FactoryTalk VantagePoint EMI: 50 Minutes to Value
-
Upload
rockwell-automation -
Category
Technology
-
view
677 -
download
8
description
Transcript of FactoryTalk VantagePoint EMI: 50 Minutes to Value
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
PUBLIC INFORMATION
FactoryTalk® VantagePoint EMI 50 Minutes to Value
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
The Customer Their Vision
2
Connectivity
Plant Model
Portal
Excel
Reporting
Emailing
Trending
Mobile, secure…
Targets
Analyze by Order
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. 3
Agenda
Wrap-Up / Q&A
Building the Solution (Demo)
Our Approach
Our Role
Introduction
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Your Role
4
You are an System Integrator, a Rockwell Automation® Delivery person, a
Rockwell Automation Tech Consultant, or part of the customer delivery
team tasked with executing the Proof of Concept (POC)
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
The Customer Their Equipment
5
Common
Equipment
Common
Properties
Same at other
facilities
My Plant
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Our Task is to Deliver the POC
6
We will have 50 minutes with the customer
Our goals are to :
Develop a plant model and demonstrate the value
Demonstrate using Trend with the Model
Develop an Excel based report generic for each Machine
Discuss how this is the foundation for their vision
I can do this
with VantagePoint
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Our Approach
FactoryTalk VantagePoint EMI: 50 Minutes to Value
7
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Our Approach At a High Level
8
Data Connectivity and Shape
Property Exploration
Property Values
Step 1: Mapping Requirements to Reality
Step 2: Develop Solution
Create Types
Create Items Map Tags Demonstrate
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Data Sources Review
FactoryTalk VantagePoint EMI: 50 Minutes to Value
9
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Data Sources Review What has been done so far?
10
FactoryTalk Systems have been installed and configured
FactoryTalk View Site Edition, FactoryTalk Transaction Manager,
FactoryTalk Historian Site Edition, FactoryTalk VantagePoint EMI
FactoryTalk Transaction Manager is creating entries in a custom table
FactoryTalk Historian Site Edition is storing data
FactoryTalk VantagePoint EMI
Connected to the FactoryTalk Historian Site Edition
Review sample tags
Connected to the SQL Server with Order History
Mapped Types already created with Time Periods How does this
list get refreshed?
How did the tags
get into
VantagePoint?
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Type Creation
FactoryTalk VantagePoint EMI: 50 Minutes to Value
11
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Type Creation
12
Think of what the end user wants to do
Typically find information based on some
structure
Plant >> Line >> Equipment >> Property
What do we need to create types of?
Line
Work Station (Equipment)
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Type Creation Work Station Type
13
Reference Properties
Status (Core.DiscreteTag)
Order – Current (Core.StringTag)
Parts – Good (Core.AnalogTag)
Parts – Reject (Core.AnalogTag)
Parts – Total (Connector.Incuity.Calculation.FloatTag)
Percent Good (Connector.Incuity.Calculation.FloatTag)
Target (Connector.Incuity.Calculation.FloatTag)
Order History (Connector.MsSql.MappedType)
This is not in the
list?
Why is this not a collection?
Where will we find this?
Don’t forget to
Re-order
Why add this?
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Type Creation Work Station Type
14
Inheritance
Base.Equipment
Icon
Core.ConnectorInsql
Collection Properties
Tags (Collection of Core.Tag)
Operations - None
Default Property - None
Why do we
inherit?
What is the
purpose? What else should
we consider?
What are the
options?
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Type Creation Work Station Type - Results
15
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Type Creation Line Type
16
Reference Properties
Reports (Core.Folder)
Inheritance
Base.Location
Icon
Core.Production (87)
Collection Properties
WorkStation
Operations - None
Default Property - None
Why is this a
reference?
Why do we need
a Line Type?
Why
Base.Location?
What is the
purpose?
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Type Creation Line Type - Results
17
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Creating Items in the Model
FactoryTalk VantagePoint EMI: 50 Minutes to Value
18
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Creating the Work Stations and the Navigation Model
19
Create Folder MI02 under MyEnterprise.Demos.RSTechED
Create Line 1 as RSTechED.MI02.Line
Map Reports folder from System.Solutions.Demos.RSTechED.MI02.Content.Line 1
Create Filling Work Station as RSTechED.MI02.WorkStation
Map known items from FTHistorian
Map Order History Item SQL Connector
Create Percent Good Calculation Tag (Good / Total Parts)
Create Target Rate Calculation Tag (Fixed Value)
Add to the Tags collection
Validate Configuration using Trend
Why use the
Solutions Folder?
Can I re-use
these calculations?
What can I
put here?
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Import the remaining items…
20
Import an ICP file which contains the configuration of the remaining Work
Stations
Why do it this way?
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Line and Work Stations The Results
21
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Creating Content
FactoryTalk VantagePoint EMI: 50 Minutes to Value
22
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Trending Showing the Results
23
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Excel Showing the Results
24
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Wrap-Up
FactoryTalk VantagePoint EMI: 50 Minutes to Value
25
26
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
Where can I learn more?
27
Sessions
Introduction to FactoryTalk VantagePoint and Enterprise Manufacturing
Intelligence
FactoryTalk VantagePoint EMI: Sneak Peek at What's Coming in v6.0
Reporting Best Practices for Production Information
Labs
FactoryTalk VantagePoint EMI Basic Lab: Building an Information System
FactoryTalk VantagePoint EMI Advanced Lab: Exploring the Possibilities
FactoryTalk VantagePoint EMI: Advanced Reporting
Come ask questions at the Mobility Experience booth
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
We care what you think!
On the mobile app:
1. Locate session using
Schedule or Agenda Builder
2. Click on the thumbs up icon on
the lower right corner of the
session detail
3. Complete survey
4. Click the Submit Form button
28
Please take a couple minutes to complete a quick session survey to tell us how we’re doing.
2
3
4
1
Thank you!!
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
PUBLIC INFORMATION
Questions
29
Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved.
www.rsteched.com
Follow RSTechED on Facebook & Twitter. Connect with us on LinkedIn.
PUBLIC INFORMATION
Thank-you!