FA-600€¦ · vel. vtr wb w/ w/o pounds leaving maximum thousand btuh minimum noise criteria on...
Transcript of FA-600€¦ · vel. vtr wb w/ w/o pounds leaving maximum thousand btuh minimum noise criteria on...
T
UP
TYPE
LENGTH
F
1
F
M1
(1L)
A
PS
FS
DN
(1L)
EJ
(E)
A(X)
CFM
DEGREE FAHRENHEIT
ENTERING
PRESSURE
TS
T
AIR DEVICE CALL OUT. TYP.
OF (X) DEVICES.
FLEXIBLE DUCT CONNECTION
CEILING ACCESS PANEL
DETAIL DESIGNATION
EQUIPMENT DESIGNATION
POINT OF CONN. (CONN. NEW
TO EXISTING)
POINT OF DISCONNECTION
ARROW INDICATES DIRECTION
OF FLOW
RISE IN DIRECTION OF AIRFLOW
DROP IN DIRECTION OF
AIRFLOW
CONSTANT AIR VOLUME
GALLONS PER MINUTE
INCH WATER COLUMN
MOTOR CONTROL CENTER
MINIMUM CIRCUIT AMP
BRITISH THERMAL UNIT PER
HOUR
BRAKE HORSE POWER
DIRECT DIGITAL CONTROL
ENERGY EFFICIENT RATIO
FEET WATER COLUMN
PRESSURE DROP/
DIFFERENTIAL
POUNDS PER SQUARE INCH
GAUGE
UNLESS OTHERWISE NOTED
VENT THROUGH ROOF
MAX. OVER CURRENT
PROTECTION
VARIABLE FREQUENCY DRIVE
REVOLUTION PER MINUTE
RETURN DUCT UP
SUPPLY DUCT UP
EXHAUST DUCT UP
SUPPLY DUCT DOWN
RETURN DUCT DOWN
EXHAUST DUCT DOWN
ROUND DUCT DOWN
ROUND DUCT UP
TRANSITION-RECT. TO
RECT. OR ROUND TO
ROUND
TRANSITION-RECT. TO
ROUND
CAPPED DUCTWORK
DUCT W/ INTERNAL LINING
1L= 1" THICK 2L= 2" THICK
MOTORIZED DAMPER
BACKDRAFT DAMPER
CONICAL SPIN-IN FITTING W/
MANUAL VOLUME DAMPER
SYMBOL DESCRIPTIONABBR
RETURN/ EXHAUST AIR FLOW
SYMBOL
SUPPLY AIR FLOW SYMBOL
RETURN AIR GRILLE
LOW PRESSURE FLEXIBLE DUCT
SUPPLY SLOT DIFFUSER
SUPPLY DIFFUSER-
4-WAY THROW
SUPPLY DIFFUSER-
3-WAY THROW
SUPPLY DIFFUSER-
2-WAY THROW
SUPPLY DIFFUSER-
1-WAY THROW
CUBIC FEET PER HOUR
CUBIC FEET PER MINUTE
EXTERNAL STATIC PRESSURE
STANDARD AIR CUBIC FEET PER
MINUTE
TOTAL STATIC PRESSURE
HEATING WATER SUPPLY
HEATING WATER RETURN
BRINE WATER SUPPLY
BRINE WATER RETURN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
SPACE TEMPERATURE SENSOR
PRESSURE SWITCH
CONTROL AIR (PNEUMATIC)
BALL VALVE W/ HOSE
CONNECTION
STRAINER W/ BLOW-OFF &
CAPPED HOSE- END
CONNECTION
TEMPERATURE/ PRESSURE
RELIEF VALVE
PIPE CAP OR PLUG
PRESSURE GAUGE W/GAUGE
COCK
FLEXIBLE PIPE CONNECTOR
THERMOMETER W/THERMOWELL
EXPANSION JOINT
ECCENTRIC REDUCER
CONCENTRIC REDUCER
PRESSURE/ TEMPERATURE
PORT TAPS
FOR MECHANICAL AND PLUMBING EQUIPMENT AS
INDICATED ON THE DIVISION 21, 22, AND 23 DRAWINGS,
THE DIVISION 21, 22 AND 23 CONTRACTORS SHALL
COORDINATE WITH DIVISION 26 CONTRACTOR TO
CONNECT ALL MECHANICAL AND PLUMBING
EQUIPMENT INDICATED ON THE MECHANICAL AND
PLUMBING DRAWINGS. COORDINATE FOR COMPLETE
WIRING, STARTERS, AND DISCONNECTING MEANS FOR
ALL MECHANICAL AND PLUMBING EQUIPMENT.
CR/RG
2"HWS
PIPE SIZE/ PIPE TYPE
DESCRIPTIONABBRSYMBOL
DESCRIPTIONABBRSYMBOL
DESCRIPTIONABBRSYMBOL
DESCRIPTIONABBRSYMBOL
DESCRIPTIONABBRSYMBOL
DESCRIPTIONABBRSYMBOL
DESCRIPTIONABBRSYMBOL
DESCRIPTIONSYMBOL
SINGLEDOUBLE
DESCRIPTIONABBRSYMBOL
SINGLEDOUBLE
F
M
SECTION VIEW SHEET NO.
SECTION NO.
POC
POD
SHEET KEY NOTES
(R)
(E)
REMOVE
EXISTING
DN
AFF
NTS
AMB
AFG
TOP
BTUH
CFH
DB
DDC
CV
DEFL
DIA
ENT
°F
DWG
EER
FPI
FPM
GPH
GPM
FT WC
GAL
IN WC
LBS
MBH
MIN
LVG
MAX
DOWN
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
TOP OF PIPE (AFF)
NOT TO SCALE
AMBIENT
CONSTANT VOLUME
DECIBEL
DRY-BULB
DEFLECTION
DIAMETER
DRAWING
FINS PER INCH
FEET PER MINUTE
GALLON
GALLONS PER HOUR
NC
PRESS
PSIG
O.C.
P.D.
PWL
QTY
RH
SS
TYP
SPECS
SQ
UON
VEL.
VTR
WB
W/
W/O
POUNDS
LEAVING
MAXIMUM
THOUSAND BTUH
MINIMUM
NOISE CRITERIA
ON CENTER
QUANTITY
SOUND POWER LEVEL
RELATIVE HUMIDITY
SPECIFICATIONS
SQUARE
STAINLESS STEEL
TYPICAL
VELOCITY
WET-BULB
WITH
WITHOUT
F-1
BHP
FLA
HP
HZ
KW
MCA
MCC
MOCP
RLA
RPM
FULL LOAD AMP
HORSEPOWER
HERTZ
KILOWATTS
RUNNING LOAD AMP
AFTER FILTERAF
AH
B
BB
CAV
CC
CH
EF
FC
FF
FT
FS
HC
HU
MUA
PF
P
RF
SF
ST
VAV
VFD
WF
AIR HANDLING UNIT
BOILER
BASEBOARD
COOLING COIL
CHILLER
EXHAUST FAN
FAN COIL UNIT
FINAL FILTER
FLASH TANK
FLOOR SINK
HEATING COIL
HUMIDIFIER SECTION
MAKE-UP AIR UNIT
PRE-FILTER
PUMP
RETURN FAN
SUPPLY FAN
SOUND TRAP
VARIABLE AIR VOLUME
WATER FILTRATION
AL ALUMINUM
COEFFICIENT OF PERFORMANCE
EFFICIENCY
ISOLATOR
METAL
OPENING
REFERENCE
SHEET
COP
EFF
ISOL.
MTL
OPNG
REF
SHT
DUCT DROP
VANED ELBOW
CONICAL TAP
FD FIRE DAMPER
FIRE SMOKE DAMPER.
CONTROLLED BY DUCT
SMOKE DETECTOR
MANUAL VOLUME
DAMPER W/
LOCKING QUADRANT
FSD
MD
VD
BD
CD
CD
CD
CD
LD
AP
BOTTOM OF DUCT (AFF)
BOD
TOP OF DUCT (AFF)
TOD
CFM
DP
EA
ESP
MA
OA
DISCHARGE PLENUM
EXHAUST AIR
MAKE-UP AIR
OUTSIDE AIR
RA
SA
SCFM
S.P.
TG
TSP
RETURN AIR
SUPPLY AIR
STATIC PRESSURE
TRANSFER GRILLE
A
FLOW SWITCHFS
PS
(E) T
EXISTING THERMOSTAT
NEW THERMOSTATT
HWS
HWR
BWS
BWR
CWS
CWR
DR
V
EQUIPMENT DRAIN
VENT
PLUG VALVEPV
P&T
CR
ER
EJ
U UNION
AIR VENTAV
FC
PG
ELBOW UP
ELBOW DOWN
TEE UP
TEE DOWN
TPR
STR
STEAM TRAP
POUNDS PER HOUR
LOW PRESSURE STEAM SUPPLY
LOW PRESSURE STEAM
CONDENSATE RETURN
PUMPED CONDENSATE RETURN
PRESSURE REDUCING VALVE
CONDENSATE RETURN UNIT
DESCRIPTIONABBRSYMBOL
LPS
LPR
PR
PRV
CRU
LBS/HR
DRAIN VALVE W/ HOSE END
CONN.
CHECK VALVE W/ INDICATION
OF FLOW DIRECTION
PRESSURE REDUCING VALVE
CIRCUIT SETTER OR BALANCING
VALVE
GLOBE VALVE (STRAIGHT
PATTERN)
GLOBE VALVE (ANGLE
PATTERN)
BUTTERFLY VALVE
AUTOMATIC TEMP. CONTROL
VALVE, 2-WAY
STRAINER W/ BLOW-OFF &
CAPPED HOSE-END
CONNECTION
OUTSIDE STEM AND YOKE
DESCRIPTIONABBRSYMBOL
DV
CV
PRV
SV SOLENOID VALVE
CS,BV
GLV
BFV
BV
TCV
GLV
BALL VALVE
STR
GATE VALVEGV
OS&Y
SD SMOKE DAMPER
S
DUCT MOUNTED SMOKE
DETECTOR
LENGTHEXISTING PIPING TO BE
REMOVED (DASHED LINE)
EXISTING PIPING
(LIGHT SOLID LINE)
EXISTING DUCTWORK
NO CHANGE
(LIGHT SOLID LINE)
EXISTING DUCTWORK TO
BE REMOVED (DASHED
LINE)
CFM
OR
DEVICES.
AIR DEVICE CALL
OUT. TYP. OF (X)
A
CFM
SIZE
(X)
A(X)
MFS MAXIMUM FUSE SIZE
DIESEL OIL GAUGE
DIESEL OIL PUMP
DOG
FOG
DOP
FOP
(E)
(R)
WIRE MESH SCREENWMS
SQ.FTSQUARE FEET
GENERAL:
1. UNLESS OTHERWISE NOTED, THE WORK DESCRIBED ON THE PLANS
AND SPECIFICATIONS SHALL INCLUDE THE FURNISHING AND
INSTALLATION OF ALL LABOR AND MATERIALS NECESSARY FOR
COMPLETE AND OPERATIONAL HVAC, FIRE PROTECTION AND
PLUMBING SYSTEMS. CONTRACTOR SHALL FURNISH THESE EVEN IF
ITEMS REQUIRED TO ACHIEVE THIS (I.E. OFFSETS, ISOLATION AND
BALANCING DEVICES, MAINTENANCE CLEARANCES, ETC.) ARE NOT
SPECIFICALLY SHOWN.
2. DATA GIVEN ON THE DRAWINGS IS AS EXACT AS COULD BE SECURED.
ABSOLUTE ACCURACY IS NOT GUARANTEED AND THE CONTRACTOR
SHALL OBTAIN AND VERIFY EXACT LOCATIONS, MEASUREMENTS,
LEVELS, SPACE REQUIREMENTS, POTENTIAL CONFLICTS WITH OTHER
TRADES, ETC. AT THE SITE AND SHALL SATISFACTORILY ADAPT HIS
WORK TO THE ACTUAL CONDITIONS OF THE JOB.
3. THE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND SHALL NOT BE
SCALED. THEY SHOW CERTAIN PHYSICAL RELATIONSHIPS WHICH
MUST BE ESTABLISHED WITHIN THE DIVISION 23 WORK AND ITS
INTERFACE WITH OTHER WORK. ESTABLISHING THIS RELATIONSHIP
IN THE FIELD IS THE EXCLUSIVE RESPONSIBILITY OF THE
CONTRACTOR. THIS DIVISION SHALL COORDINATE ITS WORK WITH
ALL DIVISIONS OF THE WORK AND ADJUST ITS WORK AS REQUIRED
BY THE ACTUAL CONDITIONS OF THE PROJECT.
A. THE CONTRACTOR SHALL VISIT THE SITE BEFORE SUBMITTING
A BID TO BECOME THOROUGHLY FAMILIAR WITH THE ACTUAL
CONDITIONS OF THE PROJECT. NO EXTRAS WILL BE ALLOWED
DUE TO LACK OF KNOWLEDGE OF EXISTING CONDITIONS.
B. CERTAIN SYSTEMS REQUIRE ENGINEERING OF INSTALLATION
DETAILS BY CONTRACTOR. UNLESS FULLY DETAILED IN THE
CONTRACT DOCUMENTS, SUCH ENGINEERING IS THE
EXCLUSIVE RESPONSIBILITY OF THE CONTRACTOR.
C. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE
WHERE CLEARANCES ARE LIMITED, AND WHERE INSTALLATION
DRAWINGS OR SCHEMATICS, "CONSTRUCTION DRAWINGS", OR
COORDINATION DRAWINGS MAY BE REQUIRED IN ACCORDANCE
WITH, OR IN EXCESS OF, THOSE REQUIRED BY THE
SPECIFICATIONS. THE CONTRACTOR SHALL PREPARE ALL
SUCH COORDINATION DRAWINGS AS PART OF THE BASE
CONTRACT.
4. THESE NOTES ONLY SUPPLEMENT, AND DO NOT REPLACE, THE
SPECIFICATIONS.
5. DEFINITIONS AND TERMINOLOGY
A. THE DEFINITIONS OF DIVISION 1 AND THE GENERAL CONDITIONS
OF THIS SPECIFICATION ALSO APPLY TO THE DIVISION 23
CONTRACT DOCUMENTS.
B. "CONTRACT DOCUMENTS" CONSTITUTE THE DRAWINGS,
SPECIFICATIONS, GENERAL CONDITIONS, PROJECT MANUALS,
ETC., PREPARED BY ENGINEER (OR OTHER DESIGN
PROFESSIONAL IN ASSOCIATION WITH ENGINEER) FOR
CONTRACTOR'S BID OR CONTRACTOR'S NEGOTIATIONS WITH
THE OWNER. THE DIVISION 23 DRAWINGS AND SPECIFICATIONS
PREPARED BY THE ENGINEER ARE NOT CONSTRUCTION
DOCUMENTS.
C. "CONSTRUCTION DOCUMENTS", "CONSTRUCTION DRAWINGS",
AND SIMILAR TERMS FOR DIVISION 23 WORK REFER TO
INSTALLATION DIAGRAMS, SHOP DRAWINGS AND
COORDINATION DRAWINGS PREPARED BY THE CONTRACTOR
USING THE DESIGN INTENT INDICATED ON THE ENGINEER'S
CONTRACT DOCUMENTS. THESE SPECIFICATIONS DETAIL THE
CONTRACTOR'S RESPONSIBILITY FOR "ENGINEERING BY
CONTRACTOR" AND FOR PREPARATION OF CONSTRUCTION
DOCUMENTS.
D. "FURNISH" MEANS TO "SUPPLY" AND USUALLY REFERS TO AN
ITEM OF EQUIPMENT.
E. "INSTALL" MEANS TO "SET IN PLACE, CONNECT AND PLACE IN
FULL OPERATIONAL ORDER".
F. "PROVIDE" MEANS TO "FURNISH AND INSTALL".
G. "EQUIVALENT" MEANS "MEETS THE SPECIFICATIONS OF THE
REFERENCE PRODUCT OR ITEM IN ALL SIGNIFICANT ASPECTS."
SIGNIFICANT ASPECTS SHALL BE AS DETERMINED BY THE
ARCHITECT/ENGINEER.
H. "WORK BY OTHER(S) DIVISIONS"; "RE: XX DIVISION", AND SIMILAR
EXPRESSIONS MEANS WORK TO BE PERFORMED UNDER THE
CONTRACT DOCUMENTS, BUT NOT NECESSARILY UNDER THE
DIVISION OR SECTION OF THE WORK ON WHICH THE NOTE
APPEARS. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO
COORDINATE THE WORK OF THE CONTRACT BETWEEN HIS/HER
SUPPLIERS, SUBCONTRACTORS AND EMPLOYEES. IF
CLARIFICATION IS REQUIRED, CONSULT ARCHITECT/ENGINEER
BEFORE SUBMITTING BID.
I. BY INFERENCE, ANY REFERENCE TO A "CONTRACTOR" OR
"SUB-CONTRACTOR" MEANS THE ENTITY WHICH HAS
CONTRACTED WITH THE OWNER FOR THE WORK OF THE
CONTRACT DOCUMENTS.
J. "ENGINEER" MEANS THE DESIGN PROFESSIONAL FIRM WHICH
HAS PREPARED THESE CONTRACT DOCUMENTS. ALL
QUESTIONS, SUBMITTALS, ETC. OF THIS DIVISION SHALL BE
ROUTED THROUGH THE ARCHITECT TO THE ENGINEER
(THROUGH PROPER CONTRACTUAL CHANNELS).
EXISTING BUILDING:
1. THE CONTRACTOR'S ATTENTION IS CALLED TO THE FACT THAT THE
EXISTING BUILDING WILL BE OCCUPIED BY THE OWNER DURING
CONSTRUCTION. CONTINUED OPERATION OF THE FACILITY SHALL
NOT BE HINDERED BY THIS WORK. THE CONTRACTOR SHALL
ACCOUNT FOR ALL ADDITIONAL COSTS WHICH MAY BE INCURRED BY
HIM DUE TO THE DIFFICULTY OF WORKING OVER AND AROUND
EMPLOYEES, SPORTING EVENTS AND CONCERTS, EQUIPMENT, ETC.;
AND DUE TO THE HOURS OF THE DAY IN WHICH AN AREA MAY BE
AVAILABLE WHEN SUBMITTING HIS BID.
2. MAINTAIN A MARK-UP SET OF DRAWINGS WHICH INDICATE
VARIATIONS IN THE ACTUAL INSTALLATION FROM THE ORIGINAL
DESIGN. SURRENDER DRAWINGS TO OWNER UPON COMPLETION.
INCORPORATE THESE NOTES INTO THE AS-BUILDING DRAWINGS.
3. COORDINATE ALL PENETRATIONS OF THE FLOOR SLAB PRIOR TO
COMMENCING WORK. UTILIZE X-RAY AND VISUAL INVESTIGATION OF
EXISTING CONDITIONS AS REQUIRED PRIOR TO DRILLING OR
CUTTING. COORDINATE ALL NEW PENETRATIONS WITH OTHER
DIVISIONS OF THE WORK. ALL CONTRACTORS ARE INDIVIDUALLY
RESPONSIBLE FOR ALL PENETRATIONS REQUIRED BY THEIR
DIVISIONS.
ELECTRICAL COORDINATION:
1. VERIFY THE ELECTRICAL SERVICE PROVIDED BY THE ELECTRICAL
CONTRACTOR BEFORE ORDERING ANY MECHANICAL EQUIPMENT
REQUIRING ELECTRICAL CONNECTIONS.
2. PROVIDE PREMIUM EFFICIENCY MOTORS (NEMA STANDARD MG1-2003,
TABLES 12-12 AND 12-13) WITH 1.15 SERVICE FACTOR ON ALL
EQUIPMENT, MOTORS SHALL BE CAPABLE OF OPERATING
CONTINUOUSLY AT 105°F UNDER JOBSITE CONDITIONS AND
ALTITUDE.
3. UNLESS NOTED OTHERWISE, ALL MECHANICAL EQUIPMENT SHALL BE
PROVIDED WITH HOA SWITCH AND STARTER COMPATIBLE WITH
EQUIPMENT AND BMS SYSTEM. STARTERS SHALL BE PROVIDED BY
DIVISION 23 UNLESS IN A MOTOR CONTROL CENTER. ALL
DISCONNECTS SHALL BE FURNISHED BY DIVISION 26.
4. THE ELECTRICAL POWER FOR CERTAIN EQUIPMENT PROVIDED
UNDER DIVISION 23 HAS NOT BEEN SPECIFICALLY INDICATED ON THE
ELECTRICAL DRAWINGS AND MUST BE PROVIDED BY AND FIELD
COORDINATED BY THE DIVISION 23 TRADE REQUIRING SUCH POWER.
5. SUFFICIENT POWER FOR THIS PURPOSE SHALL BE FURNISHED AS
"SPARE", DEDICATED CIRCUIT CAPACITY IN DIVISION 26'S
PANELBOARDS. ALL WIRING, CONDUIT AND ELECTRICAL DEVICES
DOWNSTREAM OF THE PANELBOARDS IS THE RESPONSIBILITY OF
THE DIVISION 23 TRADE REQUIRING THE POWER UNLESS OTHERWISE
SHOWN ON THE ELECTRICAL DRAWINGS.
SUCH EQUIPMENT IS HEREBY DEFINED AS:
A. ELECTRICAL HEAT TRACE. REQUIRED HEAT TRACE LOCATIONS,
CAPACITIES AND SPECIFICATION ARE SHOWN OR INDICATED ON
THE DRAWINGS. PROVIDE ELECTRICAL HEAT TRACING ON ALL
PIPES THAT ARE SUBJECT TO FREEZING, THIS INCLUDES AREAS
LIKE LOADING DOCK, INTAKE/RELIEF/EXHAUST SHAFTS, ETC.
REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
B. TEMPERATURE CONTROL PANELS AND LINE VOLTAGE POWER
FOR 24V CONTROL TRANSFORMERS. REQUIRED CONNECTION
ARE INCLUDED IN DIVISION 23 09 00 AND WILL BE SHOWN BY
THAT CONTRACTOR'S CONTROL SUBMITTAL DRAWINGS.
INSTALLATION:
1. SUSPEND EACH TRADE'S WORK SEPARATELY FROM THE STRUCTURE.
DUCTWORK SHALL BE HELD TIGHT TO STRUCTURE EXCEPT WHERE
OTHERWISE SHOWN.
2. INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS UNLESS SPECIFICALLY
INDICATED OTHERWISE OR WHERE LOCAL CODES OR REGULATIONS
TAKE PRECEDENCE.
3. PROVIDE MANUFACTURER'S RECOMMENDED SERVICE CLEARANCE
AROUND ALL EQUIPMENT REQUIRING SAME.
4. PROVIDE FOR SAFE CONDUCT OF THE WORK, CAREFUL REMOVAL
AND DISPOSITION OF MATERIALS AND PROTECTION OF PROPERTY
WHICH IS TO REMAIN UNDISTURBED.
6. ISOLATE ALL PRESSURIZED PIPE (CHILLED WATER, STEAM, ETC.)
EACH RISER, BRANCH, PIECE OF EQUIPMENT, AND AREA SERVED.
7. NO CHILLED WATER OR CONDENSER WATER LINES SHALL BE
LOCATED EXPOSED IN FINISHED SPACES OR BELOW THE BUILDING
SLAB UNLESS SHOWN OTHERWISE ON THE DRAWINGS.
8. ALL CURBS, ROOF JACKS, ROOF THIMBLES, ROOF DRAINS, ETC.
SHALL BE COMPATIBLE WITH ROOFING SYSTEM TO BE PROVIDED.
REFERENCE ARCHITECTURAL DIVISION FOR REQUIRED FLASHING
DETAILS.
9. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL
CONCRETE EQUIPMENT PAD DIMENSIONS, BASED ON THE FINAL
EQUIPMENT SELECTION, TO THE STRUCTURAL AND GENERAL
CONTRACTOR FOR INCLUSION IN THOSE CONTRACTOR'S WORK AS
DESCRIBED BY THE GENERAL CONTRACTOR.
10. UNDER THE BASE CONTRACT, THE CONTRACTOR SHALL PROVIDE ALL
LABOR AND MATERIALS NECESSARY TO SPLIT EQUIPMENT INTO
MULTIPLE PIECES TO FACILITATE RIGGING TO FINAL INSTALLED
LOCATION. CONTRACTOR SHALL REASSEMBLE THE EQUIPMENT AND
TEST TO CONFIRM PROPER OPERATION AND MAINTAIN ALL THE
MANUFACTURERS WARRANTEES.
11. WARRANTY: AT A MINIMUM, THE ENTIRE MECHANICAL SYSTEM SHALL
BE WARRANTED AGAINST DEFECTS IN MATERIALS AND
WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR AFTER ACCEPTANCE
OF THE SYSTEM BY THE OWNER. REFER TO INDIVIDUAL
SPECIFICATION SECTIONS FOR SPECIFIC WARRANTY REQUIREMENTS.
DUCTWORK INSTALLATION:
1. SEAL ALL SEAMS (LONGITUDINAL AND TRANSVERSE) AIR TIGHT WITH
SEALANT PER SPECIFICATIONS.
2. DUCT DIMENSIONS ARE INSIDE CLEAR.
3. DIFFUSER NECK SIZE IS SAME AS FLEXIBLE DUCT SIZE.
4. UNLESS OTHERWISE NOTED, ALL CHANGES IN DIRECTION SHALL BE
MADE WITH RADIUS ELBOWS WITH RADIUS TO CENTERLINE EQUAL TO
1.5 DUCT WIDTH.
5. WHERE REQUIRED FOR SPACE CONSTRAINTS, PROVIDE MITERED
ELBOWS WITH TURNING VANES AS FOLLOWS:
A. FOR DUCT WIDTHS OF 36" OR LESS, PROVIDE MANUFACTURED
SINGLE WIDTH TURNING VANES, WITH NO TRAILING EDGES AND
SPACING IN ACCORDANCE WITH SMACNA DUCT CONSTRUCTION
STANDARDS FOR "STANDARD SPACING".
B. USE DOUBLE THICKNESS (AIRFOIL) BLADES WITHOUT TRAILING
EDGES FOR DUCT WIDTHS GREATER THAN 36".
6. BRANCH LINES:
A. MAKE ALL TAPS TO ROUND DUCTWORK WITH CONICAL TEES.
B. MAKE ALL TAPS TO RECTANGLE DUCTWORK WITH 45° ENTRY OR
CONICAL SPIN IN TO ROUND.
C. INCLUDE DAMPERS AT ALL BRANCH LINES.
7. DUCT SIZES NOT CALLED OUT SHALL BE DETERMINED BASED ON 0.08"
S.P. LOSS OR LESS PER 100 FT. OF LENGTH.
8. INCLUDE DAMPERS AT ALL BRANCH LINES, WHERE SHOWN ON THE
DRAWINGS, AND WHERE OTHERWISE REQUIRED FOR BALANCING.
DAMPERS SHALL BE INSTALLED A MINIMUM OF 3'-0" FROM ANY
REGISTER.
PIPE INSTALLATION:
1. ALL PIPING SHALL BE ADEQUATELY SUPPORTED FROM THE BUILDING
STRUCTURE TO PREVENT SAGGING, POCKETING, SWAYING OR
DISPLACEMENT BY MEANS OF HANGERS AND SUPPORTS. PIPING IS
NOT TO BE SUPPORTED BY EQUIPMENT.
2. PROVIDE DIELECTRIC UNIONS BETWEEN DISSIMILAR MATERIALS.
3. PROVIDE MANUAL AIR VENTS AND CAPPED HOSE-END DRAINS WITH
ISOLATION VALVES AT PIPING HIGH AND LOW POINTS.
4. WELD PIPE IN ACCORDANCE WITH APPLICABLE CODES AND
STANDARDS. WELDERS SHALL BE CERTIFIED FOR TYPE OF WORK
BEING PERFORMED.
5. FLUSH OUT PIPING AND REMOVE CONTROL DEVICES BEFORE
PERFORMING PRESSURE TEST. DO NOT USE PIPING SYSTEM VALVES
TO ISOLATE SECTIONS WHERE TEST PRESSURE EXCEEDS VALVE
PRESSURE RATING. PRESSURIZE PIPING AT AS SPECIFIED IN THE
SPECIFICATION OR TO 100 PSIG MINIMUM. IF LEAKAGE IS OBSERVED
OR IF TEMPERATURE COMPENSATED PRESSURE DROP EXCEEDS 1%
OF TEST PRESSURE, REPAIR LEAKS AND RETEST. DO NOT USE AIR
PRESSURE TO TEST PLASTIC PIPE.
6. PROVIDE SUPPORT UNDER ELBOWS ON PUMP SUCTION AND
DISCHARGE LINES.
7. ALL STRAINERS SHALL BE FURNISHED WITH A "ROUGHING" SCREEN
AND TWO (2) SCREENS FOR NORMAL OPERATION. INSTALL STRAINER
WITH ROUGHING SCREEN AND OPERATE SYSTEM FOR 24 HOURS
MINIMUM (RUN DOMESTIC WATER SYSTEMS AT MAX FLOW FOR A
MINIMUM OF ONE HALF (1/2) HOUR. REMOVE ROUGHING SCREEN AND
INSTALL NORMAL SCREEN, AFTER TWO WEEKS OF NORMAL
OPERATION INSTALL NEW NORMAL SCREEN.
8. PIPING SIZES SHALL BE BASED ON 2' OR LESS HEAD LOSS PER 100
FEET OF LENGTH. VELOCITIES SHALL NOT EXCEED 10 FEET PER
SECOND.
9. INSTALL ALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION
WITHIN THE PIPING SYSTEM. ENSURE ALL REQUIRED PIPE EXPANSION
WILL OCCUR IN THE PROPER DIRECTION AND SEGMENT OF PIPE.
PROPERLY ANCHOR (RE: SPECIFICATIONS) ALL PIPING REQUIRING
EXPANSION/CONTRACTION ISOLATION. COORDINATE PIPE
EXPANSION/CONTRACTION TO PREVENT DAMAGE TO ANY AND ALL
BUILDING COMPONENTS.
10. PROVIDE ISOLATION VALVES AT EVERY HYDRONIC BRANCH LINE
WHERE INDICATED OR NOT.
CONDENSATE DRAINAGE:
1. PROVIDE CONDENSATE DRAINAGE FOR ALL COOLING COILS AND
OVERFLOW PANS.
2. ROUTE CONDENSATE PIPING, FULL SIZE OF DRIP PAN CONNECTION,
TO NEAREST CODE APPROVED RECEPTACLE.
CUTTING, PATCHING AND DEMOLITION:
1. KEEP DEMOLITION & CUTTING TO MINIMUM REQUIRED FOR PROPER
EXECUTION OF WORK.
2. BE RESPONSIBLE FOR ALL CUTTING AND PATCHING NECESSARY FOR
THE COMPLETION OF THE WORK.
3. NO CUTTING (NOT SHOWN ON THE CONTRACT DOCUMENTS) SHALL
BE DONE WITHOUT THE APPROVAL OF THE ARCHITECT AS TO
LOCATIONS, METHOD AND EXTENT OF THE CUTTING.
4. REPAIR ALL ACCIDENTAL OR INTENTIONAL DAMAGE TO MATCH
EXISTING CONSTRUCTION WITH NO NOTICEABLE DIFFERENCE IN
CONTINUITY, APPEARANCE OR FUNCTION.
5. DEMOLISH AND CAP ALL INDICATED PIPING BACK AT NEAREST MAIN.
STRUCTURE:
1. DO NOT PENETRATE STRUCTURAL MEMBERS. ALL EQUIPMENT
SUPPORTS SHALL BE ATTACHED TO THE LOAD BEARING MEMBERS OF
STRUCTURAL ELEMENTS. DO NOT OVER-STRESS ANY STRUCTURAL
MEMBERS. CONTACT STRUCTURAL ENGINEER FOR ALLOWABLE
LOADS FOR SPECIFIC MEMBERS.
2. DO NOT UTILIZE POWDER DRIVEN ANCHORS FOR ANY LOCATIONS
WHICH REQUIRE THE LOAD TO BE HELD IN TENSION. SEE
STRUCTURAL DIVISION FOR ADDITIONAL RESTRICTIONS.
3. SEE ALSO STRUCTURAL DIVISION FOR ACCEPTABLE ANCHORING AND
SUPPORT MEANS, METHODS, AND LOCATIONS.
4. PROVIDE FLEXIBLE CONNECTORS, EXPANSION LOOPS, EXPANSION
JOINTS, ADDITIONAL FITTINGS OR EQUIVALENT TO ACCOMMODATE
THE THERMAL EXPANSION OF THE BUILDING THROUGH STRUCTURAL
EXPANSION JOINTS. PROVIDE SUCH FITTING AT EVERY PIPE, DUCT,
CONDUIT, ETC. CROSSING OF A STRUCTURAL EXPANSION JOINT.
FIRE STOPPING:
1. FIRE STOPPING REQUIREMENT: PENETRATIONS THROUGH RATED
WALLS AND FLOORS SHALL BE SEALED WITH A MATERIAL CAPABLE
OF PREVENTING THE PASSAGE OF FLAMES AND HOT GASSES WHEN
SUBJECTED TO THE REQUIREMENTS OF THE TEST STANDARD
SPECIFIC FOR FIRE STOPS ASTM-E-814. ACCEPTANCE MATERIALS
INCLUDE: DOW CORNING RTV FIRE STOP FOAM FOR BARE PIPE,
METAL CONDUIT, AND ELECTRICAL CABLE; 3M FIRE DAM 150 CAULK
FOR BARE PIPE, METAL CONDUIT, AND BUILDING CONSTRUCTION;
GAPS 3M FS-195 INTUMESCENT STRIPS FOR INSULATED PIPES,
PLASTIC PIPE OR CONDUIT, AND ELECTRICAL CABLE.
SCOPE CLARIFICATION NOTES:
1. THESE DOCUMENTS SERVE TO DEFINE THE NATURE OF THE
SYSTEMS, LEVEL OF CONTROL AND FINISH, RELATIONSHIPS WITH
OTHER BUILDING SYSTEMS, AND GENERAL DESIGN INTENT OF THIS
DIVISION'S WORK. THE CONTRACTOR SHALL EXAMINE THE
DOCUMENTS OF ALL TRADES TO COMPLETELY FAMILIARIZE
HIM/HERSELF WITH THE VARIOUS CONCEPTS PRESENTED BY OTHER
TRADES AND ADAPT THIS WORK AND ANY ASSOCIATED PRICING
ACCORDING. WHERE CONFLICTS EXIST BETWEEN THESE
DOCUMENTS AND THOSE OF OTHER DIVISIONS, THE MORE
STRINGENT (AS DETERMINED BY THE ENGINEER) SHALL TAKE
PRECEDENCE. IN PARTICULAR, WHERE ARCHITECTURAL
BACKGROUNDS INDICATE PROGRAMMATIC DIFFERENCES IN ROOM
LOCATIONS, ROOM FUNCTIONS, PLUMBING FIXTURE COUNTS, CEILING
TYPES, RATED CONSTRUCTION, CLEARANCES, OR ROOM
RELATIONSHIPS, THE ARCHITECTURAL DRAWINGS SHALL TAKE
PRECEDENCE AND THIS CONTRACTOR SHALL ADAPT HIS/HER WORK
ACCORDINGLY WHILE MAINTAINING THE DESIGN INTENT
REPRESENTED BY THE DOCUMENTS OF THIS DIVISION.
2. PROVIDE FIRE STOPPING ON ALL PIPES, DUCTS, DEVICES, ETC.
PENETRATING ALL FIRE RATED CONSTRUCTION ASSEMBLIES.
3. EQUIPMENT SHOWN IS NOT NECESSARILY TO SCALE.
4. THE DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR IS
RESPONSIBLE FOR ALL OFFSETS, TRANSITIONS, ELBOWS, ETC. AS
REQUIRED IN DUCTWORK, PIPING, SUPPORTS, ETC. TO COMPLETE
HIS/HER WORK IN A CLEAN, FUNCTIONAL INSTALLATION.
5. THIS CONTRACTOR IS RESPONSIBLE FOR ALL SLEEVES FOR
PENETRATIONS THROUGH SLABS AND BEAMS REQUIRED BY THE
INTENT OF THE SCOPE OF WORK INDICATED ON THE DRAWINGS.
COORDINATION OF QUANTITY AND LOCATIONS OF ALL PENETRATIONS
SHALL BE DONE BY THIS CONTRACTOR DURING THE SHOP DRAWINGS
PROCESS FOR REVIEW BY THE STRUCTURAL ENGINEER.
6. ALL COMBINATION FIRE/SMOKE DAMPERS SHALL HAVE END SWITCH
PACKAGE FOR REMOTE STATUS MONITORING, REMOTE OVERRIDE
CAPABILITY AND HIGH LIMIT TEMPERATURE SENSOR PREVENTING
DAMPER REOPENING WHEN DUCT TEMPERATURE IS ABOVE
DAMPER'S UL555S LISTING.
RATED ASSEMBLY DUCT PENETRATIONS:
1. PROVIDE COMBINATION FIRE/SMOKE DAMPERS IN ALL SUPPLY,
RETURN AND EXHAUST DUCTS PENETRATING SHAFT ENCLOSURES,
FLOOR PENETRATIONS, 1-HR AND 2-HR FIRE BARRIERS, AND SMOKE
BARRIERS. REFER TO ARCHITECTURAL PLANS, A-200 SERIES SHEETS,
FOR RATED ASSEMBLY TYPES AND LOCATIONS.
MECHANICAL SHEET LIST TABLE
Sheet Number Sheet Title
M-000.00 MECHANICAL LEGEND AND NOTES
M-010.00 MECHANICAL SCHEDULES
M-011.00 MECHANICAL SCHEDULES
M-101.00 MECHANICAL DEMO PLAN - N.W. QUADRANT EL.48
M-102.00 MECHANICAL DEMO PLAN - N.E. QUADRANT EL.48
M-201.00 MECHANICAL PLAN - N.W. QUADRANT EL.48
M-500.00 MECHANICAL ENLARGED DEMO PLAN - FUTURE
CHILLER PLANT
M-501.00 MECHANICAL ENLARGED PLAN - CHILLER PLANT
M-502.00 MECHANICAL ENLARGED PLANS - CENTRAL MER
M-503.00 MECHANICAL PLAN - STAIRS
M-600.00 MECHANICAL RISER DIAGRAM
M-700.00 MECHANICAL DETAILS I
M-701.00 MECHANICAL DETAILS II
M-702.00 MECHANICAL DETAILS III
M-703.00 MECHANICAL DETAILS IV
M-704.00 MECHANICAL DETAILS V
M-705.00 MECHANICAL CONTROLS I
M-706.00 MECHANICAL CONTROLS II
M-707.00 MECHANICAL CONTROLS III
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-000.00_D
V18025.01.dw
g
06 M
ar '19 - 11:00am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-000.00
MECHANICAL LEGEND
AND NOTES
CHILLER SCHEDULE (WATER COOLED)
CODE
(CH)
CH-1
GENERAL NOTES
1.BRINE WATER CONTAINS 40% ETHYLENE GLYCOL.
2. PROVIDE VFD ON COMPRESSORS.
3. REFRIGERANT: R-717 (AMMONIA)
4. CHILLER SHALL BE CAPABLE OF PROVIDING THE SCHEDULED CAPACITY WITH THE CHILLED (BRINE) WATER CHEMISTRY.
5. FOULING FACTORS: EVAPORATOR - 0.0005 CONDENSER - 0.0005
6. CONNECTIONS (IN/OUT): EVAPORATOR: 10"/10" CONDENSER: 8"/8"
7. CHILLER CONTROL PANEL/MCC SHALL BE SUPPLIED WITH TWO INDEPENANT POWER CONNECTIONS. CHILLER CONTROL PANEL SHALL INCLUDE ALL DISCONNECTS, COMPRESSOR VFDS, BRINE PUMP VFDS, CONDENSER PUMP STARTERS, AND CONTROLS.
POWER CONNECTION #1 SHALL INCLUDE: (1) 200 HP COMPRESSOR, (1) 40 HP BRINE PUMP, & (1) 15 HP CONDENSER WATER PUMP.
POWER CONNECTION #2 SHALL INCLUDE: (1) 200 HP COMPRESSOR, (1) 40 HP BRINE PUMP, (1) 15 HP CONDENSER WATER PUMP, & CONTROL SYSTEM POWER.
MANUFACTURER/
MODEL NO.
ICE BUILDERS INC. / WCC-CFZWM-D0400S
OPERATING
WEIGHT
(LBS)
10,500
NOMINAL
TONS
210
NO.
OF
COMPRESSORS
2
CHILLED (BRINE) WATER DATA
EWT
(F)
17
LWT
(F)
14
GPM
1,200
WPD
(FT)
27
FOULING
FACTOR
0.0005
CONNECTION
IN/OUT
10"/10"
CONDENSER WATER DATA
EWT
(F)
85
LWT
(F)
95
NO. OF
CONDENSERS
1
EA.
GPM
576
WPD
(FT)
10.4
FOULING
FACTOR
0.0005
CONNECTION
IN/OUT
8"/8"
ELECTRICAL
POWER
CONNECTION
1
2
VOLTS
460
460
HZ
60
60
PH
3
3
MCA
(AMPS)
381
383
DESIGN
(AMPS)
278
280
MFS
(AMPS)
400
400
DIMENSIONS (IN)
LENGTH
252
WIDTH
72
HEIGHT
107
KW/TON
1.26
REMARKS
EXPANSION TANK SCHEDULE
CODE
(ET)
ET-ICE
GENERAL NOTES
1. TYPE: B=FULL BLADDER
2. PROVIDE 4" HOUSEKEEPING PAD BELOW UNIT.
3. FLUID CONTAINS 40% ETHYLENE GLYCOL. EXPANSION TANK COMPONENTS IN CONTACT WITH THE FLUID SHALL BE COMPATIBLE WITH GLYCOL.
REMARKS
MANUFACTURER/
MODEL NO.
AMTROL / 3000-L
SERVICE
BRINE
LOCATION
ICE PLANT
OPERATING
WEIGHT
LBS.
9,200
DESIGN PARAMETERS
SYSTEM
VOLUME
(GAL)
10,000
MIN.
TEMP (F)
10
MAX
TEMP (F)
150
OPERATING PARAMETERS
RELIEF VALVE
SETTING
(PSIG)
60
CW MU
PRV REQ'T
(PSIG)
-
TANK
CONFIG
VERTICAL
TYPE
B
TANK
VOLUME
(GAL)
792
MAX
WORKING
PRESSURE
(PSI)
150
PHYSICAL
SIZE
DIA. X LEN
48" X 118"
REMARKS
CHILLER PUMP SKID SCHEDULE (PP-ICE)
GENERAL
CODE
BWP-1
BWP-2
CWP-1
CWP-2
GENERAL NOTES
1. PROVIDE A COMPLETE PUMP PACKAGE. PUMP PACKAGE INCLUDES PUMPS, MOUNTING RAILS, VIBRATION ISOLATION, INTERIAL BASES, AND ALL PIPING TRIM FOUND ON THE DETAIL DRAWINGS. PROVIDE HEADERS ON THE SUCTION AND DISCHARGE SIDE OF EACH PUMPS WITH ALL REQUIRED
ISOLATION VALVES. SKID SHALL INCLUDE ADDITIONAL SPACE TO ACCOMMODATE A 3 BRINE AND CONDENSER WATER PUMP WITH CONNECTION FLANGE WITH ISOLATION VALVE.
2. PROVIDE MAGNETIC STARTER WITH AUXILIARY CONTACTS AND HOA SWITCH ON ALL THREE PHASE MOTORS WHERE VARIABLE FREQUENCY DRIVES ARE NOT SPECIFIED.
3. PROVIDE PREMIUM EFFICIENCY MOTORS FOR MOTORS 1 HP AND OVER PER NEMA STANDARD MG1-2003, TABLES 12-12 AND 12-13.
4. FOR PARALLEL PUMP APPLICATIONS MANUFACTURER SHALL REVIEW SINGLE PUMP OPERATON SUCH THAT PUMP CAN OPERATE AND NOT EXCEED THE END OPERATION POINT ON THE PUMP CURVE AND MOTOR HP IS PROPERLY
SELECTED TO PREVENT OVERLOADING.
5. NPSHR AT SCHEDULED OPERATING POINT SHALL NOT EXCEED 0.8*NPSHA.
6. REFER TO DRAWINGS TO DETERMINE REQUIRED PUMP ROTATION. COORDINATE WITH MECHANICAL CONTRACTOR PRIOR TO ORDERING.
7. PUMP HOUSING SHALL BE COMPLETELY INSULATED.
8. PROVIDE A SEAL FLUSH AT EACH PUMP.
REMARK NOTES
A. PARALLEL PUMP APPLICATION WITH ONE PUMP STANDBY.
B. FLUID CONTAINS 40% ETHYLENE GLYCOL. ALL PUMP COMPONENTS IN CONTACT WITH THE FLUID SHALL BE COMPATIBLE WITH GLYCOL. ADJUST STANDARD CATALOG PERFORMANCE TO ACCOUNT FOR USE OF GLYCOL.
CONTROL NOTES
I. MAINTAIN PRESSURE MEASURED ACROSS THE CHILLER EVAPORARTOR SHELL.
II. MAINTAIN PRESSURE MEASURED ACROSS THE CHILLER CONDENSER SHELL.
MANUFACTURER/
MODEL NO.
BELL & GOSSETT / E-1510 5EB
BELL & GOSSETT / E-1510 5EB
BELL & GOSSETT / E-1510 4BD
BELL & GOSSETT / E-1510 4BD
SERVICE
BRINE PUMP
BRINE PUMP
CONDENSER WATER
CONDENSER WATER
LOCATION
ICE PLANT
ICE PLANT
ICE PLANT
ICE PLANT
PUMP DATA
PUMP
TYPE
END SUCTION
END SUCTION
END SUCTION
END SUCTION
GPM
1,200
1,200
576
576
DRIVE
VFD
VFD
CV
CV
RPM
1,800
1,800
1,800
1,800
HEAD
(FT)
90
90
70
70
FLUID TEMP.
RANGE (F)
10-120
10-120
55-100
55-100
NPSHR
(FT)
14.8
14.8
7.6
7.6
IMPELLER
SIZE (IN.)
11
11
9.125
9.125
MIN.
EFF. %
82
82
84
84
ELECTRICAL
BHP
35.6
35.6
12.7
12.7
HP
40
40
15
15
VOLT
460
460
460
460
PH
3
3
3
3
HZ
60
60
60
60
FLA
45.7
45.7
18.5
18.5
CONTROLS
I
I
II
II
WEIGHT
(LBS.)
1,890
1,890
460
460
REMARKS
A,B
A,B
A
A
FAN SCHEDULE
CODE
GX-1
GX-2
GENERAL NOTES
1. DRIVE TYPE: D=DIRECT-PROVIDE RHEOSTAT SPEED CONTROLLER IN FAN HOUSING UNLESS OTHERWISE NOTED.
B=BELT-PROVIDE ADJUSTABLE SHEAVE UNLESS OTHERWISE NOTED.
VFD=VARIABLE FREQUENCY DRIVE.
2. PROVIDE MAGNETIC STARTER WITH AUXILARY CONTACTS AND HOA SWITCH ON ALL THREE PHASE UNITS.
3. PROVIDE PREMIUM EFFICIENCY MOTORS. PER NEMA STANDARD MG1-2003, TABLED 12-12, AND 12-13.
4. PROVIDE FLEXIBLE CONNECTIONS AT DUCT INLET AND OUTLET.
5. FAN SHALL MEET THE REQUIREMENT OF THE AMCA TYPE B SPARK RESISTANCE.
MOUNTING (MTG)
1. INSTALL FAN WITH HANGING VIBRATION ISOLATORS.
CONTROL (CTRL)
I. INTERLOCK WITH REFRIGERATION MONITORING SYSTEM. INTERLOCK FAN WITH ISOLATION DAMPER
II. INTERLOCAK WITH CHILLER PLANT AIR HANDING UNIT (AC-ICE) AND ISOLATION DAMPERS.
REMARK NOTES
MANUFACTURER/
MODEL NO.
GREENHECK / TCB-2-16-50
GREENHECK / TCB-1-09-3
SERVICE
ICE PLANT
ICE PLANT
LOCATION
MECH MEZZANINE
MECH MEZZANINE
WEIGHT
LBS
327
165
CFM
5,000
600
DRIVE
B
B
MOTOR
TYPE
CV
CV
FAN
RPM
2,264
1,866
ESP
("WC)
1.5
1
ELECTRICAL DATA
HP
5
1/3
BHP
4.28
0.24
VOLT
460
115
PH
3
1
HZ
60
60
FLA
7.6
7.2
MTG
1
1
CONTROL
I
II
REMARKS
PUMP SCHEDULE
GENERAL
CODE
CWP-AC1
CWP-AC2
GENERAL NOTES
1. PROVIDE MAGNETIC STARTER WITH AUXILIARY CONTACTS AND HOA SWITCH ON ALL THREE PHASE MOTORS WHERE VARIABLE FREQUENCY DRIVES ARE NOT SPECIFIED.
2. PROVIDE PREMIUM EFFICIENCY MOTORS FOR MOTORS 1 HP AND OVER PER NEMA STANDARD MG1-2003, TABLES 12-12 AND 12-13.
3. FOR PARALLEL PUMP APPLICATIONS MANUFACTURER SHALL REVIEW SINGLE PUMP OPERATON SUCH THAT PUMP CAN OPERATE AND NOT EXCEED THE END OPERATION POINT ON THE PUMP CURVE AND MOTOR HP IS PROPERLY SELECTED TO PREVENT OVERLOADING.
4. NPSHR AT SCHEDULED OPERATING POINT SHALL NOT EXCEED 0.8*NPSHA.
5. REFER TO DRAWINGS TO DETERMINE REQUIRED PUMP ROTATION. COORDINATE WITH MECHANICAL CONTRACTOR PRIOR TO ORDERING.
6. MOUNT PUMP ON 6" HOUSEKEEPING PAD.
CONTROL NOTES
I. INTERLOCK PUMP WITH WATER COOLED PACKAGE UNIT (AC-ICE)
MANUFACTURER/
MODEL NO.
BELL & GOSSETT / E-90 1AAB
BELL & GOSSETT / E-90 1AAB
SERVICE
AC-ICE
AC-ICE
LOCATION
ICE PLANT
ICE PLANT
PUMP DATA
PUMP
TYPE
IN-LINE
IN-LINE
GPM
38
38
DRIVE
CV
CV
RPM
3,600
3,600
HEAD
(FT)
70
70
FLUID TEMP.
RANGE (F)
55-100
55-100
NPSHR
(FT)
14.8
14.8
IMPELLER
SIZE (IN.)
4.75
4.75
MIN.
EFF. %
57.2
57.2
ELECTRICAL
BHP
1.58
1.58
HP
2
2
VOLT
460
460
PH
3
3
HZ
60
60
FLA
3.4
3.4
CONTROLS
I
I
WEIGHT
(LBS.)
65
65
REMARKS
A
A
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-010.00_D
V18025.01.dw
g
06 M
ar '19 - 11:00am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-010.00
MECHANICAL
SCHEDULES
COOLING TOWER SCHEDULE
CODE
(CT)
CT-1&2
GENERAL NOTES
1. PROVIDE PREMIUM EFFICIENCY MOTORS (FOR MOTORS 1HP AND OVER PER NEMA STANDARD MG-1 2003: TABLES 12-12, 12-13).
2. PROVIDE MAGNETIC STARTERS WITH AUXILIARY CONTACTS AND HOA SWITCH ON ALL THREE PHASE MOTORS.
3. SEE SPECIFICATIONS FOR VIBRATION ISOLATION REQUIREMENTS.
4. TOWER TO BE CTI RATED.
5. PROVIDE A VFD ON EACH FAN MOTOR. PROVIDE DIGITAL OUT, DIGITAL IN, ANALOG OUT, AND ANALOG IN COMMUNICATION WITH BMS.
6. PROVIDE TYPE 304 STAINLESS STEEL CONSTRUCTION FOR BASIN, PANELS, STRUCTURAL MEMBERS, FASTENERS, AND ALL OTHER COMPONENTS.
7. PROVIDE A VIBRATION CUTOUT SWITCH.
8. BASIN HEATERS SHALL BE PROVIDED WITH CONTROLS TO MAITIAIN 40F WATER TEMPERATURE AT -20F AMBIENT
9. PROVIDE A TOTALLY ENCLOSED FAN COOLED MOTOR.
10. PROVIDE ELECTRIC LIQUID LEVEL CONTROL INTERFACE, INCLUDING OPERATING LIQUID LEVEL, DRY CONTACT SENSOR AND DRY CONTACTS FOR HIGH AND LOW LEVEL ALARM INDICATION FOR CONNECTION TO
BUILDING AUTOMATION SYSTEM AT EACH TOWER.
11. VFD SHALL COME FACTORY MOUNTED IN A NEMA 3R ENCLOSURE. PROVIDE HEATER AND FAN WITHIN VFD ENCLOSURE.
12. PROVIDE EXTERNAL LADDERS, RAILINGS, AND INTERNAL WALKING PLATFORM.
13. SEE SPECIFICATION FOR SOUND DATA REQUIREMENTS.
REMARK NOTES
MANUFACTURER/
MODEL NO.
BAC / XES15E-1285-06FN
TYPE
INDUCED DRAFT
SERVICE
ICE CHILLER
LOCATION
ROOF
NUMBER
OF
CELLS
2
TOTAL
OPERATING
WEIGHT (LBS)
19,275
TOTAL
FLOW
GPM
630
EWT
(°F)
95
LWT
(°F)
85
DESIGN
WBT
(°F)
76.6
MAX. TOWER
PUMPING
HEAD (FT W)
10
ELECTRICAL
FAN (EACH CELL)
HP
2
VOLT
460
PH
3
HZ
60
FLA
3.4
BASIN HEATER (EACH CELL)
kW
12
VOLT
460
PH
3
HZ
60
FLA
15.2
OVERALL
DIMENSIONS
LENGTH
17'-2"
WIDTH
11'-10"
HEIGHT
10'-0"
REMARKS
STEAM SHELL AND TUBE HEAT EXCHANGER SCHEDULE
CODE
(HX)
HX-ICE
GENERAL NOTES
1. BRINE: 40% ETHYLENE GLYCOL.
2. REFER TO DETAILS AND SPECIFICATIONS FOR PIPING ARRANGEMENT AND ACCESSORIES.
3. HEAT EXCHANGER AND TANK TO BE ASSEMBLED AT THE FACTORY AND SHIPPED FULLY ASSEMBLED.
4. DELTA T = 6 DEGREES FOR HEAT EXCHANGER. OPERATING TEMPERATURE, 5 TO 150F
5. HEAT EXCHANGER SHALL BE COMPATABLE WITH THE BRINE SOLUTION AND OPERATING TEMPERATURES.
REMARK NOTES
A.
MANUFACTURER/
MODEL NO.
BELL & GOSSETT / SU-203-2
SERVICE
ICE OUT
LOCATION
MECHANICAL MEZZINE
OPERATING
WEIGHT (LBS)
1,444
MBH
3,500
TUBE SIDE
FLUID
BRINE
GPM
1,200
DELTA
T (F)
6.5
WPD
(FT)
15
NO. OF
PASSES
2
RATED
PRES. (PSI)
150
SURFACE AREA
(SQFT)
212.5
SHELL SIDE
PRESSURE
(PSIG)
5
LBS/HR
3,620
RATED
PRES. (PSI)
150
REMARKS
WATER COOLED PACKAGE UNIT SCHEDULE
CODE
(WSHP)
AC-ICE
GENERAL NOTES:
1. UNIT SHALL PROVIDE COOLING ONLY.
2. INSTALL UNITS WITH ADEQUATE CLEARANCE FOR COIL PULL, FILTER REPLACEMENT, COMPRESSOR REPAIR, AND TO FULLY OPEN ALL ACCESS DOORS. PROVIDE A MINIMUM OF 3 FEET IN FRONT OF ALL
DISCONNECTS, VFD'S, AND CONTROL PANELS. COMPLY FULLY WITH NEC.
3. PROVIDE FACTORY INSTALLED P-TRAP FOR CONDENSATE LINE. PIPE CONDENSATE PIPING TO NEAREST FLOOR DRAIN LOCATED WITHIN THE ICE PLANT.
4. PROVIDE A 5 YEAR WARRANTY ON THE COMPRESSOR.
5. REFIGERANT: R-410A.
6. PROVIDE FACTORY INSTALLED DISCONNECT SWITCH.
7. PROVIDE 2" MERV 8 FILTER.
8. ALL PIPING AND ELECTRICAL CONNECTIONS SHALL BE MADE WITH FLEXIBLE CONNECTIONS.
9. PROVIDE DUCT SMOKE DETECTORS PER CODE IN THE SUPPLY AND RETURN AIR OF ALL UNITS 2000 CFM OR GREATER. RE: SPECIFICATIONS. INITIALIZATION OF A DUCT SMOKE DETECTOR SHALL STOP RESPECTIVE
FANS AND CLOSE OUTSIDE AIR DAMPERS.
10. ALL FANS TO BE DELIVERED IN SECTIONS. ANY FURTHER REQUIRED FIELD DISASSEMBLY AND UNIT REASSEMBLY SHALL BE DONE BY THE CONTRACTOR UNDER THE SUPERVISION OF THE MANUFACTURER.
11. MOUNT UNIT ON A 4" HOUSEKEEPING PAD.
12. PROVIDE HAYES MEASUREFLOW PRESSURE INDEPENDENT BALANCING VALVE AND 2-WAY CONTROL VALVE FOR EACH UNIT.
13. PROVIDE FACTORY INSTALLED ECM MOTORS
14. PROVIDE 2-STAGE COMPRESSORS.
REMARK NOTES:
MANUFACTURER/
MODEL
CLIMATEMASTER / TC-160
AREA
SERVED
ICE PLANT
LOCATION
FLOOR
WEIGHT
(LBS)
1,069
CFM
4,900
ESP
(IN.)
0.5
COOLING CAPACITY
TOTAL
MBH
140.8
SENS
MBH
114.6
EWT
(F)
85
LWT
(F)
95
GPM
38
WPD
(FT)
11.3
EAT (F)
D.B.
77
W.B.
62
LAT (F)
D.B.
55
W.B.
55
EER
12.3
ELECTRICAL DATA
KW
13.3
VOLT
460
PH
3
HZ
60
FLA
26.5
MCA
29.3
MFS
40
DIMENSIONS (IN)
WIDTH
82
DEPTH
29
HEIGHT
70
REMARKS
GRILLE REGISTER DIFFUSER SCHEDULE
CODE
A
B
C
GENERAL NOTES
1. SEE PLANS FOR CFM AND NECK SIZES.
2. MAXIMUM NOISE CRITERIA (NC) SHALL BE 30 UNLESS OTHERWISE NOTED.
3. COLOR TO BE COORDINATED WITH ARCHITECT PRIOR TO ORDERING.
4. MATERIAL IS STEEL UNLESS OTHERWISE NOTED.
5. PROVIDE BALANCING DEVICE FOR ALL GRILLES, REGISTERS, AND DIFFUSERS UNLESS OTHERWISE NOTED. BALANCING DEVICES
SHALL BE LOCATED AS FAR FROM THE GRILLES AS POSSIBLE.
REMARKS
MANUFACTURER/
MODEL NO.
TITUS / 350 RL
TITUS / 300
TITUS / OMNI
SERVICE
RETURN/
EXHAUST
AIR
SUPPLY AIR
SUPPLY AIR
TYPE
GRILLE
GRILLE
SQUARE
ACCESSORIES
PROVIDE OPPOSED
BLADE DAMPER
WHERE NOTED
PROVIDE OPPOSED
BLADE DAMPER
WHERE NOTED
NONE
FACE SIZE
SEE DRAWINGS
SEE DRAWINGS
24X24
NECK SIZE
SEE DRAWING
SEE DRAWING
SEE DRAWINGS
FINISH
TBD BY
ARCHITECT
TBD BY
ARCHITECT
TBD BY
ARCHITECT
REMARKS
HEATING AND VENTILATING AIR HANDLING UNIT SCHEDULE
CODE
(AHU)
HV-ICE
GENERAL NOTES
1. PROVIDE PREMIUM EFFICIENCY MOTORS FOR MOTORS 1 HP AND OVER PER NEMA STANDARD MG1-2003, TABLES 12-12 AND 12-13.
2. PROVIDE FACTORY MOUNTED VFD AND DISCONNECT
3. INSTALL UNITS WITH ADEQUATE CLEARANCE FOR COIL PULL , FILTER REPLACEMENT AND TO FULLY OPEN ACCESS DOORS. PROVIDE A MINIMUM OF 3 FEET CLEARANCE IN FRONT OF DISCONNECTS SWITCHES AND CONTROL PANELS. COMPLY FULLY WITH NEC.
4. UNIT TOTAL STATIC PRESSURE SHALL INCLUDE SCHEDULED EXTERNAL STATIC PRESSURE PLUS ALL SCHEDULED INTERNAL PRESSURE DROPS. INCLUDE VALUES FOR DIRTY FILTERS.
5. PROVIDE DUCT SMOKE DETECTORS IN THE SUPPLY AND RETURN AIR OF ALL UNITS 2000 CFM OR GREATER. RE: SPECIFICATIONS. INITIALIZATION OF A DUCT SMOKE DETECTOR SHALL STOP RESPECTIVE FANS.
6. ALL UNITS TO BE DELIVERED IN SECTIONS. ANY FURTHER REQUIRED FIELD DISASSEMBLY AND UNIT REASSEMBLY SHALL BE DONE BY THE CONTRACTOR UNDER THE SUPERVISION OF THE MANUFACTURER.
7. CEILING HUNG UNIT, PROVIDE VIBRATION ISOLATION AS REQUIRED.
8. PROVIDE SINGLE POINT ELECTRICAL CONNECTION.
9. PROVIDE ACCESS DOORS ON BOTH SIDES OF UNIT.
10. PROVIDE MAGNETIC FILTER GAUGES.
11. PROVIDE FREEZE STAT PER CODE DOWNSTREAM OF HEATING COIL.
MANUFACTURER/
MODEL NO.
CARRIER / 39L10
AREA
SERVED
ICE PLANT
LOCATION
MECH MEZZANINE
WEIGHT
LBS
664
SUPPLY FAN
CFM
4,800
TYPE
LG
TSP
(IN)
1.73
ESP
(IN.)
1
HP
5
MAX
BHP
3
FAN
RPM
958
MIN. OSA
(CFM)
4800
HEATING CAPACITY (STEAM)
EAT (°F)
0
LAT (°F)
64
APD
("W.C.)
0.15
TOTAL
MBH
339
STEAM
LB/HR
354
PSI
5
COIL
ROWS
1
FINS
PER IN
9
PRE-FILTER
TYPE
MERV 8
APD ("WC)
INITIAL
0.16
FINAL
0.5
ELECTRICAL
VOLT
460
PH
3
FLA
6.5
MOCP
10
DIMENSIONS (IN)
WIDTH
57
DEPTH
58
HEIGHT
32
REMARKS
CABINET HEATER SCHEDULE (HYDRONIC)
CODE
CH-1
GENERAL NOTES
1. HEATING WATER: EWT:180 F, LWT=160F
2. UNIT SHALL BE SHIPPED WITH 2" PLEATED FILTERS.
3. PROVIDE CONTROLS TRANSFORMER. COORDINATE LOCATION WITH CONTROLS CONTRACTOR.
4. NO BMS CONNECTION OR MONITORING. PROVIDE LOCAL CONTROLS ONLY.
5. ENCLOSURE COLOR SELECTED BY ARCHITECT.
6. UNIT CONTROLLED BY WALL MOUNTED TEMPERATURE SENSOR/CONTROLLER PROVIDED BY CONTROL CONTRACTOR
7. BOTTOM INLET, TOP BAR GRILLE OUTLET
REMARK NOTES:
MANUFACTURER/
MODEL NO.
STERLING / F04
AREA SERVED
STAIR
FAN
CFM
375
ESP
(IN.)
0
HEATING COIL
EAT
(F)
40
LAT
(F)
114
MBH
30
GPM
3
ROW
1
WPD
(FT)
0.27
ELECTRICAL
VOLT
115
PH
1
DIMENSIONS
(INCHES)
W
47
H
25
D
9.5
WEIGHT
(LBS)
122
REMARKS
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-010.00_D
V18025.01.dw
g
06 M
ar '19 - 11:00am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-011.00
MECHANICAL
SCHEDULES
GENERAL NOTES KEYNOTES
11. EXISTING SYSTEMS INFORMATION IS SHOWN FOR REFERENCE
ONLY TO CLARIFY SCOPE. CONTRACTOR SHALL FIELD VERIFY
THESE EXISTING CONDITION TO CONFIRM THE PRECISE TIE-IN
LOCATION FOR NEW WORK.
2. INTERIM RELOCATIONS OF EXISTING SYSTEMS MAY BE REQUIRED
TO ACCOMPLISH THE FINAL INDICATED SCOPE IN A STAGED
MANNER. CONTRACTOR'S SCOPE SHALL INCLUDE A PHASED
APPROACH AND ALL COSTS ASSOCIATED WITH THIS MAKE-READY
WORK. REFER TO ARCHITECTURAL PHASING PLANS.
3. DEMOLITION TO OCCUR ONLY WHEN SPACES ARE NOT OCCUPIED.
4. CUT ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK AND
ASSOCIATED AT EACH POINT OF DISCONNECTION INDICATED ON
DEMOLITION PLANS.
5. WHERE DISCONNECTING DUCTWORK, CONTRACTOR SHALL
PROVIDE AN AIRTIGHT CAP AND SEAL EXISTING TO REMAIN
DUCTWORK AIRTIGHT.
6. COORDINATION DRAWINGS SHALL BE PREPARED TO ENSURE
ROUTING AVOIDS CONFLICTS WITH NEW AND EXISTING WORK.
CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES.
7. 7. ALL WORK AFFECTING BUILDING SYSTEM OPERATION SHALL
BE COORDINATED WITH BUILDING ENGINEERING.
XX
A A.5 A.7 B
(E)10"LPS
DN
(E)10"LPS
(E)12"LPS
(R)6"CWS/R
DN
(E)6"LPS
(E)6"LPS
UP
(E)6"LPS
(E)6"LPS
UP
(E)8"LPS
EXISTING EXHAUST AIR PLENUM
..
(R)6"CWS/R
DN
(R) (2)1
1
2
" REFRIGERANT
RELIEF PIPING DN
DEMOLISH (2)1
1
2
" REFRIGERANT
RELIEF PIPING BACK TO
DISCHARGE LOCATION.
(R)62X40 (R)62X40 TAP AND PATCH
EXHAUST AIR PLENUM
(R)62X40 TAP AND PATCH
EXHAUST AIR PLENUM
(R)62X40
(R)40X62
(E
)6
0X
18
(R)54X100
(R)54X100
(R
)8
6X
60
EXISTING INTAKE AIR PLENUM
(R)56X48
(R)56X48
(R)6"CWS/R
DN
(R)56X48 TAP AND PATCH
OUTSIDE AIR PLENUM
EXISTING INTAKE AIR PLENUM
(R)40X62
DEMOLISH (2) INDOOR COOLING TOWERS
(E)14"STORM
M
(E)6"LPS
UP
(
E
)
6
0
X
6
8
(E)6"LPS
(E
)8
"L
PS
(E)5"LPR
(E)4"LPR
(E)5"LPR
DN TO
PUMP
(E)V
1
(E)66X60
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-102.00_D
V18025.01.dw
g
06 M
ar '19 - 11:00am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-101.00
MECHANICAL DEMO
PLAN - N.W. QUADRANT
EL.48
MECHANICAL DEMO PLAN - N.W. QUADRANT EL.48
11/8" = 1'-0"
GENERAL NOTES KEYNOTES
11. EXISTING SYSTEMS INFORMATION IS SHOWN FOR REFERENCE
ONLY TO CLARIFY SCOPE. CONTRACTOR SHALL FIELD VERIFY
THESE EXISTING CONDITION TO CONFIRM THE PRECISE TIE-IN
LOCATION FOR NEW WORK.
2. INTERIM RELOCATIONS OF EXISTING SYSTEMS MAY BE REQUIRED
TO ACCOMPLISH THE FINAL INDICATED SCOPE IN A STAGED
MANNER. CONTRACTOR'S SCOPE SHALL INCLUDE A PHASED
APPROACH AND ALL COSTS ASSOCIATED WITH THIS MAKE-READY
WORK. REFER TO ARCHITECTURAL PHASING PLANS.
3. DEMOLITION TO OCCUR ONLY WHEN SPACES ARE NOT OCCUPIED.
4. CUT ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK AND
ASSOCIATED AT EACH POINT OF DISCONNECTION INDICATED ON
DEMOLITION PLANS.
5. WHERE DISCONNECTING DUCTWORK, CONTRACTOR SHALL
PROVIDE AN AIRTIGHT CAP AND SEAL EXISTING TO REMAIN
DUCTWORK AIRTIGHT.
6. COORDINATION DRAWINGS SHALL BE PREPARED TO ENSURE
ROUTING AVOIDS CONFLICTS WITH NEW AND EXISTING WORK.
CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES.
7. 7. ALL WORK AFFECTING BUILDING SYSTEM OPERATION SHALL
BE COORDINATED WITH BUILDING ENGINEERING.
XX
(E)10"LPS
DN
(E)6"LPS
UP
(E)14"LPS
(E)14"LPS
(E)6"LPS
UP
(E
)1
2"L
PS
(E)12"LPS
(E)6"CWS
(E)6"CWR
(E)6"CWS
(E)6"CWR
(R)6"CWS/R
DN
EXISTING EXHAUST AIR PLENUM
..
(R)6"CWS/R
DN
(R) (2)1
1
2
" REFRIGERANT
RELIEF PIPING DN
DEMOLISH (2)1
1
2
" REFRIGERANT
RELIEF PIPING BACK TO
DISCHARGE LOCATION.
(R)62X40 (R)62X40 TAP AND PATCH
EXHAUST AIR PLENUM
(R)62X40 TAP AND PATCH
EXHAUST AIR PLENUM
(R)62X40
(R)40X62
(E
)6
0X
18
DEMOLISH (2) INDOOR COOLING TOWERS
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-102.00_D
V18025.01.dw
g
06 M
ar '19 - 11:00am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-102.00
MECHANICAL DEMO
PLAN - N.E. QUADRANT
EL.48
MECHANICAL DEMO PLAN - N.E. QUADRANT EL.48
11/8" = 1'-0"
GENERAL NOTES KEYNOTES
11. EXISTING SYSTEMS INFORMATION IS SHOWN FOR REFERENCE
ONLY TO CLARIFY SCOPE. CONTRACTOR SHALL FIELD VERIFY
THESE EXISTING CONDITION TO CONFIRM THE PRECISE TIE-IN
LOCATION FOR NEW WORK. REFER TO DEMOLITION PLANS FOR
ADDITIONAL INFORMATION REGARDING EXISTING SYSTEMS.
EXISTING SYSTEMS NOTES ARE NOT SHOWN ON CONSTRUCTION
PLANS FOR CLARITY OF THE DRAWINGS.
2. CONTRACTOR SHALL PROVIDE CORE DRILLING AS REQUIRED FOR
NEW PIPE PENETRATIONS.
3. COORDINATION DRAWINGS SHALL BE PREPARED TO ENSURE
ROUTING AVOIDS CONFLICTS WITH NEW AND EXISTING WORK.
CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES.
4. ALL WORK AFFECTING BUILDING SYSTEM OPERATION SHALL BE
COORDINATED WITH BUILDING ENGINEERING.
5. PIPING SHALL BE ROUTED TO AVOID IMPACTING ALL EXISTING
CEILING HEIGHTS. PROVIDE RISE AND FALLS AS NECESSARY TO
AVOID OBSTRUCTIONS, SUCH AS STRUCTURAL ELEMENTS AND
EXISTING TO REMAIN PIPING.
6. INTERIM RELOCATIONS OF EXISTING SYSTEMS MAY BE REQUIRED
TO ACCOMPLISH THE FINAL INDICATED SCOPE IN A STAGED
MANNER. CONTRACTOR'S SCOPE SHALL INCLUDE A PHASED
APPROACH AND ALL COSTS ASSOCIATED WITH THIS MAKE-READY
WORK.
7. PROVIDE FIRE/SMOKE DAMPERS AT ALL SHAFT PENETRATIONS,
MECHANICAL ROOM WALL PENETRATIONS AND RATED ASSEMBLY
PENETRATIONS. REFER TO ARCH. FOR RATED ASSEMBLY TYPES
AND LOCATIONS.
8. PROVIDE 1/2"X1/2" WIRE MESH SCREEN ON ALL OPEN DUCTS
TAPPED TO SHAFT PLENUM.
9. CONTRACTOR IS RESPONSIBLE FOR ALL CEILING REMOVALS AND
REINSTALLATIONS REQUIRED TO COMPLETE WORK. PROVIDE
CEILING TILES AS REQUIRED. CEILING TILES SHALL MATCH
EXISTING.
ADD/DEDUCT ALTERNATE: PROVIDE A PRICING ALTERNATE FOR
ROUTING THE BRINE PIPING WITHIN THE PROPOSED TRENCH.
A A.5 A.7 B
10
9.5
9.3
9
8.5
AA
(E)10"LPS
DN
(E)10"LPS
(E)6"LPS
(E)6"LPS
UP
(E)6"LPS
(E)6"LPS
UP
(E)8"LPS
EXISTING EXHAUST AIR PLENUM
(E
)6
0X
18
EXISTING INTAKE AIR PLENUMEXISTING INTAKE AIR PLENUM
(E)14"STORM
M
(E)6"LPS
UP
(
E
)
6
0
X
6
8
(E)6"LPS
(E
)8
"L
PS
(E)5"LPR
(E)4"LPR
(E)5"LPR
DN TO
PUMP
(E)V
1
(E)66X60
10"BRINE SUPPLY
& RETURN DN
10"BWS/R DN
10"BWR
10"BWS
8"CWS/R DN
8"CWS/R
UP
24X24 EA DN
8"BWR
DN
6"LPS
4"LPR
DN
HX
ICE
1
1
2
"MAKEUP WATER
SLOW CLOSING
SOLENOID VALVE
SEE PLUMBING DWG
FOR CONTINUATION.
30X18
1
8
X
3
0
24X24
30X20 EA UP
2
4
X
2
4
8"CWR
8"CWSHV
ICE
2
1
2
"L
PS
2"LPR
30
X1
8
1
1
2
"MAKUP CW
DN
6"REFRIGERATION
RELIEF UP
18X30
SA UP
12X10
OA DN
12X12
GX
1
GX
2
24
X2
4
12
X1
0
12X10
M
1
1
2
"WATER METER
WITH 1
1
2
" BYPASS
10"BWR
10"BWS
1
APPROXIMATE
LOCATION OF
PROPOSED
TRENCH ON
FLOOR BELOW.
6"REFRIGERATION
RELIEF DN
LOW LEAK MOTORIZED
DAMPERS
LOW LEAK
MOTORIZED
DAMPERS
LOW LEAK
MOTORIZED
DAMPERS
S
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-202.00_D
V18025.01.dw
g
06 M
ar '19 - 11:01am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-201.00
MECHANICAL PLAN -
N.W. QUADRANT EL.48
MECHANICAL PLAN - N.W. QUADRANT EL.48
11/8" = 1'-0"
(E)5"LPR UP
(E)2
1
2
"PD
UP
(R)30x6RA
(R)18x10EAD
(
R
)
1
2
x
8
E
A
D
(R)?x8EA
(E)16x16
(E)20x10
TRANSFER
DUCT
(
E
)
2
2
x
1
4
S
A
D
(
E
)
2
0
x
1
2
S
A
D
(E)
BH-16
(E
)20x12S
AD
(R
)16x8S
AD
(E)1
1
2
"BHF UP
(E)1
1
2
"BHR UP
(E
)16x10S
AD
(R)12x8SAD
(R)16x8SAD
(R
)16x8S
AD
(E)1
1
2
"BHF UP
(E)1
1
2
"BHR UP
(
E
)
1
0
x
8
(E)10x6
TF UP
(E)
BH-17
(R)10x8SADT
(R)14x8SAD
(
E
)
2
8
x
1
4
E
A
D
(
E
)
1
8
x
1
0
E
A
D
(E)STEAM
CONDENSATE
PUMP
DEMOLISH EXISTING TOILET
EXHAUST BACK TO MAIN
GENERAL NOTES
KEYNOTES
1
1. EXISTING SYSTEMS INFORMATION IS
SHOWN FOR REFERENCE ONLY TO
CLARIFY SCOPE. CONTRACTOR SHALL
FIELD VERIFY THESE EXISTING CONDITION
TO CONFIRM THE PRECISE TIE-IN
LOCATION FOR NEW WORK. REFER TO
DEMOLITION PLANS FOR ADDITIONAL
INFORMATION REGARDING EXISTING
SYSTEMS. EXISTING SYSTEMS NOTES ARE
NOT SHOWN ON CONSTRUCTION PLANS
FOR CLARITY OF THE DRAWINGS.
2. CONTRACTOR SHALL PROVIDE CORE
DRILLING AS REQUIRED FOR NEW PIPE
PENETRATIONS.
3. COORDINATION DRAWINGS SHALL BE
PREPARED TO ENSURE ROUTING AVOIDS
CONFLICTS WITH NEW AND EXISTING
WORK. CONTRACTOR SHALL COORDINATE
WITH ALL OTHER TRADES.
4. ALL WORK AFFECTING BUILDING SYSTEM
OPERATION SHALL BE COORDINATED WITH
BUILDING ENGINEERING.
5. PIPING SHALL BE ROUTED TO AVOID
IMPACTING ALL EXISTING CEILING
HEIGHTS. PROVIDE RISE AND FALLS AS
NECESSARY TO AVOID OBSTRUCTIONS,
SUCH AS STRUCTURAL ELEMENTS AND
EXISTING TO REMAIN PIPING.
6. INTERIM RELOCATIONS OF EXISTING
SYSTEMS MAY BE REQUIRED TO
ACCOMPLISH THE FINAL INDICATED SCOPE
IN A STAGED MANNER. CONTRACTOR'S
SCOPE SHALL INCLUDE A PHASED
APPROACH AND ALL COSTS ASSOCIATED
WITH THIS MAKE-READY WORK.
7. PROVIDE FIRE/SMOKE DAMPERS AT ALL
SHAFT PENETRATIONS, MECHANICAL
ROOM WALL PENETRATIONS AND RATED
ASSEMBLY PENETRATIONS. REFER TO
ARCH. FOR RATED ASSEMBLY TYPES AND
LOCATIONS.
8. PROVIDE 1/2"X1/2" WIRE MESH SCREEN ON
ALL OPEN DUCTS TAPPED TO SHAFT
PLENUM.
9. CONTRACTOR IS RESPONSIBLE FOR ALL
CEILING REMOVALS AND
REINSTALLATIONS REQUIRED TO
COMPLETE WORK. PROVIDE CEILING
TILES AS REQUIRED. CEILING TILES SHALL
MATCH EXISTING.
10. PROVIDE CHILLER BREAK GLASS STATION
WITH HORN/STOBE IN ACCORDANCE WITH
CODE. AT A MINIMUM, PROVIDE A BREAK
GLASS STATION AND HORN STROP WITHIN
THE CHILLER PLANT AND JUST OUTSIDE
THE ROOM AT EACH DOOR TO THE
CHILLER PLANT.
24X14 SA OPENING, EXTEND DUCTWORK
DOWN TO 12" ABOVE THE FINISHED FLOOR
AND PROVIDE WMS. 2,450 CFM
PROVIDE FLANGED CONNECTION TO
ALLOW PIPE TO BE REMOVED IN THE
FUTURE TO ALLOW FOR A FUTURE CHILLER
TO BE RIGGED.
PROVIDE FLANGED CONNECTION ABOVE
THE BOTH THE EVAPORATOR AND
CONDENSER BUNDLES TO ALLOW PIPE TO
REMOVED FOR CLEANING OF THE SHELL.
78X12 RA DUCT, EXTEND DUCTWORK UP TO
24" FROM THE UNDERSIDE OF SLAB. AND
PROVIDE WMS. PROVIDE VOLUME DAMPER
ON RETURN AND VENTILATION AIR IN THE
VERTICAL. BALANCE VENTILATION AIR
DAMPER TO 500 CFM AND THE RETURN AIR
TO 4,400 CFM.
ALL BRINE AND CONDENSER WATER PIPING
SHALL BE RACKED AT AN ELEVATION THAT
MAINTAINS ACCESS FOR A SECOND
CHILLER BEING INSTALLED AS INDICATED.
ASSUME SECOND CHILLER WILL BE THE
SAME SIZE AND THE PROPOSED.
ADD ALTERNATE: PROVIDE A PRICING
ALTERNATE FOR ROUTING THE BRINE
PIPING WITHIN THE PROPOSED TRENCH.
TEMPORARILY SUPPORT ALL EXISTING TO
REMAIN MECHANICAL, PLUMBING, AND
ELECTRICAL EQUIPMENT TO
ACCOMMODATE TRENCH.
2
3
4
5
6
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-500.00_D
V18025.01.dw
g
06 M
ar '19 - 11:01am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-500.00
MECHANICAL ENLARGED
DEMO PLAN - FUTURE
CHILLER PLANT
MECHANICAL ENLARGED DEMO PLAN - FUTURE CHILLER PLANT
1/4" = 1' - 0"
1
(E)5"LPR UP
(E)2
1
2
"PD
UP
4"LPR UP
(E)16x16
(E)20x10
TRANSFER
DUCT
(
E
)
2
2
x
1
4
S
A
D
(
E
)
2
0
x
1
2
S
A
D
(E)
BH-16
(E
)20x12S
AD
(E)1
1
2
"BHF UP
(E)1
1
2
"BHR UP
(E
)16x10S
AD
(E)1
1
2
"BHF UP
(E)1
1
2
"BHR UP
(
E
)
1
0
x
8
(E)10x6
TF UP
(E)
BH-17
(
E
)
2
8
x
1
4
E
A
D
(
E
)
1
8
x
1
0
E
A
D
AC
ICE
CWP
1
CWP
2
BWP
1
BWP
2
24X24 EA UP
18X30 SA UP
FSD
10"BWS/R UP
8"CWS/R UP
ET
ICE
8"BWR UP
6"REFRIGERATION
RELIEF UP
10"BWS
10"BWR
8"CWS/R
10"BWS/R & 8"CWS/R
TO CHILLER
18X
20
1
1
24X
14
8"B
WR
3
2
2
CO
NT
RO
L P
AN
EL
FUTURE CHILLER
44X14
WMS
EMERGENCY
SHOWER/EYE
WASH STATION
1" TO EXPANSION
TANK
CO
NT
RO
L P
AN
EL
CH
1
4
12X10 OA UP
FSD
(E)STEAM
CONDENSATE
PUMP
5
2
1
2
"CWS
2
1
2
"CWR
CWP
AC1
CWP
AC2
PP
ICE
8x10 SAD
A
8Ø
150
A
6Ø
50
T
(2)
16x10 S
AD
750 CFM
8x6 SAD
B
26X8
750
16x10 S
AD
B
8X6
75
B
8X6
75
WMS
T
GLYCOL
MIXING
STATION
FSD
FSD
FSD
CH
1
1
"
H
W
S
/
R
S
S
S
1,500 GALLON AMMONIA
DIFFUSION TANK
6"REFRIGERATION
RELIEF
M
CONDENSER WATER
LINKED BUTTERFLY
CONTROL VALVES
BMS CONTROL
PANEL
REFRIGERANT
MONITOR
PANEL
1
1
2
"CONDENSER WATER BLOW
DOWN VALVE. PIPE DRAIN
DISCHARGE TO EXISTING DRAIN.
REMOVE GRATE TO FACILITATE
DIRECT DISCHARGE.
CONDENSER WATER
WATER TREATMENT
TS
TO BMS
GENERAL NOTES
KEYNOTES
1
1. EXISTING SYSTEMS INFORMATION IS
SHOWN FOR REFERENCE ONLY TO
CLARIFY SCOPE. CONTRACTOR SHALL
FIELD VERIFY THESE EXISTING CONDITION
TO CONFIRM THE PRECISE TIE-IN
LOCATION FOR NEW WORK. REFER TO
DEMOLITION PLANS FOR ADDITIONAL
INFORMATION REGARDING EXISTING
SYSTEMS. EXISTING SYSTEMS NOTES ARE
NOT SHOWN ON CONSTRUCTION PLANS
FOR CLARITY OF THE DRAWINGS.
2. CONTRACTOR SHALL PROVIDE CORE
DRILLING AS REQUIRED FOR NEW PIPE
PENETRATIONS.
3. COORDINATION DRAWINGS SHALL BE
PREPARED TO ENSURE ROUTING AVOIDS
CONFLICTS WITH NEW AND EXISTING
WORK. CONTRACTOR SHALL COORDINATE
WITH ALL OTHER TRADES.
4. ALL WORK AFFECTING BUILDING SYSTEM
OPERATION SHALL BE COORDINATED WITH
BUILDING ENGINEERING.
5. PIPING SHALL BE ROUTED TO AVOID
IMPACTING ALL EXISTING CEILING
HEIGHTS. PROVIDE RISE AND FALLS AS
NECESSARY TO AVOID OBSTRUCTIONS,
SUCH AS STRUCTURAL ELEMENTS AND
EXISTING TO REMAIN PIPING.
6. INTERIM RELOCATIONS OF EXISTING
SYSTEMS MAY BE REQUIRED TO
ACCOMPLISH THE FINAL INDICATED SCOPE
IN A STAGED MANNER. CONTRACTOR'S
SCOPE SHALL INCLUDE A PHASED
APPROACH AND ALL COSTS ASSOCIATED
WITH THIS MAKE-READY WORK.
7. PROVIDE FIRE/SMOKE DAMPERS AT ALL
SHAFT PENETRATIONS, MECHANICAL
ROOM WALL PENETRATIONS AND RATED
ASSEMBLY PENETRATIONS. REFER TO
ARCH. FOR RATED ASSEMBLY TYPES AND
LOCATIONS.
8. PROVIDE 1/2"X1/2" WIRE MESH SCREEN ON
ALL OPEN DUCTS TAPPED TO SHAFT
PLENUM.
9. CONTRACTOR IS RESPONSIBLE FOR ALL
CEILING REMOVALS AND
REINSTALLATIONS REQUIRED TO
COMPLETE WORK. PROVIDE CEILING
TILES AS REQUIRED. CEILING TILES SHALL
MATCH EXISTING.
10. PROVIDE CHILLER BREAK GLASS STATION
WITH HORN/STOBE IN ACCORDANCE WITH
CODE. AT A MINIMUM, PROVIDE A BREAK
GLASS STATION AND HORN STROP WITHIN
THE CHILLER PLANT AND JUST OUTSIDE
THE ROOM AT EACH DOOR TO THE
CHILLER PLANT.
24X14 SA OPENING, EXTEND DUCTWORK
DOWN TO 12" ABOVE THE FINISHED FLOOR
AND PROVIDE WMS. 2,450 CFM
PROVIDE FLANGED CONNECTION TO
ALLOW PIPE TO BE REMOVED IN THE
FUTURE TO ALLOW FOR A FUTURE CHILLER
TO BE RIGGED.
PROVIDE FLANGED CONNECTION ABOVE
THE BOTH THE EVAPORATOR AND
CONDENSER BUNDLES TO ALLOW PIPE TO
REMOVED FOR CLEANING OF THE SHELL.
78X12 RA DUCT, EXTEND DUCTWORK UP TO
24" FROM THE UNDERSIDE OF SLAB. AND
PROVIDE WMS. PROVIDE VOLUME DAMPER
ON RETURN AND VENTILATION AIR IN THE
VERTICAL. BALANCE VENTILATION AIR
DAMPER TO 500 CFM AND THE RETURN AIR
TO 4,400 CFM.
ALL BRINE AND CONDENSER WATER PIPING
SHALL BE RACKED AT AN ELEVATION THAT
MAINTAINS ACCESS FOR A SECOND
CHILLER BEING INSTALLED AS INDICATED.
ASSUME SECOND CHILLER WILL BE THE
SAME SIZE AND THE PROPOSED.
ADD ALTERNATE: PROVIDE A PRICING
ALTERNATE FOR ROUTING THE BRINE
PIPING WITHIN THE PROPOSED TRENCH.
TEMPORARILY SUPPORT ALL EXISTING TO
REMAIN MECHANICAL, PLUMBING, AND
ELECTRICAL EQUIPMENT TO
ACCOMMODATE TRENCH.
2
3
4
5
6
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-500.00_D
V18025.01.dw
g
06 M
ar '19 - 11:01am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-501.00
MECHANICAL ENLARGED
PLAN - CHILLER PLANT
MECHANICAL ENLARGED PLAN - CHILLER PLANT
1/4" = 1' - 0"
1
(E)42X18
(E)42X18
(E)ICE MELTING
PUMP
(E)8"
(E)96x18 GR
5660 CFM
(R)ETHYLENE
GLYCOL DRUM
(E)5"
(E)3"LPS
(E)10"LPS
(E)2
1
2
"CPD
(E)60X18
(E)5"
(E)1
1
4
"
(E)2
1
2
"CPD
(E)6"
(E)6"
(E)DOMESTIC
WATER HEATER
(E)42X18
(E)2
1
2
"
(E)5"
(E)4"
(E)2"
(E)4"
(E)96x18 GR
5660 CFM
(E)SUMP
PUMPS
(R)ETHYLENE
GLYCOL
TRANSFER PUMP
ALL EQUIPMENT
AND TANKS ARE
LOCATED ON
MECHANICAL
MEZZANINE IN
THIS LOCATION.
(E
)6"
(E
)6"LP
R
(E
)6"
(E)2"
(E)1
1
4
"
(R
)1
1
2
"
TO EXISTING
DOMESTIC
COLD WATER
(R)BRINE
MIX PUMP
(R)BRINE
MIX TANK
(R)BRINE
EXPANSION
TANK
(R)10"BRINE(R)10"BRINE
(R)10"BRINE
(R)10"BRINE
(R)10"BRINE
(R)6"CWS/R
TO COOLING
TOWER
(R)6"CWS/R
TO METER
ROOM
(R)4"CW
(R)4"CW
(R)6"CW (R)6"CW
(R)6"CW
(R)4"CW
(E)10"LPS
(R)BRINE
CHILLER #1
(R)BRINE
CHILLER #2
(R)CONDENSER
WATER PUMP #1
(R)CONDENSER
WATER PUMP #2
(R)BRINE
PUMP #2
(R)BRINE
PUMP #1
(R)ICE
OUT HX
(E)ICE MELT HX
(E)SUMP
PUMPS
(E)EXHAUST
FAN (E-3)
(E)60X18
(E)60X18
(E)24X12
(R)24X16
(E)AHU
(V-3)
(E)AHU
(S-3)
(E)SA DUCT
SERVE
ROOM
(R) TWO
1
1
2
"REFRIGERANT
RELIEF PIPES
(E)MANHOLE
COVERS
(E)42X18
(E)42X18
(E)ICE MELTING
PUMP
(E)8"
(E)96x18 GR
5660 CFM
(E)5"
(E)3"LPS
(E)10"LPS
(E)2
1
2
"CPD
(E)60X18
(E)5"
(E)1
1
4
"
(E)2
1
2
"CPD
(E)6"
(E)6"
(E)DOMESTIC
WATER HEATER
(E)42X18
(E)2
1
2
"
(E)5"
(E)4"
(E)2"
(E)4"
(E)96x18 GR
5660 CFM
(E)SUMP
PUMPS
10"B
RIN
E
10"B
RIN
E
10"BRINE SUPPLY
& RETURN UP
-
ALL EQUIPMENT
AND TANKS ARE
LOCATED ON
MECHANICAL
MEZZANINE IN
THIS LOCATION.
(E
)6"
(E
)6"LP
R
(E
)6"
(E)2"
(E)1
1
4
"
(R
)1
1
2
"
TO EXISTING
DOMESTIC
COLD WATER
(E)10"LPS
(E)ICE MELT HX
(E)SUMP
PUMPS
(E)EXHAUST
FAN (E-3)
(E)60X18
(E)60X18
(E)24X12
(E)AHU
(V-3)
(E)AHU
(S-3)
(E)SA DUCT
SERVE
ROOM
(E)MANHOLE
COVERS
10"B
RIN
E
10"B
RIN
E
6
GENERAL NOTES
KEYNOTES
1
1. EXISTING SYSTEMS INFORMATION IS
SHOWN FOR REFERENCE ONLY TO
CLARIFY SCOPE. CONTRACTOR SHALL
FIELD VERIFY THESE EXISTING CONDITION
TO CONFIRM THE PRECISE TIE-IN
LOCATION FOR NEW WORK. REFER TO
DEMOLITION PLANS FOR ADDITIONAL
INFORMATION REGARDING EXISTING
SYSTEMS. EXISTING SYSTEMS NOTES ARE
NOT SHOWN ON CONSTRUCTION PLANS
FOR CLARITY OF THE DRAWINGS.
2. CONTRACTOR SHALL PROVIDE CORE
DRILLING AS REQUIRED FOR NEW PIPE
PENETRATIONS.
3. COORDINATION DRAWINGS SHALL BE
PREPARED TO ENSURE ROUTING AVOIDS
CONFLICTS WITH NEW AND EXISTING
WORK. CONTRACTOR SHALL COORDINATE
WITH ALL OTHER TRADES.
4. ALL WORK AFFECTING BUILDING SYSTEM
OPERATION SHALL BE COORDINATED WITH
BUILDING ENGINEERING.
5. PIPING SHALL BE ROUTED TO AVOID
IMPACTING ALL EXISTING CEILING
HEIGHTS. PROVIDE RISE AND FALLS AS
NECESSARY TO AVOID OBSTRUCTIONS,
SUCH AS STRUCTURAL ELEMENTS AND
EXISTING TO REMAIN PIPING.
6. INTERIM RELOCATIONS OF EXISTING
SYSTEMS MAY BE REQUIRED TO
ACCOMPLISH THE FINAL INDICATED SCOPE
IN A STAGED MANNER. CONTRACTOR'S
SCOPE SHALL INCLUDE A PHASED
APPROACH AND ALL COSTS ASSOCIATED
WITH THIS MAKE-READY WORK.
7. PROVIDE FIRE/SMOKE DAMPERS AT ALL
SHAFT PENETRATIONS, MECHANICAL
ROOM WALL PENETRATIONS AND RATED
ASSEMBLY PENETRATIONS. REFER TO
ARCH. FOR RATED ASSEMBLY TYPES AND
LOCATIONS.
8. PROVIDE 1/2"X1/2" WIRE MESH SCREEN ON
ALL OPEN DUCTS TAPPED TO SHAFT
PLENUM.
9. CONTRACTOR IS RESPONSIBLE FOR ALL
CEILING REMOVALS AND
REINSTALLATIONS REQUIRED TO
COMPLETE WORK. PROVIDE CEILING
TILES AS REQUIRED. CEILING TILES SHALL
MATCH EXISTING.
10. PROVIDE CHILLER BREAK GLASS STATION
WITH HORN/STOBE IN ACCORDANCE WITH
CODE. AT A MINIMUM, PROVIDE A BREAK
GLASS STATION AND HORN STROP WITHIN
THE CHILLER PLANT AND JUST OUTSIDE
THE ROOM AT EACH DOOR TO THE
CHILLER PLANT.
24X14 SA OPENING, EXTEND DUCTWORK
DOWN TO 12" ABOVE THE FINISHED FLOOR
AND PROVIDE WMS. 2,450 CFM
PROVIDE FLANGED CONNECTION TO
ALLOW PIPE TO BE REMOVED IN THE
FUTURE TO ALLOW FOR A FUTURE CHILLER
TO BE RIGGED.
PROVIDE FLANGED CONNECTION ABOVE
THE BOTH THE EVAPORATOR AND
CONDENSER BUNDLES TO ALLOW PIPE TO
REMOVED FOR CLEANING OF THE SHELL.
78X12 RA DUCT, EXTEND DUCTWORK UP TO
24" FROM THE UNDERSIDE OF SLAB. AND
PROVIDE WMS. PROVIDE VOLUME DAMPER
ON RETURN AND VENTILATION AIR IN THE
VERTICAL. BALANCE VENTILATION AIR
DAMPER TO 500 CFM AND THE RETURN AIR
TO 4,400 CFM.
ALL BRINE AND CONDENSER WATER PIPING
SHALL BE RACKED AT AN ELEVATION THAT
MAINTAINS ACCESS FOR A SECOND
CHILLER BEING INSTALLED AS INDICATED.
ASSUME SECOND CHILLER WILL BE THE
SAME SIZE AND THE PROPOSED.
ADD ALTERNATE: PROVIDE A PRICING
ALTERNATE FOR ROUTING THE BRINE
PIPING WITHIN THE PROPOSED TRENCH.
TEMPORARILY SUPPORT ALL EXISTING TO
REMAIN MECHANICAL, PLUMBING, AND
ELECTRICAL EQUIPMENT TO
ACCOMMODATE TRENCH.
2
3
4
5
6
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-500.00_D
V18025.01.dw
g
06 M
ar '19 - 11:01am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-502.00
MECHANICAL ENLARGED
PLANS - CENTRAL MER
MECHANICAL ENLARGED PLAN - CHILLER PLANT
1/4" = 1' - 0"
1
MECHANICAL DEMO ENLARGED PLAN - CHILLER PLANT
1/4" = 1' - 0"
1
GENERAL NOTES
KEYNOTES
1
1. EXISTING SYSTEMS INFORMATION IS
SHOWN FOR REFERENCE ONLY TO
CLARIFY SCOPE. CONTRACTOR SHALL
FIELD VERIFY THESE EXISTING CONDITION
TO CONFIRM THE PRECISE TIE-IN
LOCATION FOR NEW WORK. REFER TO
DEMOLITION PLANS FOR ADDITIONAL
INFORMATION REGARDING EXISTING
SYSTEMS. EXISTING SYSTEMS NOTES ARE
NOT SHOWN ON CONSTRUCTION PLANS
FOR CLARITY OF THE DRAWINGS.
2. CONTRACTOR SHALL PROVIDE CORE
DRILLING AS REQUIRED FOR NEW PIPE
PENETRATIONS.
3. COORDINATION DRAWINGS SHALL BE
PREPARED TO ENSURE ROUTING AVOIDS
CONFLICTS WITH NEW AND EXISTING
WORK. CONTRACTOR SHALL COORDINATE
WITH ALL OTHER TRADES.
4. ALL WORK AFFECTING BUILDING SYSTEM
OPERATION SHALL BE COORDINATED WITH
BUILDING ENGINEERING.
5. PIPING SHALL BE ROUTED TO AVOID
IMPACTING ALL EXISTING CEILING
HEIGHTS. PROVIDE RISE AND FALLS AS
NECESSARY TO AVOID OBSTRUCTIONS,
SUCH AS STRUCTURAL ELEMENTS AND
EXISTING TO REMAIN PIPING.
6. INTERIM RELOCATIONS OF EXISTING
SYSTEMS MAY BE REQUIRED TO
ACCOMPLISH THE FINAL INDICATED SCOPE
IN A STAGED MANNER. CONTRACTOR'S
SCOPE SHALL INCLUDE A PHASED
APPROACH AND ALL COSTS ASSOCIATED
WITH THIS MAKE-READY WORK.
7. PROVIDE FIRE/SMOKE DAMPERS AT ALL
SHAFT PENETRATIONS, MECHANICAL
ROOM WALL PENETRATIONS AND RATED
ASSEMBLY PENETRATIONS. REFER TO
ARCH. FOR RATED ASSEMBLY TYPES AND
LOCATIONS.
8. PROVIDE 1/2"X1/2" WIRE MESH SCREEN ON
ALL OPEN DUCTS TAPPED TO SHAFT
PLENUM.
9. CONTRACTOR IS RESPONSIBLE FOR ALL
CEILING REMOVALS AND
REINSTALLATIONS REQUIRED TO
COMPLETE WORK. PROVIDE CEILING
TILES AS REQUIRED. CEILING TILES SHALL
MATCH EXISTING.
DISCHARGE EMERGENCY MACHINERY
ROOM EXHAUST VERTICALLY UPWARDS AT
A MINIMUM OF 2,500 FPM. ADJUST DUCT
DISCHARGE DIMENSIONS AS REQUIRED TO
ACHIEVE VELOCITY. PROVIDE A DRAIN
WITH A TRAP AT THE BASE OF THE
DUCTWORK TO DRAIN ANY WATER THAT
COLLECTS. DUCTWORK ELBOW SHALL BE
AT LEAST 6' ABOVE ROOF DECK.
DISCHARGE EMERGENCY REFRIGERANT
EXHAUST PIPE AS HIGH ON THE WALL AS
POSSIBLE, A MINIMUM OF 10'-0" ABOVE
ROOF. PROVIDE 45 DEGREE MITERED END
WITH BUG SCREEN AT DISCHARGE. PIPING
SHALL BE PAINTED TO MATCH
SURROUNDINGS.
PIPE SHALL BE HEAT TRACED.
COORDINATE POWER CONNECTION AND
SENSOR LOCATION WITH ELECTRICAL
CONTRACTOR.
CONNECT 4"DRAIN TO COOLING TOWER
DRAIN AND OVERFLOW DRAIN IN THIS CELL.
2
3
4
EXISTING
SHAFT
30X20 EA DN/UP
8"CWS/R
DN/UP
6"REFRIGERATION
RELIEF DN/UP
HEAT TRACE
CONTROL PANEL
8"CWS/R
DN
8"CWS/R
DN/UP
(E)R
6
30X20 EA UP
6"REFRIGERATION
RELIEF DN
6"REFRIGERATION
RELIEF UP
EXISTING
RETURN DUCT
30X20 EA DN
30X20 EA UP
20X30
8"CWS/R
DN/UP
6"REFRIGERATION
RELIEF DN/UP
4"DR
CT
2
CT
1
4"HUB
DN
4"DR
30X20 EA DN
8"CWS/R
DN
1
4"HUB
DRAIN
6"REFRIGERATION
RELIEF DN
2
3
3
3
3
6"CWR
36"CWR
6" EQUALIZER
LINE
4
4
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-502.00_D
V18025.01.dw
g
06 M
ar '19 - 11:01am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-503.00
MECHANICAL PLAN -
STAIRS
MECHANICAL PLAN - STAIRS - CONCOURSE LEVEL (LEVEL 61)
11/8" = 1'-0"
MECHANICAL PLAN - STAIRS - INTERMEDIATE (LEVEL 76 THRU 95)
21/8" = 1'-0"
MECHANICAL PLAN - STAIRS - CLUB LEVEL (LEVEL 107)
31/8" = 1'-0"
MECHANICAL PLAN - STAIRS - COOLING TOWER LEVEL (LEVEL 121)
41/8" = 1'-0"
BWP
2
CH
1
10
"B
WR
10
"B
WR
10"BWR
10"BWR
10"BWS
LEVEL 31
LEVEL 48
BWP
1
10
"B
WR
10
"B
WR
10"BWR
CHILLED WATER
DIFFERENTIAL
BYPASS
ICE PLANT & PUMP ROOM
LEVEL 61
(E) ICE FLOOR
(E)10"BWS
(E)10"BWR
10"BWR
10"BWS
BRINE WATER ONE LINE
NOT TO SCALE
CONDENSER WATER ONE LINE
NOT TO SCALE
CWP
1
CWP
2
8"C
WR
8"C
WR
8" CWR
LEVEL 31
LEVEL 48
ICE PLANT & PUMP ROOM
CH
1
8"C
WR
8"C
WR
CONDENSER WATER
LINKED BUTTERFLY
CONTROL VALVES
M
M
2"METER WITH
BYPASS
2"RPZ PIPED
TO DRAIN
2"MAKEUP WATER SLOW
CLOSING SOLENOID VALVE
(E)4"DCW
2"DCW
LEVEL 61
LEVEL76
LEVEL 95
LEVEL 107
LEVEL 121(ROOF)
8"C
WR
8"C
WS
CT
1
CT
2
6"CWS
8"CWS
M
6"CWR6"CWR
M
8"CWR
4"DR
2"DRAIN
3"OVERFLOW DRAIN
6"CWS
2"DRAIN
3"OVERFLOW DRAIN
6" EQUALIZER
LINE
PROVIDE ELECTRIC HEAT CABLE, INSULATION
AND METAL PROTECTIVE COVER FOR ALL
PIPING ABOVE THE ROOF EXCEPT FOR THE
OVERFLOW AND DRAIN PIPES DOWN STREAM
OF THE DRAIN VALVE.
4"HUB DRAIN, SEE PLUMBING
DRAWINGS FOR CONTINUATION
8"CWR
HX
ICE
M
MECHANICAL MEZZANINEMECHANICAL MEZZANINE
8"B
WR
8"BWS
M
ET
ICE
PART OF THE CHILLER PUMP SKID
PACKAGE
PP
ICE
PART OF THE CHILLER PUMP SKID
PACKAGE
PP
ICE
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-600.00_D
V18025.01.dw
g
06 M
ar '19 - 11:01am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-600.00
MECHANICAL RISER
DIAGRAM
PROVIDE TRANSITION WHERE REQUIRED
TYPICAL OF INLET AND OUTLET
PROVIDE 30 DEGREE MAXIMUM DUCT
ANGLE AT TRANSITION
INLET
OUTLET
THREADED ROD TO
STRUCTURE ABOVE
BELT DRIVE MOTOR COVER
SPRING VIBRATION
ISOLATORS
(TYPICAL)
MOTORIZED
BACKDRAFT
DAMPER
(LOCATION
PER PLANS)
FLEXIBLE
CONNECTION
(TYPICAL)
INLINE FAN WITH ACOUSTICALLY
LINED HOUSING
PROVIDE ADEQUATE CLEARANCE
TO ALLOW FULL OPENING OF ACCESS
DOOR
DUCTWORK SIZES
INDICATED ON
DRAWINGS
NOTE:
INSTALL FAN WITH PROPER SERVICE CLEARANCE TO MOTOR AND DRIVE AND ALL PARTS FOR
PROPER AIR MOVEMENT AS RECOMMENDED BY THE MANUFACTURER.
A
INLINE FAN DETAIL
NO SCALE
1'-0"
DR
CWS
CWR
S
S
NOTES:
1. CONTROL/WATER REGULATING VALVES SHALL BE ON-OFF FOR FLOWS LESS THAN 6 GPM. FOR FLOWS GREATER THEN 6 GPM, THE SUPPLY SIDE
VALVE SHALL BE ON-OFF AND THE RETURN SIDE SHALL MODULATE BASED ON CONDENSER PRESSURE TO OPERATE AS A WATER REGULATING
VALVE. VALVE SHALL BE SET TO MAINTAIN MINIMUM REQUIRED FLOW AT ALL TIMES.
2. LIQUID DETECTOR SHALL SHUT DOWN UNIT AND CLOSE AUTOMATIC SUPPLY & RETURN VALVES UPON SENSING LIQUID.
3. PROVIDE STAINLESS STEEL DRIP PAN AND LIQUID DETECTORS BENEATH ALL HYDRONIC EQUIPMENT AND PIPING.
4. PROVIDE CONDENSATE PUMP FOR EACH UNIT HUNG ABOVE CEILING AND PIPE TO JANITOR CLOSET OR APPROVED LOCATION ON THIS FLOOR.
VERIFY LOCATION WITH BUILDING. CONDENSATE PUMPS SHALL BE 120V, 1PH, 60 HZ, 93W. 25 GPH @ 15' HEAD, 20' SHUTOFF HEAD, LOCATED:
A. IN EXPOSED CEILINGS: LITTLE GIANT VCMA-20ULS.
1
2
GAL TANK CAPACITY, RECEPTACLE PLUG.
B. CONCEALED ABOVE FINISHED CEILINGS: LITTLE GIANT VCC-20-P. 1.2 QT TANK CAPACITY, HARD WIRED.
5. ALL PIPE CONNECTIONS, INCLUDING CONDENSATE, SHALL BE MADE WITH FLEXIBLE, STAINLESS STEEL BRAIDED HOSE OF THE SAME SIZE AS THE
PIPE.
6. PROVIDE A DUCT SMOKE DETECTOR IN THE SUPPLY AND RETURN IN ALL UNITS 2000 CFM OR GREATER.
7. PROVIDE SEISMIC BRACING FOR ALL CEILING HUNG UNITS. PROVIDE SEISMIC ANCHORS FOR ALL FLOOR MOUNTED UNITS.
8. PROVIDE 2-WAY VALVE FOR SYSTEMS WITH VFD PUMPING OR PRESSURE DEPENDENT BYPASS. PROVIDE 3-WAY VALVES WITH BYPASS AND
BALANCING VALVE FOR SYSTEMS WITHOUT EITHER.
PACKAGED WATER
A/C OR HEAT PUMP
SPRING ISOLATOR
2" DEEP SECONDARY DRAIN PAN
SMOKE DETECTOR
SUPPLY AIR DUCT SEE PLAN
FOR SIZE AND CONT.
WATER SENSOR WIRE TO UNIT TO SHUT DOWN
OPERATION UPON SENSING OF WATER IN PAN
4" DEEP COPPER P-TRAP IF UNIT IS NOT SELF TRAPPED
FLEXIBLE PIPE CONNECTORS (TYP.). HIGH PRESSURE
STAINLESS STEEL BRAIDED HOSE.
UNION (TYP.)
THERMOMETER (TYP.)
CIRCUIT
SETTER
CHECK VALVE
BALL VALVE (TYP.)
STRAINER
MOTORIZED WATER
VALVE
PRESSURE GAUGE (TYP.)
CONTROL/WATER REGULATING VALVE
O.A. DUCT
MVD
SMOKE DETECTOR
R.A. BOOT
FILTER
AIR VENT
G
WATER SOURCE HEAT PUMP DETAIL
NO SCALE
H
TYPICAL STEAM CONVERTOR (SHELL & TUBE HEAT EXHANGGER)
NO SCALE
PITCH
3/4" SWING CHECK VALVE
(VACUUM BREAKER)
NOTE
1. MAX. AUTOMATIC CONTROL VALVE SIZE 2-1/2 INCHES. FOR STEAM FLOW RATE GREATER THAN 2-1/2 INCHES VALVE
CAPACITY, FURNISH TWO CONTROL VALVES IN PARALLEL AS INDICATED.
2. BY-PASS PIPING AROUND CONTROL VALVES TO BE ONE LINE SIZE SMALLER THAN MAIN STEAM SUPPLY LINE
UPSTREAM OF CONTROL VALVES.
3. PROVIDE PIPE UNIONS, FLANGES & ARRANGE WATER PIPING TO FACILITATE TUBE BUNDLE REMOVAL WITH MINIMUM
DISTURBANCE TO PIPING.
4. PRESSURE RELIEF VALVE SET AT 20% OVER WORKING PRESSURE.
B
END SUCTION WATER PUMP DETAIL
NO SCALE
TRIPLE DUTY VALVE
CHECK, BALANCING, AND
SHUTOFF
FLEX CONNECTION (TYP.)
PRESSURE GAUGE
WITH ISOLATION
COUPLING GUARD
END SUCTION
PUMP
INERTIA BASE
SPRING VIBRATION ISOLATORS
PUMP SUCTION
THERMOMETER
(TYP)
BUTTERFLY VALVE (TYP)
PRESSURE GAUGE
(TYP)
GAUGE ISOLATION
VALVE (TYP)
PROVIDE REDUCERS AS REQUIRED
FULL SIZE SUCTION DIFFUSER
WITH STRAINER
4" CONCRETE
HOUSEKEEPING PAD
INCREASER AS REQUIRED
NOTES:
1. CONCRETE PAD AND INERTIA BASES TO BE PROVIDED UNDER GENERAL CONSTRUCTION DIVISION OF SPECIFICATIONS.
INERTIA BASE HEIGHTS SHALL BE AS FOLLOWS UP TO 15HP=6": 15-50HP=8": 60-100HP=10": OVER 100HP=12"
2. PROVIDE SUCTION DIFFUSER WITH BASKET STRAINER IN LIEU OF INLINE Y-STRAINER
PROVIDE PRESSURE DIFFERENTIAL BYPASS VALVE
LOCATE ACROSS SUPPLY AND RETURN MAINS WHERE
MULTIPLE PUMPS ARE PROVIDED
PUMP DISCHARGE
SPRING TYPE VIBRATION ISOLATOR (TYP)
BASE TO BE SHIMMED
LEVELED, BOLTED AND
GROUTED TO INERTIA BASE
COMBINE CASING, SEAL LEAK-OFF & BEDPLATE
DRAINS & EXTEND TO FLOOR DRAIN
SUPPORT PIPE WELD TO ELBOW
HEEL AND BASE PLATE
VENT VALVE
FLUSHING WATER TO
PUMP MECHANICAL SEALS
PRESSURE GAUGE WITH
STOP COCK (TYP)
CONICAL
SEDIMENT
SEPARATOR
FROM DISCHARGE
SIDE OF PUMP
BLOW OFF
VALVE
TO SUCTION SIDE OF PUMP
D
PIPING ASSEMBLY FOR EXTERNALLY FLUSHED MECHANICAL SEALS PUMPS
NO SCALE
DUCT LINER
METAL FASTENERS
12" O.C. MAX. (TYP.)
NOT MORE THAN 2" FROM
EDGE OF LINER
GALVANIZED SHEET
METAL DUCT
ALL ENDS OF LINER TO BE COATED
WITH ADHESIVE. ENDS OF LINER SHALL
BE BUTTED FIRMLY TOGETHER AND
TAPED OVER.
GALVANIZED SHEET
METAL DUCT
TOP AND BOTTOM SECTION
OF LINER SHALL OVERLAP
THE SIDES
DUCT LINER
LINER TO BE ADHERED TO
DUCT WITH 100% ADHESIVE
F
DUCT LINER DETAIL
NO SCALE
E
CHILLER CONNECTIONS DETAIL
NO SCALE
1" DRAIN VALVE AND CAP
CHILLERAIR VENT
(TYP.)
P&T TAP (TYP.)
BALANCING VALVE (TYP.)
PRESSURE GAUGE (TYP.)
CWR
(OUT)
STRAINER WITH BLOW OFF
VALVE AND 1"Ø HOSE
ADAPTER
BUTTERFLY VALVE (TYP.)
THERMOMETER (TYP.)
CWS
(IN)
BWR
(IN)
BWS
(OUT)
AUTOMATIC MODULATING
ISOLATION VALVE (TYP).
PROVIDE BMS CONTROL
CONNECTION & POWER AS
REQUIRED
T P
T P
BMS CONNECTED FLOW
MEASURING STATION
T P
P T
BMS CONNECTED
PRESSURE AND
TEMPERATURE SENSOR
(TYP.)
CHILLER BASE RAIL SYSTEM
END SUCTION PUMPS
I
HEATING AND VENTILATING UNIT DETAIL
NO SCALE
~
~
~
~
S
S
NOTES:
1. LIQUID DETECTOR SHALL BE WIRED TO SHUT DOWN UNIT AND CLOSE AUTOMATIC SUPPLY & RETURN VALVES UPON SENSING LIQUID.
2. PROVIDE STAINLESS STEEL DRIP PAN AND LIQUID DETECTORS BENEATH ALL HYDRONIC EQUIPMENT AND PIPING.
3. ALL PIPE CONNECTIONS SHALL BE MADE WITH FLEXIBLE, METAL BREADED HOSE OF THE SAME SIZE AS THE PIPE.
4. PROVIDE A DUCT SMOKE DETECTOR IN THE SUPPLY AND RETURN IN ALL UNITS 2000 CFM OR GREATER.
5. WHERE UNITS UTILIZE A PLENUM RETURN, PROVIDE EACH TERMINAL UNIT WITH A FIRE ALARM RELAY FOR FAN SHUTDOWN.
FLEX CONNECTION IF DUCTED RETURN
HANGER RODS WITH SPRING
ISOLATORS. TYPICAL.
SUPPORT UNIT IN
ACCORDANCE W/ MFG.
RECOMMENDATIONS. (TYP.)
FANCOIL
FLEXIBLE CONNECTION
30 DEGREE MAXIMUM.
SUPPLY DUCT
WITH 1" LINER
SECONDARY DRAIN PAN
LIQUIDS DETECTOR
REFER TO COIL PIPING
DETAIL (TYP)
SMOKE DETECTOR
SEE NOTE BELOW
(TYP.)
RETURN
AIR WITH
1" LINER
CONTROL
CABINET
NOTE:
1. PROVIDE ANGLE IRON OR UNISTRUT SUPPORTS FROM FLOOR FOR ALL INLINE PUMPS 7
1
2
HP & LARGER. SMALLER PUMPS MAY BE
SUPPORTED FROM STRUCTURE ABOVE. PUMPS MUST BE SUPPORTED WITH VIBRATION ISOLATORS. PROVIDE LAYOUT AND
SUPPORT DETAILS FOR APPROVAL.
2. VALVES SHALL BE THE SAME SIZE AS PIPE, REDUCE AS REQUIRED TO PUMP CONNECTIONS.
3. FOR PUMPS OVER 1 HP: PUMP & PIPE WITHIN 20' SHALL BE SUPPORTED FROM SPRING ISOLATORS.
4. SUBSTITUTE BALL VALVES FOR BUTTERFLY VALVES FOR ALL PIPING 2" AND SMALLER.
LIFTING EYES
BUTTERFLY VALVE (3" AND LARGER) BALL
VALVE (2
1
2
" AND SMALLER W/LEVER
HANDLE. (VALVE NOT NEEDED IF
BALANCING VALVE IS RATED FOR
BUBBLE SHUT OFF)
INLINE PUMP
STRAINER HOSE
END DRAIN VALVE
PRESSURE GAUGE
(TYP)
TEMP GAUGE (TYP)
PROVIDE TRIPLE DUTY VALVE OR
BALANCING VALVE W/ MEMORY
STOP AND CHECK VALVE
FLEX
CONNECTION
(TYP)
C
IN-LINE PUMP DETAIL
NO SCALE
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-700.00_D
V18025.01.dw
g
06 M
ar '19 - 11:01am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-700.00
MECHANICAL DETAILS I
PIPE
INSULATION
STEEL BAND SWABBED
WITH TAR
STEEL CAP
STAINLESS STEEL
FLASHING
ROOF
1"PIPE SLEEVE
D
DETAIL OF INSULATED PIPE THRU ROOF
NO SCALE
CONTINUOUS WELD
ALL AROUND
PIPE
STEEL CAP
STAINLESS STEEL
FLASHING
ROOF
PIPE SLEEVE 1"
C
DETAIL OF UNINSULATED PIPE THRU ROOF
NO SCALE
4" MINIMUM
NOTE:
THIS DETAIL REFERS TO PIPES BEING INSTALLED
THROUGH EXISTING FLOOR SLABS USING A CORE DRILL.
SLAB THICKNESS SHALL BE CONFIRMED BY CORE
DRILLING THROUGH THE SLAB FOR THE RISER BEFORE
DRILLING FOR SLEEVE.
PIPE RISER
SPECIFIED INSULATION
OVER PIPE CLAMP
PIPE CLAMP
PROVIDE WATERPROOF
NON-SHRINK GROUT #5000
BY PLUMBING
CONTRACTOR
PACK VOID TIGHTLY W/
APPROVED FIRE SEALANT AND
SEAL ENDS WITH WATERPROOF
MASTIC, SEE SPEC.
EPOXY COATING
WATER PROOFING
2"
MINIMUM 4"
IPS SCH 40 PIPE SLEEVE
SIZED FOR MIN 1/2"
ANNULUS
CHROME PLATED
ESCUTCHEON PLATE
ON EXPOSED PIPES
E
DETAIL OF PIPE THRU EXISTING FLOOR SLAB
NO SCALE
NOTE: OMIT ESCUTCHEON PLATES
FOR CONCEALED PIPES.
METAL STUD CHANNEL FRAME AROUND
16 GAGE PIPE SLEEVE
PIPE
SPECIFIED INSULATION
STUD WALL POSITIVE ACTING CHROME
PLATED ESCUTCHEON PLATES
F
DETAIL OF PIPE THRU STUD WALL
NO SCALE
FLOOR OR WALL ASSEMBLY - MIN 4-1/2" THICK LIGHTWEIGHT OR NORMAL WEIGHT
CONCRETE FLOOR OR 5-1/2" WALL OR CMU BLOCK WALL. THE MAX OPENING DIAMETER
IS 8". THE MAX ANNULAR SPACE IS 3/4".
PIPE INSULATION - NOMINAL 1" THICK, OR THINNER, FIBERGLASS OR MINERAL WOOL
PIPE INSULATION.
METALLIC PIPE OF CONDUIT - MAX NOMINAL 4" DIAMETER, SCH. 5 OR HEAVIER STEEL
OR CAST IRON PIPE.
FORMING MATERIAL - TIGHTLY PACK MIN 4PCF MINERAL WOOL BATT INSULATION TO
FILL THE ANNULAR SPACE TO A MIN 3-1/2" DEPTH, AND RECESS 1" FROM THE TOP
SURFACE OF THE FLOOR OR FROM BOTH SURFACES OF THE WALL.
NELSON FSP PUTTY - APPLY OVER THE FORMING MATERIAL TO A MIN DEPTH OF 1",
FLUSH WITH THE TOP SURFACE OF THE FLOOR OR WITH BOTH SURFACES OF THE
WALL WITH AN ADDITIONAL 3/4" CROWN AROUND THE PIPE WHERE IT PENETRATES
THE FLOOR OR WALL.
F RATING 2 HR.
T RATING 0 HR.
WALL
FORMING MATERIAL
PUTTY
PIPE INSULATION
PIPE INSULATION
PIPE
PIPE
FORMING MATERIAL
FLOOR
PUTTY
1
2
3
4
5
G
CONCRETE FLOOR OR WALL INSULATED METALLIC PIPE FIRE STOPPING DETAIL
NO SCALE
2H
2H
L
C
W
H
W
10
5, 6
8
4
PIPE SIZE (IN.)
W W
14
12
ANCHOR TO ANCHOR EXPANSION, (INCHES)
2
4 6 8 10 12
H
H H
W
WW
H
HH
2
3 3.5
4
6 7
4.5
54
9
108
3
4 5
6
8 10
6
75.5
12
1411
3.5
5 6
7
10 12
7.5
86.5
15
1613
4
5.5 6.5
8
11 13
8.5
97.5
17
1815
5
6.5 8
10
13 16
10
119
20
2218
5.5
7.5 9
11
15 18
12
1310.5
24
2621
6
8.5 10
12
17 20
13
1411.5
H
2823
6.5
9 11
13
18 22
14
15.512.5
28
3125
7
9.5 11.5
14
19 23
15
1613
30
3226
PIPING MAINS
MOMENT GUIDES
ANCHOR ON PIPE RUN
ANCHOR
MOMENT GUIDES
LONG RADIUS
WELDING FITTINGS
3
4
, 1, 1
1
4
1
1
2
, 2
2
1
2
, 3
A
EXPANSION LOOP DETAIL FOR BUILDING EXPANSION JOINTS
NO SCALE
B
DRAIN VALVE CONNECTION
NO SCALE
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
3/4" GATE VALVE
ADAPTER TO 3/4" HOSE
THREAD PROVIDE HOSE
CAP NUT
ELEVATION
THREADED PIPING
ELEVATION
WELDED PIPING
NOTES:
1. PROVIDE DRAIN VALVES AT LOW POINTS OF WATER SYSTEM.
2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS AND/OR
PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.
4"
1 1/2"
1 1/2"
1 1/2"
1
4
"
NEOPRENE INSULATION CARRIED
TO WALL
PIPE
STANDARD BLACK
STEEL PIPE SLEEVE
OAKUM PACKED
1
1
2
" x
1
4
" SEAL RING
TAMPED LEAD
CAULING COMPOUND
H
WATERPROOF SLEEVE
NO SCALE
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-700.00_D
V18025.01.dw
g
06 M
ar '19 - 11:01am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-701.00
MECHANICAL DETAILS II
AIR VENT
TO FLOOR DRAIN
COLD WATER
FILL
TO FLOOR DRAIN
P
SERVICE VALVE
PRESSURE REDUCING
VALVE W/ CHECK, OR
EQUAL
AIR SEPARATOR
PRESSURE GAUGE
EXPANSION TANK SEE
EXPANSION TANK PIPING DETAIL
I
AIR SEPARATOR PIPING DETAIL
NO SCALE
WOOD NAILER
PREFABRICATED CURB
FLASHING
BASE PLATE
COUNTER FLASHING
ROOF DECK
H
FLASHED ROOF EQUIPMENT CURB
NO SCALE
1. INSTALL MANUAL AIR VENT AT ALL HIGH POINTS WHERE FLOW CHANGES DIRECTION. INSTALL
AUTOMATIC AIR VENT TO PIPING WHICH INSTALLED IN EXPOSED AREA INCLUDING FAN ROOM AND
MECHANICAL ROOM.
2. INSTALL HOSE VALVE (SPECIFIED GAUGE COCK) 5'-0" ABOVE FLOOR. LOCATION TO BE
COORDINATED WITH ARCHITECT.
3. WELDED PIPE FITTING SHOWN. SCREWED FITTING SIMILAR.
AUTOMATIC AIR VENT
SEE NOTE 2
1/4" COPPER TUBING
REDUCER
AUTOMATICMANUAL
1
2
" VENT PIPE
TO FLOOR DRAIN
NOTES:
4 PIPE
DIAMETERS
(18"MAX)
4 PIPE
DIAMETERS
(18"MAX)
HIGHEST POINT
IN SYSTEMHIGHEST POINT
IN SYSTEM
A
AIR VENT DETAILS
NO SCALE
PIPE & DUCT PARALLEL
TO JOISTS
PIPE & DUCT PERPENDICULAR
TO JOISTS
4 x 3 x
1
4
STEEL CONT.
CONN. TO JOISTS AT
PANEL POINT
JOIST
WELDED
4 x 3 x
1
4
STEEL
BOLTS
(TYP.)
1" x
1
8
" GALV.
STEEL STRAP FOR
UP TO 8 SQ. FT.
IN AREA AND 47"
WIDTH MAX.
DUCTWORK SUPPORT
WELDED
3
8
" DIA HANGER
ROD FOR OVER 8
SQ. FT. IN AREA
AND OVER 47" WIDE
DUCTWORK SUPPORT
HANGER RODS
FOR PIPING
SUPPORT
1" x
1
8
" GALV.
STEEL STRAP FOR
UP TO 8 SQ. FT.
IN AREA AND 47"
WIDTH MAX.
DUCTWORK SUPPORT
4 x 3 x
1
4
STEEL
BOLTS (TYP.)
C
DUCT AND PIPE SUPPORT FROM OPEN WEB TRUSS
NO SCALE
B
HANGER FASTENED TO STRUCTURE DETAIL
NO SCALE
CONC. DECK
ROD COUPLING, IF
REQUIRED
(TYP.)
HILTI CONCRETE
ANCHOR
SUPPORT
BEAM
T.B. CLAMP
ROD TO
DUCT
ROD TO
DUCT
STRAP
HANGER
TO DUCT
HILTI CONCRETE
FASTENER
3/16
A
A
FINISH FLOOR
RISER PIPE
SECURE TO
PIPE
HEAVY DUTY PIPE
CLAMP SIZED FOR
LOADS TAC WELD TO
STEEL PLATE
3/8" THICK LOAD
BEARING PLATE
(WELD TO CLAMP)
TYPE 'PN'
NEOPRENE
ISOLATOR PAD
WELD PLATE TO ONE SIDE
OF CLAMP ONLY
SECTION A-A
D
RISER ISOLATION SUPPORT
NO SCALE
SPRING (SELECT ISOLATOR SIZE FOR 1"
DEFLECTION AT WEIGHT OF FULL PIPE
BORNE BY HANGER)
STD NEOPRENE GROMMET
AFTER INSULATION, RELEASE NUT BELOW
WASHER TO ALLOW SPRING TO ACT FREELY
INSTALL CALCIUM SILICATE OR HI-LO BLOCKS
WHERE PIPING IS INSULATED
DOUBLE DEFLECTION STD
NEOPRENE ELEMENT
(N) ADJUSTABLE, 30°
SWING
SPRING AND NEOPRENE IN
SHEAR VIBRATION
ISOLATOR
THREADED ROD
PIPE HANGERS
PIPING
1" SCRIM FACED
FIBERGLASS OR 1/2"
CLOSED CELL FOAM
INSULATION STRIP
BETWEEN BEARING AREA
OF PIPE AND PIPE HANGER
(BARE PIPES ONLY)
E
VIBRATION ISOLATION HANGER DETAIL
NO SCALE
INSULATION PIPE
CHANNEL
EQUIP. CURB
PLATED ROD
ROLLER CHAIR
SADDLE WASHER
LOAD BEARING CALCIUM SILICATE OR HILO
BLOCK INSULATION AT ALL HANGER
POINTS
F
ROOF PIPE SUPPORT
NO SCALE
INSULATION
PIPE
HANGER ROD
SEMI-CYLINDRICAL GALVANIZED IRON
SHIELD. FOR HOT PIPES 2-1/2" & OVER,
USE PROTECTIVE SADDLE
LOAD BEARING CALCIUM SILICATE OR HILO
BLOCK INSULATION AT ALL HANGER POINTS
ANGLE IRON
TRAPEZE HANGER
INSULATION SHIELDPIPE
HANGER ROD
VIBRATION
ELIMINATORS
WHERE
REQUIRED
(SEE H&V
SPECIFICATIONS)
CLEVIS HANGER
VIBRATION ELIMINATORS
WHERE REQUIRED (SEE
H&V SPECIFICATIONS)
INSULATION
SEMI-CYLINDRICAL GALVANIZED IRON
SHIELD.FOR HOT PIPES 2-1/2" & OVER,
USE PROTECTIVE SADDLE
LOAD BEARING CALCIUM SILICATE
OR HILO BLOCK INSULATION AT ALL
HANGER POINTS
CLEVIS HANGER-INSULATED PIPES
INSULATION SHIELD
SEMI-CYLINDRICAL
GALVANIZED IRON
SHIELD. FOR HOT PIPES
2-1/2" & OVER, USE
PROTECTIVE SADDLE
VIBRATION ELIMINATORS
WHERE REQUIRED (SEE
H&V SPECIFICATIONS)
LOAD BEARING CALCIUM
SILICATE OR HILO BLOCK
INSULATION AT ALL HANGER
POINTS
CLEVIS ROLLER HANGER
INSULATION SHIELD
G
PIPE HANGER DETAIL
NO SCALE
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-700.00_D
V18025.01.dw
g
06 M
ar '19 - 11:01am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-702.00
MECHANICAL DETAILS III
HANGER STRAPS OR RODS
MAX DUCT
DIA. (IN.)
QUANTITY/SIZE
(IN.)
MAX LOAD
(LBS.)
MAX SPACING
(FT.)
26
ONE 1 X 22
GA STRAP
260
12
12
420
ONE 1 X 18
GA STRAP
36
12
700
ONE 1 X 16
GA STRAP
50
12
1,320
TWO
3
8
DIA
RODS
60
12
2,500
TWO
1
2
DIA.
RODS
84
HANGER
RODS
OVER 50" DIA.
BAND
LOAD RATED
FASTENERS
50" DIA. & UNDER
BAND OF SAME SIZE
AS HANGER STRAP
H
ROUND DUCT HANGING DETAIL
NO SCALE
DUCT
DUCT
UP TO 8 SQ.FT. IN AREA
AND 47" WIDTH MAX.
OVER 8 SQ.FT. IN AREA
AND OVER 47" WIDE
NOTE:
1. PROVIDE WHEN NO SEISMIC REQUIREMENT. SEE
SPECIFICATIONS SECTION 23 05 49.
FOR DUCTS FROM 48"-60" WIDE 1 1/4" x 1 1/4" x
1/4" ANGLES 4'-0" O.C.
FOR DUCTS FROM 61"-90" WIDE 1 1/2" x 1 1/2" x
1/4" ANGLES 4'-0" O.C.
HANGERS SHALL BE PLACED ON
BOTH SIDES OF DUCT AND
SPACED 6'-0" O.C.
1" x 1/8" GALVANIZED
STEEL FLATS
1/4" DIA. RIVETS OR BOLTS
TURN STEEL FLATS 3"
UNDER
SHEETMETAL
SCREWS
6" O.C.
LOCKNUT
3/8" DIA. HANGER RODS 4'-0" O.C.
G
METHOD OF SUPPORTING DUCTS
NO SCALE
15° MAX.
DIM
.
"D
"
30° MAX.
2/3
"D
"
MIN
.
12" MIN.
TYPICAL OBSTRUCTION TO DUCT PATHROUND OR RECTANGULAR DUCT, TYPICAL
TYPICAL OBSTRUCTION TO DUCT PATH DO NOT TRANSITION DUCT TO SIDE, TYPICAL
DEPRESSED DUCT (SEE ELEVATION VIEW)
AIR FLOW
ELEVATION VIEW
DUCT DIM.
(SEE PLAN)
TRANS.
DN.
TRANS.
UP
PLAN VIEW
D
DUCT "VENTURI" DEPRESSION DETAIL
NO SCALE
W
45
L
AIR FLOW
REMOTE CEILING OPERATOR WHERE
DAMPER IS INACCESIBLE
VOLUME DAMPER PROVIDE
CONCEALED CEILING DAMPER
REGULATOR
NOTE:
L=1/4 W (4" MIN.)
NOTE:
DAMPERS SHOULD NOT BE
INSTALLED CLOSER THAN TWO
DUCT WIDTHS TO ELBOWS OR
INTERSECTIONS
E
BRANCH DUCT TAKE-OFF DETAIL
NO SCALE
WALL RATING DAMPER RATING
4 HOUR 3 HOUR
3 HOUR 3 HOUR
2 HOUR
1
1
2
HOUR
1 HOUR
1
1
2
HOUR
S
5' MAX
DUCT DIMENSION SLEEVE GAUGE
ABOVE 12 SF18
12 SF AND SMALLER20
NOTES:
REFER TO FIRE/SMOKE DAMPER MANUFACTURER'S INSTALLATION DETAILS. CONFORM
TO MOST STRINGENT REQUIREMENT IF THIS DETAIL CONFLICTS WITH UL LISTING
INSTALLATION INSTRUCTIONS.
DUCT
FIRESTAT
NEGATOR SPRING
CAULKING
MATERIAL
DAMPER
FRAME
PERIMETER ANGLES
FASTENED TO COLLAR
FASTEN DAMPER TO
SLEEVE WITH MINIMUM
NO. 8 BOLTS 12" ON
CENTER
ACCESS DOOR SIZED LARGE ENOUGH FOR
MAINTENANCE AND RESETTINGMINIMUM SIZE
OF 18X14. FOR SMALLER DUCTS, PROVIDE
ACCESS DOORS 2" SMALLER THAN DUCT
SLEEVE
OPERATOR/
ACTUATOR
AUXILIARY
OPERATING
JACK SHAFT
FUSIBLE ROD
UL LISTED SMOKE DETECTOR.
LISTED FOR AIR VELOCITY,
TEMPERATURE AND HUMIDITY
AT INSTALLATION LOCATION
INSTALL WITHIN 5' AT DAMPER
APPROVED-TYPE BREAKWAY
DUCT CONNECTION (TYP.)
DAMPER TO BE SECURED TO
1
8
" X
1
8
" COLLAR WITH
1/8" ROUND NUTS AND BOLTS OR WELDING IN MNTG. HOLES
PROVIDED OR NO. 10 SHEET METAL 8" O.C. OR 3/16" STEEL POP
RIVETS
MAINTAIN CLEARANCE IN
ACCORDANCE WITH UL 555
STANDARD.
U.L. 555 & 555S LISTED
U.M. FIRE/SMOKE DAMPER
U.N. WITH NYC MEA NUMBER
I
COMBINATION FIRE/SMOKE DAMPER DETAIL
NO SCALE
EXTRUDED SILICON RUBBER SEAL AT
BLADE EDGE
STAINLESS STEEL SPRING JAMB SEAL
ASSIST BLADE LINKAGE AS REQUIRED
1/2"Ø PINLOCK ROD WITH
DOUBLE-SCALED BEARINGS
EXTRUDED STOP AT TOP AND BOTTOM
7/8"
5"
CLOSED BLADE DETAIL
(NOTE OVERLAP OF BLADES)
C
OPPOSED BLADE DAMPER DETAIL
NO SCALE
A
CABINET HEATER
NO SCALE
FAN COIL UNIT
CONTROL VALVE
BALANCING VALVE
P&T TAP
AIR VENT
CABINET HEATER UNIT ENCLOSURE
FAN SPEED CONTROLS
ELECTRICAL JUNCTION BOX
HWR
HWS
DRAIN
C
L
r
SEAL METAL JOINTS WITH SEALER
CONICAL SPIN-IN DUCT FITTING
WITH MANUAL LOCKING
QUADRANT. PROVIDE FIELD
INSTALLED INSULATION, HANDLE
AND MECHANISM SHALL REMAIN
FREE TO OPERATE
ALL TURNS SHALL BE A MIN.
OF r= 1.5D. PROVIDE A
MAXIMUM OF 135 DEG TOTAL
FIBERFREE HOSPITAL
GRADE INSULATION WITH
VAPOR BARRIER
CEILING
IF REQUIRED, FIELD FABRICATE
END SEAL USING TAPE
PROVE A MIN. OF 3 DUCT
DIAMETERS (D) STRAIGHT DUCT
UPSTREAM OF DIFFUSER NECK.
NO FLEXIBLE DUCTWORK SHALL
BE USED
DIFFUSER
FACE STYLE PER
SCHEDULE
F
CEILING DIFFUSER DETAIL (HARD DUCT)
NO SCALE
45°
OUTSIDE
INSIDE
EXT. WALL
22 GA. GALV. FLASHING
G.I. LOCK
GALV. SHEET METAL
DUCT WORK
DUCT INSULATION
SOLDERED CORNERS AND
SEAMS ON FLASHING
SHEET METAL SCREWS
APPROX. 12"ON CENTERS
(TYPICAL)
B
EXTERIOR WALL PENETRATION DETAIL
NO SCALE
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-700.00_D
V18025.01.dw
g
06 M
ar '19 - 11:01am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-703.00
MECHANICAL DETAILS IV
L
P
S
L
P
C
R
A
3/4"
A BLPS
1" & 1¼"
1½" & 2"
2½" & 3"
4" & 5"
6" & 8"
10" & 12"
14" & 16"4"
4"
3"
3"
SAME
SIZE
AS LPS
3/4"
3/4"
1"
1¼"
1½"
1½"
2"
2"
TRAP CAPACITY
LB / HR
30
60
90
180
360
1800
1200
700
PIPE SIZES
NOTE:
1. PROVIDE THIS PIPING ARRANGEMENT WHERE LOW
PRESSURE TRAPS ARE REQUIRED.
2. OMIT CHECK VALVE WHERE FLOW IS BY GRAVITY TO
LPCR.
B
SHUT OFF VALVE
CHECK VALVE
F & T TRAP
1
2
"DRAIN WITH CAP
STRAINER WITH BLOW-OFF VALVE
B
12" MINIMUM
6" MINIMUM
A
LOW PRESSURE (<15 PSI) STEAM DRIP ASSEMBLY
NO SCALE
LPS
LPR
STEAM COIL
VACUUM BREAKER AND
AIR VENT
CONTROL VALVE
ECCENTRIC REDUCER
UNION
TAKE-OFF TOP OF MAIN
ISOLATION VALVE, TYP.
STRAINER INSTALL WITH Y
BRANCH HORIZONTAL
THERMODYNAMIC TRAP
FLOAT AND THERMOSTATIC TRAP
MIN. 2'
MIN 6"
B
LOW PRESSURE STEAM COIL CONNECTION DETAIL
NO SCALE
S SS
S
M
VALVED
OUTLET
MINIMUM
1" AIR GAP
ETHYLENE GLYCOL
SOLUTION HOLDING
TANK
MANUAL
VALVE
BALANCING VALVE
SIMPLEX MAKE-UP
PUMP ASSEMBLY
OVERFLOW TO
NEAREST DRAIN
TANK FLOAT SWITCH
TO OPEN & CLOSE
C.W. WATER MAKE
UP SOLENOID VALVE
FUNNEL
PRESSURE SWITCH
FOR MAKE-UP
PRESSURE SWITCH
FOR HI/LO ALARMS
SHUT OFF
VALVE
SYSTEM ISOLATION
VALVE FOR
MAINTENANCE
EXPANSION LINE
PRESSURE
GAUGE
SPRING LOADED
RELIEF VALVE
RUN TO NEAREST
FLOOR DRAIN
FINISHED FLOOR
4" HIGH CONCRETE
HOUSEKEEPING PAD
ACCESS
OPENING
MECHANICAL PLUMBING
AUTOMATIC MAKE-UP WATER PRV
VALVE. SETPOINT DETERMINED BASE
ON SYSTEM PRESSURE.
BALL VALVE
TO FLOOR DRAIN
REDUCED PRESSURE
BACKFLOW PREVENTER
CW MAKE UP
D
DIAPHRAGM EXPANSION TANK WITH MAKE-UP PUMP AND GLYCOL TANK DETAIL
NO SCALE
115 V 1Ø,
60HZ
CORPORATION STOP (TYP)
CONDUCTIVITY CONTROLLER
AND CHEMICAL FEED
CONTROLLER, AND BIOCIDE
TIMER
CONDENSER
BIOCIDE DRUM
INHIBITOR DRUM
CONDUCTIVITY PROBE
CONDENSER WATER
PUMP
PRESSURE SWITCH
BLOWDOWN
TO DRAIN
BIOCIDE DRUM
SAMPLE
COOLING
TOWER
E
CONDENSER WATER CHEMICAL TREATMENT
NO SCALE
CONDENSATE PUMP
DISCHARGE TO BOILER
FILL FUNNEL
3/8"
3/8" GLOBE VALVE
DRAIN
FROM PUMP
BOILER FEED LINE
3/8" PETCOCK
1"
1"
FILLING FUNNEL WITH
SHUT OFF VALVE
MANUAL AIR VENT WITH
GOOSNECK FITTING
UNION (TYP.)
SUPPORT RING
4" CONCRETE PAD
PROVIDE ONE FOR HEATING WATER AND ONE FOR CHILLED WATER.
NEEDLE VALVE FOR FLOW
CONTROL
FROM SUPPLY HEADER
HEADER
3/4"
TO DRAIN
3/4"
F
SHOT TYPE CHEMICAL FEEDER
NO SCALE
G
CHEMICAL POT FEEDER
NO SCALE
WALL RATING DAMPER RATING
4 HOUR3 HOUR
3 HOUR 3 HOUR
2 HOUR
1
1
2
HOUR
1 HOUR
1
1
2
HOUR
S
5' M
AX
DUCT DIMENSION SLEEVE GAUGE
ABOVE 12 SF18
12 SF AND SMALLER20
NOTES:
REFER TO FIRE/SMOKE DAMPER MANUFACTURER'S INSTALLATION DETAILS. CONFORM
TO MOST STRINGENT REQUIREMENT IF THIS DETAIL CONFLICTS WITH UL LISTING
INSTALLATION INSTRUCTIONS.
DUCT
FIRESTAT
NEGATOR
SPRING
CAULKING
MATERIAL
PERIMETER ANGLES
FASTENED TO COLLAR
FASTEN DAMPER TO SLEEVE
WITH MINIMUM NO. 8 BOLTS
12" ON CENTER
ACCESS DOOR SIZED LARGE ENOUGH FOR
MAINTENANCE AND RESETTING MINIMUM SIZE OF 18X14.
FOR SMALLER DUCTS, PROVIDE ACCESS DOORS 2"
SMALLER THAN DUCT
SLEEVE
OPERATOR/
ACTUATOR
AUXILIARY
OPERATING
JACK SHAFT
FUSIBLE ROD
UL LISTED SMOKE DETECTOR.
LISTED FOR AIR VELOCITY,
TEMPERATURE AND HUMIDITY
AT INSTALLATION LOCATION
INSTALL WITHIN 5' AT DAMPER
APPROVED-TYPE BREAKWAY
DUCT CONNECTION (TYP.)
DAMPER TO BE SECURED
TO
1
8
" X
1
8
" COLLAR WITH
1/8" ROUND NUTS AND BOLTS
OR WELDING IN MNTG. HOLES
PROVIDED OR NO. 10 SHEET METAL
8" O.C. OR 3/16" STEEL POP RIVETS
MAINTAIN CLEARANCE IN
ACCORDANCE WITH UL 555 STANDARD.
U.L. 555 & 555S LISTED
U.M. FIRE/SMOKE DAMPER
U.N. WITH NYC MEA NUMBER
PROVIDE 6" H CONCRETE CURB
AROUND FLOOR PENETRATION
C
COMBINATION FIRE/SMOKE DAMPER DETAIL
NO SCALE
H
-
NO SCALE
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-700.00_D
V18025.01.dw
g
06 M
ar '19 - 11:01am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-704.00
MECHANICAL DETAILS V
COND
EP
DP
EA
DPT
CSEN
DO
DI
BDD
CD
CHS
CHR
CC
C
AO
AI
DIFFERENTIAL PRESSURE SWITCH
DIFFERENTIAL PRESSURE TRANSMITTER
ELECTRICAL-PNEUMATIC TRANSDUCER SWITCH
DIGITAL OUTPUT
CURRENT SENSOR
EXHAUST AIR
DIGITAL INPUT
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSATE OVERFLOW
BACKDRAFT DAMPER
COOLING COIL
CONTROL DAMPER
CONTROLLER
ANALOG INPUT
ANALOG OUTPUT
TEMPERATURE TRANSMITTER W/AVERAGING BULB
WET BULB TEMPERATURE TRANSMITTER
MOTORIZED CONTROL
HOT WATER SUPPLY
HOT WATER RETURN
INTERLOCK RELAY
PC PREHEAT COIL
OUTSIDE AIR
MINIMUM
M
MIN
OA
HWR
HWS
IR
FILTER ASSEMBLY
HIGH LIMIT HUMIDITY SWITCH
HUMIDITY TRANSMITTER
FLOW TRANSDUCER
FIRE ALARM PANEL
CONTROL LEGEND (NOT ALL ABBREVIATION ARE USED FOR THIS PROJECT)
HEATING COIL
FREEZESTAT
HT
HC
HH
F
FT
FR
FAN COIL UNIT
FLOW SWITCH
FCU
FAP
FS
VELOCITY SENSOR
THERMOSTAT
VARIABLE FREQUENCY DRIVE
TEMPERATURE TRANSMITTER
VS
WBT
V
VFD
T
TTAB
TT
VALVE
STATIC PRESSURE TRANSMITTER
SUPPLY FAN
SMOKE DETECTOR (BY ELECTRICAL)
SUPPLY AIR
RETURN FAN
RETURN AIR
PRESSURE TRANSMITTER
SPACE TEMPERATURE SENSOR
SWITCHING RELAY
SF
SPT
SR
TS
SA
SD
PT
RA
RF
CO CARBON MONOXIDE SENSOR
OCCUPANCY SENSOROS
START/STOPS/S
ED ENABLE/DISABLE
PNEUMATIC ELECTRIC SWITCHPEEND SWITCHE/S
HARDWIRED INTERFACEHI
CI COMMUNICATION INTERFACE
BUILDING MANAGEMENT SYTEM (BMS) GENERAL NOTES:
GENERAL:
A. BMS CONTRACTOR SHALL COORDINATE ALL INTERFACE REQUIREMENTS. CONTROLS SHALL BE AUTOMATED LOGIC.
B. BMS/ATC CONTRACTOR IS RESPONSIBLE FOR UNDERSTANDING NEW YORK STATE ENERGY CODE AND ALL OTHER RELEVANT NEW YORK STATE STANDARDS.
C. TC CONTRACTOR SHALL COORDINATE WITH ENGINEER CM/GC, AND MC FOR VALVE ACTUATOR AND OTHER CONTROL COMPONENT REPLACEMENT OR
INSTALLATION PROVISIONS SHOWN OR IMPLIED THROUGHOUT THE CONTRACT DOCUMENTS. PROVIDE ALL MISCELLANEOUS ACCESSORIES, DEVICES,, TRANSLATORS, AND
MODULES REQUIRED FOR A COMPLETE SYSTEM.
D. PROVIDE INDIVIDUAL INPUTS OR OUTPUTS FOR EACH POINT LISTED IN THE DIAGRAMS AND POINTS LIST. PROVIDE ANY ADDITIONAL CONTROL POINTS NOT LISTED IN THE
DIAGRAMS OR POINTS LISTS, BUT REQUIRED TO MEET THE SEQUENCES OF OPERATION. ALL ANALOG OUTPUTS SHALL BE 4-20MA, 0-10VDC OR 0-20VDC UNLESS OTHERWISE
INDICATED. AO=ANALOG OUTPUT, AI=ANALOG INPUT, DO=DIGITAL (BINARY) OUTPUT, DI=DIGITAL (BINARY) INPUT.
E. ALL SETPOINTS SHALL BE MAPPED WITH GRAPHIC DISPLAY AND BE FULLY ADJUSTABLE AT THE OPERATOR WORKSTATION.
F. PROVIDE OVERRIDE CONTROL OF ALL POINTS AT THE OPERATOR WORKSTATION.
G. ALL "MONITORING" POINTS SHALL BE MAPPED TO THE BMS WORKSTATION GRAPHIC DISPLAY
H. ALL CONTROL POINTS SHALL BE DISPLAYED AT THE OPERATOR WORKSTATION.
I. "OPERATOR" IS DEFINED AS THE OWNER'S REPRESENTATIVE DESIGNATED TO OPERATE THE BMS.
J. THE BMS SHALL MONITOR CONTROL, AND CALCULATE ALL THE POINTS AND FUNCTIONS LISTED.
AI
AI
FS
DI
AO
T
T
MPS
BWS
PT
AI
POINT DESCRIPTION
STEAM VALVE POSITION COMMAND
SUPPLY WATER TEMPERATURE (LWT)
SUPPLY WATER TEMPERATURE SETPOINT
RETURN WATER TEMPERATURE (EWT)
SYSTEM LOW PRESSURE
SYSTEM PRESSURE SETPOINT
ANALOG
INPUT
IN
PU
T V
ALU
E
X
X
TE
MP
X
X
PR
ES
HU
MID
IT
Y
AM
PS
GP
M
CF
M
PP
M
PE
RC
EN
T
OUTPUT
DD
C 4-20 m
a, 0-10 V
DC
X
SE
TP
OIN
T A
DJ
BINARY
INPUT
IN
PU
T V
ALU
E
ST
AT
US
O
N\O
FF
X
FILT
ER
S
TA
TU
S
ST
AT
US
O
PE
N\C
LO
SE
D
ST
AT
US
- A
LA
RM
OUTPUT
ST
AR
T\S
TO
P
OP
EN
\C
LO
SE
D
LO
CK
O
UT
EN
AB
LE
\D
IS
AB
LE
ALARMS
HIG
H A
NA
LO
G
X
LO
W A
NA
LO
G
X
X
BIN
AR
Y
SE
NS
OR
F
AIL
CO
MM
F
AIL
ALARM LABEL
SUPPLY WATER TEMPERATURE OUT OF RANGE
SYSTEM LOW PRESSURE
CA
LC
ULA
TE
D V
ALU
E
BA
CN
ET
TR
EN
D
X
X
X
X
X
X
DIS
PLA
Y O
N G
RA
PH
IC
X
X
X
X
X
X
FLOW SWITCH
BWP-1 START/STOP
BWP-1 STATUS - CURRENT SENSOR
BWP-2 START/STOP
BWP-2 STATUS - CURRENT SENSOR
X X
X X
X X
X X
X X
XX X XBWP-1 PUMP TROUBLE
BWP-1 CURRENT SWITCH FAILURE XX
XX X XBWP-2 PUMP TROUBLE
BWP-2 CURRENT SWITCH FAILURE XX
X NO FLOW
X
AI
MACHINERY ROOM
REFRIGERANT LEAK
R
DETECTOR
A. PROVIDE A DRIVE SUMMARY GRAPHIC LOCATED AT THE
OPERATOR STATION, INCLUDING ALL OPERATING AND
MONITORING CONDITIONS. BMS SHALL MONITOR FAN
STATUS AND ALL DAMPER POSITIONS.
B. PROVIDE SEPARATE MONITORING OF FAN STATUS VIA
DIFFERENTIAL PRESSURE SWITCH.
C. ALARM AT BMS:
1. REFRIGERANT LEAK ALARM
2. FAN FAILURE (AFTER 30 SECONDS, ADJUSTABLE)
3. EPD SWITCH TRIPPED OFF.
4. EXH. FAN ON-ONLY SWITCH TRIPPED ON.
F. MAP HIGH SPEED AND NORMAL SPEED REFERENCED
FEEDBACK AND VFD ALARM STATUS.
G. INTERLOCK EXHAUST FAN WITH MAKE-UP AIR LOUVER.
DI
ALARM
STATUS
EPO CHILLER
OFF-ONLY SWITCH
BREAK GLASS
DI
HARDWIRE
BY DIV. 26
AI
TS
"NORMAL" OPERATION MODE:
1. MOTORIZED DAMPER MD2 & MD4 SHALL CLOSE
2. MOTORIZED DAMPER MD1 & MD3 SHALL OPEN.
3. GX-2 SHALL ENERGIZE AND GX-1 SHALL DE-ENERGIZE.
4. ENERGIZE AC-ICE TO MAINTAIN 70 F (ADJ.) SPACE TEMPERATURE.
5. STOP UNIT HV-ICE.
"EMERGENCY" OPERATION MODE:
1. OPERATION UPON DETECTION OF REFRIGERANT LEAK
DETECTOR OR ACTIVATION OR BREAK GLASS SWITCH.
2. MOTORIZED DAMPER MD2 & MD4 SHALL OPEN
3. MOTORIZED DAMPER MD1 & MD3 SHALL CLOSE.
4. GX-2 SHALL STOP AND GX-1 SHALL START.
5. HV-ICE SHALL START MAINTAINING A 55 F (ADJ.) DAT.
6. STOP UNIT AC-ICE
A
CONTROL SYSMBOL LEGEND
NO SCALE
MDO
BWR
HX
ICE
(TYP. OF 2)
BWP-3 START/STOP
BWP-3 STATUS - CURRENT SENSOR
X X
X X
XX X XHWP-3 PUMP TROUBLE
BWP-3 CURRENT SWITCH FAILURE XX
THE ICE OUT HEAT EXCHANGER SHALL BE MANUALLY ENGAGED VIA ASWITCH AT THE LOCAL CONTROL PANEL.
MANUALLY ENGAGING THE ICE OUT HEAT EXCHANGER SHALL:
DISABLE CHILLERS.
OPEN ICE OUT HEAT EXCHANGER BRINE VALVE.
CONTINUE OPERATION OF LEAD PUMP OR START LEAD BRINECIRCULATION PUMP.
CLOSE ALL CHILLER ISOLATION VALVES.
WAIT 5 MINUTES FOR ALL VALVES TO REACH FINAL POSITIONS.
MODULATE STEAM CONTROL VALVE TO MAINTAIN 6 DEGREE DELTA(ADJUSTABLE) ON LEAVING WATER TEMPERATURE. MAXIMUM LEAVINGWATER TEMPERATURE SHALL BE LIMITED TO 60 F (ADJUSTABLE).
MANUALLY DISENGAGING THE ICE OUT HEAT EXCHANGER SHALL SHUTTHE STEAM CONTROL VALVE AND RETURN THE BRINE CIRCULATINGPUMPS TO THE CONDITION THAT EXISTED PRIOR TO THE ENGAGEMENTOF THE ICE OUT HEAT EXCHANGER.
ICE OUT HEAT EXCHANGER ISOLATION VALVE X X X
B
CHILLER ROOM VENTILATION/EXHAUST CONTROL
NO SCALE
C
ICE OUT HEAT EXCHANGER
NO SCALE
OA
HV
ICE
MD1
DO
NO
SA
MD2
DO
NC
AC
ICE
NO SCALE
ICE PLANT VENTILATION SYSTEM
EA
DP
DI
DP
DI
MD4
DO
NC
MD3
DO
NO
GX
1
GX
2
EA
NO SCALE
ICE PLANT EXHAUST SYSTEM
ES
DI
ES
DI
ES
DI
ES
DI
DO
S/S
DO
S/S
ECONOMIZER OPERATION MODE:
1. MOTORIZED DAMPER MD2 & MD4 SHALL OPEN
2. MOTORIZED DAMPER MD1 & MD3 SHALL CLOSE.
3. GX-2 SHALL STOP AND GX-1 SHALL START.
4. HV-ICE SHALL START TOM MAINTAIN A 70 F (ADJ.) SPACE
TEMPERATURE.
5. STOP UNIT AC-ICE.
K. THE BMS SHALL MONITOR EACH HEAT TRACE CIRUCIT ON THE PIPING BY THE COOLING TOWER.
L. THE BMS SHALL MONITOR THE WATER LEVEL IN THE SUMP PUMP.
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-700.00_D
V18025.01.dw
g
06 M
ar '19 - 11:01am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-705.00
MECHANICAL
CONTROLS I
B
WATER COOLED AIR HANDING UNIT
NO SCALE
DO
DI
STATUS
CWR
CWS
MANUFACTURER'S
CONTROLLER
S/S
DI
COND. LEAK
DETECTION.
WATER COOLED
AIR HANDLING
UNIT
POINT DESCRIPTION
UNIT START/STOP
CONDENSER WATER CONTROL VALVE
SPACE TEMPERATURE SETPOINT
SPACE TEMPERATURE
SPACE OCCUPANCY SENSOR
WSHP STATUS
PAN MOISTURE TRANSDUCER
ANALOG
INPUT
IN
PU
T V
ALU
E
X
TE
MP
X
PR
ES
HU
MID
IT
Y
AM
PS
GP
M
CF
M
PP
M
PE
RC
EN
T
OUTPUT
DD
C 4-20 m
a, 0-10 V
DC
X
SE
TP
OIN
T A
DJ
BINARY
INPUT
IN
PU
T V
ALU
E
ST
AT
US
O
N\O
FF
X
X
ST
AT
US
- F
ILT
ER
ST
AT
US
O
PE
N\C
LO
SE
D
ST
AT
US
- A
LA
RM
X
OUTPUT
ST
AR
T\S
TO
P
X
OP
EN
\C
LO
SE
D
LO
CK
O
UT
EN
AB
LE
\D
IS
AB
LE
ALARMS
HIG
H A
NA
LO
G
X
LO
W A
NA
LO
G
X
BIN
AR
Y
X
X
SE
NS
OR
F
AIL
CO
MM
F
AIL
ALARM LABEL
SPACE TEMP OUT OF RANGE
FAN COIL UNIT TROUBLE (CURRENT SENSOR)
MOISTURE IN DRAIN PAN
CA
LC
ULA
TE
D V
ALU
E
BA
CN
ET
TR
EN
D
X
X
X
X
X
X
X
DIS
PLA
Y O
N G
RA
PH
IC
X
X
X
X
X
X
X
T
AI
SPACE
TEMPERATURE
(WIRED)
DI
CS
SPACE TEMPERATURE OVERRIDE X X
NOTES:
UNIT SHALL OPERATE CONTINUOUSLY WHEN SPACE TEMPERATURE IS ABOVE SETPOINT AND ICE CHILLER
IS IN NORMAL OPERATION. DAMPERS AND EXHAUST FANS SHALL MODULATE BASED ON THE CHILLER
PLANT VENTILATION/EXHAUST SEQUENCE OF OPERATION.
UNIT SHALL DE-ENERGIZE IN EMERGENCY MECHANICAL VENTILATION MODE. DAMPERS AND EXHAUST
FANS SHALL MODULATE BASED ON THE CHILLER PLANT VENTILATION/EXHAUST SEQUENCE OF OPERATION.
UNIT OPERATES UNDER MANUFACTURER'S CONTROLS TO MAINTAIN SPACE TEMPERATURE SETPOINT
A. STAGE COMPRESSOR(S)
B. OPEN OF CONDENSER WATER CONTROL VALVE
BMS MONITORS
A. UNIT STATUS
B. GENERAL ALARM
C. LEAK DETECTOR
OA
RA
MOTORIZED OA DAMPER (MD1) X
X
X
X
OUTSIDE AIR DAMPER MD1 FAILURE X X
X X
AC
ICE
X
X
X
X
X X
X X
MOTORIZED OA DAMPER (MD2)
MOTORIZED EA DAMPER (MD3)
MOTORIZED EA DAMPER (MD4)
OUTSIDE AIR DAMPER MD2 FAILURE
EXHAUST AIR DAMPER MD3 FAILURE
EXHAUST AIR DAMPER MD4 FAILURE
F
DP
A0
MD1
SA
HWS
HWR
AO
HC
BI
SF
BO
BI
FR
CS
BI
AI
AI
SD
BI
CD
AI
BI
AI
AI
T
OA
OA
MD2
BO
CD
NOTES:
A. ICE PLANT OPERATING IN NORMAL MODE:
1. HV-ICE SHALL BE DISABLED.
2. REFER TO CHILLER PLANT VENTILATION/EXHAUST SEQUENCE FOR ADDITIONAL CONTROLS AND DAMPER POSITIONS.
B. ICE PLANT OPERATING IN EMERGENCY MODE:
1. OPEN HEATING VALVE .
2. ENERGIZE SUPPLY FAN HV-ICE AND SHALL OPERATE CONTINUOUSLY. HEATING VALVES SHALL MODULATE IN SEQUENCE TO
MAINTAIN A MINIMUM DISCHARGE AIR TEMPERATURE OF 55 F (ADJ.).
3. REFER TO CHILLER PLANT VENTILATION/EXHAUST SEQUENCE FOR ADDITIONAL CONTROLS AND DAMPER POSITIONS.
C. ICE PLANT IN ECONOMIZER MODE:
1. ENERGIZE SUPPLY FAN HV-ICE AND SHALL OPERATE CONTINUOUSLY. HEATING VALVES SHALL MODULATE IN SEQUENCE TO
MAINTAIN SPACE SETPOINT TEMPERATURE.
2. REFER TO CHILLER PLANT VENTILATION/EXHAUST SEQUENCE FOR ADDITIONAL CONTROLS AND DAMPER POSITIONS.
E. FAN SAFETY CONTROLS:
1. DE-ENERGIZE THE SUPPLY FAN WHENEVER THE FREEZE STAT IS TRIPPED, EITHER SMOKE DETECTOR HAS TRIPPED OR A FAN
STATUS INDICATES A FAILURE (AFTER A TWO-MINUTE DELAY). THE SMOKE DETECTORS, FREEZE STAT AND THE FAN FAILURES
REQUIRE A MANUAL RESET.
2. DE-ENERGIZE THE SUPPLY FAN WHEN THE DISCHARGE STATIC PRESSURE HIGH-LIMIT REACHES 4.0 INCHES WC (ADJ.).
3. PROVIDE SUCTION STATIC PRESSURE SWITCH AT INLET OF SUPPLY FAN. SWITCH TO BE TIED TO SUPPLY FAN START CIRCUIT.
DE-ENERGIZE SUPPLY FAN WHEN SUCTION SUPPLY FAN STATIC PRESSURE HIGH-LIMIT REACHES 2.0 INCHES WC (ADJ.)
4. ALARM THE BMS WITH THE APPROPRIATE ALARM MESSAGE.
F. FREEZE PROTECTION:
1. A MANUAL RESET HEATING COIL DISCHARGE AIR LOW LIMIT SHALL TURN THE FANS OFF IF ANY 12-INCHES OF ITS SENSING
ELEMENT IS BELOW ITS SETPOINT (35 ADJ.).
2. THE OA DAMPERS SHALL CLOSE.
3. THE HEATING VALVE SHALL OPEN TO FULL OPEN POSITION.
4. THE HEATING VALVE SHALL REMAIN FULL OPEN IF THE MIXED AIR TEMPERATURE IS BELOW 40F (ADJ.) WHEN THE FANS ARE
OFF.
H. HEATING VALVE CONTROL:
1. THE HEATING VALVES SHALL MODULATE TO MAINTAIN THE DAT (ADJ.). THE HEATING VALVES SHALL BE FULLY CLOSED IF THE
FANS ARE OFF.
AI
H
OA
P
P T
BI
A
100% O.A. VARABLE AIR VOLUME HEATING AND VENTILATING AIR HANDLING UNIT (HV-ICE)
NO SCALE
POINT DESCRIPTION
SUPPLY FAN VFD
SUPPLY FAN POWER (KW)
SUPPLY FAN SPEED (RPM)
SUPPLY FAN TROUBLE
SUPPLY FAN CURRENT SWITCH
SUPPLY FAN SUCTION PRESSURE
SUPPLY FAN DISCHARGE PRESSURE
SUPPLY AIR TEMPERATURE
SUPPLY AIR DUCT SYSTEM STATIC PRESSURE
HEATING COIL 2-WAY VALVE
VENTILATION DAMPER (MD1)
VENTILATION DAMPER (MD2)
SA SMOKE DETECTOR
FILTER PRESSURE DROP
FREEZESTAT
SUPPLY AIR HIGH STATIC
SPACE TEMPERATURE
SPACE HUMIDITY
SPACE TEMPERATURE SETPOINT
AHU ALARM STATUS
OUTSIDE AIR TEMPERATURE (INTAKE SENSOR)
OUTSIDE AIR HUMIDITY (INTAKE SENSOR)
ANALOG
INPUT
IN
PU
T V
ALU
E
X
TE
MP
X
X
X
PR
ES
X
X
X
X
X
HU
MID
IT
Y
X
X
AM
PS
X
GP
M
CF
M
PP
M
PE
RC
EN
T
OUTPUT
DD
C 4-20 m
a, 0-10 V
DC
X
X
X
X
SE
TP
OIN
T A
DJ
X
X
BINARY
INPUT
IN
PU
T V
ALU
E
ST
AT
US
O
N\O
FF
ST
AT
US
- F
ILT
ER
ST
AT
US
O
PE
N\C
LO
SE
D
X
ST
AT
US
- A
LA
RM
X
X
X
OUTPUT
ST
AR
T\S
TO
P
X
OP
EN
\C
LO
SE
D
X
X
LO
CK
O
UT
EN
AB
LE
\D
IS
AB
LE
ALARMS
HIG
H A
NA
LO
G
X
X
X
X
X
X
X
X
LO
W A
NA
LO
G
X
X
X
X
BIN
AR
Y
X
X
X
SE
NS
OR
F
AIL
X
X
X
X
X
X
X
X
CO
MM
F
AIL
X
X
X
X
ALARM LABEL
SUPPLY FAN VFD TROUBLE
SUPPLY FAN CURRENT SWITCH FAILURE
SUPPLY FAN SUCTION HIGH STATIC
SUPPLY FAN DISCHARGE HIGH STATIC
SUPPLY AIR TEMPERATURE OUT OF RANGE
SUPPLY AIR DUCT STATIC OUT OF RANGE
HEATING COIL CONTROL VALVE FAIL
OUTSIDE AIR DAMPER (MD1) FAILURE
OUTSIDE AIR DAMPER (MD2) FAILURE
SA SMOKE DETECTOR ACTIVATION
HIGH FILTER PRESSURE DROP
FREEZESTAT ACTIVATION
SUPPLY AIR HIGH STATIC PRESSURE
SPACE TEMPERATURE OUT OF RANGE
SPACE HUMIDITY OUT OF RANGE
OA TEMPERATURE SENSOR FAILURE
OA HUMIDITY SENSOR FAILURE
CA
LC
ULA
TE
D V
ALU
E
X
X
X
X
X
X
X
BA
CN
ET
X
X
TR
EN
D
DIS
PLA
Y O
N G
RA
PH
IC
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SA TO AC-ICE
NO
NC
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-700.00_D
V18025.01.dw
g
06 M
ar '19 - 11:01am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-706.00
MECHANICAL
CONTROLS II
NO SCALE
M
DO
TT
AI
CHILLER CONTROL
PANEL, TYP. OF 2.
TT
AI
VFD
VFD
CSEN
VFD
SOFTWARE
INTERFACE
TYPICAL OF 2
PT
AI
FS
DICSEN
DO
S/S
SOFTWARE
INTERFACE
TO BMS
TO CHILLER
CONTROL PANEL
DO
E/D
DI
RUN
STATUS
DI
ALARM
BWP
1
BWP
2
CH
1
TT
AI
CONDENSER WATER CONTROL DIAGRAM
NO SCALE
M
DO
TT
AI
CHILLER CONTROL
PANEL
TT
AI
CSEN
PT
AI
FS
DO
S/S
CWP
1
CH
1
V2
TT
AI
S
BLOWDOWN
SOLENOID VALVE TO
HARDWIRE
CHEMICAL TREATMENT SYSTEM
DI
FEEDBACK STATUS
O/C
TT
AI
CT
1
M
DO
CT
2
M
DO
M
AO
DI
DI
D0
CONTROL
PANEL
CT
VFD
DI
DI
TYP. OF 2 CT.
HIGH LEVEL
ALARM
LOW LEVEL
ALARM
DI
DO
DI
S/S
OPERATING LEVEL
CURRENT SENSOR
SOFTWARE
INTERFACE
CSEN
AO
SPEED
CONTROL
BRINE WATER CONTROL DIAGRAM
TO BMS
TO BMS
M
DO
DI
CSEN
CWP
2
DI
DI
DI
TO ICE FLOOR
S
D0
FS
HX
ICE
M
DO
A
ICE CHILLER CONTROLS
NO SCALE
DO
S/S
CONDENSER
WATER MAKE-UP
TT
AI
FROM ICE FLOOR
POINT DESCRIPTION
CHILLER START/STOP
COMPRESSOR #1 RUN STATUS
COMPRESSOR #2 RUN STATUS
CHILLER TROUBLE
CHILLER BW & CW FLOW SWITCH
CW ISOLATION VALVE
BRINE ISOLATION VALVE (CHILLER)
BRINE ISOLATION VALVE (HX-ICE)
CONDENSER DIFFERENTIAL PRESSURE
EVAPORATOR DIFFERENTIAL PRESSURE
CWP-1 PUMP START/STOP
CWP-1 PUMP TROUBLE
CWP-1 CURRENT SWITCH
CWP-2 PUMP START/STOP
CWP-2 PUMP TROUBLE
CWP-2 CURRENT SWITCH
BWP-1 PUMP START/STOP
BWP-1 VFD SPEED COMMAND
BWP-1 PUMP VFD TROUBLE
BWP-1 SPEED (RPM)
BWP-1 SPEED (KW)
BWP-1 CURRENT SWITCH
BWP-2 PUMP START/STOP
BWP-2 VFD SPEED COMMAND
BWP-2 PUMP VFD TROUBLE
BWP-2 SPEED (RPM)
BWP-2 SPEED (KW)
BWP-2 CURRENT SWITCH
BWS/R TEMPERATURES (3 LOCATIONS)
CWS/R TEMPERATURE (5 LOCATIONS)
ICE FLOOR TEMPERATURE SENSORS (2 LOCATION)
IR FLOOR TEMPERATURE SENSORS (2 LOCATIONS)
COMMON BW PUMP DISCHARGE PRESSURE
COMMON CW PUMP DISCHARGE PRESSURE
CONDENSER WATER BYPASS VALVE
COOLING TOWER ISOLATION VALVES (2 LOCATIONS)
BLOWDOWN CW SOLENOID VALVE
MAKE-UP WATER COLENOID VALVE
MAKE-UP WATER METER
BRINE CHEMICAL TREATMENT ALARM STATUS
CW CHEMICAL TREATMENT ALARM STATUS
REFRIGERANT LEAK DETECTOR ALARM STATUS
COOLING TOWER START/STOP (CT-1)
COOLING TOWER FAN STATUS (CT-1)
COOLING TOWER SPEED CONTROL (CT-1)
COOLING TOWER ALARM STATUS (CT-1)
COOLING TOWER HIGH WATER LEVEL ALARM (CT-1)
COOLING TOWER LOW WATER LEVEL ALARM (CT-1)
COOLING TOWER OPERATING WATER LEVEL (CT-1)
COOLING TOWER START/STOP (CT-2)
COOLING TOWER FAN STATUS (CT-2)
COOLING TOWER SPEED CONTROL (CT-2)
COOLING TOWER ALARM STATUS (CT-2)
COOLING TOWER HIGH WATER LEVEL ALARM (CT-2)
COOLING TOWER LOW WATER LEVEL ALARM (CT-2)
COOLING TOWER OPERATING WATER LEVEL (CT-2)
CHILLER EXHAUST FAN START/STOP (GX-1)
CHILLER EXHAUST FAN STATUS (GX-1)
CHILLER VENTILATION EXHAUST FAN START/STOP (GX-2)
CHILLER VENTILATION EXHAUST FAN STATUS (GX-2)
EXHAUST ISOLATION DAMPER (MD3)
EXHAUST ISOLATION DAMPER (MD4)
GENERAL NOTES:
1. ALL POINTS IDNETIFIED IN THE CHILLER SPECIFICATION SHALL BE PULLED INTO THE BMS. PROVIDE ALL NECESSARY CARDS/DEVICES TO INTERFACE BMS WITH CHILLER CONTROLLER.
2. ALL CONTROLS SHALL BE WIRED TO THE CHILLER CONTROLLER. COORDINATE COTROL CONNECTION WITH ICE CHILLER MANUFACTUR.
3. EXTEND EXISTING INBEDDED ICE FLOOR SENSORS AND INFRARED SENSORS TO CHILLER CONTROLLER. EXTEND WIRE AS REQUIRED FROM EXISTING LOCATION TO NEW CHILLER LOCATION.
ANALOG
INPUT
IN
PU
T V
ALU
E
X
X
TE
MP
X
X
X
X
PR
ES
X
X
X
X
HU
MID
IT
Y
AM
PS
X
X
X
X
X
X
GP
M
X
X
CF
M
PP
M
PE
RC
EN
T
OUTPUT
DD
C 4-20 m
a, 0-10 V
DC
X
X
X
X
X
X
X
SE
TP
OIN
T A
DJ
BINARY
INPUT
IN
PU
T V
ALU
E
X
X
X
X
X
X
X
X
X
ST
AT
US
O
N\O
FF
X
X
X
X
X
X
ST
AT
US
- F
ILT
ER
ST
AT
US
O
PE
N\C
LO
SE
D
ST
AT
US
- A
LA
RM
OUTPUT
ST
AR
T\S
TO
P
X
X
X
X
X
X
X
X
X
X
X
X
X
OP
EN
\C
LO
SE
D
X
X
X
X
X
X
X
X
LO
CK
O
UT
EN
AB
LE
\D
IS
AB
LE
ALARMS
HIG
H A
NA
LO
G
X
X
X
X
LO
W A
NA
LO
G
X
X
X
X
X
X
BIN
AR
Y
SE
NS
OR
F
AIL
X
X
X
X
CO
MM
F
AIL
X
X
X
ALARM LABEL
CHILLER TROUBLE
NO FLOW
CONDENSER IS OUT OF RANGE
EVAPORATOR IS OUT OF RANGE
CWP-1 TROUBLE
CWP-1 FAILURE
CWP-2 TROUBLE
CWP-2 FAILURE
BWP-1 VFD TROUBLE
BWP-1 FAILURE
BWP-2 VFD TROUBLE
BWP-2 FAILURE
COMMON BW PRESSURE TO HIGH
COMMON CW PREESSURE TO HIGH
BRINE WATER CHEMICAL TREATMENT TROUBLE
CONDENSER WATER CHEMICAL TREATMENT TROUBLE
REFRIGERANT MONITOR ALARM
CT-1 TROUBLE
CT-1 BASIN WATER TO HIGH
CT-1 BASIN WATER TO LOW
CT-1 TROUBLE
CT-2 BASIN WATER TO HIGH
CT-2 BASIN WATER TO LOW
GX-1 TROUBLE
GX-2 TROUBLE
EXHAUST AIR DAMPER (MD3) FAILURE
EXHAUST AIR DAMPER (MD4) FAILURE
CA
LC
ULA
TE
D V
ALU
E
BA
CN
ET
X
X
X
X
TR
EN
D
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
DIS
PLA
Y O
N G
RA
PH
IC
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\M
ech\M
-700.00_D
V18025.01.dw
g
06 M
ar '19 - 11:01am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
M-707.00
MECHANICAL
CONTROLS III
EQUIP. DRAIN
SANITARY VENT
FC
(PLAN) (ELEV)
DN
UP
F
1
F
M
REDUCED PRESSURE ZONE
ASSEMBLY
DOUBLE CHECK DETECTOR
ASSEMBLY
DOUBLE CHECK VALVE
ASSEMBLY
POINT OF CONN. (CONN. NEW
TO EXISTING)
POINT OF DISCONNECTION
ARROW INDICATES DIRECTION
OF FLOW
RISE IN DIRECTION OF FLOW
DROP IN DIRECTION OF FLOW
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC TEMP. HOT WATER
SANITARY WASTE ABOVE FLOOR
TEMPERED WATER
DOMESTIC HOT WATER
CIRCULATING
SANITARY WASTE BELOW
FLOOR (UNDER GROUND)
STORM PIPING ABOVE FLOOR
STORM PIPING BELOW FLOOR
STORM OVERFLOW ABOVE
FLOOR
VENT THRU ROOF
PS
FS
EJ
THERMOMETER
W/THERMOWELL
UNION
EXPANSION JOINT
FLEXIBLE PIPE CONNECTOR
PRESSURE SWITCH
PRESSURE GAUGE W/GAUGE
COCK
HOSE BIBB, WALL HYDRANT
OVERFLOW ROOF DRAIN
SHOCK ARRESTOR W/BALL
VALVE
CONCENTRIC REDUCER
ECCENTRIC REDUCER
DRAIN VALVE W/ HOSE END
CONN.
CHECK VALVE W/ INDICATION
OF FLOW DIRECTION
PRESSURE REDUCING VALVE
AUTO FLOW CONTROL VALVE W/
TEST PORTS
CIRCUIT SETTER OR BALANCING
VALVE
GLOBE VALVE (STRAIGHT
PATTERN)
GLOBE VALVE (ANGLE
PATTERN)
BUTTERFLY VALVE
THERMOSTATIC MIXING
VALVE, 2-WAY
TEMPERATURE/ PRESSURE
RELIEF VALVE
STRAINER W/ BLOW-OFF &
CAPPED HOSE-END
CONNECTION
OUTSIDE STEM AND YOKE
DOUBLE CHECK VALVE
HOUSE TRAP
FOR MECHANICAL AND PLUMBING EQUIPMENT AS
INDICATED ON THE DIVISION 21, 22, AND 23 DRAWINGS,
THE DIVISION 21, 22 AND 23 CONTRACTORS SHALL
COORDINATE WITH DIVISION 26 CONTRACTOR TO
CONNECT ALL MECHANICAL AND PLUMBING
EQUIPMENT INDICATED ON THE MECHANICAL AND
PLUMBING DRAWINGS. COORDINATE FOR COMPLETE
WIRING, STARTERS, AND DISCONNECTING MEANS FOR
ALL MECHANICAL AND PLUMBING EQUIPMENT.
2"SAN
PIPE SIZE/ PIPE TYPE
EQUIPMENT DESIGNATION
POC
POD
DN
AFF
DOWN
AFG
TOP
BOP
NTS
(E)
(R)
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
TOP OF PIPE (AFF)
BOTTOM OF PIPE (AFF)
NOT TO SCALE
EXISTING
REMOVE
BS BELOW SLAB
SHEET KEY NOTES
SECTION VIEW SHEET NO.
SECTION NO.
F
SP
TB
FIRE
SPRINKLER
THRUST BLOCK
DESCRIPTIONABBRSYMBOL
DESCRIPTIONABBRSYMBOL
DESCRIPTIONABBRSYMBOL
DESCRIPTIONABBRSYMBOL
DESCRIPTIONABBRSYMBOL
DESCRIPTIONABBRSYMBOL
RPZ
DCDA
DCVA
DCV
HT
I.E. INVERT ELEVATION
CW
HW
T
HWC
THW
SAN
UGS
V
DR
EJ
U
AV AIR VENT
FC
FS FLOW SWITCH
PS
PG
ELBOW UP
ELBOW DOWN
TEE UP
TEE DOWN
PIPE CAP OR PLUG
CO CLEANOUT PLUG
HB/ WH
VB VACUUM BREAKER
SA
FD
CODP/
FCO
FLOOR DRAIN
FLOOR CLEANOUT
WALL CLEANOUTWCO
CR
DV
CV
PRV
SV
FCV
SOLENOID VALVE
CS,BV
GLV
BFV
BV
TCV
GLV
BALL VALVE
TPR
VALVE IN RISER
STR
GATE VALVEGV
OS&Y
ST
ST
OD
RD ROOF DRAIN
OD
BACKFLOW PREVENTERBFP
FRESH AIR INTAKEFAI
MOCV METER OUTLET CONTROL
VALVE
M
M M METER
ER
VTR
FS FLOOR SINK
CONCENTRIC REDUCERCR
EL ELEVATION
CL CENTERLINE
INV INVERT
EXISTING PIPING TO BE
REMOVED (DASHED LINE)
EXISTING PIPING
(LIGHT SOLID LINE)
SQ.FTSQUARE FEET
(R)
(E)
GENERAL PLUMBING CONTRACT REQUIREMENTS:
1. UNLESS OTHERWISE NOTED, THE WORK DESCRIBED ON THE
PLANS AND SPECIFICATIONS SHALL INCLUDE THE FURNISHING
AND INSTALLATION OF ALL LABOR AND MATERIALS
NECESSARY FOR COMPLETE AND OPERATIONAL HVAC, FIRE
PROTECTION AND PLUMBING SYSTEMS. CONTRACTOR SHALL
FURNISH THESE EVEN IF ITEMS REQUIRED TO ACHIEVE THIS
(I.E. OFFSETS, ISOLATION AND BALANCING DEVICES,
MAINTENANCE CLEARANCES, ETC.) ARE NOT SPECIFICALLY
SHOWN.
2. DATA GIVEN ON THE DRAWINGS IS AS EXACT AS COULD BE
SECURED. ABSOLUTE ACCURACY IS NOT GUARANTEED AND
THE CONTRACTOR SHALL OBTAIN AND VERIFY EXACT
LOCATIONS, MEASUREMENTS, LEVELS, SPACE
REQUIREMENTS, POTENTIAL CONFLICTS WITH OTHER
TRADES, ETC. AT THE SITE AND SHALL SATISFACTORILY
ADAPT HIS WORK TO THE ACTUAL CONDITIONS OF THE JOB.
3. THE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND SHALL
NOT BE SCALED. THEY SHOW CERTAIN PHYSICAL
RELATIONSHIPS WHICH MUST BE ESTABLISHED WITHIN THE
DIVISION 23 WORK AND ITS INTERFACE WITH OTHER WORK.
ESTABLISHING THIS RELATIONSHIP IN THE FIELD IS THE
EXCLUSIVE RESPONSIBILITY OF THE CONTRACTOR. THIS
DIVISION SHALL COORDINATE ITS WORK WITH ALL DIVISIONS
OF THE WORK AND ADJUST ITS WORK AS REQUIRED BY THE
ACTUAL CONDITIONS OF THE PROJECT.
A. THE CONTRACTOR SHALL VISIT THE SITE BEFORE
SUBMITTING A BID TO BECOME THOROUGHLY FAMILIAR
WITH THE ACTUAL CONDITIONS OF THE PROJECT. NO
EXTRAS WILL BE ALLOWED DUE TO LACK OF
KNOWLEDGE OF EXISTING CONDITIONS.
B. CERTAIN SYSTEMS REQUIRE ENGINEERING OF
INSTALLATION DETAILS BY CONTRACTOR. UNLESS
FULLY DETAILED IN THE CONTRACT DOCUMENTS, SUCH
ENGINEERING IS THE EXCLUSIVE RESPONSIBILITY OF
THE CONTRACTOR.
C. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
DETERMINE WHERE CLEARANCES ARE LIMITED, AND
WHERE INSTALLATION DRAWINGS OR SCHEMATICS,
"CONSTRUCTION DRAWINGS", OR COORDINATION
DRAWINGS MAY BE REQUIRED IN ACCORDANCE WITH,
OR IN EXCESS OF, THOSE REQUIRED BY THE
SPECIFICATIONS. THE CONTRACTOR SHALL PREPARE
ALL SUCH COORDINATION DRAWINGS AS PART OF THE
BASE CONTRACT.
4. THESE NOTES ONLY SUPPLEMENT, AND DO NOT REPLACE,
THE SPECIFICATIONS.
5. DEFINITIONS AND TERMINOLOGY
A. THE DEFINITIONS OF DIVISION 1 AND THE GENERAL
CONDITIONS OF THIS SPECIFICATION ALSO APPLY TO
THE DIVISION 23 CONTRACT DOCUMENTS.
B. "CONTRACT DOCUMENTS" CONSTITUTE THE DRAWINGS,
SPECIFICATIONS, GENERAL CONDITIONS, PROJECT
MANUALS, ETC., PREPARED BY ENGINEER (OR OTHER
DESIGN PROFESSIONAL IN ASSOCIATION WITH
ENGINEER) FOR CONTRACTOR'S BID OR CONTRACTOR'S
NEGOTIATIONS WITH THE OWNER. THE DIVISION 23
DRAWINGS AND SPECIFICATIONS PREPARED BY THE
ENGINEER ARE NOT CONSTRUCTION DOCUMENTS.
C. "CONSTRUCTION DOCUMENTS", "CONSTRUCTION
DRAWINGS", AND SIMILAR TERMS FOR DIVISION 23
WORK REFER TO INSTALLATION DIAGRAMS, SHOP
DRAWINGS AND COORDINATION DRAWINGS PREPARED
BY THE CONTRACTOR USING THE DESIGN INTENT
INDICATED ON THE ENGINEER'S CONTRACT
DOCUMENTS. THESE SPECIFICATIONS DETAIL THE
CONTRACTOR'S RESPONSIBILITY FOR "ENGINEERING BY
CONTRACTOR" AND FOR PREPARATION OF
CONSTRUCTION DOCUMENTS.
D. "FURNISH" MEANS TO "SUPPLY" AND USUALLY REFERS
TO AN ITEM OF EQUIPMENT.
E. "INSTALL" MEANS TO "SET IN PLACE, CONNECT AND
PLACE IN FULL OPERATIONAL ORDER".
F. "PROVIDE" MEANS TO "FURNISH AND INSTALL".
G. "EQUIVALENT" MEANS "MEETS THE SPECIFICATIONS OF
THE REFERENCE PRODUCT OR ITEM IN ALL SIGNIFICANT
ASPECTS." SIGNIFICANT ASPECTS SHALL BE AS
DETERMINED BY THE ARCHITECT/ENGINEER.
H. "WORK BY OTHER(S) DIVISIONS"; "RE: XX DIVISION", AND
SIMILAR EXPRESSIONS MEANS WORK TO BE
PERFORMED UNDER THE CONTRACT DOCUMENTS, BUT
NOT NECESSARILY UNDER THE DIVISION OR SECTION OF
THE WORK ON WHICH THE NOTE APPEARS. IT IS THE
CONTRACTOR'S SOLE RESPONSIBILITY TO COORDINATE
THE WORK OF THE CONTRACT BETWEEN HIS/HER
SUPPLIERS, SUBCONTRACTORS AND EMPLOYEES. IF
CLARIFICATION IS REQUIRED, CONSULT
ARCHITECT/ENGINEER BEFORE SUBMITTING BID.
I. BY INFERENCE, ANY REFERENCE TO A "CONTRACTOR"
OR "SUB-CONTRACTOR" MEANS THE ENTITY WHICH HAS
CONTRACTED WITH THE OWNER FOR THE WORK OF THE
CONTRACT DOCUMENTS.
J. "ENGINEER" MEANS THE DESIGN PROFESSIONAL FIRM
WHICH HAS PREPARED THESE CONTRACT DOCUMENTS.
ALL QUESTIONS, SUBMITTALS, ETC. OF THIS DIVISION
SHALL BE ROUTED THROUGH THE ARCHITECT TO THE
ENGINEER (THROUGH PROPER CONTRACTUAL
CHANNELS).
EXISTING BUILDING:
1. THE CONTRACTOR'S ATTENTION IS CALLED TO THE FACT
THAT THE EXISTING BUILDING WILL BE OCCUPIED BY THE
OWNER DURING CONSTRUCTION. CONTINUED OPERATION OF
THE FACILITY SHALL NOT BE HINDERED BY THIS WORK. THE
CONTRACTOR SHALL ACCOUNT FOR ALL ADDITIONAL COSTS
WHICH MAY BE INCURRED BY HIM DUE TO THE DIFFICULTY OF
WORKING OVER AND AROUND EMPLOYEES, DESKS,
EQUIPMENT, ETC.; AND DUE TO THE HOURS OF THE DAY IN
WHICH AN AREA MAY BE AVAILABLE WHEN SUBMITTING HIS
BID.
2. MAINTAIN A MARK-UP SET OF DRAWINGS WHICH INDICATE
VARIATIONS IN THE ACTUAL INSTALLATION FROM THE
ORIGINAL DESIGN. SURRENDER DRAWINGS TO OWNER UPON
COMPLETION. INCORPORATE THESE NOTES INTO THE
AS-BUILT DRAWINGS.
3. COORDINATE ALL PENETRATIONS OF THE FLOOR SLAB PRIOR
TO COMMENCING WORK. UTILIZE X-RAY AND VISUAL
INVESTIGATION OF EXISTING CONDITIONS AS REQUIRED
PRIOR TO DRILLING OR CUTTING. COORDINATE ALL NEW
PENETRATIONS WITH OTHER DIVISIONS OF THE WORK. ALL
CONTRACTORS ARE INDIVIDUALLY RESPONSIBLE FOR ALL
PENETRATIONS REQUIRED BY THEIR DIVISIONS.
GENERAL PLUMBING DEMOLITION NOTES:
1. THE CONTRACTOR SHALL CAREFULLY INSPECT, REVIEW AND
DOCUMENT THE EXISTING BUILDING PLUMBING SYSTEMS
WITHIN THE PROJECT WORK AREAS SHOWN TO BE
DEMOLISHED. PRIOR DOCUMENTATION OF EXISTING
CONDITIONS, CAPACITIES AND PHYSICAL ARRANGEMENTS IS
LIMITED. THESE DOCUMENTS ATTEMPT TO DEFINE AREAS BUT
MAY NOT ACCURATELY SHOW ALL EXISTING CONDITIONS.
2. ALL EXISTING SANITARY AND STORM PIPING BEING REUSED
SHALL BE INSPECTED AND VERIFIED TO BE IN GOOD
CONDITION PRIOR TO CONNECTION OF ANY NEW PLUMBING
SYSTEMS.
3. ALL PIPING SYSTEMS NO LONGER IS USE DUE TO
RENOVATION SHALL BE REMOVED. NO PIPING WILL BE
ABANDONED IN PLACE.
GENERAL PLUMBING NOTES:
1. ALL DRAIN GRATES, CLEANOUT COVERS, AND OTHER
FINISHED-EXPOSED COMPONENTS SHALL BE PROTECTED
FROM DAMAGE. DAMAGED COMPONENTS SHALL BE
REPLACED BY CONTRACTOR AT NO ADDITIONAL COST TO THE
CONTRACT.
2. COORDINATE ROUTING OF ALL PLUMBING PIPING WITH
STRUCTURAL BEAMS, COLUMNS, ETC. ALLOW FOR
REROUTING OF PIPING AS REQUIRED.
3. PIPING ROUTING ON DRAWINGS IS GENERALLY
DIAGRAMMATIC WITH EFFORTS DURING DESIGN TO AVOID
STRUCTURAL CONFLICTS. CONTRACTOR SHALL COORDINATE
ROUTING OF ALL PIPING THROUGH BUILDING WITH
STRUCTURAL CONDITIONS. CONTRACTOR COORDINATION
DRAWINGS SHALL REFLECT ALL PIPE ROUTING AND PIPING
THAT MAY HAVE TO BE SHIFTED AND/OR MOVED TO AVOID
CONFLICTS. SHIFTED OR MOVED PIPING SHALL REFLECT NO
ADDITIONAL COST TO THE PROJECT.
4. ALL REQUIRED OPENINGS IN STEEL BEAMS AND STRUCTURAL
WALLS ARE TO BE ACCOMPLISHED USING
SLEEVES/PENETRATIONS PROPERLY SIZED FOR THE PIPE
THEY SERVE. CORE DRILLING IN PANS IS ALLOWED UPON
PRIOR APPROVAL OF ARCHITECT AND STRUCTURAL
ENGINEER.
5. ALL HORIZONTAL SANITARY PIPING 3" AND SMALLER
WHETHER ABOVE GRADE OR BELOW SHALL SLOPE AT 1/4"/FT.
SLOPE. ALL PIPING 4" AND LARGER SHALL SLOPE AT 1/8"/FT.
SLOPE UNLESS OTHERWISE NOTED. ALL STORM AND
OVERFLOW PIPING SHALL SLOPE AT 1/8"/FT. SLOPE UNLESS
OTHERWISE NOTED. ALL GREASE WASTE PIPING SHALL SLOPE
AT 1/4"/FT.
6. IN GENERAL THE POINT OF CONNECTION FOR SANITARY AND
STORM PIPE IS AT 5 FEET OUTSIDE OF BUILDING FOOTPRINT.
CONFORM WORK TO MEET INVERT.
7. CAP ALL SANITARY AND STORM TEES FOR FUTURE BRANCH
PIPING AND STAKE LOCATION OF PIPING FOR CONNECTION TO
FUTURE BRANCH LINES.
8. ALL PIPING TO BE INSTALLED IN CONCEALED AREAS, IF NOT
POSSIBLE PIPING TO BE PERPENDICULAR AND PARALLEL
TIGHT TO STRUCTURE. INSTALL WITHIN WEBBING OF STEEL.
REFER TO ARCH. DRAWINGS FOR AREAS WHICH NO PIPING
CAN BE INSTALLED, "NO FLY ZONES" OR RESTRICTED AREAS.
ALL SHOP DRAWINGS AND COORDINATION DRAWINGS MUST
BE SUBMITTED TO OWNER FOR APPROVAL BEFORE
INSTALLATION.
9. ALL CLEANOUTS FOR HORIZONTAL STORM DRAINAGE SYSTEM
SHALL BE PIPE SIZE OR MAXIMUM 6" FOR LARGER PIPE. IN
ADDITION TO THE CLEANOUT LOCATIONS SHOWN ON
DRAWINGS, CLEANOUTS SHALL BE PROVIDED PROVIDED IN
ACCORDANCE WITH THE LOCAL GOVERNING CODE.
ADDITIONAL CLEANOUTS SHALL BE PROVIDED AS FOLLOWS;
A. EACH RUN OF PIPING WHICH IS MORE THAN 75 FEET IN
LENGTH OR FRACTION THEREOF
B. HORIZONTAL LINES 5 FEET OR MORE
C. HORIZONTAL LINES FOR EACH AGGREGATE CHANGE OF
DIRECTION EXCEEDING 45 DEGREES,
D. AT THE BASE OF ALL SANITARY AND STORM RISERS. ALL
VERTICAL CLEANOUTS SHALL BE SIZED TO
ACCOMMODATE THE LARGEST PIPE ON THAT BRANCH
LINE, BUT NEVER LARGER THAN 4". ALL GREASE WASTE
PIPING SHALL HAVE CLEANOUTS EVERY 50 FEET OR
FRACTIONS THEREOF AND AS NOTED ABOVE. ALL
10. ALL EQUIPMENT AND PIPING SHALL BE BRACED FOR SEISMIC
REQUIREMENTS APPLICABLE FOR SEISMIC ZONE
REQUIREMENTS FOR THIS PROJECT.
11. PROVIDE DIELECTRIC FITTINGS AT ALL CONNECTIONS
BETWEEN DISSIMILAR METALS AND AS SHOWN ON DRAWINGS.
ELECTRICAL COORDINATION:
1. VERIFY THE ELECTRICAL SERVICE PROVIDED BY THE
ELECTRICAL CONTRACTOR BEFORE ORDERING ANY
PLUMBING EQUIPMENT REQUIRING ELECTRICAL
CONNECTIONS.
2. THE ELECTRICAL POWER FOR CERTAIN EQUIPMENT
PROVIDED UNDER DIVISION 22 HAS NOT BEEN SPECIFICALLY
INDICATED ON THE ELECTRICAL DRAWINGS AND MUST BE
PROVIDED BY AND FIELD COORDINATED BY THE DIVISION 22
TRADE REQUIRING SUCH POWER.
INSTALLATION:
1. SUSPEND EACH TRADE'S WORK SEPARATELY FROM THE
STRUCTURE. DUCTWORK SHALL BE HELD TIGHT TO
STRUCTURE EXCEPT WHERE OTHERWISE SHOWN.
2. INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE
WITH MANUFACTURER'S RECOMMENDATIONS UNLESS
SPECIFICALLY INDICATED OTHERWISE OR WHERE LOCAL
CODES OR REGULATIONS TAKE PRECEDENCE.
3. PROVIDE FOR SAFE CONDUCT OF THE WORK, CAREFUL
REMOVAL AND DISPOSAL OF MATERIALS AND PROTECTION OF
PROPERTY WHICH IS TO REMAIN UNDISTURBED.
4. PLUMBING CONTRACTOR IS RESPONSIBLE FOR PROVIDING
ALL CONCRETE EQUIPMENT PAD DIMENSIONS, BASED ON THE
FINAL EQUIPMENT SELECTION, TO THE STRUCTURAL AND
GENERAL CONTRACTOR FOR INCLUSION IN THOSE
CONTRACTOR'S WORK AS DESCRIBED BY THE GENERAL
CONTRACTOR.
5. WARRANTY: AT A MINIMUM, THE ENTIRE PLUMBING SYSTEM
SHALL BE WARRANTED AGAINST DEFECTS IN MATERIALS AND
WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR AFTER
ACCEPTANCE OF THE SYSTEM BY THE OWNER. REFER TO
INDIVIDUAL SPECIFICATION SECTIONS FOR SPECIFIC
WARRANTY REQUIREMENTS.
PIPE INSTALLATION:
1. ALL PIPING SHALL BE ADEQUATELY SUPPORTED FROM THE
BUILDING STRUCTURE TO PREVENT SAGGING, POCKETING,
SWAYING OR DISPLACEMENT BY MEANS OF HANGERS AND
SUPPORTS. PIPING IS NOT TO BE SUPPORTED BY EQUIPMENT.
2. PROVIDE DIELECTRIC UNIONS BETWEEN DISSIMILAR
MATERIALS.
3. FLUSH OUT PIPING AND REMOVE CONTROL DEVICES BEFORE
PERFORMING PRESSURE TEST. DO NOT USE PIPING SYSTEM
VALVES TO ISOLATE SECTIONS WHERE PRESSURIZE PIPING
AT AS SPECIFIED IN THE SPECIFICATION OR TO 100 PSIG
MINIMUM. IF LEAKAGE IS OBSERVED OR IF TEMPERATURE
COMPENSATED PRESSURE DROP EXCEEDS 1% OF TEST
PRESSURE, REPAIR LEAKS AND RETEST.
4. PROVIDE SUPPORT UNDER ELBOWS ON PUMP SUCTION AND
DISCHARGE LINES.
5. ALL STRAINERS SHALL BE FURNISHED WITH A "ROUGHING"
SCREEN AND TWO (2) SCREENS FOR NORMAL OPERATION.
INSTALL STRAINER WITH ROUGHING SCREEN AND OPERATE
SYSTEM FOR 24 HOURS MINIMUM (RUN DOMESTIC WATER
SYSTEMS AT MAX FLOW FOR A MINIMUM OF ONE HALF (1/2)
HOUR. REMOVE ROUGHING SCREEN AND INSTALL NORMAL
SCREEN, AFTER TWO WEEKS OF NORMAL OPERATION INSTALL
NEW NORMAL SCREEN.
6. PIPING SIZES SHALL BE BASED ON 2' OR LESS HEAD LOSS PER
100 FEET OF LENGTH. VELOCITIES SHALL NOT EXCEED 10
FEET PER SECOND.
7. INSTALL ALL PIPING TO ALLOW FOR EXPANSION AND
CONTRACTION WITHIN THE PIPING SYSTEM. ENSURE ALL
REQUIRED PIPE EXPANSION WILL OCCUR IN THE PROPER
DIRECTION AND SEGMENT OF PIPE. PROPERLY ANCHOR (RE:
SPECIFICATIONS) ALL PIPING REQUIRING
EXPANSION/CONTRACTION ISOLATION. COORDINATE PIPE
EXPANSION/CONTRACTION TO PREVENT DAMAGE TO ANY AND
ALL BUILDING COMPONENTS.
CUTTING, PATCHING AND DEMOLITION:
1. KEEP DEMOLITION & CUTTING TO MINIMUM REQUIRED FOR
PROPER EXECUTION OF WORK.
2. BE RESPONSIBLE FOR ALL CUTTING AND PATCHING
NECESSARY FOR THE COMPLETION OF THE WORK.
3. NO CUTTING (NOT SHOWN ON THE CONTRACT DOCUMENTS)
SHALL BE DONE WITHOUT THE APPROVAL OF THE ARCHITECT
AS TO LOCATIONS, METHOD AND EXTENT OF THE CUTTING.
4. REPAIR ALL ACCIDENTAL OR INTENTIONAL DAMAGE TO MATCH
EXISTING CONSTRUCTION WITH NO NOTICEABLE DIFFERENCE
IN CONTINUITY, APPEARANCE OR FUNCTION.
5. DEMOLISH AND CAP ALL INDICATED PIPING BACK AT NEAREST
MAIN.
FIRE STOPPING:
1. FIRE STOPPING REQUIREMENT: PENETRATIONS THROUGH
RATED WALLS AND FLOORS SHALL BE SEALED WITH A
MATERIAL CAPABLE OF PREVENTING THE PASSAGE OF
FLAMES AND HOT GASES WHEN SUBJECTED TO THE
REQUIREMENTS OF THE TEST STANDARD SPECIFIC FOR FIRE
STOPS ASTM-E-814. ACCEPTANCE MATERIALS INCLUDE: DOW
CORNING RTV FIRE STOP FOAM FOR BARE PIPE, METAL
CONDUIT, AND ELECTRICAL CABLE; 3M FIRE DAM 150 CAULK
FOR BARE PIPE, METAL CONDUIT, AND BUILDING
CONSTRUCTION; GAPS 3M FS-195 INTUMESCENT STRIPS FOR
INSULATED PIPES, PLASTIC PIPE OR CONDUIT, AND
ELECTRICAL CABLE.
SCOPE CLARIFICATION NOTES:
1. THESE DOCUMENTS SERVE TO DEFINE THE NATURE OF THE
SYSTEMS, LEVEL OF CONTROL AND FINISH, RELATIONSHIPS
WITH OTHER BUILDING SYSTEMS, AND GENERAL DESIGN
INTENT OF THIS DIVISION'S WORK. THE CONTRACTOR SHALL
EXAMINE THE DOCUMENTS OF ALL TRADES TO COMPLETELY
FAMILIARIZE HIM/HERSELF WITH THE VARIOUS CONCEPTS
PRESENTED BY OTHER TRADES AND ADAPT THIS WORK AND
ANY ASSOCIATED PRICING ACCORDING. WHERE CONFLICTS
EXIST BETWEEN THESE DOCUMENTS AND THOSE OF OTHER
DIVISIONS, THE MORE STRINGENT (AS DETERMINED BY THE
ENGINEER) SHALL TAKE PRECEDENCE. IN PARTICULAR,
WHERE ARCHITECTURAL BACKGROUNDS INDICATE
PROGRAMMATIC DIFFERENCES IN ROOM LOCATIONS, ROOM
FUNCTIONS, PLUMBING FIXTURE COUNTS, CEILING TYPES,
RATED CONSTRUCTION, CLEARANCES, OR ROOM
RELATIONSHIPS, THE ARCHITECTURAL DRAWINGS SHALL
TAKE PRECEDENCE AND THIS CONTRACTOR SHALL ADAPT
HIS/HER WORK ACCORDINGLY WHILE MAINTAINING THE
DESIGN INTENT REPRESENTED BY THE DOCUMENTS OF THIS
DIVISION.
2. PROVIDE FIRE STOPPING ON ALL EXISTING AND NEW PIPES,
DEVICES, ETC. PENETRATING ALL FIRE RATED CONSTRUCTION
ASSEMBLIES.
3. EQUIPMENT SHOWN IS NOT NECESSARILY TO SCALE.
4. THE DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE
CONTRACTOR IS RESPONSIBLE FOR ALL OFFSETS,
TRANSITIONS, ELBOWS, ETC. AS REQUIRED IN DUCTWORK,
PIPING, SUPPORTS, ETC. TO COMPLETE HIS/HER WORK IN A
CLEAN, FUNCTIONAL INSTALLATION.
5. THIS CONTRACTOR IS RESPONSIBLE FOR ALL SLEEVES FOR
PENETRATIONS THROUGH SLABS AND BEAMS REQUIRED BY
THE INTENT OF THE SCOPE OF WORK INDICATED ON THE
DRAWINGS. COORDINATION OF QUANTITY AND LOCATIONS OF
ALL PENETRATIONS SHALL BE DONE BY THIS CONTRACTOR
DURING THE SHOP DRAWINGS PROCESS FOR REVIEW BY THE
STRUCTURAL ENGINEER.
SEWAGE EJECTOR/SUMP PUMP SCHEDULE
CODE
SEP-ICE
GENERAL NOTES
1. PROVIDE CHECK VALVE AND SHUT OFF VALVE ON EACH PUMP (#30-0152). SEE GENERAL DETAIL ON DRAWINGS.
2. PROVIDE A NEMA 4X DUPLEX CONTROL PANEL WITH ALTERNATING CAPABILITES, (#10-1042).
3. PROVIDE FOUR CLAMP TYPE \VARIABLE LEVEL FLOAT SWITCH (#10-0744)
4. PROVIDE A DUPLEX BASIN AND COVER, FIBERGLASS CONSTRUCTION WITH A 4" INLET HUB, AND A STEEL DUPLEX COVER 2"D 2"V (#31-0010)
5. PROVIDE QUICK DISCONNECT PIPING.
6. CONTROL PANEL SHALL BE FURNISHED WITH A BMS CONNECTION. BMS SHALL MONITOR ALL ALARMS.
7. PROVIDE A GAS TIGHT LID ON SUMP BASIN.
MANUFACTURER/MODEL NO.
ZOELLER / N163
SERVICE
ICE PLANT
TYPE
SUBMERSIBLE
NO. OF
PUMPS
2
GPM(EA)
59
FT HD (EA)
20
DISCHARGE SIZE (EA)
2"
RPM
3,450
SUMP SIZE
36" DIA X 36" DEEP
ELECTRICAL (EA.)
HP
0.5
VOLT
115
PH
1
FLA
15
REMARKS
PLUMBING FIXTURE SCHEDULE
CODE
SS
FD
GENERAL NOTES
1. PLUMBING DESIGN AND SIZES ARE BASED ON THE 2015 UNIFORM PLUMBING CODE.
2. FINISH AND TYPE OF ALL FIXTURES ARE SUBJECT TO ARCHITECT APPROVAL.
3. EACH PLUMBING FIXTURE SHALL BE PROVIDED WITH A P-TRAP, EXCEPT THOSE WITH INTEGRAL TRAPS.
4. FAUCET SHALL BE LEAD FREE AS PER COMPLIANCE WITH NSF 61.
ACCESSORY CODES
TP = TRAP PRIMER
TMV = GUARDIAN MODEL G3900LF TEMPERING VALVE, 81 GALLON CAPACITY, ANSI Z358.1-2014, ONE TEMPERING VALVE FOR BOTH SS.
FIXTURE
SAFETY STATION WITH EYEWASH
FLOOR DRAIN
MANUFACTURER / MODEL NO.
GUARDIAN / G1902
ZURN / Z-505
CW CONN.
1-1/4"
-
HW CONN.
1-1/4"
-
SAN CONN.
-
SEE PLANS
VENT CONN.
1-1/2"
2"
ACCESSORIES
TMV
TP
CHILLER PLANT - 31 LEVEL
MECHANICAL MEZZANINE - 48 LEVEL
SEWAGE
EJECTOR
4"FD3"FD
4"SAN
2"V
2"V
SEP
ICE
2"V
EXISTING
8"SAN
2"P
D
TO STREET
PLUMBING RISER DIAGRAMN.T.S.
CODP
SS
4"FD
2"V
SS
4"SAN
(E
)4
"V
PLUMBING SHEET LIST TABLE
Sheet Number Sheet Title
P-000.00 PLUMBING LEGEND, SCHEDULE, NOTES, AND RISER DIAGRAM
P-201.00 PLUMBING PLAN - ICE CHILLER PLANT
P-202.00 PLUMBING PLAN - ROOF
P-700.00 PLUMBING DETAILS I
P-701.00 PLUMBING DETAILS II
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\P
lum
b\P
-000.00_D
V18025.01.dw
g
06 M
ar '19 - 11:02am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
P-000.00
PLUMBING LEGEND,
SCHEDULE, NOTES, AND
RISER DIAGRAM
GENERAL NOTES KEYNOTES
11. EXISTING SYSTEMS INFORMATION IS SHOWN FOR REFERENCE
ONLY TO CLARIFY SCOPE. CONTRACTOR SHALL FIELD VERIFY
THESE EXISTING CONDITION TO CONFIRM THE PRECISE EXISTING
CONDITIONS AND TIE-IN LOCATION FOR NEW WORK. REFER TO
DEMOLITION PLANS FOR ADDITIONAL INFORMATION REGARDING
EXISTING SYSTEMS. EXISTING SYSTEMS NOTES ARE NOT SHOWN
ON CONSTRUCTION PLANS FOR CLARITY OF THE DRAWINGS.
2. THE CONTRACTOR SHALL FREEZE ANY AND ALL PIPING THAT DOES
NOT HAVE A POSITIVE SHUT DOWN OR OPERATING/EXISTING
VALVE. CONTRACTOR SHALL PROVIDE VALVES TO INSTALL.
3. CONTRACTOR SHALL PROVIDE CORE DRILLING AS REQUIRED FOR
NEW PIPE PENETRATIONS.
4. COORDINATION DRAWINGS SHALL BE PREPARED TO ENSURE
ROUTING AVOIDS CONFLICTS WITH NEW AND EXISTING WORK.
CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES.
5. ALL WORK AFFECTING BUILDING SYSTEM OPERATION SHALL BE
COORDINATED WITH BUILDING ENGINEERING.
REMOVE EXISTING FLOOR DRAIN GRATE AND REPLACE WITH A
SEALED SOLID COVER.
DEMOLISH EXISTING SANITARY DROP THROUGH SLAB. PROVIDE A
CLEANOUT ON EXISTING SANITARY DROP TO ALLOW FOR FUTURE
CLEANING.
2
NIC
(E)4"SAN DN/UP
(R)FD
DEMOLISH ALL EXISTING CW, HW, HWC,
SANITARY, VENT PIPING BACK TO
NEAREST MAIN THAT SERVES
BATHROOM IN THIS AREA. FIXTURES
INCLUDE (2) LAVATORIES, (1) WATER
CLOSET, (1) URINAL, & (1) SHOWER.
(E)4"SAN UP
(E)FD
(R)
3
4
"HW/CW
UP TO CAPPED
PIPE
(E)4"V UP
(R
)4
"U
GS
(R
)4
"V
(R
)4
"V
(R
)4
"V
(R)2"CW
(R)1"HW
(E
)4
"U
GS
(E
)4
"U
GS
(R)4"V DN
(E)4"V
(R)
3
4
"HW
(R)
3
4
"CW
(R
)
3 4
"H
W
(R
)
3 4
"C
W
DEMOLISH ALL EXISTING CW, HW, HWC, SANITARY, VENT
PIPING BACK TO NEAREST MAIN THAT SERVES BATHROOM IN
THIS AREA. FIXTURES INCLUDE (1) SHOWER AND ALL PIPING
TRIM FOR AN ABANDONED LAVATORY AND WATER CLOSET.
CAP ALL FLOOR DRAINS WITH SOLID COVERS.
(E)4"UGS
1
2
SEE MECHANICAL DWG
FOR CONTINUATION.
1
1
2
"RPZ
A A.5 A.7 BA A.5 A.7 B
(E)14"STORM
M(E)4"DCW
SEE MECHANICAL DWG
FOR CONTINUATION.
1
1
2"CW
1
1
2
"RPZ, PIPE DRAIN
DISCHARGE TO NEAREST
FLOOR DRAIN.
2"PD
DN
(E)8"SAN
NIC
(E)4"SAN DN/UP
(E)4"SAN UP
(E)FD
(E)4"V UP
(E
)4
"U
GS
(E
)4
"U
GS
(E)4"V
(E)4"UGS
SS
3"FD
4"FD
4"FD
CODP
CODP
ROUTE PIPE THRU
EXISTING GRAY BEAM
PENETRATION
SS
.
2"C
W
1"H
W
..
1
1
4
"TW
1
1
2
"TW
1
1
4
"TW
2"PD
UP
TRAP
PRIMER
TEMPERING
VALVE
SEP
ICE
1
1
2
"C
W
1
1
2
CW
SEE MECHANICAL DWG
FOR CONTINUATION.
1
1
2
"RPZ
4"S
AN
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\P
lum
b\P
-202.00_D
V18025.01.dw
g
06 M
ar '19 - 11:02am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
P-201.00
PLUMBING PLAN - ICE
CHILLER PLANT
PLUMBING PLAN - MEZZANINE ABOVE ICE PLANT - 48 LEVEL
31/8" = 1'-0"
PLUMBING DEMO PLAN - FUTURE ICE CHILLER PLANT
11/8" = 1'-0"
PLUMBING PLAN - ICE CHILLER PLANT
21/8" = 1'-0"
GENERAL NOTES
KEYNOTES
1
1. EXISTING SYSTEMS INFORMATION IS
SHOWN FOR REFERENCE ONLY TO
CLARIFY SCOPE. CONTRACTOR SHALL
FIELD VERIFY THESE EXISTING CONDITION
TO CONFIRM THE PRECISE EXISTING
CONDITIONS AND TIE-IN LOCATION FOR
NEW WORK. REFER TO DEMOLITION
PLANS FOR ADDITIONAL INFORMATION
REGARDING EXISTING SYSTEMS. EXISTING
SYSTEMS NOTES ARE NOT SHOWN ON
CONSTRUCTION PLANS FOR CLARITY OF
THE DRAWINGS.
2. THE CONTRACTOR SHALL FREEZE ANY
AND ALL PIPING THAT DOES NOT HAVE A
POSITIVE SHUT DOWN OR
OPERATING/EXISTING VALVE.
CONTRACTOR SHALL PROVIDE VALVES TO
INSTALL.
3. CONTRACTOR SHALL PROVIDE CORE
DRILLING AS REQUIRED FOR NEW PIPE
PENETRATIONS.
4. COORDINATION DRAWINGS SHALL BE
PREPARED TO ENSURE ROUTING AVOIDS
CONFLICTS WITH NEW AND EXISTING
WORK. CONTRACTOR SHALL COORDINATE
WITH ALL OTHER TRADES.
5. ALL WORK AFFECTING BUILDING SYSTEM
OPERATION SHALL BE COORDINATED WITH
BUILDING ENGINEERING.
6.
XX
EXISTING
SHAFT
NEW PIPING
COORD.
W/ MECH
ROOF HATCH
LADDERNEW GWB BHD
NEW ACT
2 x 2
8' - 6" AFF
EXISTING ACT
8' - 6" AFF
ROOF HATCH ABOVE
ENSURE EXISTING
RATED CONSTRUCTION
@STAIR
ENCLOSURE
RETAINED & RESTORED
GWB BHD
TO CONCEAL
RWL
4"ST
UP
4"ST
UP
4"HUB
UP
EXTEND 4"SAN TO
CONNECT TO EXISTING
4"SAN LOCATED IN
PLUMBING CHASE.
4"S
AN
(E)8"ST DN
4"S
T
NEW COOLING TOWER
REFER TO MECH.
EXIST PARAPET
EXIST WALL BELOW
NEW
COOLING
TOWER
EXIST WALL BELOW
RDRD
NEW GUARDRAIL NEW ROOF AREA EXIST MTL SIDING
BELOW
EXIST EXH FAN
NEW ROOF
ACCESS LADDER
4"ST
DN
4"RD4"RD
4"ST
DN
4"HUB
DN
4"HUB
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\P
lum
b\P
-201.00_D
V18025.01.dw
g
06 M
ar '19 - 11:02am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
P-202.00
PLUMBING PLAN - ROOF
PLUMBING PLAN - CLUB LEVEL (LEVEL 107)
21/8" = 1'-0"
PLUMBING PLAN - ROOF
11/8" = 1'-0"
NOTE:
1. REFER TO SPECIFICATIONS SECTION 22 10 00.
2. THIS DETAIL ALSO APPLICABLE TO INTERIOR NON-WATER PROOF
FLOOR CONSTRUCTION. FOR WATER PROOF FLOOR
CONSTRUCTION AND OTHER FLOOR CONSTRUCTION SEE
SPECIFICATIONS.
3. F RATING: 1 OR 2 HOUR
4. UL W-L-1083 SYSTEM ASSEMBLY
5. TESTED IN ACCORDANCE WITH ASTM E-814 AND ANSI/UL 1479
6. ALL EQUIPMENT SHALL BE PROVIDED WITH
SEISMIC BRACING
ENGINEER TO CONFIRM.
ESCUTCHEON BOTH SIDES
PROVIDE A MINIMUM
1
2
IN. DEPTH OF SEALANT (NELSON
CLK SEALANT OR EQUIVALENT) FLUSH WITH WALL.
ALL SPACES BETWEEN PIPES AND SLEEVES SHALL BE
PACKED FULL DEPTH WITH MINERAL WOOL OR OTHER
EQUALLY FIRE RESISTIVE MATERIAL (FIBERGLASS SHALL
NOT BE USED). SLEEVE CLEARANCE SHALL NOT EXCEED 1/2"
BETWEEN PIPE AND SLEEVE.
PIPE SLEEVE
CEMENT ANY GAPS BETWEEN
SLEEVES AND WALL
PIPE
WALL OR PARTITION
A
DETAIL OF PIPING PIERCING REQUIRED FIRE RATE PARTITIONS AND WALL
NO SCALE
4" MINIMUM
NOTE:
THIS DETAIL REFERS TO PIPES BEING INSTALLED
THROUGH EXISTING FLOOR SLABS USING A CORE DRILL.
SLAB THICKNESS SHALL BE CONFIRMED BY CORE
DRILLING THROUGH THE SLAB FOR THE RISER BEFORE
DRILLING FOR SLEEVE.
PIPE RISER
SPECIFIED INSULATION
OVER PIPE CLAMP
PIPE CLAMP
PROVIDE WATERPROOF
NON-SHRINK GROUT #5000
BY PLUMBING
CONTRACTOR
PACK VOID TIGHTLY W/
APPROVED FIRE SEALANT AND
SEAL ENDS WITH WATERPROOF
MASTIC, SEE SPEC.
EPOXY COATING
WATER PROOFING
2"
MINIMUM 4"
IPS SCH 40 PIPE SLEEVE
SIZED FOR MIN 1/2"
ANNULUS
CHROME PLATED
ESCUTCHEON PLATE
ON EXPOSED PIPES
B
DETAIL OF PIPE THRU EXISTING FLOOR SLAB
NO SCALE
C
PIPE THRU STUD WALL DETAIL
NO SCALE
METAL STUD CHANNEL FRAME AROUND
16 GAGE PIPE SLEEVE
PIPE
SPECIFIED INSULATION
STUD WALL
POSITIVE ACTING CHROME PLATED
ESCUTCHEON PLATES
NOTE:
OMIT ESCUTCHEON PLATES FOR
CONCEALED PIPES.
SPECIFIED INSULATION
OVER PIPE CLAMP
1/4" THICK SPOKE, 4" LARGER
THAN SLEEVE DIA. TACK WELD
TO SLEEVE
PIPE RISER
PIPE CLAMP
WATER STOP CURB WHERE
DIRECTED
PACK VOID TIGHTLY W/APPROVED FIRE
SEALANT AND SEAL ENDS WITH MASTIC,
SEE SECTION 22 10 00.
IPS PIPE SLEEVE SIZED FOR
MIN 1/2" ANNULUS
CHROME PLATED
ESCUTCHEON PLATE ON
EXPOSED PIPES
D
PIPE THRU FLOOR SLAB DETAIL
NO SCALE
CONC. DECK
HILTI SHIELD
SUPPORT BEAM
LOOP HANGER
T.B. CLAMP
3/8" A.T.R.
PIPE
LOOP HANGER
PIPE
HILTI SHIELD HANGER
NOT TO SCALE
TOP BEAM CLAMP
NOT TO SCALE
3/8" ROD COUP. (IF NEEDED)
3/8" A.T.R.
NOTES:
1. ALL EQUIPMENT SHALL BE PROVIDED WITH
SEISMIC BRACING
E
HANGER DETAILS
NO SCALE
INSULATION
SHIELD
HANGER ROD
SEMI- CYLINDRICAL GALVANIZED IRON
SHIELD. FOR HOT PIPES 2-1/2" & OVER, USE
PROTECTIVE SADDLE
ANGLE IRON
INSULATION
PIPE
LOAD BEARING CALCIUM
SILICATE INSULATION AT ALL
HANGER POINTS
NOTES:
1. ALL EQUIPMENT SHALL BE PROVIDED WITH
SEISMIC BRACING
F
TRAPEZE HANGER
NO SCALE
NOTES:
1. ALL EQUIPMENT SHALL BE PROVIDED WITH
SEISMIC BRACING
HANGER ROD
VIBRATION ELIMINATORS WHERE
REQUIRED (SEE SPECIFICATIONS)
PIPE
G
CLEVIS HANGER
NO SCALE
NOTES:
1. ALL EQUIPMENT SHALL BE PROVIDED WITH
SEISMIC BRACING
INSULATION SHIELD
INSULATION
LOAD BEARING CALCIUM SILICATE
INSULATION AT ALL HANGER
POINTS
SEMI- CYLINDRICAL GALVANIZED IRON
SHIELD. FOR HOT PIPES 2-1/2" & OVER,
USE PROTECTIVE SADDLE
VIBRATION ELIMINATORS WHERE
REQUIRED (SEE SPECIFICATIONS)
NOTES:
1. PROVIDE RUBBER INSULATORS OR COPPER PLATED TRAPEZE
WHERE COPPER PIPE IS IN CONTACT WITH TRAPEZE.
2. PROVIDE VIBRATION ISOLATORS IN PIPE HANGERS WITHIN 10 FEET
OF ROTATING EQUIPMENT.
PIPE PARALLEL
TO JOISTS
PIPE PERPENDICULAR
TO JOISTS
NOTES:
1. ALL EQUIPMENT SHALL BE PROVIDED WITH
SEISMIC BRACING
4 x 3 x 1/4" ANGLE STEEL
BOLTS
(TYPICAL)
HANGER RODS FOR
PIPING SUPPORT
3/8" DIA HANGER ROD.
WELDED
JOIST
4 x 3 x 1/4" ANGLE STEEL CONT. CONN. TO
JOISTS AT PANEL POINT
WELDED
BOLTS
(TYPICAL)
4 x 3 x 1/4" ANGLE
STEEL
H
METHODS OF PIPE SUPPORT
NO SCALE
PPP #P2-500 TRAP PRIMER
PPP #AG-500 AIR GAP FITTING
1
2
" TO (1) FLOOR DRAIN PRIMER TAP OR
DU-2 DISTR. UNIT.
PPP #DU-2 DISTR. UNIT (WHEN REQ'D TO
SERVE (2) FLOOR DRAINS)
1
2
"TO EACH FLOOR DRAIN
1" MIN.
FIXED
AIR GAP
1
2
"FULL PORT BALL VALVE
1
2
"
HEIGHT ABOVE FINISHED FLOOR TO
BE 1'-0" FOR EVERY 20'-0" OF
PRIMER PIPE LINE.
CW MAIN
6" MIN.
11"
I
TRAP PRIMER DETAIL
NO SCALE
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\P
lum
b\P
-700.00_D
V18025.01.dw
g
06 M
ar '19 - 11:02am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
P-700.00
PLUMBING DETAILS I
DIM
EN
SIO
NS
3"
&
4"
5"
&
6"
8" 10" 12" 15"
1"1" 1 1/8"5/8" 3/4" 7/8"A
B 3/4" 7/8"1"
1 1/8" 1 1/8" 1 1/4"
C
X
D
1/4"
X
1 1/4"
X
3/8"
1 1/2"
X X
1/2"
2"
X X
3/8"
1 1/2"
1/2"
2"
1/2"
2 1/2"
5/8"E 3/4" 7/8" 7/8"7/8"3/4"
NOMINAL PIPE SIZES
NOTES:
1. ALL EQUIPMENT SHALL BE PROVIDED WITH SEISMIC BRACING
2. UNDERGROUND PIPE HANGERS SIMILAR OR EQUAL TO F & S #275
SELF SUPPORTING FLOOR SLAB
4"X4"X1/4" FISH PLATE OR BENT RODS
MAYBE USED
SLAB ON GRADE
BITUMINOUS COATING
EARTH
ROD SIZE "A"
STEEL PIPE CLAMP
NOTE:
PROVIDE HANGERS ON ALL UNDERGROUND SOIL, VENT AND STORM
DRAINAGE PIPING. ALL JOINTS ON THE UNDERGROUND PIPING SHALL BE
SEALED WATER TIGHT SO THAT THERE WILL BE NO GROUND WATER
INFILTRATION INTO THE DRAINAGE SYSTEM.
E
DETAIL OF PIPE IN FILL
NO SCALE
CONCRETE WALL
WELDED ENTIRE PERIMETER
OF SLEEVE
INSIDE BUILDING
GALVANIZED STEEL FLANGE
WELDED TO SLEEVE
LEAD
OAKUM
LEAD
GALVANIZED STEEL SLEEVE
GALVANIZED STEEL FLANGE
WELDED TO SLEEVE
ESCUTCHEON IN FINISHED
AREAS ONLY
OAKUM
WELDED ENTIRE PERIMETER
OF SLEEVE
CONCRETE WALL
A
DETAIL OF WATERTIGHT SLEEVE
NO SCALE
1"
PIPE
STEEL CAP
ROOF
CONTINUOUS WELD ALL
AROUND
STAINLESS STEEL FLASHING
PIPE SLEEVE
B
DETAIL OF UNINSULATED PIPE THRU ROOF
NO SCALE
2"
36"DIA.
+24"(MIN)
2"
2"
2"
DISCHARGE PIPING DIAGRAM
NOTES:
1. ALL EQUIPMENT SHALL BE PROVIDED WITH
SEISMIC BRACING
4" DISCHARGE SEE PLANS
TYPICAL GATE VALVE
TYPICAL UNION
TYPICAL CHECK VALVE
2"DISCHARGE FROM
EACH SUMP PUMP
FULLY GASKETED SUMP COVER BY
PUMP MFGR
DEPTH TO BE FIELD VERIFIED
MIN 4'-0" INLET PIPING. SEE PLANS
FOR SIZE & QUANTITY
CONDUIT & WIRING TO BLDG
ELECT. SUPPLY
GRADE (VERIFY)
2"V. TO 2"VTR
4"DISCHARGE TO DAYLIGHT. OR
AT HOUSE TRAP
COMBINE TO 4"DISCHARGE
GATE VALVE
CHECK VALVE
TYPICAL UNION
SUMP PUMP
FIBERGLASS SUMP
DIFFERENTIAL FLOAT SWITCH
ELEVATION
C
DUPLEX SUMP PUMP DETAIL
NO SCALE
1/2"
DIA.
A B
12
"6
"V
AR
IE
S
D
C
12
"6
"
PIPE SIZES A B C D
6"
8"
12"
10"
16"
21"
24"
27"
30"
36"
1'-3"
1'-3"
1'-6"
1'-5"
1'-6"
2'-0"
1'-6"
1'-6"
1'-6"
2'-0"
1'-6"
1'-6"
2'-0"
2'-0"
2'-6"
3'-0"
3'-6"
3'-6"
4'-0"
4'-6"
2'-3"
2'-3"
6'-6"
2'-6"
2'-6"
2-6"
2'-6"
2'-6"
3'-0"
3'-0"
2'-6"
2'-6"
3'-0"
3'-0"
4'-0"
3'-6"
4'-6"
4'-6"
5'-6"
5'-0"
NOTES:
1. ALL EQUIPMENT SHALL BE PROVIDED WITH
SEISMIC BRACING
CONCRETE
TYPICAL AT ALL JOINTS
TYPICAL AT ALL JOINTS
UNDISTURBED EARTH
SUPPORT FOOTING BELOW FROST
NOTE: LINE ON FIRM ORIGINAL SUBSOIL
D
CONCRETE PIER FOR SUPPORTING PIPE IN FILL
NO SCALE
F
TEMPERING VALVE DETAIL
NO SCALE
THERMOMETER
TEMPERED HW
MIXING VALVE
CONN TO CW
CONN TO HW
BALL VALVE
(TYP.)
UNION
(TYP.)
INSULATION PIPE
CHANNEL
EQUIP. CURB
PLATED ROD
ROLLER CHAIR
SADDLE WASHER
LOAD BEARING CALCIUM SILICATE OR HILO
BLOCK INSULATION AT ALL HANGER
POINTS
G
ROOF PIPE SUPPORT
NO SCALE
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\P
lum
b\P
-700.00_D
V18025.01.dw
g
06 M
ar '19 - 11:02am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
P-701.00
PLUMBING DETAILS II
DN
UP
SHEET KEY NOTES
FLOOR CONTROL VALVE
ASSEMBLY
TAMPER SWITCH
FIRE HOSE CABINET
FIRE HOSE VALVE
FHC
FHV
EXISTING HEAD TO REMAIN
EXISTING HEAD TO
BE REMOVED
E
CONCEALED PENDANT
FOR MECHANICAL, PLUMBING AND SPRINKLER
EQUIPMENT AS INDICATED ON THE DIVISION 21, 22,
AND 23 DRAWINGS, THE DIVISION 21, 22 AND 23
CONTRACTORS SHALL COORDINATE WITH DIVISION 26
CONTRACTOR TO CONNECT ALL MECHANICAL AND
PLUMBING EQUIPMENT INDICATED ON THE
MECHANICAL, PLUMBING AND SPRINKLER DRAWINGS.
COORDINATE FOR COMPLETE WIRING, STARTERS,
AND DISCONNECTING MEANS FOR ALL MECHANICAL,
PLUMBING AND SPRINKLER EQUIPMENT.
DESCRIPTIONABBRSYMBOL
F
M
SECTION VIEW SHEET NO.
SECTION NO.
POINT OF CONN. (CONN. NEW TO
EXISTING)
POC
POD POINT OF DISCONNECTION
ARROW INDICATES DIRECTION
OF FLOW
RISE IN DIRECTION OF FLOW
DROP IN DIRECTION OF FLOW
DN DOWN
ABOVE FINISHED FLOORAFF
AFG
TOP
BOP
I.E.
NTS
(E)
(R)
SPR.
FD
ABOVE FINISHED GRADE
TOP OF PIPE (AFF)
BOT. OF PIPE (AFF)
INVERT ELEVATION
NOT TO SCALE
EXISTING
REMOVE
SPRINKLER
FLOOR DRAIN
O.C. ON CENTER
UPRIGHT UNDER OBSTRUCTIONUO
SIDEWALL HEAD
EXTENDED COVERAGE
SIDEWALL HEAD
EXTENDED COVERAGE
CONCEALED PENDANT HEAD
EC
EC
DESCRIPTIONABBRSYMBOL
PS
FS
EJ
UNION
EXPANSION JOINT
FLEXIBLE PIPE CONNECTOR
PRESSURE SWITCH
PRESSURE GAUGE W/GAUGE
COCK
CONCENTRIC REDUCER
ECCENTRIC REDUCER
DESCRIPTIONABBRSYMBOL
EJ
U
FC
FS FLOW SWITCH
PS
PG
ELBOW UP
ELBOW DOWN
TEE UP
TEE DOWN
PIPE CAP OR PLUG
CR
ER
TS
TS
FIRE DEPARTMENT
(SIAMESE) CONNECTION
FCVA
FHC
FHV
(PLAN) (ELEV)
DRAIN VALVE W/ HOSE END
CONN.
CHECK VALVE W/ INDICATION
OF FLOW DIRECTION
PRESSURE REDUCING VALVE
BUTTERFLY VALVE
TEMPERATURE/ PRESSURE
RELIEF VALVE
STRAINER W/ BLOW-OFF &
CAPPED HOSE-END
CONNECTION
OUTSIDE STEM AND YOKE
DESCRIPTIONABBRSYMBOL
DV
CV
PRV
BFV
BV BALL VALVE
TPR
VALVE IN RISER
STR
GATE VALVEGV
OS&Y
DRY CONCEALED PENDANT
HEAD
D
D
D
DRY UPRIGHT HEADD
SIA
INTERMEDIATE TEMPERATURE
RATED HEAD
IT
IT
HIGH TEMPERATURE RATED
HEAD
HT
HT
TEMP TEMPERATURE
DESCRIPTIONABBRSYMBOL
SPRINKLER HEAD SCHEDULE
MANUFACTURER MODEL NO. K-FACTOR
RELIABLE F1FR 5.6
RELIABLE G5-56 5.6
QUICK RESPONSE SIDEWALL
QUICK RESPONSE CONCEALED PENDANT
7
7
QUICK RESPONSE UPRIGHTRELIABLE F1FR 5.6 7
REQ.
PRESSURE
(PSI)
DESCRIPTION
VALVE WITH TAMPER SWITCH
TS
EC
DOUBLE CHECK DETECTOR
ASSEMBLY
DCDA
M
PIPE SIZE
SPRINKLER PIPING
STANDPIPE PIPING
DRAIN
3
4
"
DESCRIPTIONABBRSYMBOL
SP
ST
DR
EXISTING SPRINKLER PIPING
(LIGHT SOLID LINE)
EXISTING SPRINKLER PIPING
TO BE REMOVED (DASHED
LINE)
SQ.FTSQUARE FEET
(E)
(R)
R
R
UPRIGHTU
UO
FIRE PROTECTION NOTES RELATING
TO CONSTRUCTION
1. CONTRACTOR SHALL INCLUDE DRAWINGS, SPECIFICATIONS, AND
CALCULATIONS FOR TEMPORARY SPRINKLER COVER TO INSURE FIRE
SAFETY DURING CONSTRUCTION TO COMPLY WITH THE CURRENT
CODES AND DOB, FIRE DEPARTMENT (FD), AND OSHA.
2. BIDDERS SHALL INCLUDE LINE-ITEM COST FOR FD AND DOB COMPLIANT
FIRE PROTECTION SYSTEMS. THIS SHALL INCLUDE ALL REQUIRED
TEMPORARY SYSTEMS AS WELL AS MAINTANENCE, ALTERATION AND
RELOCATION OF THESE SYSTEMS AS REQUIRED TO ADAPT TO ONGOING
CONSTRUCTION.
3. OWNER SHALL SUBMIT A LETTER TO THE FD REQUESTING APPROVAL OF
FIRE PROTECTION METHOD DURING CONSTRUCTION. THE LETTER
SHALL ADDRESS:
A. SCOPE OF WORK
B. METHOD OF INSTALLATION
C. IMPAIRMENT PROCEDURE, INCLUDING:
1) SYSTEM OPERATION
2) SHUT-DOWN AND CUT-IN
3) DAILY RETURN OF SERVICE
4) FD NOTIFICATIONS
5) FIRE-GUARD AND LOG OF INSPECTIONS
6) CONTINUOUS STANDPIPE SERVICE
7) MAINTENANCE OF ACCESSIBILITY OF HOSE STATIONS
8) TENANT ELEVATOR BYPASS
9) OPERATION OF MANUAL PULL STATIONS
10) VISIBILITY AND MARKING OF EXITS
11) PROTECTION OF ELEVATORS AND STAIRWAYS
12) PROVISION OF PORTABLE FIRE EXTINGUISHERS
13) REMOVAL OF COMBUSTIBLE WASTE ON A DAILY BASIS
14) ENFORCEMENT OF "NO SMOKING" POLICY
4. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED
APPROVALS AND SIGN-OFFS AT COMPLETION OF CONSTRUCTION AND
SHALL SUBMIT ALL REQUIRED DOCUMENTS AND CALCULATIONS IN
ORDER TO DO SO.
GENERAL FIRE PROTECTION CONTRACT REQUIREMENTS:
GENERAL:
1. UNLESS OTHERWISE NOTED, THE WORK DESCRIBED ON THE PLANS
AND SPECIFICATIONS SHALL INCLUDE THE FURNISHING AND
INSTALLATION OF ALL LABOR AND MATERIALS NECESSARY FOR
COMPLETE AND OPERATIONAL HVAC, FIRE PROTECTION AND
PLUMBING SYSTEMS. CONTRACTOR SHALL FURNISH THESE EVEN IF
ITEMS REQUIRED TO ACHIEVE THIS (I.E. OFFSETS, ISOLATION AND
BALANCING DEVICES, MAINTENANCE CLEARANCES, ETC.) ARE NOT
SPECIFICALLY SHOWN.
2. DATA GIVEN ON THE DRAWINGS IS AS EXACT AS COULD BE SECURED.
ABSOLUTE ACCURACY IS NOT GUARANTEED AND THE CONTRACTOR
SHALL OBTAIN AND VERIFY EXACT LOCATIONS, MEASUREMENTS,
LEVELS, SPACE REQUIREMENTS, POTENTIAL CONFLICTS WITH OTHER
TRADES, ETC. AT THE SITE AND SHALL SATISFACTORILY ADAPT HIS
WORK TO THE ACTUAL CONDITIONS OF THE JOB.
3. THE DRAWINGS ARE DIAGRAMMATICAL IN NATURE AND SHALL NOT BE
SCALED. THEY SHOW CERTAIN PHYSICAL RELATIONSHIPS WHICH
MUST BE ESTABLISHED WITHIN THE DIVISION 23 WORK AND ITS
INTERFACE WITH OTHER WORK. ESTABLISHING THIS RELATIONSHIP IN
THE FIELD IS THE EXCLUSIVE RESPONSIBILITY OF THE CONTRACTOR.
THIS DIVISION SHALL COORDINATE ITS WORK WITH ALL DIVISIONS OF
THE WORK AND ADJUST ITS WORK AS REQUIRED BY THE ACTUAL
CONDITIONS OF THE PROJECT.
A. THE CONTRACTOR SHALL VISIT THE SITE BEFORE SUBMITTING A
BID TO BECOME THOROUGHLY FAMILIAR WITH THE ACTUAL
CONDITIONS OF THE PROJECT. NO EXTRAS WILL BE ALLOWED
DUE TO LACK OF KNOWLEDGE OF EXISTING CONDITIONS.
B. CERTAIN SYSTEMS REQUIRE ENGINEERING OF INSTALLATION
DETAILS BY CONTRACTOR. UNLESS FULLY DETAILED IN THE
CONTRACT DOCUMENTS, SUCH ENGINEERING IS THE EXCLUSIVE
RESPONSIBILITY OF THE CONTRACTOR.
C. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE
WHERE CLEARANCES ARE LIMITED, AND WHERE INSTALLATION
DRAWINGS OR SCHEMATICS, "CONSTRUCTION DRAWINGS", OR
COORDINATION DRAWINGS MAY BE REQUIRED IN ACCORDANCE
WITH, OR IN EXCESS OF, THOSE REQUIRED BY THE
SPECIFICATIONS. THE CONTRACTOR SHALL PREPARE ALL SUCH
COORDINATION DRAWINGS AS PART OF THE BASE CONTRACT.
SUCH DRAWINGS MAY BE SUBMITTED TO THE
ARCHITECT/ENGINEER FOR RECORD AND COMMENT (AT THE
CONTRACTOR'S OPTION).
4. THESE NOTES ONLY SUPPLEMENT, AND DO NOT REPLACE, THE
SPECIFICATIONS.
5. DEFINITIONS AND TERMINOLOGY
A. THE DEFINITIONS OF DIVISION 1 AND THE GENERAL CONDITIONS
OF THIS SPECIFICATION ALSO APPLY TO THE DIVISION 23
CONTRACT DOCUMENTS.
B. "CONTRACT DOCUMENTS" CONSTITUTE THE DRAWINGS,
SPECIFICATIONS, GENERAL CONDITIONS, PROJECT MANUALS,
ETC., PREPARED BY ENGINEER (OR OTHER DESIGN
PROFESSIONAL IN ASSOCIATION WITH ENGINEER) FOR
CONTRACTOR'S BID OR CONTRACTOR'S NEGOTIATIONS WITH
THE OWNER. THE DIVISION 23 DRAWINGS AND SPECIFICATIONS
PREPARED BY THE ENGINEER ARE NOT CONSTRUCTION
DOCUMENTS.
C. "CONSTRUCTION DOCUMENTS", "CONSTRUCTION DRAWINGS",
AND SIMILAR TERMS FOR DIVISION 23 WORK REFER TO
INSTALLATION DIAGRAMS, SHOP DRAWINGS AND
COORDINATION DRAWINGS PREPARED BY THE CONTRACTOR
USING THE DESIGN INTENT INDICATED ON THE ENGINEER'S
CONTRACT DOCUMENTS. THESE SPECIFICATIONS DETAIL THE
CONTRACTOR'S RESPONSIBILITY FOR "ENGINEERING BY
CONTRACTOR" AND FOR PREPARATION OF CONSTRUCTION
DOCUMENTS.
D. "FURNISH" MEANS TO "SUPPLY" AND USUALLY REFERS TO AN
ITEM OF EQUIPMENT.
E. "INSTALL" MEANS TO "SET IN PLACE, CONNECT AND PLACE IN
FULL OPERATIONAL ORDER".
F. "PROVIDE" MEANS TO "FURNISH AND INSTALL".
G. "EQUIVALENT" MEANS "MEETS THE SPECIFICATIONS OF THE
REFERENCE PRODUCT OR ITEM IN ALL SIGNIFICANT ASPECTS."
SIGNIFICANT ASPECTS SHALL BE AS DETERMINED BY THE
ARCHITECT/ENGINEER.
H. "WORK BY OTHER(S) DIVISIONS"; "RE: XX DIVISION", AND SIMILAR
EXPRESSIONS MEANS WORK TO BE PERFORMED UNDER THE
CONTRACT DOCUMENTS, BUT NOT NECESSARILY UNDER THE
DIVISION OR SECTION OF THE WORK ON WHICH THE NOTE
APPEARS. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO
COORDINATE THE WORK OF THE CONTRACT BETWEEN HIS/HER
SUPPLIERS, SUBCONTRACTORS AND EMPLOYEES. IF
CLARIFICATION IS REQUIRED, CONSULT ARCHITECT/ENGINEER
BEFORE SUBMITTING BID.
I. BY INFERENCE, ANY REFERENCE TO A "CONTRACTOR" OR
"SUB-CONTRACTOR" MEANS THE ENTITY WHICH HAS
CONTRACTED WITH THE OWNER FOR THE WORK OF THE
CONTRACT DOCUMENTS.
J. "ENGINEER" MEANS THE DESIGN PROFESSIONAL FIRM WHICH
HAS PREPARED THESE CONTRACT DOCUMENTS. ALL
QUESTIONS, SUBMITTALS, ETC. OF THIS DIVISION SHALL BE
ROUTED THROUGH THE ARCHITECT TO THE ENGINEER
(THROUGH PROPER CONTRACTUAL CHANNELS).
EXISTING BUILDING:
1. THE CONTRACTOR'S ATTENTION IS CALLED TO THE FACT THAT THE
EXISTING BUILDING WILL BE OCCUPIED BY THE OWNER DURING
CONSTRUCTION. CONTINUED OPERATION OF THE FACILITY SHALL
NOT BE HINDERED BY THIS WORK. THE CONTRACTOR SHALL
ACCOUNT FOR ALL ADDITIONAL COSTS WHICH MAY BE INCURRED BY
HIM DUE TO THE DIFFICULTY OF WORKING OVER AND AROUND
EMPLOYEES, DESKS, EQUIPMENT, ETC.; AND DUE TO THE HOURS OF
THE DAY IN WHICH AN AREA MAY BE AVAILABLE WHEN SUBMITTING
HIS BID.
2. MAINTAIN A MARK-UP SET OF DRAWINGS WHICH INDICATE
VARIATIONS IN THE ACTUAL INSTALLATION FROM THE ORIGINAL
DESIGN. SURRENDER DRAWINGS TO OWNER UPON COMPLETION.
3. COORDINATE ALL PENETRATIONS OF THE FLOOR SLAB PRIOR TO
COMMENCING WORK. UTILIZE X-RAY AND VISUAL INVESTIGATION OF
EXISTING CONDITIONS AS REQUIRED PRIOR TO DRILLING OR CUTTING.
COORDINATE ALL NEW PENETRATIONS WITH OTHER DIVISIONS OF
THE WORK. ALL CONTRACTORS ARE INDIVIDUALLY RESPONSIBLE
FOR ALL PENETRATIONS REQUIRED BY THEIR DIVISIONS.
GENERAL FIRE PROTECTION DEMOLITION NOTES:
1. THE CONTRACTOR SHALL CAREFULLY INSPECT, REVIEW AND
DOCUMENT THE EXISTING BUILDING FIRE PROTECTION SYSTEMS
WITHIN THE PROJECT WORK AREAS SHOWN TO BE DEMOLISHED.
PRIOR DOCUMENTATION OF EXISTING CONDITIONS, CAPACITIES AND
PHYSICAL ARRANGEMENTS IS LIMITED. THESE DOCUMENTS ATTEMPT
TO DEFINE AREAS BUT MAY NOT ACCURATELY SHOW ALL EXISTING
CONDITIONS.
2. ALL EXISTING FIRE PROTECTION PIPING BEING REUSED SHALL BE
INSPECTED AND VERIFIED TO BE IN GOOD CONDITION PRIOR TO
CONNECTION OF ANY NEW FIRE PROTECTION SYSTEMS.
3. ALL PIPING SYSTEMS NO LONGER IS USE DUE TO RENOVATION SHALL
BE REMOVED. NO PIPING WILL BE ABANDONED IN PLACE.
GENERAL FIRE PROTECTION NOTES:
1. COORDINATE ROUTING OF ALL FIRE PROTECTION PIPING WITH
STRUCTURAL BEAMS, COLUMNS, ETC. ALLOW FOR REROUTING OF
PIPING AS REQUIRED.
2. PIPING ROUTING ON DRAWINGS IS GENERALLY DIAGRAMMATIC WITH
EFFORTS DURING DESIGN TO AVOID STRUCTURAL CONFLICTS.
CONTRACTOR SHALL COORDINATE ROUTING OF ALL PIPING THROUGH
BUILDING WITH STRUCTURAL CONDITIONS. CONTRACTOR
COORDINATION DRAWINGS SHALL REFLECT ALL PIPE ROUTING AND
PIPING THAT MAY HAVE TO BE SHIFTED AND/OR MOVED TO AVOID
CONFLICTS. SHIFTED OR MOVED PIPING SHALL REFLECT NO
ADDITIONAL COST TO THE PROJECT.
3. ALL EQUIPMENT AND PIPING SHALL BE BRACED FOR SEISMIC
REQUIREMENTS APPLICABLE FOR SEISMIC ZONE REQUIREMENTS FOR
THIS PROJECT.
4. ALL FIRE PROTECTION PIPING SHALL BE SCHEDULE 40 OR GREATER.
THE USE OF SCHEDULE 10 PIPE WILL NOT BE ACCEPTED FOR ANY
REASON.
5. COORDINATE ROUTING OF ALL FIRE PROTECTION PIPING WITH
STRUCTURAL BEAMS, COLUMNS, ETC. ALLOW FOR REROUTING OF
PIPING AS REQUIRED.
6. PIPING ROUTING ON DRAWINGS IS GENERALLY DIAGRAMMATIC WITH
EFFORTS DURING DESIGN TO AVOID STRUCTURAL CONFLICTS.
CONTRACTOR SHALL COORDINATE ROUTING OF ALL PIPING THROUGH
BUILDING WITH STRUCTURAL CONDITIONS. CONTRACTOR
COORDINATION DRAWINGS SHALL REFLECT ALL PIPE ROUTING AND
PIPING THAT MAY HAVE TO BE SHIFTED AND/OR MOVED TO AVOID
CONFLICTS. SHIFTED OR MOVED PIPING SHALL REFLECT NO
ADDITIONAL COST TO THE PROJECT.
7. ALL REQUIRED OPENINGS IN STEEL BEAMS AND STRUCTURAL WALLS
ARE TO BE ACCOMPLISHED USING SLEEVES/PENETRATIONS
PROPERLY SIZED FOR THE PIPE THEY SERVE. ALL BEAM
PENETRATIONS SHALL BE APPROVED BY THE STRUCTURAL
ENGINEER. CORE DRILLING IN PANS IS ALLOWED UPON PRIOR
APPROVAL OF ARCHITECT AND STRUCTURAL ENGINEER.
ELECTRICAL COORDINATION:
1. VERIFY THE ELECTRICAL SERVICE PROVIDED BY THE ELECTRICAL
CONTRACTOR BEFORE ORDERING ANY PLUMBING EQUIPMENT
REQUIRING ELECTRICAL CONNECTIONS.
2. THE ELECTRICAL POWER FOR CERTAIN EQUIPMENT PROVIDED UNDER
DIVISION 21 HAS NOT BEEN SPECIFICALLY INDICATED ON THE
ELECTRICAL DRAWINGS AND MUST BE PROVIDED BY AND FIELD
COORDINATED BY THE DIVISION 21 TRADE REQUIRING SUCH POWER.
INSTALLATION:
1. SUSPEND EACH TRADE'S WORK SEPARATELY FROM THE STRUCTURE.
DUCTWORK SHALL BE HELD TIGHT TO STRUCTURE EXCEPT WHERE
OTHERWISE SHOWN.
2. INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS UNLESS SPECIFICALLY
INDICATED OTHERWISE OR WHERE LOCAL CODES OR REGULATIONS
TAKE PRECEDENCE.
3. PROVIDE MANUFACTURER'S RECOMMENDED SERVICE CLEARANCE
AROUND ALL EQUIPMENT REQUIRING SAME.
4. PROVIDE FOR SAFE CONDUCT OF THE WORK, CAREFUL REMOVAL
AND DISPOSAL OF MATERIALS AND PROTECTION OF PROPERTY
WHICH IS TO REMAIN UNDISTURBED.
5. WARRANTY: AT A MINIMUM, THE ENTIRE FIRE PROTECTION SYSTEM
SHALL BE WARRANTED AGAINST DEFECTS IN MATERIALS AND
WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR AFTER ACCEPTANCE
OF THE SYSTEM BY THE OWNER. REFER TO INDIVIDUAL
SPECIFICATION SECTIONS FOR SPECIFIC WARRANTY REQUIREMENTS.
PIPE INSTALLATION:
1. ALL PIPING SHALL BE ADEQUATELY SUPPORTED FROM THE BUILDING
STRUCTURE TO PREVENT SAGGING, POCKETING, SWAYING OR
DISPLACEMENT BY MEANS OF HANGERS AND SUPPORTS. PIPING IS
NOT TO BE SUPPORTED BY EQUIPMENT.
2. FLUSH OUT PIPING AND REMOVE CONTROL DEVICES BEFORE
PERFORMING PRESSURE TEST. THE ENTIRE FIRE PROTECTION
SYSTEM SHALL BE TESTED HYDROSTATICALLY AT NOT LESS THAN 200
PSI PRESSURE FOR TWO HOURS, OR AT 50 PSI IN EXCESS OF THE
MAXIMUM STATIC PRESSURE WHEN THE MAXIMUM STATIC PRESSURE
IN EXCESS OF 150 PSI. ANY SYSTEM FAILING TO MEET THE PRESSURE
TEST SHALL BE REPAIRED AND RETESTED AT NO ADDITIONAL COST,
UNTIL THE TEST REQUIREMENTS ARE MET.
CUTTING, PATCHING AND DEMOLITION:
1. KEEP DEMOLITION & CUTTING TO MINIMUM REQUIRED FOR PROPER
EXECUTION OF WORK.
2. BE RESPONSIBLE FOR ALL CUTTING AND PATCHING NECESSARY FOR
THE COMPLETION OF THE WORK.
3. NO CUTTING (NOT SHOWN ON THE CONTRACT DOCUMENTS) SHALL BE
DONE WITHOUT THE APPROVAL OF THE ARCHITECT AS TO
LOCATIONS, METHOD AND EXTENT OF THE CUTTING.
4. REPAIR ALL ACCIDENTAL OR INTENTIONAL DAMAGE TO MATCH
EXISTING CONSTRUCTION WITH NO NOTICEABLE DIFFERENCE IN
CONTINUITY, APPEARANCE OR FUNCTION.
5. DEMOLISH AND CAP ALL INDICATED PIPING BACK AT NEAREST MAIN.
SUBMITTAL REQUIREMENTS:
1. AFTER RECEIPT OF NOTICE TO PROCEED, THE CONTRACTOR SHALL
SUBMIT A TYPED LIST OF SUBMITTALS AND THE SCHEDULED DATE OF
SUBMISSION. LIST SHALL INCLUDE SUBMITTAL NUMBER, SECTION
NUMBER AND SCHEDULED DATE OF SUBMISSION.
2. REFER TO THE SPECIFICATIONS FOR ADDITIONAL SUBMITTAL
REQUIREMENTS.
FIRE STOPPING:
1. FIRE STOPPING REQUIREMENT: PENETRATIONS THROUGH RATED
WALLS AND FLOORS SHALL BE SEALED WITH A MATERIAL CAPABLE
OF PREVENTING THE PASSAGE OF FLAMES AND HOT GASES WHEN
SUBJECTED TO THE REQUIREMENTS OF THE TEST STANDARD
SPECIFIC FOR FIRE STOPS ASTM-E-814. ACCEPTANCE MATERIALS
INCLUDE: DOW CORNING RTV FIRE STOP FOAM FOR BARE PIPE,
METAL CONDUIT, AND ELECTRICAL CABLE; 3M FIRE DAM 150 CAULK
FOR BARE PIPE, METAL CONDUIT, AND BUILDING CONSTRUCTION;
GAPS 3M FS-195 INTUMESCENT STRIPS FOR INSULATED PIPES,
PLASTIC PIPE OR CONDUIT, AND ELECTRICAL CABLE.
SCOPE CLARIFICATION NOTES:
1. THESE DOCUMENTS SERVE TO DEFINE THE NATURE OF THE
SYSTEMS, LEVEL OF CONTROL AND FINISH, RELATIONSHIPS WITH
OTHER BUILDING SYSTEMS, AND GENERAL DESIGN INTENT OF THIS
DIVISION'S WORK. THE CONTRACTOR SHALL EXAMINE THE
DOCUMENTS OF ALL TRADES TO COMPLETELY FAMILIARIZE
HIM/HERSELF WITH THE VARIOUS CONCEPTS PRESENTED BY OTHER
TRADES AND ADAPT THIS WORK AND ANY ASSOCIATED PRICING
ACCORDING. WHERE CONFLICTS EXIST BETWEEN THESE DOCUMENTS
AND THOSE OF OTHER DIVISIONS, THE MORE STRINGENT (AS
DETERMINED BY THE ENGINEER) SHALL TAKE PRECEDENCE. IN
PARTICULAR, WHERE ARCHITECTURAL BACKGROUNDS INDICATE
PROGRAMMATIC DIFFERENCES IN ROOM LOCATIONS, ROOM
FUNCTIONS, PLUMBING FIXTURE COUNTS, CEILING TYPES, RATED
CONSTRUCTION, CLEARANCES, OR ROOM RELATIONSHIPS, THE
ARCHITECTURAL DRAWINGS SHALL TAKE PRECEDENCE AND THIS
CONTRACTOR SHALL ADAPT HIS/HER WORK ACCORDINGLY WHILE
MAINTAINING THE DESIGN INTENT REPRESENTED BY THE
DOCUMENTS OF THIS DIVISION.
2. REFER TO LIFE SAFETY/CODE REPORT FOR ADDITIONAL SCOPE OF
WORK THAT MAY NOT BE REFLECTED ON THE DRAWINGS. REFER TO
PLUMBING SPECIFICATION AND NARRATIVE FOR ADDITIONAL
INFORMATION.
3. PROVIDE FIRE STOPPING ON ALL EXISTING AND NEW PIPES, DEVICES,
ETC. PENETRATING ALL STAIR ENCLOSURES AND FIRE RATED
CONSTRUCTION ASSEMBLIES. PENETRATIONS WITH EXISTING FIRE
STOPPING AT STAIR ENCLOSURES SHALL BE REPLACED WITH NEW
FIRE STOPPING.
4. THE DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR IS
RESPONSIBLE FOR ALL OFFSETS, TRANSITIONS, ELBOWS, ETC. AS
REQUIRED IN DUCTWORK, PIPING, SUPPORTS, ETC. TO COMPLETE
HIS/HER WORK IN A CLEAN, FUNCTIONAL INSTALLATION.
5. THIS CONTRACTOR IS RESPONSIBLE FOR ALL SLEEVES FOR
PENETRATIONS THROUGH SLABS AND BEAMS REQUIRED BY THE
INTENT OF THE SCOPE OF WORK INDICATED ON THE DRAWINGS.
COORDINATION OF QUANTITY AND LOCATIONS OF ALL PENETRATIONS
SHALL BE DONE BY THIS CONTRACTOR DURING THE SHOP DRAWINGS
PROCESS FOR REVIEW BY THE STRUCTURAL ENGINEER.
NOTES:
1. ALL EQUIPMENT SHALL BE PROVIDED WITH SEISMIC BRACING
SHALL BE AS REQUIRED BY THE AUTHORITIES HAVING JURISDICTION BUT
SHALL NOT BE SMALLER THAN THE FOLLOWING:
THE CONTRACTOR SHALL BE RESPONSIBLE TO PREPARE HYDRAULIC CALCULATIONS AND
OBTAIN APPROVAL FROM ALL AUTHORITIES HAVING JURISDICTION OVER THE SPRINKLER
WORK, INCLUDING THE BUILDING DEPARTMENT, THE OWNERS INSURANCE CO., OBTAIN
AGENCY APPROVALS FOR HYDRAULICS PRIOR TO INSTALLATION OF NEW WORK.
HYDRAULIC CALCULATIONS SHALL BE SIGNED AND SEALED BY A LICENSED PROFESSIONAL
ENGINEER RETAINED BY THE SPRINKLER CONTRACTOR.
SPRINKLER CONTRACTOR SHALL PREPARE ALL DOCUMENTS REQUIRED FOR ANY
SUBSEQUENT FILING WITH AUTHORITIES HAVING JURISDICTION
1. OCCUPANCY CLASSIFICATION = LIGHT HAZARD
2. DENSITY = 0.10 GPM/SQUARE FEET
3. AREA OF APPLICATION = 1500 SQUARE FEET
4. COVERAGE/SPRINKLER = 225 SQUARE FEET/HEAD MAXIMUM
* 5. STORAGE SPACES SHALL BE CONSIDERED ORDINARY HAZARD,
GROUP 1 AND THE COVERAGE PER SPRINKLER SHALL BE 130 SQUARE FEET OR
LESS
MECHANICAL MEZZANINE (LEVEL 48)
ICE PLANT & PUMP ROOM (LEVEL 31)
CONCOURSE (LEVEL 61)
(E)10"FP
TS
(E)DOUBLE
DETECTED
CHECK VALVE
2
1
2
"DRY PIPE
VALVE
AREA OF
WORK
N.T.S.
SPRINKLER SHEET LIST TABLE
Sheet Number Sheet Title
SP-000.00 SPRINKLER LEGEND AND NOTES
SP-201.00 SPRINKLER PLUMBING PLAN - ICE CHILLER PLANT
SP-700.00 SPRINKLER DETAILS
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\S
prinkler\S
P-000.00_D
V18025.01.dw
g
06 M
ar '19 - 11:02am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
SP-000.00
SPRINKLER LEGEND
AND NOTES
GENERAL NOTES KEYNOTES
11. EXISTING SYSTEMS INFORMATION IS SHOWN FOR REFERENCE ONLY
TO CLARIFY SCOPE. CONTRACTOR SHALL FIELD VERIFY THESE
EXISTING CONDITION TO CONFIRM THE PRECISE TIE-IN LOCATION FOR
NEW WORK. REFER TO DEMOLITION PLANS FOR ADDITIONAL
INFORMATION REGARDING EXISTING SYSTEMS. EXISTING SYSTEMS
NOTES ARE NOT SHOWN ON CONSTRUCTION PLANS FOR CLARITY OF
THE DRAWINGS.
2. CONTRACTOR IS RESPONSIBLE FOR ALL CEILING REMOVALS AND
REINSTALLATIONS REQUIRED TO COMPLETE WORK. PROVIDE CEILING
TILES AS REQUIRED. CEILING TILES SHALL MATCH EXISTING.
3. ANY WORK OUTSIDE OF SCOPE WORK SHALL BE COMPLETED DURING
PREMIUM TIME. SEE PREMIUM TIME NOTE ON SAME PAGE.
4. CONTRACTOR SHALL PROVIDE CORE DRILLING AS REQUIRED FOR
NEW PIPE PENETRATIONS.
5. COORDINATION DRAWINGS SHALL BE PREPARED TO ENSURE ROUTING
AVOIDS CONFLICTS WITH NEW AND EXISTING WORK. CONTRACTOR
SHALL COORDINATE WITH ALL OTHER TRADES.
6. CONTRACTOR SHALL PERFORM HYDRAULIC CALCULATIONS AND
SUBMIT WITH SHOP DRAWINGS, REFER TO SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS.
7. ALL WORK AFFECTING BUILDING SYSTEM OPERATION SHALL BE
COORDINATED WITH BUILDING ENGINEERING.
8. MINIMUM PIPE SIZE FOR ALL SPRINKLER BRANCH TO SPRINKLER
HEADS SHALL BE 1".
9. SPRINKLER HEADS SHALL BE LOCATED CENTERED ON CEILING WITH
RESPECT TO NEW CEILING GRID.
10. NEW AND EXISTING TO REMAIN PIPING SHALL BE RELOCATED TO
ALLOW FOR INSTALLATION OF OTHER TRADES.
11. COORDINATE COLOR OF CONCEALED HEADS WITH ARCHITECT.
12. PIPING SHALL BE SIZED ACCORDING TO HOW MANY HEADS ARE FED
DOWNSTREAM OF BRANCH. REFER TO THE FOLLOWING CHARTS:
LOCATE SPRINKLER HEADS BELOW STAIRS.
DIAMETER OF
BRANCH
MAX. NUMBER
OF HEADS
1"
1
1
4
"
1
1
2
"
2"
2
1
2
"
3"
4"
2
3
5
10
30
60
>100
BRANCH SIZING CRITERIA
(.10 GPM/S.F.)
BRANCH SIZING CRITERIA
(.15 GPM/S.F.)
DIAMETER OF
BRANCH
MAX. NUMBER
OF HEADS
1"
1
1
4
"
1
1
2
"
2"
2
1
2
"
3"
4"
2
3
5
10
20
40
100
SHAFT
ABOVE
EXISTING STAIRS TO REMAIN
SHAFT
ABOVE
EXISTING STAIRS TO REMAIN
SHAFT
ABOVE
EXISTING STAIRS TO REMAIN
SHAFT
ABOVE
NIC
NIC
(E)2
1
2
"SP
UP
(R)
(R)2"
(R
)1
1
2
"(R
)1
1
2
"
(E)2
1
2
"SP
UP
(R)
(R)(R)
(R)(R)
(R)1
1
2
"
(R
)1"
(R
)1"
(R)(R)
(R)
(R)
(R)
(R)1
1
4
"
(R
)1
1
2
"
(E)
(E)
(R)(R)
(E
)1"
(R) (R) (R) (R) (R)
(R) (R) (R) (R) (R)
(R) (R) (R) (R) (R)
(R)
NIC
FSD -COORD W/ MECH
10"BWS/R UP
-COORD W/ MECH
8"CWS/R UP
-COORD W/ MECH
6"REFRIGERATION
EXHAUST UP
-COORD W/ MECH
10"BWS/R & 8"CWS/R
TO CHILLER
-COORD W/ MECH
18
X2
0
24
X1
4
12X10 OA UP
FSD -COORD W/ MECH
4"LPR UP
-COORD W/ MECH
24X24 EA UP
-COORD
W/ MECH
8"BWR UP
-COORD W/ MECH
12X10 OA UP
FSD
(E)2
1
2
"SP
UP
(E)2
1
2
"SP
UP
(E)
(E)
(E
)1
"
A A.5 A.7 BAA A A.5 A.7 BAA
(E)2
1
2
"SP
DN
(E)2
1
2
"SP
DN
(E)10"FP
(E)DOUBLE
DETECTED
CHECK VALVE
(E)4" FLOOR
CONTROL
ASSEMBLY
2
1
2
"DRY PIPE
VALVE
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\S
prinkler\S
P-201.00_D
V18025.01.dw
g
06 M
ar '19 - 11:02am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
SP-201.00
SPRINKLER PLUMBING
PLAN - ICE CHILLER
PLANT
SPRINKLER PLAN - ICE CHILLER PLANT
21/8" = 1'-0"
SPRINKLER DEMO PLAN - FUTURE ICE CHILLER PLANT
11/8" = 1'-0"
SPRINKLER PLAN - ICE CHILLER PLANT
21/8" = 1'-0"
SPRINKLER PLAN - MEZZANINE ABOVE ICE PLANT - 48 LEVEL
31/8" = 1'-0"
B
CLEVIS HANGER, PIPE 1 1/2" DIA. AND LESS, TOP BEAM CLAMP HANGER
NO SCALE
A
PIPE THRU STUD WALL DETAIL
NO SCALE
NOTES:
1. ALL EQUIPMENT SHALL BE PROVIDED WITH SEISMIC BRACING
HYDRAULIC SPRINKLER SIZING CRITERIA
SHALL BE AS REQUIRED BY THE AUTHORITIES HAVING JURISDICTION BUT
SHALL NOT BE SMALLER THAN THE FOLLOWING:
THE CONTRACTOR SHALL BE RESPONSIBLE TO PREPARE HYDRAULIC CALCULATIONS AND
OBTAIN APPROVAL FROM ALL AUTHORITIES HAVING JURISDICTION OVER THE SPRINKLER
WORK, INCLUDING THE BUILDING DEPARTMENT, THE OWNERS INSURANCE CO., OBTAIN
AGENCY APPROVALS FOR HYDRAULICS PRIOR TO INSTALLATION OF NEW WORK.
HYDRAULIC CALCULATIONS SHALL BE SIGNED AND SEALED BY A LICENSED PROFESSIONAL
ENGINEER RETAINED BY THE SPRINKLER CONTRACTOR.
SPRINKLER CONTRACTOR SHALL PREPARE ALL DOCUMENTS REQUIRED FOR ANY
SUBSEQUENT FILING WITH AUTHORITIES HAVING JURISDICTION
1. OCCUPANCY CLASSIFICATION = LIGHT HAZARD/ORDINARY HAZARD
2. DENSITY = 0.10/0.15 GPM/SQUARE FEET
3. AREA OF APPLICATION = 1500 SQUARE FEET
4. COVERAGE/SPRINKLER = 225 SQUARE FEET/HEAD MAXIMUM FOR LIGHT
HAZARD, 130 SQUARE FEET/HEAD MAXIMUM FOR ORDINARY HAZARD
5. STORAGE SPACES SHALL BE CONSIDERED ORDINARY HAZARD, GROUP 1
AND THE COVERAGE PER SPRINKLER SHALL BE 130 SQUARE FEET OR
LESS
F
HYDRAULIC SPRINKLER SIZING CRITERIA
NO SCALE
NOTES:
1. INSTALL PIPING PER METHOD
A OR B AT THE DIRECTION OF
THE ARCHITECT WHERE THE
AVAILABLE SPACE BETWEEN
THE EXISTING BEAM AND THE
CEILING CONSTRUCTION DOES
NOT ALLOW FOR PIPING TO THE
SPRINKLER HEAD AT A
CONSTANT ELEVATION.
2. ALL EQUIPMENT SHALL BE
PROVIDED WITH SEISMIC
BRACING
EXISTING DECK
SUSPENDED CEILING
CONSTRUCTION
FINISHED CEILING
EXISTING BEAM
TO MAIN
EXISTING DECK
EXISTING BEAM
FINISHED CEILING
SUSPENDED CEILING
CONSTRUCTION
DRILL AND SLEEVE EXISTING
BEAM
METHOD B
METHOD A
TO MAIN
H
LOW BEAM CROSSING DETAIL
NO SCALE
MAXIMUM ALLOWABLE DISTANCE OF
DEFLECTOR ABOVE BOTTOM OF
OBSTRUCTION
(B)
0"
1"
2"
3"
4"
6"
7"
9"
11"
14"
DISTANCE FROM SPRINKLERS
TO SIDE OF OBSTRUCTION
(A)
LESS THAN 1'
1' TO LESS THAN 1'-6"
1'-6" TO LESS THAN 2'
2' TO LESS THAN 2'-6"
2'-6" TO LESS THAN 3'
3' TO LESS THAN 3'-6"
3'-6" TO LESS THAN 4'
4' TO LESS THAN 4'-6"
4'-6" TO LESS THAN 5'
5' AND GREATER
MAXIMUM ALLOWABLE DISTANCE
OF DEFLECTOR ABOVE BOTTOM
OF OBSTRUCTION
(B)
0"
2
1
2
"
3
1
2
"
5
1
2
"
7
1
2
"
9
1
2
"
12
14
16
1
2
"
18
DISTANCE FROM SIDEWALL
SPRINKLER TO SIDE OF
OBSTRUCTION
(A)
LESS THAN 4'
4' TO LESS THAN 5'
5' TO LESS THAN 5'-6"
5'-6" TO LESS THAN 6'-6"
6' TO LESS THAN 6'-6"
6' TO LESS THAN 7'
7' TO LESS THAN 7'-6"
7'-6" TO LESS THAN 8'
8' TO LESS THAN 8'-6"
8'-6" AND GREATER
SIDEWALL SPRINKLERS
PENDANT SPRINKLERS
NOTES:
1. ALL EQUIPMENT SHALL BE PROVIDED WITH SEISMIC BRACING
2.
SPRINKLER
HEAD
CEILING
OBSTRUCTIONOBSTRUCTION
WALL
SPRINKLER HEAD
A
B
CEILING
A
B
I
POSITIONING OF SPRINKLERS TO AVOID OBSTRUCTIONS TO DISCHARGE
NO SCALE
NOTES:
1. PROVIDE RUBBER INSULATORS OR COPPER PLATED TRAPEZE
WHERE COPPER PIPE IS IN CONTACT WITH TRAPEZE.
2. PROVIDE VIBRATION ISOLATORS IN PIPE HANGERS WITHIN 10 FEET
OF ROTATING EQUIPMENT.
PIPE PARALLEL
TO JOISTS
PIPE PERPENDICULAR
TO JOISTS
NOTES:
1. ALL EQUIPMENT SHALL BE PROVIDED WITH
SEISMIC BRACING
4 x 3 x 1/4" ANGLE STEEL
BOLTS
(TYPICAL)
HANGER RODS FOR
PIPING SUPPORT
3/8" DIA HANGER ROD.
WELDED
JOIST
4 x 3 x 1/4" ANGLE STEEL CONT. CONN. TO
JOISTS AT PANEL POINT
WELDED
BOLTS
(TYPICAL)
4 x 3 x 1/4"
ANGLE STEEL
G
METHODS OF PIPE SUPPORT
NO SCALE
FROM SYSTEM
AUXILIARY DRAIN VALVE
INSPECTOR'S TEST VALVE
1" SIGHT GLASS
NEAREST
FLOOR DRAIN
UNION
NOTE:
1. PROVIDE INSPECTION TEST CONNECTION AT HYDRAULICALLY MOST REMOTE POINT IN SPRINKLER SYSTEM.
2. INSPECTORS TEST CONNECTIONS AS SHOWN SHALL BE PROVIDED AFTER EACH O.S.&Y ZONE CONTROL VALVE.
DRAIN VALVES SHALL BE PROVIDED AT THE END OF EACH ZONE WHETHER INDICATED ON THE DRAWINGS OR NOT.
IN SUCH CASES WHERE RECEPTICALS, FLOOR DRAINS, ETC. ARE NOT CONVENIENTLY LOCATED TO RECEIVE
DISCHARGE FROM DRAIN POINTS AT THE END OF THE SYSTEMS THEN THE INSPECTORS TEST CONNECTION WILL
BE CONSIDERED AN ACCEPTABLE SUBSTITUTE FOR THE DRAIN VALVE.
3. ALL EQUIPMENT SHALL BE PROVIDED WITH SEISMIC BRACING
C
INSPECTOR'S TEST CONN. ASSEMBLY
NO SCALE
FIRE PROTECTION NOTES RELATING TO CONSTRUCTION
1. CONTRACTOR SHALL INCLUDE DRAWINGS, SPECIFICATIONS, AND CALCULATIONS FOR TEMPORARY SPRINKLER COVER, FIRE-WATCH, OR
OTHER MEASURES TO INSURE FIRE SAFETY DURING CONSTRUCTION TO COMPLY WITH THE CURRENT CODES AND DOB, AND OSHA.
2. BIDDERS SHALL INCLUDE LINE-ITEM COST FOR FIRE CODE AND DOB COMPLIANT FIRE PROTECTION SYSTEMS. THIS SHALL INCLUDE ALL
REQUIRED TEMPORARY SYSTEMS AS WELL AS MAINTENANCE, ALTERATION AND RELOCATION OF THESE SYSTEMS AS REQUIRED TO ADAPT
TO ONGOING CONSTRUCTION.
3. CONTRACTOR SHALL SUBMIT A LETTER TO THE AUTHORITY HAVE JURISDICTION (AHJ) REQUESTING APPROVAL OF FIRE PROTECTION
METHOD DURING CONSTRUCTION. THE LETTER SHALL ADDRESS:
A. SCOPE OF WORK
B. METHOD OF INSTALLATION
C. IMPAIRMENT PROCEDURE, INCLUDING:
1) SYSTEM OPERATION
2) SHUT-DOWN AND CUT-IN
3) DAILY RETURN OF SERVICE
4) AHJ NOTIFICATIONS
5) FIRE-GUARD AND LOG OF INSPECTIONS
6) CONTINUOUS STANDPIPE SERVICE
7) MAINTENANCE OF ACCESSIBILITY OF HOSE STATIONS
8) TENANT ELEVATOR BYPASS
9) OPERATION OF MANUAL PULL STATIONS
10) VISIBILITY AND MARKING OF EXITS
11) PROTECTION OF ELEVATORS AND STAIRWAAYS
12) PROVISION OF PORTABLE FIRE EXTINGUISHERS
13) REMOVAL OF COMBUSTIBLE WASTE ON A DAILY BASIS
14) ENFORCEMENT OF "NO SMOKING" POLICY
4. CONTRACTOR SHALL IDENTIFY "FIRE PREVENTION PROGRAM SUPERINTENDANT" TO ADMINISTRATOR FIRE CODE REQUIREMENTS UNDER
FIRE CODE #1408.1.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED APPROVALS AND SIGN-OFFS AT COMPLETION OF CONSTRUCTION AND
SHALL SUBMIT ALL REQUIRED DOCUMENTS AND CALCULATIONS IN ORDER TO DO SO.
D
FIRE PROTECTION NOTES RELATING TO CONSTRUCTION
NO SCALE
METAL STUD CHANNEL FRAME AROUND
16 GAGE PIPE SLEEVE
PIPE
STUD WALL
POSITIVE ACTING CHROME PLATED
ESCUTCHEON PLATES
NOTE:
OMIT ESCUTCHEON PLATES FOR
CONCEALED PIPES.
CONC. DECK
HILTI SHIELD
SUPPORT BEAM
LOOP HANGER
T.B. CLAMP
3/8" A.T.R.
PIPE
LOOP HANGER
PIPE
HILTI SHIELD HANGER
NOT TO SCALE
TOP BEAM CLAMP
NOT TO SCALE
3/8" ROD COUP. (IF NEEDED)
3/8" A.T.R.
NOTES:
1. ALL EQUIPMENT SHALL BE
PROVIDED WITH SEISMIC BRACING
DRAIN AND
INSPECTOR
TEST WITH
SIGHT GLASS
TO DRY SPRINKLER
MAINS
SIZE PER PLANS
PRESSURE GAUGE (TYP.)
DRY PIPE VALVE WITH
TRIM AND ACCELERATOR.
ACCELERATOR SHALL BE
VALVED FOR ISOLATION
DURING SERVICE.
PROVIDE TAMPER
SWITCHES ON
ACCELERATOR ISOLATION
VALVES.
FROM WATER SERVICE
PROVIDE NEW AIR COMPRESSOR
COMPRESSOR CAPACITY SHALL BE SUCH
THAT SYSTEM MAY BE PRESSURIZED
WITHIN 15 MINUTES.
PRESSURE
REGULATOR
CHECK VALVE
GLOBE VALVE (TYP.)
RELIEF VALVE
AIR PRESSURE ALARM SWITCH
AIR FILTER/DRYER
WITH AUTO DRAIN
AIR PRESSURE
ALARM SWITCH
1/2" DRUM DRIP
W/TEST VALVE
PIPE ALL DRAINS TO FLOOR
DRAIN (TYP.)
AIR
COMPRESSOR
NOTES:
1. PIPE ALL DRAINS TO EXTERIOR OR NEAREST APPROVED RECEPTACLE
2. ALL FLOW, TAMPER AND PRESSURE SWITCHES TO BE PROVIDED BY
THIS CONTRACTOR AND WIRED BY ELECTRICAL CONTRACTOR
3. PROVIDE LOCKS ON VALVES WHERE REQUIRED BY CODE. PROVIDE
TAMPER SWITCHES WHERE INDICATED
4. PROVIDE 3 TAMPER SWITCHES, 1 FLOW SWITCH, AND 2 AIR PRESSURE
ALARM SWITCHES PER ASSEMBLY. COORDINATE WITH FIRE ALARM
CONTRACTOR.
1"
1"
1"
3
4
"
SYSTEM SHUTOFF
VALVE WITH TAMPER
SWITCH AND FLOW
SWITCH
E
SCHEMATIC DIAGRAM OF DRY PIPE SPRINKLERS
NO SCALE
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\S
prinkler\S
P-700.00_D
V18025.01.dw
g
06 M
ar '19 - 11:02am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
SP-700.00
SPRINKLER DETAILS
ABBREVIATIONS
NO SCALE
TYPICAL DEVICE MOUNTING HEIGHTS
NOTES:
FINISHED FLOOR
TOP OF CABINET
TOP OF CABINET
TOP OF CABINET
48" (4'-0") U
.N
.O
.
78" (6'-6") U
.N
.O
.
64" (5'-4") U
.N
.O
.
72" (6'-0") U
.N
.O
.
NOTES:
NOTE:
ALL DEVICES INDICATED TO BE
INSTALLED AT DIFFERENT
MOUNTING HEIGHTS AND
LOCATED WITHIN ONE STUD
SPACE FROM EACH OTHER SHALL
ALIGN VERTICALLY, ON THE
SAME SIDE OF THE STUD. WHERE
WALL MOUNTED TELEPHONES
OCCUR OVER LIGHT SWITCHES,
VOLUME CONTROLS, ETC.
OFFSET ONE STUD SPACE.
1. ALL EXPOSED RACEWAYS ARE TO BE INSTALLED PARALLEL OR PERPENDICULAR TO WALLS OR STRUCTURAL MEMBERS SUCH THAT
THEY FOLLOW STRUCTURAL SURFACE CONTOURS AND SHALL BE INSTALLED SUCH THAT THEY DO NOT OBSTRUCT PASSAGEWAYS
OR ACCESS TO EQUIPMENT. MULTIPLE RACEWAYS SHOULD BE INSTALLED GROUPED TOGETHER. THE LOCATION OF PUBLICLY
VISIBLE RACEWAYS SHALL BE APPROVED BY THE ARCHITECT PRIOR TO INSTALLATION. (EXTRA TIME SHOULD BE ALLOWED FOR THIS
REVIEW AND APPROVAL.)
2. THE DISCONNECTING MEANS FOR ALL MECHANICAL EQUIPMENT SHALL BE ACCESSIBLE AND HAVE THE CLEARANCE IN FRONT AS
REQUIRED BY NEC AMENDMENTS.
3. ALL CEILING ATTACHED OBJECTS AND FLOOR ATTACHED EQUIPMENT INCLUDING BUT NOT LIMITED TO PENDANT LIGHTING FIXTURES,
GENERAL LIGHTING, MULTIPLE RACEWAYS, GENERATOR, TRANSFORMER ELECTRICAL SWITCHGEAR, AND SWITCHBOARDS SHALL BE
INSTALLED IN ACCORDANCE WITH SUPPORTING OBJECTS FOR SEISMIC ZONE AS REQUIRED BY STATE AND LOCAL CODES.
4. ALL SWITCHGEAR, SWITCHBOARDS AND TRANSFORMERS SHALL HAVE A 4 INCH HOUSE KEEPING PAD. UNDER NO CONDITION SHALL
THE HIGHEST SWITCH OR BREAKER EXCEED 6'-6" AFF.
5. DATA GIVEN ON THE DRAWINGS IS AS EXACT AS COULD BE SECURED. ABSOLUTE ACCURACY IS NOT GUARANTEED AND THE
CONTRACTOR SHALL OBTAIN AND VERIFY EXACT LOCATIONS, MEASUREMENTS, LEVELS, SPACE REQUIREMENTS, POTENTIAL
CONFLICTS WITH OTHER TRADES, ETC. AT THE SITE AND SHALL SATISFACTORILY ADAPT HIS WORK TO ACTUAL CONDITIONS AT THE
BUILDINGS. THE DRAWINGS ARE DIAGRAMMATICAL IN NATURE AND SHALL NOT BE SCALED. HOWEVER THIS DOES NOT RELIEVE ANY
SUB-CONTRACTOR FROM COORDINATING HIS WORK WITH ALL OTHER TRADES AND FROM ADJUSTING HIS WORK AS REQUIRED BY
THE ACTUAL CONDITIONS OF THE PROJECT. THE CONTRACTOR SHALL VISIT THE SITE BEFORE SUBMITTING COSTS TO BECOME
THOROUGHLY FAMILIAR WITH THE ACTUAL CONDITIONS OF THE PROJECT.
6. COORDINATE AND ADJUST ALL WORK BETWEEN TRADES AND EXISTING CONDITIONS IN ORDER TO ACCOMPLISH A NEAT,
INTEGRATED AND EFFICIENT INSTALLATION WHICH INCLUDE BUT ARE NOT LIMITED TO:
a. EXAMINE THE CONTRACT DOCUMENTS OF ALL TRADES (IE. THE ARCHITECTURAL REFLECTED CEILING PLAN, MECHANICAL
HVAC DRAWINGS, ELECTRICAL LIGHTING PLAN, FIRE PROTECTION PLAN, ETC.).
b. COORDINATE NECESSARY EQUIPMENT, FIXTURES, ETC. SO THAT THE FINAL INSTALLATION IS COMPATIBLE WITH THE
MATERIALS AND EQUIPMENT OF THE OTHER TRADES.
c. THIS CONTRACTOR SHALL ASSIST THE DIVISION 23 CONTRACTOR IN PREPARING SHOP DRAWINGS FOR COORDINATING
INSTALLATION OF ALL WORK (IE. LOCATING ALL LIGHTING FIXTURES IN CEILING WITH CEILING CLEARANCES, RACEWAYS,
PIPING, EQUIPMENT FOR CLEARANCE THROUGHOUT).
d. THE ELECTRICAL DRAWINGS INDICATE THE ELECTRICAL REQUIREMENTS FOR A SIGNIFICANT PORTION OF THE MECHANICAL
AND PLUMBING SYSTEMS. ADDITIONAL MECHANICAL AND PLUMBING EQUIPMENT IS INDICATED ON THE DIVISION 21E
DRAWINGS. REFER TO MECHANICAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. PROVIDE COMPLETE
WIRING AND FUSIBLE DISCONNECTING MEANS FOR ALL MECHANICAL AND PLUMBING EQUIPMENT.
7. DEFINITIONS:
a. "FURNISH" MEANS TO "SUPPLY" AND USUALLY REFERS TO AN ITEM OF EQUIPMENT.
b. "INSTALL" MEANS TO "SET IN PLACE, CONNECT AND PLACE IN FULL OPERATIONAL ORDER".
c. "PROVIDE" MEANS TO "FURNISH AND INSTALL".
d. "EQUIVALENT" MEANS "MEETS THE SPECIFICATIONS OF THE REFERENCE PRODUCT OR ITEM IN ALL SIGNIFICANT ASPECTS."
SIGNIFICANT ASPECTS SHALL BE DETERMINED BY THE ENGINEER.
e. "RE: DIVISION", AND SIMILAR EXPRESSIONS MEANS WORK TO BE PERFORMED UNDER THE CONTRACT DOCUMENTS, BUT
NOT NECESSARILY UNDER THE DIVISION OR SECTION OF THE WORK ON WHICH THE NOTE APPEARS. IT IS THE CONTRACTORS
SOLE RESPONSIBILITY TO COORDINATE THE WORK OF THE CONTRACT BETWEEN HIS/HER SUPPLIERS, SUBCONTRACTORS,
AND EMPLOYEES. IF CLARIFICATION IS REQUIRED, CONSULT ARCHITECT.
8. "FIRESTOPPING" REQUIREMENT. ALL PENETRATIONS THROUGH RATED WALLS AND FLOORS SHALL BE SEALED WITH MATERIAL
CAPABLE OF PREVENTING THE PASSAGE OF FLAMES AND HOT GASSES WHEN SUBJECTED TO THE REQUIREMENTS OF THE TEST
STANDARD SPECIFIC FOR FIRE STOPS ASTM-E-814. ALL PENETRATIONS SHALL MEET F AND T RATINGS AS REQUIRED BY THE
BUILDING CODE.
9. WHERE DISCONNECTS ARE INDICATED ON DRAWINGS CONTRACTOR SHALL PROVIDE FINAL CONNECTION TO EQUIPMENT BEING
SERVED BY DISCONNECT.
10. CONTRACTOR PROVIDE ALL MISCELLANEOUS SUPPORTS AS REQUIRED FOR A COMPLETE OPERABLE ELECTRICAL INSTALLATION
INCLUDING MISCELLANEOUS STEEL, UNI-STRUT, ALL-THREAD, AIRCRAFT CABLE, ETC.
TH
E E
NT
IR
E LE
NG
TH
N
OT
LE
SS
TH
AN
80" A
ND
N
OT
G
RE
AT
ER
T
HA
N
96" A
FF
T
O B
OT
TO
M O
F D
EV
IC
E
DE
VIC
E
TO
T
OP
O
F
CONTROL
PANELS
1. MOUNTING HEIGHTS SHOWN ON ARCHITECTURAL ELEVATIONS SHALL GOVERN OVER THOSE SHOWN ABOVE.
2. CONTRACTOR SHALL ENSURE THAT ALL MOUNTING HEIGHTS COMPLY WITH CURRENT ADA REQUIREMENTS.
3. WHERE EVER DEVICES ARE INDICATED TO BE ABOVE DOORS, DEVICE SHALL BE CENTERED BETWEEN TOP OF
DOOR TRIM AND CEILING LINE.
4. ALL ABOVE COUNTER (DESIGNATED BY "AC") SHALL BE MOUNTED 8" ABOVE COUNTER OR MAXIMUM HEIGHT OF
44" TO TOP OF DEVICE. VERIFY HEIGHTS WITH ARCHITECT.
5. FOR CEILINGS BELOW 7'-4", FIRE ALARM STROBE OR HORN/STROBES SHALL BE WALL MOUNTED 6" BELOW
FINISHED CEILING.
6. HEIGHTS SHOWN ARE TYPICAL TO CENTERLINE OF BOX UNLESS NOTED OTHERWISE. ALL DUPLEX RECEPTACLES
SHALL BE MOUNTED VERTICALLY.
7. REFER TO ARCHITECTURAL DRAWINGS FOR RECEPTACLE MOUNTING HEIGHTS. STANDARD CONVENIENCE
RECEPTACLES SHALL BE MOUNTED AT HEIGHT INDICATED ABOVE WHERE MOUNTING HEIGHT IS NOT SHOWN ON
ARCHITECTURAL DOCUMENTS.
8. CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS DIMENSIONS WHERE AVAILABLE. WHERE DEVICES
ARE MOUNTED IN CASEWORK OR MILLWORK, CONTRACTOR SHALL VERIFY EXACT DIMENSIONS PRIOR TO
INSTALLATION.
BO
TT
OM
OF
D
EV
IC
E
16" A
FF
U
.N
.O
.
-G
YP
-B
LO
CK
18"A
FF
U
.N
.O
.
-B
LO
CK
(6")
LIGHTING
RACEWAY LEGEND
A-2,4
A
A:2,4
T
EQUIPMENT
POWER DEVICES
TO
J
BRANCH CIRCUIT HOMERUN TO PANELBOARD,
NUMBER OF ARROWS INDICATES NUMBER OF
CIRCUITS, NUMERAL INDICATES CIRCUIT
NUMBER.
BRANCH CIRCUIT HOMERUN CONTROLLED BY
LIGHTING CONTROL SYSTEM. FIRST
HEXAGON LETTER CORRESPONDS TO FIRST
CIRCUIT NUMBER. (ie. CIRCUIT #2 IS ON ZONE
A)
UNDERGROUND FEEDER
UNDERGROUND BRANCH CIRCUIT HOMERUN
CONDUIT UP
CONDUIT DOWN
CONDUIT RUNS UNDERFLOOR OR BELOW
GRADE
CONDUIT RUN CONCEALED IN WALLS OR
CEILING, OR EXPOSED WHEN CEILINGS ARE
NOT PRESENT.
MOTOR CONNECTION
MAX MAXIMUM
MB MAIN BREAKER
MC MECHANICAL CONTRACTOR
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MCP MOTOR CIRCUIT PROTECTOR
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MFR MANUFACTURER
MG MOTOR GENERATOR
MH MANHOLE OR METAL HALIDE
MIN MINIMUM
MLO MAIN LUGS ONLY
MOV MOTOR OPERATED VALVE
MS MOTOR STARTER
MSB MAIN SWITCHBOARD
MTD MOUNTED
MTG MOUNTING
MS MOTOR STARTER
MV MEDIUM VOLTAGE
N NEUTRAL
NEC NATIONAL ELECTRICAL CODE
NIC NOT IN CONTRACT
NC NORMALLY CLOSED
NL NIGHT LIGHT
NO NORMALLY OPEN
NTS NOT TO SCALE
OC ON CENTER
OA OUTSIDE DIAMETER
P POLE
PA PUBLIC ADDRESS
PB PUSH BUTTON
PE PHOTOELECTRIC
PF POWER FACTOR
PH PHASE
PNL PANEL
PR PAIR
PRI PRIMARY
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE
PWR POWER
QR QUARTZ RESTRIKE
R EXISTING TO BE RELOCATED
REC RECEPTACLE
RGS RIGID GALVANIZED STEEL
RM ROOM
RPM REVOLUTIONS PER MINUTE
SCP SECURITY CONTROL PANEL
SEC SECONDARY/SECOND
SEC SECTION
SHT SHEET
SPD SURGE PROTECTIVE DEVICE
SPDT SINGLE POLE, DOUBLE THROW
SQ.FT SQUARE FEET
ST SHUNT TRIP
STD STANDARD
SW SWITCH
SWBD SWITCHBOARD
TC TIME CLOCK
TEL TELEPHONE
TEMP TEMPERATURE
TELECOM TELECOMMUNICATIONS
TGB TELECOMMUNICATIONS GROUND BUS
TL TWIST LOCK
TMGB TELECOMMUNICATIONS MAIN GROUND BUS
TR TELECOMMUNICATIONS ROOM
UC UNDER COUNTER
U/G UNDER GROUND
UH UNIT HEATER
UL UNDERWRITER LABORATORIES
UNF UNFUSED
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
UTP UNSHIELDED TWISTED PAIR
V VOLT
VFD VARIABLE FREQUENCY DRIVE
VM VOLTMETER
W WATT
W/ WITH
WH WATT HOUR
WLAN WIRELESS LOCAL AREA NETWORK
WP WEATHERPROOF (IN-USE TYPE REQUIRED)
WPL WEATHERPROOF LOCKABLE ENCLOSURE.
WT WATERTIGHT
XMFR TRANSFORMER
XP EXPLOSION PROOF
STEM MOUNTED EXIT SIGN. MOUNTING,
FACES AND DIRECTIONAL ARROWS
(CHEVRONS) PER PLANS DAUL-LITE SERIES
SE WITH RED LETTERS AND STEM KIT
OCCUPANCY SENSOR - CEILING MOUNTED
LIGHT SWITCH
DISCONNECT SWITCH UPPER NUMERAL
DENOTES SWITCH SIZE, LOWER NUMERAL
DENOTES FUSE SIZE
UNF DENOTES UNFUSED
POWER PANEL
GROUND
TRANSFORMER
EQUIPMENT IDENTIFICATION TAG
MOTOR AND THERMAL OVERLOAD
WEATHERPROOF
MOTOR WITH DISCONNECT SWITCH AND VFD
(REFER TO MECHANICAL SCHEDULES)
SINGLE WALL RECEPTACLE
WALL DUPLEX RECEPTACLE
WALL QUAD RECEPTACLE
WALL JUNCTION BOX
SINGLE TOGGLE SWITCH
WEATHERPROOF
GROUND FAULT INTERRUPTER TYPE
DENOTES REMOVE
DENOTES EXISTING TO REMAIN
A,AMP AMPERE
AC ABOVE COUNTER
AF AMPERE FUSE/FRAME
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AL ALUMINUM
AM AMMETER
ANN ANNUNCIATOR
ANT ANTENNA
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AWG AMERICAN WIRE GAUGE
BFC BELOW FINISHED CEILING
BFG BELOW FINISHED GRADE
BKR BREAKER
C CONDUIT
CAB CABINET
CAM CAMERA
CB CIRCUIT BREAKER
CCTV CLOSED CIRCUIT TELEVISION
CKT CIRCUIT
CO CONDUIT ONLY
COMB COMBINATION
COND CONDUCTOR
CT CURRENT TRANSFORMER
CU COPPER
dB DECIBEL
DGP DIGITAL GATHERING PANEL
DISC DISCONNECT
DL DAMP LISTED
DWG DRAWING
DVR DIGITAL VIDEO RECORDER
E EXISTING
EA EACH
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
EG EQUIPMENT GROUND
EHC ELECTRIC HEATING COIL
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EM EMERGENCY
EMT ELECTRIC METALLIC TUBING
EOL F/A END OF LINE RESISTOR
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXH EXHAUST
F FUSE
FA FIRE ALARM
FACP FIRE ALARM CONTROL PANEL
FBO FURNISHED BY OTHERS
FC FOOTCANDLES
FDR FEEDER
FLEX FLEXIBLE
FLR FLOOR
FLUOR FLUORESCENT
FO FIBER OPTIC
G GROUND
GALV GALVANIZED
GEN GENERATOR
GFI GROUND FAULT CIRCUIT INTERRUPTER
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GND GROUND
HD HEAVY DUTY
HH HAND HOLE
HOA HAND-OFF-AUTO
HP HORSEPOWER
HPF HIGH POWER FACTOR
HPS HIGH PRESSURE SODIUM
HT HEIGHT
HTR HEATER
ID INSIDE DIAMETER
IG ISOLATED GROUND
IMC INTERMEDIATE GRADE METALLIC CONDUIT
INCAND INCANDESCENT
J-BOX JUNCTION BOX
KCMIL THOUSAND OF CIRCULAR MILLS
KVA KILOVOLT AMPERE
KW KILOWATT
KWH KILOWATT HOUR
LA LIGHTNING ARRESTOR
LFC LIQUIDTIGHT FLEXIBLE CONDUIT
LTG LIGHTING
LV LOW VOLTAGE
MA MILLIAMPERE
ABBREVIATIONS
THE ELECTRICAL DRAWINGS INDICATE THE ELECTRICAL
REQUIREMENTS FOR A SIGNIFICANT PORTION OF THE MECHANICAL AND
PLUMBING SYSTEMS. ADDITIONAL MECHANICAL AND PLUMBING
EQUIPMENT IS INDICATED ON THE DIVISION 21, 22,AND 23 DRAWINGS.
THE ELECTRICAL CONTRACTOR SHALL INCLUDE COSTS IN THE DIVISION
26 PRICING TO CONNECT ALL MECHANICAL AND PLUMBING EQUIPMENT
INDICATED ON THE ELECTRICAL DRAWINGS AND ON THE MECHANICAL
AND PLUMBING DRAWINGS. PROVIDE COMPLETE WIRING, STARTERS,
AND DISCONNECTING MEANS FOR ALL MECHANICAL AND PLUMBING
EQUIPMENT.
MECHANICAL/PLUMBING COORDINATION
REQUIREMENTS
WP
WP
GFI
OS
R
E
VFD
100
UNF
J
SINGLE WALL RECEPTACLE
WALL DUPLEX RECEPTACLE
WALL QUAD RECEPTACLE
WALL JUNCTION BOX
SINGLE TOGGLE SWITCH
WEATHERPROOF
GROUND FAULT INTERRUPTER TYPE
DENOTES REMOVE
DENOTES EXISTING TO REMAIN
WP
GFI
R
E
4 PORT DATA/VOICE OUTLET WITH 3/4"
CONDUIT ROUTED UP TO 6" ABOVE
FINISHED CEILING.
CHAIN HUNG 1X4 LENSED LED STRIP LIGHT
25W, 3000 LM LITHONIA LIGHTING
ZL1NL48SMR3000LMMVOLT30K80CR1WHHC36
2X2 RECESSED LED FIXTURE WITH ACRYLIC LENS
3300 LUMENS MULTIVOLT LITHONIA CAT #2GTL33LLP830
SYMBOL
DISCRIPTION
LIGHT FIXTURE SCHEDULE
WALL MOUNTED LED LITHONIA CAT #
CLXLED363000LMSEFFDLMVOLT
ELECTRICAL AND FIRE ALARM SHEET LIST TABLE
Sheet Number Sheet Title
E-000.00 ELECTRICAL LEGEND AND NOTES
E-010.00 ELECTRICAL SCHEDULES
E-100.00 ELECTRICAL DEMO PLAN - N.W. QUADRANT EVENT LEVEL
E-200.00 ELECTRICAL POWER PLAN - N.W. QUADRANT EVENT LEVEL
E-202.00 ELECTRICAL POWER PLAN - N.E. QUADRANT EL.48
E-203.00 ELECTRICAL POWER PLAN - N.W. QUADRANT EL.48
E-301.00 ELECTRICAL LIGHTING PLAN - EVENT LEVEL
E-502.00 ELECTRICAL POWER PLAN - STAIRS
E-600.00 ELECTRICAL RISER DIAGRAM
E-601.00 ELECTRICAL RISER DIAGRAM SHT 2
E-700.00 ELECTRICAL DETAILS
FA-201.00 FIRE ALARM PLAN - EVENT LEVEL
FA-202.00 FIRE ALARM PLAN - FP48
FA-600.00 FIRE ALARM RISER DIAGRAM
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\E
lec\E
-000.00_D
V18025.01.dw
g
06 M
ar '19 - 11:03am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
E-000.00
ELECTRICAL LEGEND
AND NOTES
NOTES:
N ID
M
M
M
M
M
M
P
P
P
S
S
S
P
P
P
P
P
P
P
P
P
XL CENTER CHILLER PLANT REPLACEMENT
480Y/277
3PHASE,4WIRE+GND
DESCRIPTION
CWP-AC1
-----
-----
AC-ICE
-----
-----
--SPARE--
--SPARE--
--SPARE--
HVCT-R
--CONNECTED LOAD--
-------
--SPARE--
--SPARE--
--SPARE--
--SPARE--
--SPARE--
--SPARE--
--SPARE--
--SPARE--
--SPARE--
Book1.xls
V-A
942
942
942
7341
7341
7341
9886
9886
9886
ME Engineers Inc.
BUS:
MAINS:
P
3
<
<
3
<
<
1
1
1
3
<
<
1
1
1
1
1
1
1
1
1
800
800
BKR
20
40
20
20
20
150
20
20
20
20
20
20
20
20
20
Amps
AMP MAIN BKR
OPTIONS:
CONCEALED HINGE COVER
LAMINATED NAMEPLATE
CKT
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
PH
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
Copper
CKT
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
BKR
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
P
3
>
>
3
>
>
3
>
>
1
1
1
1
1
1
1
1
1
1
1
1
PANEL:
SECTION:
LOCATION:
DATE:
FED FROM :
MOUNTING :
ISSUE:
V-A
942
942
942
1801
1801
1801
2105
2105
2105
DPL31
1 OF 1
L31 MAIN ELEC ROOM
02/15/19
MAIN SWITCHBOARD
SURFACE
DESCRIPTION
CWP-AC2
-----
-----
HV-ICE
-----
-----
GX-1
-----
-----
--SPARE--
--SPARE--
--SPARE--
--SPARE--
--SPARE--
--SPARE--
--SPARE--
--SPARE--
--SPARE--
--SPARE--
--SPARE--
--SPARE--
ID
M
M
M
M
M
M
M
M
M
P
P
P
P
P
P
P
P
P
P
P
P
N
NOTES:
N ID
M
M
M
S
S
S
E
E
E
P
P
P
P
P
P
XL CENTER CHILLER PLANT REPLACEMENT
480Y/277
3PHASE,4WIRE+GND
1. PANEL SHALL BE FRONT HINGED TO BOX
2. PANEL SHALL BE NEMA TYPE 3R
3. PROVIDE FULL BUSSING FOR PANEL
DESCRIPTION
CT-1
-----
-----
LVCT-R
--CONNECTED LOAD--
-------
CT-2 BASIN HEATER
-----
-----
--SPARE--
--SPARE--
--SPARE--
--SPARE--
--SPARE--
--SPARE--
Book1.xls
V-A
943
943
943
3360
4200
3200
4000
4000
4000
ME Engineers Inc.
BUS:
MAINS:
P
3
<
<
3
<
<
3
<
<
1
1
1
1
1
1
225
150
BKR
20
60
30
20
20
20
20
20
20
Amps
AMP MAIN BKR
OPTIONS:
NEMA 3R / IP64 ENCLOSURE
BOLT IN BRANCH BKRS
LAMINATED NAMEPLATE
CKT
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
PH
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
Copper
CKT
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
BKR
20
30
20
20
20
P
3
>
>
3
>
>
1
1
1
PANEL:
SECTION:
LOCATION:
DATE:
FED FROM :
MOUNTING :
ISSUE:
V-A
943
943
943
4000
4000
4000
HVCT-R
1 OF 1
AT ROOF COOLING TOWER
02/15/19
DPL31
SURFACE
DESCRIPTION
CT-2
-----
-----
CT-1 BASIN HEATER
-----
-----
--SPARE--
--SPARE--
--SPARE--
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
ID
M
M
M
E
E
E
P
P
P
C
C
C
C
C
C
N
NOTES:
N ID
R
X
M
X
E
E
P
P
P
XL CENTER CHILLER PLANT REPLACEMENT
208Y/120
3PHASE,4WIRE+GND
1. PANEL SHALL BE FRONT HINGED TO BOX
DESCRIPTION
ROOF RECEPTACLE
CT-1 CONTROLS
CT#1 VFD/FAN AND HEATER
CT #1 WATER LEVEL CONTROLS
CONDENSOR SUPPLY HEAT TRACE
CONDENSOR RETURN HEAT TRACE
--SPARE--
--SPARE--
--SPARE--
Book1.xls
V-A
360
800
1000
1000
1200
1200
ME Engineers Inc.
BUS:
MAINS:
P
1
1
1
1
1
1
1
1
1
60
60
BKR
20
20
20
20
20
20
20
20
20
Amps
AMP MAIN BKR
OPTIONS:
NEMA 3R / IP64 ENCLOSURE
BOLT IN BRANCH BKRS
LAMINATED NAMEPLATE
CKT
1
3
5
7
9
11
13
15
17
PH
A
B
C
A
B
C
A
B
C
Copper
CKT
2
4
6
8
10
12
14
16
18
BKR
20
20
20
20
20
20
20
20
20
P
1
1
1
1
1
1
1
1
1
PANEL:
SECTION:
LOCATION:
DATE:
FED FROM :
MOUNTING :
ISSUE:
V-A
800
1000
1000
1200
1200
LVCT-R
1 OF 1
AT ROOF COOLING TOWER
02/15/19
SURFACE
DESCRIPTION
CT #2 CONTROLS
CT #2 WATER LEVEL CONTROLS
CT #2VFD FAN AND HEATER
EQUALIZER 'HEAT TRACING
DRAIN HEAT TRACING
--SPARE--
--SPARE--
--SPARE--
--SPARE--
ID
X
X
M
E
E
P
P
P
P
N
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\E
lec\E
-010.00_D
V18025.01.dw
g
06 M
ar '19 - 11:03am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
E-010.00
ELECTRICAL
SCHEDULES
GENERAL NOTES KEYNOTES
1 DISCONNECT AND REMOVE RECEPTACLES NOTED WITH "R",
ALL LIGHT FIXTURES AND ASSOCIATED CONDUIT AND WIRE
SHALL BE REMOVED BACK TO NEAREST TERMINATION POINT. PRIOR TO
DISCONNECTION AND REMOVALS CONTRACTOR SHALL TRACE OUT
LIGHT CONTROL, EMERGENCY LIGHTING AND NORMAL LIGHTING
BRANCH CIRCUITS AND LABEL FOR REUSE. CONTRACTOR SHALL
MAINTAIN CONTINUITY OF EXISTING BRANCH CIRCUITS AND LIGHT
CONTROL NOT AFFECTED BY NEW WORK.
EXISTING SWITCHES SERVING UPPER LEVEL STORAGE AREA TO BE
DISCONNECTED AND RELOCATED AS INDICATED. CONTRACTOR SHALL
EXTEND ALL ASSOCIATED WIRING TO NEW LOCATION AND RECONNECT
PROVIDE ADEQUATE PROTECTION DURING CONSTRUCTION
2
3 ADD ALTERNATE
PROVIDE PRICING ALTERNATE FOR ROUTING THE ELECTRICAL
CONDUIT AND WIRE ASSOCIATED WITH EXISTING MCC WITHIN
PROPOSED TRENCH. DISCONNECT AND TEMPORARILY RELOCATE
EXISTING MCC EXTEND ALL ASSOCIATED FEEDERS, CONDUITS AND
WIRE AS REQUIRED. CONTRACTOR SHALL COORDINATE ALL
SHUTDOWNS OF AFFECTED SYSTEMS FED FROM MCC WITH BUILDING
FACILITIES. PROVIDE ALL CONDUIT, WIRE, ETC AS REQUIRED.
1. PRIOR TO BID, CONTRACTOR SHALL VERIFY ALL WORK ASSOCIATED WITH EXISTING CONDITIONS TO
DETERMINE NECESSARY WORK. ANY DISCREPANCIES OBSERVED ON SITE SHALL BE BROUGHT UP TO
ARCHITECT'S AND ENGINEER'S ATTENTION PRIOR TO BID.
2. ALL DEVICES AND FIXTURES INDICATED WITH 'E' OR 'EXISTING' SHALL REMAIN. MAINTAIN CONTINUITY
OF CIRCUITRY. PROVIDE ADEQUATE PROTECTION DURING DEMOLITION AND CONSTRUCTION.
3. ALL DEVICES AND FIXTURES INDICATED WITH 'R' OR 'RELOCATE' ARE EXISTING TO BE RELOCATED.
4. REFER TO ARCHITECTURAL PLANS FOR ADDITIONAL DEMOLITION INFORMATION INCLUDING AREAS TO
BE DEMOLISHED.
5. REFER TO MECHANICAL, PLUMBING, AND SPRINKLER DRAWINGS FOR ADDITIONAL INFORMATION ON
MECHANICAL EQUIPMENT TO BE REMOVED.
6. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
7. CONTRACTOR SHALL COORDINATE ALL REQUIRED SHUTDOWNS WITH FACILITIES DEPARTMENT.
8. CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION FOR ALL ELECTRICAL EQUIPMENT TO
REMAIN.
1
1
EXISTING MOTOR CONTROL
MCA
DISCONNECT AND REMOVE
POWER SOURCE SERVING
CHILLER BACK TO MAIN
ELECTRIC ROOM BACK TO
POINT OF ORIGIN. REMOVAL
SHALL INCLUDE ALL
ASSOCIATED CONDUIT,
WIRE, SUPPORT ETC
DISCONNECT POWER
SOURCE AND REMOVE
BACK TO POINT OF
ORIGIN INCLUDING ALL
ASSOCIATED CONDUIT,
WIRE, DISC SWITCH,
SUPPORTS ETC
BRINE MIXING
PUMP
TRACE OUT WIRING SERVING
COOLING TOWERS. DISCONNECT
AND REMOVE BACK TO POINT OF
ORIGN. REMOVALS SHALL INCLUDE
ALL ASSOCIATED RELAYS, WIRING
SUPPORTS DISCONNECT SWITCHES
ETC. COORDINATE ALL REMOVALS
WITH MECHANICAL CONTRACTOR.
EXISTING DUPLEX PUMP AND
ALL ASSOCIATED ELECTRIC
SUPPLY TO REMAIN
BRINE
PUMP
#1
BRINE
PUMP
#1
DISCONNECT AND REMOVE
POWER SOURCE TO BRINE
PUMPS #1 & #2 BACK TO
MCCA REMOVALS SHALL
INCLUDE ALL ASSOCIATED
CONDUIT, WIRE. RELAYS
SUPPORTS ETC
DISCONNECT AND REMOVE
POWER SOURCE SERVING
(2) CONDENSOR WATER
PUMPS (CH-1 & CH-2) BACK
TO MCCA. REMOVAL SHALL
INCLUDE ALL ASSOCIATED
CONDUIT, WIRE,
DISCONNECT SWITCHES,
SUPPORT ETC
EXISTING
PANEL LB-5
T
EXISTING POWER
DISTRIBUTION
TO REMAIN
DISCONNECT POWER SOURCE TO
COOLING TOWERS AND REMOVE BACK
TO SWITCHBOARD MS2 LOCATED IN
MAIN ELECTRIC ROOM. COORDINATE
REMOVALS WITH MECHANICAL CONTRACTOR
EXISTING FIRE ALARM
ANNUNICATOR AND LIGHTING
CONTROL PANELS TO BE
RELOCATED. FOR NEW LOCATION
REFER TO CONSTRUCTION DWG
1
1
1
.
2
1
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
E
E
E
R
R
R
R
REMOVE DISCONNECT SWITCH
AND ASSOCIATED CONDUIT.
CUT BACK EXISTING CONDUIT AND
WIRE BACK SERVING CHILLER BEING
REMOVED TO THIS PROPOSED LOCATION
SAFE OFF FOR REUSE. COORDINATE
EXACT LOCATION IN FIELD
CUT BACK EXISTING CONDUIT AND WIRE SERVING CHILLER
BEING REMOVED TO PULL BOX AND SAFE OFF FOR REUSE
EXISTING CONDUIT AND WIRE
TO REMAIN. FOR ADDITIONAL
INFORMATION REFER TO LEVEL 48
CONSTRUCTION
EXISTING PULL BOX TO REMAIN
RE-ROUTE COMMUNICATION WIRING,
CONDUIT AND ASSOCIATED WIRING
ALONG WALL AS REQUIRED TO SUIT THE
REMOVAL OF LOWER LEVEL
DOUBLE DOORS COORDINATE ALL
REROUTING AND REQUIRED SHUTDOWNS
IN FIELD WITH BUILDING FACILITIES
DEPARTMENT.
1
MSB
(EXISTING PANEL
TO REMAIN)
R
E
SEE KEY NOTE 3 ADD ALTERNATE
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\E
lec\E
-101.00_D
V18025.01.dw
g
06 M
ar '19 - 11:03am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
E-100.00
ELECTRICAL DEMO PLAN
- N.W. QUADRANT
EVENT LEVEL
ELECTRICAL DEMO PLAN - N.W. QUADRANT EVENT LEVEL
11/8" = 1'-0"
GENERAL NOTES KEYNOTES
1 CONNECT TO SPARE 1P,20A CIRCUIT BREAKER IN PANEL
MSB. PROVIDE ALL CONDUIT, WIRE ETC AS REQUIRED.
CONNECT POWER FOR FIRE SMOKE DAMPER TO SPARE 1P, 20A
CIRCUIT BREAKER IN EXISTING PANEL MSB. MAX (5) FIRE SMOKE
DAMPERS PER CKT, PROVIDE LOCKING TAB FOR CIRCUIT BREAKER.
1. PRIOR TO BID, CONTRACTOR SHALL VERIFY ALL WORK ASSOCIATED WITH EXISTING CONDITIONS TO
DETERMINE NECESSARY WORK. ANY DISCREPANCIES OBSERVED ON SITE SHALL BE BROUGHT UP TO
ARCHITECT'S AND ENGINEER'S ATTENTION PRIOR TO BID.
2. ALL DEVICES INDICATED WITH 'E' OR 'EXISTING' SHALL REMAIN. MAINTAIN CONTINUITY OF CIRCUITRY.
PROVIDE ADEQUATE PROTECTION DURING DEMOLITION AND CONSTRUCTION.
3. THE WORDS "REPLACE" AND "REPLACEMENT" INDICATE A REQUIREMENT TO DEMOLISH OLD AND
REPLACE WITH NEW.
4. FOR EXACT LOCATION AND MOUNTING HEIGHTS OF ALL DEVICES REFER TO ARCHITECTURAL
DRAWINGS.
5. REFER TO ARCHITECTURAL DRAWINGS FOR EQUIPMENT LOCATIONS AND ADDITIONAL INFORMATION.
6. PROVIDE (1) NEUTRAL FOR EACH HOT AND (1) COMMON GROUND FOR EACH HOMERUN.
7. ALL MECHANICAL/PLUMBING EQUIPMENT IS SHOWN FOR ELECTRICAL CIRCUITING INFORMATION ONLY.
EXACT LOCATIONS AND QUANTITIES OF MECHANICAL/PLUMBING EQUIPMENT SHALL BE COORDINATED
WITH MECHANICAL/PLUMBING DRAWINGS.
8. EXACT LOCATIONS AND QUANTITIES OF FIRE/SMOKE DAMPERS SHALL BE COORDINATED WITH
MECHANICAL DRAWINGS.
9. ALL EXISTING POWER RECEPTACLES AND DATA OUTLETS SHALL BE PROVIDED WITH NEW
COVERPLATES TO MATCH NEW OUTLETS.
10. ALL EXPOSED CONDUIT SHALL BE ROUTED PERPENDICULAR, PARALLEL, AND TIGHT TO COLUMNS AND
BEAMS. ALL EXPOSED CONDUIT ROUTING SHALL BE COORDINATED WITH ENGINEER AND ARCHITECT
PRIOR TO INSTALLATION. NO ADDITIONAL COST TO OWNER WILL BE ALLOWED FOR RELOCATING
CONDUIT DUE TO THE LACK OF COORDINATION WITH ARCHITECT.
11. ALL BACK BOXES SHALL BE FLUSH MOUNTED UNLESS NOTED OTHERWISE. ALL VERTICAL SECTIONS
OF CONDUIT SHALL BE CONCEALED. CONTRACTOR SHALL COORDINATE INSTALLATION OF CONDUIT
AND BACK BOXES IN CONCRETE, MASONRY AND GYP. WALLS.
12. CIRCUIT NUMBERS FOR CIRCUITS ORIGINATING FROM EXISTING PANELS ARE SHOWN FOR
REFERENCE ONLY. CONTRACTOR SHALL VERIFY SPARE BREAKERS IN THE FIELD.
2
NIC
NIC
NIC
18X30 SA UP
FSD -COORD W/ MECH
10"BWS/R UP
-COORD W/ MECH
8"CWS/R UP
-COORD W/ MECH
6"REFRIGERATION
EXHAUST UP
-COORD W/ MECH
10"BWS/R & 8"CWS/R
TO CHILLER
-COORD W/ MECH
18
X2
0
24
X1
4
12X10 OA UP
FSD -COORD W/ MECH
4"LPR UP
-COORD W/ MECH
24X24 EA UP
-COORD
W/ MECH
8"BWR UP
-COORD W/ MECH
12X10 OA UP
FSD
MSB
RELOCATED FIRE ALARM ANNUNICATOR AND
LIGHTING CONTROL PANEL. CONTRACTOR SHALL
DISCONNECT, RELOCATE AND RE INSTALL AT
LOCATION INDICATED. EXTEND ALL ASSOCIATED
CONDUIT, WIRE, LIGHTING CIRCUITS ETC.
PROVIDE ALL REQUIRED
RE-PROGRAMMING AS REQUIRED. COORDINATE
SHUT DOWN OF THE SYSTEMS WITH
FACILITIES/ENGINEERING DEPARTMENT PERSONNEL.
CO
NT
RO
L P
AN
EL
CO
NT
RO
L P
AN
EL
CH
1
CWP
1
CWP
2
BWP
1
BWP
2
30
UNF
30
UNF
AC
ICE
60
UNF
(2) 4"C FROM
LEVEL 48 TO FEED CH-1
CONTROL PANEL, FOR
ADDITIONAL INFORMATION
REFER TO POWER RISER
DIAGRAM
FUTURE
MSB
(EXIST)
DPL-31
DPL31:2,4,6
DPL31:7,9,11
(3 #10,#10
GND,3/4"C)
J
.
SEP
ICE
1
WP
CONNECT TO NEAREST
RECEPTACLE BRANCH
CIRCUIT SERVING AREA
OR TO SPARE 1P, 20A CIRCUIT
BREAKER IN PANEL MSB
PROVIDE ALL CONDUIT
WIRE, ETC AS REQUIRED.
1
1
CWP
AC-1
CWP
2
J CH
1
J
FSD
J
FSD
J
FOR MECHANICAL
CONTROLS
1
J
FOR MECHANICAL
CONTROLS
1
J
J
J
FOR MECHANICAL
CONTROLS
1
1
1
2
2
DPL31:7,9,11
(3 #12,#12
GND,3/4"C)
DPL31:1,3,5
EXISTING CONDUITS ROUTED
HIGH ABOVE EQUIPENT
EXISTING CONDUIT UP TO 48 LEVEL
FOR CONTINUATION SEE
E-202
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\E
lec\E
-201.00_D
V18025.01.dw
g
06 M
ar '19 - 11:03am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
E-200.00
ELECTRICAL POWER
PLAN - N.W. QUADRANT
EVENT LEVEL
ELECTRICAL POWER PLAN - N.W. QUADRANT EVENT LEVEL
11/8" = 1'-0"
ELECTRICAL POWER PLAN - N.E. QUADRANT EVENT LEVEL
21/8" = 1'-0"
GENERAL NOTES
1. PRIOR TO BID, CONTRACTOR SHALL VERIFY ALL WORK ASSOCIATED WITH EXISTING CONDITIONS TO
DETERMINE NECESSARY WORK. ANY DISCREPANCIES OBSERVED ON SITE SHALL BE BROUGHT UP TO
ARCHITECT'S AND ENGINEER'S ATTENTION PRIOR TO BID.
2. ALL DEVICES INDICATED WITH 'E' OR 'EXISTING' SHALL REMAIN. MAINTAIN CONTINUITY OF CIRCUITRY.
PROVIDE ADEQUATE PROTECTION DURING DEMOLITION AND CONSTRUCTION.
3. THE WORDS "REPLACE" AND "REPLACEMENT" INDICATE A REQUIREMENT TO DEMOLISH OLD AND
REPLACE WITH NEW.
4. FOR EXACT LOCATION AND MOUNTING HEIGHTS OF ALL DEVICES REFER TO ARCHITECTURAL
DRAWINGS.
5. REFER TO ARCHITECTURAL DRAWINGS FOR EQUIPMENT LOCATIONS AND ADDITIONAL INFORMATION.
6. PROVIDE (1) NEUTRAL FOR EACH HOT AND (1) COMMON GROUND FOR EACH HOMERUN.
7. ALL MECHANICAL/PLUMBING EQUIPMENT IS SHOWN FOR ELECTRICAL CIRCUITING INFORMATION ONLY.
EXACT LOCATIONS AND QUANTITIES OF MECHANICAL/PLUMBING EQUIPMENT SHALL BE COORDINATED
WITH MECHANICAL/PLUMBING DRAWINGS.
8. EXACT LOCATIONS AND QUANTITIES OF FIRE/SMOKE DAMPERS SHALL BE COORDINATED WITH
MECHANICAL DRAWINGS.
9. ALL EXISTING POWER RECEPTACLES AND DATA OUTLETS SHALL BE PROVIDED WITH NEW
COVERPLATES TO MATCH NEW OUTLETS.
10. ALL EXPOSED CONDUIT SHALL BE ROUTED PERPENDICULAR, PARALLEL, AND TIGHT TO COLUMNS AND
BEAMS. ALL EXPOSED CONDUIT ROUTING SHALL BE COORDINATED WITH ENGINEER AND ARCHITECT
PRIOR TO INSTALLATION. NO ADDITIONAL COST TO OWNER WILL BE ALLOWED FOR RELOCATING
CONDUIT DUE TO THE LACK OF COORDINATION WITH ARCHITECT.
11. ALL BACK BOXES SHALL BE FLUSH MOUNTED UNLESS NOTED OTHERWISE. ALL VERTICAL SECTIONS
OF CONDUIT SHALL BE CONCEALED. CONTRACTOR SHALL COORDINATE INSTALLATION OF CONDUIT
AND BACK BOXES IN CONCRETE, MASONRY AND GYP. WALLS.
12. CIRCUIT NUMBERS FOR CIRCUITS ORIGINATING FROM EXISTING PANELS ARE SHOWN FOR
REFERENCE ONLY. CONTRACTOR SHALL VERIFY SPARE BREAKERS IN THE FIELD.
EXISTING PULLBOX
APPROXIMATE LOCATION OF
NEW AND EXISTING SPLICE BOXES FOR
CONNECTION TO FEEDERS SERVING
EXISTING CHILLERS BEING REMOVED.
PROVIDE NEW SPLICES TO
FEEDERS, EXTEND AND CONNECT TO
NEW CHILLERS. ROUTING OF
FEEDERS TO NEW CHILLERS SHALL BE
COORDINATED IN FIELD WITH MECHANICAL
CONTRACTOR. FOR ADDITIONAL
INFORMATION REFER TO
ELECTRICAL RISER DIAGRAM
PROVIDE NEW SLICE AND
SPLICE BOX
EXISTING SPLICE BOX
EXISTING FEEDERS FROM
SWITCHBOARD AT EVENT LEVEL
SERVING EXISTING CHILLERS
BEING REMOVED
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\E
lec\E
-202.00_D
V18025.01.dw
g
06 M
ar '19 - 11:03am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
E-202.00
ELECTRICAL POWER
PLAN - N.E. QUADRANT
EL.48
ELECTRICAL POWER PLAN - N.E. QUADRANT EL.48
11/8" = 1'-0"
GENERAL NOTES
1. PRIOR TO BID, CONTRACTOR SHALL VERIFY ALL WORK ASSOCIATED WITH EXISTING CONDITIONS TO
DETERMINE NECESSARY WORK. ANY DISCREPANCIES OBSERVED ON SITE SHALL BE BROUGHT UP TO
ARCHITECT'S AND ENGINEER'S ATTENTION PRIOR TO BID.
2. ALL DEVICES INDICATED WITH 'E' OR 'EXISTING' SHALL REMAIN. MAINTAIN CONTINUITY OF CIRCUITRY.
PROVIDE ADEQUATE PROTECTION DURING DEMOLITION AND CONSTRUCTION.
3. THE WORDS "REPLACE" AND "REPLACEMENT" INDICATE A REQUIREMENT TO DEMOLISH OLD AND
REPLACE WITH NEW.
4. FOR EXACT LOCATION AND MOUNTING HEIGHTS OF ALL DEVICES REFER TO ARCHITECTURAL
DRAWINGS.
5. REFER TO ARCHITECTURAL DRAWINGS FOR EQUIPMENT LOCATIONS AND ADDITIONAL INFORMATION.
6. PROVIDE (1) NEUTRAL FOR EACH HOT AND (1) COMMON GROUND FOR EACH HOMERUN.
7. ALL MECHANICAL/PLUMBING EQUIPMENT IS SHOWN FOR ELECTRICAL CIRCUITING INFORMATION ONLY.
EXACT LOCATIONS AND QUANTITIES OF MECHANICAL/PLUMBING EQUIPMENT SHALL BE COORDINATED
WITH MECHANICAL/PLUMBING DRAWINGS.
8. EXACT LOCATIONS AND QUANTITIES OF FIRE/SMOKE DAMPERS SHALL BE COORDINATED WITH
MECHANICAL DRAWINGS.
9. ALL EXISTING POWER RECEPTACLES AND DATA OUTLETS SHALL BE PROVIDED WITH NEW
COVERPLATES TO MATCH NEW OUTLETS.
10. ALL EXPOSED CONDUIT SHALL BE ROUTED PERPENDICULAR, PARALLEL, AND TIGHT TO COLUMNS AND
BEAMS. ALL EXPOSED CONDUIT ROUTING SHALL BE COORDINATED WITH ENGINEER AND ARCHITECT
PRIOR TO INSTALLATION. NO ADDITIONAL COST TO OWNER WILL BE ALLOWED FOR RELOCATING
CONDUIT DUE TO THE LACK OF COORDINATION WITH ARCHITECT.
11. ALL BACK BOXES SHALL BE FLUSH MOUNTED UNLESS NOTED OTHERWISE. ALL VERTICAL SECTIONS
OF CONDUIT SHALL BE CONCEALED. CONTRACTOR SHALL COORDINATE INSTALLATION OF CONDUIT
AND BACK BOXES IN CONCRETE, MASONRY AND GYP. WALLS.
12. CIRCUIT NUMBERS FOR CIRCUITS ORIGINATING FROM EXISTING PANELS ARE SHOWN FOR
REFERENCE ONLY. CONTRACTOR SHALL VERIFY SPARE BREAKERS IN THE FIELD.
A A.5 A.7 B
10
9.5
9.3
9
8.5
AA
(2) 4"C DOWN TO
CHILLER ROOM
APPROXIMATE LOCATION OF
NEW AND EXISTING SPLICE BOXES FOR
CONNECTION TO FEEDERS SERVING
EXISTING CHILLERS BEING REMOVED.
PROVIDE NEW SPLICES TO
FEEDERS, EXTEND AND CONNECT TO
NEW CHILLERS. ROUTING OF
FEEDERS TO NEW CHILLERS SHALL BE
COORDINATED IN FIELD WITH MECHANICAL
CONTRACTOR. FOR ADDITIONAL
INFORMATION REFER TO
ELECTRICAL RISER DIAGRAM
PROVIDE NEW SLICE AND
SPLICE BOX
EXISTING SPLICE BOX
HV
ICE
GX
1
GX
2
TO
30
UNF
30
UNF
VFD
CONNECT TO SPARE 1P,
20A CIRCUIT BREAKER IN
PANEL "MSB"
DPL31:14,16,18
(3 #12 #12 GND 3/4"C)
DPL31:8,10,12
(3 #12 #12
GND 3/4"C)
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\E
lec\E
-202.00_D
V18025.01.dw
g
06 M
ar '19 - 11:03am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
E-203.00
ELECTRICAL POWER
PLAN - N.W. QUADRANT
EL.48
ELECTRICAL POWER PLAN - N.W. QUADRANT EL.48
11/8" = 1'-0"
GENERAL NOTES KEYNOTES
1
CONNECT TO EXISTING NORMAL LIGHTING BRANCH CIRCUIT
SERVING AREA MADE SPARE BY REMOVALS
2
FIXTURES MARKED WITH "EM" SHALL BE DESIGNATED EMERGENCY.
CONNECT TO EXISTING EMERGENCY LIGHTING BRANCH CIRCUIT
SERVING AREA
EXIT SIGNS SHALL BE CONNECTED TO UNSWITCHED LEG OF
EMERGENCY BRANCH CIRCUIT
3
1. ALL DEVICES AND FIXTURES INDICATED WITH 'E' OR 'EXISTING' SHALL REMAIN. MAINTAIN
CONTINUITY OF CIRCUITRY. PROVIDE ADEQUATE PROTECTION DURING DEMOLITION AND
CONSTRUCTION.
2. REFER TO LIGHT FIXTURE SCHEDULE FOR LIGHT FIXTURE INFORMATION.
3. CONTRACTOR SHALL COORDINATE VOLTAGES FOR ALL LIGHT FIXTURES PRIOR TO INSTALLATION
AND PROVIDE FOR ALL LOW VOLTAGE TRANSFORMERS AS REQUIRED.
4. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR ALL FIXTURE LOCATIONS WITHIN A
CEILING OR CEILING GRID. FOR AREAS WITHOUT CEILINGS, FIXTURE LOCATIONS ARE DIAGRAMMATIC.
THE INTENT IS TO ALIGN, CENTER, OR SPACE FIXTURES BETWEEN ARCHITECTURAL AND
STRUCTURAL ELEMENTS.
5. PROVIDE #10 SIZE WIRE FOR ALL BRANCH CIRCUITS EXCEEDING 75 FEET.
6. CONNECT SWITCHES TO LIGHTING FIXTURES. PROVIDE CONTROL OF FIXTURES AS INDICATED.
7. ALL SURFACE MOUNTED CONDUIT SHALL BE ROUTED PERPENDICULAR AND PARALLEL TO BEAMS
AND COLUMNS. ALL CONDUIT ROUTING SHALL BE COORDINATED WITH THE ARCHITECT PRIOR TO
INSTALLATION AND INSTALLED IN A NEAT AND CONSISTENT MANNER. ALL SURFACE MOUNTED
CONDUIT WHERE EXPOSED TO PUBLIC AREAS SHALL BE PAINTED. PAINT COLOR TO BE DETERMINED
BY ARCHITECT.
8. ELECTRICAL CONTRACTOR SHALL FIELD VERIFY EXACT FIXTURE LENGTHS FOR ALL CONTINUOUS
LINEAR FIXTURES. FOR COVES, PROVIDE CONTINUOUS ILLUMINATION WITH 6'' MAXIMUM DISTANCE
BETWEEN END FIXTURE AND WALL.
9. ELECTRICAL CONTRACTOR TO COORDINATE WITH MECHANICAL CONTRACTOR FOR PLACEMENT OF
FIXTURES IN MECHANICAL ROOMS TO PROVIDE UNIFORM LIGHT LEVELS.
10. MOUNTING HEIGHT OF LIGHT FIXTURES SHALL BE BELOW THE LOWEST MECHANICAL PIPING
1. ALL SENSOR LOCATIONS ARE APPROXIMATE. REFER TO
MANUFACTURER'S INSTALLATION INSTRUCTIONS PRIOR TO
INSTALLATION.
2. ULTRASONIC CEILING MOUNT SENSORS SHOULD BE LOCATED A
MINIMUM OF SIX (6) FEET FROM HVAC SUPPLY/RETURN VENTS.
3. CONTRACTOR IS RESPONSIBLE FOR FOLLOWING THE MANUFACTURER'S
RECOMMENDED PLACEMENT, AND FIELD VERIFICATION OF CIRCUITS
WITH RESPECT TO POWER PACK PLACEMENT.
4. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF REQUIRED
NUMBER OF POWER PACKS:
A. ONE POWER PACK IS REQUIRED FOR EACH CONTROLLED CIRCUIT.
B. EACH POWER PACK CAN SUPPLY UP TO 150mA. REFER TO
INSTALLATION GUIDE FOR MAXIMUM NUMBER OF SENSORS
CONNECTED TO POWER PACK.
C. IF MULTIPLE CIRCUITS ARE TO BE CONTROLLED BY A SINGLE
SENSOR, AUXILIARY RELAYS MAY BE USED IN CONJUNCTION WITH A
POWER PACK.
5. SENSORS MOUNTED OVER DOORWAYS SHOULD BE PLACED ONE (1)
FOOT INSIDE THRESHOLD.
6. CORRIDOR SENSORS SHALL BE SET TO 100% INFRARED RANGE AND 10
MINUTE DELAYED OFF TIME. OFFICE SENSORS SHALL BE SET TO 70%
INFRARED RANGE AND 30 MINUTE DELAYED OFF TIME. ALL SENSORS
SHALL HAVE AMBIENT LIGHT OVERRIDE TURNED OFF. CONTRACTOR
SHALL ADJUST BLINDERS ON VACANCY SENSORS TO AVOID NUISANCE
SWITCHING AS REQUIRED. REFER TO MANUFACTURER'S INSTALLATION
INSTRUCTIONS FOR ADDITIONAL INFORMATION.
7. UPON COMPLETION OF INSTALLATION OF VACANCY SENSORS AND
INSTALLATION COMPONENTS, AND AFTER CONNECTION TO POWER
SOURCE, TEST DEVICES AND INSTALLATION COMPONENTS TO
DEMONSTRATE COMPLIANCE WITH REQUIREMENTS. WHEN POSSIBLE,
FIELD CORRECT MALFUNCTIONING UNITS, THEN RETEST TO
DEMONSTRATE COMPLIANCE. REPLACE UNITS WHICH CANNOT BE
SATISFACTORY CORRECTED.
8. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
VACANCY SENSOR NOTES:
NIC
NIC
NIC
18X30 SA UP
FSD -COORD W/ MECH
10"BWS/R UP
-COORD W/ MECH
8"CWS/R UP
-COORD W/ MECH
6"REFRIGERATION
EXHAUST UP
-COORD W/ MECH
10"BWS/R & 8"CWS/R
TO CHILLER
-COORD W/ MECH
18X
20
24X
14
12X10 OA UP
FSD -COORD W/ MECH
4"LPR UP
-COORD W/ MECH
24X24 EA UP
-COORD
W/ MECH
8"BWR UP
-COORD W/ MECH
12X10 OA UP
FSD
EM
EM
EM
1
2
3
OS
OS
CO
NT
RO
L P
AN
EL
CO
NT
RO
L P
AN
EL
EM
EM
EM
EM
EM
EM
(TYP)
3
1
(TYP)
2
UP TO LEVEL ABOVE
EM
EM
EM
CONNECT TO EXISTING LIGHTING BRANCH
CIRCUIT THAT SERVES AREA. PROVIDE ALL
CONDUIT, WIRE ETC AS REQUIRED.
CONNECT TO SPARE 1P, 20A
IN EXISTING EMERGENCY
PANEL EHNW31 LOCATED IN
CHILLER ROOM
3
3
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\E
lec\E
-301.00_D
V18025.01.dw
g
06 M
ar '19 - 11:03am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
E-301.00
ELECTRICAL LIGHTING
PLAN - EVENT LEVEL
ELECTRICAL LIGHTING PLAN - EVENT LEVEL
11/8" = 1'-0"
GENERAL NOTES
KEYNOTES
1
1. XX
XX
EXISTING
SHAFT
NEW PIPING
COORD.
W/ MECH
ROOF HATCH
LADDERNEW GWB BHD
NEW ACT
2 x 2
8' - 6" AFF
EXISTING ACT
8' - 6" AFF
ROOF HATCH ABOVE
ENSURE EXISTING
RATED CONSTRUCTION
@STAIR
ENCLOSURE
RETAINED & RESTORED
GWB BHD
TO CONCEAL
RWL
FEEDER TO ROOF PANEL HVCT-R
AT COOLING TOWER
ROUTE CONDUIT SAME PATH
AS MECHANICAL PIPING
3/4"C FOR DATA LINE TO BMS
SYSTEM COORDINATE
OCATION WITH MECHANICAL
CONTRACTOR
EXISTING
SHAFT
NEW PIPING COORD.
W/ MECH
FEEDER UP TO ROOF PANEL HVCT-R
AT COOLING TOWER
ROUTE CONDUIT SAME PATH
AS MECHANICAL PIPING FOR
DETAILS REFER TO POWER
DISTRIBUTION DIAGRAM COORDINATE
ALL ROUTING WITH MECHANICAL
CONTRACTOR
FEEDER DN TO PANEL
DPL31OOF ROUTE
CONDUIT SAME PATH
AS MECHANICAL PIPING
3/4"C FOR DATA LINE TO BMS
SYSTEM COORDINATE
OCATION WITH MECHANICAL
CONTRACTOR
3/4"C DN FOR DATA LINE TO
BMS SYSTEM COORDINATE
LOCATION WITH
MECHANICAL CONTRACTOR
EXISTING
STAIRS
RAKER BEAM
ABOVE
NEW PIPING
COORD.
W/ MECH
MECH ROOM
BELOW
EXIST ROOF BELOW
EXHAUST DUCT
- REFER TO MECH
NEW DUCTWORK ENCLOSURE
3" MTL COMPOSITE PANEL
MOUNTED ON 'C' CHANNEL
FRAMING ANCHORED TO
EXIST WALL & CONC FRAME
EXIST SLOPE
ROOF BELOW
FEEDER UP TO ROOF PANEL HVCT-R
AT COOLING TOWER
ROUTE CONDUIT SAME PATH
AS MECHANICAL PIPING
3/4"C FOR DATA LINE TO BMS
SYSTEM COORDINATE
OCATION WITH MECHANICAL
CONTRACTOR
30
UNF
JJ
J
WP
WP
WP
30
UNF
JJ
J WP
WPWP
WP
GFI
WP
GFI
LVCT-R:6
FOR CT #2 VFD/DISCONNECT
FAN AND HEATER
TO FAN MOTOR
LVCT-R:2
FOR CT #2 WATER LEVEL CONTROLS
TO FAN MOTOR
LVCT-R:7
FOR CT #1 WATER LEVEL CONTROLS
SEE DETAIL
LVCT-R:1
TO RECEPTACLE ON
OPPOSITE SIDE
OF COOLING TOWER
WP
LVCT-R:3
FOR CT #1
CONTROLS
WP
WP
FOR CONNECTION TO BMS SYSTEM PROVIDE
EMPTY 3/4"C WITH DRAG WIRE. PROVIDE ALL
SUPPORTS, CONDUIT, BACKBOXES ETC AS
REQUIRED. COORDINATE CONNECTIONS OF
BMS SYSTEM WITH MECHANICAL
CONTRACTOR.
HVCT-R
XCT-R
LVCT-R
APPROXIMATE LOCATION
OF FEEDER FOR PANELHVCT-R
T
(NEMA 3R)
(NEMA 3R)
(NEMA 3R)
LVCT-R:5
FOR CT#1 VFD/DISCONNECT FAN
AND HEATER
LOCATE ALL ELECTRICAL EQUIPMENT
ON CATWALK SUPPORTS. PROVIDE ALL
CONNECTORS, FITTINGS, SUPPORTS,
ETC., AS REQUIRED. EXACT LOCATION
AND MOUNTING SHALL BE
COORDINATED IN FIELD
LVCT-R:1
FOR CT#2
CONTROLS
TO RECEPTACLE ON
OPPOSITE SIDE
J
LVCT-R:8,9,10,11
FOR HEAT
TRACING
3/4"C FOR DATA LINE TO BMS
SYSTEM COORDINATE
OCATION WITH MECHANICAL
CONTRACTOR
WP
WP
HVCT-R:8,10,12 (CT 1 BASIN HEATER) 3 #12 #12 GND 3/4"C)
WP
HVCT-R:13,15,17 CT #2 BASIN HEATER) 3 #12 #12 GND 3/4"C
J
CT1CT2
VFD
VFD
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\E
lec\E
-502.00_D
V18025.01.dw
g
06 M
ar '19 - 11:04am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
E-502.00
ELECTRICAL POWER
PLAN - STAIRS
ELECTRICAL POWER PLAN - STAIRS - CONCOURSE LEVEL (LEVEL 61)
11/8" = 1'-0"
ELECTRICAL POWER PLAN - STAIRS - INTERMEDIATE (LEVEL 76 THRU 95)
21/8" = 1'-0"
ELECTRICAL POWER PLAN - STAIRS - CLUB LEVEL (LEVEL 107)
31/8" = 1'-0"
ELECTRICAL POWER PLAN - STAIRS - COOLING TOWER LEVEL (LEVEL 121)
41/8" = 1'-0"
EXISTING MOTOR CONTROL
MCA (800A)
Bkr/OCPD
20
30
40
50
50
60
70
80
90
100
100
110
125
150
175
200
225
250
250
300
350
400
400
400
400
400
450
500
500
600
700
750
800
800
800
1000
1000
1200
1200
1600
1600
1600
2000
2000
2500
2500
2500
3000
3500
3500
4000
4000
ALUMINUM FEEDERS SHALL ONLY BE USED WITH NON ROTARY EQUIPMENT (i.e. PANELBOARDS, DIST. BOARDS, ETC..)
ALUMINUM FEEDERS ARE NOT PERMITED TO BE USED WITH MOTORIZED EQUIPMENT.
ALLUMINUM FEEDERS SHALL ONLY BE USED WITH OCPDs THAT ARE 225A OR GREATER
ONLY HIGH GRADE ALUMINUM CABLES WILL BE ACCEPTED, COMPACT ALUMINUM TYPE SE WITH COMPRESSION FITTINGS.
ALL CONDUCTORS ARE WITH THHN/THWN WIRE WITH 60DEG TERMINATIONS
UP TO #1AWG AND 75DEG FOR LARGER SIZES.
ALL ALUMINUM FEEDERS SHALL INCLUDE COPPER
EQUIPMENT GROUND CONDUCTORS
TAG
F1
F2
F3
F4
-
F5
F5
F6
F7
F8
-
F8A
F9
F9
F10
F11
F12
F13
-
F14
F15
F16
-
F16B
-
-
F17
F18
-
F19
F20
F20
F21
-
F21C
F22
-
F23
F23C
F24
-
F24C
F25
F25C
F26
-
F26C
F27
F28
F28C
F29
F29C
Sets
1
1
1
1
-
1
1
1
1
1
-
1
1
1
1
1
1
1
-
1
1
2
-
1
-
-
2
2
-
2
2
2
3
-
2
3
-
4
3
5
-
4
6
5
7
-
6
8
10
9
11
10
PIPE
3/4"
3/4"
3/4"
1"
-
1-1/4"
1-1/4"
1-1/4"
1-1/4"
1-1/2"
-
1-1/2"
1-1/2"
1-1/2"
2"
2"
2-1/2"
2-1/2"
-
3"
3"
2"
-
3"
-
-
2-1/2"
2-1/2"
-
3"
3"
3"
3"
-
3-1/2"
3"
-
3"
3-1/2"
3"
-
3-1/2"
3"
4"
3-1/2"
-
4"
3-1/2"
3-1/2"
4"
4"
4"
COPPER
FDR/PIPE [3W]
3#12,#12G
3#10,#10G
3#8,#10G
3#6,#10G
-
3#4,#8G
3#4,#8G
3#3,#8G
3#2,#8G
3#1,#8G
-
3#1,#6G
3#1/0,#6G
3#1/0,#6G
3#2/0,#6G
3#3/0,#6G
3#4/0,#4G
3#250,#4G
-
3#350,#4G
3#500,#3G
3#3/0,#3G
-
3#500,#3G
-
-
3#4/0,#2G
3#250,#2G
-
3#350,#1G
3#500,#1/0G
3#500,#1/0G
3#300,#1/0G
-
3#600,#1/0G
3#400,#2/0G
-
3#350,#3/0G
3#600,#3/0G
3#400,#4/0G
-
3#600,#4/0G
3#400,#250G
3#600,#250G
3#500,#350G
-
3#600,#350G
3#500,#400G
3#500,#500G
3#600,#500G
3#500,#500G
3#600,#500G
FEEDER TABLE - CONDUCTORS
ALUMINUM
FDR/PIPE [3W]
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3#300,#4G
3#350,#4G
-
3#500,#4G
3#700,#3G
3#250,#2G
-
-
-
-
3#300,#2G
3#350,#2G
-
3#500,#1G
3#700,#1/0G
3#700,#1/0G
3#400,#1/0G
-
-
3#600,#2/0G
-
3#500,#3/0G
-
3#600,#4/0G
-
-
3#600,#250G
-
3#700,#350G
-
-
3#700,#400G
3#700,#500G
-
3#700,#500G
-
TAG
FA1
FA2
FA3
FA4
FA4A
FA5
FA5
FA6
FA7
FA8
FA8A
-
FA9
FA9
FA10
FA11
FA12
FA13
FA13A
FA14
FA15
FA16
FA16A
FA16B
FA16C
FA16D
FA17
FA18
FA18A
FA19
FA20
-
FA21
FA21A
FA21C
FA22
FA22A
FA23
FA23C
FA24
FA24A
FA24C
FA25
FA25C
FA26
FA26A
FA26C
FA27
FA28
FA28C
FA29
FA29C
Sets
1
1
1
1
1
1
1
1
1
1
1
-
1
1
1
1
1
1
1
1
1
2
2
1
1
1
2
2
2
2
2
-
3
3
2
3
3
4
3
5
5
4
6
5
7
7
6
8
10
9
11
10
PIPE
3/4"
3/4"
1"
1"
1-1/4"
1-1/4"
1-1/4"
1-1/4"
1-1/2"
2"
2"
-
2"
2"
2"
2-1/2"
2-1/2"
3"
3
3"
3-1/2"
2-1/2"
2-1/2"
3-1/2"
4"
4"
2-1/2"
3"
3"
3"
3-1/2"
-
3"
3"
4"
3-1/2"
3-1/2"
3"
4"
3-1/2"
3-1/2"
4"
3-1/2"
4"
3-1/2"
4"
4"
4"
4"
4"
4"
4"
COPPER
FDR/PIPE [4 W]
4#12,#12G
4#10,#10G
4#8,#10G
4#6,#10G
4#6,#8G
4#4,#8G
4#4,#8G
4#3,#8G
4#2,#8G
4#1,#8G
4#1,#6G
-
4#1/0,#6G
4#1/0,#6G
4#2/0,#6G
4#3/0,#6G
4#4/0,#4G
4#250,#4G
4#250,#2G
4#350,#4G
4#500,#3G
4#3/0,#3G
4#3/0,#1/0G
4#500,#3G
4#600,#3G
4#600,#1/0G
4#4/0,#2G
4#250,#2G
4#250,#1/0G
4#350,#1G
4#500,#1/0G
-
4#300,#1/0G
4#300,#2/0G
4#600,#1/0G
4#400,#2/0G
4#400,#3/0G
4#350,#3/0G
4#600,#3/0G
4#400,#4/0G
4#400,#250G
4#600,#4/0G
4#400,#250G
4#600,#250G
4#500,#350G
4#500,#500G
4#600,#350G
4#500,#400G
4#500,#500G
4#600,#500G
4#500,#500G
4#600,#500G
ALUMINUM
FDR/PIPE [4 W]
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4#300,#4G
4#350,#4G
4#350,#2G
4#500,#4G
4#700,#3G
4#250,#3G
4#250,#1/0G
-
-
-
4#300,#2G
4#350,#2G
4#350,#1/0G
4#500,#1G
4#700,#1/0G
4#400,#1/0G
4#400,#2/0G
-
4#600,#2/0G
4#600,#3/0G
4#500,3/0G
-
4#600,#4/0G
4#600,#250G
-
4#600,#250G
-
4#700,#350G
4#700,#500G
-
4#700,#400G
3#700,#500G
-
4#700,#500G
-
BRINE
PUMP #1
BRINE
PUMP #2
CONDENSOR
PUMP
#3
CONDENSOR
PUMP
#4
BRIME
MIXING
PUMP
#4
NEW SPLICE TO EXISTING FEEDER
PROVIDE NEW SPLICE BOX
EXISTING FEEDER FROM
MAIN ELECTRIC ROOM
MS1-A3 (2) SETS OF 4 #
4OO MCM
T
DPL-
31
HVCT-R
XCT-R
LVCT-R
POWER DISTRIBUTION DIAGRAM
N.T.S.
DISCONNECT AND REMOVE ALL ASSOCIATED CONDUIT, WIRE ETC BACK TO MCA
GENERAL NOTES
1
1 11
1
FA21
30
UNF
30
UNF
WP
WP
30KVA DRY TYPE
480-208/120V
3 PHASE XFMR IN
WEATHER PROOF
ENCLOSURE
CT-1 CT-2
F2
F2
F4
FA8
WP
WP
LOCATE ALL ELECTRICAL EQUIPMENT ON CATWALK SUPPORTS. PROVIDE ALL
CONNECTORS, FITTINGS, SUPPORTS, ETC., AS REQUIRED. EXACT LOCATION
AND MOUNTING SHALL BE COORDINATED IN FIELD
2
2
NOT ALL RISER OFFSETS OR SUPPORT BOXES ARE SHOWN. CONTRACTOR
SHALL PROVIDE OFFSETS AND SUPPORT BOXES AS REQUIRED. CONTRACTOR IS
RESPONSIBLE FOR DETERMINING FIELD CONDITIONS AND INCLUDING ALL
NECESSARY OFFSET COSTS IN THE BID PRICE.
HORIZONTAL CONDUIT SEGMENTS ARE SHOWN ON THIS DRAWING FOR
REFERENCE ONLY. REFER TO PLAN DRAWINGS FOR ADDITIONAL
REQUIREMENTS SUCH AS ROUTING.
CONTRACTOR SHALL ENSURE THAT ALL WALL AND SLAB PENETRATIONS ARE
FIRE STOPPED IN ORDER TO MAINTAIN AS A MINIMUM THE FIRE RATING OF THE
WALL OR SLAB. REFERENCE ARCHITECTURAL AND STRUCTURAL PLANS FOR
ADDITIONAL INFORMATION.
ALL FEEDERS SHALL BE COPPER (75°C).
CONTRACTOR TO NOTE FEEDER SIZES AND PROVIDE SUITABLE LUGS FOR
TERMINATION FOR ALL EXISTING EQUIPMENT.
ALL MECHANICAL PANELBOARDS SHALL BE POWER TYPE PANELS.
CONTRACTOR SHALL FIELD VERIFY ALL WORK ASSOCIATED WITH EXISTING
PANELS TO DETERMINE NECESSARY WORK.
ALL WORK INDICATED ON THIS DRAWING IS NEW UNLESS OTHERWISE NOTED.
REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
EXISTING PANEL MSB SHALL BE REPLACED WITH NEW PANEL AT SAME
LOCATION. DISCONNECT EXISTING PANEL AND RECONNECT NEW PANEL TO
EXISTING FEEDERS. NEW PANEL SHALL BE DOOR HINGED ON BOX, RATED FOR
225A, 208/120V, 3 PHASE, 4 WIRE 48 POLES, WITH (1) 2P,60A,(3) 2P,30A, (1) 2P, 20A,
(2) 1P,30A AND THE BALANCE SHALL BE 1P,20A CIRCUIT, BREAKERS. ALL
EXISTING BRANCH CIRCUITS SHALL BE CONNECTED TO SAME CIRCUIT BREAKER
AS ORIGINAL PANEL. CONNECT BRANCH CIRCUITS DOUBLED UP ON CIRCUIT
BREAKERS TO AVAILABLE 1P, 20A CIRCUIT BREAKER. CONTRACTOR SHALL
PROVIDE UPDATED PANEL SCHEDULE TO REFLECT ALL NEW WORK
1
2
3
4
5
6
7
8
9
10
11
EXIST
CHILLER
#1
EXIST
CHILLER
#2
EXISTING MS-2
EXISITNG 400A FEEDEER
NEW SPLICE BOX , PROVIDE SPLICE TO
EXISTING FEEDER AND EXTEND TO
NEW MECHANICAL ROOM AND CONNECT
TO CHILLER #1 CONTROL PANEL
EXISTING SPLICE BOX , PROVIDE SPLICE TO
EXISTING FEEDER AND EXTEND TO
NEW MECHANICAL ROOM AND CONNECT
TO CHILLER #1 CONTROL PANEL
FA16B
FA16B
100
UNF
100
UNF
60
UNF
60
UNF
CH-1
CONTROL
PANEL
EVENT LEVEL
NEW PANEL MSB
EXISTING PANEL MSB TO BE REPLACED
12
12
FA21
FA16B
FA16B
LEVEL 48
CWP
1
CWP
2
BWP
1
BWP
2
F2
F2
F5
F5
VFDVFD
VFD
VFD
FA
9
WP
NEW
EXISTING
DEMO
LINE TYPE LEGEND
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\E
lec\E
-600.00_D
V18025.01.dw
g
06 M
ar '19 - 11:04am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
E-600.00
ELECTRICAL RISER
DIAGRAM
KEYNOTES
1 XX
FR
3
ASSEMBLY HLL & MTG
ROOM (PNL T30)
2
5
1
7
10
TRIP
8
400
400
400
4
SPACE
FEED TO P.R OUTSIDE
SNOW RM
HW MESSAGE CTR
600A SW IN CHILLER
RM
EXHIBITING HALL E
PB-3
6
LTG PNLS LB5
LB6 & LB7
SCOREBOARD NC
CATWALK
EXHIBITING HALL E
PB-4
9
SE MESSAGE CTR
11
LTG PNLS LB3 & LB4
12
13
14
800
600
800
800
400
400
400
225
400
FR
4
BUSWAY YO AS
3
6
1
34
14
TRIP
13
1600
400
400
5
SPACE
SCREW COMPRESSOR 1
8
400A BUS DUCT SHOW
POWER
400
400
1600
800
400
400
SCREW COMPRESSOR 2
COLLISION CLUB
TRANSFORMER
SPACE
SPACE
1200
FUSE
208/120V Y
750 KVA
TRANSFORMER
480V Δ
11
BUSWAY YO SNW
7
2
1600
1200
SPACE
(400)
1600
FR TRIP FUSE
SPACE
400
9EXHIBITING HALL
LTG PNL T-1
400
CONT & LTG
PNL'S LA2 & LA3
400
12
EXHIBITING HALL
LTG PNL T-2
10
3000A
FUSE
NEUTRAL
GROUND BUS
FR
3
KITCHEN PANTRY
KPB1
2
5
1
7
8
TRIP
9
400
400
200
4
EXHIBITION HALL
SOUTH PP1
CONCESSION PREP
CB3(PP-IN-31C-1
FACIUTY LOUNGE)
SPACE
6
CONCESSION STAND ADV
TICKET SALES
CONCESSION
STAND 3
10
CONCESSION STAND C5/3
EAST MESSAGE CENTER
CONTROL RM
11
EXHIBITION HALL
PNL LB2
12
800
600
400
225
400
400
400
400
100
KITCHEN PANTRY
KPB2
EXHIBITION HALL
SOUTH PP2
SPACE
PNL T4
14
100 CONCESSION
PNL CB1
15
100 CONCESSION
PNL CB2
NEUTRAL
GROUND BUS
TRIP FRFUSE
800
800
600
600
MOTOR CONTROL
MCC
MOTOR CONTROL
MCB
800
700
MOTOR CONTROL
MCA
5
4
3
400
8
(400)
9
600
7
SPARE
SPACE
SHOW POWER
400A BUS DUCT
10
SPACE
1600
6
TRANSFORMER
750 KVA
TRANSFORMER
480V
TRIP FRFUSE
1600
1
1600
BUS WAY TO
SSE
1600
2
800
700
800
700
11
12
COLLISEUM
CLUB
SHOW POWER
208/120V
VS
V
AS
A
UTILITY
REVENUE
K
K
3000A FUSE
MIN
BREAKER
3000A
GFR
K
K
GFR
MIN
BREAKER
3000A
VS
V
AS
A
UTILITY
REVENUE
275
275
EXISTING ELEVATION - MCA
TEF EF-8
SP-1
FREIGHT ELEV
(SUMP PUMP
ADMIN
UNIT HEATER
E-19
EVAP
COND
SUPPLY FAN
V3
SUPPLY FAN
SF-14
RELIEF FAN
E-3
BRINE
TREATMENT
PUMP
NW STORAGE
RETURN FAN
R-12
RETURN FAN
R-11
ICE MELT
PUMP
HEATER
SF-12
ANIMAL EXH
FAN (E-1)
BRINE MIXING
PUMP
BRINE
PUMP #1
BRINE
PUMP #2
V-1
DUPLEX
SEWAGE
EJECTOR
P-2
O.H.
DOOR
WEST
VOM
HTRS
VISIT
TEAM
ELECT
O.H.
DOOR
DRY
STOR
(ZAMBONI)
DUPLEX
COND
PUMP
#4
DUPLEX
COND
PUMP
#3
EXISTING MS-2
EXISTING MS-1
PANTRY
EXH
E-12
GEF
EF-10
SF-11
BLANK
ELEC
WATER
HTR
SUPPLY FAN
SUPPLY FAN
SUPPLY FAN
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\E
lec\E
-600.00_D
V18025.01.dw
g
06 M
ar '19 - 11:04am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
E-601.00
ELECTRICAL RISER
DIAGRAM SHT 2
GROUND (GREEN)
LOW ALARM (RED)
CONTROL
DISCONNECT
SWITCH
HOT
MAKE UP VALVE ON (WHITE)
HIGH ALARM (BLUE)
MAKE UP VALVE OFF (BLACK)
SOLENOID
VALVE
WATER
LEVEL
CONTROL
(BY OTHERS)
H
CO
NT
RO
L P
OW
ER
S
UP
PL
Y
12
0V
P
OW
ER
P
ER
E
LE
CT
RIC
AL
P
LA
NS
HIGH
ALARM
LLOW
ALARM
* NOTE: A WATERPROOF WIRE NUT IS PROVIDED
ON THE END OF EACH WIRE SHOWN WITH AN
ASTERISK (*). DO NOT REMOVE THESE WIRE NUTS.
DO NOT USE THESE WIRES.
*
120V CIRCUIT
LOW ALARM CIRCUIT
MAKE-UP CIRCUIT
HIGH ALARM CIRCUIT
*
STATUS CODE L.E.D.
FUSE
1. DASHED LINES INDICATE WIRING BY CONTRACTOR.
2. ALL EXTERIOR BOXES SHALL BE WEATHERPROOF
TYPE.
3. COORDINATE ALL MOUNTING AND POWER
CONNECTION TERMINATIONS WITH THE
MANUFACTURER.
4. REFER TO MECHANICAL SCHEDULES,
SPECIFICATIONS AND PLANS FOR ADDITIONAL
INFORMATION.
5. ALL CONNECTIONS SHALL BE COORDINATED WITH
THE MECHANICAL CONTRACTOR PRIOR TO
INSTALLATION.
6. REFER TO PLANS FOR EQUIPMENT AND
DISTRIBUTION LOCATIONS.
7. INTERLOCK IMMERSION HEATERS WITH CIRCULATING
PUMP TO DE-ENERGIZE HEATERS WHEN PUMP IS
RUNNING.
GENERAL NOTES:
1
NEUTAL
INCOMING POWER SOURCE MUST HAVE A 3A FUSE
FOR COMPONENT PROTECTION. USING A FUSE
OVER 3A WILL VOID WARRANTY.
KEYNOTES:
1
66"
securely mounted disconnect switch
s shown on plan, size per
mechanical coordination schedule
DISCONNECT SWITCH, SIZE PER MECHANICAL
COORDINATION. MOUNT SECURELY.
2 PIPE SUPPORT OR
TWO UNI-STRUT HEAVY
GAUGE CHANNELS.
CONDUIT FROM
ELECTRICAL
DISTRIBUTION
FLANGES FASTENED TO FLOOR
PVC COVERED FLEXIBLE CONNECTION CONTAINING POWER CIRCUIT &
GROUND WIRES, PROVIDE EXTRA SLACK TO ALLOW ROTATING MOTOR 90°
FOR MAINTENANCE WITHOUT BREAKING ELECTRICAL CONNECTION.
BASIN HEATER POWER FEEDER
FROM ELECTRICAL DISTRIBUTION,
FEEDER SIZE PER PLANS AND
RISERS (TYP)
PVC COVERED
FLEXIBLE
CONNECTION
CONTAINING
POWER CIRCUIT
& GROUND
WIRES (TYP)
1. ALL EXTERIOR BOXES SHALL BE WP TYPE.
2. ALL EXTERIOR DISCONNECTS AND CONTROL PANELS SHALL BE NEMA 4X.
3. COORDINATE ALL MOUNTING AND POWER CONNECTION TERMINATIONS WITH THE MANUFACTURER.
4. REFER TO MECHANICAL SCHEDULES, SPECIFICATIONS AND PLANS FOR ADDITIONAL INFORMATION.
5. ALL CONNECTIONS SHALL BE COORDINATED WITH THE MECHANICAL CONTRACTOR PRIOR TO INSTALLATION.
6. ALL CONNECTIONS SHOWN ON DETAIL SHALL BE PROVIDED FOR EACH COOLING TOWER CELL.
7. REFER TO PLANS FOR EQUIPMENT AND DISTRIBUTION LOCATIONS.
GENERAL NOTES:
NEMA 4X, UNFUSED DISCONNECT WITH POWER CONNECTION FOR COOLING TOWER FAN. FAN QUANTITY
PER MECHANICAL SCHEDULES. SIZE PER PLANS/SCHEDULES. REFER TO REMOTE MOUNTED VFD
DISCONNECT INTERFACE FOR ADDITIONAL INFORMATION.
120V, 1PH CONNECTION FOR WATER LEVEL CONTROL. (FOR TOWERS WITH ELECTRONIC LEVEL
CONTROLS) REFER TO CT WATER LEVEL CONTROL WIRING DIAGRAM FOR ADDITIONAL INFORMATION.
CONTROL PANEL (NEMA 4X) BY OTHERS. REFER TO ELECTRIC IMMERSION HEATER WIRING DIAGRAM FOR
ADDITIONAL INFORMATION.
NEMA 4X, UNFUSED DISCONNECT WITH POWER CONNECTION FOR BASIN HEATERS. SIZE PER
PLANS/SCHEDULES. REFER TO ELECTRIC IMMERSION HEATER WIRING DIAGRAM FOR ADDITIONAL
INFORMATION.
CONNECT POWER TO SOLENOID VALVE AND WATER LEVEL CONTROLS PROVIDED WITH COOLING TOWER.
PROVIDE ALL INTERCONNECTIONS PER MANUFACTURER'S REQUIREMENTS.
REMOTE VFD, PER MECHANICAL SCHEDULES. REFER TO REMOTE MOUNTED VFD DISCONNECT INTERFACE
FOR ADDITIONAL INFORMATION.
REFER TO MECHANICAL SCHEDULES FOR HEATER KW RATING AND QUANTITY.
FEEDER PER ELECTRICAL PLANS.
KEYNOTES:
1
2
3
4
5
4
3
2
1
COOLING
TOWER CELL
QUANTITY PER
MECHANICAL
SCHEDULES.
(TYPICAL EACH
CELL)
6
5
7
8
POWER FEEDER BETWEEN VFD
AND LOCAL DISCONNECT, FEEDER
SIZE PER PLANS AND RISERS (TYP)
FUSES
L3
L2
L1
G
BLK
BLK
CT
N
120
240/24
C
NO
NC
T1
T2
G1
G2
SHIELDED CABLE
G2
G1
T2
T1
SH
{
T2
T3
T1
CONTROL PANEL (BY OTHERS)
DOOR
DISCONNECT
HEATER #1
208V OR
480V 3PH
POWER
PER
ELECTRICAL
PLANS
IMMERSION HEATERS (BY
OTHERS)
SENSOR PROBE/CORD
ASSEMBLY (BY OTHERS)
NEMA 4X, UNFUSED DISCONNECT WITH POWER CONNECTION FOR BASIN HEATERS. SIZE
PER PLANS/SCHEDULES. REFER TO ELECTRIC IMMERSION HEATER WIRING DIAGRAM
FOR ADDITIONAL INFORMATION.
REFER TO MECHANICAL SCHEDULES FOR HEATER KW RATING AND QUANTITY.
FEEDER PER ELECTRICAL PLANS.
SPRAY PUMP AUX. CONTACT BY EC. INTERLOCK IMMERSION HEATERS WITH SPRAY
WATER CIRCULATING PUMP TO DE-ENERGIZE HEATERS WHEN SPRAY PUMP IS RUNNING.
KEYNOTES:
1
2
3
1. DASHED LINES INDICATE WIRING BY CONTRACTOR.
2. ALL EXTERIOR DISCONNECTS AND CONTROL PANELS SHALL BE NEMA 4X.
3. COORDINATE ALL MOUNTING AND POWER CONNECTION TERMINATIONS WITH THE
MANUFACTURER.
4. REFER TO MECHANICAL SCHEDULES, SPECIFICATIONS AND PLANS FOR ADDITIONAL
INFORMATION.
5. ALL CONNECTIONS SHALL BE COORDINATED WITH THE MECHANICAL CONTRACTOR
PRIOR TO INSTALLATION.
6. REFER TO PLANS FOR EQUIPMENT AND DISTRIBUTION LOCATIONS.
GENERAL NOTES:
4
HEATER #2
(IF REQ'D)
COMBINATION
TEMPERATURE
LIQUID
LEVEL
CONTROLLER
MAIN
DISCONNECT
SWITCH
CONTROLLING
CONTACTORS
TERMINAL
BLOCK
4
1
3
2
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\E
lec\E
-700.00_D
V18025.01.dw
g
06 M
ar '19 - 11:04am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
E-700.00
ELECTRICAL DETAILS
GENERAL NOTES
1. PRIOR TO BID, CONTRACTOR SHALL VERIFY ALL WORK ASSOCIATED WITH EXISTING CONDITIONS TO
DETERMINE NECESSARY WORK. ANY DISCREPANCIES OBSERVED ON SITE SHALL BE BROUGHT UP TO
ARCHITECT'S AND ENGINEER'S ATTENTION PRIOR TO BID.
2. ALL DEVICES INDICATED WITH 'E' OR 'EXISTING' SHALL REMAIN. MAINTAIN CONTINUITY OF CIRCUITRY.
PROVIDE ADEQUATE PROTECTION DURING DEMOLITION AND CONSTRUCTION.
3. THE WORDS "REPLACE" AND "REPLACEMENT" INDICATE A REQUIREMENT TO DEMOLISH OLD AND
REPLACE WITH NEW.
4. FOR EXACT LOCATION AND MOUNTING HEIGHTS OF ALL DEVICES REFER TO ARCHITECTURAL
DRAWINGS.
5. REFER TO ARCHITECTURAL DRAWINGS FOR EQUIPMENT LOCATIONS AND ADDITIONAL INFORMATION.
6. PROVIDE (1) NEUTRAL FOR EACH HOT AND (1) COMMON GROUND FOR EACH HOMERUN.
7. ALL MECHANICAL/PLUMBING EQUIPMENT IS SHOWN FOR ELECTRICAL CIRCUITING INFORMATION ONLY.
EXACT LOCATIONS AND QUANTITIES OF MECHANICAL/PLUMBING EQUIPMENT SHALL BE COORDINATED
WITH MECHANICAL/PLUMBING DRAWINGS.
8. EXACT LOCATIONS AND QUANTITIES OF FIRE/SMOKE DAMPERS SHALL BE COORDINATED WITH
MECHANICAL DRAWINGS.
9. ALL EXISTING POWER RECEPTACLES AND DATA OUTLETS SHALL BE PROVIDED WITH NEW
COVERPLATES TO MATCH NEW OUTLETS.
10. ALL EXPOSED CONDUIT SHALL BE ROUTED PERPENDICULAR, PARALLEL, AND TIGHT TO COLUMNS AND
BEAMS. ALL EXPOSED CONDUIT ROUTING SHALL BE COORDINATED WITH ENGINEER AND ARCHITECT
PRIOR TO INSTALLATION. NO ADDITIONAL COST TO OWNER WILL BE ALLOWED FOR RELOCATING
CONDUIT DUE TO THE LACK OF COORDINATION WITH ARCHITECT.
11. ALL BACK BOXES SHALL BE FLUSH MOUNTED UNLESS NOTED OTHERWISE. ALL VERTICAL SECTIONS
OF CONDUIT SHALL BE CONCEALED. CONTRACTOR SHALL COORDINATE INSTALLATION OF CONDUIT
AND BACK BOXES IN CONCRETE, MASONRY AND GYP. WALLS.
12. CIRCUIT NUMBERS FOR CIRCUITS ORIGINATING FROM EXISTING PANELS ARE SHOWN FOR
REFERENCE ONLY. CONTRACTOR SHALL VERIFY SPARE BREAKERS IN THE FIELD.
NIC
NIC
NIC
15cd
15cd
15cd
15cd
15cd
EXISTING FIRE ALARM
SPEAKER STROBE TO BE
REPLACED WITH NEW AT
SAME LOCATION
EXISTING FIRE ALARM
SPEAKER/STROBE
EXISTING FIRE ALARM
SPEAKER/STROBE
15cd
FR
FR
HV
ICE
(AT 48 LEVEL)
AC
ICE
FR
FR
FR
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\F
ire A
larm
\F
A-201.00_D
V18025.01.dw
g
06 M
ar '19 - 11:04am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
FA-201.00
FIRE ALARM PLAN -
EVENT LEVEL
FIRE ALARM PLAN - EVENT LEVEL
11/8" = 1'-0"
GENERAL NOTES KEYNOTES
11. XX XX
A A.5 A.7 B
10
9.5
9.3
9
8.5
AA
FR
MM
FOR SPRINKLER DRY VALVE
HV
ICE
S
R
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\F
ire A
larm
\F
A-202.00_D
V18025.01.dw
g
06 M
ar '19 - 11:04am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
FA-202.00
FIRE ALARM PLAN - FP48
FIRE ALARM PLAN - FP48
11/8" = 1'-0"
GENERAL NOTES
1. TESTING AND FINAL CONNECTION OF CONTROL PANEL SHALL BE
MADE BY THE BASE BUILDING FIRE ALARM VENDOR
IN COORDINATION WITH THIS CONTRACTOR.
2. CHECK-OUT AND PROGRAMMING OF THE FIRE ALARM SYSTEM SHALL
BE MADE BY FIRE ALARM VENDOR (JCI CHRIS LETT 860-602-3179)
3. FIRE ALARM WIRING SHALL BE INSTALLED IN CONDUIT WHERE
FINISHED CEILINGS ARE NOT PRESENT. ALL FIRE ALARM WIRING
ABOVE FINISHED CEILINGS SHALL BE TEFLON COATED (PLENUM
RATED).
5. CONTRACTOR SHALL SUBMIT COMPLETE SHOP DRAWINGS FOR THE
SYSTEM, INCLUDING WIRING DIAGRAMS, CATALOG CUTS OF ALL
DEVICES, AND SYSTEM RISER DIAGRAM AND SEQUENCE OF
OPERATION.
6. PROVIDE END-OF-LINE DEVICES AS REQUIRED.
7. ALL CONDUITS SHALL BE GROUNDED BY MEANS CONFORMING WITH
THE NATIONAL ELECTRCIAL CODE WITH A GROUND CONDUCTOR
EQUAL IN SIZE TO THE LARGEST CONDUCTOR USED IN THE SYSTEM;
BUT IN NO CASE SHALL THE GROUND CONDUCTOR BE SMALLER THEN
#10 AWG. ALL CONDUITS SHALL BE RIGID STEEL CONDUIT. ALL
CONDUITS AND JUNCTION BOXES SHALL BE PAINTED RED.
8. ALL FIRE ALARM SYSTEM WIRING SHALL BE TWISTED PAIR #14 AWG
MINIMUM, SOLID COPPER, 200 DEG. C, 600V, INSULATED
CONDUCTORS, BS & E OR APPROVED AND COLORED RED.
9. RUN RIGID CONDUIT WHERE NOT CONCEALED IN CEILINGS AND
WHERE REQUIRED BY ALL APPLICABLE CODES, ALL WIRING SHALL BE
COLOR CODED AND IDENTIFIED AT THE FACP. ALL FIRE ALARM
CABLES SHALL BE APPROVED FOR USE IN FIRE ALARM SYSTEMS IN
THE CITY HARTFORD CT .
10. ELECTRICAL CONTRACTOR SHALL PERFORM ALL NECESSARY FIRE
DEPARTMENT FILING. WORK SHALL NOT BE CONSIDERED COMPLETE
UNLESS ALL NECESSARY FILING, TESTS, AND INSPECTIONS ARE
COMPLETED AND APPROVED.
11. ELECTRICAL CONTRACTOR SHALL FIRE STOP ALL PENETRATIONS
THROUGH FIRE RATED PARTITIONS AND SLABS.
12. ELECTRICAL CONTRACTOR SHALL INCLUDE IN HIS BID ONE (1) DAY
FOR WALK-THRUS AND ALL PRE-TESTING, PRIOR TO FIRE
DEPARTMENT INSPECTION AND TESTING.
13. VISUAL ALARM FLASHING STROBE LIGHT SHALL BE MINIMUM 75
CANDELAS AND WILL BE MOUNTED @ 80" A.F.F. PER "A.D.A."
REQUIREMENTS STROBE LIGHTS MUST BE ALTERNATELY WIRED ON A
& B CIRCUITS AS REQUIRED BY CODE.
14. COORDINATE COLOR AND LOCATION OF ALL DEVICES AND CONDUIT
ROUTING WITH ARCHITECT PRIOR TO ANY WORK AND INSTALLATION.
15. REFER TO FLOOR PLAN FOR EXACT QUANTITY OF DEVICES.
16. ALL DEVICES SHALL BE PROVIDED BY THIS CONTRACTOR.
17. PRIOR TO SUBMITTING HIS BID, CONTRACTOR SHALL FIELD VERIFY
ALL EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO
AVAILABILITY OF CIRCUITS/ZONES ETC., AND INFORM THE
ENGINEER/ARCHITECT OF ANY DISCREPANCY AND INCLUDE IN HIS BID
TO INCLUDE THE SAME AS DIRECTED. CLIENT IS NOT RESPONSIBLE
FOR ANY ADDITIONAL COSTS RESULTING FROM VERIFIABLE EXISTING
CONDITIONS DISCOVERED AFTER CONTRACT HAS BEEN AWARDED.
18. PROVIDE A FIRE ALARM CONTROL RELAY FOR CONTROL OF DAMPER
MOTOR POWER FOR ALL FIRE SMOKE DAMPERS. ROUTE POWER VIA
FIRE ALARM RELAY.
19. ALL FIRE ALARM INSTALLATIONS SHALL BE COORDINATED WITH
BUILDING ENGINEER PRIOR TO INSTALLATION.
NOTES
1. REFER TO PLAN DRAWINGS FOR DEVICE
LOCATIONS.
2. DIVISION 26 SHALL BE RESPONSIBLE FOR
FILING AND OBTAINING APPROVAL OF ALL
APPROPRIATE AUTHORITIES FOR SYSTEM,
INCLUDING PAYING ALL ASSOCIATED FEES,
INCLUDING OBTAINING SERVICES OF A
CONNECTICUT STATE LICENSED
PROFESSIONAL ENGINEER. WORK SHALL
NOT BE CONSIDERED COMPLETE UNLESS
ALL NECESSARY FILING, TESTS, AND
INSPECTIONS ARE COMPLETED AND
APPROVED.
3. ALL NEW FIRE ALARM DEVICES SHALL BE
FULLY COMPATIBLE WITH THE EXISTING
SYSTEM AND SHALL BE INSTALLED UNDER
DIRECT SUPERVISION OF EXISTING SYSTEM
SUPPLIER (JCI CHRIS LETT 860-602-3179)
WHO SHALL WARRANTY ALL WORK FOR (1)
YEAR.
4. ALL WIRING SHALL BE TEFLON INSULATED
AND JACKETED, 2HR RATED. CABLE SHALL
BE RATED 600 VOLT AND SHALL BE BSA
APPROVED. PROVIDE #14 AWG MINIMUM
WIRING FOR ALL SIGNAL AND INITIATION
DEVICES. ROUTE ALL WIRING IN CONDUIT.
5. EXACT ROUTING OF FIRE ALARM WIRING TO
BE COORDINATED IN FIELD.
6. QUANTITY OF DEVICES ON ONE LOOP SHALL
BE PER MANUFACTURER'S
RECOMMENDATION.
7. LOCATE ALL STROBES 6'-8" TO BOTTOM
ABOVE FINISHED FLOOR OR 6" TO CENTER
BELOW FINISHED CEILING, WHICHEVER IS
LOWEST.
8. PROVIDE SEPARATE NOTIFICATION
CIRCUITS FOR SPEAKER AND STROBE
DEVICES. ALL NOTIFICATION CIRCUITS
SHALL BE TWO HOUR PROTECTIVE CIRCUIT
OR IN CONDUIT PER NFPA 72.
9. STROBE SHALL DELIVER A MINIMUM U.L.
1971 LISTED EFFECTIVE INTENSITY OF 75
CANDELA (AND SHALL BE COMPATIBLE WITH
BASE BLDG. FIRE ALARM SYSTEM) WITH NO
MORE THAN A 225MA DRAW. 15 CANDELA
U.L. 1971 LISTED/75 CANDELA NEAR AXIS
STROBES (115MA DRAW) SHALL BE UTILIZED
FOR SPACE WITH NO DIMENSION GREATER
THAN 20 FEET.
10. PROVIDE MONITORING MODULES, CONTROL
MODULES, END SWITCHES, LED STATUS
LIGHTS, SELECTOR SWITCHES, PRINTED
CIRCUIT CARDS, PROGRAMMING, AND ALL
APPURTENANCES AS REQUIRED.
11. COORDINATE EXACT LOCATION AND
QUANTITY OF ALL DUCT TYPE SMOKE
DETECTORS WITH DIVISION 23. DIVISION 26
SHALL HARD WIRE TO RELAY STARTER.
12. COORDINATE EXACT LOCATION AND
QUANTITY OF ALL FIRE SMOKE DAMPERS
WITH DIVISION 23.
13. FIRE ALARM CONTRACTOR TO PROVIDE
INTERFACE TO ELECTRICALLY UNLOCK ALL
ELECTRICALLY HELD DOORS WITH CARD
READER ACCESS.
14. ALL VISUAL DEVICES SHALL BE
SYNCHRONIZED.
15. PROVIDE END-OF-LINE DEVICES AS
REQUIRED.
17. DIVISION 26 SHALL FIRE STOP ALL
PENETRATIONS THROUGH FIRE RATED
PARTITIONS AND SLABS.
18. RUN RIGID CONDUIT WHERE NOT
CONCEALED IN CEILINGS AND WHERE
REQUIRED BY ALL APPLICABLE CODES, ALL
WIRING SHALL BE COLOR CODED AND
IDENTIFIED AT THE FACP.
19. ALL CONDUITS SHALL BE GROUNDED BY
MEANS CONFORMING WITH THE NATIONAL
ELECTRICAL CODE WITH A GROUND
CONDUCTOR EQUAL IN SIZE TO THE
LARGEST CONDUCTOR USED IN THE
SYSTEM; BUT IN NO CASE SHALL THE
GROUND CONDUCTOR BE SMALLER THEN
#10 AWG. ALL CONDUITS SHALL BE RIGID
STEEL CONDUIT. ALL CONDUITS AND
JUNCTION BOXES SHALL BE PAINTED RED.
20. REFER TO SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
21. ALL ANNUNCIATING DEVICES SHALL BE
COORDINATED WITH ARCHITECT.
22. TESTING AND FINAL CONNECTION OF
CONTROL PANELS AND PROGRAMMING OF
THE FIRE ALARM SYSTEM SHALL BE MADE
BY THE BUILDING FIRE ALARM VENDOR.
23. CONTRACTOR SHALL SUBMIT COMPLETE
SHOP DRAWINGS FOR THE SYSTEM,
INCLUDING WIRING DIAGRAMS, CATALOG
CUTS OF ALL DEVICES, SYSTEM RISER
DIAGRAM, AND SEQUENCE OF OPERATION.
GENERAL NOTES
15cd 15cd 15cd 15cd
CONNECT TO EXISTING SPEAKER/STROBE
CIRCUITS IN AREA PROVIDE ALL CONDUIT, WIRE
ETC AS REQUIRED.
FIRE ALARM RISER DIAGRAM
N.T.S.
15cdEXISTING SPEAKER STROBE
TO BE REPLACED WITH NEW AT
SAME LOCATION
SEQUENCE OF OPERATION
SY
ST
EM
T
RO
UB
LE
A
T F
AC
P
SY
ST
EM
T
RO
UB
LE
A
T F
AA
P
IN
IT
IA
TE
A
UD
IB
LE
&
V
IS
IB
LE
IN
IT
IA
TE
A
UD
IB
LE
&
V
IS
IB
LE
AC
TIV
AT
E A
LL
SE
ND
S
IG
NA
L T
O
RE
CA
LL
E
LE
VA
TO
R
RE
CA
LL
E
LE
VA
TO
R
SH
UN
T T
RIP
SH
UT
D
OW
N A
IR
RE
LE
AS
E D
OO
R H
OL
DE
RS
TE
RM
IN
AT
E P
OW
ER
T
O A
CC
ES
S
AL
AR
M S
IG
NA
L A
T F
AC
P
IN
IT
IA
TE
A
UD
IB
LE
&
V
IS
IB
LE
AL
AR
M S
IG
NA
L A
T F
AA
P
SU
PE
RV
IS
OR
Y S
IG
NA
L A
T F
AC
P
IN
IT
IA
TE
A
UD
IB
LE
&
V
IS
IB
LE
SU
PE
RV
IS
OR
Y S
IG
NA
L A
T F
AA
P
NO
TIF
IC
AT
IO
N D
EV
IC
ES
CE
NT
RA
L M
ON
IT
OR
IN
G S
TA
TIO
N
TO
P
RIM
AR
Y L
EV
EL
TO
S
EC
ON
DA
RY
L
EV
EL
EL
EV
AT
OR
C
ON
TR
OL
LE
R
DIS
TR
IB
UT
IO
N S
YS
TE
M
CO
NT
RO
L D
OO
R E
QU
IP
ME
NT
SYSTEM TROUBLE
WATER FLOW
TAMPER
PULL STATION
DUCT SMOKE DETECTOR
SMOKE DETECTOR
ELEVATOR LOBBY SMOKE
DETECTOR EXIT LEVEL
ELEVATOR LOBBY SMOKE DETECTOR
OTHER THAN EXIT LEVEL
ELEVATOR EQUIPMENT ROOM
SMOKE DETECTOR
SMOKE DETECTOR
ELEVATOR TOP SHAFT
ELEVATOR EQUIPMENT ROOM
HEAT DETECTOR
AC
TIV
AT
E F
IR
EM
AN
'S
H
AT
CL
OS
E A
LL
A
FF
EC
TE
D
FIR
E S
MO
KE
D
AM
PE
RS
NOTE:
SOME DEVICES SHOWN MAY NOT APPLY TO THIS PROJECT.
15cd
4. COORDINATE INSTALLATION OF FIRE ALARM EQUIPMENT WITH BASE
BUILDING FIRE ALARM VENDOR
FR
FR
15cd
FR
HV
ICE
AC
ICE
48 LEVEL
EVENT LEVEL
INTERCONNECT DUCT SMOKE DETECTOR
WITH FIRE ALARM SYSTEM TO SHUT DOWN
UNIT UPON ACTIVATION OF ANY FIRE ALARM
DEVICE. (TYP)
FIRE ALARM RELAY
FIRE/SMOKE DETECTOR
SPEAKER/STROBE
EXISTING SPEAKER/STROBE
FIRE ALARM SYMBOLS
PULL STATION
FR
EXISTING FIRE ALARM
PANEL LOCATED
AT SECURITY OFFICE
FR FR
FOR SPRINKLER DRY VALVE
S R
DUCT SMOKE DETECTOR
"S" DENOTES SUPPLY
"R" DENOTES RETURN
EXISTING ANNUNICATOR PANEL
RELOCATED
PROJ. NO.
DWG. No.SCALE
DWG. TITLE
DATE PLOTTED
CHECKED
DRAWN
REVISIONS/ISSUES
DO NOT SCALE THE DRAWINGS
DESCRIPTION DATE
1605.05-3
CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND REPORT ANY OMISSIONS OR
DISCREPANCIES TO THE ARCHITECT BEFORE
PROCEEDING WITH THE WORK.
SEAL
G:\xl center ice chiller - dv18025.01\C
AD
\F
ire A
larm
\F
A-600.00_D
V18025.01.dw
g
06 M
ar '19 - 11:04am
FIL
EN
AM
E:
PL
OT
DA
TE
:
XR
EF
S:
12 FEB 2019
XL CENTER
Tel (416) 591 8999 Fax(416) 591 9087
14 Duncan Street 4th Floor
Toronto, Ontario, CA M5H 3G8
Tel (212) 986 3700 Fax (212) 687 6467
CO N S U L T I N G E N G I N E E R S P. C.
CONSULTING ENGINEERS
Tel (310) 842 8700 Fax (310) 842 7700
Severud Associates
engineers
1 CIVIC CENTER PLAZA
HARTFORD, CT
CHILLER PLANTRELOCATION
ISSUED FOR BID2019-02-13
1
AS NOTED
ME
ME
FA-600.00
FIRE ALARM RISER
DIAGRAM