    Captain Perera was assigned back to the Communications Bureau July 22, 2013. Prior to his arrival

    Captain Perera was contacted by several members of the staff to begin being brought up to speed on

    what projects were ongoing at the Bureau. The largest of which was the Radio rebanding project. This

    project Captain Perera was advised was in horrible shape with a complete lack of leadership and

    direction. Captain Perera was advised the vendor was dictating what was to be done and what was

    acceptable. Additionally Captain Perera was advised that the EDACS system was responding poorly and

    failing routinely as documented in numerous emails prior to his arrival.

    On July 23, Captain Perera met with Bureau staff to get brought up to speed on what had been

    happening with the radio project as well the state of the radio system. Captain Perera was advised the

    project was a mess with a tremendous backlog of routine radio request approvals waiting for Lt Sliman.

    This prevented moving the P25 project forward. ITD was given instruction to bring all of the pending

    items forward to me for approval. When discussed with Sliman he stated that he could not get direction

    from command staff. Additionally Captain Perera identified the following shortcomings with the radio

    project with resolution, if any, following. Captain Perera immediately brought them forward to the

    chain of command as well as Harris and ITD. There are supporting emails that can be obtained via Public

    Records Requests.

    1.

    The NICE recording solutionThe system was not recording the new P25 system properly. Harris

    said that is was not their issue. Ultimately after several months it was determined that it was in

    fact a Harris trim PC issue. Once correct the system began recording, but this continues to be an up

    and down issue due to the weakness of this solution. There have still be recurring issues with

    garbled audio that have been brought to the attention of Harris, ITD and NICE. With each saying

    the issue belongs to the other. NICE has purchased and made some changes to the original

    configuration that has worked for years to accommodate the radio. It remains to be seen if this

    corrects the issue.

    2. OTAR/OTAP The new system was supposed to be capable of over the air programming and

    reprogramming, however thus far it has been incapable of doing so satisfactorily, with an

    unacceptable time frame as well as success rate.

    3. Encryption Miami-Dade County is the largest (volume) system in the world for Harris. It is the

    largest deployment for a digital system and the largest potential for an encrypted digital system. In

    looking at the design of the system Captain Perera became concerned that it looked identical to the

    old system. This was of concern because in a digital environment the system reacts differently and

    can result in packet loss due to poor coverage. The fact that we were using the same infrastructure

    (towers) was a significant concern, especially in light of the fact that the plan was to go full

    encryption. Captain Perera began to voice his concern regarding this as well as the over state of

    the old system in weekly radio meetings that Captain Perera resurrected. Captain Perera wasassured during these initial meetings that Harris and ITD had conducted coverage testing and it,

    according to Sliman and ITD was better than EDACS. In speaking with other members of the

    team they were not so optimistic, indicating that was not in fact the case. Captain Perera asked for

    the coverage testing results and said it would be forth coming.

    4.

    CoverageAs Captain Perera said above from the beginning Captain Perera expressed that there

    was coverage issues with the new system. From July 22, 2013, when CAPTAIN PERERA asked for

    the coverage maps to November 6, 2013 when Captain Perera received them Captain Perera was

  • 5/19/2018 Failing Radio System MDPD

    2/4

    told time and time again that the coverage was perfect and not an issue. The contract calls for 65

    buildings within the county to be identified for a BDA to help with in building coverage with a cap

    of $250k. Captain Perera advised this was not enough and too little money as a solution as

    complex as need in JMH or the MIC is in excess of $250k alone. Was told that the contract is what

    it is. Despite Communications Bureau testing which indicated there were significant issues with

    coverage ITD said Harris passed the acceptance test plan and accepted the system. In June??Harris finally accepted and admitted that there is coverage problems with the system and said it

    will pay for a new site to be added as well as retuning of several other sites to try and increase

    coverage.

    5. Emergency ButtonIt was determined that during one of the code revisions a change was made

    regarding the emergency button feature resulting in it not working properly. This was one of the

    driving forces to returning to the EDACS system. This was later corrected in rev 16 of the code.

    6.

    Patching between systems In order to cutover there would have to be some patching between

    systems. We were advised by Harris that this would not be an issue and there were several ways to

    accommodate this, each with pros and cons. Ultimately all methods failed and a hard patch

    using the Federal interoperability channels (identified by me) had to be used. This works marginally

    at best with limited functionality, but at least it is a method that can be employed if necessary.

    7. Training- Harris pushed training of the staff early on. They were trained the week of August 5, too

    early to be of use due to the delays. They did not offer any refresher training prior to the cut. The

    original cut date was in December but was pushed January of 2014.

    8. Old System ITD had stopped working or conducting PM on the EDACS system with the

    implementation of the P25 system. This caused a myriad of issues and failures. Captain Perera

    demanded that they continue and preform maintenance on the existing equipment. While doing

    so they found broken antenna, some filled with water from rain and even some with animal nests

    inside. It is unknown if some of this is causing part of the issues that are still being experienced

    today.

    9.

    Network/Audio quality at LighspeedThere is a significant difference between the audio qualityat Lightspeed and DPCC. When the system was designed and implemented the system uses the

    county network to send the audio from DPCC to Lightspeed. This issue was brought up on

    numerous occasion, from the beginning because the proper method for transmitting the signal is

    via a dedicated microwave link, utilizing the network as a backup. Captain Perera was advised that

    the network was fine and that there was no money for a microwave link. Captain Perera still firmly

    believe this is causing some of the continuous network issues that are encountered with the system.

    In August Harris finally admitted there were network issues with the system and has taken some

    steps to fix them. The microwave is still outstanding.

    10.

    Vocoder issue- Industry-standard codecs (or vocoder software) that convert spoken voice to digital

    data cannot adequately compensate for high pitched sounds. For example, a is a police officer

    who is trying to announce his or her location during a pursuit. The officers digitized voice may be

    unintelligible because of the siren. A canine officer with a dog that is barking loudly may not be

    heard because of the competing noise from the dog. It has been identified and brought forward

    multiple times that higher pitched voices are having problems with the system. On September 2,

    2014, Harris has finally said there may be an issue with the vocoder.

  • 5/19/2018 Failing Radio System MDPD

    3/4

    11.Airport DAS - Another project that was stagnant. Airport had built the MIC and had no radio

    coverage. That had been brought forward to Sliman more than a year ago. Captain Perera

    engaged ITD as an officer safety issues and finally resolved at the end of December 1013.

    On November 12, 2013, Captain Perera was advised to attend a meeting at ITD with Angel Petisco,

    Felix Perez, and JD Patterson. Captain Perera was acting Major at the time and had been for abouttwo months. The meeting tone was very adversarial, with all parties saying Captain Perera was not

    working with Harris. ITD went so far as to infer that Captain Perera had an alternative agenda to

    cause the project to fail. Captain Perera defended himself and said then that all Captain Perera was

    trying to do was ensure that the officers on the street had the communication they needed.

    Petisco said that Captain Perera was making noise about encryption. He said that MDPD wanted

    full encryption and that he had negotiated for it as additional and that MDPD was going to be fully

    encrypted whether Captain Perera liked it or not, regardless of the facts that Captain Perera

    presented to him on the rate of failure. Petisco said that Captain Perera had too much on his plate

    and perhaps MDPD should off load this to a new person. Patterson nodded. Because of all of the

    issues with the system the date for cutover had to be pushed from December to January 14, 2014.

    It was as if Captain Perera had caused the problem and delay. After the meeting Patterson took me

    aside and said that he was going to assign a Major to the Bureau to handle the radio project so that

    it would be implemented smoothly. Captain Perera told him Captain Perera was doing fine and did

    not need someone else to manage it. He told me to begin sending updates as to the status to him

    weekly.

    On November 25, 2013, Rey Valdez was assigned to the Bureau and given the marching orders to

    ensure the radio project was implemented smoothly. Captain Perera transitioned the radio project

    to the Major and began to let him run it. He spearheaded the reprogramming of the radios in

    consult with me. Captain Perera disengaged for the most part from the project but provided

    feedback when asked up until the point where we cutover and he went out due to health issues fora couple of weeks. Even though it had been brought to Harris and ITDs attention by not only

    himself, but Midgley and the dispatchers that the system was not function properly prior to the

    cutover, we went live anyway. While Valdez was out the complaints regarding the system by both

    the dispatchers and officers continued to mount, including the emergency button and all other

    previously identified concerns.

    On May 2, 2014, Captain Perera made the decision to cut back to the old system due to ongoing

    officer safety issues. This was discussed with the chain of command and fought by ITD and Harris.

    This issue went up can down the chain and we finally went back on May 15, 2014. It resulted in an

    appearance before the Commission and explanations required by all. Again, Captain Perera was

    blamed for not working with Harris and ITD. Captain Perera said that MDPD would not go back to

    the system again until it was stable and had been extensively tested. Captain Perera also began

    researching other Harris implementations and found the Oakland case. Captain Perera reached out

    to Oakland PD and was advised of their ongoing issues. They provided me with reports

    documenting all of the problems they had. At the next radio meeting Captain Perera presented

    this information to Harris and ITD since the systems and issues were almost exactly the same. This

    was not well received and again Captain Perera was told by ITD that Harris was taking this well as

  • 5/19/2018 Failing Radio System MDPD

    4/4

    Captain Perera was not a good partner and was trying to hurt the implementation. The

    relationship with Harris continued to degrade although Captain Perera was actively supportive and

    trying to facilitate the project.

    After receiving a new set of code (rev20) in the first part of July, we began testing. Testing

    occurred from then until July 27, 2014The handheld code seemed stable, but there were issueswith the mobile code still. Harris and ITD were pushing for an aggressive schedule due to time

    constraints imposed by the FCC. Another extension was granted to January of 2015 with no others.

    A decision was made to move forward since the majority of radio use is on the handheld and Harris

    advised they had corrected other issues with towers and the network. A second radio was marked

    and issued to South District personnel so that they could test the system as they were working. This

    was not what Harris and ITD wanted, they wanted to cut back over and began pushing for that

    saying they were incapable of getting enough data from the testing being conducted. Harris had

    advised that the system had stabilized and needed to be load tested. On July 31, 2014, a decision,

    which Captain Perera supported, was made to migrate South only to the new system to see how it

    would react. If it was functioning properly we would bring another district on. South initially

    appeared to be stable and worked on the new system for a week. It was decided that Northwest

    would be brought on the system on Monday, August 11, 2014. Almost immediately complaints

    started coming in, including multiple instances where officers needed backup and could not

    communicate. A meeting was convened on Tuesday, August 12, 2014, wherein the issues that

    were occurring were brought forward and Captain Perera said that due to officer safety we needed

    to migrate back to the old system as the new one was still too unstable with the increased load.

    Harris asked to keep one district on so that they could continue testing. Captain Perera agreed only

    if the system stabilized. South District migrated back to the old system at 5PM. As Captain Perera

    was the acting Major Captain Perera contacted the acting Chief R. Cordero-Stutz and advised what

    had transpired. At approximately 6:30PM Captain Perera was called by the Director and

    questioned regarding what had transpired. He advised that Petisco had contacted him and told himof his decision. Captain Perera explained all, to what Captain Perera thought was his satisfaction

    and did not hear further until Captain Perera was called to his office on Tuesday, August 19, 2014

    and told Captain Perera was being transferred to an administrative position rewriting the

    departmental manual. When asked why he said Captain Perera had too much history and he was

    tired of all the barbs being thrown. That it was for his own protection so they could not blame me

    for the problems. Captain Perera tried to explain all but he did not entertain any explanation and

    said he had made up his mind. Later Captain Perera learned through Felix Perez that Harris also

    had requested that Captain Perera be removed from the project. The project still has many of the

    aforementioned issues, with only a few being partly resolved.

    This is clearly a retaliatory action in response to all of the concerns Captain Perera had expressedduring his tenure regarding this project. Everything Captain Perera has identified and brought

    forward regarding the shortcomings of this system has been proven true. Captain Perera is a

    recognized subject matter expert in communications by the Department of Homeland Security. No

    one in MDPD has his credentials or background in communications or 911.