FACILITY PLANNING
-
8/9/2019 Facility Planning02
2/10
Defnition o Facility
PlanningFacility Planning determines how an activitys tangible fedassets best s!""ort achieving the activitys ob#ectives$
%am"les&
a$ In man!'act!ring( the ob#ective is to s!""ort "rod!ction$
b$ In an air"ort( the ob#ective is to s!""ort the "assenger
air"lane inter'ace$
c$ In a hos"ital( the ob#ective is to "rovide medical care to
"atients$
-
8/9/2019 Facility Planning02
3/10
Hierarchy o Facility
Planning
Location: is the "lacement o' a 'acility with res"ect to c!stomers( s!""liers(
and other 'acilities with which it inter'aces$Structure: consists o' the b!ilding and services )e$g$( gas( water( "ower(
heat( light( air( sewage*$
Layout: consists o' all e+!i"ment( machinery( and '!rnishings within thestr!ct!re$
Handling System: consists o' the mechanism by which all interactionsre+!ired by the layo!t are satisfed )e$g$( materials( "ersonnel(
in'ormation( and e+!i"ment handling systems*$
Facility
Planning
Structural
Design
FacilityLocation
Facility
Design
Layout
Design
Handling
System Design
-
8/9/2019 Facility Planning02
4/10
Facility Planning Objectives
,$ -!""ort the organi.ation/s mission thro!gh im"roved
material handling( materials control( and good
ho!se0ee"ing$
1$ %2ectively !tili.e "eo"le( e+!i"ment( s"ace( and energy$
3$ 4inimi.e ca"ital investment$
5$ 6e 7eible and "romote ease o' maintenance$
8$ Provide 'or em"loyee sa'ety and #ob satis'action$
-
8/9/2019 Facility Planning02
5/10
Imortant Factors to
!valuate Facility PlansIn develo"ing well9tho!ght 'acilities design alternatives it is im"ortant to
loo0 into iss!es s!ch as&
a* Layo!t characteristics
9 total distance traveled
9 man!'act!ring 7oor visibility
9 overall aesthetics o' the layo!t
9 ease o' adding '!t!re b!siness
b* 4aterial handling re+!irements
9 !se 'or the c!rrent material handling e+!i"ment
9 investment re+!irements on new e+!i"ment
9 s"ace and "eo"le re+!irements
-
8/9/2019 Facility Planning02
6/10
Imortant Factors to !valuate Facility
Plans "cont#$c* :nit load im"lied9 im"act on ;IP levels
9 s"ace re+!irements
9 im"act on material handling e+!i"ment
d* -torage strategies
9 s"ace and "eo"le re+!irements
9 im"act on material handling e+!i"ment
9 h!man 'actors ris0s
e*
-
8/9/2019 Facility Planning02
7/10
Facility Layout % Layout roblem may be to
determine the location 'or a new machine(
develo" a new layo!t 'or an eisting "rod!ction "lant(
develo" a layo!t 'or a new "rod!ction "lant(
etc$
% Layout roblem may arises due to changes in the design o' a "rod!ct(
addition or deletion o' a "rod!ct(
change in the demand o' a "rod!ct( changes in the design o' the "rocess(
addition or deletion o' a "rocess(
re"lacement o' e+!i"ment(
etc$
-
8/9/2019 Facility Planning02
8/10
Objectives o Facility
Layout &inimi'e investment in e(uiment#
&inimi'e roduction time#
&inimi'e material handling cost#
&a)imi'e utili'ation o sace#
&aintain *e)ibility o arrangement and oeration#
Provide saety and comort to emloyees#
-
8/9/2019 Facility Planning02
9/10
Se(uential %roach vs
Integrated %roachSequential Approach :
Product
Design
Production
Planning
Process
Design
Facility
Layout
Material
Handling
System Design
-
8/9/2019 Facility Planning02
10/10
Se(uential %roach vs
Integrated %roachIntegrated Approach :
Impressive results in cost, quality,
productivity, sales, customer
satisaction, delivery time,inventory levels, space ! handling
requirements, "uilding si#e, etc$
Product
Design
Process
Design
Schedule
Design
Layout Design
!
Material Handling
System Design
%oncurrent &ngineering
'erms o product, process,
scheduling and acility design
planners (or) (ith mar)eting,
purchasing, etc$ Personnel
address the design process in
an integrated (ay$