ON TIME
6 000 km6 000 km6 000 km6 000 km
6 000 km6 000 km6 000 km6 000 km• The force should be on mission within 10 days of an EU decision to launch an operation.
• Sustainable for 30 days (but extendable up to 120 days).
• Deployable over 6 000 km from Brussels (this is the planning target but not a limitation).
• The Government Bill of 15 March 2012– decided to set Sweden available as Framework Nation (FN) for an EU battlegroup in 2015, for
the third time – previously FN responsibility 2008 and 2011
• EU decision making process for a peacekeeping operation– all Member States (MS) as well as the EU Commission are entitled to propose a
peacekeeping operation
– there must be unanimity between the MS’ for such an operation
– overall co-ordination responsibility rests with the EU Political and Security Committee; when
the design of the operation is agreed upon between the MS, the European Council makes an
unanimous decision, which the Governments of the FN and its partners (i.e. NBG 15) acts
upon (in Sweden after a decision by Parliament)
– the tasks for the Battlegroup are designed to conform to the principles of the UN Charter
– each MS is funding its own contribution
Decision making process
SUBTASKS, examples
• Separation of Parties by Force (SOPF)– Forced separation of hostile formations– Establishment of limited protected zones– Securing LOC’s (Lines of Communications)
• Conflict Prevention (CP)– Support to elections– Disarmament– Show of Force
• Evacuation Operation (EO)– Security for groups of non-military– Point defence / facility protection– Armed redeployment of personnel and/or equipment e.g. UN, NGO, IO, etc etc
• Assistance to Humanitarian Operations (HA)– Protection of transport and distribution– Protection of important objects/facilities– Crowd and riot control
• Stability, Reconstruction and Military Advice (SRMA)– Plan and initiate DDR - Disarmament, Demobilization and Reintegration– Provide key installation protection– Conduct prisoner and detainee handling– Establish and run temporary detention facilities
RIGHT MINDSET
But also
• Common
understanding of
Human Rights
• The strength of our
7-nations coalition
WWW.FORSVARSMAKTEN.SE
Respective National Defence Forces
NBG Road map
SWG
LOGFCdr
BG MCC (F)HQ
OHQ(Cell)
OPCdr
Nordic MilitaryCoordination Group
(NMCG)
Nordic Steering Group (NSG)
SWG = Sub Working Group
Financial
Management
BoardSWG
Trg/Eval/LL
SWG
CIS
SWG Req
spec/C2
SWG
Public
Affairs
Equipment
Management
Board
Environmental
Management
Board
Political Military Consultation Group (PMC)
MoD/MFAFIN
MoD/MFAEST
MoD/MFAIRL
MoD/MFALAT
MoD/MFALIT
MoD/MFANOR
MoD/MFASWE
Manning
ComSec
Sec
SWG
Intel
Cancelled
Phase 1 (2013)Planning
Phase 2 (2014)Preparation
Aim
- Training
- Viking 14
- MILEX 14
- Illuminated Summer 14
- Joint Action 14
- Case study development
- Polex 14
- FOC
Phase 3 (2015)Jan - June
Standby
Aim
Maintain effectiveness
Uphold Readiness
MOU ModernisedLatvia and Lithuania to join
Aim
Technical Arrangement with TCN
ORBAT
Implement LI/LL
Prepare phase 2-4
Phase 4 (2015)July-Sept
Post Standby
Aim
Deactivation of BG
Lessons Identified
report to EU
+ 4 months
Road Map 2013 Road Map 2014 Road Map 2015
NBG 15 - Way Ahead
Finland:
Unit: Helicopter detachment (MEDEVAC capability). Total approx 60 tps
Latvia:
Units: Infantry Company, TACP, EOD personnel. Total approx 150 tps.
Ireland:
Units: ISTAR Company with core of ISTAR HQ. Total approx 175 tps.
Norway:
Unit: Escort Platoon. Total approx 50 tps
Lithuania:
Units: Force Protection Platoon. Total approx 50 tps
Estonia:
Units: Military police, Engineer, GEO info, HUMINT and CIMIC team. Total approx 50 tps
Troop Contributing Nations
WWW.FORSVARSMAKTEN.SE
FCdr
(F)HQCom
Spt
Des
Op Cdr
MP
CIMIC
ISTAR
ISTAR
Bn HQ
HQ & Fire Spt
Coy
Mot Inf Coy
Eng Coy
Mot Inf Coy
Mot Inf Coy
Log Coy
EW
EW Unit
Field HumintTeam
GeoInfoSG Cdr’s Support Team
HQ Coy
LAP Unit
CBRN Unit
MP Plt
CIMIC Plt
MOVCON
Log Bn
Log Coy
Role 2E
Movcon
Role 2 LM
Strategic Enablers
NSE
ORBAT 2.2
F
QRF Coy
MOVCON
Movcon
Transport- SAC (C 17)- Salis (An-124)- MCC
ISTAR
ISTAR HQ
ISTAR Coy
ISTAR Log Coy
EAW
Expeditionary Air Wing
AMU
Air MaintenanceUnit
F
JAS
ATU
C
HU
UABU
Air BaseUnit
MEDEVAC
Core Bn
NBG 15 – ORBAT 2.2
Approx ~2 500 troops in total
Swedish ~1 900 troops
TCN approx ~600 troops
FCdr
(F)HQCom
Spt
Des
Op Cdr
MP
CIMIC
ISTAR
ISTAR
Bn HQ
HQ & Fire Spt
Coy
Mot Inf Coy
Eng Coy
Mot Inf Coy
Mot Inf Coy
Log Coy
EW
EW Unit
Field HumintTeam
GeoInfoSG Cdr’s Support Team
HQ Coy
LAP Unit
CBRN Unit
MP Plt
CIMIC Plt
MOVCON
Log Bn
Log Coy
Role 2E
Movcon
Role 2 LM
Strategic Enablers
NSE
F
QRF Coy
MOVCO
N
Movcon
Transport- SAC (C 17)- Salis (An-124)- MCC
ISTAR
ISTAR HQ
ISTAR Coy
ISTAR Log Coy
EAW
Expeditionary Air Wing
AMU
Air MaintenanceUnit
F
JAS
ATU
C
HU
UABU
Air BaseUnit
MEDEVAC
Core Bn
FCdr
(F)HQ
Op
Cdr
MP CIMICEAWISTAR
Mot Inf Bn Eng CoyExpeditionary Air Wing
GeoInfoSG
HQ Coy LAP Unit CBRN Unit MP Plt CIMIC PltLog Bn QRF Istar
OHQ
FrancePA
- More “boots on the ground” – Latvian QRF coy
- IRL LN for ISTAR
- Helicopters in place (Black Hawk and NH 90)
- Reinforced medical capacity
- National Core battallion manned by professional contracted soldiers
- A permanent national HQ is used as basis for FHQ
NBG 15 compared to NBG 11
EMBARK/DEBARK, examples
AP (Advance Party)
EEF (Early Entry Force)
MF (Main Force)
AP EEF MF
Time
D D+10 D+25
EMBARK/DEBARK, Examples
Different mode of transport…….!
SPOE
HB
SPOD
APOD
JOA
APOEJOA (Joint Operation Area)
HB (Home Base)
SPOD (Sea Port of Debarkation)
APOD (AirPort of Debarkation)
SPOE (Sea Port of Embarkation)
APOE (AirPort of Embarkation)
AOO 1
EMBARK/DEBARK, Examples
MOB (Main Operation Base)
FOB (Forward Operation Base)
AOO (Area of Operation)
Different bases…….!
FOB/MOBSPOD
APOD
FOB/MOB
SPOD/APOD
SPOD
APOD
MOB
FOB
AOO
AOO
AOO 2
Viking 14(CPX)
Milex 14 (CPX)
Illuminated
Summer 14(CPX)
Deployment
Exercise (CPX)
week 414-415 420-421 436
Joint Action 14(Livex)
437-438 444-446
DVD
POLEX 14
Timings for POLEX and DVD (TBD).
EXERCISES
31MAR-11APR 12MAY-23MAY 01SEP-05SEP 08SEP-19SEP 27OCT-14NOV
WWW.FORSVARSMAKTEN.SE
CET/FIT + JOINT
ACTION (FINEX)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
NBG 15Exercise Plan 2014 SWEDEN
Joint Fire
VIKING 14
MILEX 14
Illuminated
Summer
F CdrTEWT
LOG
Unit EX
CIS
Unit EX
Core BnUnit EX
Core Bn
Unit EX
EAWWS Table-top Ex
June
Förberedande NMCG 2013-11-05
LOG
TEWT
Log BnUnit EX
C2
If necessary information or orders do not reach the
intended receiver in time and in an understandable format;
• the need for C2 or related methods are not properly
cared for
• and/or the opponent has managed to get inside our
OODA-loop
More information
eng web: www.forsvarsmakten.se/nbg15
swe web: www.forsvarsmakten.se/nbg
twitter: @EUBG15 www.twitter.com/eubg15
instagram: @EUBG15 www.instagram.com/eubg15
swe intranet: http://emilia.swedi.mil.se/Pa-gang/Projekt-och-fokusomraden/NBG15