Faneuil Branch Library · 2019-10-22 · Faneuil Branch Library Renovations Oudens Ello...

44
Oudens Ello Architecture Boston Public Library Faneuil Branch Library Renovations City of Boston 1 Faneuil Branch Library Community Meeting #1 October 21, 2019 CITY OF BOSTON Martin J. Walsh, Mayor Patrick I. Brophy, Chief of Operations CITY OF BOSTON PUBLIC FACILITIES DEPARTMENT Patricia M. Lyons, Director BOSTON PUBLIC LIBRARY OUDENS ELLO ARCHITECTURE

Transcript of Faneuil Branch Library · 2019-10-22 · Faneuil Branch Library Renovations Oudens Ello...

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 1

Faneuil Branch LibraryCommunity Meeting #1 October 21, 2019

CITY OF BOSTON

Martin J. Walsh, Mayor Patrick I. Brophy, Chief of Operations

CITY OF BOSTON PUBLIC FACILITIES DEPARTMENT Patricia M. Lyons, Director

BOSTON PUBLIC LIBRARY

OUDENS ELLO ARCHITECTURE

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 2

Agenda

1. Introduction

2. Project Team

3. Process and Schedule

4. Project Goals 5. Existing Conditions Assessment 6. Community Input 7. Next Steps

8. Feedback Contact

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 3

Project Team

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 4

Oudens Ello Architecture

Project Team

Mayor’s Office of Neighborhood

Services

Boston Public Library

Brighton Community

City of Boston Public Facilities

Department

Consultants & Engineers

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 5

Oudens Ello Architecture

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 6

Process & Schedule

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 7

Process

1. Program Study

Duration Approx. 6 – 12 months

THE BOSTON PUBLIC LIBRARY

COMPASS: Strategic Plan

  

 

 

 

Final Report – 11/23/2015

Faneuil Branch of the Boston Public Library Programming Study Brighton, MA

Faneuil Branch Library Programming Study PCM Project No. 7043

Pre‐construction rendering of the Faneuil Branch of the Boston Public Library  

Current axonometric cutaway  

Completed Fall 2015 A study is performed to determine all the different areas and rooms needed in the library and what size they should be. Conceptual floor plans are created to show how all the spaces can fit together on the site with thoughtful adjacencies of spaces.

During this phase are 2-3 Community meetings.

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 8

Process

1. Program Study 2. Design

We are here

Duration Approx. 6 – 12 months

Duration Approx. 12 – 18 months

Completed Fall 2015 A study is performed to determine all the different areas and rooms needed in the library and what size they should be. Conceptual floor plans are created to show how all the spaces can fit together on the site with thoughtful adjacencies of spaces.

During this phase are 2-3 Community meetings.

Summer 2019 — Ongoing The architects take the information from the programming study and start to design a building with the assistance of engineers. Design has 3 phases: Conceptual Design, Schematic Design and Design Development. In each phase the design becomes more refined and detailed. Following the Design Development phase the architects put together construction documents.

During this phase are 2-3 Community meetings.

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 9

Process

3. ConstructionEstimated Start Fall 2020 Once the construction documents are completed they are put out to bid for a construction company. Once a construction company is chosen ground is broken and the building is built.

1. Program StudyCompleted Fall 2015 A study is performed to determine all the different areas and rooms needed in the library and what size they should be. Conceptual floor plans are created to show how all the spaces can fit together on the site with thoughtful adjacencies of spaces.

During this phase are 2-3 Community meetings.

2. Design

We are here

Summer 2019 — Ongoing The architects take the information from the programming study and start to design a building with the assistance of engineers. Design has 3 phases: Conceptual Design, Schematic Design and Design Development. In each phase the design becomes more refined and detailed. Following the Design Development phase the architects put together construction documents.

During this phase are 2-3 Community meetings.

Duration Approx. 6 – 12 months

Duration Approx. 12 – 18 months

Duration Approx. 12 – 18 months

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 10

2014-15

Com

mun

ity M

eetin

g 10

/29/

14Estimated Schedule

Program Study

Com

mun

ity M

eetin

g 12

/18/

14Co

mm

unity

Mee

ting

4/1/

15Co

mm

unity

Mee

ting

6/10

/15

July Aug Sep Oct Nov Dec Jan Feb Mar Apr May June July Aug Sep Oct Nov Dec

Schematic Design

Construction Documents

Bidding

Construction

2020 2021

Com

mun

ity M

tg 2

(Win

ter)

Com

mun

ity M

tg 3

(Spr

ing)

Com

mun

ity M

tg 1

Design Development

2016-18

Funding & Designer Selection

2019

We are here

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 11

Project Goals

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 12

Project Goals

The 2015 Programming Study serves as a Road Map for the design phase

Project Goals

Faneuil Branch of the Boston Public Library Programming Study Final Report PCM Project No. 7043 EXECUTIVE SUMMARY

1

EXECUTIVE SUMMARY The Faneuil Branch of the Boston Public Library is a remarkable and well-loved building and institution. Opened in 1932, the 7,600 square foot branch is a well preserved example of a well-constructed Art Deco building, with intact details inside and out. The stone building is a solid anchor located at the geographical and cultural heart of the community.

GENERAL FACILITY INFORMATION

The library is located on a roughly rectangular site at the intersection of Bigelow Street and Faneuil Street in Brighton. The site abuts a Fire Station to the West on Faneuil Street and the residential community to the North. The building is well positioned on the urban open space of Oak Square, sharing frontage on the Square with other prominent civic institutions (YMCA, Fire Station, Church, bank), as well as local business.

There have been a series of minor improvement and maintenance projects over the decades (including replacement windows in 2004), but the building remains a largely intact example of the Art Deco style and the only building in this style in the Boston Public Library system. The building is one and one-half stories, with the main level used for the majority of public services and basement primarily for staff functions and public toilets. There is also a crawl space under a portion of the building.

The purpose of this study has been to investigate options for improvements to the Faneuil Branch of the Boston Public Library to maintain its utility

and to enhance services for the 21st century. This study has been completed through a process of assessing the building's existing condition, establishing the programmatic requirements for the future, and then developing conceptual designs. The conceptual designs became the basis for a construction cost projection.

The work was closely coordinated through the City of Boston’s Public Facilities Department and the BPL. The local community participated actively at every phase of the process through a series of public meetings.

The foundation for the library assessment, programming and conceptual design was the Boston Public Library’s strategic plan, the “BPL Compass.” The BPL Compass served as a guiding document that directed the development of library enhancement initiatives. Its principals were incorporated into all phases of the study, setting a basis for our existing conditions analysis, shaping our programming dialog with the community and guiding the development of the conceptual designs.

Faneuil Branch of the Boston Public Library Programming Study Final Report PCM Project No. 7043 STUDY METHODOLOGY

6

These events are limited to being held after regular library hours so as not to interfere with public service in the Children’s Room. By contrast, the Brighton and Honan-Allston branches rank 4th and 16th for community meetings respectively, indicating that there is

community demand for public gathering spaces in the neighborhood. The Faneuil branch could help to meet this need if a more suitable space were available to the public for use.

ACCESSIBILITY: The existing facility does not meet current standards for ADA accessibility.

Project Goals & Objectives emerged from the BPL general agenda, branch use statistics, demographic composition of the service population, community desires for library services, the City need to provide and maintain quality facilities and the consultant team experience with library buildings. Combining all these factors, the following general goals and objectives emerged. Establish the library’s welcoming character and become an accessible library with all patron services on one level. Achieve this goal without dramatically changing the exterior appearance of the historic building. Facilitate an “active library” accommodating “next generation” library service, without compromising the historic integrity of the library’s interior spaces. Re-establish quality spaces and programs for Children which support early literacy and learning, without disturbing the essential character of the spaces which have become well loved by several generations. Maintain quality collections, without encroaching on space for patrons to spend time in the library. Update furnishings while maintaining and/or restoring important pieces that carry forth the

unique history of the library for subsequent generations. Support community groups in their need to have spaces to gather and share ideas, while maintaining a high “utilization rate” for all of the library’s spaces. Improve (or replace) building systems in general (plumbing, lighting, heating, cooling, fire protection). Support future enhanced technologies for communicating and producing as well as garnering information, even though we do not yet know what they will be. Efficiently support staff functions while having offices and support on the lower level and community service points on the main level.

Further space-specific goals are articulated in the Program section.

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 13

Project Goals

Faneuil Branch of the Boston Public Library  Programming Study    Final Report  PCM Project No. 7043 BUILDING PROGRAM  

      21 

PROGRAM SUMMARY On the following pages are a quantitative summary and then room data sheets or functional area descriptions.  On these sheets, space‐by‐space goals and objectives are summarized as they apply to each of the various functional areas of the library.  The spaces of the library are organized into 6 basic use zones: 

 

 

 

 

 

   

 

 

 

 

 

  

 

Some of these spaces are not currently in Faneuil branch and are included only in Scope 3, described earlier.  In the section that follows, different aspects of the various library spaces are also identified as part of Scope 1, 2, or 3. 

Welcome Zone Entrance & Vestibule Borrower Service Desk – Circulation & InfoSelf‐Service Holds Browsing/New Books Friends Booksale Space

Commons Zone/Shared Services 

Community Gathering Space Casual Seating & Networking Zone Group Study/Consultation Space Copy/Print Services Public Restrooms 

Adult Services Information/Reference  Adult Fiction/Non‐Fiction Collections CDs & DVDs Magazines/Reading Adult Seating/Reading Adult Computers Quiet Reading/Study Area 

Children’s Services

Children's Fiction/Non‐Fiction & AV Collections 

Children's Picture Book Area Children's Computers Children's Program Area Children's Storage 

Teen’s Services

Teen Collections Teen Gathering & Seating Spaces Teen Computers 

Administration/Support

Staff Workroom Branch Librarian Office Staff Break Room Building Maint./Custodial Closet/         Custodian’s Desk Tele/Data Closet Storage 

Area DesignationNet Area (existing) CollectionStaff Stns.Seating PCs

Faneuil Branch of the Boston Public LibraryProgramming StudyPCM Project No. 7043 BUILDING PROGRAM

Program Space Summary

 Final Report

A. Welcome ZoneEnt r ance & Ve s t ibu l e 40 00 0 040

Bor rower Se rv i ce De sk 395 10 0 0395

Brows ing/New Books 300 00 200 040

Se l f -Se rv i ce Ho ld s 75 00 200 040

Fr i end s Book Sa l e Space 75 00 100 020

B. Commons Zone/Shared ServicesCommuni ty Ga the r ing Space 900 028 0 00

Casua l Sea t ing & Network ing Zone inc. above 00 0 00

Group S tudy/Consu l t a t ion Space inc. above 06 0 00

Copy/Pr in t Se rv i ce s 80 00 0 040

Pub l i c Res t rooms 300 00 0 065

C. Adult ServicesIn fo rma t ion/Re fe rence inc. above 11 0 1inc. above

Adul t F i c t ion/Non-F ic t ion Co l l ec t ion s 700 00 8853 0560

CDs & DVDs 400 00 4441 0150

Magaz ine s/Read ing inc. above 00 20 0inc. above

Adu l t Sea t ing/Read ing 700 014 0 0560

Adul t Compute r s 300 05 0 5560

Quie t Read ing/S tudy Area inc. above 00 NA 00

D. Children's ServicesChi ld ren ' s Se rv i ce s - Gene ra l 1500 140 inc. below 4995

Chi ld ren ' s F i c t ion/Non-F ic t ion & AV Col l e c t ion s inc. above 00 15186 0inc. above

Pic tu re Book Area inc. above 00 inc. above 0inc. above

Chi ld ren ' s Compute r s inc. above 00 0 0inc. above

Chi ld ren ' s P rog r am Area inc. above 020 * 0 065

Chi ld ren ' s S to r age 100 00 0 060

F. Teen's ServicesTeen Se rv i ce s - Gene r a l 400 010 inc. below 0360

Teen Co l l e c t ion s inc. above 00 1620 0inc. above

page P-2222

The 2015 Programming Study serves as a Road Map for the design phase

Project Goals Program

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 14

Project Goals

Faneuil Branch of the Boston Public Library Programming Study Final Report PCM Project No. 7043 STUDY METHODOLOGY

12

The exercise encouraged the community to get into some detail with the narrative about the program, but in small enough sections that it was not overwhelming. Although the exercise could not be replicated on-line, the notes and presentation from the meeting were posted for the benefit of those who could not attend the meeting in person. We recognized the community feedback and suggestions and incorporated them as appropriate into the final program.

CONCEPTUAL DESIGN

At the 2nd community meeting scope options were introduced as a method for investigating alternative schemes and programmatic options for development. Described in more detail later in this report, the basic options were:

Scope 1

ADA Accessibility & Basic Systems Upgrades

Scope 2

Accessibility, System Upgrades + Moderate Expansion

Scope 3

Accessibility, Maintenance + Comprehensive Improvements/ Expansion

These Scope Options were developed into similar Design Options during Conceptual Design:

Scope 1

Light Intervention

Scope 2

Moderate Intervention

Scope 3

Major Intervention

Several variations on the options were developed and reviewed with BPL, from which preferred options were selected for presentation to the community. Common to all options was an accessible entrance, accessible toilets and elevator to serve both levels. Each option was reviewed at a community meeting, and the presentation and meeting notes were posted on the BPL web site so that community members who could not be present could review and comment.

After the period for review and comment from the community ended, the input was incorporated into revised drawings, virtual models and perspective renderings. The updated drawings became the basis for the construction cost estimate.

Faneuil Branch of the Boston Public Library  Programming Study    Final Report  PCM Project No. 7043 RECOMMENDED LAYOUTS & OPTIONS  

    63 

                

               Optional arrangements for the multipurpose community gathering space  The space is configured to not only have light from the large north‐facing windows, but also have light from clerestory windows above the existing rear elevation.  In this way, the addition is enhanced with the increased daylight and the interior space near the existing windows still has access to daylight.  Because this addition is directly contiguous with the elevator and stair, which extend to the basement level, a partial basement is included. (the basement does not extend all the way to the Children's wing to avoid costly underpinning of the existing foundation.)  Being convenient to the elevator, this new basement space enhances the functionality of the multi‐purpose space by providing the storage necessary for the folding tables, stacking chairs and portable performance platform or "stage" that allows the space above to be arranged for larger community meetings (such as are currently held in the over‐crowded Children's Library). 

Multiple options are potentially available for the location of the mobile service desk and the mobile bookstacks within Children’s services.  The expansion toward the street accommodates seating and houses part of the targeted collection (opening space in the original Children's Library for seating there as well.) 

Community gathering space from the existing back of the Library, looking out the north facing windows to the landscape 

Community gathering space looking through a former window into the Children’s Library 

The 2015 Programming Study serves as a Road Map for the design phase

Project Goals Program Scope of Work

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 15

Project GoalsFROM 2015 PROGRAMMING STUDY

Accessibility: Accessible entrance and restrooms w/ all patron services on one level Preservation: Maintain historic character of exterior and interior spaces Technology: Upgrade technology and adaptability of systems Collections: Collection that is responsive to community needs Community Room: Create a space that will allow for programs for all ages at all times of day Children’s Spaces: Incorporate high quality spaces and programs for children Building Systems: Integrate modern, energy efficient building systems Finishes & Furnishings: Update interior finishes and furniture

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 16

Project Goals

ADDED DURING DESIGN PHASE

Sightlines: Optimize visibility and clear sightlines throughout library Sustainability: Maximize energy efficiency, daylighting, and interior comfort

FROM 2015 PROGRAMMING STUDY

Accessibility: Accessible entrance and restrooms w/ all patron services on one level Preservation: Maintain historic character of exterior and interior spaces Technology: Upgrade technology and adaptability of systems Collections: Collection that is responsive to community needs Community Room: Create a space that will allow for programs for all ages at all times of day Children’s Spaces: Incorporate high quality spaces and programs for children Building Systems: Integrate modern, energy efficient building systems Finishes & Furnishings: Update interior finishes and furniture

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 17

Light Intervention Moderate Intervention Major Intervention

FROM 2015 PROGRAMMING STUDY

• Accessibility • Basic Systems Upgrades

• Accessibility • Systems Upgrades • Moderate Addition to

Children’s Wing

• Accessibility • Systems Upgrades • Moderate Addition to

Children’s Wing • Larger addition for

Community Room

Addresses: Addresses: Addresses:

Scope of Work

10,042 GSF (+1,281 SF) 10,271 GSF (+1,510 SF) 11,860 GSF (+3,099 SF)

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 18

Light Intervention Moderate Intervention Major Intervention

FROM 2015 PROGRAMMING STUDY

• Accessibility • Basic Systems Upgrades

• Accessibility • Systems Upgrades • Moderate Addition

• Accessibility • Systems Upgrades • Larger Addition • Community Room

Addresses: Addresses: Addresses:

Scope of Work

10,042 GSF (+1,281 SF) 10,271 GSF (+1,510 SF) 11,860 GSF (+3,099 SF)

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 19

Existing Conditions Assessment Summer 2019

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 20

Existing Conditions Assessment

Surveys • Site Survey • Building Survey

Reports • Building Code Report • Building Enclosure Report • Geotechnical Report

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 21

Site Survey

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 22

Site Survey Grading & Building Levels

+5’-8”

+3’-8”

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 23

Site Survey Grading & Building Levels

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 24

Building Survey

3D Laser Scanning Station

3D Laser Scanning Technology

• Develop accurate measured drawings for renovation work

• Document historic interior andexterior details

• Verify building dimensions and square footages from Programming Study

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 25

3D Laser Scanning Technology

• Develop accurate measured drawings for renovation work

• Document historic interior andexterior details

• Verify building dimensions and square footages from Programming Study

Building Survey

3D Laser Scanning Station

*Actual building area approx. 1,000 SF less than assumed in Programming Study

Bigelow Street

Faneuil Street Oak Square

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 26

3D Building Scan Building Survey 3D Scan

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 27

3D Building Scan Building Survey 3D Scan

Bigelow Street

Faneuil Street Oak Square

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 28

Building Survey 3D Scan

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 29

Building Survey 3D Model

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 30

Building Survey 3D Model

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 31

Basement-9' - 5"

First Floor0' - 0"

Upper Roof19' - 4 13/32"

Low Roof9' - 9"

Mechanical-13' - 3 1/2"

9' -

7 13

/32"

9' -

9"9'

- 5"

3' -

10 1

/2"

Basement-9' - 5"

First Floor0' - 0"

Upper Roof19' - 4 13/32"

Mechanical-13' - 3 1/2"

5' -

9 1/

32"

0' -

7"

13' -

5"

1' -

0"

0' -

9 1/

2"

1' -

8 1/

4"

0' -

7 1/

2"

7' -

4"

19' -

4 1

3/32

"9'

- 5"

3' -

10 1

/2" Basement

-9' - 5"

First Floor0' - 0"

Upper Roof19' - 4 13/32"

Low Roof9' - 9"

9' -

7 13

/32"

9' -

9"9'

- 5"

Basement-9' - 5"

First Floor0' - 0"

Upper Roof19' - 4 13/32"

Low Roof9' - 9"

Mechanical-13' - 3 1/2"3'

- 10

1/2

"9'

- 5"

9' -

9"9'

- 7

13/3

2"

Basement-9' - 5"

First Floor0' - 0"

Upper Roof19' - 4 13/32"

Low Roof9' - 9"

9' -

7 13

/32"

9' -

9"9'

- 5"

Scale:

Drawn By:

Existing Conditions Surveys Inc.398 Columbus Avenue #334Boston, MA 02116 USA

T 617.247.9161F 617.249.0746E [email protected]

The Most AccurateExisting Conditions Surveys and

As-Built Surveys

www.existingconditions.com

Date:

www.existingconditions.com

All projects are measured using the mostadvanced laser measuring equipment andour best standards and practices. All workwill be field verified by client prior todesign or construction or other use, pleasevisit www.existingconditions.com for termsand conditions of use.

General Notes:

1. It is expressly understood by client that ECS is notan architectural or engineering entity. None of thedocuments prepared by ECS for client shall haveany stamping or certification of such tradeprofessionals.

2. This is not a structural or MEP analysis or duediligence model. Visible and accessible elementsare modeled for location and size. Furtherstructural or MEP analysis could be necessary byothers.

3. STANDARD OF PRACTICE. Services performed byECS under this Agreement will be conducted in amanner consistent with that level of care and skillordinarily exercised by members of the professioncurrently practicing in the same locality undersimilar conditions. No other representation,expressed or implied, and no warranty orguarantee is included or intended in thisAgreement, or in any report, opinion, document orotherwise. Client shall field verify all work prior todesign construction, or other use.

Laser Scanning Notes:

1. Visit FARO.com and leica-geosystems.com for 3Dlaser scanner tolerances, range information andproduct specifications.

2. Laser scanning equipment uses light waves tomeasure distances, unforeseen site conditionssuch as dust, moisture, vibration, surfacereflectivity, lighting conditions, temperature,humidity, ferromagnetic materials, buildingconfiguration etc. may impact registration betweenscan locations.

3. Accuracy over long distances can be improved ifthe client provides survey benchmarks prior toscanning in order to reference the laser scan datainto a coordinate system.

4. The Revit file contains the most completealignment of point cloud data. All laser scanning bydefault is in a localized coordinate system. Laserscans completed on multiple days may be tied intoprevious laser scans by use of site specificfeatures and targets. Point cloud adjustments aremade in Revit for a final verification.

TM

REV01042019

1/8" = 1'-0"

Existing ExteriorElevations

EX04ECS

8/9/19

Faneuil Branch -Boston PublicLibrary419 Faneuil St, Brighton, MA

Revision Schedule

RevisionNumber

RevisionDescription

RevisionDate

1/8" = 1'-0"1 South Elevation

1/8" = 1'-0"2 West Elevation

1/8" = 1'-0"3 Partial West Elevation

1/8" = 1'-0"4 North Elevation1/8" = 1'-0"5 Partial North Elevation

Building Survey Measured Drawings

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 32

EX04

4

EX04 2

EX051

EX04

1

UP

DN

MECH ROOM

UP

EX052

EX04 3

EX04

5

WINDOW WELL, TYP.

UNABLE TO ACCESS THIS AREA

EX04

4

EX04 2

EX051

EX04

1

UP

UP

ROOF TO ENTRYBELOW

DOWN

UNABLE TOVERIFY THISAREA

RAISED PLATFORM

UP

EX052

EX04 3

EX04

5

DESK

BOOK SHELVES, TYP.

FIREPLACEBOOK SHELVES, TYP.

WINDOW WELL, TYP.

BOOK SHELVES, TYP.

27' - 9 3/32" 14' - 6 13/32" 27' - 9 1/16"

70' - 0 19/32"

21' -

9 1

3/16

"30

' - 2

25/

32"

19' - 0 5/32" 30' - 11 19/32"

25' - 8"

2' -

9 3/

4"11

' - 5

1/2

"

36' -

5 1

5/32

"50

' - 8

3/4

"

25' -

9 3

/16"

30' -

3 2

3/32

"

Scale:

Drawn By:

Existing Conditions Surveys Inc.398 Columbus Avenue #334Boston, MA 02116 USA

T 617.247.9161F 617.249.0746E [email protected]

The Most AccurateExisting Conditions Surveys and

As-Built Surveys

www.existingconditions.com

Date:

www.existingconditions.com

All projects are measured using the mostadvanced laser measuring equipment andour best standards and practices. All workwill be field verified by client prior todesign or construction or other use, pleasevisit www.existingconditions.com for termsand conditions of use.

General Notes:

1. It is expressly understood by client that ECS is notan architectural or engineering entity. None of thedocuments prepared by ECS for client shall haveany stamping or certification of such tradeprofessionals.

2. This is not a structural or MEP analysis or duediligence model. Visible and accessible elementsare modeled for location and size. Furtherstructural or MEP analysis could be necessary byothers.

3. STANDARD OF PRACTICE. Services performed byECS under this Agreement will be conducted in amanner consistent with that level of care and skillordinarily exercised by members of the professioncurrently practicing in the same locality undersimilar conditions. No other representation,expressed or implied, and no warranty orguarantee is included or intended in thisAgreement, or in any report, opinion, document orotherwise. Client shall field verify all work prior todesign construction, or other use.

Laser Scanning Notes:

1. Visit FARO.com and leica-geosystems.com for 3Dlaser scanner tolerances, range information andproduct specifications.

2. Laser scanning equipment uses light waves tomeasure distances, unforeseen site conditionssuch as dust, moisture, vibration, surfacereflectivity, lighting conditions, temperature,humidity, ferromagnetic materials, buildingconfiguration etc. may impact registration betweenscan locations.

3. Accuracy over long distances can be improved ifthe client provides survey benchmarks prior toscanning in order to reference the laser scan datainto a coordinate system.

4. The Revit file contains the most completealignment of point cloud data. All laser scanning bydefault is in a localized coordinate system. Laserscans completed on multiple days may be tied intoprevious laser scans by use of site specificfeatures and targets. Point cloud adjustments aremade in Revit for a final verification.

TM

REV01042019

1/8" = 1'-0"

Existing FloorPlans

EX01ECS

8/9/19

Faneuil Branch -Boston PublicLibrary419 Faneuil St, Brighton, MA

1/8" = 1'-0"1 Basement

1/8" = 1'-0"2 First Floor

Revision Schedule

RevisionNumber

RevisionDescription

RevisionDate

1 Revision 1 Date 1

Building Survey Measured Drawings

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 33

Original Current

Building Survey Historic Features

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 34

Original

Current

Building Survey Historic Features

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 35

Reports

Building Code Building Enclosure Geotechnical

Geotechnical Data and Engineering Report

Boston Public Library - Faneuil Branch 419 Faneuil Street

Brighton, MA 02135

Prepared for

Mr. Conrad Ello Oudens Ello Architecture, LLC

46 Waltham Street, Suite 4A Boston, MA 02118

Prepared by RSE Associates, Inc.

63 Pleasant Street Suite 300

Watertown, MA 02472

Project Number: 19078-01

5 September 2019

Chapter 34 Investigation &

Evaluation Report

Project:

Boston Public Library – Faneuil Branch 419 Faneuil Street Boston, MA 02135

September 3, 2019

Prepared for:

Oudens Ello Architecture, LLC 46 Waltham Street, Suite 4A

Boston, MA 02118

20 September 2019 Conrad Ello, AIA Principal Oudens Ello Architecture, LLC 46 Waltham Street, Suite 4A Boston, MA 02118 Project 191226 – Boston Public Library, Faneuil Branch, 419 Faneuil St., Brighton, MA Dear Mr. Ello: Per your request, Jason Der Ananian and Gert Guldentops of Simpson Gumpertz & Heger Inc. (SGH) visited the above-named site on 30 July 2019 to perform a building enclosure condition assessment. We reviewed the exterior walls, windows, doors, skylight, and roof assemblies from the building exterior and reviewed the building interior for signs of water infiltration or deterioration. This letter summarizes our limited on-site observations, and, based on our visual survey, provides our recommendations for remedial work.

1. BACKGROUND

The Faneuil Branch Library, a Brighton branch of the Boston Public Library (BPL), is a 1-1/2 story, 7,600 sq ft Art Deco mass masonry building constructed in 1932 (Photo 1). The above-grade walls are limestone clad and contain steel windows (fixed sash and operable casements) with insulating glass units in punched openings (Photo 2). Several punched openings are infilled with plywood and contain air-conditioning units (Photo 2). The primary roofing system on the high and low roofs consists of low-slope single-ply membrane with internal roof drains and perimeter metal flashing (Photo 3). The high roof contains a unit skylight with monolithic polycarbonate glazing and a translucent laylight over the main-level reading room and service desk (Photo 4). The limestone parapet above the main entrance is covered with flat-seam metal panels with soldered joints (Photo 5). The main level is primarily used for public services, and the basement is primarily used for staff functions, storage, mechanical equipment, and public restrooms. An addition (date unknown) was constructed on the north elevation and consists of the same cladding and roofing assemblies as the original building but contains a crawlspace in lieu of a full basement. Recent building renovations (circa 2003/2004) included repointing limestone mortar joints, repairing cracked limestone lintels and installing flashing, repairing interior finishes, installing replacement windows, and replacing the low-slope roof assemblies. We understand that Oudens Ello Architecture, LLC (OEA) is the Architect of Record for a planned building renovation and addition, the design of which is scheduled to commence in May 2019, with an anticipated project completion date of September 2021. OEA retained SGH to conduct a visual survey of the building enclosure and provide recommendations for remedial work. Our scope of work did not include making probe openings in the roof or wall assemblies to identify

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 36

Building Enclosure Survey

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 37

SHEET NO.

PROJECT NO.

DATE

CLIENT BY

SUBJECT CHECKED BY

Oudens Ello Architecture, LLCBoston Public Library, Faneuil Branch, Condition Assesment.

Figure 4/5191226.00

30 July 2019GGJSD

Area obstructed by tree.

Mortar joints inlimestone deteriorated.

Deteriorated mortarjoints at wall return near

parapet

Areas are weathered

Area stained withcopper oxide.

Fire alarm wirepenetration.

Mortar joints inlimestone deteriorated.

Small areas of limestone spallingin this area. Approximately 50% of limestonejoints deteriorated.

Observations at exteriorstaircase noted onisometric on the left.

Legend:SpallWeathered areaCrackDeteriorated mortar jointMortar patch (deteriorated or color mismatch)

Building Enclosure Survey

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 38

Geotechnical Survey

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 39

Community Input

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 40

Community Input

• What types of programs have you attended at the library?

• What additional programs would you like to see happening at the library given an expanded community room that could accommodate 50+ people?

• What would you like to see in the community room when not in use for group activities? Types of seating, collections?

• What would you like to see in a children’s area? Types of seating, collections?

• What kinds of material would you like to see in the collection?

• Are there additional services that would benefit the community?

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 41

Next Steps

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 42

2014-15

Com

mun

ity M

eetin

g 10

/29/

14Estimated Schedule

Program Study

Com

mun

ity M

eetin

g 12

/18/

14Co

mm

unity

Mee

ting

4/1/

15Co

mm

unity

Mee

ting

6/10

/15

July Aug Sep Oct Nov Dec Jan Feb Mar Apr May June July Aug Sep Oct Nov Dec

Schematic Design

Construction Documents

Bidding

Construction

2020 2021

Com

mun

ity M

tg 2

(Win

ter)

Com

mun

ity M

tg 3

(Spr

ing)

Com

mun

ity M

tg 1

Design Development

2016-18

Funding & Designer Selection

2019

We are here

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 43

Thank You

Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 44

Feedback?

3. Feel free to contact: Priscilla Foley, Director of Neighborhood Services [email protected]

1. Leave a suggestion in the Comment Box located in the library

2. Provide feedback online using the BPL’s Faneuil Project page: https://www.bpl.org/faneuil-project/

This presentation and all feedback will be uploaded to the BPL’s Faneuil Branch Library project page: https://www.bpl.org/faneuil-project/