1 Mast – Factory SOP Training Content Updated on 01/05/09 (Total 61 pages) Slide 3 – SOP Assessment Report Slide 4 – Job File/Style Folder Slide 5 – SOP tree Slide 6 – Trims/accessories receipt and card Slide 7 – Fabric Warehouse--Receipt of piece goods Slide 8 – Incoming Fabric Inspection Slide 9 – Incoming Fabric Internal Testing– shade blanket for washed garment Slide 10 -Incoming Fabric Internal Testing– continued .1 Slide 11 -Incoming Fabric Internal Testing– continued .2 Slide 12 -Fabric Relaxation Slide 13 -Pilot Lot Samples Testing Slide 14 -Pre-Production Meeting Slide 15 -Pattern & Marker Slide 16 -Cutting Room Slide 17 -Cutting Room-- continued Slide 18 -Shade Numbering Slide 19 -Cut Panel Inspection– Accuracy & Skills Slide 20 -Cut Panel Inspection– Fabric flaws Slide 21 -Fusing Room

description

Quality Manual

Transcript of Factory SOP Training Content - MAST

Page 1: Factory SOP Training Content - MAST

1

Mast – Factory SOP Training ContentUpdated on 01/05/09 (Total 61 pages)

� Slide 3 – SOP Assessment Report

� Slide 4 – Job File/Style Folder

� Slide 5 – SOP tree

� Slide 6 – Trims/accessories receipt and card

� Slide 7 – Fabric Warehouse--Receipt of piece goods

� Slide 8 – Incoming Fabric Inspection

� Slide 9 – Incoming Fabric Internal Testing– shade blanket for washed garment

� Slide 10 -Incoming Fabric Internal Testing– continued .1

� Slide 11 -Incoming Fabric Internal Testing– continued .2

� Slide 12 -Fabric Relaxation

� Slide 13 -Pilot Lot Samples Testing

� Slide 14 -Pre-Production Meeting

� Slide 15 -Pattern & Marker

� Slide 16 -Cutting Room

� Slide 17 -Cutting Room-- continued

� Slide 18 -Shade Numbering

� Slide 19 -Cut Panel Inspection– Accuracy & Skills

� Slide 20 -Cut Panel Inspection– Fabric flaws

� Slide 21 -Fusing Room

Page 2: Factory SOP Training Content - MAST

2

Mast – Factory SOP Training ContentUpdated on 01/05/09 (Total 61 pages)--- Continued� Slide 22 -Machine Repair & Maintenance

� Slide 23 -Sewing lines

� Slide 24 -Sewing lines-- continued

� Slide 25 -Sharp Objects Control

� Slide 26 -Traffic Light System

� Slide 27 -Traffic Light System-- continued

� Slide 28 -End-line Inspection

� Slide 29 -Inspection & Audit terminology

� Slide 30 -Factory Inspector & Auditor

� Slide 31 -Wash Garment Control

� Slide 32 -Pressing

� Slide 33 -Final Inspection

� Slide 34 -Color Shade Sorting

� Slide 35 -Fit Audits

� Slide 36 -Packing

� Slide 37 -Pre-final & Final audit

� Slide 38 -Defect Analysis

� Slide 39 to 61 -Appendix from A to S

Page 3: Factory SOP Training Content - MAST

3

SOP Assessment Report� Mast Industries will conduct this SOP assessment report in our active garment factories

every 3 months.

� Record will be documented and shared with related factories for immediate

improvement.

Page 4: Factory SOP Training Content - MAST

4

Job File/Style Folder� A job file/style folder should be kept in factory which file all key SOP documents

for each style.

Page 5: Factory SOP Training Content - MAST

5

SOP treeFabric, Trim & Accessories warehouse

Patterns, Markers, Cutting

& Fusing

Sewing/assembling Lines

Finishing

Off line Process

Pre-final & final- N3

P

B

B

B

P

P

B

B

P

PB

B

N2, R P

�Trim card & checking

�Fabric process control- A

�Dye lot control- C

�Fabric inspection- B

�Fabric internal testing- D

�Fabric relaxation

�PP meeting associated- E

ReportElementSection

�K

ey p

rocess in

spectio

n-

N2

�W

ash g

arm

ent c

ontro

l-Q

, R

�P

P m

eetin

g a

ssocia

ted-

E

�Cut panel inspection- G

�Shade numbering

�Fabric defects guideline- H

�Fusing record- I

�PP meeting associated- E

�Machine repair/maintenance-

J, K

�Job spec- L

�Sharp objects control- F

�Inline audit same as App- N3

�Traffic light system- M

�Key process inspection- N2

�End-line inspection- N1, O

�PP meeting associated- E

�Pressing

�Final inspection- N2, O

�Color shade sorting

�Fit audit- S

�Packing

�PP meeting associated- EDefect

analysis

A, B

, C, D

N1,2,3

G, H, I

N3

N1, 2,

3

Pilot Lot

B

P

P

Bulk

Page 6: Factory SOP Training Content - MAST

6

Trims & Accessories Card & Receipt� Each of the approved trims should be posted in the sub-material sections for the

workers’ checking of the incoming trims including quality & quantity (suggest 10% for each item/size is minimum). Checking record should be kept in warehouse for reference.

� Clear segregation of trims & accessories storage will ensure that there is no mix up or misunderstanding during production.

� Proper inventory must be established. This must include the booking in and their distribution. And records must be clear for trace back.

Page 7: Factory SOP Training Content - MAST

7

Fabric Warehouse---Receipt of piece goods� Swatch must be cut from middle of each roll exterior end. A swatch is at least 6

inches x 6 inches. These swatches should be mounted on the dye lot control sheets as per dye lot. (Dye lot control sheet- Appendix C)

� Swatch must be checked against approved shade by a qualified person using the required light under Macbeth light box.

� Fabric warehouse should be organized with all the fabric rolls being put in an pallet. Marking with customer & style numbers on each rack for easy reference.

� Rolls must remain covered. Appendix A is for recording fabric control process.

Page 8: Factory SOP Training Content - MAST

8

Incoming Fabric Inspection� Factory should carry out at least 10% of the incoming fabric inspection with

using 4-point system prior to cutting. If this fails, then an additional 15% must be done. If this still fails, then it must be 100% checked.

� Fabric defects guidelines & approved shade band should be in place.

� Should use the Brand Standard and requirement or follow 4 point system in Mast SOP if Brand have no specific requirement. (Pieces Goods Inspection Report– see Appendix B)

Page 9: Factory SOP Training Content - MAST

9

Incoming Fabric Internal Testing--Shade blanket for Washed

Garments

� Upon receipt of the fabric, the factory must cut head ends from all rolls, and sew them together as a blanket, and launder according to the approved standard.

� All rolls must be numbered as per the original rolls and then joined together to see a before and after effect.

� Every roll per dye lot must be checked for shade continuity before and after wash.

Page 10: Factory SOP Training Content - MAST

10

Incoming Fabric Internal Testing –Continued.1

� There must be a 50cm X 50cm square swatch drawn onto at least 10% rolls of all the dye lots received to ensure that the fabric rolls are to be grouped for marker by proper range of shrinkage is consistent throughout the fabric (Fabric Internal Test Summary Report-see Appendix D). Suggest that Denim be tested 100%, and to use a plastic template to ensure that all squares are consistent.

� Fabric preliminary shrinkage testing environment should be similar with bulk production.

Min

.3Y

50X50 square cm for s

hrinkage te

st

6X6 square inches for listing test

6x6 square inches for Dye Lot Control

18X6 square inches- Shade

blanket for washed garment

Page 11: Factory SOP Training Content - MAST

11

Incoming Fabric Internal Testing –Continued. 2

� Suggest that a squares be taken min of 3 yards away from interior end of a roll.

� Cut samples from 10% of all rolls across all dye lots. Ensure that proper listing test (end to end and side to side) are carried out on all of these selected rolls.

� Fabric weight should be checked against the original requirement.

� Test on fusing shrinkage, marking chalks/pens/number sticker & any new join.

� It’s suggested that dry crocking fastness testing be for color bleeding intensity.

Page 12: Factory SOP Training Content - MAST

12

Fabric Relaxation� Fabric rolls must be unrolled, lapped and must be individually stored on a

separate rack.

� Relaxation at least 24 hours prior to spreading & cutting. Record with the time started for relaxation on each lot of fabric should be recorded.

� Stretch fabrics could also be preshrunk using sponging machine or heat setting machines prior to spreading/cutting.

Page 13: Factory SOP Training Content - MAST

13

Pilot Lot Samples Testing� Factory should carry out pilot lot testing for all news styles, new fabrications

prior to bulk cutting.

� For those orders with quantities more than 500 pieces, a 32 pieces of pilot lot samples testing is required.

� Fabric shrinkage will be built into the Pilot Lot patterns

� After the evaluation on the pilot testing, the finalized shrinkage will be built into the bulk patterns.

� Pilot Lot Samples need to be reviewed by Mast QA or factory designated QA. (Pilot assessments report- see Appendix P)

Page 14: Factory SOP Training Content - MAST

14

Pre-Production Meeting� Factory should conduct pre-production meeting for all styles prior to bulk

production.

� It is essential process to ensure all of the suitable raw materials and machineries are identified and available in order to produce the required garments.

� PP meeting record form. (see Appendix E)

Page 15: Factory SOP Training Content - MAST

15

Patterns & Markers� Pattern shouldn’t be changed from buyer’s approval or Mast approval.

� As a general rule, one garment must be laid one way. Depending on certain fabric or prints, we may in fact have to make the markers all one way. This should be clarified at the PP meeting and exercised in bulk. In the event that we have two of the same size in one marker, then one must be marked 8a and another must be marked 8b, to avoid any confusion when bundling.

� Make sure that marker components are all there and are marked properly on grain lines.

� Ensure that style & PO numbers are properly marked on the markers.

Page 16: Factory SOP Training Content - MAST

16

Cutting Room� Cutting room should be well lighted. (Lighting: Minimum 70 FC)

� The cutting room supervisor should always receive a copy of the Fabric Inspection Report as the fabric is passed to the cutting room for processing.

� Approved shade band should be in place as a reference.

� Original patterns for all sizes must be in the cutting room prior to spreading. They must be made from card and must be hung in the cutting room for immediate reference.

� Make sure that each dye lot must be cut in the order size ratio.

� Roll code with dye lot should be recorded in each cutting quality report (see Appendix G).

� Fabric piles must always be cut in specified directions. Again, this must be specified on the PP report during the meeting.

� Notches must be checked for accuracy, and depth shouldn’t exceed 1/8” in some cases especially on knitted fabric or delicate fabrics it may be advisable to mark these as small triangles on the outside rather than notches.

Page 17: Factory SOP Training Content - MAST

17

Cutting Room--Continued� A maximum height of 3 ½” must be used. However this might vary depending on the

fabrication.

� The edge on all piles must be totally flush prior to cutting and under no circumstance

should any cutting commence until the lay had been scrutinized by the cutting room

manager.

� End cuts should be re-ticketed and put to one side in an orderly fashion. The original

ticket should be used to ensure that if re-cuts are needed they come from the same roll

and dye lot.

� Tissue paper must be used to separate individual rolls.

Page 18: Factory SOP Training Content - MAST

18

Shade Numbering� All Brands production must be numbered not only by size, but also must contain

information on the dye lot control.

� All parts must be numbered, and these must remain on the garment until shade sorting.

- Suggest that a visual guide is used to identify lots. The color coding can be used in many different way that is a fast and efficient to maintain lot integrity.

� Fused parts numbering isn’t easy to handle because it could leave a mark or the numbers could be taken off and put back in the wrong order or not at all. For shade numbering control, fusing section is a key player.

Page 19: Factory SOP Training Content - MAST

19

Cut panel Inspection— Accuracy & Skills

� Factory should carry out at least 10% of the key cut bundles inspection for cutting accuracy, cutting skills etc..

� Checking of top, middle, bottom pieces of cut pieces against the hardboard patterns for accuracy & variation.

� Checking of both face and wrong sides of the cut piece is required to make sure they are cut along the marker line.

� The tolerance for miss cuts on any pieces is +/- 1/16” all around. If in general the cut panel was 1/16” over all around, this would not be acceptable and have to be re-cut.

� Cutting quality report—see

Appendix G

Page 20: Factory SOP Training Content - MAST

20

Cut panel Inspection– Fabric flaws

� All main panels must be 100% inspected for fabric flaws.

� Fabric defects guidelines should be in place. (Fabric defects guideline– see Appendix H)

� Cutting quality records should be maintained. (see Appendix G)

Page 21: Factory SOP Training Content - MAST

21

Fusing Room

� Approved lab test reports from PCC or Vilene for the actual interlining should be in place with a swatch for reference.

� Factory should check at least 2 to 3 times a day on machine temperature and fuse line temperature using thermo papers or thermometer.

� At least checking of twice a day for the bond strength with using bond strength tester.

� Record (including temperature, dwell time, pressure & bond strength) should be maintained for reference. (Fusing record—see Appendix I)

Page 22: Factory SOP Training Content - MAST

22

Machine Repair & MaintenanceEach factory must ensure that they keep proper machine record

(Machine Repair– see Appendix J), and plan maintenance

schedule (see Appendix KAppendix KAppendix KAppendix K).� Machine repair records must exist for each machine and the summary records are kept in the workshop,

and which must be signed by the mechanic and head mechanic each time whilst work carry out.

� Planned maintenance schedule must exist. Each machine must pull in at least once every two months depends on type of machinery and serviced as part of factories ongoing preventative maintenance program.

� Ensure proper training gave for new operator and daily care procedure.

Page 23: Factory SOP Training Content - MAST

23

Sewing lines� A job specification for each operation should be placed in front of each sewing

worker as a reference of the acceptable standard. Same fabrication mock up reference sample are acceptable. (see Appendix L)

� The reference sample should be sewn by the operator performing the operation and approved by technician or quality auditor and also signed by the operator for quality agreement.

� Traffic light system should be performed. And Line Lighting is at least 70 FC.

� A traffic light report containing one complete month of readings must be posted at the machine. Factory must implement properly Sharp Objects Control.

Page 24: Factory SOP Training Content - MAST

24

Sewing lines--continued

� An internal production sample and approved tech pack should be posted in each sewing line. And trims cards should be in place.

� The end-line inspector must inspect 100% of the garments of his/her line and record defects as stated with in-line audit report.

� 100% key process inspections are needed for key operation prior to the assembling. Key process must be defined at PP meeting stage and recorded in.

� The inline auditor and end-line inspector must compare findings at least every 2 hours and report workmanship or machine issues to the QA supervisor/manager.

� Inline auditors scheme must be a ratio of 1:20 operators and less 25 operators.

Page 25: Factory SOP Training Content - MAST

25

Sharp Objects Control

� It is a standard practice for all factories to control, the use of needles, pins, and other sharp objects that are used in the manufacturing process. This will minimize the risk associated with needle or part of a needle, a pin or other sharp object being caught or trapped into a garment during production.

� Sharp Objects Log refer to Appendix F

Page 26: Factory SOP Training Content - MAST

26

Traffic Light System�Traffic light/Right First Time system should be implemented on each

sewing operations/operator.

� Inline auditor should inspect 10pcs sample at an operator per round. Auditing of at least 4 times a days of each operators performance shouldoccur.

1. No defects mark card GREEN to go to next operator.

2. One defect mark card YELLOW, circle defect type#1,2,3,4,5,6,7 or 8.

- Inform and show operator fault. Move to next operator.

3. Two defects mark card RED, Three defects mark card BLACK, circle defect type#1,2,3,4,5,6,7 or 8.

- Inform and show SUPERVISOR of faults.

- Supervisor must stay with operator until 20 consecutive (for RED), 30 consecutive (for BLACK) garments/parts/operations pass.

- Supervisor initial at the RED/BLACK to indicated 20/30 garments have passed consecutively.

4. If an operator has consecutive inspection RED, Factory Manager must be informed to re-train the operator or taken necessary follow up actions. Pls indicate this by using BLACK.

5. If a high defective rate is found on one particular operation in any one hour at 100% End Line inspection, End-line Inspector must inform Line Supervisor immediately and not wait until the end of the day.

Page 27: Factory SOP Training Content - MAST

27

Traffic Light System-- continued

6. If a high defective rate is found on one particular operator in any one hour at 100% Final

Inspection, Inspector must inform Supervisor immediately and not wait until the end of the

day. This system will work very well in reducing repair levels on hourly, daily based if used

properly. Proper communicating among different inspection stages on defects found and

timely follow up actions are vital. (Operator Quality Performance Sheet– see Appendix M )

Page 28: Factory SOP Training Content - MAST

28

End-line inspections� Factory should carry out 100% inspection to appearance & workmanship of

finished WIP at end of each sewing line.

� Sheets of measurement inspection must be filed properly, and measurement should be checked for across sizes and colors of a minimum of 10% of daily output of each line in key points and at least 3 pieces of every size in full point.The only way to measure a garment is in fact with a tape measure.

� Hourly records must be kept, using the End-Line Daily Inspection Report. (see Appendix N1). This report breaks down the repair rate into hourly figures for real time management.

Page 29: Factory SOP Training Content - MAST

29

Inspection & Audit terminology� Operation must be performed by a qualified inspector or auditor.

� Inspection and audit should be carried out under a lighting of at least 100FC.

� Proper dedicated table & area must be used.

� A predefined inspection method & quality standard must be given to the operator.

� Inspection & audit reports are to be made for follow up reference.

� Key process inspection must be for 100% of finished operation before next operation.

Page 30: Factory SOP Training Content - MAST

30

Factory Inspector & Auditor

� Auditor can be a higher level operator than inspector.

� Inspector and Auditor shouldn’t be trimming garments and shouldn’t have scissors at their table.

� All inspector must have their eyesight checked twice a year for clarity and color blindness. The individuals who have to perform this operation by fully experienced and must have undergone proper training prior to taking up this position.

� Measurement Inspector must pass “Blind Measure Test” which is used to monitor the performance of measurement inspector for each new style shipment before they start to measure for the BULK. The test will ensure that the inspector measurement method is same as Approved PP requirement. They must work on blank spec sheets and must fill in the exact measurement they take. I.E. if it is, 34 3/8” then fill in that figure. The test spec sheet must review by the supervisor and sign off or do calibration immediately for the inspector who measured incorrectly. (see Appendix O)

Page 31: Factory SOP Training Content - MAST

31

Wash Garments Control� Garments to be reviewed against approved standards on color shade, washing

effect, hand feel and recorded for improvement before proceeding with bulk wash. (Washing record– see Appendix Q)

� A daily in/out record between factory and laundry should be maintained to monitor a smooth production flow. (Washing and fall out tables– see Appendix R)

� Designated QC in laundry check 10% garment each tank on washing effects i.e. color, hand feel & measurement in key points and maintain records.

� All garments should be segregated by shade lot with proper identification on each garment before sending to laundry for washing.

� Garment tend to turn yellow in the PH condition from neutral to mildly alkaline (7-9). Therefore, it’s our intent to control the PH value on finished garments at 5.5 –6.5.

� It’s a must for the laundry to control the PH at our requirement and factory to test the same on finished garments when returned after washing. A testing record must be maintained to ensure PH is properly controlled.

Page 32: Factory SOP Training Content - MAST

32

Pressing� Vacuum tables should be equipped. Vacuuming be used only after the

garment has been pressed.

� All pressing equipment should be regularly maintained and clean.

� Pressing tables covers & pads must be replaced on a regular basis.

� Factory should avoid stacking of finished products too high while they are still damp.

� Prevent any unnecessary wrinkles on garments prior to packing.

� Teflon shoes must be used on delicate fabric and sensitive colors.

Page 33: Factory SOP Training Content - MAST

33

Final Inspection� Factory should carry out 100% checking of the finished products on workmanship

& appearance prior to packing.

� Factory should carry out 100% checking on critical measurement prior to packing.

� Defective garments should be segregated clearly into area different from quality garments.

� Daily Final Inspection finding should be recorded properly (see Appendix N2 same format as End-line Inspection Report). It will be easy to see how effective the End-line is by making this direct comparison.

Page 34: Factory SOP Training Content - MAST

34

Color Shade Sorting� Factory should segregate the finished product’s color shade against the

approved shade band for packing.

� These should be checked under the light box or with a table equipped with CWF, daylight and Inca light source.

� For those light color garment, it should be checked randomly under UV light to confirm no OBA staining on garment prior to packing.

Page 35: Factory SOP Training Content - MAST

35

Fit Audits� Factory should audit the fitting of the finished products for each style against the

approved green tag samples with using the approved mannequin.

� Record should be kept for reference. We suggest factory to back up with photographs taken. Also like each factory to comply their own fit audit report (see Appendix S).

� This must be done on a weekly basis to ensure that the integrity of the garment remains.

Page 36: Factory SOP Training Content - MAST

36

Packing� Proper folding instruction should be in place for operators’ prompt reference.

� Factory should reduce any unnecessary wrinkles on finished garments prior to packing.

� Factory should allow the finished garments being dried sufficiently before putting into plastic bags.

Page 37: Factory SOP Training Content - MAST

37

Pre-final & Final Audit– by the Designated Auditor of Factory

� There has to be a separate Factory Auditor Team, who conducts in-process audits and final audits to finished goods daily. Audit operations can refer to Mast SOP of Final/Inline Audit. Also they must report daily to the General Manageron the results of these audits.

� To ensure that Designated Auditors of Factory are implementing audits, Mast auditor will be auditing these reports.

� If the Designated Auditor have been certified by Mast, will be called “FCA”.� If the factory are certified, MCA will waive some Final Audits subject to Factory

Certification Program.� Pre-final/Final audit finding can be inputted into format designed by factory or

Mast.

Page 38: Factory SOP Training Content - MAST

38

Defect Analysis

� To address the problem in the right time with the right approach, factories have to analyze their weakness first. Defects found indaily In-line, End-line & Final inspection have to be properly recorded and analyzed by defect groups for corrective and preventative action. (Refer to Appendix N1 & N2 )

Page 39: Factory SOP Training Content - MAST

39

Page 40: Factory SOP Training Content - MAST

40

Page 41: Factory SOP Training Content - MAST

41

Page 42: Factory SOP Training Content - MAST

42

Page 43: Factory SOP Training Content - MAST

43

Page 44: Factory SOP Training Content - MAST

44

Page 45: Factory SOP Training Content - MAST

45

Page 46: Factory SOP Training Content - MAST

46

Page 47: Factory SOP Training Content - MAST

47

Page 48: Factory SOP Training Content - MAST

48

Page 49: Factory SOP Training Content - MAST

49

Page 50: Factory SOP Training Content - MAST

50

Page 51: Factory SOP Training Content - MAST

51

Page 52: Factory SOP Training Content - MAST

52

Page 53: Factory SOP Training Content - MAST

53

Page 54: Factory SOP Training Content - MAST

54

Page 55: Factory SOP Training Content - MAST

55

Page 56: Factory SOP Training Content - MAST

56

Page 57: Factory SOP Training Content - MAST

57

Page 58: Factory SOP Training Content - MAST

58

Page 59: Factory SOP Training Content - MAST

59

Page 60: Factory SOP Training Content - MAST

60

Page 61: Factory SOP Training Content - MAST

61