8 April 2016 1 FALP 06 April 2016 Farid Zizi President of the Air Navigation Commission (ANC) International Civil Aviation Organization (ICAO) From Global Plans to Work Programme Management

Transcript of FALP 06 April 2016 From Global Plans to Work Programme ... … · From Global Plans to Work...

Page 1: FALP 06 April 2016 From Global Plans to Work Programme ... … · From Global Plans to Work Programme Management . Relationship between ICAO Strategic and business documents •Global

8 April 2016 1

FALP 06 April 2016

Farid Zizi President of the Air Navigation Commission (ANC) International Civil Aviation Organization (ICAO)

From Global Plans to Work Programme Management

Page 2: FALP 06 April 2016 From Global Plans to Work Programme ... … · From Global Plans to Work Programme Management . Relationship between ICAO Strategic and business documents •Global

Relationship between ICAO Strategic and business documents

• Global Plans define ICAO long term vision to meet ICAO Strategic Objectives

• ICAO Business Plan is ICAO rolling plan for the Upcoming triennium

• Air Navigation Work Programme is the collection of all ICAO activities in the Air Navigation Domain

8 April 2016 2

Page 3: FALP 06 April 2016 From Global Plans to Work Programme ... … · From Global Plans to Work Programme Management . Relationship between ICAO Strategic and business documents •Global

Evolution- Phase 1

•Based on what we HAVE today

•Involves application of available

procedures, processes and

capabilities

•Identifies potential « gap »

requirements that focus near-term

work programme activities

Evolution- Phase 2

•Based on what we KNOW today

•Involves application of

emerging procedures,

processes and capabilities

•Identifies potential « gap »

requirements and drives future

R&D

Evolution- Phase 3

•Based on CONCEPT

expectations

•Involves application of

new procedures,

processes and capabilities

•Fills « gap » requirements and

sustains continuous improvement

R&D

NEAR TERM MEDIUM TERM LONG TERM

System Performance Based

Optimum Capacity and Flexible Flights

Globally Interoperable

Systems and Data

Efficient Flight Path

Airport Operations

Performance Improvement Areas

Block 0 (2013)

Block 1 (2018)

Block 2 (2023)

Block 3 (2028 & >)

Global Plan Initiatives

Page 4: FALP 06 April 2016 From Global Plans to Work Programme ... … · From Global Plans to Work Programme Management . Relationship between ICAO Strategic and business documents •Global

Integrated Planning through Block Upgrades

4 Briefing to the Council of ICAO -

18 May 2012

Airport Operations

The Global Air Navigation Plan

Page 5: FALP 06 April 2016 From Global Plans to Work Programme ... … · From Global Plans to Work Programme Management . Relationship between ICAO Strategic and business documents •Global

SW

IM

Da

ta L

ink

AIM

NA

VIG

AT

ION

SU

RV

EIL

LA

NC

E

CO

MM

UN

ICA

TIO

NS

Another way to look at it

BLOCK 1

BLOCK 2

BLOCK 0

BLOCK 3

2013

2018

2023

2028

B0-15

B1-85

B2-35

B1-15

B2-15

B3-15

Page 6: FALP 06 April 2016 From Global Plans to Work Programme ... … · From Global Plans to Work Programme Management . Relationship between ICAO Strategic and business documents •Global

PIRG and RASG

What is for me in the ICAO Global Plan?

Global Plans

COMPREHENSION

MY SITUATION

?

Actions and

Evolutionary Steps

IDENTIFICATION Local and

Regional

Plan

Performance

!!

Roadmaps can assist States in their implementation of the Global Plans

Safety and Air Navigation Reporting

Page 7: FALP 06 April 2016 From Global Plans to Work Programme ... … · From Global Plans to Work Programme Management . Relationship between ICAO Strategic and business documents •Global

From Global Plan to

Regional Planning

Page 8: FALP 06 April 2016 From Global Plans to Work Programme ... … · From Global Plans to Work Programme Management . Relationship between ICAO Strategic and business documents •Global

Regional Plans in Line with ICAO ASBU Methodology

SESAR

Mapping to

NextGen (via ASBU

structure)

SESAR

Mapping to

ICAO

ASBUs

S

E

S

A

R

NextGen

ICAO GANP -

ASBU

UE-US MOC

Page 9: FALP 06 April 2016 From Global Plans to Work Programme ... … · From Global Plans to Work Programme Management . Relationship between ICAO Strategic and business documents •Global

Reporting against the Current Global Plans

8 April 2016 9

Page 10: FALP 06 April 2016 From Global Plans to Work Programme ... … · From Global Plans to Work Programme Management . Relationship between ICAO Strategic and business documents •Global

GANP and

GASP Update

Page 11: FALP 06 April 2016 From Global Plans to Work Programme ... … · From Global Plans to Work Programme Management . Relationship between ICAO Strategic and business documents •Global

11

GLOBAL PLANS

Global Plans

SARPs & PANS

Training & Guidance

Implementation Planning

Assess & Measure

if needed

Compliance & Verification

Needs Analysis / Validation

8 April 2016

Page 12: FALP 06 April 2016 From Global Plans to Work Programme ... … · From Global Plans to Work Programme Management . Relationship between ICAO Strategic and business documents •Global

8 April 2016 12

An essential tool to drive the work : the Job Card

Page 13: FALP 06 April 2016 From Global Plans to Work Programme ... … · From Global Plans to Work Programme Management . Relationship between ICAO Strategic and business documents •Global

Job Card Life cycle

Problem Statement

Final provisions

Ikit

Partial provisions

Ikit

Page 14: FALP 06 April 2016 From Global Plans to Work Programme ... … · From Global Plans to Work Programme Management . Relationship between ICAO Strategic and business documents •Global

Analysing Air Navigation Work Program

• Safety &GASP Analysis • GANP Analysis • Implementation Analysis • Expert Groups • …

Analysis of the Work Programme: • Identification of expected achievements, resources and timelines • Measuring contribution to the Business Plan Expected Results and ICAO

Objectives? • Monitoring progress of work • Identifying related potential challenges

Page 15: FALP 06 April 2016 From Global Plans to Work Programme ... … · From Global Plans to Work Programme Management . Relationship between ICAO Strategic and business documents •Global

GANP

The Proposed Structure

Work Program Elements (WPE) with all the necessary details for analysis

Contribute to

Job Cards or Work Packages Problem Statement

Definition Required actions (WPE)

Timelines

Structure in line with Operating plan of the ICAO Business Plan

Contribute to

Contribute to

Contribute to

Thre

ad/R

oad

map

ICAO Strategic Objectives

Thre

ad/R

oad

map

Thre

ad/R

oad

map

ICAO Business Plan Contribute to

GASP

Glo

bal

Saf

ety

Ro

adm

ap

Safe

ty P

rio

riti

es

Page 16: FALP 06 April 2016 From Global Plans to Work Programme ... … · From Global Plans to Work Programme Management . Relationship between ICAO Strategic and business documents •Global

On the basis of last approved Programme

Work Program Management Process

Update Monitor

Review Prioritize Resource Approve

Share & Publish

Autumn Session

All year long

Winter Session