Fall Real Estate Conference 2013 - Driskell
-
Upload
chase-miller -
Category
Business
-
view
339 -
download
1
description
Transcript of Fall Real Estate Conference 2013 - Driskell
City of Boulder2013 “Breaking Ground” Overview
David DriskellExecutive Director, Community Planning + Sustainability
A Tale of Two Cities…
sensitiveinfill
transformativeredevelopment
A Tale of Two Cities…
sensitive infill
18,600 SF third story addition above existing buildingGround floor retail / restaurant space
Final construction phase
1600 Pearl
3-story addition in existing parking lot42,000 SF commercial, with ground floor retail / restaurant
Approved by planning board / subject to call-up
1738 Pearl
1301 Walnut
60,170 SF commercialGround floor retail, with offices above and below (daylighted)
By-right development / in review
1707 Walnut Apartments
Three-story infill redevelopment of former 7-1126 rental apartments / below-grade parking
Approved / in tech doc
901 Pearl
21,000 SF commercial, with ground floor restaurantFour condominiums above
Approved / in tech doc
909 Walnut
18,400 SF commercialGround floor restaurant, with offices above
In site review
11th and Pearl
11th and Pearl
160,000 SF commercialGround floor retail, public plaza, rooftop garden/restaurantNew downtown cinema, office space, below grade parking
Expected construction start early 2014
Downtown RTD Station Improvements
Expanded bus service / BRT terminus+ 15th Street enhancements+ West Pearl streetscape
Civic Area Vision Plan
Adopted September 2013
Civic Area Vision Plan
Adopted September 2013
Park at the CoreEast
End
West
End
“Civic Use Pad” (next to St Julien)
1750 14th Street
64,400 SF mixed use reuse / redevelopment8,500 SF commercial / 1,600 SF “micro-office”
43 residential units / 3,800 SF “micro-lofts”In concept review
transformative redevelopment
3100 Pearl
319 rental apartments (avg size: 800 SF)396,900 SF total / 5,000 SF ground floor commercial
Below grade parking (with parking maximums)
3100 Pearl
RTD Bus Box
Pearl Boulevard
Pearl Parkway, Junction Place + Goose Creek Bridge
New “multi-way boulevard” prototypeNew north-south multi-modal connection / Goose Creek crossing
Shared street design on Junction PlaceNew multi-use path connections, 30th to Foothills
Pearl Parkway, Junction Place + Goose Creek Bridge
Depot Square
Below grade RTD bus facilityRestored/repurposed historic depot with public plazaShared street design connecting to new pocket park
Depot Square
150-room Hyatt Hotel71 permanently affordable apartments
120,000 SF shared parking structure (wrapped by housing)
Depot Square
Steelyards Lofts
17 attached units First new residential in Boulder Junction north of Goose Creek
Site review approved
Pearl Place (30th and Pearl)
120-room hotel / 200,000 SF office / 6,000 SF retailNew multi-use path connection / daylighted creek / public space
Completed concept review
800 & 970 28th Street
800 28th St. -- 100 four-bedroom units / Fitness center and office
970 28th St. -- 150 one- and two-bedroom units / small retail
28th and Canyon / Eads-Golden Buff Site
Two hotels + 38,400 SF office building360 hotel rooms total / below grade parking
Ground floor retail / restaurant
26th and Canyon / Village Shopping Ctr.
Residence Inn 171 rooms / 116,000 SF
Located in parking area in front of current Marriot HotelIn site review
“Baseline Zero” (Baseline @ 36)
180,000 SF office building / 70,000 SF, 100-key hotelUnderground parking / restored riparian corridor
Enhanced path connections / leading-edge green buildingIn concept review
Boulder Foothills Hospital Expansion
200,000+ new SF
Becoming main hospital facility for Boulder
Under construction / completion in 2014
Gunbarrel Town Center
Urban mixed use center251 new housing units / 22,000 SF new retail + office
Expected completion in 2015
Alexan Flatirons
12 residential buildings @ end of Spine Road231 attached rental units, 1500 SF on-site retail + clubhouse
Under construction
Avery Brewing Company
94,000 SF brewery operation5,000 SF on-site restaurant
In tech doc
Violet Crossing (Violet @ Broadway)
98 attached for-rent units / 89,350 SFFlood and multi-use path improvements
Key property in North BoulderUnder construction
820 Lee Hill
31 single family homes (former County yards site)“Woonerf” street design / shared open space / 10th St. connection
Site review approved
1000 Rosewood
18 new small-lot homes and duplexStreet facing with alley access / new street connections
Under construction
Washington Village
33 co-housing units + 3000 SF officeRestored / reused historic school and pocket park
Phased construction; completion in 2016
Trailhead (4th Street)
23 single family homes / mix of sizesSite of former “Junior Academy”
Phased development / site development underway
Kalmia Estates
29 single family homes16 duplex units14 four-plex units
Under construction
Wonderland Creek Townhomes
40 attached townhome units4 detached “Habitat for Humanity” affordable units
Site review approved
City of Boulder2013 “Breaking Ground” Overview
David DriskellExecutive Director, Community Planning + Sustainability
We partner with our community to create a truly great and sustainable city, worthy of its setting