Failure of Transformers

download Failure of Transformers

of 10

Transcript of Failure of Transformers

  • 7/28/2019 Failure of Transformers

    1/10

    PRESENTATION

    Transformer failure Failure analysis

    Case studies

    C.P.Deshmukh

    (Sr. Specialist)BHEL

  • 7/28/2019 Failure of Transformers

    2/10

    INTRODUCTION

    Transformers play vital role intransmission of Generated power.

    Distribution of power to the utilities

    of electricity. Operation demands reliability and

    uninterrupted power supply.

    Minimum outage and earliestrestoration.

  • 7/28/2019 Failure of Transformers

    3/10

    FAILURE OF TRANSFORMERS

    External reasons for transformer failure Moisture

    Tap changer

    Bushings

    Hard synchronization

    Hot spot inside the transformer

    Short circuit faults

    Ageing/ poor maintenance

    Fire & others.

  • 7/28/2019 Failure of Transformers

    4/10

    FAILURE ATTRIBUTION System faults, transients & line short circuits.

    Erection deficiencies.

    Poor maintenance .

    Accessories failures (bushing, tap changer).

    Incipient fault. Repeated back charging

    Hard synchronization

    Over fluxing

    Ageing & continuous operation/ inadequate maintenance.

    Fire and other reasons.

  • 7/28/2019 Failure of Transformers

    5/10

    SYSTEM FAULTS & SHORT CIRCUITS

    Adequacy of protection against external faults.

    Analysis of transformer suitability.

    Testing of transformer for all low voltage test.

    Monitoring of oil parameters.

    Internal inspection Overhauling and maintenance

    Retightening of all the joints and terminal gear leads.

    Thorough checking of on load tap changer

    Healthiness of bushings.

    Re-commissioning & close monitoring.

  • 7/28/2019 Failure of Transformers

    6/10

    PREVENTION OF ERECTION DEFICIENCIES

    N2 Pressure maintenance during storage.

    Internal inspection.

    Impact recorder analysis for jerks during transportation.

    Corrective action for internal anchoring of parts.

    Thorough cleaning. Ensure core and core clamping isolation.

    Purging with dry nitrogen and heating if necessary.

    Thorough testing of all the parameters including bushings etc.

    Details study of test results

    Commissioning of transformer by experts.

    Clearance for charging from OEM.

  • 7/28/2019 Failure of Transformers

    7/10

    MAINTENANCE REQUIREMENT

    Deterioration of oil and ingress of moisture.

    OLTC oil drastic contamination.

    Healthiness of bushings.

    Isolation of core and clamping structure.

    Removal of sludge like material from bottom tank. Incipient fault diagnosis.

    Periodic monitoring of temperature parameters.

    Thermal scanning of all the external joints and transformer

    tank pockets.

    Checking of gases collection in B/R.

    DGA monitoring

  • 7/28/2019 Failure of Transformers

    8/10

    ACCESSORIES FAILURES (BUSHING, TAP CHANGER).

    OIP Bushing :

    o Increase of tan delta of bushing.

    o Leakage through porcelain / flange joints.

    o Oil leakage from test tap connection.

    o Oil loss visible from gauge glass.

    Tap changero Oil contamination.

    o Poor BDV value

    o Ingress of moisture

    o Imperfect joints

    o Contacts pitting/ erosion

    Conservator

    o Air cell failure.

    o Excessive oil rise due to thermal fault.

  • 7/28/2019 Failure of Transformers

    9/10

    INCIPIENT FAULT.

    Decomposition of oil due to local heating. Isolation failure of core & core clamping.

    Failure of yoke shunts insulation.

    Multiple earthing of wall shunts.

    Sludge deposit on core and moisturization.

    Improper earthing strips of shunts and core

    clamping structure.

    Heating of joints ( brazing & crimped) & hot spot.

    High discharges in critical areas in transformers.

  • 7/28/2019 Failure of Transformers

    10/10

    REPEATED BACK CHARGING &HARD

    SYNCHRONIZATION

    Switching surges during operation. Decomposition of oil in critical areas.

    Physical movement of windings in the tank.

    Discharges in critical areas.

    Incipient fault development.

    Unbalance of amperes turns in transformer .

    Looseness of winding and leads due to

    physical movement during these operations.