Farnborough Airspace Change Proposal FACC Briefing 4 October 2012.

8
Farnborough Airspace Change Proposal FACC Briefing 4 October 2012

Transcript of Farnborough Airspace Change Proposal FACC Briefing 4 October 2012.

Page 1: Farnborough Airspace Change Proposal FACC Briefing 4 October 2012.

Farnborough Airspace Change ProposalFACC Briefing4 October 2012

Page 2: Farnborough Airspace Change Proposal FACC Briefing 4 October 2012.

Slide 2

What is an airspace change proposal?

• It is a formal Civil Aviation Authority (CAA) process that will be undertaken by TAG Farnborough Airport in order to introduce a new airspace design as well as arrival and departure procedure changes

• The process is outlined in CAA publications CAP724 and CAP725

• The proposal will be prepared by TAG Farnborough Airport; the sponsor of the proposal

• NATS has been contracted to provide technical and operational support

• The Airspace Change Proposal (ACP) process requires comprehensive and quality consultation to ensure that the requirements and aspirations of all stakeholders are considered when developing the design options

1

Page 3: Farnborough Airspace Change Proposal FACC Briefing 4 October 2012.

Slide 3

Why is TAG Farnborough carrying out an ACP?

• In line with the TAG Farnborough Airport’s 2009 Master Plan, it is undertaking an airspace change to provide the airport with a more predictable and efficient airspace environment

• This ACP therefore represents TAG Farnborough continuing to deliver the commitments made in its Master Plan

8.4.8 TAG will work with the CAA to explore the possibility of applying for an Airspace Change Proposal. If granted, this would result in TAG having a greater degree of control over a  larger

area of airspace around the airport, and enable the introduction of procedures which could result in further noise mitigation.

2

Page 4: Farnborough Airspace Change Proposal FACC Briefing 4 October 2012.

Slide 4

Cont… Why is TAG Farnborough carrying out an ACP?

• To create a new operating environment which offers all airspace users predictability and consistency of operation

• Creating a known air traffic control (ATC) environment will assist the airport in catering for the increasing number of air traffic movements (ATMs)

• Aircraft will fly more predictable and efficient inbound and outbound flight paths

• There are three key benefits:

1. Improvements in overall airspace efficiency

2. Environmental benefits

3. Safety benefits

   

3

Page 5: Farnborough Airspace Change Proposal FACC Briefing 4 October 2012.

Slide 5

What are the benefits?

1. Improved airspace efficiency

Advanced navigation systems will enable high-precision, optimal approach and departure procedures. Aircraft will remain at higher altitudes for longer and spend less time in the air

2. Environmental benefits

Reduced track miles will be flown with more predictable and efficient flight paths

Improvements in efficiency would result in: reductions in fuel usage, emissions (including CO2) and noise around the airport

3. Safety benefits

By changing to a new airspace environment, which includes elements of controlled airspace, the airport will be able to create a known and more predictable environment

   4

Page 6: Farnborough Airspace Change Proposal FACC Briefing 4 October 2012.

Slide 6

What is the process?

The process to be followed is outlined in CAA publication CAP725 and contains a number of phases:

•Phase 1 Framework briefing

•Phase 2 Proposal development

•Phase 3 Preparing for consultation

•Phase 4 Consultation and formal proposal submission

•Phase 5 Regulatory decision

•Phase 6 Implementation

•Phase 7 Operational review

5

Page 7: Farnborough Airspace Change Proposal FACC Briefing 4 October 2012.

Slide 7

Activities

• Project start June2012

• Initial design options and parameters Aug 2012

• Pre-consultation with key aviation stakeholders Oct 2012

• Detailed design options and concept of operations Aug 2013

• Formal consultation process Aug2013

• Final submission to DAP Oct 2013

• DAP decision Feb2014

6

Page 8: Farnborough Airspace Change Proposal FACC Briefing 4 October 2012.

Thank you