Faculty Assembly Report Information Resources November 2010.

11
Faculty Assembly Report Information Resources November 2010
  • date post

    21-Dec-2015
  • Category

    Documents

  • view

    214
  • download

    0

Transcript of Faculty Assembly Report Information Resources November 2010.

Faculty Assembly Report

Information ResourcesNovember 2010

Completed Projects• New e-mail system for faculty and staff

– Business Productivity Online Suite• Microsoft Exchange for e-mail and calendar• 25 GB mailbox• Microsoft SharePoint for document sharing and collaboration• Microsoft Office Communications Server for presence (status

of person’s current availability),• instant messaging, voice, video and collaboration• Integration with UND’s current voice system to provide

limited voice features (i.e., access to• voice messages through e-mail client)

• Safe Connect– Secure connection to wired and wireless

network

• Bomgar– Remote access control for desktop support

• Dell Support– Continued to be a certified Dell support shop

Completed Projects

• New Videoconference classroom (Rm 5121)

• Mediasite Lecture Capture – United, Haugen, Keller & Rm 5520– Tied into Active Directory for single sign-on for

students– Mobile Access

• 18 new 58’’ Plasma TVs in PCL rooms

• Active Directory in PCL rooms and B320B

Completed Projects

Completed Projects• Helped with UND Simulation Center

– B-Line Medical– Signature AV

Completed Projects

3001 Remodeling

Completed Projects• Grand Forks

– B320B Computer Lab upgrade• New videoconferencing• Smart classroom

– OT Classroom– United, Haugen, & Keller lecture rooms upgrade

• Crestron Control Systems• New Cameras• 32x32 Video Matrix switch in Keller• Integrated Videoconferencing units• Improved audio

Completed Projects• Grand Forks

– New on-premise MS Sharepoint server 2010– Sharepoint training for staff– New CME database– CRM Training for staff

• Fargo– Lab upgrade

• Bismarck & Minot– Servers upgrades

Completed Projects• New Microsoft Deployment server

– Rapid deployment for new computers– Faster upgrade for old computers

• New File Storage Server for researchers– 16 Terabyte– Expandable– Redundancy & Daily Backup

• Gigabyte access to research area– Internet-2 connection

Completed Projects

• Information Resources restructure– Computer Services Information Technology

Services (led by Vicki Link)

– Videoconferencing Services• New Centralized Conferencing Scheduler

• Medical Media– Free Graphic Design Services

Future Projects

• Rm 5006 Remodel

• New Website– UND Templates– Omni Update

• SMHS Image Library– Sharepoint 2010