Fast and Thorough: Quality Assurance for
Agile Data Warehousing Projects
What?
Test Types (1 of 4)
• Unit– Evaluate the quality of a single developer story– Perhaps a single ETL mapping or a session– Mostly functional, some system meta data
• Component– Unit-test style verification of an assembly of units, perhaps a workflow
• Integration– Evaluate the coherence of the full application, as far as it exists to date– Add data scenarios, e.g., nominal, dirty data, missing data, EOP
processing• System
– All the above, but most likely a subset conducted formally as a final certification
– Add very technical tests of operational topics
Test Types (2 of 4)
• Functional: Does an object meet its business requirements? • Examples: Does it transform a particular set of input as predicted by an
example from an SME?
• Story Tests: Did the product owner accept a user story during the user demo at an iteration’s end?
• Simulations: Does it transform an entire set of data as predicted by the project’s lead roles?
• Alpha Tests: Can the team get the app to behave when they take the role of users?
Test Types (3 of 4)
• Scenarios: Consider a compound business situation: Can app support all needs at once?
• Exploratory Testing: Consider the edges of the business requirements: Other functionality needed?
• Usability Testing: Will the app sustain the business functions of each “user persona” we intend to support?
• UAT: Does the app deliver on every case of a structured, business-run, system appraisal?
• Beta Tests: Does the system perform when real users interact with it and when it’s loaded with realistic data?
Test Types (4 of 4)
• Performance Tests: Does the app have acceptable response times under a normal load?
• Load Tests: …under the highest conceivable load?
• Security Tests: Is the system sufficiently resistant to a wide range of techniques to reveal and/or compromise its data?
• Non-Functional Requirements Tests: Does the application meet a wide range of criteria for long-term inclusion in the department’s IT platform and low total cost of ownership?
Target Column Test Types
Col Type
Unique Values
Valid Range
Count Distinct
Group Counts
Sums or
Averages
Reconciliation
Expected Results
Eqv Class Partitioning
Edge Testing
Combo
Reduction
Primal Keys
Natural Keys
Foreign Keys
Replicated
Aggregated
Derived
Source Meta Data
Warehouse Meta Data
Who?
Project Artifact: QA Role & ResponsibilitiesWho
Developer/ Sys Analyst DM System
Tester Prod. Owner & Sol. Arch
Auto’d Test Engine
Type
Smoke
Unit/Component
Integration
Iteration User Demo
Archive
Formal System Test
End-to-End
Acceptance
Soak
Where?
Techniques to Choose From
Unit testing: developer’s standard testing technique
Systems analyst inspection: manual data inspection by systems analyst, esp. matters concerning business rules and source-to-target mappings
Actual-data analytics: scripts, usually of SQL commands, run against actual results
Actual-to-expected result comparisons: usually scripts employing SQL “minus” commands
UAT subset: the appropriate items from the evolving user acceptance script that the solution designer and product owner are accumulating
Full UAT: execution of the full user acceptance test script for the release
How?
Data-Based Testing Scenarios Nominal
(“happy path”)
Dirty Data(human-visible syntax flaws)
Corrupted Data
(machine-visible syntax flaws)
Missing Rows / Tables
(e.g., no customers record or file)
Incoherent Data
(skipped or mis-sequenced files)
Duplicate Data(e.g., overlap between extracts)
End-of-Period(e.g., month, quarter, year)
Archiving(purging of data that’s too old)
Catch-Up(usually three days per run day)
Restart(test operation instructions)
High-or Full-Volume(performance and 1-in-a million errors)
Resource Outage(FTP node goes down)
Where?
When?