1 Major Projects Update – July 2016 Prepared by Business and Operations July 7, 2016 Facilities Update Construction Progress Construction Websites - http://www.bismarckschools.org/district/construction/ BPS Athletic Complex – Phase II Work continues grading the site at the practice football field. The pile of topsoil is almost gone. Work in progress installing the drain tile around the artificial turf baseball field. The perimeter of the baseball field has been staked for fence location. Work continues applying the track surface. Concrete work continues on the grandstand addition and in the Restroom Building. Bollards have been installed at the overhead section door of the Restroom Building. Work in progress pouring the stoops at doors 101A, 102A, and 104A. The restrooms are ready for the installation of the CMU walls. Mechanical curbs have been installed on the roof of the Restroom Building. The roof membrane has been installed at the dugouts. BHS Science Rooms Renovation The fourth science room is finished. The fifth science room has been abated. Flooring will be installed in the final two rooms by the end of the week. Cabinets for all four of the remaining rooms are here and installation should begin next week. Lincoln Elementary Addition Sheet rock is 90% complete. Plumbing work and chase ways need to be complete before taping can begin. Sidewalks on west side have been poured. Landscaping and irrigation will go in this week with sod following next week. Bathroom partitions and mirrors have been delivered. Marker boards have been delivered.

Transcript of Facilities Update - Moodle€¦ · Facilities Update • Construction ... BHS Science Rooms...

Page 1: Facilities Update - Moodle€¦ · Facilities Update • Construction ... BHS Science Rooms Renovation • The fourth science room is finished. • The fifth science room has been

1

Major Projects Update – July 2016

Prepared by Business and Operations July 7, 2016

Facilities Update

• Construction Progress

Construction Websites - http://www.bismarckschools.org/district/construction/ BPS Athletic Complex – Phase II

• Work continues grading the site at the practice football field. The pile of topsoil is almost gone. • Work in progress installing the drain tile around the artificial turf baseball field. • The perimeter of the baseball field has been staked for fence location. • Work continues applying the track surface. • Concrete work continues on the grandstand addition and in the Restroom Building. • Bollards have been installed at the overhead section door of the Restroom Building. • Work in progress pouring the stoops at doors 101A, 102A, and 104A. • The restrooms are ready for the installation of the CMU walls. • Mechanical curbs have been installed on the roof of the Restroom Building. • The roof membrane has been installed at the dugouts.

BHS Science Rooms Renovation

• The fourth science room is finished. • The fifth science room has been abated. • Flooring will be installed in the final two rooms by the end of the week. • Cabinets for all four of the remaining rooms are here and installation should begin next week.

Lincoln Elementary Addition

• Sheet rock is 90% complete. • Plumbing work and chase ways need to be complete before taping can begin. • Sidewalks on west side have been poured. • Landscaping and irrigation will go in this week with sod following next week. • Bathroom partitions and mirrors have been delivered. • Marker boards have been delivered.

Page 2: Facilities Update - Moodle€¦ · Facilities Update • Construction ... BHS Science Rooms Renovation • The fourth science room is finished. • The fifth science room has been

2

Air Conditioning Progress

• Moses Gymnasium 25% (0%) - to be completed when school is out • CHS locker rooms 95% (60%) -

Equity Projects

Approved Projects Budget Expended o Phase I Air Conditioning

(Electrical Upgrade) $325,000 $ 119,717 o District Safety Match

Office relocation and Front Entries $346,371 $ 746,371 o Bismarck High School

9th Science Rooms and lockers $115,117 $ 89,494 o Century High School

Parking Lot Expansion and lockers $794,095 $ 685,381 o Roosevelt

Add doors to classrooms $ 20,000 $ 25,000 o Horizon Middle School

Durango Connection $160,000 $ 234,233 o Wachter

Science Room Renovation $ 75,000 $ 52,589 o BECEP

Parent Place $150,000 $ 64,896 o Prairie Rose

Storage Addition $200,000 $ 407,712 o Grimsrud

Specialist Addition $600,000 $ 818,747 o Highland Acres

Kitchen $600,000 $1,079,564 o Door Controls

Card Access $250,000 $ 257,531 o Phase II Air Conditioning

Air conditioning $980,000 $1,173,085 o Bismarck High School

Science Rooms Renovation $500,000 $ 391,506 o Northridge

Bathroom renovations and Controls $125,000 $ 46,146

Total $5,240,583 $6,191,972

Page 3: Facilities Update - Moodle€¦ · Facilities Update • Construction ... BHS Science Rooms Renovation • The fourth science room is finished. • The fifth science room has been

3

Transportation Update • Summary of Operations

o No Transportation Director has been hired by Harlow’s as of yet. o Our new white activity bus has arrived. o We currently have 3,665 students registered for 2016-17 busing it goes higher each day.

Vehicle Count + or (-) Total Miles + or (-) 2015 2016 2015 2016 Extended Year 0 7 7.00 Extended Year 0.00 3,646.00 3,646.00 In City 62 69 7.00 In City 145,901.00 152,936.00 7,035.00 Other Purpose 7 10 3.00 Other Purpose 50,310.00 46,775.00 (3,535.00) Rural 56 61 5.00 Rural 306,405.75 327,680.50 21,274.75 Spec Ed 6 13 7.00 Spec Ed 67,550.00 102,860.00 35,310.00 Vocational Ed 3 3 0.00 Vocational Ed 31,500.00 28,612.50 (2,887.50) Family to School 0 0 0.00

Family to School 0.00 1,775.00 1,775.00

134 163 29.00 601,666.75 664,285.00 62,618.25 Vehicle Capacity + or (-) Rides Per Run + or (-) 2015 2016 2015 2016 Extended Year 0 39 39.00 Extended Year 0 5.29 5.29 In City 83 82 (1.00) In City 62.45 55.93 (6.52) Other Purpose 51 49 (2.00) Other Purpose 15 10.6 (4.40) Rural 79 78 (1.00) Rural 59.59 54.36 (5.23) Spec Ed 31 40 9.00 Spec Ed 7.5 8.77 1.27 Vocational Ed 84 84 0.00 Vocational Ed 35 35 0.00 Family to School 0 0 0.00

Family to School 0 1 1.00

328 372 44.00 179.54 164.66 (14.88)

Total Annual Runs + or (-) Miles Per

Run + or (-) 2015 2016 2015 2016 1.00 Extended Year 0 206 206.00 Extended Year 0 17.7 17.70 In City 10,850 12,075 1,225.00 In City 13.45 12.67 (0.78) Other Purpose 2,709 2,845 136.00 Other Purpose 18.57 16.44 (2.13) Rural 9,800 10,675 875.00 Rural 31.27 30.7 (0.57) Spec Ed 2,975 4,930 1,955.00 Spec Ed 22.71 20.86 (1.85) Vocational Ed 4,725 5,250 525.00 Vocational Ed 6.67 5.45 (1.22) Family to School 0 293 293.00

Family to School 0 6.06 6.06

31,059 36,274 5,215.00 92.67 109.88 17.21

Page 4: Facilities Update - Moodle€¦ · Facilities Update • Construction ... BHS Science Rooms Renovation • The fourth science room is finished. • The fifth science room has been

4

Total Annual Rides + or (-)

Max Ride Time in Minutes + or (-)

2015 2016 2015 2016 Extended Year 0 1,022 1,022.00 Extended Year 0 39 39.00 In City 677,600 678,799 1,199.00 In City 61 54 (7.00) Other Purpose 44,376 37,825 (6,551.00) Other Purpose 57 52 (5.00) Rural 583,975 583,393 (582.00) Rural 91 77 (14.00) Spec Ed 21,175 45,915 24,740.00 Spec Ed 54 61 7.00 Vocational Ed 165,375 183,750 18,375.00 Vocational Ed 16 16 0.00 Family to School 0 293 293.00

Family to School 0 25 25.00

1,492,501 1,530,997 38,496.00 279 324 45.00

Page 5: Facilities Update - Moodle€¦ · Facilities Update • Construction ... BHS Science Rooms Renovation • The fourth science room is finished. • The fifth science room has been

5

BPS Athletic Complex – Phase II

Page 6: Facilities Update - Moodle€¦ · Facilities Update • Construction ... BHS Science Rooms Renovation • The fourth science room is finished. • The fifth science room has been

6

Page 7: Facilities Update - Moodle€¦ · Facilities Update • Construction ... BHS Science Rooms Renovation • The fourth science room is finished. • The fifth science room has been

7

Bismarck High School Science Labs

Flooring installation will be complete.

Cabinet installation in the fifth science room.

Cabinet installation in the chemistry lab.

Page 8: Facilities Update - Moodle€¦ · Facilities Update • Construction ... BHS Science Rooms Renovation • The fourth science room is finished. • The fifth science room has been

8

Lincoln Elementary Addition

Landscaping has begun. New sidewalk has been poured on

west side.

Classroom on west side Classroom on east side

Girls bathroom. Hallway tin work.

Page 9: Facilities Update - Moodle€¦ · Facilities Update • Construction ... BHS Science Rooms Renovation • The fourth science room is finished. • The fifth science room has been

Beginning Fund Balance - July 1, 2015 11,942,296$

Revenue For FY-16:Property Tax Receipts 3,842,984$ Apartment Income 145,949 Revenue in Leiu of Taxes 3,162 Energy Savings Project (35,251) Interest Income -

Total Revenue 3,956,844$ 3,956,844

Total Funds Available 15,899,139$

Expenditures For FY-16:Energy Savings Project 1,117,166 Bond Payment 152,349 Liberty 761 Liberty Addition 482,718 Lncoln Addition 414,542 Equity Projects 2,041,812

BPS Fields 5,465,651

Legacy High School Project 4,785,494

Total Expenditures 14,460,493 14,460,493

Fund Balance as of June 30, 2016 1,438,647

BISMARCK PUBLIC SCHOOLS

Building Fund2015-16 Revenues and Expenditures

June 30, 2016

Building Fund.xls - Summary FY-16 7/7/2016