Facilities Engineering Information A Big Step
Transcript of Facilities Engineering Information A Big Step
![Page 1: Facilities Engineering Information A Big Step](https://reader031.fdocuments.in/reader031/viewer/2022012515/618f6118660b103f1b6007b5/html5/thumbnails/1.jpg)
1
Facilities Engineering Information
A Big Step
Presenter: Peter Leigh
Date: 11 October 2011
Document No:
Revision No:
![Page 2: Facilities Engineering Information A Big Step](https://reader031.fdocuments.in/reader031/viewer/2022012515/618f6118660b103f1b6007b5/html5/thumbnails/2.jpg)
2
Ichthys is a 40 year project
Document No:
Revision No:
•Semi-submersible central processing facility (CPF)
will be one of the biggest of its type ever built.
•FPSO designed to hold more than1 million barrels
of high value condensate
•885km pipeline to Darwin NT
•Two LNG trains - 8.4 Mt/a
•LPG and condensate plants
![Page 3: Facilities Engineering Information A Big Step](https://reader031.fdocuments.in/reader031/viewer/2022012515/618f6118660b103f1b6007b5/html5/thumbnails/3.jpg)
3
The CPF is one of the largest in the world
![Page 4: Facilities Engineering Information A Big Step](https://reader031.fdocuments.in/reader031/viewer/2022012515/618f6118660b103f1b6007b5/html5/thumbnails/4.jpg)
4
The FPSO is 333 metres long
![Page 5: Facilities Engineering Information A Big Step](https://reader031.fdocuments.in/reader031/viewer/2022012515/618f6118660b103f1b6007b5/html5/thumbnails/5.jpg)
5 5
The expected data volumes are huge
TAGS 550,000
DOCUMENTS 280,000
DRAWINGS 600,000
DATA FIELDS 242,355,000
![Page 6: Facilities Engineering Information A Big Step](https://reader031.fdocuments.in/reader031/viewer/2022012515/618f6118660b103f1b6007b5/html5/thumbnails/6.jpg)
6
Our starting point
![Page 7: Facilities Engineering Information A Big Step](https://reader031.fdocuments.in/reader031/viewer/2022012515/618f6118660b103f1b6007b5/html5/thumbnails/7.jpg)
7 7
Unstructured
information -
significant effort
to load and will
delay start up
Traditional
approach
Earlier access to
information to
allow time to
format
information
Require
incremental
handover
More rigour in
the format and
content of
information
handed over
Specify the
target
information
systems
information
requirements
Improved control
over the input
format giving
greater
consistency
Provide
templates
and seed files
Application of
proven
approaches to
data take-on
Use a DMC
with tools and
techniques
We recognised the value of Engineering Information
Document No:
Revision No:
![Page 8: Facilities Engineering Information A Big Step](https://reader031.fdocuments.in/reader031/viewer/2022012515/618f6118660b103f1b6007b5/html5/thumbnails/8.jpg)
8
What now?
Acquire IM resources
Deploy our Data
Management Contractor
Ensure our requirements
are in the EPC contracts
Communicate the
requirement to project
teams, EPCs and
suppliers
![Page 9: Facilities Engineering Information A Big Step](https://reader031.fdocuments.in/reader031/viewer/2022012515/618f6118660b103f1b6007b5/html5/thumbnails/9.jpg)
9
Information integration in Operations
![Page 10: Facilities Engineering Information A Big Step](https://reader031.fdocuments.in/reader031/viewer/2022012515/618f6118660b103f1b6007b5/html5/thumbnails/10.jpg)
10
Thank you