Far East Energy - Corporate Presentation January 2014

32
Far East Energy Corporation January 2014 Leading the way in high-perm China CBM

description

Corporate Presentation January 2014

Transcript of Far East Energy - Corporate Presentation January 2014

Page 1: Far East Energy - Corporate Presentation January 2014

Far East Energy Corporation

January 2014

Leading the way in high-perm China CBM

Page 2: Far East Energy - Corporate Presentation January 2014

Excellent way to play the opportunity presented by China’s strong gas demand and rising price profile

Large, high permeability/high gas content block; strong proven reserves; high gas price and exceptional access to market

High Permeability – only large block so far in China with this critically important technical parameter Not necessary to drill high risk and expensive, multi-lateral horizontal wells Only Chinese CBM play where robust economics are probable

Reserves - PRMS net 2P (proved + probable) reserves of 440.8 Bcf (12.5 Bcm); PV-10 2P US $2.1 billion

High gas price – now at RMB 1.95/m3 (including the current subsidy of 0.25 RMB/m3 ) this is equivalent to ~$9.12/Mcf via a 20 year take-or-pay pipeline contract. Subsidy increase to 0.6 RMB/m3 announced, with expected implementation this year – would increase received price to ~$10.99/Mcf (RMB 2.35/m3)

Exceptional offtake potential – 325 MMcf/d (9.2 MMcm/d) of offtake capacity has been installed by provincial gas companies, in the vicinity of Shouyang (pipelines, power and LNG).

1

Shouyang – leading the way in high-perm China CBM

Page 3: Far East Energy - Corporate Presentation January 2014

2

Shouyang Block Location Map Qinshui Basin in Coal-Rich Shanxi Province

FEEC operates 1,168 km2

(288,570 ac)

Page 4: Far East Energy - Corporate Presentation January 2014

Favorable Shouyang PSC

PSC area is approximately 1203 km2 (297,242 acres), expiring in 2032 with approximately 1168 km2 (288,570 acres) operated by Far East Energy (one of the largest PSCs in China)

Far East has 100% interest in the current production/gas sales area (Area A1, certified by the Chinese Ministry of Land and Resources (MLR) of 64.7 km2 (15,978.7 acres)

Far East’s Area A1 is in the ODP process and will be held until expiration of the PSC on June 30, 2032 Exploration period for the remaining 1103.1 km2 (272,582 acres) extended to June 30, 2016

70% Far East /30% CUCBM split in remaining 1103 km2 (272,581 acres) CUCBM pays 30% development costs; FEEB recovers all exploration costs out of production

ConocoPhillips has 3.5% Revenue Interest out of FEEC share PRC royalty is zero until reaching 50 MMcf/d (1.416 MMcm/d) of gas production, and up to 3% after reaching 500 MMcf/d

(14.16 MMcm/d)

3

Shouyang Production Sharing Contract Area

Taiyuan

Page 5: Far East Energy - Corporate Presentation January 2014

SEC and PRMS Reserve Reports Prepared by RISC as of 12/31/2012

4

SEC Reserve Report 12/31/2012 PRMS Reserve Report 12/31/2012 SEC Net Reserves Bcf (Bcm) PRMS Net Reserves Bcf (Bcm)

SEC Total Proved (1P) 51.3 (1.5) PRMS Total Proved (1P) 303.7 (8.6)

SEC Total Probable 392.4 (11.1) PRMS Total Probable 137.1 (3.9)

SEC Total Net 2P (Proved + Probable) Reserves 443.7 (12.6) PRMS Total Net 2P (Proved + Probable Reserves) 440.8 (12.5)

SEC Reserve Report 12/31/2012 PRMS Reserve Report 12/31/2012

SEC Future Cash Flow NPV-10 ($millions) PRMS Future Cash Flow NPV-10 ($millions)

SEC NPV-10 Proved (1P) $40.4 PRMS NPV-10 Proved (1P) $1,084.5

SEC NPV-10 Probable $775.7 PRMS NPV-10 Probable $966.0

Total 2P (Proved + Probable) NPV-10 $million $816.1 Total 2P (Proved + Probable) NPV 10 $2,050.5

Standardized measure of discounted future net cash flows for SEC proved oil and gas reserves and the NPV10% valuation for proved reserves is $40.4 million

Note: YE2013 Reserve Report is in progress

Page 6: Far East Energy - Corporate Presentation January 2014

5

SYS-02 Perm: 300+ mD

Gas Content: 529 scf/ton Approx Depth: 1320 m

1H Pilot Area Perm: 80-100 mD

Average Depth: Approx 600 m Average Gas Content: 400-600 scf/ton

Average Thickness: 3-4.5 m

SYS-05 Perm: 12 mD

Gas Content: 1032 scf/ton Approx Depth:1420 m

SY-P12 Perm: 10 mD

Gas Content: 584 scf/ton Approx Depth: 1018 m

SY-P9 Gas Content: 555 scf/ton

Approx Depth: 828 m

SY-P20 Perm: 20 mD

Gas Content: 619 scf/ton Approx Depth: 1110 m

SY-P17 Gas Content: 644 scf/ton Approx. Depth: 1241 m

SY-P7 Perm: 140 mD

Gas Content: 429 scf/ton Approx Depth: 540 m

SY-P13 Perm: 120 mD

Gas Content: 288 scf/ton Approx Depth: 645 m

SY-P11 Perm: 50 mD

Gas Content: 466 scf/ton Approx Depth: 1054 m

SYS-03 Gas Content: 693 scf/ton Approx Depth: 1474 m

SYE-06 Perm: 11 md

Gas Content: 701 scf/ton Approx Depth:1300 m

High Perm and Gas Content Across Entire Shouyang Block

SYSE-09 Perm: 20 mD

Gas Content: 667 scf/ton Approx Depth: 1388 m

SYSE-05 Gas Content: 724 scf/ton Approx Depth: 1378 m

SY-P18 Perm: 15 mD

Gas Content: 728 scf/ton Approx Depth: 1125 m

SY-P19 Gas Content: 715 scf/ton Approx. Depth: 1211 m

SYE-04 Gas Content: 473 scf/ton Approx. Depth: 1167 m

SYE-18 Gas Content: 916 scf/ton

Approx Depth:1300 m

SYE-07 Gas Content: 955 scf/ton Approx. Depth: 1273 m

Page 7: Far East Energy - Corporate Presentation January 2014

6

High Perm Project

Page 8: Far East Energy - Corporate Presentation January 2014

Resource Investment Strategy Consultants (RISC) (Most recently, April 2013) (Report on YE 2012 Reserves considered all wells completed through 12/31/2012)

“Data from well tests and performance analysis indicates coal permeability is in the range 10 to 300 millidarcies (mD) with an average permeability of approximately 50 mD.”

RISC has participated in all of the CBM projects in Australia and is one of the leading engineering groups in the world for CBM.

High Permeability Confirmed by CBM Experts

MHA Petroleum Consultants LLC (May 2013)

“Permeability in the area we evaluated varies from 28 to 110 mD.”

MHA is located in the Rocky Mountains and has worked extensively on the San Juan, Raton, and Powder River Basins (all high permeability CBM plays).

Energy & Geoscience Institute (EGI) at the University of Utah (May 2013, work in progress)

Commenting on our Shouyang Block, “Preliminary results from our study concur that perm in the area is at least 25 mD and likely higher in portions of the block.”

Largest E&P research consortia at any university worldwide. 70 member companies including PetroChina, CNOOC, Shell, BP, Exxon, Chevron, ConocoPhilips, Saudi Aramco, Statoil, Total.

7

Page 9: Far East Energy - Corporate Presentation January 2014

8

High Permeability Confirmed by CBM Experts

Ancell Energy Consulting, Inc. (2012)

“I have always believed that the most accurate reservoir permeability can be determined during the single phase flow period because it eliminates many unknowns ...that crop up during two phase flow...I believe the permeability (of Shouyang) is in the range 80 to 120 mD.”

“I also spent over a year very successfully simulating Chinese anthracite coals that have permeability on the unit range using these same techniques...I know the permeability is higher than the less than 10 md present in all the other places I have seen in China...I would not be associated with this project if I didn’t really believe that. The prize here will be worth the effort.”

Inventor of the IFO test. Developer of the world’s first reservoir simulator for CBM. One of the world’s leading CBM reservoir engineers.

Netherland, Sewell & Associates (June 2007)

“Well deliverability and pressure data were reviewed in order to qualitatively estimate the permeability of Coal Seam 15. In our opinion, Coal Seam 15 contains high permeability, on the order of 100 millidarcies...”

“...the high permeability of the coal will likely enable appreciable amounts of gas to be produced.”

“High permeability associated with Coal Seam 15 may allow for high recovery efficiencies and relatively large drainage areas per well...”

NSAI is chosen by more companies to evaluate more CBM properties than any other petroleum consulting firm in the world.

Advanced Resources International, Inc. (July 2008)

“Based upon our analysis of the reservoir and well performance data described in this report, we conclude that several coal properties needed for commercial gas production exist in the pilot area. These include coal permeability (80-120 mD), thickness and gas content (approximately 500 scf/ton on a dry, ash-free basis...)”

ARI was one of the worldwide pioneers in CBM engineering and geoscience (1970s) and is recognized as one of the leading CBM expert centers in the world.

Page 10: Far East Energy - Corporate Presentation January 2014

High Permeability Yields Superior Economics

Shouyang High Perm is a Differentiating Factor in China

Many coal reservoirs in China have very high gas content, but few also have the benefit of high permeability,

with none, so far, as high as Shouyang

Coal reservoirs with high perm have a greater propensity for producing at higher levels relative to low permeability seams

Higher perm allows wells to maintain production for longer periods of time, enabling higher gas recovery rates, and fewer wells can drain the same acreage, resulting in superior economics

Similar discoveries in Black Warrior and San Juan Basins led to the incredible growth of the CBM industry in the U.S. Combination of high perm and high gas content are the characteristics that a major is looking for in a CBM play

9

Page 11: Far East Energy - Corporate Presentation January 2014

Resource Comparisons

Technical data suggests that the company’s Shouyang acreage compares very well

to premier U.S. CBM plays

San Juan Black Warrior Shouyang

Coal Gas Content, scf/ton (m3/ton)(b)

400-500 (11.33-14.16)

350-500 (9.91-14.16)

400-1050(a)

(11.33-29.8)

Coal Thickness: Typical Net Coal, feet (m)(b)

40 (12)

5 (1.5)

10-33 (3-10)

Pressure (psi) (MPa)(b)

1500 (10.3)

400 (2.8)

400 (2.8)

Permeability (mD)(b) 25 75 50(d)

Recovery Factor, %(c) 80 65 70-87

Note: Actual results are likely to vary from the following preliminary estimates, which are based on various assumptions

Notes: a. Based on recent gas content test results from several pilot development test wells. b. Source: Data on U.S. Basins from John P. Seidle, Sproule Associates, Inc. and Southwest Partnership on Carbon Sequestration. c. Source: MHA Petroleum Consultants LLC, May 2013. d. Permeability in Shouyang ranges from 10-300 mD with an average of 50 mD according to RISC.

10

Units of Measure: scf/ton = Standard cubic feet per ton m3/ton = Cubic meters per ton Psi = Pounds per square inch MPa = megapascal mD = Millidarcy

Page 12: Far East Energy - Corporate Presentation January 2014

11

Infrastructure and Gas Pricing

Page 13: Far East Energy - Corporate Presentation January 2014

First Pipeline Contract for a Foreign CBM Operator in China

20 year gas sales contract with Shanxi

Provincial Guoxin Energy Development

Group (SPG)

Flowing in a pipeline with

1.13 million cubic meters (MMcm/d),

40 million cubic feet per day

(40 MMcf/d) of capacity.

95 wells currently connected to sales

line. Additional wells are being

connected.

Current wellhead price including current subsidies is 1.95

Rmb/m3, which could rise to 2.35 Rmb/m3 (when announced

subsidies are implemented)

Recently negotiated gas

sales price increase to 1.70 Rmb/m3 (inclusive of VAT) (~$7.95) + current

government subsidies of 0.25 Rmb/m3 (~$1.17)

which is ~$9.12/Mcf.

Announcement made 11/2012 to

increase government

subsidy to 0.6 Rmb/m3 bringing

gas price to ~$11.00/Mcf

Favorable “take-or-pay” contract terms

Pipeline must “take” all gas

produced up to 300,000 m3/d (10.6

MMcf/d), or pay for available

volumes not taken.

Company has no minimum delivery

obligation.

Ability to renegotiate contract for volumes

in excess of 300,000 m3/d

Setting stage for strong competitive bidding for selling

gas into second pipeline built to

the area.

Additional gas off-take possibilities

Second pipeline built to our block

presents possibility of even higher

prices as two lines may compete for Far East Energy’s gas; power plant, LNG facility and

chemical plant are all in progress and near our 1H pilot

area

12

Page 14: Far East Energy - Corporate Presentation January 2014

Pipeline Off-Take and Potential Additional Capacity

Current/Potential Off-Take Capacity (Approximations)

Market Million Cubic Feet Per Day

(MMcf/d)/ (MMcm/d)

Current Contract with SPG Pipeline (PL) 40/1.13

SPG Parallel PL(1) 50/1.42

Shanxi International PL(1)

(completed) 190/5.38

Power Plant(1)

(under construction) 25/0.71

LNG Facility(1)

(under construction) 20/0.57

Total Near-Term Off-Take Potential 325/9.20

(1) Volumes stated represent maximum amounts that could potentially be contracted to these facilities. Preliminary discussions only; no formal contractual discussions to date. 13

View from hill - LNG facility and power plant construction

Power plant north of our 2nd stage compressor

Page 15: Far East Energy - Corporate Presentation January 2014

14

2013 Drilling Program Highlights

Page 16: Far East Energy - Corporate Presentation January 2014

2013 Drilling Program Complete Field Report as of 12/31/2013

15

SPUD IN 2013 COMPLETED IN 2013

GATHERING SYSTEM EXPANSION

in 2013

PEAK RIGS IN FIELD

74 wells

47 production 27 appraisal

56

47 production 9 appraisal

95 wells now connected

Up from 54 wells at YE2012

31 rigs

June 2013

Page 17: Far East Energy - Corporate Presentation January 2014

Increase Production, Gas Sales, Revenues

16

Page 18: Far East Energy - Corporate Presentation January 2014

Appraisal Wells Drilled

17

Page 19: Far East Energy - Corporate Presentation January 2014

Contacts

Website www.fareastenergy.com

Investor Relations Contacts

Jennifer H. Whitley – CFO David Nahmias – Investor Relations

Huw Williams – Investor Relations, Asia [email protected]

+ 1 281 606 1600

Corporate Headquarters 333 N. Sam Houston Parkway E., Suite 230

Houston, Texas 77060 Telephone: +1 832 598 0470

18

Page 20: Far East Energy - Corporate Presentation January 2014

19

Appendix

Page 21: Far East Energy - Corporate Presentation January 2014

“A Critical Mass of Wells is Necessary to Dewater and Achieve Significant Production Increases”* Virtually all world-class CBM fields

have high permeability

High perm is important to facilitate robust economics

The key is to drill enough wells to get the core area dewatered

The examples on the right show the timelines for several well-known world class projects

Companies with large financial resources took from 4 to 8 years and as much as 21 to 110 wells to achieve significant gas production.

100+ wells may be required, but per well gas production should be very high.

Black Warrior Basin (Alabama Brookwood) 1977 - first well drilled

1982 – first gas sold 1985 – first monetization Bowen Basin (Fairview Australia)

1993 - first well drilled 1998 - first gas sold 2005 (late) - first monetization 2008 - second large monetization San Juan Basin (Fruitland Coal, Colorado and

New Mexico) - Amoco 1977 – first coal well drilled

1982 (approximate) – first gas sales Powder River Basin (Montana/Wyoming) -

Marathon - drilled 100 wells in 15 months with no appreciable gas production during that period. After a few more months and another 10 wells, production began to climb at a rate of 1 million cubic feet (28,320 m3) per day per month. In other words, Marathon had to have 100+ wells that had achieved significant dewatering before gas production ramped up substantially.

*Ancell Engineering, October 2009.

20

Page 22: Far East Energy - Corporate Presentation January 2014

High Perm Development Marathon Case Study

21

Early Production History Powder River Basin Project

Northwest Location Twp 53N Rge 77W

High perm economics unlocked by having sufficient number of wells to dewater core area

Shouyang gas content is 4 to 8 times higher, potentially yielding commensurately higher gas volumes

Marathon drilled 100+ wells in 15 months before appreciable gas production. After sufficient dewatering had occurred, production began to climb at a rate of

1 million cubic feet (28,320 m3) per day month over month.

Among known analogs, this project required the highest number of wells to dewater and achieve a large gas spike.

Page 23: Far East Energy - Corporate Presentation January 2014

Modest number of wells in first 6 years; 65 wells drilled and completed through 12/31/2012

Only 21 wells drilled from 6/2004 to 6/2009

Only 45 wells will have been dewatering or producing gas for more than 2 years as of 6/30/2013

Historic analogs demonstrate it may require as many as 110 wells (refer to previous slides) to dewater a virgin high permeability area sufficiently to trigger onset of the typical major production ramp up

Eventually all high permeability fields produce commercial quantities of gas when dewatered, usually resulting in major production* and superior economics

22

Measured Pace of Drilling

*Marathon field grew by 1 MMcf/d month over month after 110 wells were drilled

Page 24: Far East Energy - Corporate Presentation January 2014

Source: EIA

China Energy Demand Projected Evolution, 2011-2030 Cumulative % change in projected energy mix (base year = 2010)

Source: Interfax, FEEC

China has indicated intent to expand natural gas pricing reform in the coming year

Current price subsidy of $1.17/Mcf projected to increase to approximately $3.04/Mcf

100% refund of VAT tax

PRC royalty set to zero until gas production exceeds 50 MMcf/d, and maximum PRC royalty of 3% after gas production exceeds 500 MMcf/d

China CBM Incentives Specifically incentivizing CBM development

Source: China Statistical Yearbook 2010

China Estimated Gas Resources By type, 2010

China is the world’s largest consumer of energy, and its growth in energy use is projected to outstrip the rest of the world

Energy demand projected to shift from coal to natural gas and renewables:

Gas demand projected to double by 2017 and more than quadruple by 2030

China’s gas resources are largely unconventional, and CBM accounts for more than one third total supply:

China’s policy seeks to specifically incentivize development of CBM resources via subsidies and favorable fiscal terms

Source: WoodMackenzie, EIA

-1.2% -2.4% -3.2% -4.4% -5.6%

-7.0% -8.2% -8.8% -9.4% -9.7% -9.6% -9.7% -10.0% -10.2% -10.6% -10.8% -10.9% -10.9% -10.9% -10.7%

1.0% 1.3% 1.3% 1.4% 1.5% 1.7% 1.8% 2.0% 2.0% 2.1% 2.3% 2.3% 2.4% 2.4% 2.5% 2.6% 2.7% 0.9% 1.4% 1.7% 2.4% 2.8% 3.2% 3.6% 3.6% 3.6% 3.5% 3.5% 3.4% 3.3% 3.3% 3.3% 3.4% 3.4% 0.9% 1.1% 1.4% 1.6% 1.9% 2.1% 2.3% 2.5% 2.6% 2.8% 2.9% 3.0% 3.1% 3.2% 3.4% 3.5% 3.6% 1.6%

1.9% 2.5%

2.6% 2.6% 2.4% 1.9% 1.6% 1.4% 1.5% 1.7% 1.9% 2.0% 1.9% 1.8% 1.4% 0.9%

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Coal Natural Gas Renewables Nuclear Liquids

2011

Coal 60%

Gas 6%

Other 34%

Coal 71%

Gas 3%

Other 26%

China Projected Energy Mix 2010 2030

Conventional 2% Conventional

Yet-to-Find 24%

Coalbed Methane

35%

Shale Gas 29%

Tight Gas 10%

Total = 3,687 Tcf

Overview of Chinese Gas Market

Energy demand continues upswing, while gas increases in importance

23

Page 25: Far East Energy - Corporate Presentation January 2014

More stringent coal standards may create an opportunity for the gas sector, with stricter environmental requirements and limits on coal imports potentially driving up domestic prices and reducing the cost advantage of coal. (Interfax 5/31/2013)

Cities are adopting gas for power generation and heating in lieu of coal. The Beijing municipal government will ban coal use within the fourth ring road – the city centre – by the end of this year, and within the sixth ring road by 2015. (Interfax 5/31/2013)

China – responsible for one-quarter of global carbon emissions – pledged as early as 2009 to cut carbon intensity by 40-45% from 2005 levels by 2020. The central government is counting on the displacement of coal by cleaner-burning fuels, such as relatively low-carbon gas, to meet the target. (Interfax 5/23/13)

Chinese natural gas demand expected to double by 2017 and quadruple by 2030 (Gavin Thompson, Wood Mackenzie, Head of Asia Pacific Gas Research, May 2012)

With gas demand increasing from just over 150 billion cubic meters (approximately 5.3 Tcf) now to more than 600 Bcm (approximately 21.2 Tcf) by 2030, China will have to rely on unconventional supplies such as CBM and coal-to-gas, as well as both piped and liquefied natural gas (LNG) imports (Gavin Thompson, Wood Mackenzie, Head of Asia Pacific Gas Research, May 2012)

Coalbed methane, coal-to-gas to exceed shale gas production until after 2020 (Gavin Thompson, Wood Mackenzie, Head of Asia Pacific Gas Research, May 2012)

Chinese government officials have stated that given that CBM is an integral part of the Chinese energy infrastructure, the country’s aim is to see a 250% increase in CBM production over the next five years and a 300% increase in the amount of natural gas used by 2020

Increasing Focus on Unconventional Gas

24

Page 26: Far East Energy - Corporate Presentation January 2014

Shanxi Province Pipelines (also Connected to Shaanjing II Pipeline to Beijing)

25

Page 27: Far East Energy - Corporate Presentation January 2014

Strong & Growing Local and Regional Market

Taiyuan is the Capital of Shanxi Province with a population of over 4.2 million, as of 2010

Taiyuan is positioned to increase the role of gas in its energy mix

The city intends all buses and taxis to be gas-powered by 2015, with 62 vehicular gas refilling stations to be built by the same period

Local Surrounding Area

Nanyanzhu and Shouyang: Plans have been announced to convert all homes in Nanyanzhu and Shouyang to the local CBM grid

Chemical plant under construction 12 kilometers south of 1H pilot area using CBM as a feedstock

120 MW power plant (25 MMcf/d) and a 20 MMcf/d (566,400 m3/d) LNG facility (see photo – across the street from our sales facility and very close proximity to our 1H production area)

Map not to scale and city, village locations are approximate

Far East Energy sales facility on left

Third parties building industrial park w LNG facility and 120 MW gas-fired power plant

26

Page 28: Far East Energy - Corporate Presentation January 2014

35+ years of experience

Former U.S. Assistant Secretary of Energy under the elder President Bush (41st president) during period of highest CBM growth in United States; Responsible for all fossil energy programs and policy

Director of National Institute Petroleum & Energy Research

Highly Experienced Management Team

Michael R. McElwrath

CEO, President & Director

Dr. Zhendong Yang

Senior Vice President - Geology

40+ years of experience

Pioneer in China CBM, Chief Geologist with Amoco, Arco, BP CBM projects

Rebecca Le

President, CFO FEEB

30+ years of experience

CBM Drilling & Production Manager; District Manager for Halliburton - Russia

Robert Hockert

China Country Manager

15+ years of experience

CPA, MPA, BBA; Amerada Hess, PriceWaterhouse, CitiCorp, Con Edison

15+ years of experience

Former Finance Director of Global Energy Development PLC, CFO of Zero Emission Energy Plants, Ernst & Young LLP, CPA

Jennifer H. Whitley

CFO

27

Page 29: Far East Energy - Corporate Presentation January 2014

Former Founder, Director, President or CFO of publicly and privately held banking, energy and technology companies

Chairman, retired U.S. Department of Energy

Director, Office of Natural Gas

Director, DC Office of American Association of Petroleum Geologists

Established U.S.- China Oil & Gas Industry Forum working with NDRC

Board of Directors

C. P. Chiang

William A. Anderson

Dr. Donald A. Juckett

Former China Country Manager of Burlington Resources

40 years with Exxon, British Gas, Tenneco, etc.

John C. Mihm Retired Senior Vice President of ConocoPhillips

China background dates to 1983

Lucian L. Morrison Founder and Director of numerous trust and investment companies

Former Chairman and CEO of Wing Corp. (exploration and production company)

Thomas E. Williams Retired President of Mauer Technology and VP, R&BD of Noble Technology Services Division (both Noble Corporation subsidiaries)

Over 35+ years of experience

Former U.S. Assistant Secretary of Energy

Director of National Institute Petroleum & Energy Research

Michael R. McElwrath

28

Page 30: Far East Energy - Corporate Presentation January 2014

Cautionary Statements

Please note that any comments made today about expectations are to be considered forward-looking statements and are subject to risks and uncertainties. Many factors could cause actual results to differ materially. Accordingly, please refer to the accompanying slides and our SEC filings on our website that define forward-looking statements and list risk factors and other events that could impact future results, which cautionary statement is incorporated herein by reference. Also please note that the Company undertakes no duty to update forward-looking statements.

Statements contained in this presentation that state the intentions, hopes, estimates, beliefs, anticipations, expectations or predictions of the future of Far East Energy Corporation and its management are forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. It is important to note that any such forward-looking statements are not guarantees of future performance and involve a number of risks and uncertainties. Actual results could differ materially from those projected in such forward-looking statements. Factors that could cause actual results to differ materially from those projected in such forward-looking statements include: the preliminary nature of well data, including permeability and gas content; the volume of gas that is ultimately produced or sold from our wells may be less than anticipated; the fracture stimulation program may not be successful in increasing gas volumes; due to limitations under Chinese law, we may have only limited rights to enforce the gas sales agreement between Shanxi Province Guoxin Energy Development Group Limited and China United Coalbed Methane Corporation, Ltd., to which we are an express beneficiary; additional wells may not be drilled, or if drilled may not be timely whether due to poor weather conditions, lack of availability of drilling rigs, poor execution by our drilling contractors, or other reasons; additional pipelines and gathering systems needed to transport our gas may not be constructed, or if constructed may not be timely, or their routes may differ from those anticipated; the pipeline and local distribution/compressed natural gas companies may decline to purchase or take our gas, or we may not be able to enforce our rights under definitive agreements with pipelines; conflicts with coal mining operations or coordination of our exploration and production activities with mining activities could adversely impact or add significant costs to our operations; the Company’s inability to comply with certain covenants and obligations, satisfy certain continuing representations, or remedy a material adverse effect to the business of the Company or other events of default could result in early termination of the Standard Chartered Bank credit facility and the outstanding senior secured notes and require immediate repayment of all outstanding amounts thereunder; the Company may be unable to enter into a resources-based lending facility or obtain additional debt financing on commercially advantageous terms, if at all; the Company may not have sufficient capital to drill sufficient appraisal wells to retain productive acreage upon expiration of the exploration period under the Shouyang production sharing contract; our lack of operating history; limited and potentially inadequate management of our cash resources; risk and uncertainties associated with exploration, development and production of coalbed methane; proved reserves may not be reported in a timely manner or at all and, if reported, may be smaller than anticipated; our inability to extract or sell all or a substantial portion of our estimated contingent resources; we may not satisfy requirements for listing our securities on a securities exchange; expropriation and other risks associated with foreign operations; disruptions in capital markets affecting fundraising; matters affecting the energy industry generally; lack of availability of oil and gas field goods and services; environmental risks; drilling and production risks; changes in laws or regulations affecting our operations, as well as other risks described in our Annual Report on Form 10-K, quarterly reports on Form 10-Q and subsequent filings with the Securities and Exchange Commission. Statements contained in this presentation speak only as of the date hereof. We assume no obligation to update any of these statements.

29

Page 31: Far East Energy - Corporate Presentation January 2014

Cautionary Statements • Definition of Technical Terms: Certain technical terms used in this presentation associated with descriptions of the potential for oil and gas properties are not consistent with the definition of “Proved Reserves” in

the SEC rules and thus the SEC guidelines prohibit us from including such terms in filings with the SEC. Such terms used herein are defined as follows:

– PRMS Reserves: This term refers to those quantities of petroleum anticipated to be commercially recoverable by application of development projects to known accumulations from a given date forward under defined conditions under the Petroleum Resources Management System (PRMS) methodology promulgated by the Society of Professional Engineers. PRMS reserves must further satisfy four criteria: they must be discovered, recoverable, commercial and remaining (as of the evaluation date) based on the development project(s) applied.

– Original Gas-in-Place: This term refers to discovered and undiscovered gas-in-place, which is the quantity of hydrocarbons which is estimated, on a given date, to be

contained in known accumulations, plus those quantities already produced therefrom, plus those estimated quantities in accumulations yet to be discovered. – Recoverable CBM Resources: Recoverable CBM resources refer to a calculation based on geologic and/or engineering data similar to that used in estimates of proved

reserves; but technical, contractual, economic, or regulatory uncertainties preclude such resources from being classified as proved reserves. Recoverable CBM resources may also be estimated assuming future economic conditions different from those prevailing at the time of the estimate.

– SPE Contingent Resources: Those quantities of CBM estimated, as of a given date, to be potentially recoverable from known accumulations by application of development

projects, but which are not currently considered to be commercially recoverable due to one or more contingencies.

– Estimated Ultimate Recovery: The sum of resources remaining as of a given date and the cumulative production as of that date.

• Note to Investors: The SEC permits oil and gas companies, in their filings with the SEC, to disclose only proved reserves that a company has demonstrated by actual production or conclusive formation

tests to be economically and legally producible under existing economic and operating conditions. We discuss certain terms and methodologies, such as PRMS reserves and contingent resources, that are not permitted to be included in filings with the SEC. Investors are urged to consider closely the disclosures in our Form 10-K, File No. 0-32455, available on our website at http://www.fareastenergy.com under the heading, “SEC Filings.” You can also obtain our Form 10-K and our other SEC filings over the Internet at the SEC's website at http://www.sec.gov. This presentation contains information about adjacent properties on which we have no right to explore. U.S. investors are cautioned that petroleum/mineral deposits on adjacent properties are not necessarily indicative of such deposits on our properties. This presentation also includes various estimates and comparisons contained in studies and reports posted on our website at http://www.fareastenergy.com under the heading “Presentations.” Actual results are likely to vary from the results in the studies and reports.

30

Page 32: Far East Energy - Corporate Presentation January 2014

Cautionary Statements Additional Information Regarding Estimates of Reserves and Resources • The estimates in the RISC SEC reserve report as of December 31, 2012 were prepared in accordance with the definitions and regulations of the U.S. Securities and Exchange

Commission and the FASB Accounting Standards Codification Topic 932, Extractive Industries-Oil and Gas with the exclusion of future income tax and Chinese VAT. The estimates in the RISC PRMS reserve and contingent resources report as of December 31, 2011 were prepared in accordance with the definitions and guidelines contained within the Petroleum Resources Management System promulgated by the Board of the Society of Professional Engineers in March 2007.

• Pre-Tax PV10 for SEC Proved Reserves, Pre-Tax PV10 for PRMS Reserves, and the standardized measure of discounted future net cash flows do not purport to be, nor should they be interpreted to present, the fair value of the coal bed methane reserves. An estimate of fair value would take into account, among other things, the recovery of reserves not presently classified as proved, the value of unproved properties, and consideration of expected future economic and operating conditions.

• Estimated future production of SEC proved reserves and estimated future production and development costs of SEC proved reserves are based on current costs and economic conditions. Future income tax expenses are computed using the appropriate year-end statutory tax rates applied to the future pretax net cash flows from SEC proved reserves, less the tax basis of Far East Energy. All wellhead prices are held flat over the forecast period for all reserve categories. The estimated future net cash flows are then discounted at a rate of 10%.

• Pre-Tax PV10 for SEC proved reserves may be considered a non-GAAP financial measure as defined by the SEC and is derived from the standardized measure of discounted future net cash flows for SEC proved reserves, which is the most directly comparable US GAAP financial measure. Pre-tax PV10 for SEC proved reserves is computed on the same basis as the standardized measure of discounted future net cash flows for proved reserves but without deducting future income taxes. As of December 31, 2012, our estimated discounted future income taxes were $0 and our standardized measure of after-tax discounted future net cash flows for proved reserves was $40.4 million.

• Pre-Tax PV10 for PRMS reserves may be considered non-GAAP financial measures as defined by the SEC. There do not exist any directly comparable US GAAP measures. Pre-tax PV10 for PRMS reserves is computed on the basis set forth in the RISC PRMS reserve and contingent resources report as of December 31, 2011 and includes proved, probable and possible reserves as described therein.

• We believe pre-tax PV10 is a useful measure for investors for evaluating the relative monetary significance of our natural gas properties. We further believe investors may utilize our pre-tax PV10 as a basis for comparison of the relative size and value of our proved reserves to other companies because many factors that are unique to each individual company impact the amount of future income taxes to be paid. Our management uses this measure when assessing the potential return on investment related to our coal bed methane properties and acquisitions. However pre-tax PV10 is not a substitute for the standardized measure of discounted future net cash flows.

• Far East Energy cautions that the disclosures shown above are based on estimates of proved, probable or possible reserve quantities and future production schedules which are inherently imprecise and subject to revision, and the 10% discount rate is arbitrary. Estimates of economically recoverable oil and natural gas reserves and of future net revenues are based upon a number of variable factors and assumptions, all of which are to some degree subjective and may vary considerably from actual results. Therefore, actual production, revenues, development and operating expenditures may not occur as estimated. The reserve data are estimates only, are subject to many uncertainties and are based on data gained from production histories and on assumptions as to geologic formations and other matters. Actual quantities of oil and natural gas may differ materially from the amounts estimated.

Additional Information Regarding Statements of Valuation Statements of valuation contained in this presentation are presented for illustrative purposes only and do not represent the actual value that Far East may realize in an arm’s length transaction on commercially reasonable terms, which may be significantly more or less favorable than suggested by such statements. Valuation of assets is a complex process involving the application of subjective business and financial judgment in determining the most appropriate and relevant methods of financial analysis and the application of those methods to the particular circumstances. In making such statements of valuation, Far East did not apply any generally accepted valuation methods, but presented such statements solely for illustrative purposes in comparison to other CBM fields. Such statements do not purport to be appraisals or necessarily reflect the prices at which any assets actually may be sold, which are inherently subject to uncertainty.

31