FB 2-Room Slab BOQ

12
2-room slab Item Description QuantityUnit Unit rate 1.0 General requirements 1 lot 50,000.00 2.0 Mobilization/Demobilization 1 lot ### Permits & Licenses 1 lot 75,000.00 Temporary Facilities 1 lot 15,000.00 Bonds & Insurances 1 lot 40,000.00 Preparation of As-built coordinated plans 1 lot 50,000.00 Drawings & Forms submittals 1 lot 10,000.00 Water and Electrical Consumption 1 lot 20,000.00 Communication Expenses 1 lot 30,000.00 Service Vehicle 1 lot ### Engineering supervision 1 lot ### Materials Inspection & testing 1 lot 35,000.00 Safety and Health 1 lot ### 3.0 Earthworks 3.1 Clearing and Grubbing - 41.90 3.2 Structural Excavation 45.3 265.00 3.3 Backfilling and Compaction 28.317 598.38 3.4 Gravel Bedding G‐1 26.03 1475.00 3.5 Soil Poisoning 222.2 95.00 3.6 Disposal 17 239.00 4.0 Structural Works 4.1 Concrete, 3000 psi 67.27 4811.31 4.2 Formwork 473 438.18 4.3 Grade 60 Rebar 8646.58 kgs 58.93 4.4 Strutural Steel - kgs 4.5 4‐ 20mmx400mm LONG A307 Anchor Bolts - pcs 5.0 Architechtural Works 5.1 6" thk CHB Wall 152.89 718.87 5.2 4" thk CHB Wall 24.15 692.67 5.3 Plastering Work 408 211.35 5.4 12 x 300mm Fiber Cement Fascia Board - 5.5 Floor Topping - 5.6 Waterproofing on Roof deck 180 6.0 Doors and Windows 6.1 2100mmH x 900mmW Single Panel Door, 50mm 6 set 6 thk. Tanguile Solid Door, Duco Painted Finish 6.2 2100mmH x 700mmW PVC Type Assembly Single 2 set 2475.00 Door w/ Louver

description

FB 2-room slab BOQ

Transcript of FB 2-Room Slab BOQ

Page 1: FB 2-Room Slab BOQ

2-room slab

Item Description Quantity Unit Unit rate Amount

1.0 General requirements 1 lot 50,000.00 50,000.00

2.0 Mobilization/Demobilization 1 lot 100,000.00 100,000.00

Permits & Licenses 1 lot 75,000.00 75,000.00

Temporary Facilities 1 lot 15,000.00 15,000.00

Bonds & Insurances 1 lot 40,000.00 40,000.00

Preparation of As-built coordinated plans 1 lot 50,000.00 50,000.00

Drawings & Forms submittals 1 lot 10,000.00 10,000.00

Water and Electrical Consumption 1 lot 20,000.00 20,000.00

Communication Expenses 1 lot 30,000.00 30,000.00

Service Vehicle 1 lot 350,000.00 350,000.00

Engineering supervision 1 lot 100,000.00 100,000.00

Materials Inspection & testing 1 lot 35,000.00 35,000.00

Safety and Health 1 lot 150,000.00 150,000.00

3.0 Earthworks3.1 Clearing and Grubbing - m² 41.903.2 Structural Excavation 45.3 m³ 265.00 12,004.50 3.3 Backfilling and Compaction 28.317 m³ 598.38 16,944.33 3.4 Gravel Bedding G 1‐ 26.03 m³ 1475.00 38,394.25 3.5 Soil Poisoning 222.2 m² 95.00 21,109.00 3.6 Disposal 17 m³ 239.00 4,063.00

-

4.0 Structural Works - 4.1 Concrete, 3000 psi 67.27 m³ 4811.31 323,656.82 4.2 Formwork 473 m² 438.18 207,259.14 4.3 Grade 60 Rebar 8646.58 kgs 58.93 509,542.96 4.4 Strutural Steel - kgs4.5 4 20mmx400mm LONG A307 Anchor Bolts ‐ - pcs

-

5.0 Architechtural Works - 5.1 6" thk CHB Wall 152.89 m² 718.87 109,908.03 5.2 4" thk CHB Wall 24.15 m² 692.67 16,727.98 5.3 Plastering Work 408 m² 211.35 86,230.80 5.4 12 x 300mm Fiber Cement Fascia Board - m²5.5 Floor Topping - m²5.6 Waterproofing on Roof deck 180 m² -

-

6.0 Doors and Windows - 6.1 2100mmH x 900mmW Single Panel Door, 50mm 6 set -

6 thk. Tanguile Solid Door, Duco Painted Finish -

- 6.2 2100mmH x 700mmW PVC Type Assembly Single 2 set 2475.00 4,950.00

Door w/ Louver -

Page 2: FB 2-Room Slab BOQ

- 6.3 1200mmH x 2400mmW PVC Frame Casement‐ 4 set -

Type Glass Window (6mm thk. Glass) -

- 6.4 1200mmH x 1800mmW PVC Frame Casement‐ 8 set -

Type Glass Window (6mm thk. Glass) -

- 6.5 600mmH x 600mmW PVC Frame Awning Type‐ 2 m² -

Glass Window (6mm thk. Glass) -

-

-

-

7.0 Roofing Works - 7.1 Ga. 24 GI Long span Prepainted‐ - m²

Roofing with insulation -

- 7.2 10mm dia x 8.810 m with Standard Nuts & - sets

Washers, each end (for classroom) -

- 7.3 10mm dia x 2.060 m with Standard Nuts & Washers, - set

each end (for CR) -

-

8.0 Painting Works - 8.1 Concrete Surfaces Exterior 154 m² 260.01 40,041.54

- 8.2 Concrete Surfaces Interior 212 m² 253.01 53,638.12

-

9.0 Tile Works @ CR - 9.1 Wall 14.64 m² 922.57 13,506.45 9.2 Floor 5.6 m² 922.57 5,166.39 9.3 Plumbing works 1 lot 52817.00 52,817.00 9.4 Electrical Works 1 lot 103981.60 103,981.60 9.5 Septic Tank 1 lot 97650.50 97,650.50

2,689,775.42

Page 3: FB 2-Room Slab BOQ

DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 3.3 Backfilling & CompactionUnit of Measurement : 80 m³Output per day :

Designation Daily Rate

A. Labor

a. Construction Foreman 1 8 400.00b. Skilled Laborer 2 8 350.00c. Laborer 2 8 250.00

Sub - Total for A

Name and Capacity Daily Rate

B. Equipment

a. Backhoe 1 8 23,940.00

b. Shovel 4 8 20.00

Minor Tools (10% of Labor) 160.00

No. of Person

No. of Hours

No of Units

No. of Hours

Page 4: FB 2-Room Slab BOQ

Sub - Total for BC. Total (A + B)D. Output per day = 80E. Direct Unit Cost (C ÷ D)

Page 5: FB 2-Room Slab BOQ

DETAILED UNIT PRICE ANALYSIS (DUPA)

Amount

400.00700.00500.00

1,600.00

Amount

23,940.0080.00

160.00

Page 6: FB 2-Room Slab BOQ

24,180.0025,780.00

80.00322.25

Page 7: FB 2-Room Slab BOQ

2-room slab

Item Description Quantity Unit Unit rate Amount1.0 General requirements 1 lot ### ###

2.0 Mobilization / Temporary Structures, 1 lot ### ### Utilities and Services / Demobilization / Standard Billboard

3.0 Earthworks

-

4.0 Structural Works -

-

5.0 Architechtural Works -

-

6.0 Doors and Windows -

-

-

-

7.0 Roofing Works -

-

8.0 Painting Works -

9.0 Tile Works @ CR -

TOTAL

#REF!