS1

ROBOTICS: 1.905 AVU POWERUP Steps 4-5

L17 Check MCIU filter screen

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

S3/S4 INSTL VIEW (PDRS,VIEW SPRT)Steps 1-3

ROBO:1.901 AVU WRST CAM S1 FOCAL LNGTH S/U Ref. MSG 021

NOTES

3-32

FD04

STURCKOW ARCHAMBAULT FORRESTER

FD04 EZ ACTIVITIES: OCAC FILTER INSPECTION HARD REBOOT ALL PGSCs EXCEPT: WLES and RPOP2 (STS6,7)

REPLANNEDSTS-117 (FD )

12:00

13:00

14:00

15:00

GMT

Date06/11(162)

12:00

13:00

14:00

15:00

16:00

MET

Day 002W E Z

TDRS

DORB

14

15

1

ORB

41

42

43

STS ATT~

BIAS -XLV -ZVV

~

BIAS -XLV -ZVV

CDR

EVA COMM CNFG (EVA,EVA PREP) Steps 1 & 5MNVR (TRK) UPDATE (Post S3/S4 Install) TG=2 BV=5 P=159 Y=2 OM=181 A15/FREE/VERN Init TRK

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

S3/S4 INSTALL VIEWING (PDRS, VIEWING SUPPORT) Steps 4-5

PRIVATE MEDICAL CONFERENCE Perform via A/G 2

PLT

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

ROBOTICS: 1.102 S3/S4 INSTALL Steps 1-5

~

MS1

ROBOTICS: 1.905 AVU POWERUP Steps 4-5

L17 Check MCIU filter screen

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

S3/S4 INSTL VIEW (PDRS,VIEW SPRT)Steps 1-3

ROBO:1.901 AVU WRST CAM S1 FOCAL LNGTH S/U Ref. MSG 021

NOTES

Page 7: FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 16 valve should have been re-opened per step 8 of N2 REPRESS

06/11/07 06:10:07

FLT PLN/117/FLIGHT

FD04

REILLYSWANSON OLIVAS

REPLANNED

3-33

STS-117 (FD )

12:00

13:00

14:00

15:00

GMT

Date06/11(162)

12:00

13:00

14:00

15:00

16:00

MET

Day 002W E Z

TDRS

~

~

~

~

DORB

14

15

1

ORB

41

42

43

~

BIAS -XLV -ZVV

~

BIAS -XLV -ZVV

STS ATT

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK Steps 21-30 MCC-H will perform step 24.

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK MCC-H will perform steps 1-4, 16-20, & 24

MS4

EVA SYSTEMS: 2.315 HYGIENE BREAK MCC-H will peform steps 1-4, 16-20, & 24

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

NOTES

3-33

FD04

REILLYSWANSON OLIVAS

REPLANNEDSTS-117 (FD )

12:00

13:00

14:00

15:00

GMT

Date06/11(162)

12:00

13:00

14:00

15:00

16:00

MET

Day 002W E Z

TDRS

DORB

14

15

1

ORB

41

42

43

STS ATT~

BIAS -XLV -ZVV

~

BIAS -XLV -ZVV

MS2

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK Steps 21-30 MCC-H will perform step 24.

MS3

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

EVA SYSTEMS: 2.315 HYGIENE BREAK MCC-H will perform steps 1-4, 16-20, & 24

MS4

EVA SYSTEMS: 2.315 HYGIENE BREAK MCC-H will peform steps 1-4, 16-20, & 24

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

SLEEP

~

NOTES

Page 8: FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 16 valve should have been re-opened per step 8 of N2 REPRESS

06/11/07 06:10:07

FLT PLN/117/FLIGHT

FD04

STURCKOW ARCHAMBAULT FORRESTER

A DAP A12 - CNTL ACCL 3 DAP B12 - CNTL ACCL 4 Go to: DAP A12/FREE/VERN

UPLINKβ21 onlyBox C1,C2,C3,D2

REPLANNED

3-34

STS-117 (FD )

16:00

17:00

18:00

19:00

GMT

Date06/11(162)

16:00

17:00

18:00

19:00

20:00

MET

Day 002W E Z

TDRS

~

~ ~

~

DORB

1

2

3

4

ORB

43

44

45

46

~

~

BIAS -XLV -ZVV

STS ATT

CDR

Pst 3 bolts tight permanently edit DAPS A

EVA1 INHIBIT PAD (EVA, TIMELINES)

IMU STAR OF OPPTY ALIGN (ORB OPS)

P/TV SUPPORT EVA 1

P/TV07 EVA (PHOTO/TV, SCENES) Setup

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

S3/S4 INSTALL VIEWING (PDRS, VIEWING SUPPORT) Step 11

P/TV SUPPORT EVA 1~

PLT

S3/S4 INSTALL VIEWING (PDRS, VIEWING SUPPORT) Step 11

ROBO: 1.104 MNVR TO PRE-DEPLOYSURVEY POSITION Steps 1-2

SSRMS SUPPORT EVA 1~

ROBOTICS: 1.102 S3/S4 INSTL (Limp) Step 8

ROBOTICS: 1.102 S3/S4 INSTALL Steps 1-5

~

ROBOTICS: 1.103 S3/S4 UNGRAPPLE Perform after 3 bolts tight

ROBOTICS: 1.102 S3/S4 INSTL (Safe) Step 8

ROBOTICS: 1.102 S3S4 INSTALL MNVR to RTL Steps 6-7 Ref. MSG 021

ROBO: 1.902 AVU WRIST CAM S3 TRUSS INSTALL Steps 9-10

MS1

IVA SUPPORT EVA 1

~

ROBOTICS: 1.102 S3/S4 INSTL (Limp) Step 8

ROBOTICS: 1.102 S3/S4 INSTALL Steps 1-5

ROBOTICS: 1.102 S3S4 INSTALL MNVR to RTL Steps 6-7 Ref. MSG 021

ROBO: 1.902 AVU WRIST CAM S3TRUSS INSTALL

NO EXERCISEDURING RTL &CAPTURE ANDNO ERGOMETER DURING SSASBOLTING UNTIL3 BOLTS TIGHT

NOTES

3-34

FD04

STURCKOW ARCHAMBAULT FORRESTER

A DAP A12 - CNTL ACCL 3 DAP B12 - CNTL ACCL 4 Go to: DAP A12/FREE/VERN

UPLINKβ21 onlyBox C1,C2,C3,D2

REPLANNEDSTS-117 (FD )

16:00

17:00

18:00

19:00

GMT

Date06/11(162)

16:00

17:00

18:00

19:00

20:00

MET

Day 002W E Z

TDRS

DORB

1

2

3

4

ORB

43

44

45

46

STS ATT~

~

BIAS -XLV -ZVV

CDR

Pst 3 bolts tight permanently edit DAPS A

EVA1 INHIBIT PAD (EVA, TIMELINES)

IMU STAR OF OPPTY ALIGN (ORB OPS)

P/TV SUPPORT EVA 1

P/TV07 EVA (PHOTO/TV, SCENES) Setup

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

S3/S4 INSTALL VIEWING (PDRS, VIEWING SUPPORT) Step 11

P/TV SUPPORT EVA 1~

PLT

S3/S4 INSTALL VIEWING (PDRS, VIEWING SUPPORT) Step 11

ROBO: 1.104 MNVR TO PRE-DEPLOYSURVEY POSITION Steps 1-2

SSRMS SUPPORT EVA 1~

ROBOTICS: 1.102 S3/S4 INSTL (Limp) Step 8

ROBOTICS: 1.102 S3/S4 INSTALL Steps 1-5

~

ROBOTICS: 1.103 S3/S4 UNGRAPPLE Perform after 3 bolts tight

ROBOTICS: 1.102 S3/S4 INSTL (Safe) Step 8

ROBOTICS: 1.102 S3S4 INSTALL MNVR to RTL Steps 6-7 Ref. MSG 021

ROBO: 1.902 AVU WRIST CAM S3 TRUSS INSTALL Steps 9-10

MS1

IVA SUPPORT EVA 1

~

ROBOTICS: 1.102 S3/S4 INSTL (Limp) Step 8

ROBOTICS: 1.102 S3/S4 INSTALL Steps 1-5

ROBOTICS: 1.102 S3S4 INSTALL MNVR to RTL Steps 6-7 Ref. MSG 021

ROBO: 1.902 AVU WRIST CAM S3TRUSS INSTALL

NOTES

NO EXERCISEDURING RTL &CAPTURE ANDNO ERGOMETER DURING SSASBOLTING UNTIL3 BOLTS TIGHT

Page 9: FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 16 valve should have been re-opened per step 8 of N2 REPRESS

06/11/07 06:10:07

FLT PLN/117/FLIGHT

FD04

After 2 bolts (#3 and one other), or at any 3 bolts, tight: EV crew are "GO" for Post Depress

REILLYSWANSON OLIVAS

At AVU Tgt Acquisition: EV crew are "GO" for HUT Donning

At RTL: EV crew are "GO" for Helmet Donning

NO EXERCISEDURING RTL &CAPTURE ANDNO ERGOMETERDURING SSASBOLTING UNTIL3 BOLTS TIGHT

REPLANNED

3-35

STS-117 (FD )

16:00

17:00

18:00

19:00

GMT

Date06/11(162)

16:00

17:00

18:00

19:00

20:00

MET

Day 002W E Z

TDRS

~

~ ~

~

DORB

1

2

3

4

ORB

43

44

45

46

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Init Fill #2 Ref. MSG 004

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

EXERCISE Ref. MSG 020, Item 5

~

MS3

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA 1 SORTIE EGRESS/SETUP

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

MS4

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

EVA 1 SORTIE EGRESS/SETUP

S1-S3 NADIR UTILITY TRAY CONNECT

~

NOTES

3-35

FD04

After 2 bolts (#3 and one other), or at any 3 bolts, tight: EV crew are "GO" for Post Depress

REILLYSWANSON OLIVAS

At AVU Tgt Acquisition: EV crew are "GO" for HUT Donning

At RTL: EV crew are "GO" for Helmet Donning

NO EXERCISEDURING RTL &CAPTURE ANDNO ERGOMETERDURING SSASBOLTING UNTIL3 BOLTS TIGHT

REPLANNEDSTS-117 (FD )

16:00

17:00

18:00

19:00

GMT

Date06/11(162)

16:00

17:00

18:00

19:00

20:00

MET

Day 002W E Z

TDRS

DORB

1

2

3

4

ORB

43

44

45

46

STS ATT~

~

BIAS -XLV -ZVV

MS2

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Init Fill #2 Ref. MSG 004

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

EXERCISE Ref. MSG 020, Item 5

~

MS3

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA 1 SORTIE EGRESS/SETUP

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

MS4

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: CREWLOCK DEPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 2.320 10.2 PSIACAMPOUT EVA PREP

EVA 1 SORTIE EGRESS/SETUP

S1-S3 NADIR UTILITY TRAY CONNECT

~

NOTES

Page 10: FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 16 valve should have been re-opened per step 8 of N2 REPRESS

06/11/07 06:10:07

FLT PLN/117/FLIGHT

FD04

STURCKOW ARCHAMBAULT FORRESTER

REPLANNED

3-36

STS-117 (FD )

20:00

21:00

22:00

23:00

GMT

Date06/11(162)

20:00

21:00

22:00

23:00

00:00

MET

Day 002W E Z

TDRS

~

~

~

~

DORB

4

5

6

7

ORB

46

47

48

~

~

BIAS -XLV -ZVV

STS ATT

CDR

P/TV SUPPORT EVA 1

~

N2 REPRESS USING PL N2 VALVES Init (ORB OPS, ECLS) Steps 1-5. On MCC Go, perform Step 6. MCC will TMBU all limits

P/TV SUPPORT EVA 1

~

PLT

EPS: 1.3.354 PVM RADIATOR DEPLOY On MCC GO: Perform Step 6 only

~

ROBOTICS: 1.104 MNVR TO PRE-DEPLOYSURVEY POSITION Step 3

SSRMS SUPPORT EVA 1

~

MS1

IVA SUPPORT EVA 1

~

~

NO EXERCISEDURING PVRDEPLOY

NOTES

3-36

FD04

STURCKOW ARCHAMBAULT FORRESTER

REPLANNEDSTS-117 (FD )

20:00

21:00

22:00

23:00

GMT

Date06/11(162)

20:00

21:00

22:00

23:00

00:00

MET

Day 002W E Z

TDRS

DORB

4

5

6

7

ORB

46

47

48

STS ATT~

~

BIAS -XLV -ZVV

CDR

P/TV SUPPORT EVA 1

~

N2 REPRESS USING PL N2 VALVES Init (ORB OPS, ECLS) Steps 1-5. On MCC Go, perform Step 6. MCC will TMBU all limits

P/TV SUPPORT EVA 1

~

PLT

EPS: 1.3.354 PVM RADIATOR DEPLOY On MCC GO: Perform Step 6 only

~

ROBOTICS: 1.104 MNVR TO PRE-DEPLOYSURVEY POSITION Step 3

SSRMS SUPPORT EVA 1

~

MS1

IVA SUPPORT EVA 1

~

~

NOTES

NO EXERCISEDURING PVRDEPLOY

Page 11: FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 16 valve should have been re-opened per step 8 of N2 REPRESS

06/11/07 06:10:07

FLT PLN/117/FLIGHT

FD04

REILLYSWANSON OLIVAS

REPLANNED

3-37

STS-117 (FD )

20:00

21:00

22:00

23:00

GMT

Date06/11(162)

20:00

21:00

22:00

23:00

00:00

MET

Day 002W E Z

TDRS

~

~

~

~

DORB

4

5

6

7

ORB

46

47

48

~

~

BIAS -XLV -ZVV

STS ATT

MS2

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERM

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATION

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Init Fill #3 Ref. MSG 004

FR/SW EMU RECONFIG (EVA, AIRLOCK CNFG)

EXERCISE Ref. MSG 020, Item 5

~

MEAL

EPS: 1.3.354 PVM RADIATOR DEPLOY On MCC GO: Perform Step 6 only

~

CSS: 15-0374 IWIS INSTALLATIONIN SHUTTLE AIRLOCK Perform Step 1, omit Steps 1.8 & 1.9 Ref. MSG 005

MS3

AFT (3A) SABB UNSTOW

RELEASE AFT/FWD (3A/1A) SABB RESTRAINT RELEASE

AJIS STRUT RIGIDIZATION (1-4)

PVM RADIATOR CINCHES/WINCHES

FWD/AFT (1A/3A) ECU/SSU MLI REMOVAL AND JETTISON

MS4

1A/3A SAW BETA GIMBAL RESTRAINT RELEASE

FWD (1A) SABB UNSTOW

SARJ LAUNCH LOCKS

~

APFR RECONFIG

ORU BAG CONFIG

S3 MDM SHROUD

APFR RECONFIG

KEEL PIN ROTATE

S1-S3 ZENITH UTILITY TRAY CONNECT

S1-S3 NADIR UTILITY TRAY CONNECT~

SARJ DLA 2 INSTALL

NO EXERCISEDURING PVRDEPLOY

NOTES

3-37

FD04

REILLYSWANSON OLIVAS

REPLANNEDSTS-117 (FD )

20:00

21:00

22:00

23:00

GMT

Date06/11(162)

20:00

21:00

22:00

23:00

00:00

MET

Day 002W E Z

TDRS

DORB

4

5

6

7

ORB

46

47

48

STS ATT~

~

BIAS -XLV -ZVV

MS2

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERM

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Perform FILL TERMINATION

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) Init Fill #3 Ref. MSG 004

FR/SW EMU RECONFIG (EVA, AIRLOCK CNFG)

EXERCISE Ref. MSG 020, Item 5

~

MEAL

EPS: 1.3.354 PVM RADIATOR DEPLOY On MCC GO: Perform Step 6 only

~

CSS: 15-0374 IWIS INSTALLATIONIN SHUTTLE AIRLOCK Perform Step 1, omit Steps 1.8 & 1.9 Ref. MSG 005

MS3

AFT (3A) SABB UNSTOW

RELEASE AFT/FWD (3A/1A) SABB RESTRAINT RELEASE

AJIS STRUT RIGIDIZATION (1-4)

PVM RADIATOR CINCHES/WINCHES

FWD/AFT (1A/3A) ECU/SSU MLI REMOVAL AND JETTISON

MS4

1A/3A SAW BETA GIMBAL RESTRAINT RELEASE

FWD (1A) SABB UNSTOW

SARJ LAUNCH LOCKS

~

APFR RECONFIG

ORU BAG CONFIG

S3 MDM SHROUD

APFR RECONFIG

KEEL PIN ROTATE

S1-S3 ZENITH UTILITY TRAY CONNECT

S1-S3 NADIR UTILITY TRAY CONNECT~

SARJ DLA 2 INSTALL

NOTES

NO EXERCISEDURING PVRDEPLOY

Page 12: FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 16 valve should have been re-opened per step 8 of N2 REPRESS

06/11/07 06:10:07

FLT PLN/117/FLIGHT

FD04

STURCKOW ARCHAMBAULT FORRESTER

UPLINKTFL 199

REPLANNED

SLEEP START: 3/05:303-38

STS-117 (FD )

00:00

01:00

02:00

03:00

GMT

Date06/11(162)

00:00

01:00

02:00

03:00

04:00

MET

Day 003W E Z

TDRS

~

~

~

~

DORB

7

8

9

ORB

49

50

51

~

~

BIAS -XLV -ZVV

STS ATT

CDR

N2 RPRS USING PL N2 VLVS Term (ORB OPS, ECLS) On MCC Go, Steps 7-12 MCC will TMBU all limits

PRIVATE MEDICAL CONFERENCE Perform via S/G 2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS) Ref. MSG 020, Item 4

EXERCISE Ref. MSG 020, Item 5

P/TV SUPPORT EVA 1

P/TV SUPPORT EVA 1

~

PLT

EXERCISE Ref. MSG 020, Item 5

EPS: 1.3.354 PVM RADIATOR DEPLOY On MCC GO: Perform Step 6 only

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SSRMS SUPPORT EVA 1

MS1

IVA SUPPORT EVA 1

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

JOINT OPS: 6.103 HARDLINE AUDIOCONFIG (ISS) Steps 1,2,6,7

EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE (Init) Ref. MSG 020, Item 1

NO EXERCISEDURING PVRDEPLOY

NOTES

3-38

FD04

STURCKOW ARCHAMBAULT FORRESTER

UPLINKTFL 199

REPLANNED

SLEEP START: 3/05:30

STS-117 (FD )

00:00

01:00

02:00

03:00

GMT

Date06/11(162)

00:00

01:00

02:00

03:00

04:00

MET

Day 003W E Z

TDRS

DORB

7

8

9

ORB

49

50

51

STS ATT~

~

BIAS -XLV -ZVV

CDR

N2 RPRS USING PL N2 VLVS Term (ORB OPS, ECLS) On MCC Go, Steps 7-12 MCC will TMBU all limits

PRIVATE MEDICAL CONFERENCE Perform via S/G 2

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS) Ref. MSG 020, Item 4

EXERCISE Ref. MSG 020, Item 5

P/TV SUPPORT EVA 1

P/TV SUPPORT EVA 1

~

PLT

EXERCISE Ref. MSG 020, Item 5

EPS: 1.3.354 PVM RADIATOR DEPLOY On MCC GO: Perform Step 6 only

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

SSRMS SUPPORT EVA 1

MS1

IVA SUPPORT EVA 1

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

JOINT OPS: 6.103 HARDLINE AUDIOCONFIG (ISS) Steps 1,2,6,7

EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE (Init) Ref. MSG 020, Item 1

NOTES

NO EXERCISEDURING PVRDEPLOY

Page 13: FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 16 valve should have been re-opened per step 8 of N2 REPRESS

06/11/07 06:10:07

FLT PLN/117/FLIGHT

FD04

REILLYSWANSON OLIVAS

REPLANNED

SLEEP START: 3/05:303-39

STS-117 (FD )

00:00

01:00

02:00

03:00

GMT

Date06/11(162)

00:00

01:00

02:00

03:00

04:00

MET

Day 003W E Z

TDRS

~

~

~

~

DORB

7

8

9

ORB

49

50

51

~

~

BIAS -XLV -ZVV

STS ATT

MS2

CWC TRANSFER Transfer 2 CWCs to ISS Ref. MSG 004

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

EPS: 1.3.354 PVM RADIATOR DEPLOY On MCC GO: Perform Step 6 only

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX MCC-H will perform Step 44

REF: 117 CONSUMABLES TRACKING CC (EVA)

MS3

EVA SYSTEMS: CREWLOCK REPRESS (CC)EVA SYSTEMS: PRE REPRESS (CC)

SARJ LAUNCH LOCKS

EVA 1 SORTIE CLEANUP/INGRESS

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX MCC-H will perform Step 44

REF: 117 CONSUMABLES TRACKING CC (EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

SARJ LAUNCH LOCKS

~

EVA 1 SORTIE CLEANUP/INGRESS

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX MCC-H will perform Step 44

REF: 117 CONSUMABLES TRACKING CC (EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

NO EXERCISEDURING PVRDEPLOY

NOTES

3-39

FD04

REILLYSWANSON OLIVAS

REPLANNED

SLEEP START: 3/05:30

STS-117 (FD )

00:00

01:00

02:00

03:00

GMT

Date06/11(162)

00:00

01:00

02:00

03:00

04:00

MET

Day 003W E Z

TDRS

DORB

7

8

9

ORB

49

50

51

STS ATT~

~

BIAS -XLV -ZVV

MS2

CWC TRANSFER Transfer 2 CWCs to ISS Ref. MSG 004

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

EPS: 1.3.354 PVM RADIATOR DEPLOY On MCC GO: Perform Step 6 only

~

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX MCC-H will perform Step 44

REF: 117 CONSUMABLES TRACKING CC (EVA)

MS3

EVA SYSTEMS: CREWLOCK REPRESS (CC)EVA SYSTEMS: PRE REPRESS (CC)

SARJ LAUNCH LOCKS

EVA 1 SORTIE CLEANUP/INGRESS

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX MCC-H will perform Step 44

REF: 117 CONSUMABLES TRACKING CC (EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

MS4

EVA SYSTEMS: PRE REPRESS (CC)EVA SYSTEMS: CREWLOCK REPRESS (CC)

SARJ LAUNCH LOCKS

~

EVA 1 SORTIE CLEANUP/INGRESS

EVA SYSTEMS: 1.240 POST EVA With H2O With METOX MCC-H will perform Step 44

REF: 117 CONSUMABLES TRACKING CC (EVA)

PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)

~

NOTES

NO EXERCISEDURING PVRDEPLOY

Page 14: FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 16 valve should have been re-opened per step 8 of N2 REPRESS

MSG 018 (15-0392) - FD04 MISSION SUMMARY Page 1 of 1

1 2 3 4 5 6

Good Morning Atlantis! Great team effort yesterday getting docked, handing off S3/S4, and getting the EVA crew in campout. We are excited about today's S3/S4 Install and EVA 1. Good luck! YOUR CURRENT ORBIT IS: 183 X 179 NM

7 8 9

10 11 12 13 14

NOTAMS: MORON (MRN) – CLOSED WAKE ISLAND (WAK) - CLOSED GOOSE BAY (YYR) – RWY 08/26 CLOSED KEFLAVIK (IKF) – UNUSABLE RIO GALLEGOS (AWG) – UNUSABLE

15 16 17 18 19

NEXT 2 PLS OPPORTUNITIES: EDW22 ORB 49 – 3/00:48 (FEW160 SCT220 230/18P24) EDW22 ORB 64 – 3/23:34 (FEW120 SCT210 230/16P26)

20 21 22 23

OMS TANK FAIL CAPABILITY: L OMS FAIL: NO R OMS FAIL: NO

24 25 26 27 28

LEAKING OMS PRPLT BURN: L OMS LEAK: ALWAYS RETROGRADE R OMS LEAK: ALWAYS RETROGRADE

29 30 31 32 33 34 35

OMS QUANTITIES(%) L OMS OX = 31.0 R OMS OX = 33.0 FU = 30.8 FU = 32.5 SUBTRACT I’CNCT COUNTER FOR CURRENT OMS QUANTITIES

36 37 38

DELTA V AVAILABLE: OMS 331 FPS

39 40 41 42 43 44 45 46 47 48 49 50 51

ARCS (TOTAL ABOVE QTY1) 46 FPS TOTAL IN THE AFT 377 FPS ARCS (TOTAL ABOVE QTY2) 80 FPS FRCS (ABOVE QTY 1) 30 FPS AFT QTY 1 81 % AFT QTY 2 43 % THERE ARE NO FAILURE/IMPACT/WORK AROUNDS FOR TODAY.

Page 1 of 1, MSG 018 (15-0392)

Page 15: FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 16 valve should have been re-opened per step 8 of N2 REPRESS

15-0395 (MSG 021) – FD4 SVS S3S4 VIEWING LIGHTING PREDICTIONS Page 1 of 1

The table below indicates the predicted lighting for SVS operations based on the consecutive day passes during the S3S4 Truss Install. In the lighting descriptions and the graphical DAY PASS TIMELINE below, 0 references dawn. The top two bands show lighting predictions for the SRMS Wrist camera (Primary) for the two day passes listed. The bottom band shows lighting predictions for Camera B (Backup), and is applicable to both orbits.

1 2 3 4 5 6 7 8 9

10 11 12

Dawn MET times for day passes in the neighborhood of the S3S4 Truss Install: 002/15:45 002/17:15 0 15 30 45 57

Array DAY PASS TIMELINE

13 14

002/15:45 30 46

S1 & S3S4 Targets Non-Uniform Uniform Non-Uniform

15 16

002/17:15 30 50

S1 & S3S4 Targets Non-Uniform Uniform Non-Uniform

17 18

002/15:45 & 002/17:15 16 53

Contingency S0/S1 Camera B FL Cal Targets

Non-Uniform Uniform Non-Uniform

19 20 21

NON-UNIFORM LIGHTING UNIFORM LIGHTING

Non-Uniform Uniform

22 23

NIGHT PASS LIGHTING INFORMATION: 24

25 26 27 28 29

Adequate lighting for SVS without shadowing using SRMS floodlight. Additional lighting may cause shadowing on targets and should be adjusted as required. The S1 Lower Outboard camera light can cause SVS target washout, shadows, and camera glare if pointed directly at the SVS targets or the SVS camera. FLIGHT NIGHT 3 TESTING RESULTS: 30

31 32

SRMS Wrist Camera performance and SVS database parameters verified in daylight conditions with target #2 (S1_E4) manually excluded as per the install procedure.

Page 1 of 1, 15-0395 (MSG 021)

Page 16: FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 16 valve should have been re-opened per step 8 of N2 REPRESS

MSG 023 (15-0398) - STATUS OF REGIONS OF INTEREST Page 1 of 1

1 2 3 4 5 6 7 8 9

10 11

The Orbiter Project Office held a Focused Inspection Meeting and agreed there is no data that would drive an OBSS based Focused Inspection at this time. Based on additional data review, a non-OBSS based Focused Inspection is still possible. If such an inspection is required, the Orbiter Project Office directed the Debris Assessment Team to have a focused inspection CHIT ready on FD4 to officially start the mission ops planning work to support any non-OBSS based Focused Inspection on FD7. There is only one area (Arrowhead Tadpole Gap Filler) under review at this time. The attached figure shows the gap filler region of interest.

12 13 14 15 16 17 18 19 20 21 22 23 24

Page 1 of 1, MSG 023 (15-0398)

Page 17: FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 16 valve should have been re-opened per step 8 of N2 REPRESS

MSG 022 (15-0396) - FD03 MMT SUMMARY Page 1 of 2

Page 1 of 2, MSG 022 (15-0396)

1 The FD 3 MMT met to review the mission progress. There were only a few items of 2 discussion which included a continuing review of the ascent data, imagery and inspection 3 data, and the Port OMS Pod blanket. The team thanks you for the additional 400mm in-4 cabin imagery you provided today on the OMS Pod blanket. 5 6 Ascent Data Review: 7 The preliminary ascent data review indicates that ascent was very nominal. There were no 8 SRB hold down post stud hangs indicated in the orbiter acceleration data. Additionally, the 9 SSME, ET, SRB, and ascent trajectory data (alpha, beta, q-bar, altitude, and altitude rates), 10 all indicate that powered flight was nominal with no issues. 11 12 Imagery/Debris Assessment Team: 13 The imagery and debris assessment teams continue to process the FD 2 inspection and FD 14 3 RPM photography data. The starboard RCC panels 3-10 have been cleared and the rest 15 of the starboard wing, port wing, and nose cap continue to be processed but there are no 16 concerns at this point for the Leading Edge Sub System. The details of these reviews will 17 be presented at tomorrows FD 4 MMT. Additionally, the Wing Leading Edge data, Radar 18 data and ascent imagery continue to be assessed but there are currently no new items of 19 interest. 20 21 Port OMS POD Blanket: 22 The team continues to assess the blanket damage on the Port OMS Pod but have 23 concluded that the torn blanket is the result of aerodynamic loads and not due to a debris 24 impact. As a result there are no concerns with the integrity of the structure below the 25 blanket. Past flight data is being assessed for OMS Pod damage and preliminary 26 indications are that at least eleven flights have encountered tile/blanket damage. STS-41G 27 was the worst with a 6.0 inch by 40.0 inch section of blanket missing in the same general 28 location of the Pod as the torn blanket. Damage was noted post flight on two of the exposed 29 graphite epoxy panels. Aero thermal analysis continues for the cavity under the torn blanket 30 based on the LDRI, RMS, and handheld imagery. Preliminary results indicate that there 31 may be increased heating in the exposed cavity due to the raised blanket corner. Since this 32 could result in localized damage to the graphite epoxy panel, the MMT tasked the EVA 33 community provide options to fold down the raised edge if required. More of the aero 34 thermal analysis results as well as potential EVA options to secure the edge of the blanket 35 will be a topic of discussion at tomorrows MMT. 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

Page 18: FD04 MISSION SUMMARY · 2013. 6. 27. · 15 2. During the payload N2 repress termination on FD3, only the O2 REG INLET SYS 1 16 valve should have been re-opened per step 8 of N2 REPRESS

MSG 022 (15-0396) - FD03 MMT SUMMARY Page 2 of 2

Page 2 of 2, MSG 022 (15-0396)

1 Figure 1: Port OMS Pod Blanket LDRI View 2 3

4 5 6 Figure 2: Past Mission OMS Pod Damage (Including STS-41G) 7 8

9