FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved December 3rd, 2015, requires all metropolitan planning organizations (MPO), state transportation departments, and public transportation operators to cooperate in preparing a report of federal funds obligated during the immediately preceding year. The WFRC staff, with the help of UDOT and UTA, has prepared a report of obligated federal, and local and state match funding during federal fiscal year 2017 (October 1, 2016 through September 30, 2017).

Transcript of FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT...

Page 1: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

December 3rd, 2015, requires all metropolitan planning organizations (MPO), state transportation

departments, and public transportation operators to cooperate in preparing a report of federal

funds obligated during the immediately preceding year. The WFRC staff, with the help of UDOT

and UTA, has prepared a report of obligated federal, and local and state match funding during

federal fiscal year 2017 (October 1, 2016 through September 30, 2017).

Page 2: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved
Page 3: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved
Page 4: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

** Note ** Almost all Reconstruction and Capacity projects include active transportation components.

Page 5: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved
Page 6: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Salt Lake/ West Valley Urban Surface Transportation Program (STP) FundsObligated FY2017

PIN PIN Status Category Description County Federal Funds State Funds Local Funds Total Funds

6621 Close OutStructures Bridge

Rehabilitation

1300 SOUTH; 500 W. TO 700 W. & Cnty:FA-2290; MP

6.04 - 6.34SALT LAKE $414,480.27 $0.00 $30,097.94 $444,578.21

8110 ActiveSignal and/or Lighting

Project

SR-152; MP 2.78 - 3.04 & Cnty:FA-2082; MP 11.82 -

12.57 & Cnty:FA-2116; MP 2.98 - 3.18SALT LAKE $41,488.28 $0.00 $3,012.72 $44,501.00

8565 Close OutRoadway Reconstruct - With

Widening

HIGHLAND DRIVE @ I-215; I-215 WB ON-RAMP TO

LA CRESTASALT LAKE $289,013.00 $0.00 $0.00 $289,013.00

10009 AwardedRoadway Reconstruct - With

Widening

Cnty:FA-2123; MP .00 - 1.00 & 5600 West from 7800

South to 8600 SouthSALT LAKE $4,283,930.06 $0.00 $311,082.34 $4,595,012.40

10012 Closed Other Study Cnty:FA-2104; MP 1.24 - 3.19 SALT LAKE ($8,864.71) $0.00 ($643.72) ($9,508.43)

11098 Close Out Other U of U Central Campus Electrified Shuttle Route SALT LAKE $44,497.18 $0.00 $3,231.21 $47,728.39

11963 Closed Funding Pass ThroughVarious Locations in Salt Lake/Ogden/Layton Urban

AreasSALT LAKE ($391,536.51) $0.00 $0.00 ($391,536.51)

11986 ScopingRoadway Reconstruct - With

Widening

Porter Rockwell Blvd (Fifth Segment); Redwood Road to

0.46 miles eastSALT LAKE $468,014.60 $0.00 $33,985.40 $502,000.00

11989 ClosedRoadway Reconstruct -

Without Widening9000 South; 4800 West to 5300 West SALT LAKE ($602,785.10) $0.00 ($43,771.91) ($646,557.01)

13116 ScopingRoadway Minor Rehab -

Purple Book3200 West; 10431 South to 10600 South SALT LAKE $111,876.00 $0.00 $8,124.00 $120,000.00

13962 Close OutStructures Bridge

RehabilitationCnty:FA-2238; MP .33 - .38 SALT LAKE $0.00 $0.00 $0.01 $0.01

14831 ScopingRoadway Reconstruct -

Without Widening

Cnty:FA-2172; MP 3.71 - 5.58 & Cnty FA-2172; MP

3.707 - 5.579SALT LAKE $699,225.00 $0.00 $0.00 $699,225.00

STP - URBAN AREA SALT LAKE (WFRC) STP_URB_SL

2/6/2018

Page 7: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Salt Lake/ West Valley Urban Surface Transportation Program (STP) FundsObligated FY2017

PIN PIN Status Category Description County Federal Funds State Funds Local Funds Total Funds

STP - URBAN AREA SALT LAKE (WFRC) STP_URB_SL

15854 Active Other N/A Annual Work Program SALT LAKE $585,000.00 $0.00 $0.00 $585,000.00

7208 Closed ATMS ProjectATMS / ITS IN SALT LAKE CITY AND SALT LAKE

COUNTYSALT LAKE $0.00 $0.00 ($173.94) ($173.94)

10011Under

Construction

Signal and/or Lighting

Project

138TH SO; BANERTER TO 3RD EAST & Cnty:FA-

2044; MP .19 - .50 & update routeSALT LAKE $1,835,260.52 $0.00 $0.00 $1,835,260.52

11985 Active Funding Pass Through Project Planning Support - Salt Lake County SALT LAKE $400,000.00 $0.00 $0.00 $400,000.00

11986 ScopingRoadway Reconstruct - With

Widening

Porter Rockwell Blvd (Fifth Segment); Redwood Road to

0.46 miles eastSALT LAKE $3,882,448.76 $0.00 ($64,450.40) $3,817,998.36

Totals $ 12,052,047 $ - $ 280,494 $ 12,332,541

2/6/2018

Page 8: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Ogden/ Layton Urban Surface Transportation Program (STP) FundsObligated FY2017

PIN PIN Status Category Description County Federal Funds State Funds Local Funds Total Funds

8551 ClosedSignal and/or Lighting

Project200 NORTH; 900 WEST TO FLINT STREET DAVIS ($172,618.22) $0.00 ($3,837.59) ($176,455.81)

8559Contract

Complete

Roadway Reconstruct - With

WideningADAMS AVENUE; CITY LIMITS TO US-89 WEBER ($233,522.53) $0.00 ($16,957.49) ($250,480.02)

11092Contract

Complete

Spot Improvement -

OperationalSR-103; MP .00 - .17 & SR-103; MP .00 - .17 DAVIS $1,235,297.50 $89,702.50 $0.00 $1,325,000.00

11963 Closed Funding Pass ThroughVarious Locations in Salt Lake/Ogden/Layton Urban

AreasSALT LAKE ($247,750.44) $0.00 $0.00 ($247,750.44)

11990 Active Funding Pass Through Project Planning Support -Weber & Davis County DAVIS $300,000.00 $0.00 $21,784.84 $321,784.84

12279Contract

Complete

Roadway Minor Rehab -

Purple BookSR-232; MP .45 - 2.25 & SR-232; MP .45 - 2.25 DAVIS $1,398,450.00 $101,550.00 $0.00 $1,500,000.00

12291Under

Construction

Roadway Minor Rehab -

Purple BookSR-193; MP 5.17 - 8.43 & SR-193; MP 5.17 - 8.43 DAVIS $3,230,242.34 $234,567.64 $0.00 $3,464,809.98

13122Physically

Complete

Roadway Reconstruct - With

Widening

Cnty:FA-1392; MP .66 - 1.23 & Center Street; Legacy

Parkway to Redwood RoadDAVIS $1,171,963.61 $0.00 $85,103.44 $1,257,067.05

13470Physically

Complete

Roadway Preventative

MaintenanceSR-204; MP .00 - .92 & SR-204; MP 2.23 - 5.42 WEBER $1,184,821.94 $86,037.16 $0.00 $1,270,859.10

13740Substantially

Compl

Roadway Minor Rehab -

Purple BookI-15; MP 332.66 - 338.64 VARIOUS $3,729,200.00 $270,800.00 $0.00 $4,000,000.00

14042 AdvertisedRoadway Reconstruct - With

Widening

Cnty:FA-1410; MP .57 - .95 & 1500 South Phase 3;

1350 West to 1100 WestDAVIS $331,898.80 $0.00 $24,101.20 $356,000.00

14043 ScopingRoadway Reconstruct - With

WideningBluff Road; 550 West (on Gentile) to 1000 West DAVIS $9,999.85 $0.00 $726.15 $10,726.00

15854 Active Other N/A Annual Work Program SALT LAKE $315,000.00 $0.00 $0.00 $315,000.00

Totals $ 12,252,983 $ 782,657 $ 110,921 $ 13,146,561

STP - URBAN AREA Ogden / Layton (WFRC) STP_URB_O/L

Page 9: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Salt Lake/ West Valley the Ogden/ Layton Urban Area Congestion Mitigation/ Air Quality (CMAQ) FundsObligated FY2017

PIN PIN Status Category Description County Federal Funds State Funds Local Funds Total Funds

11092Contract

Complete

Spot

Improvement -

Operational

SR-103; MP .00 - .17 & SR-103; MP .00 - .17 DAVIS $936,892.51 $68,033.49 $0.00 $1,004,926.00

11094 AwardedIntersection

Improvements7800 South & 1300 West SALT LAKE $310,154.76 $0.00 $22,522.24 $332,677.00

11095 ActiveIntersection

Improvements9000 South & 4000 West SALT LAKE $46,615.00 $0.00 $3,385.00 $50,000.00

11097 ScopingTrails and

BikepathsJordan River Trail - Gardner Village TRAX Station SALT LAKE $74,584.00 $0.00 $5,416.00 $80,000.00

11998 ClosedIntersection

ImprovementsLittle Cottonwood Canyon Intersection - Snowbird Entry 1 SALT LAKE ($54,556.06) ($3,961.65) $0.00 ($58,517.71)

14588 ActiveTransit

ServiceTooele Flex Route Transit service in Tooele County TOOELE $0.00 $0.00 ($10,892.39) ($10,892.39)

7194 ClosedIntersection

ImprovementsSR-106: MAIN STREET & PARRISH LANE DAVIS $0.00 $0.00 ($6,214.62) ($6,214.62)

13929Physically

Complete

Intersection

Improvements500 W at 700 S. and Forest St., Brigham City BOX ELDER $517,971.89 $0.00 $37,613.10 $555,584.99

15637 ScopingIntersection

ImprovementsSR-102; MP 15.44 - 15.55 BOX ELDER $139,845.00 $0.00 $10,155.00 $150,000.00

14588 ActiveTransit

ServiceTooele Flex Route Transit service in Tooele County TOOELE $149,999.61 $0.00 $10,892.39 $160,892.00

15565 ScopingTransit

ServiceTooele County TOOELE $150,000.00 $0.00 $0.00 $150,000.00

CMAQ - URBAN AREA Salt Lake/ West Valley & Ogden/ Layton (WFRC) CMAQ_WFRC

2/6/2018

Page 10: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Salt Lake/ West Valley the Ogden/ Layton Urban Area Congestion Mitigation/ Air Quality (CMAQ) FundsObligated FY2017

PIN PIN Status Category Description County Federal Funds State Funds Local Funds Total Funds

CMAQ - URBAN AREA Salt Lake/ West Valley & Ogden/ Layton (WFRC) CMAQ_WFRC

7947 Active ATMS Project TRAFFIC ADAPIVE CONTROL SYSTEM SALT LAKE ($46,615.00) ($3,385.00) $0.00 ($50,000.00)

8241 Closed ATMS Project VARIABLE MESSAGE SIGN OPTIMIZATION SALT LAKE ($56,048.66) ($4,070.04) $0.00 ($60,118.70)

8242 Closed ATMS Project SALT LAKE COUNTY TRAFFIC SIGNAL INTERCONNECT SALT LAKE ($6,638.53) ($482.07) $0.00 ($7,120.60)

11143 Active ATMS Project various locations along the Wasatch Front VARIOUS $279,690.00 $20,310.00 $0.00 $300,000.00

12166 ScopingTrails and

BikepathsWest Haven; D&RGW Rail to Ogden River Trail WEBER $102,553.00 $0.00 $0.00 $102,553.00

12631Under

ConstructionATMS Project

SR-97; MP 4.09 - 5.10 & Cnty:FA-3308; MP 1.50 - 3.00 & SR-37; MP

1.50 - 1.50 & SR-107; MP 1.95 - 3.52 & Cnty:FA-1456; MP 1.70 -

1.70 & SR-106; MP 7.29 - 7.29 & SR-106; MP 9.03 - 9.03 & SR-106;

MP 8.30 - 8.30 & Cnty:FA-1404; MP 2.08 - 2.74 & Cnty:FA-1

VARIOUS $559,112.43 $40,600.57 $0.00 $599,713.00

12637 Closed ATMS ProjectSR-209; MP 14.49 - 18.84 & Cnty:FA-2044; MP 3.37 - 5.02 &

Cnty:FA-2062; MP .25 - .87 & SR-209; MP 12.18 - 12.65SALT LAKE $46,615.00 $3,385.00 $0.00 $50,000.00

12638 Scoping ATMS Project

Cnty:FA-2061; MP .00 - .00 & Cnty:FA-2080; MP 3.87 - 4.61 & SR-

282; MP 2.25 - 2.25 & SR-282; MP 2.54 - 2.54 & SR-68; MP 41.31 -

45.08 & SR-111; MP 9.11 - 10.09 & SR-175; MP .30 - 1.90 & SR-171;

MP .00 - 5.55

SALT LAKE $111,876.00 $8,124.00 $0.00 $120,000.00

12640Under

ConstructionATMS Project

SR-201; MP 15.69 - 15.84 & I-215; MP 7.15 - 7.42 & I-15; MP 292.21

- 292.49 & SR-201; MP 15.69 - 15.84 & I-215; MP 7.15 - 7.42 & I-15;

MP 292.21 - 292.49

SALT LAKE $1,701,167.81 $123,532.19 $0.00 $1,824,700.00

12674 Awarded ATMS ProjectI-215; MP 27.44 - 27.44 & I-215; MP 25.63 - 28.50 & I-215; MP 25.63

- 28.50 & SR-68; MP 62.88 - 67.27VARIOUS $932,300.00 $67,700.00 $0.00 $1,000,000.00

2/6/2018

Page 11: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Salt Lake/ West Valley the Ogden/ Layton Urban Area Congestion Mitigation/ Air Quality (CMAQ) FundsObligated FY2017

PIN PIN Status Category Description County Federal Funds State Funds Local Funds Total Funds

CMAQ - URBAN AREA Salt Lake/ West Valley & Ogden/ Layton (WFRC) CMAQ_WFRC

14646 Scoping ATMS Project Cnty:FA-2326; MP 2.34 - 2.44 & SR-282; MP 1.99 - 2.94 SALT LAKE $46,615.00 $3,385.00 $0.00 $50,000.00

14910Under

ConstructionATMS Project Various signalized intersections throughout SL County SALT LAKE $472,994.01 $34,346.99 $0.00 $507,341.00

Totals $ 6,415,128 $ 357,518 $ 72,877 $ 6,845,523

2/6/2018

Page 12: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Salt Lake/ West Valley the Ogden/ Layton Transportation Alternatives Program (TAP) FundsOblligated FY2017

PIN PIN Status Category Description County Federal Funds State Funds Local Funds Total Funds

12009 Closed Trails and BikepathsCnty:FA-2105; MP 1.37 - 2.12 & 700 West; 7200 South

to 7800 South, Midvale CitySALT LAKE ($23,039.54) $0.00 $0.00 ($23,039.54)

12166 Scoping Trails and Bikepaths West Haven; D&RGW Rail to Ogden River Trail WEBER $107,533.35 $0.00 $7,808.66 $115,342.01

13122Physically

Complete

Roadway Reconstruct - With

Widening

Cnty:FA-1392; MP .66 - 1.23 & Center Street; Legacy

Parkway to Redwood RoadDAVIS $81,988.60 $0.00 $0.00 $81,988.60

13134 Closed Trails and Bikepaths Dry Creek Trail; 10200 South to 10000 South SALT LAKE $1,749.72 $0.00 $127.06 $1,876.78

13137 Closed Trails and Bikepaths Pedestrian Crossing on Fort Union SALT LAKE $6,461.70 $0.00 $469.22 $6,930.92

14057 Scoping Trails and Bikepaths Grant Promenade; 22nd Street to 2250 Street WEBER ($34,799.96) $0.00 ($2,527.04) ($37,327.00)

14795 Close Out Trails and Bikepaths Non-construction project SALT LAKE $26,220.94 $0.00 $0.00 $26,220.94

14826 Close Out Trails and Bikepaths D&RGW Crossing at 200 North Kaysville DAVIS $107,397.42 $0.00 $7,798.78 $115,196.20

14944 Active Trails and Bikepaths SR-210; MP 4.47 - 4.47 SALT LAKE $67,591.75 $0.00 $0.00 $67,591.75

14945 Scoping Trails and BikepathsSec 1 completes a gap, Sec 2 Bridge over Welby Jacobs

Canal, Sec 3 will extend trail to 4000 WestSALT LAKE $23,307.50 $0.00 $0.00 $23,307.50

14946 Scoping Trails and Bikepaths Smith Fields Park to Willow Creek Trail & Stokes Ave SALT LAKE $10,000.00 $0.00 $0.00 $10,000.00

14947 Scoping Trails and Bikepaths Cnty:FA-2105; MP .93 - .93 SALT LAKE $32,416.07 $0.00 $0.00 $32,416.07

TAP - URBAN AREA Salt Lake/ West Valley & the Ogden / Layton (WFRC) TAP_URB_WFRC

2/6/2018

Page 13: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Salt Lake/ West Valley the Ogden/ Layton Transportation Alternatives Program (TAP) FundsOblligated FY2017

PIN PIN Status Category Description County Federal Funds State Funds Local Funds Total Funds

TAP - URBAN AREA Salt Lake/ West Valley & the Ogden / Layton (WFRC) TAP_URB_WFRC

14948 Scoping Trails and Bikepaths SR-171; MP 14.98 - 15.02 SALT LAKE $10,000.00 $0.00 $0.00 $10,000.00

14949 Scoping Trails and BikepathsEast-west route across I-215, the City desires to modify

the underpass at 5400 S.SALT LAKE $28,947.92 $0.00 $0.00 $28,947.92

14950 Scoping Trails and BikepathsCnty:FA-2060; MP 3.32 - 3.32 & Cnty:FA-2060; MP

3.32 - 3.32SALT LAKE $10,000.00 $0.00 $0.00 $10,000.00

14951 Scoping Trails and Bikepaths Cnty:FA-2148; MP 5.46 - 6.82 SALT LAKE $18,646.00 $0.00 $0.00 $18,646.00

Totals $ 474,421 $ - $ 13,677 $ 488,098

2/6/2018

Page 14: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Grant Number Fed. Amt Local Amt. Tot. Amt. Brief Description Award Date StatusApprox %

Comp

UT-04-0025-02 $ 400,000 $ 100,000 $ 500,000 VTCLI UTA One-Call/One-Click 41838 Ready to close 100

UT-04-0026-02 $ 177,230 $ 44,308 $ 221,538 VTCLI Tooele Computer Aided Sched. and Disp. 41838 Active 99

UT-16-X006-01 $ 1,159,485 $ 467,630 $ 1,627,115 5310 Large Urbanized Areas FY2013 42241 Active 71

UT-26-0007-02 $ 50,000 $ - $ 50,000 VTCLI UTA Marketing/Outreach 41838 Ready to close 100

UT-26-0008-02 $ 50,000 $ - $ 50,000 VTCLI Tooele Marketing/Outreach 41838 Ready to close 100

UT-90-X073-00 $ 40,604,545 $ 10,151,137 $ 50,775,682 5307: PM, ADA ops, security, enhancements, planning 41514 Ready to close 100

UT-90-X075-00 $ 40,810,152 $ 10,202,538 $ 51,012,690 5307: PM, ADA ops, security, enhancements, planning 41904 Active 99

UT-90-X077-01 $ 45,067,852 $ 11,266,964 $ 56,334,816 FY15 5307 PM Planning ADA Secure En 42297 Ready to close 100

UT-2016-007-00 $ 250,500 $ 62,625 $ 313,125 TOD Planning Grant P/O BRT 42563 Active 40

UT-2016-013-00D $ 661,632 $ 198,640 $ 860,272 Sec 5310 Large UZA Area FY 2014 and FY 2015 O/L 42632 Active 71

UT-2016-013-00S $ 958,581 $ 352,340 $ 1,310,921 Sec 5310 Large UZA Area FY 2014 and FY 2015 SL/WV 42632 Active 28

UT-2016-013-00U $ 350,245 $ 75,760 $ 426,005 Sec 5310 Large UZA Area FY 2014 and FY 2015 P/O 42632 Active 13

UT-2017-001 $ 70,981,999 $ 70,982,001 $ 141,964,000 UTA Provo-Orem Bus Rapid Transit - Small Starts 42723 Active 84

UT-2017-002 $ 5,899,741 $ 1,474,935 $ 7,374,676 FY2015-16-5339 Depot District, Riverside, Provo Intermodal 42723 Active 90

UT-2017-003 $ 4,273,770 $ 754,195 $ 5,027,965 FY2016 5339 Discretionary for Replacement Buses 42754 Active 96

UT-2017-005-00 $ 7,318,340 $ 1,829,585 $ 9,147,925 FY17 5337 Fixed Guideway Preventative Maintenance (7/12) 42824Awaiting final

apptn177

UT-2017-006-00 $ 250,000 $ 62,500 $ 312,500 FY 2016 5309 Ogden TOD Planning 42817 Active 0

UT-2017-010-00 $ 26,201,312 $ 6,550,328 $ 32,751,640 FY17 5307 Formula PM Planning ADA Secur Enh (7/12) 42871Awaiting final

apptn118

UTA FY 2017 GRANTS OVERVIEW

Funds Allocated (awarded and executed) in Fed. FY 2017 (10/01/16 - 09/30/2017)

FTA Grants

2/8/2018

Page 15: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Grant Number Fed. Amt Local Amt. Tot. Amt. Brief Description Award Date StatusApprox %

Comp

UTA FY 2017 GRANTS OVERVIEW

Funds Allocated (awarded and executed) in Fed. FY 2017 (10/01/16 - 09/30/2017)

UT-2016-013-00D $ 661,632 $ 198,640 $ 860,272 FY 14 -15 Sec 5310 Large Urbanized Area (Ogden/Layton

UZA)42635 Active 71

UT-2016-013-00S $ 958,581 $ 352,340 $ 1,310,921 FY 14 -15 Sec 5310 Large Urbanized Area (SLC/WV UZA) 42635 Active 28

UT-2016-013-00U $ 350,245 $ 75,760 $ 426,005 FY 14 -15 Sec 5310 Large Urbanized Area (Provo Orem UZA) 42635 Active 13

UT-2017-015-00 $ 678,381 $ 267,921 $ 946,302 FY15-17 5310 Ogden/Layton 42992 Active 0

UT-2017-016-00 $ 437,819 $ 101,515 $ 539,334 FY15-17 5310 Provo/Orem 42992 Active 0

UT-2017-017-00 $ 1,588,868 $ 786,774 $ 2,375,642 FY15-17 5310 Salt Lake/West Valley 42992 Active 0

UT-2017-012-00 $ 5,427,100 $ 891,400 $ 6,318,500 FY 2015 5312 LoNo Electric Buses 43000 Active 0

UT-2017-011-00 $ 3,520,000 $ 880,000 $ 4,400,000 FY 17 Section 3028 Positive Train Control 43000 Active 27

UT-2017-013-00 $ 2,848,793 $ 502,728 $ 3,351,521 FY17 5339 Formula Bus & Bus Facilities (Full Appt) 43000 Active 0

EMW-2015-RA-0035 $ 100,000 $ - $ 100,000 Homeland Security -- Multi-Agency Exercise 42309 Ready to close 100

EMW-2016-RA-00045 $ 182,500 $ - $ 182,500 Homeland Security -- Awareness Campaign 42596 Active 7

16-1812JH $ 50,000 $ 244,000 $ 294,000 SLCo CDBG Rt 200 ADA Bus Stop Improvements 42490 Active 29

17-2342JH $ 68,366 $ - $ 68,366 SLCo CDBG - 3900 S ADA Bus Stop Improvements 42866 Active 0

168642 $ 980,318 $ 245,080 $ 1,225,398 JARC/New Freedom old UDOT 42410 Active 9

178233 $ 794,042 $ 794,042 $ 1,588,084 All UZA Operating -Flex Routes 42620 Active 13

17-2128TP $ 25,000 $ - $ 25,000 UCAIR - Ski Bus Marketing 42688 Ready to close 100

Other Agency Grants

Non Federal Grants

2/8/2018

Page 16: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Grant Number Fed. Amt Local Amt. Tot. Amt. Brief Description Award Date StatusApprox %

Comp

UTA FY 2017 GRANTS OVERVIEW

Funds Allocated (awarded and executed) in Fed. FY 2017 (10/01/16 - 09/30/2017)

UT-90-X071-00 $ 41,588,702 $ 10,397,176 $ 51,985,878 5307: PM, ADA ops, security, enhancements, planning 41138 Closed 100

UT-95-X004-00 $ 4,072,028 $ 295,695 $ 4,367,723 Rideshare, Vans, Operating, Rehab LRVs CMAQ/STP 40422 Closed 100

UT-2016-008-00 $ 46,141,985 $ 11,535,497 $ 57,677,482 FY16 5307 PM Planning ADA Secure En 42604 Closed 100

UT-2016-009-00 $ 12,868,500 $ 3,217,125 $ 16,085,625 5337 FY16 Fixed Guideway Prev Maint 42605 Active 95

$ 368,808,244 $ 145,361,179 $ 514,189,423 Federal

AmountLocal Amount Total Amount

$ 98,904,780 $ 77,979,839 $ 176,884,619 Capital Improvements 27% 54% 34%

$ 269,903,464 $ 64,164,215 $ 321,219,179 Operation/ Planning and Maintenance (O & M) 73% 44% 62%

Total Amounts

Grants Closed Since Last Year-End Report

2/8/2018

Page 17: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Wasatch Front Regional Council Area2017 Projects with Federal Highway Funds

Obligated/ De-Obligated

Plan Fund Desc. PIN PIN Status Category Project Location County Total Obl. FA STATE LOCAL TOTAL

BRIDGE REHAB/REPLACEMENT (ON/OFF)

BR_ON/OFF14666 Active Structures Bridge Rehabilitation Cnty:FA-2040; MP 13.84 - 13.91 & Statewide SALT LAKE $55,313.96 $55,313.96 $13,828.49 $0.00 $69,142.45

CMAQ REDUCE PM 2.5 EMISSIONS

CMAQ_PM2.511092

Contract

CompleteSpot Improvement - Operational SR-103; MP .00 - .17 & SR-103; MP .00 - .17 DAVIS $936,892.51 $936,892.51 $68,033.49 $0.00 $1,004,926.00

11094 Awarded Intersection Improvements 7800 South & 1300 West SALT LAKE $310,154.76 $310,154.76 $0.00 $22,522.24 $332,677.00

11095 Active Intersection Improvements 9000 South & 4000 West SALT LAKE $46,615.00 $46,615.00 $0.00 $3,385.00 $50,000.00

11097 Scoping Trails and Bikepaths Jordan River Trail - Gardner Village TRAX Station SALT LAKE $74,584.00 $74,584.00 $0.00 $5,416.00 $80,000.00

11998 Closed Intersection Improvements Little Cottonwood Canyon Intersection - Snowbird Entry 1 SALT LAKE ($54,556.06) ($54,556.06) ($3,961.65) $0.00 ($58,517.71)

CMAQ TOOELE @ 100 %

CMAQ_TOOELE114588 Active Transit Service Tooele Flex Route Transit service in Tooele County TOOELE $0.00 $0.00 $0.00 ($10,892.39) ($10,892.39)

CMAQ WFRC @ 100 % PRO-RATA

CMAQ_WFRC_17194 Closed Intersection Improvements SR-106: MAIN STREET & PARRISH LANE DAVIS $0.00 $0.00 $0.00 ($6,214.62) ($6,214.62)

CONGESTION MITIGATION / AIR (BOX

ELDER) CMAQ_BOX_ELD13929

Physically

CompleteIntersection Improvements 500 W at 700 S. and Forest St., Brigham City BOX ELDER $517,971.89 $517,971.89 $0.00 $37,613.10 $555,584.99

15637 Scoping Intersection Improvements SR-102; MP 15.44 - 15.55 BOX ELDER $139,845.00 $139,845.00 $0.00 $10,155.00 $150,000.00

CONGESTION MITIGATION/AIR QUALITY

(TOOEL CMAQ_TOOELE14588 Active Transit Service Tooele Flex Route Transit service in Tooele County TOOELE $149,999.61 $149,999.61 $0.00 $10,892.39 $160,892.00

15565 Scoping Transit Service Tooele County TOOELE $150,000.00 $150,000.00 $0.00 $0.00 $150,000.00

CONGESTION MITIGATION/AIR QUALITY

(WFRC) CMAQ_WFRC7947 Active ATMS Project TRAFFIC ADAPIVE CONTROL SYSTEM SALT LAKE ($46,615.00) ($46,615.00) ($3,385.00) $0.00 ($50,000.00)

8241 Closed ATMS Project VARIABLE MESSAGE SIGN OPTIMIZATION SALT LAKE ($56,048.66) ($56,048.66) ($4,070.04) $0.00 ($60,118.70)

8242 Closed ATMS Project SALT LAKE COUNTY TRAFFIC SIGNAL INTERCONNECT SALT LAKE ($6,638.53) ($6,638.53) ($482.07) $0.00 ($7,120.60)

11143 Active ATMS Project various locations along the Wasatch Front VARIOUS $279,690.00 $279,690.00 $20,310.00 $0.00 $300,000.00

12166 Scoping Trails and Bikepaths West Haven; D&RGW Rail to Ogden River Trail WEBER $102,553.00 $102,553.00 $0.00 $0.00 $102,553.00

12631Under

ConstructionATMS Project

SR-97; MP 4.09 - 5.10 & Cnty:FA-3308; MP 1.50 - 3.00 & SR-37;

MP 1.50 - 1.50 & SR-107; MP 1.95 - 3.52 & Cnty:FA-1456; MP

1.70 - 1.70 & SR-106; MP 7.29 - 7.29 & SR-106; MP 9.03 - 9.03 &

SR-106; MP 8.30 - 8.30 & Cnty:FA-1404; MP 2.08 - 2.74 &

Cnty:FA-1

VARIOUS $559,112.43 $559,112.43 $40,600.57 $0.00 $599,713.00

12637 Closed ATMS ProjectSR-209; MP 14.49 - 18.84 & Cnty:FA-2044; MP 3.37 - 5.02 &

Cnty:FA-2062; MP .25 - .87 & SR-209; MP 12.18 - 12.65SALT LAKE $46,615.00 $46,615.00 $3,385.00 $0.00 $50,000.00

12638 Scoping ATMS Project

Cnty:FA-2061; MP .00 - .00 & Cnty:FA-2080; MP 3.87 - 4.61 & SR-

282; MP 2.25 - 2.25 & SR-282; MP 2.54 - 2.54 & SR-68; MP 41.31 -

45.08 & SR-111; MP 9.11 - 10.09 & SR-175; MP .30 - 1.90 & SR-

171; MP .00 - 5.55

SALT LAKE $111,876.00 $111,876.00 $8,124.00 $0.00 $120,000.00

1 2/14/2018

Page 18: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Wasatch Front Regional Council Area2017 Projects with Federal Highway Funds

Obligated/ De-Obligated

Plan Fund Desc. PIN PIN Status Category Project Location County Total Obl. FA STATE LOCAL TOTAL

12640Under

ConstructionATMS Project

SR-201; MP 15.69 - 15.84 & I-215; MP 7.15 - 7.42 & I-15; MP

292.21 - 292.49 & SR-201; MP 15.69 - 15.84 & I-215; MP 7.15 -

7.42 & I-15; MP 292.21 - 292.49

SALT LAKE $1,701,167.81 $1,701,167.81 $123,532.19 $0.00 $1,824,700.00

12674 Awarded ATMS ProjectI-215; MP 27.44 - 27.44 & I-215; MP 25.63 - 28.50 & I-215; MP

25.63 - 28.50 & SR-68; MP 62.88 - 67.27VARIOUS $932,300.00 $932,300.00 $67,700.00 $0.00 $1,000,000.00

14646 Scoping ATMS Project Cnty:FA-2326; MP 2.34 - 2.44 & SR-282; MP 1.99 - 2.94 SALT LAKE $46,615.00 $46,615.00 $3,385.00 $0.00 $50,000.00

14910Under

ConstructionATMS Project Various signalized intersections throughout SL County SALT LAKE $472,994.01 $472,994.01 $34,346.99 $0.00 $507,341.00

CONVERTED TAP FUNDS TO STP

STP_TAP_ST12096 Closed Signal and/or Lighting Project SR-68; MP 61.96 - 61.96 SALT LAKE ($16,189.30) ($16,189.30) $0.00 $0.00 ($16,189.30)

EQUITY BONUS / MINIMUM GUARANTY

EQ_BONUS(MG)11676 Abandoned Roadway Minor Rehab - Purple Book SR-108; MP .00 - .69 DAVIS ($51,276.50) ($51,276.50) ($3,723.50) $0.00 ($55,000.00)

11679 Closed Roadway Minor Rehab - Purple Book SR-126; MP 5.71 - 8.75 & SR-126; MP 9.25 - 11.62 VARIOUS ($353,624.11) ($353,624.11) ($25,678.80) $0.00 ($379,302.91)

12250 Closed Roadway Minor Rehab - Purple Book SR-235; MP .00 - .51 & US-89; MP 414.22 - 416.46 WEBER ($49,204.68) ($49,204.68) ($3,573.06) $0.00 ($52,777.74)

12292 Closed Roadway Minor Rehab - Purple Book SR-203; MP .00 - 1.87 WEBER ($85,080.47) ($85,080.47) ($6,178.21) $0.00 ($91,258.68)

12486 Closed Roadway Minor Rehab - Purple Book SR-25; MP .00 - 10.00 VARIOUS ($555,012.80) ($555,012.80) ($40,302.87) $0.00 ($595,315.67)

12507 Closed Other This is for ePM programming enhancements. STATEWIDE ($14,693.06) ($14,693.06) ($1,066.95) $0.00 ($15,760.01)

14202Physically

CompleteRoadway Preventative Maintenance US-89; MP 420.42 - 422.64 & US-89; MP 420.42 - 422.64 WEBER ($27,779.02) ($27,779.02) ($2,017.20) $0.00 ($29,796.22)

FA LTAP Program 15590 Active Other N/A Fiscal Year 2018 LTAP Program STATEWIDE $155,139.81 $155,139.81 $155,139.81 $0.00 $310,279.62

FEDERAL AID MISCELLANEOUS

FA_MISC11619 Closed Funding Pass Through Ferry Boat Discretionary Funds VARIOUS $36,344.52 $36,344.52 $9,086.13 $0.00 $45,430.65

15110 Scoping Transit Service Lake Powell Ferry VARIOUS $2,744.48 $2,744.48 $686.12 $0.00 $3,430.60

16050 Scoping Other Statewide training STATEWIDE $6,129.00 $6,129.00 $1,532.25 $0.00 $7,661.25

FEDERAL AID WITH 50% PRO-RATA

FA_MISC_50%10309 Closed Other PILOT TEST - INVEST VARIOUS ($214.62) ($214.62) ($214.62) $0.00 ($429.24)

FERRY BOAT DISC FUNDS - 2016

EM_2016_FBD14911 Close Out Transit Service

Cnty:FA-2464; MP .00 - .00 & Cnty:FA-1878; MP 5.01 - 5.40 &

Cnty:FA-1878; MP 5.40 - 5.40 & Cnty:FA-2464; MP .00 - .31VARIOUS $100,000.00 $100,000.00 $25,000.00 $0.00 $125,000.00

FERRY BOAT DISCR FUND 2015

EM_2015_FBD14911 Close Out Transit Service

Cnty:FA-2464; MP .00 - .00 & Cnty:FA-1878; MP 5.01 - 5.40 &

Cnty:FA-1878; MP 5.40 - 5.40 & Cnty:FA-2464; MP .00 - .31VARIOUS $38,842.00 $38,842.00 $9,710.50 $0.00 $48,552.50

FTA SEC_5304 GRANT @ 80%

FTA_5304_80%12990 Closed Other Various Locations in State of Utah STATEWIDE ($605,648.65) ($605,648.65) $0.00 $0.00 ($605,648.65)

15069 Active Other Statewide Rural Transit Planning STATEWIDE $825,904.65 $825,904.65 $0.00 $0.00 $825,904.65

2 2/14/2018

Page 19: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Wasatch Front Regional Council Area2017 Projects with Federal Highway Funds

Obligated/ De-Obligated

Plan Fund Desc. PIN PIN Status Category Project Location County Total Obl. FA STATE LOCAL TOTAL

FTA-MPO (CPG) FUNDS @ 93.23 %

PRORATA FTA_530715854 Active Other N/A Annual Work Program SALT LAKE $642,734.00 $642,734.00 $0.00 $0.00 $642,734.00

FY17 STIC INCENTIVE PROGRAM

FA_STIC_201715266 Active Other Central GIS Development VARIOUS $100,000.00 $100,000.00 $0.00 $0.00 $100,000.00

FY17 STIC INCENTIVE PROGRAM

FA_STIC_201815348 Scoping Other Create RFP Template for Progressive Design Build VARIOUS $100,000.00 $100,000.00 $0.00 $0.00 $100,000.00

HIGH RISK RURAL ROADS HSIP_HRRR 15231 Awarded Spot Improvement - Safety

SR-92; MP 14.57 - 15.41 & SR-178; MP .01 - .16 & SR-147; MP

11.25 - 11.49 & SR-115; MP 5.73 - 5.99 & SR-86; MP .44 - .55 &

SR-65; MP 28.13 - 28.15

VARIOUS $1,763.07 $1,763.07 $128.03 $0.00 $1,891.10

HIGHWAY SAFETY IMPROVEMENT

PROGAM HSIP9691 Closed Roadway Preventative Maintenance SR-186; MP .00 - 1.91 SALT LAKE ($25,290.26) ($25,290.26) ($1,836.47) $0.00 ($27,126.73)

11299 Closed Roadway Preventative Maintenance US-189; MP 8.30 - 16.60 VARIOUS ($2,643.45) ($2,643.45) ($191.96) $0.00 ($2,835.41)

11367 ClosedRoadway New Construction (New

Alignment)SR-202; MP .00 - .57 & SR-201; MP 2.80 - 3.25 SALT LAKE ($38,263.83) ($38,263.83) ($2,778.57) $0.00 ($41,042.40)

11372 Closed Spot Improvement - Safety I-15; MP .00 - 140.00 VARIOUS ($198,678.46) ($198,678.46) ($14,427.25) $0.00 ($213,105.71)

11384 Closed Spot Improvement - Safety SR-67; MP 3.00 - 10.84 & SR-67; MP 3.00 - 10.84 DAVIS ($82,644.54) ($82,644.54) ($6,001.33) $0.00 ($88,645.87)

11391 Central Review Spot Improvement - Safety SR-71; MP 15.30 - 15.30 SALT LAKE $670.72 $670.72 $48.71 $0.00 $719.43

11404 Closed Spot Improvement - Safety SR-266; MP 4.42 - 4.42 SALT LAKE ($12,094.02) ($12,094.02) ($878.22) $0.00 ($12,972.24)

11405 Closed Spot Improvement - Safety SR-266; MP 3.27 - 3.45 SALT LAKE ($88,127.63) ($88,127.63) ($6,399.50) $0.00 ($94,527.13)

11409 Closed Spot Improvement - Safety SR-266; MP 4.01 - 4.13 SALT LAKE ($310,501.84) ($310,501.84) ($22,547.44) $0.00 ($333,049.28)

11410 Closed ATMS Project US-189; MP 7.43 - 24.90 VARIOUS ($218,089.04) ($218,089.04) ($15,836.78) $0.00 ($233,925.82)

11498Physically

CompleteSpot Improvement - Safety SR-111; MP .00 - 9.10 SALT LAKE ($0.02) ($0.02) $0.00 $0.00 ($0.02)

11951 Closed Spot Improvement - SafetyI-84; MP 102.31 - 112.24 & I-84; MP 102.31 - 112.24 & I-84; MP

19.60 - 40.27 & I-84; MP 19.60 - 40.27VARIOUS ($119,943.13) ($119,943.13) ($8,709.82) $0.00 ($128,652.95)

12186 Closed Spot Improvement - Safety SR-12; MP 64.30 - 117.00 VARIOUS ($71,356.75) ($71,356.75) ($5,181.65) $0.00 ($76,538.40)

12189 Closed Spot Improvement - Safety

I-15; MP 188.49 - 188.56 & I-15; MP 178.29 - 178.39 & I-15; MP

175.78 - 175.85 & I-15; MP 174.67 - 174.75 & I-15; MP 173.47 -

173.54 & I-15; MP 164.46 - 164.51 & I-15; MP 163.33 - 163.46 & I-

15; MP 156.35 - 156.43 & I-15; MP 152.97 - 153.05 & I-15; M

VARIOUS ($178,449.50) ($178,449.50) ($12,958.70) $0.00 ($191,408.20)

12190 Closed Spot Improvement - Safety Various locations to be determined by Project Manager VARIOUS ($548,385.14) ($548,385.14) ($39,821.59) $0.00 ($588,206.73)

12209 Closed Spot Improvement - Safety Staffing Support STATEWIDE ($88,307.04) ($88,307.04) ($6,412.51) $0.00 ($94,719.55)

12211 Active Spot Improvement - Safety Staffing Support STATEWIDE $93,230.00 $93,230.00 $6,770.00 $0.00 $100,000.00

3 2/14/2018

Page 20: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Wasatch Front Regional Council Area2017 Projects with Federal Highway Funds

Obligated/ De-Obligated

Plan Fund Desc. PIN PIN Status Category Project Location County Total Obl. FA STATE LOCAL TOTAL

12217 Active Spot Improvement - Safety Staffing Support STATEWIDE $2,051,060.00 $2,051,060.00 $148,940.00 $0.00 $2,200,000.00

12218 Closed Spot Improvement - Safety Cnty:FA-2118; MP 3.39 - 3.39 SALT LAKE ($1,223.09) ($1,223.09) $0.00 ($88.82) ($1,311.91)

12221 Closed Spot Improvement - Safety I-80; MP 99.50 - 113.00 VARIOUS ($590,603.84) ($590,603.84) ($42,887.36) $0.00 ($633,491.20)

12640Under

ConstructionSpot Improvement - Safety

SR-201; MP 15.69 - 15.84 & I-215; MP 7.15 - 7.42 & I-15; MP

292.21 - 292.49 & SR-201; MP 15.69 - 15.84 & I-215; MP 7.15 -

7.42 & I-15; MP 292.21 - 292.49

SALT LAKE $72,719.40 $72,719.40 $5,280.60 $0.00 $78,000.00

12892 Closed Spot Improvement - Safety US-89; MP 405.97 - 407.15 & US-89; MP 398.19 - 402.25 VARIOUS ($57,228.98) ($57,228.98) ($4,155.74) $0.00 ($61,384.72)

12931 Closed Spot Improvement - Safety

I-70; MP 86.68 - 86.87 & I-70; MP 47.44 - 47.63 & I-70; MP 45.95 -

46.14 & I-70; MP 86.68 - 86.87 & I-70; MP 47.44 - 47.63 & I-70;

MP 45.95 - 46.14 & I-70; MP 21.94 - 22.28 & I-70; MP 21.94 -

22.28 & I-70; MP 17.06 - 17.25 & I-70; MP 17.06 - 17.25 &

VARIOUS ($119,330.30) ($119,330.30) ($8,665.30) $0.00 ($127,995.60)

12963 Closed Other Study Study with statewide application STATEWIDE ($594.59) ($594.59) ($43.18) $0.00 ($637.77)

13027 Active Spot Improvement - Safety Statewide study STATEWIDE $86,148.25 $86,148.25 $6,255.75 $0.00 $92,404.00

13040 Awarded Spot Improvement - Safety SR-20; MP .00 - 20.49 VARIOUS $590,607.73 $590,607.73 $42,887.64 $0.00 $633,495.37

13223Substantially

ComplSpot Improvement - Safety SR-71; MP 9.72 - 12.16 & SR-71; MP 9.72 - 12.16 SALT LAKE $195,747.57 $195,747.57 $14,214.43 $0.00 $209,962.00

13308Physically

CompleteSpot Improvement - Safety

I-15; MP 298.23 - 311.17 & I-215; MP .07 - 25.68 & I-15; MP

298.23 - 311.17 & I-80; MP 114.18 - 131.87 & I-80; MP 114.18 -

131.87 & I-215; MP .07 - 25.68 & SR-201; MP 10.74 - 12.79 & SR-

201; MP 10.74 - 12.79 & SR-201; MP 10.74 - 12.79 & SR-201; MP

10

SALT LAKE $2,521,871.50 $2,521,871.50 $183,128.50 $0.00 $2,705,000.00

13441Under

ConstructionSpot Improvement - Safety US-91; MP 1.97 - 6.60 & US-91; MP 1.97 - 6.60 BOX ELDER $932,300.00 $932,300.00 $67,700.00 $0.00 $1,000,000.00

13486 Awarded Spot Improvement - Safety

I-15; MP 312.33 - 400.59 & I-15; MP 312.18 - 400.59 & I-84; MP

81.05 - 112.11 & I-84; MP 81.04 - 112.08 & I-84; MP .03 - 42.14 &

I-84; MP .00 - 42.72

VARIOUS $139,845.00 $139,845.00 $10,155.00 $0.00 $150,000.00

13492 Close Out Spot Improvement - Safety Specific route segments TBD as part of the project VARIOUS $191,307.46 $191,307.46 $13,892.00 $0.00 $205,199.46

13493Under

ConstructionSpot Improvement - Safety SR-95; MP 16.00 - 117.00 VARIOUS $151,526.72 $151,526.72 $11,003.28 $0.00 $162,530.00

13596 Closed Spot Improvement - Safety I-80; MP 138.70 - 141.10 VARIOUS ($416,751.22) ($416,751.22) ($30,262.86) $0.00 ($447,014.08)

13900 Awarded Spot Improvement - Safety SR-114; MP 4.93 - 7.30 & SR-113; MP 6.39 - 6.74 VARIOUS $95,094.60 $95,094.60 $6,905.40 $0.00 $102,000.00

14426 Awarded Spot Improvement - Safety Various locations TBD VARIOUS $46,615.00 $46,615.00 $3,385.00 $0.00 $50,000.00

14448 Active Spot Improvement - Safety Various locations TBD VARIOUS $23,307.50 $23,307.50 $1,692.50 $0.00 $25,000.00

14455Physically

CompleteSpot Improvement - Safety SR-201; MP 2.80 - 3.50 SALT LAKE $524,712.43 $524,712.43 $38,102.58 $0.00 $562,815.01

14456Physically

CompleteSpot Improvement - Safety SR-201; MP 11.04 - 12.60 & SR-201; MP 11.04 - 12.60 SALT LAKE $1,478,476.50 $1,478,476.50 $107,361.21 $0.00 $1,585,837.71

4 2/14/2018

Page 21: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Wasatch Front Regional Council Area2017 Projects with Federal Highway Funds

Obligated/ De-Obligated

Plan Fund Desc. PIN PIN Status Category Project Location County Total Obl. FA STATE LOCAL TOTAL

14457 Awarded Spot Improvement - Safety Intersection of 4100 S and 3200 W SALT LAKE $579,733.61 $579,733.61 $0.00 $42,098.00 $621,831.61

14458Physically

CompleteSpot Improvement - Safety

SR-36; MP 60.80 - 62.90 & SR-36; MP 59.30 - 62.90 & SR-36; MP

59.30 - 62.90TOOELE $1,309,355.19 $1,309,355.19 $95,080.28 $0.00 $1,404,435.47

14459Under

ConstructionSpot Improvement - Safety

I-84; MP 115.40 - 115.41 & I-80; MP 1.48 - 1.49 & I-80; MP

117.08 - 117.09 & Various freeway routes in R2VARIOUS $2,423,979.99 $2,423,979.99 $176,020.00 $0.00 $2,599,999.99

14466 Active Spot Improvement - Safety statewide studies STATEWIDE $130,522.00 $130,522.00 $9,478.00 $0.00 $140,000.00

14468 Active Spot Improvement - Safety statewide STATEWIDE $209,767.50 $209,767.50 $15,232.50 $0.00 $225,000.00

14643 Active Spot Improvement - SafetyThis is a system evaluation and (potentially) a software modification;

no specific routes are involvedVARIOUS $46,615.00 $46,615.00 $3,385.00 $0.00 $50,000.00

14962 Awarded Spot Improvement - Safety SR-173; MP 9.29 - 9.41 SALT LAKE $368,145.29 $368,145.29 $26,733.28 $0.00 $394,878.57

15231 Awarded Spot Improvement - Safety

SR-92; MP 14.57 - 15.41 & SR-178; MP .01 - .16 & SR-147; MP

11.25 - 11.49 & SR-115; MP 5.73 - 5.99 & SR-86; MP .44 - .55 &

SR-65; MP 28.13 - 28.15

VARIOUS $158,491.00 $158,491.00 $11,509.00 $0.00 $170,000.00

15280 Awarded Spot Improvement - Safety I-84; MP .00 - 40.00 BOX ELDER $1,859,685.16 $1,859,685.16 $135,043.10 $0.00 $1,994,728.26

15372Under

ConstructionSpot Improvement - Safety Various locations in R2 SALT LAKE $801,778.00 $801,778.00 $58,222.00 $0.00 $860,000.00

15450 Active Spot Improvement - Safety Data Collection No Mappable Route STATEWIDE $372,920.00 $372,920.00 $27,080.00 $0.00 $400,000.00

15531Under

ConstructionSpot Improvement - Safety SR-30; MP 18.00 - 33.00 BOX ELDER $326,305.00 $326,305.00 $23,695.00 $0.00 $350,000.00

15598 Active Spot Improvement - Safety Statewide projects STATEWIDE $95,058.19 $95,058.19 $6,902.76 $0.00 $101,960.95

15690 Active Spot Improvement - Safety Statewide non-construction project STATEWIDE $55,938.00 $55,938.00 $4,062.00 $0.00 $60,000.00

15809 Active Spot Improvement - Safety non-construction study SALT LAKE $41,953.50 $41,953.50 $3,046.50 $0.00 $45,000.00

15810 Closed Spot Improvement - Safety I-15; MP 286.10 - 312.08 SALT LAKE $18,646.00 $18,646.00 $1,354.00 $0.00 $20,000.00

HIGHWAY SAFETY PROGRAM @ 100 %

FA HSIP_100%13900 Awarded Spot Improvement - Safety SR-114; MP 4.93 - 7.30 & SR-113; MP 6.39 - 6.74 VARIOUS $277,825.40 $277,825.40 $0.00 $0.00 $277,825.40

HSIP HIGH RISK RURAL ROAD - SPECIAL

RULE HSIP_HRRR_SR15231 Awarded Spot Improvement - Safety

SR-92; MP 14.57 - 15.41 & SR-178; MP .01 - .16 & SR-147; MP

11.25 - 11.49 & SR-115; MP 5.73 - 5.99 & SR-86; MP .44 - .55 &

SR-65; MP 28.13 - 28.15

VARIOUS $366,702.15 $366,702.15 $26,628.48 $0.00 $393,330.63

LOCAL TRANSPORTATION ASSISTANCE

PRGM FA_LTAP12981 Closed Other Study Fiscal Year 2015 LTAP Program STATEWIDE ($5,139.81) ($5,139.81) ($5,139.81) $0.00 ($10,279.62)

NATIONAL HIGHWAY SYSTEM NHS 9990 ClosedRoadway New or Reconstruct

InterchangeState Route: US-89 from: 404.30 to: 405.70 for: 1.40 DAVIS ($6.77) ($6.77) ($0.49) $0.00 ($7.26)

10863 Closed Roadway Minor Rehab - Purple Book SR-71; MP 18.28 - 22.47 SALT LAKE $0.00 $0.00 $0.01 $0.00 $0.01

10867 Closed Roadway Minor Rehab - Purple Book SR-186; MP 1.91 - 2.66 SALT LAKE $0.00 $0.00 ($0.01) $0.00 ($0.01)

5 2/14/2018

Page 22: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Wasatch Front Regional Council Area2017 Projects with Federal Highway Funds

Obligated/ De-Obligated

Plan Fund Desc. PIN PIN Status Category Project Location County Total Obl. FA STATE LOCAL TOTAL

12363 ClosedRoadway Minor Rehab - NOT Purple

BookSR-36; MP 55.77 - 62.49 TOOELE $0.00 $0.00 ($0.01) $0.00 ($0.01)

12561 AwardedRoadway Reconstruct - With

WideningUS-89; MP 363.77 - 364.79 SALT LAKE $30,841.98 $30,841.98 $2,239.62 $0.00 $33,081.60

12674 AwardedRoadway Reconstruct - With

Widening

I-215; MP 27.44 - 27.44 & I-215; MP 25.63 - 28.50 & I-215; MP

25.63 - 28.50 & SR-68; MP 62.88 - 67.27VARIOUS $119,741.15 $119,741.15 $8,695.14 $0.00 $128,436.29

NATIONAL SUMMER TRANSPORTATION

INSTITUTE NSTI15817 Active Other Study No Mappable Location at the University of Utah VARIOUS $20,000.00 $20,000.00 $0.00 $0.00 $20,000.00

NAT'L HIGHWAY PERFORM PROG.

BRIDGE ON NHPP_BR9807 Closed

Roadway Minor Rehab - NOT Purple

BookSR-68; MP 56.33 - 57.34 SALT LAKE $18,646.00 $18,646.00 $0.00 $0.00 $18,646.00

10025 Closed Structures Preventative Maintenance VARIOUS, STATEWIDE VARIOUS $37,292.00 $37,292.00 $2,708.00 $0.00 $40,000.00

10890Substantially

ComplStructures Bridge Rehabilitation

TO UTILITY; MP .19 - .20 & RANCH EXIT OVERPASS; MP .02 -

.04 & QUARRY OVERPASS; MP .03 - .05 & I-215 BELT ROUTE;

MP .17 - .19 & FROM I-80N TO I-215P; MP .41 - .43 & FROM I-

215N TO SR-186; MP .50 - .51 & FROM SR-186 TO I-215; MP .11

- .12 & FROM I-215

SALT LAKE $6,740,466.75 $6,740,466.75 $489,466.48 $0.00 $7,229,933.23

11419 Close Out Structures Bridge Rehabilitation FROM US-89; MP .00 - .12 SALT LAKE $1,075,305.49 $1,075,305.49 $78,084.50 $0.00 $1,153,389.99

13158Contract

CompleteStructures Preventative Maintenance

I-215; MP 5.59 - 6.54 & I-215; MP 5.59 - 6.54 & TO SR-190 6200

SOUTH; MP .13 - .24 & FROM SR-190 6200 SOUTH; MP .08 - .14

& SR-190; MP 1.75 - 1.83

SALT LAKE ($72,823.09) ($72,823.09) ($5,288.13) $0.00 ($78,111.22)

13323 Scoping Structures Bridge ReplacementI-80; MP 101.61 - 102.09 & I-80; MP 101.61 - 102.09 & SR-36; MP

65.64 - 66.41VARIOUS $1,864,600.00 $1,864,600.00 $135,400.00 $0.00 $2,000,000.00

13585Under

ConstructionStructures Bridge Replacement SR-151; MP 1.89 - 4.03 SALT LAKE $82,042.40 $82,042.40 $5,957.60 $0.00 $88,000.00

14344 Active Structures Preventative Maintenance

FROM SR-71; MP .00 - .17 & I-80; MP 123.11 - 125.69 & TO SR-

181 13TH EAST; MP .00 - .20 & TO SR-71; MP .00 - .11 & I-80;

MP 123.11 - 125.69

SALT LAKE $74,584.00 $74,584.00 $5,416.00 $0.00 $80,000.00

15109 Scoping Structures Preventative Maintenance Various locations throughout the state STATEWIDE $372,920.00 $372,920.00 $27,080.00 $0.00 $400,000.00

NAT'L HIGHWAY PERFORM PROG. NHS

ROUTES NHPP_NHS8828 Close Out

Roadway Reconstruct - Without

WideningSR-201; MP 5.83 - 10.93 & SR-201; MP 5.82 - 10.92 SALT LAKE $86,983.90 $86,983.90 $6,316.43 $0.00 $93,300.33

9691 Closed Roadway Preventative Maintenance SR-186; MP .00 - 1.91 SALT LAKE ($536.07) ($536.07) ($38.93) $0.00 ($575.00)

9807 ClosedRoadway Minor Rehab - NOT Purple

BookSR-68; MP 56.33 - 57.34 SALT LAKE ($18,646.00) ($18,646.00) $0.00 $0.00 ($18,646.00)

10675 ClosedRoadway Reconstruct - With

WideningUS-89 Passing Lanes & Alton Intersection Improvements VARIOUS ($307,394.32) ($307,394.32) ($22,321.78) $0.00 ($329,716.10)

10863 Closed Roadway Minor Rehab - Purple Book SR-71; MP 18.28 - 22.47 SALT LAKE ($106,484.54) ($106,484.54) ($7,732.50) $0.00 ($114,217.04)

10867 Closed Roadway Minor Rehab - Purple Book SR-186; MP 1.91 - 2.66 SALT LAKE ($8,666.03) ($8,666.03) ($629.29) $0.00 ($9,295.32)

11299 Closed Roadway Preventative Maintenance US-189; MP 8.30 - 16.60 VARIOUS ($189,773.91) ($189,773.91) ($13,780.63) $0.00 ($203,554.54)

11547 Closed Roadway Minor Rehab - Purple Book SR-193; MP 2.79 - 5.17 DAVIS $0.00 $0.00 ($0.01) $0.00 ($0.01)

6 2/14/2018

Page 23: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Wasatch Front Regional Council Area2017 Projects with Federal Highway Funds

Obligated/ De-Obligated

Plan Fund Desc. PIN PIN Status Category Project Location County Total Obl. FA STATE LOCAL TOTAL

11685 Closed Roadway Minor Rehab - Purple Book SR-203; MP 3.87 - 6.14 WEBER ($206,409.64) ($206,409.64) ($14,988.67) $0.00 ($221,398.31)

12261 Closed Roadway Preventative Maintenance SR-235; MP .49 - 3.20 & US-89; MP 417.45 - 420.45 WEBER ($121,673.25) ($121,673.25) ($8,835.44) $0.00 ($130,508.69)

12363 ClosedRoadway Minor Rehab - NOT Purple

BookSR-36; MP 55.77 - 62.49 TOOELE ($576,462.55) ($576,462.55) ($41,860.47) $0.00 ($618,323.02)

12494Under

ConstructionRoadway Minor Rehab - Purple Book SR-201; MP 13.10 - 14.94 SALT LAKE $2,133,168.59 $2,133,168.59 $154,902.41 $0.00 $2,288,071.00

12561 Awarded Roadway Minor Rehab - Purple Book US-89; MP 363.77 - 364.79 SALT LAKE $2,174,047.52 $2,174,047.52 $157,870.88 $0.00 $2,331,918.40

12594 Closed Roadway Minor Rehab - Purple Book SR-273; MP .00 - 2.07 & SR-273; MP .00 - 2.07 DAVIS ($231,384.43) ($231,384.43) ($16,802.24) $0.00 ($248,186.67)

12674 Awarded Intersection ImprovementsI-215; MP 27.44 - 27.44 & I-215; MP 25.63 - 28.50 & I-215; MP

25.63 - 28.50 & SR-68; MP 62.88 - 67.27VARIOUS $2,672,357.70 $2,672,357.70 $194,056.22 $0.00 $2,866,413.92

13321Under

ConstructionIntersection Improvements SR-193; MP 3.20 - 3.60 DAVIS $247,937.59 $247,937.59 $18,004.26 $0.00 $265,941.85

13441Under

ConstructionRoadway Preventative Maintenance US-91; MP 1.97 - 6.60 & US-91; MP 1.97 - 6.60 BOX ELDER $1,216,651.50 $1,216,651.50 $88,348.50 $0.00 $1,305,000.00

13452Contract Closed

OutRoadway Preventative Maintenance SR-68; MP 50.01 - 52.45 SALT LAKE $2,097,675.00 $2,097,675.00 $152,325.00 $0.00 $2,250,000.00

13585Under

Construction

Roadway Reconstruct - With

WideningSR-151; MP 1.89 - 4.03 SALT LAKE $12,520,789.00 $12,520,789.00 $909,211.00 $0.00 $13,430,000.00

13736Contract Closed

OutRoadway Preventative Maintenance US-89; MP 384.88 - 389.53 DAVIS $1,165,375.00 $1,165,375.00 $84,625.00 $0.00 $1,250,000.00

14192 Active Roadway Preventative Maintenance SR-13; MP .00 - .65 & US-89; MP 431.10 - 433.56 BOX ELDER $18,646.00 $18,646.00 $1,354.00 $0.00 $20,000.00

14285Substantially

ComplRoadway Minor Rehab - Purple Book US-6; MP 246.77 - 251.73 & US-6; MP 260.70 - 262.20 VARIOUS $3,826,573.15 $3,826,573.15 $277,870.86 $0.00 $4,104,444.01

14327 Close Out Asset Management I-15; MP .00 - 72.00 & I-15; MP .00 - 72.00 VARIOUS $361,890.90 $361,890.90 $26,279.11 $0.00 $388,170.01

14430Under

ConstructionAsset Management US-89; MP 423.30 - 428.77 BOX ELDER $2,342,450.36 $2,342,450.36 $170,099.64 $0.00 $2,512,550.00

14722 AwardedRoadway Reconstruct - With

Widening

US-6; MP 261.20 - 262.00 & US-6; MP 280.00 - 282.00 & US-6;

MP 257.00 - 257.70 & US-6; MP 287.27 - 290.51 & US-6; MP

278.20 - 282.00 & US-6; MP 263.35 - 270.19 & US-6; MP 251.73 -

255.81

VARIOUS $419,535.00 $419,535.00 $30,465.00 $0.00 $450,000.00

14823 Active Roadway Minor Rehab - Purple Book US-89; MP 383.77 - 384.88 VARIOUS $46,615.00 $46,615.00 $3,385.00 $0.00 $50,000.00

14904 Close OutRoadway Reconstruct - With

WideningUS-91; MP 5.60 - 5.85 BOX ELDER $121,823.29 $121,823.29 $8,846.33 $0.00 $130,669.62

15155 Close Out Roadway Minor Rehab - Purple Book SR-68; MP 62.88 - 67.27 VARIOUS $1,864.60 $1,864.60 $135.40 $0.00 $2,000.00

15313 Advertised Roadway Minor Rehab - Purple Book US-89; MP 103.55 - 115.74 VARIOUS $55,938.00 $55,938.00 $4,062.00 $0.00 $60,000.00

15491Physically

CompleteRoadway Minor Rehab - Purple Book

SR-104; MP .00 - .67 & SR-79; MP 3.05 - 4.87 & SR-204; MP .74 -

2.23WEBER $1,398,450.00 $1,398,450.00 $101,550.00 $0.00 $1,500,000.00

7 2/14/2018

Page 24: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Wasatch Front Regional Council Area2017 Projects with Federal Highway Funds

Obligated/ De-Obligated

Plan Fund Desc. PIN PIN Status Category Project Location County Total Obl. FA STATE LOCAL TOTAL

NAT'L HIGHWAY PERFORM PROGRAM -

IM NHPP_IM9419

Physically

Complete

Roadway Reconstruct - With

Widening

I-215; MP 10.41 - 19.94 & TO SR-266 4700 SOUTH EB; MP .00 -

.01 & TO SR-266 4700 SOUTH; MP .00 - .17 & FROM SR-266

4700 SOUTH; MP .00 - .17 & FROM SR-171 3500 SOUTH; MP

.06 - .16 & TO SR-171 3500 SOUTH; MP .00 - .15 & FROM SR-

171 3500 SOUTH; MP .13 -

SALT LAKE $393,463.27 $393,463.27 $24,314.68 $0.00 $417,777.95

10010Under

ConstructionAsset Management I-15; MP 293.63 - 309.33 & I-15; MP 293.63 - 309.33 SALT LAKE $1,596,351.00 $1,596,351.00 $98,649.00 $0.00 $1,695,000.00

10919 Closed Roadway Preventative Maintenance I-80; MP 10.46 - 20.00 & I-80; MP 10.46 - 20.00 TOOELE ($173,922.83) ($173,922.83) ($10,747.83) $0.00 ($184,670.66)

11340 Closed Roadway Preventative Maintenance I-15; MP 239.23 - 244.00 VARIOUS ($127,098.01) ($127,098.01) ($7,854.22) $0.00 ($134,952.23)

11493 Closed Roadway Minor Rehab - Purple Book I-80; MP 30.00 - 41.28 & I-80; MP 30.00 - 41.28 TOOELE ($2,268,257.96) ($2,268,257.96) ($140,170.54) $0.00 ($2,408,428.50)

11827Under

ConstructionSpot Improvement - Operational

TO SR-151 10600 SOUTH; MP .10 - .18 & Reference I 15 MP

293.681 - 293.470SALT LAKE $3,030,241.50 $3,030,241.50 $187,258.50 $0.00 $3,217,500.00

12259 Closed Roadway Preventative Maintenance I-84; MP 7.73 - 15.81 & I-84; MP 7.73 - 15.81 BOX ELDER ($133,798.49) ($133,798.49) ($8,268.28) $0.00 ($142,066.77)

12298Under

ConstructionRoadway Minor Rehab - Purple Book I-15; MP 365.51 - 373.26 BOX ELDER $753,440.00 $753,440.00 $46,560.00 $0.00 $800,000.00

12362 ClosedRoadway Minor Rehab - NOT Purple

BookI-80; MP 40.00 - 50.00 & I-80; MP 40.00 - 50.00 TOOELE ($509,315.73) ($509,315.73) ($31,473.96) $0.00 ($540,789.69)

12460 Closed Roadway Preventative Maintenance I-15; MP 131.84 - 138.55 VARIOUS ($108,650.68) ($108,650.68) ($6,714.23) $0.00 ($115,364.91)

12522 Closed Roadway Preventative Maintenance

TO US-89 STATE STREET; MP .00 - .14 & TO I-15N FROM I-

215N; MP .00 - .12 & TO I-15P FROM I-215N; MP .00 - .08 & I-

215; MP 13.48 - 13.56 & I-215; MP 10.41 - 13.57 & FROM SR-68

REDWOOD ROAD; MP .00 - .11 & FROM 280 EAST; MP .05 -

.25 & TO I-215P FROM I

SALT LAKE ($659,260.00) ($659,260.00) ($40,740.00) $0.00 ($700,000.00)

12560Substantially

ComplIntersection Improvements SR-209; MP 6.80 - 8.00 SALT LAKE $3,712,861.65 $3,712,861.65 $229,442.08 $0.00 $3,942,303.73

13522Contract Closed

OutAsset Management I-215; MP .07 - 6.89 & I-215; MP .07 - 6.89 SALT LAKE $3,287,086.37 $3,287,086.37 $203,130.63 $0.00 $3,490,217.00

13737 Active Roadway Minor Rehab - Purple BookI-215; MP 26.94 - 28.59 & I-215; MP 26.94 - 28.93 & I-215; MP

25.63 - 28.59 & I-215; MP 25.63 - 28.93VARIOUS $164,815.00 $164,815.00 $10,185.00 $0.00 $175,000.00

15703 Scoping Asset Management I-215; MP 15.52 - 16.54 SALT LAKE $470,900.00 $470,900.00 $29,100.00 $0.00 $500,000.00

PLANNING MPO (WFRC) PL_WFRC 11963 Closed Other Various Locations in Salt Lake/Ogden/Layton Urban Areas SALT LAKE ($431,184.67) ($431,184.67) $0.00 $0.00 ($431,184.67)

15854 Active Other N/A Annual Work Program SALT LAKE $2,138,261.00 $2,138,261.00 $0.00 $0.00 $2,138,261.00

RAIL / HWY ELIM @90/10

R/H_HZ_ELM10115351 Active Railroad Statewide study STATEWIDE $72,000.00 $72,000.00 $8,000.00 $0.00 $80,000.00

RAIL / HWY ELIM @90/10

R/H_HZ_ELM9111746 Active Railroad Weber, Davis, & SL Co Commuter Rail Line VARIOUS $40,640.71 $40,640.71 $4,515.63 $0.00 $45,156.34

12516 Closed Railroad Statewide non-construction project VARIOUS ($6,058.83) ($6,058.83) ($673.20) $0.00 ($6,732.03)

8 2/14/2018

Page 25: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Wasatch Front Regional Council Area2017 Projects with Federal Highway Funds

Obligated/ De-Obligated

Plan Fund Desc. PIN PIN Status Category Project Location County Total Obl. FA STATE LOCAL TOTAL

12987 Awarded Railroad Cnty:FA-2644; MP 2.07 - 2.07 TOOELE $87,931.80 $87,931.80 $9,770.20 $0.00 $97,702.00

13525 Active Railroad Statewide inventory STATEWIDE $126,000.00 $126,000.00 $14,000.00 $0.00 $140,000.00

13527Under

ConstructionRailroad 3 locations on Salt Lake City's road network SALT LAKE $216,000.00 $216,000.00 $0.00 $24,000.00 $240,000.00

13528 Closed Railroad Various locations in Region 3 VARIOUS ($93,353.06) ($93,353.06) ($10,372.56) $0.00 ($103,725.62)

13531 Active Railroad Consultant contract STATEWIDE $126,000.00 $126,000.00 $14,000.00 $0.00 $140,000.00

13543 Closed Railroad Locations in R4 TBD VARIOUS ($12,550.27) ($12,550.27) ($1,394.48) $0.00 ($13,944.75)

RAIL/HIGHWAY DEVICES @90/10

R/H_DEVICS9010609 Closed Railroad SR-36; MP 40.71 - 41.13 TOOELE ($469,737.63) ($469,737.63) ($52,193.07) $0.00 ($521,930.70)

13526 Scoping Railroad Cnty:FA-1392; MP 2.01 - 2.01 DAVIS $31,500.00 $31,500.00 $0.00 $3,500.00 $35,000.00

13527Under

ConstructionRailroad 3 locations on Salt Lake City's road network SALT LAKE $112,500.00 $112,500.00 $0.00 $12,500.00 $125,000.00

15005 Active Railroad Spot location of crossing on Foothill Dr TOOELE $9,000.00 $9,000.00 $1,000.00 $0.00 $10,000.00

15276 Scoping Railroad SR-171; MP 10.13 - 10.43 & SR-48; MP 4.08 - 4.24 SALT LAKE $73,980.00 $73,980.00 $8,220.00 $0.00 $82,200.00

15278 Scoping Railroad Cnty:FA-2080; MP 3.87 - 4.07 SALT LAKE $45,000.00 $45,000.00 $0.00 $5,000.00 $50,000.00

15704 Scoping Railroad Cnty:FA-1386; MP .80 - 1.14 DAVIS $18,000.00 $18,000.00 $2,000.00 $0.00 $20,000.00

12987 Awarded Railroad Cnty:FA-2644; MP 2.07 - 2.07 TOOELE $610,793.00 $610,793.00 $0.00 $0.00 $610,793.00

REPURPOSED EARMARK @ 93.23

[email protected] Awarded

Roadway Reconstruct - With

WideningI-80; MP 139.44 - 141.84 & I-80; MP 138.78 - 142.00 VARIOUS $548,505.00 $548,505.00 $39,830.30 $0.00 $588,335.30

13467 Close Out Roadway Preventative Maintenance SR-67; MP 4.82 - 11.50 & SR-67; MP 4.82 - 11.50 DAVIS $208,061.66 $208,061.66 $15,108.63 $0.00 $223,170.29

REPURPOSED EARMARK @ 80

EM_RPF9@8011828 Awarded

Roadway Reconstruct - With

WideningI-80; MP 139.44 - 141.84 & I-80; MP 138.78 - 142.00 VARIOUS $1,771.35 $1,771.35 $442.84 $0.00 $2,214.19

REPURPOSED EARMARK @ 80%

EM_RPS9@8011828 Awarded

Roadway Reconstruct - With

WideningI-80; MP 139.44 - 141.84 & I-80; MP 138.78 - 142.00 VARIOUS $1,816.23 $1,816.23 $454.06 $0.00 $2,270.29

REPURPOSED EARMARK @ 93.23

[email protected] Awarded

Roadway Reconstruct - With

WideningI-80; MP 139.44 - 141.84 & I-80; MP 138.78 - 142.00 VARIOUS $188,854.69 $188,854.69 $13,713.89 $0.00 $202,568.58

13467 Close Out Roadway Preventative Maintenance SR-67; MP 4.82 - 11.50 & SR-67; MP 4.82 - 11.50 DAVIS $2,439,317.06 $2,439,317.06 $177,133.72 $0.00 $2,616,450.78

SAFE ROUTES TO SCHOOLS -

INFRASTRUCTURE SR2S_INFR14335 Awarded Safe Sidewalk/ADA Cnty:FA-3455; MP .91 - 1.02 WEBER $41,845.25 $41,845.25 $0.00 $0.00 $41,845.25

9 2/14/2018

Page 26: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Wasatch Front Regional Council Area2017 Projects with Federal Highway Funds

Obligated/ De-Obligated

Plan Fund Desc. PIN PIN Status Category Project Location County Total Obl. FA STATE LOCAL TOTAL

SECTION 164 PENALTIES-FOR HSIP

SEC164_HSIP11367 Closed

Roadway New Construction (New

Alignment)SR-202; MP .00 - .57 & SR-201; MP 2.80 - 3.25 SALT LAKE ($505,843.96) ($505,843.96) ($36,732.42) $0.00 ($542,576.38)

11372 Closed Spot Improvement - Safety I-15; MP .00 - 140.00 VARIOUS $0.00 $0.00 ($0.01) $0.00 ($0.01)

12218 Closed Spot Improvement - Safety Cnty:FA-2118; MP 3.39 - 3.39 SALT LAKE $0.00 $0.00 $0.00 ($0.01) ($0.01)

13403 Closed Spot Improvement - Safety Non-construction STATEWIDE $114.38 $114.38 $8.31 $0.00 $122.69

13596 Closed Spot Improvement - Safety I-80; MP 138.70 - 141.10 VARIOUS $0.00 $0.00 ($0.01) $0.00 ($0.01)

14457 Awarded Spot Improvement - Safety Intersection of 4100 S and 3200 W SALT LAKE $201,264.26 $201,264.26 $0.00 $14,615.03 $215,879.29

14962 Awarded Spot Improvement - Safety SR-173; MP 9.29 - 9.41 SALT LAKE $186,459.99 $186,459.99 $13,540.00 $0.00 $199,999.99

15598 Active Spot Improvement - Safety Statewide projects STATEWIDE $93,230.00 $93,230.00 $6,770.00 $0.00 $100,000.00

15690 Active Spot Improvement - Safety Statewide non-construction project STATEWIDE $55,938.00 $55,938.00 $4,062.00 $0.00 $60,000.00

SHRP2 IMPLEMENTATION ASSISTANCE

FA_SHRP215933 Scoping Other N/A VARIOUS $100,000.00 $100,000.00 $0.00 $0.00 $100,000.00

15934 Scoping Other N/A VARIOUS $200,000.00 $200,000.00 $0.00 $0.00 $200,000.00

SPR PLANNING FUNDS @ 100%

SPR_P_100%11965 Closed Other Various Locations STATEWIDE $0.00 $0.00 ($10,000.00) $0.00 ($10,000.00)

SPR POOLED FUND 100%

SPR_R_100%10903 Scoping Spot Improvement - Safety Passive Force-Displacement Relationships for Skewed Abutments STATEWIDE $100,000.00 $100,000.00 $0.00 $0.00 $100,000.00

12436 Active Trails and Bikepaths Statewide study VARIOUS $12,000.00 $12,000.00 $0.00 $0.00 $12,000.00

13269 Active Other Meetings with Western Maintenance Partnership (WMP) STATEWIDE $15,000.00 $15,000.00 $0.00 $0.00 $15,000.00

14239 Active Other Study Research Study VARIOUS $54,002.00 $54,002.00 $0.00 $0.00 $54,002.00

15004 Active Other Pooled Fund Study, Western Alliance QTC STATEWIDE $36,000.00 $36,000.00 $0.00 $0.00 $36,000.00

15017 Scoping Other Research STATEWIDE $80,000.00 $80,000.00 $0.00 $0.00 $80,000.00

STATEWIDE PLANNING & RESEARCH

(PLANNING) SPR_P11964 Closed Other Statewide STATEWIDE ($37,613.20) ($37,613.20) ($9,403.30) $0.00 ($47,016.50)

12761 Closed Other Study

Data is collected at various locations in the state, these locations are

not known at this time and can change throughout the duratin of the

contract

STATEWIDE ($118,856.71) ($118,856.71) ($29,714.18) $0.00 ($148,570.89)

14038 Active Other SHRP2 Implementation VARIOUS $71,404.17 $71,404.17 $17,851.04 $0.00 $89,255.21

14378 Scoping Other Develop Long Range Plan Framework Using SHRP2 C01 STATEWIDE $240,000.00 $240,000.00 $60,000.00 $0.00 $300,000.00

10 2/14/2018

Page 27: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Wasatch Front Regional Council Area2017 Projects with Federal Highway Funds

Obligated/ De-Obligated

Plan Fund Desc. PIN PIN Status Category Project Location County Total Obl. FA STATE LOCAL TOTAL

14965 Close Out Other FY 2017 Statewide Planning Work Program VARIOUS ($151,600.00) ($151,600.00) ($37,900.00) $0.00 ($189,500.00)

15164 Scoping Trails and Bikepaths SR-68; MP 36.10 - 62.93 VARIOUS $48,000.00 $48,000.00 $12,000.00 $0.00 $60,000.00

15869 Active Other N/A Annual Work Program VARIOUS $5,272,892.80 $5,272,892.80 $1,318,223.20 $0.00 $6,591,116.00

STATEWIDE PLANNING & RESEARCH

(RESEARCH) SPR_R11964 Closed Other Statewide STATEWIDE ($1,379,024.75) ($1,379,024.75) ($341,783.55) $0.00 ($1,720,808.30)

13702 Closed Other Statewide STATEWIDE ($903,177.14) ($903,177.14) ($225,794.29) $0.00 ($1,128,971.43)

15849 Active Other N/A Annual Work Program VARIOUS $1,287,200.00 $1,287,200.00 $321,800.00 $0.00 $1,609,000.00

15939 Active Other Statewide project - no distinct locations STATEWIDE $32,000.00 $32,000.00 $8,000.00 $0.00 $40,000.00

STP - BRIDGE FUNDS FOR STATE

PROJECTS STP_BRIDGE9419

Physically

Complete

Roadway Reconstruct - With

Widening

I-215; MP 10.41 - 19.94 & TO SR-266 4700 SOUTH EB; MP .00 -

.01 & TO SR-266 4700 SOUTH; MP .00 - .17 & FROM SR-266

4700 SOUTH; MP .00 - .17 & FROM SR-171 3500 SOUTH; MP

.06 - .16 & TO SR-171 3500 SOUTH; MP .00 - .15 & FROM SR-

171 3500 SOUTH; MP .13 -

SALT LAKE $1,959,694.60 $1,959,694.60 $142,305.40 $0.00 $2,102,000.00

13802 Closed Structures Preventative Maintenance Cnty:FA-2124; MP 1.80 - 2.05 SALT LAKE ($91,172.68) ($91,172.68) ($6,620.61) $0.00 ($97,793.29)

14459Under

ConstructionSpot Improvement - Safety

I-84; MP 115.40 - 115.41 & I-80; MP 1.48 - 1.49 & I-80; MP

117.08 - 117.09 & Various freeway routes in R2VARIOUS $234,470.99 $234,470.99 $17,026.37 $0.00 $251,497.36

14666 Active Structures Preventative Maintenance Cnty:FA-2040; MP 13.84 - 13.91 & Statewide SALT LAKE $1,723,761.89 $1,723,761.89 $125,172.88 $0.00 $1,848,934.77

15474 Awarded Asset ManagementI-215; MP 20.00 - 23.00 & I-215; MP 19.82 - 25.72 & I-215; MP

19.58 - 25.72 & mile post changeSALT LAKE $1,575,740.20 $1,575,740.20 $114,424.12 $0.00 $1,690,164.32

STP - ENHANCEMENT - STATE

STP_ENH_ST9938

Under

ConstructionEnhancement Project on State System I-15; MP 303.34 - 303.94 & SR-171; MP 9.23 - 10.27 SALT LAKE $480.00 $480.00 $120.00 $0.00 $600.00

13321Under

ConstructionIntersection Improvements SR-193; MP 3.20 - 3.60 DAVIS ($80,000.00) ($80,000.00) ($20,000.00) $0.00 ($100,000.00)

14911 Close Out transit ServiceCnty:FA-2464; MP .00 - .00 & Cnty:FA-1878; MP 5.01 - 5.40 &

Cnty:FA-1878; MP 5.40 - 5.40 & Cnty:FA-2464; MP .00 - .31VARIOUS $1,561,288.96 $1,561,288.96 $390,322.24 $0.00 $1,951,611.20

15110 Scoping transit Service Lake Powell Ferry VARIOUS $80,000.00 $80,000.00 $20,000.00 $0.00 $100,000.00

STP - FLEXIBLE (ANY AREA) STATEWIDE

STP_FLX_ST4675 Closed Other Study UDOT Wetland Mitigation Sites Federal Projects STATEWIDE ($5,623.56) ($5,623.56) ($408.37) $0.00 ($6,031.93)

9440 Awarded Asset Management I-80; MP 133.60 - 136.30 & I-80; MP 133.60 - 136.30 SALT LAKE $119,334.40 $119,334.40 $8,665.60 $0.00 $128,000.00

9447Physically

CompleteRoadway Preventative Maintenance SR-209; MP .40 - 1.30 SALT LAKE $848,393.00 $848,393.00 $61,607.00 $0.00 $910,000.00

9691 Closed Roadway Preventative Maintenance SR-186; MP .00 - 1.91 SALT LAKE $13,066.68 $13,066.68 $948.85 $0.00 $14,015.53

9713Under

ConstructionAsset Management SR-248; MP 3.19 - 14.48 VARIOUS $7,147,822.90 $7,147,822.90 $519,047.10 $0.00 $7,666,870.00

11 2/14/2018

Page 28: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Wasatch Front Regional Council Area2017 Projects with Federal Highway Funds

Obligated/ De-Obligated

Plan Fund Desc. PIN PIN Status Category Project Location County Total Obl. FA STATE LOCAL TOTAL

9807 ClosedRoadway Minor Rehab - NOT Purple

BookSR-68; MP 56.33 - 57.34 SALT LAKE ($489,780.43) ($489,780.43) ($35,565.95) $0.00 ($525,346.38)

10010Under

ConstructionAsset Management I-15; MP 293.63 - 309.33 & I-15; MP 293.63 - 309.33 SALT LAKE $3,355,330.73 $3,355,330.73 $243,651.07 $0.00 $3,598,981.80

10866Physically

CompleteRoadway Minor Rehab - Purple Book SR-154; MP .47 - 11.39 SALT LAKE ($820,135.25) ($820,135.25) ($59,555.03) $0.00 ($879,690.28)

11092Contract

CompleteSpot Improvement - Operational SR-103; MP .00 - .17 & SR-103; MP .00 - .17 DAVIS $225,150.45 $225,150.45 $16,349.55 $0.00 $241,500.00

11110Physically

CompleteRoadway Preventative Maintenance SR-209; MP 6.20 - 7.63 SALT LAKE $1,263,266.50 $1,263,266.50 $91,733.50 $0.00 $1,355,000.00

11433 Awarded choke point US-191; MP 112.50 - 124.00 VARIOUS $2,929,987.69 $2,929,987.69 $212,764.31 $0.00 $3,142,752.00

11494 Closed Roadway Minor Rehab - Purple Book SR-173; MP 7.05 - 9.20 SALT LAKE ($834,102.68) ($834,102.68) ($60,569.29) $0.00 ($894,671.97)

11495 Closed Roadway Minor Rehab - Purple Book SR-173; MP .00 - 2.75 SALT LAKE ($628,577.97) ($628,577.97) ($45,644.89) $0.00 ($674,222.86)

11496 Closed Roadway Minor Rehab - Purple Book I-80; MP 112.80 - 117.86 & I-80; MP 112.80 - 117.86 SALT LAKE ($318,808.88) ($318,808.88) ($23,150.67) $0.00 ($341,959.55)

11498Physically

CompleteAsset Management SR-111; MP .00 - 9.10 SALT LAKE ($803,633.83) ($803,633.83) ($58,356.76) $0.00 ($861,990.59)

11499 Closed Other

I-80; MP 114.30 - 124.13 & SR-201; MP 10.81 - 16.51 & I-15; MP

303.47 - 306.77 & SR-154; MP .20 - 24.30 & SR-201; MP 10.81 -

16.51 & I-80; MP 114.30 - 124.13 & I-15; MP 303.47 - 306.77

SALT LAKE ($443,193.16) ($443,193.16) ($32,182.96) $0.00 ($475,376.12)

11508 Close Out Roadway Minor Rehab - Purple Book SR-36; MP 6.13 - 18.00 & SR-36; MP 6.13 - 18.00 TOOELE $811,848.42 $811,848.42 $58,953.27 $0.00 $870,801.69

11547 Closed Roadway Minor Rehab - Purple Book SR-193; MP 2.79 - 5.17 DAVIS ($62,227.39) ($62,227.39) ($4,518.71) $0.00 ($66,746.10)

11679 Closed Roadway Minor Rehab - Purple Book SR-126; MP 5.71 - 8.75 & SR-126; MP 9.25 - 11.62 VARIOUS ($202,769.04) ($202,769.04) ($14,724.30) $0.00 ($217,493.34)

11827Under

ConstructionSpot Improvement - Operational

TO SR-151 10600 SOUTH; MP .10 - .18 & Reference I 15 MP

293.681 - 293.470SALT LAKE $1,102,444.75 $1,102,444.75 $80,055.25 $0.00 $1,182,500.00

12162Under

ConstructionRoadway Minor Rehab - Purple Book SR-121; MP 31.20 - 32.90 & SR-121; MP 1.61 - 15.36 VARIOUS $1,746,229.54 $1,746,229.54 $126,804.40 $0.00 $1,873,033.94

12250 Closed Roadway Minor Rehab - Purple Book SR-235; MP .00 - .51 & US-89; MP 414.22 - 416.46 WEBER ($119,630.30) ($119,630.30) ($8,687.08) $0.00 ($128,317.38)

12281 Region Review Roadway Minor Rehab - Purple Book SR-106; MP .00 - 1.05 DAVIS ($69,170.19) ($69,170.19) ($5,022.87) $0.00 ($74,193.06)

12291Under

ConstructionRoadway Minor Rehab - Purple Book SR-193; MP 5.17 - 8.43 & SR-193; MP 5.17 - 8.43 DAVIS $182,781.50 $182,781.50 $13,272.88 $0.00 $196,054.38

12297 Close Out Roadway Minor Rehab - Purple Book SR-30; MP 90.62 - 94.95 BOX ELDER ($353,987.84) ($353,987.84) ($25,705.22) $0.00 ($379,693.06)

12298Under

ConstructionRoadway Minor Rehab - Purple Book I-15; MP 365.51 - 373.26 BOX ELDER ($2,685,218.30) ($2,685,218.30) ($194,990.11) $0.00 ($2,880,208.41)

12322 Closed Spot Improvement - Operational SR-83; MP 23.20 - 23.30 & SR-83; MP 19.36 - 19.39 BOX ELDER ($85,511.65) ($85,511.65) ($6,209.52) $0.00 ($91,721.17)

12 2/14/2018

Page 29: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Wasatch Front Regional Council Area2017 Projects with Federal Highway Funds

Obligated/ De-Obligated

Plan Fund Desc. PIN PIN Status Category Project Location County Total Obl. FA STATE LOCAL TOTAL

12361 ClosedRoadway Minor Rehab - NOT Purple

BookUS-89; MP 363.25 - 368.09 SALT LAKE ($199,083.92) ($199,083.92) ($14,456.70) $0.00 ($213,540.62)

12364 ClosedRoadway Minor Rehab - NOT Purple

BookSR-190; MP 1.83 - 7.90 SALT LAKE ($138,355.53) ($138,355.53) ($10,046.84) $0.00 ($148,402.37)

12486 Closed Roadway Minor Rehab - Purple Book SR-25; MP .00 - 10.00 VARIOUS ($29,612.58) ($29,612.58) ($2,150.35) $0.00 ($31,762.93)

12496Physically

CompleteRoadway Minor Rehab - Purple Book I-80; MP 20.00 - 30.00 & SR-58; MP .00 - 1.36 TOOELE $7,315,415.01 $7,315,415.01 $531,216.99 $0.00 $7,846,632.00

12500 Closed Roadway Preventative Maintenance SR-71; MP 5.03 - 6.02 SALT LAKE ($201,975.50) ($201,975.50) ($14,666.68) $0.00 ($216,642.18)

12508 Scoping Intersection Improvements SR-134; MP 11.24 - 11.45 WEBER $163,152.50 $163,152.50 $11,847.50 $0.00 $175,000.00

12518 Closed Roadway Minor Rehab - Purple Book SR-199; MP .00 - 21.96 & SR-196; MP .00 - 24.00 TOOELE ($2,682,624.68) ($2,682,624.68) ($194,801.78) $0.00 ($2,877,426.46)

12519 Close Out Asset Management SR-210; MP .00 - 3.86 SALT LAKE ($489,407.12) ($489,407.12) ($35,538.84) $0.00 ($524,945.96)

12520 Close Out Roadway Minor Rehab - Purple Book SR-172; MP .00 - 1.99 SALT LAKE $2,082,053.32 $2,082,053.32 $151,190.63 $0.00 $2,233,243.95

12522 Closed Roadway Preventative Maintenance

TO US-89 STATE STREET; MP .00 - .14 & TO I-15N FROM I-

215N; MP .00 - .12 & TO I-15P FROM I-215N; MP .00 - .08 & I-

215; MP 13.48 - 13.56 & I-215; MP 10.41 - 13.57 & FROM SR-68

REDWOOD ROAD; MP .00 - .11 & FROM 280 EAST; MP .05 -

.25 & TO I-215P FROM I

SALT LAKE ($115,422.62) ($115,422.62) ($8,381.54) $0.00 ($123,804.16)

12565Under

Construction

Roadway Reconstruct - With

WideningSR-111; MP 10.12 - 10.60 SALT LAKE $4,965,828.83 $4,965,828.83 $360,599.18 $0.00 $5,326,428.01

12584 Closed Roadway Minor Rehab - Purple BookSR-209; MP 10.19 - 11.64 & SR-71; MP 1.27 - 1.55 & SR-71; MP

1.27 - 1.55SALT LAKE ($307,269.21) ($307,269.21) ($22,312.69) $0.00 ($329,581.90)

12669 Closed Spot Improvement - Operational US-6; MP 205.00 - 225.00 VARIOUS ($80,741.93) ($80,741.93) ($5,863.16) $0.00 ($86,605.09)

13012 Closed Other Various Locations VARIOUS ($164,455.80) ($164,455.80) $0.00 $0.00 ($164,455.80)

13096 Closed Structures Preventative Maintenance Cnty:FA-1980; MP .00 - .08 MORGAN ($35,539.27) ($35,539.27) $0.00 $0.00 ($35,539.27)

13150Under

ConstructionTrails and Bikepaths SR-32; MP 7.70 - 13.04 & SR-32; MP 7.70 - 13.40 VARIOUS $4,181,551.96 $4,181,551.96 $303,648.05 $0.00 $4,485,200.01

13158Contract

Completetransit Service

I-215; MP 5.59 - 6.54 & I-215; MP 5.59 - 6.54 & TO SR-190 6200

SOUTH; MP .13 - .24 & FROM SR-190 6200 SOUTH; MP .08 - .14

& SR-190; MP 1.75 - 1.83

SALT LAKE ($1,218,300.10) ($1,218,300.10) ($88,468.21) $0.00 ($1,306,768.31)

13184 Close Out Structures Preventative Maintenance SR-319; MP .00 - .12 & US-40; MP 3.32 - 8.59 VARIOUS $19,086.44 $19,086.44 $1,385.98 $0.00 $20,472.42

13223Substantially

ComplSpot Improvement - Safety SR-71; MP 9.72 - 12.16 & SR-71; MP 9.72 - 12.16 SALT LAKE $2,307,046.28 $2,307,046.28 $167,528.73 $0.00 $2,474,575.01

13321Under

ConstructionIntersection Improvements SR-193; MP 3.20 - 3.60 DAVIS $2,686,117.81 $2,686,117.81 $195,055.43 $0.00 $2,881,173.24

13455Physically

CompleteAsset Management SR-201; MP .00 - 3.27 & SR-201; I-80 to SR-202 SALT LAKE $1,701,283.59 $1,701,283.59 $123,540.60 $0.00 $1,824,824.19

13 2/14/2018

Page 30: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Wasatch Front Regional Council Area2017 Projects with Federal Highway Funds

Obligated/ De-Obligated

Plan Fund Desc. PIN PIN Status Category Project Location County Total Obl. FA STATE LOCAL TOTAL

13458Physically

CompleteAsset Management SR-209; MP 15.89 - 18.84 SALT LAKE $3,029,143.39 $3,029,143.39 $219,964.61 $0.00 $3,249,108.00

13464 Active Roadway Minor Rehab - Purple Book SR-282; MP .00 - 2.94 SALT LAKE $326,305.00 $326,305.00 $23,695.00 $0.00 $350,000.00

13467 Close Out Roadway Preventative Maintenance SR-67; MP 4.82 - 11.50 & SR-67; MP 4.82 - 11.50 DAVIS $1,074,362.90 $1,074,362.90 $78,016.06 $0.00 $1,152,378.96

13470Physically

CompleteRoadway Preventative Maintenance SR-204; MP .00 - .92 & SR-204; MP 2.23 - 5.42 WEBER $528,127.44 $528,127.44 $38,350.56 $0.00 $566,478.00

13521Substantially

ComplRoadway Minor Rehab - Purple Book I-80; MP 125.07 - 127.60 & I-80; MP 125.07 - 127.60 SALT LAKE $6,384,340.99 $6,384,340.99 $463,606.01 $0.00 $6,847,947.00

13555 Closed Roadway Minor Rehab - Purple Book SR-266; MP .00 - 3.00 SALT LAKE ($214,443.27) ($214,443.27) ($15,572.04) $0.00 ($230,015.31)

13578 Active Other SR-209; MP 7.80 - 8.80 SALT LAKE $1,258,605.00 $1,258,605.00 $91,395.00 $0.00 $1,350,000.00

13592 Close Out Asset Management US-89; MP 406.25 - 406.41 VARIOUS ($5.59) ($5.59) ($0.41) $0.00 ($6.00)

13640 Active Roadway Preventative Maintenance SR-68; MP 32.77 - 35.99 VARIOUS $298,336.00 $298,336.00 $21,664.00 $0.00 $320,000.00

13642 Awarded Roadway Preventative Maintenance SR-132; MP 34.73 - 41.86 VARIOUS $716,480.29 $716,480.29 $52,028.01 $0.00 $768,508.30

13711Under

ConstructionAsset Management I-84; MP 89.01 - 89.51 & SR-39; MP 8.69 - 8.89 WEBER $1,334,628.48 $1,334,628.48 $96,915.53 $0.00 $1,431,544.01

13736Contract Closed

OutStructures Preventative Maintenance US-89; MP 384.88 - 389.53 DAVIS $102,383.75 $102,383.75 $7,434.71 $0.00 $109,818.46

13744Under

ConstructionAsset Management US-91; MP 1.97 - 16.94 VARIOUS $1,498,896.01 $1,498,896.01 $108,844.00 $0.00 $1,607,740.01

13753Contract Closed

OutRoadway Minor Rehab - Purple Book SR-266; MP 4.42 - 8.12 SALT LAKE $2,947,408.65 $2,947,408.65 $214,029.35 $0.00 $3,161,438.00

13775 Active Roadway Minor Rehab - Purple Book SR-36; MP 31.00 - 42.56 TOOELE $139,845.00 $139,845.00 $10,155.00 $0.00 $150,000.00

13947 Close Out Asset Management Various Locations in Region 4 VARIOUS $31,800.19 $31,800.19 $2,309.21 $0.00 $34,109.40

14194 Awarded Roadway Preventative Maintenance SR-79; MP .77 - 3.28 WEBER $955,592.41 $955,592.41 $69,391.40 $0.00 $1,024,983.81

14197 Scoping Roadway Preventative Maintenance SR-108; MP 8.02 - 10.02 & SR-108; MP 11.99 - 12.92 VARIOUS $27,969.00 $27,969.00 $2,031.00 $0.00 $30,000.00

14202Physically

CompleteRoadway Preventative Maintenance US-89; MP 420.42 - 422.64 & US-89; MP 420.42 - 422.64 WEBER ($31,914.13) ($31,914.13) ($2,317.48) $0.00 ($34,231.61)

14210 Active Roadway Minor Rehab - Purple Book SR-167; MP .00 - 11.06 VARIOUS $93,230.00 $93,230.00 $6,770.00 $0.00 $100,000.00

14269 Close Out Asset Management Various Locations in Region 4 VARIOUS $512,765.01 $512,765.01 $37,235.00 $0.00 $550,000.01

14284 Active Roadway Minor Rehab - Purple Book SR-28; MP 5.58 - 12.57 & US-89; MP 227.63 - 233.29 VARIOUS $139,845.00 $139,845.00 $10,155.00 $0.00 $150,000.00

14 2/14/2018

Page 31: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Wasatch Front Regional Council Area2017 Projects with Federal Highway Funds

Obligated/ De-Obligated

Plan Fund Desc. PIN PIN Status Category Project Location County Total Obl. FA STATE LOCAL TOTAL

14329Physically

CompleteAsset Management Various Locations in Region 4 VARIOUS $508,138.37 $508,138.37 $36,899.03 $0.00 $545,037.40

14331 Awarded Asset Management Various Locations in Region 4 VARIOUS $205,991.15 $205,991.15 $14,958.28 $0.00 $220,949.43

14407 Active Intersection Improvements US-89; MP 415.33 - 415.53 & SR-39; MP 6.30 - 6.50 WEBER $695,495.80 $695,495.80 $50,504.20 $0.00 $746,000.00

14408 Scoping Intersection Improvements SR-235; MP 2.99 - 3.20 WEBER $372,920.00 $372,920.00 $27,080.00 $0.00 $400,000.00

14430Under

ConstructionAsset Management US-89; MP 423.30 - 428.77 BOX ELDER $60,599.50 $60,599.50 $4,400.50 $0.00 $65,000.00

14431Substantially

ComplIntersection Improvements Cnty:FA-2074; MP 5.45 - 5.60 & SR-210; MP 2.00 - 2.50 SALT LAKE $2,056,408.63 $2,056,408.63 $149,328.40 $0.00 $2,205,737.03

14433Substantially

ComplAsset Management Various Locations VARIOUS $2,617.95 $2,617.95 $190.11 $0.00 $2,808.06

14729Physically

CompleteRoadway Preventative Maintenance

SR-67; MP .20 - 4.82 & SR-67; MP .00 - 4.82 & SR-67; MP .20 -

4.82 & SR-67; MP .00 - 4.82VARIOUS $2,331,652.46 $2,331,652.46 $169,315.53 $0.00 $2,500,967.99

14912Under

ConstructionATMS Project US-191; MP 47.00 - 157.00 & US-6; MP 232.00 - 300.36 VARIOUS $400,813.04 $400,813.04 $29,105.48 $0.00 $429,918.52

15147 Awarded Roadway Preventative Maintenance US-6; MP 139.78 - 149.90 VARIOUS $1,266,708.55 $1,266,708.55 $91,983.45 $0.00 $1,358,692.00

15154 Scoping Roadway Minor Rehab - Purple Book SR-60; MP .00 - .78 WEBER $23,307.50 $23,307.50 $1,692.50 $0.00 $25,000.00

15167 Awarded Asset Management SR-68; MP 52.31 - 54.82 SALT LAKE $2,418,702.90 $2,418,702.90 $175,636.80 $0.00 $2,594,339.70

15245Physically

CompleteRoadway Preventative Maintenance SR-36; MP 52.45 - 56.83 TOOELE $1,207,328.50 $1,207,328.50 $87,671.50 $0.00 $1,295,000.00

15246 Awarded Roadway Preventative Maintenance SR-209; MP 1.19 - 4.43 SALT LAKE $841,025.85 $841,025.85 $61,072.03 $0.00 $902,097.88

15248 Active Roadway Preventative Maintenance SR-201; MP 17.44 - 18.10 SALT LAKE $125,860.50 $125,860.50 $9,139.50 $0.00 $135,000.00

15445 Close Out Roadway Preventative Maintenance SR-232; MP .53 - 1.27 DAVIS $641,661.07 $641,661.07 $46,594.93 $0.00 $688,256.00

15474 Awarded Asset ManagementI-215; MP 20.00 - 23.00 & I-215; MP 19.82 - 25.72 & I-215; MP

19.58 - 25.72 & mile post changeSALT LAKE $5,500,570.00 $5,500,570.00 $399,430.00 $0.00 $5,900,000.00

15475 Awarded Asset ManagementTO SR-40 SILVER CREEK JCT.; MP .10 - .23 & I-80; MP 129.25 -

129.62VARIOUS $1,393,788.50 $1,393,788.50 $101,211.50 $0.00 $1,495,000.00

15491Physically

CompleteRoadway Minor Rehab - Purple Book

SR-104; MP .00 - .67 & SR-79; MP 3.05 - 4.87 & SR-204; MP .74 -

2.23WEBER $3,299,584.04 $3,299,584.04 $239,602.96 $0.00 $3,539,187.00

15883 Active Roadway Minor Rehab - Purple Book SR-173; MP 2.75 - 3.85 SALT LAKE $93,230.00 $93,230.00 $6,770.00 $0.00 $100,000.00

15884 Active Roadway Minor Rehab - Purple Book SR-71; MP 8.82 - 10.25 SALT LAKE $93,230.00 $93,230.00 $6,770.00 $0.00 $100,000.00

15885 Advertised Roadway Minor Rehab - Purple BookSR-210; MP 3.88 - 12.26 & SR-210; MP 12.53 - 13.62 & Bypass

Road MP 12.53 to MP 13.62SALT LAKE $93,230.00 $93,230.00 $6,770.00 $0.00 $100,000.00

15 2/14/2018

Page 32: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Wasatch Front Regional Council Area2017 Projects with Federal Highway Funds

Obligated/ De-Obligated

Plan Fund Desc. PIN PIN Status Category Project Location County Total Obl. FA STATE LOCAL TOTAL

16101 Scoping Other N/A STATEWIDE $143,600.00 $143,600.00 $0.00 $0.00 $143,600.00

STP - JHC BRIDGE FUNDS UNDER MAPP-

21 STP_BR4950 Advertised Structures Bridge Replacement Stoddard Lane over Weber River MORGAN $88,568.50 $88,568.50 $0.00 $6,431.50 $95,000.00

11857 Closed Structures Bridge Replacement Midvale City, 6755 South 690 East; Structure Replacement 035014D SALT LAKE ($175,236.95) ($175,236.95) $0.00 ($12,725.00) ($187,961.95)

14776 Active Structures Bridge Replacement Cnty:FA-2154; MP 2.31 - 2.31 & 6400 West 3975 South SALT LAKE $185,154.78 $185,154.78 $0.00 $13,445.22 $198,600.00

STP - SMALL URBAN (JHC)

STP_SU_JHC9984 Closed

Roadway Reconstruct - With

WideningOther: 1000 NORTH TREMONTON to: 1.82 for: 1.82 BOX ELDER $0.00 $0.00 $0.00 ($0.01) ($0.01)

STP - URBAN AREA OGDEN / LAYTON

(WFRC) STP_URB_O/L8551 Closed Signal and/or Lighting Project 200 NORTH; 900 WEST TO FLINT STREET DAVIS ($172,618.22) ($172,618.22) $0.00 ($3,837.59) ($176,455.81)

8559Contract

Complete

Roadway Reconstruct - With

WideningADAMS AVENUE; CITY LIMITS TO US-89 WEBER ($233,522.53) ($233,522.53) $0.00 ($16,957.49) ($250,480.02)

11092Contract

CompleteSpot Improvement - Operational SR-103; MP .00 - .17 & SR-103; MP .00 - .17 DAVIS $1,235,297.50 $1,235,297.50 $89,702.50 $0.00 $1,325,000.00

11963 Closed Funding Pass Through Various Locations in Salt Lake/Ogden/Layton Urban Areas SALT LAKE ($247,750.44) ($247,750.44) $0.00 $0.00 ($247,750.44)

11990 Active Funding Pass Through Project Planning Support -Weber & Davis County DAVIS $300,000.00 $300,000.00 $0.00 $21,784.84 $321,784.84

12279Contract

CompleteRoadway Minor Rehab - Purple Book SR-232; MP .45 - 2.25 & SR-232; MP .45 - 2.25 DAVIS $1,398,450.00 $1,398,450.00 $101,550.00 $0.00 $1,500,000.00

12291Under

ConstructionRoadway Minor Rehab - Purple Book SR-193; MP 5.17 - 8.43 & SR-193; MP 5.17 - 8.43 DAVIS $3,230,242.34 $3,230,242.34 $234,567.64 $0.00 $3,464,809.98

13122Physically

Complete

Roadway Reconstruct - With

Widening

Cnty:FA-1392; MP .66 - 1.23 & Center Street; Legacy Parkway to

Redwood RoadDAVIS $1,171,963.61 $1,171,963.61 $0.00 $85,103.44 $1,257,067.05

13470Physically

CompleteRoadway Preventative Maintenance SR-204; MP .00 - .92 & SR-204; MP 2.23 - 5.42 WEBER $1,184,821.94 $1,184,821.94 $86,037.16 $0.00 $1,270,859.10

13740Substantially

ComplRoadway Minor Rehab - Purple Book I-15; MP 332.66 - 338.64 VARIOUS $3,729,200.00 $3,729,200.00 $270,800.00 $0.00 $4,000,000.00

14042 AdvertisedRoadway Reconstruct - With

Widening

Cnty:FA-1410; MP .57 - .95 & 1500 South Phase 3; 1350 West to

1100 WestDAVIS $331,898.80 $331,898.80 $0.00 $24,101.20 $356,000.00

14043 ScopingRoadway Reconstruct - With

WideningBluff Road; 550 West (on Gentile) to 1000 West DAVIS $9,999.85 $9,999.85 $0.00 $726.15 $10,726.00

15854 Active Other N/A Annual Work Program SALT LAKE $315,000.00 $315,000.00 $0.00 $0.00 $315,000.00

STP - URBAN AREA SALT LAKE (WFRC)

STP_URB_SL6621 Close Out Structures Bridge Rehabilitation 1300 SOUTH; 500 W. TO 700 W. & Cnty:FA-2290; MP 6.04 - 6.34 SALT LAKE $414,480.27 $414,480.27 $0.00 $30,097.94 $444,578.21

8110 Active Signal and/or Lighting ProjectSR-152; MP 2.78 - 3.04 & Cnty:FA-2082; MP 11.82 - 12.57 &

Cnty:FA-2116; MP 2.98 - 3.18SALT LAKE $41,488.28 $41,488.28 $0.00 $3,012.72 $44,501.00

8565 Close OutRoadway Reconstruct - With

Widening

HIGHLAND DRIVE @ I-215; I-215 WB ON-RAMP TO LA

CRESTASALT LAKE $289,013.00 $289,013.00 $0.00 $0.00 $289,013.00

10009 AwardedRoadway Reconstruct - With

Widening

Cnty:FA-2123; MP .00 - 1.00 & 5600 West from 7800 South to

8600 SouthSALT LAKE $4,283,930.06 $4,283,930.06 $0.00 $311,082.34 $4,595,012.40

16 2/14/2018

Page 33: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Wasatch Front Regional Council Area2017 Projects with Federal Highway Funds

Obligated/ De-Obligated

Plan Fund Desc. PIN PIN Status Category Project Location County Total Obl. FA STATE LOCAL TOTAL

10012 Closed Other Study Cnty:FA-2104; MP 1.24 - 3.19 SALT LAKE ($8,864.71) ($8,864.71) $0.00 ($643.72) ($9,508.43)

11098 Close Out Other U of U Central Campus Electrified Shuttle Route SALT LAKE $44,497.18 $44,497.18 $0.00 $3,231.21 $47,728.39

11963 Closed Funding Pass Through Various Locations in Salt Lake/Ogden/Layton Urban Areas SALT LAKE ($391,536.51) ($391,536.51) $0.00 $0.00 ($391,536.51)

11986 ScopingRoadway Reconstruct - With

Widening

Porter Rockwell Blvd (Fifth Segment); Redwood Road to 0.46 miles

eastSALT LAKE $468,014.60 $468,014.60 $0.00 $33,985.40 $502,000.00

11989 ClosedRoadway Reconstruct - Without

Widening9000 South; 4800 West to 5300 West SALT LAKE ($602,785.10) ($602,785.10) $0.00 ($43,771.91) ($646,557.01)

13116 Scoping Roadway Minor Rehab - Purple Book 3200 West; 10431 South to 10600 South SALT LAKE $111,876.00 $111,876.00 $0.00 $8,124.00 $120,000.00

13962 Close Out Structures Bridge Rehabilitation Cnty:FA-2238; MP .33 - .38 SALT LAKE $0.00 $0.00 $0.00 $0.01 $0.01

14831 ScopingRoadway Reconstruct - Without

WideningCnty:FA-2172; MP 3.71 - 5.58 & Cnty FA-2172; MP 3.707 - 5.579 SALT LAKE $699,225.00 $699,225.00 $0.00 $0.00 $699,225.00

15854 Active Other N/A Annual Work Program SALT LAKE $585,000.00 $585,000.00 $0.00 $0.00 $585,000.00

7208 Closed ATMS Project ATMS / ITS IN SALT LAKE CITY AND SALT LAKE COUNTY SALT LAKE $0.00 $0.00 $0.00 ($173.94) ($173.94)

10011Under

ConstructionSignal and/or Lighting Project

138TH SO; BANERTER TO 3RD EAST & Cnty:FA-2044; MP .19 -

.50 & update routeSALT LAKE $1,835,260.52 $1,835,260.52 $0.00 $0.00 $1,835,260.52

11985 Active Funding Pass Through Project Planning Support - Salt Lake County SALT LAKE $400,000.00 $400,000.00 $0.00 $0.00 $400,000.00

11986 ScopingRoadway Reconstruct - With

Widening

Porter Rockwell Blvd (Fifth Segment); Redwood Road to 0.46 miles

eastSALT LAKE $3,882,448.76 $3,882,448.76 $0.00 ($64,450.40) $3,817,998.36

STP_ FLEXIBLE @ 100 FEDERAL FUNDING

STP_FLX_100%13918 Closed Other FY 2016 State Training Budget VARIOUS ($23,552.73) ($23,552.73) $0.00 $0.00 ($23,552.73)

15898 Active Other N/A VARIOUS $500,000.00 $500,000.00 $0.00 $0.00 $500,000.00

STP-RURAL (NON URBAN) STP_RURAL 13818 Close Out Roadway Minor Rehab - Purple Book SR-96; MP 2.80 - 18.00 VARIOUS $5,682.67 $5,682.67 $412.65 $0.00 $6,095.32

14331 Awarded Asset Management Various Locations in Region 4 VARIOUS $260,158.85 $260,158.85 $18,891.72 $0.00 $279,050.57

TAP 100% PRO RATA TAP_FLEX1 15542 Active ped and bike Various schools statewide VARIOUS $34,961.25 $34,961.25 $0.00 $0.00 $34,961.25

TAP WFRC AT 100% PRO RATA

TAP_UR_WFRC115540 Close Out ped and bike Various schools in Region 2 VARIOUS $13,111.00 $13,111.00 $0.00 $0.00 $13,111.00

TRANSPORTATION ALT PROGRAM - WFRC

TAP_URB_WFRC12009 Closed Trails and Bikepaths

Cnty:FA-2105; MP 1.37 - 2.12 & 700 West; 7200 South to 7800

South, Midvale CitySALT LAKE ($23,039.54) ($23,039.54) $0.00 $0.00 ($23,039.54)

12166 Scoping Trails and Bikepaths West Haven; D&RGW Rail to Ogden River Trail WEBER $107,533.35 $107,533.35 $0.00 $7,808.66 $115,342.01

17 2/14/2018

Page 34: FAST ACT (Fixing America’s Surface Transportation Act), the … · 2019. 1. 4. · FAST ACT (Fixing America’s Surface Transportation Act), the federal transportation bill approved

Wasatch Front Regional Council Area2017 Projects with Federal Highway Funds

Obligated/ De-Obligated

Plan Fund Desc. PIN PIN Status Category Project Location County Total Obl. FA STATE LOCAL TOTAL

13122Physically

Complete

Roadway Reconstruct - With

Widening

Cnty:FA-1392; MP .66 - 1.23 & Center Street; Legacy Parkway to

Redwood RoadDAVIS $81,988.60 $81,988.60 $0.00 $0.00 $81,988.60

13134 Closed Trails and Bikepaths Dry Creek Trail; 10200 South to 10000 South SALT LAKE $1,749.72 $1,749.72 $0.00 $127.06 $1,876.78

13137 Closed Trails and Bikepaths Pedestrian Crossing on Fort Union SALT LAKE $6,461.70 $6,461.70 $0.00 $469.22 $6,930.92

14057 Scoping Trails and Bikepaths Grant Promenade; 22nd Street to 2250 Street WEBER ($34,799.96) ($34,799.96) $0.00 ($2,527.04) ($37,327.00)

14795 Close Out Trails and Bikepaths Non-construction project SALT LAKE $26,220.94 $26,220.94 $0.00 $0.00 $26,220.94

14826 Close Out Trails and Bikepaths D&RGW Crossing at 200 North Kaysville DAVIS $107,397.42 $107,397.42 $0.00 $7,798.78 $115,196.20

14944 Active Trails and Bikepaths SR-210; MP 4.47 - 4.47 SALT LAKE $67,591.75 $67,591.75 $0.00 $0.00 $67,591.75

14945 Scoping Trails and BikepathsSec 1 completes a gap, Sec 2 Bridge over Welby Jacobs Canal, Sec 3

will extend trail to 4000 WestSALT LAKE $23,307.50 $23,307.50 $0.00 $0.00 $23,307.50

14946 Scoping Trails and Bikepaths Smith Fields Park to Willow Creek Trail & Stokes Ave SALT LAKE $10,000.00 $10,000.00 $0.00 $0.00 $10,000.00

14947 Scoping Trails and Bikepaths Cnty:FA-2105; MP .93 - .93 SALT LAKE $32,416.07 $32,416.07 $0.00 $0.00 $32,416.07

14948 Scoping Trails and Bikepaths SR-171; MP 14.98 - 15.02 SALT LAKE $10,000.00 $10,000.00 $0.00 $0.00 $10,000.00

14949 Scoping Trails and BikepathsEast-west route across I-215, the City desires to modify the underpass

at 5400 S.SALT LAKE $28,947.92 $28,947.92 $0.00 $0.00 $28,947.92

14950 Scoping Trails and Bikepaths Cnty:FA-2060; MP 3.32 - 3.32 & Cnty:FA-2060; MP 3.32 - 3.32 SALT LAKE $10,000.00 $10,000.00 $0.00 $0.00 $10,000.00

14951 Scoping Trails and Bikepaths Cnty:FA-2148; MP 5.46 - 6.82 SALT LAKE $18,646.00 $18,646.00 $0.00 $0.00 $18,646.00

TRANSPORTATION ALTERNATIVE

PROGRAM TAP_FLEX14335 Awarded Safe Sidewalk/ADA Cnty:FA-3455; MP .91 - 1.02 WEBER $297,909.69 $297,909.69 $0.00 $21,633.05 $319,542.74

14336 Close Out Safe Sidewalk/ADA Cnty:FA-2651; MP .71 - 1.09 TOOELE $195,783.00 $195,783.00 $0.00 $14,217.00 $210,000.00

14690 Active Safe Sidewalk/ADA Cnty:FA-2228; MP .23 - .28 SALT LAKE $46,615.00 $46,615.00 $0.00 $3,385.00 $50,000.00

15158 Close Out Safe Sidewalk/ADA Statewide education STATEWIDE $279,690.00 $279,690.00 $20,310.00 $0.00 $300,000.00

15478 Close Out ped and bike Statewide - no mappable location STATEWIDE $13,984.50 $13,984.50 $0.00 $0.00 $13,984.50