Dimension A
Hinges Available from Manufacturer
EZC CLASSIC ADJUSTDOOR FRAME(FOR 44mm DOORS)
20 GAUGE EZYJAMB TRIMLESS DOOR FRAME(FOR 44mm DOORS)
STANDARD STRIKE PLATE HEIGHT FROM FINISHEDFLOOR TO CENTERLINE:for for 2040mm door, 910mmfor 2400mm door, 960mm
|
PLASTERBOARD
PLASTERBOARD
STEEL DOORFRAME
(EVERY 200mm)
PLASTERBOARD
DOUBLE
TYPICAL CORNER ASSEMBLY
STRIKE OPTIONS:
TYPICAL T-STRIKEASSEMBLY
3mm
3mm
INSTALLATION DETAIL
1. INVISIBLE TYPE:RocYork RY-30, RY-45, RY-50, RY-80Tectus 340Soss 216 & 416 2. EZY-JAMB STANDARD HINGESAll standard hinges are surface applied
4” Stainless Steel (SS)4” Satin Chrome (SC)4” Oil Rubbed Bronze (OB)
Specifications20 Gauge galvanneal steel door frame adjustable for wall thicknesses upto 225mm.
Fire Rated for upto US 90minute.UK FD30 andFD60 pending
4-7/8" ASA Strike2-3/4" T-Strike2-3/4" Deadbolt Strike
EZY
UK
_EZC
_SD
_011
7
Information contained within this document supersedes all previous versions and is subject to change without notice. 1/1
For Sales and Technical Enquiries, please contact Ezyjamb UK T: 02034889655 | E: [email protected] | W: www.ezyjamb.co.uk
ImportantThe manufacturer strongly recommends timber studs or a minimum 0.75 BMT metal stud on both sides of the opening.
Ensure that the frame opening is square, level, and measures:
• Single Door width +15mm maximum• Double Door width +18mm maximum• Door height +8mm at header +25mm at floor level.
(Depending on floor clearance. Check with the project manager on site to confirm floor coverings.)
SCAN CODE TO VIEW INSTALLATION VIDEO
EzyJamb EZC Installation Instructions
Step 1
For Sales and Technical Inquiries, please contact EZ Concept AustraliaT: (03) 9737 2500 | E: [email protected] | W: ezconcept.com.au
CLEAN LINES!… The Flush Finish Door Jamb System
Step 1
Ensure that the stud opening is square and level and measures:• Single Door width +15mm maximum• Double Door width +18mm maximum• Door height +8mm at header +25mm at floor level (depending on floor clearance. Check with the Project Manager on site to confirm floor coverings.)
Important: The manufacturer strongly recommends a timber stud or a 0.75 BMT metal stud on both sides of the opening.
DOOR WIDTH + 15mmPLASTERBOARD SURFACE
DOOR OPENING
FLOOR LEVEL
Elevation
Step 2
Fasten hinge side first, making sure jamb is level and as tight against stud opening as possible. Then screw at 200mm centers up stile, screwing back through plasterboard into stud work See Detail 'B' and 'C'. Double screw all ends as Detail D. and beside hinge position - both above and below hinge as Detail E.
Elevation
PLASTERBOARDSCREW
WOOD OR STEEL STUD
EZYJAMB
JAMB DETAIL DETAIL "D"
"D"
"E"
LEVEL
200mm(8")
DETAIL "C"
"B"
DETAIL "E"
FLOOR LEVEL
SEE STEP 2A
DOOR HEIGHT + 33MM
(+ 8mmat header,+25mm
at floor level)
Installation Instructions
EZY
_IN
STI
_161
2201
5
www.ezconcept.co.uk Phone 020 3488 9655
Step 1Ensure that the structural opening is square, level, and is the correct size.
Manufactured by STUDCO Building Systems
SCAN CODE TO VIEW INSTALLATION VIDEO
EZYJAMB EZC INSTALLATION INSTRUCTIONSStep 2
• Fasten hinge side first, making sure jamb is level andas tight against stud opening as possible. • Then screw at 200mm centers up stile, screwing backthrough drywall into stud jamb. • Double screw all ends as Detail D. and beside hingeposition - both above and below hinge if using concealedhinges as Detail E.
Elevation
SCREW
DOUBLE WOOD ORSTEEL STUD
DOUBLE WOOD ORSTEEL STUD
EZY JAMB
EZY JAMBEZY JAMB
DOOR
JAMB DETAIL DETAIL "D"
"D"
"E"
LEVEL
200mm
DETAIL "C"
"B"
DETAIL "E"
FLOOR LEVEL
Step 2AHead Installation Instructions
Head joiner as inserted in jamb.
Locate head into joiner and make flush with jamb so thehead joiner is not seen.
Remove the remaining head joiner out of the strike jamb intothe end of the head (as shown) to receive the strike jamb.
2A
FRAME WIDTH + 15mmFOR STRUCTURAL OPENING
OPENING
FLOOR LEVEL
Elevation
FRAMEHEIGHT + 10mm
FORSTRUCTURAL
OPENING
3mm
DRYWALL
Important: Important:
When installing the Astra Concealed closer it is important to double screw above and below the closer and add extra �xings to the side of the closer.
Make sure the structural opening has double studs,the manufacturer strongly recommends wood studs or a minimum 20 gauge .030 metal studs on both sides of the opening. UK Fire Standards require no more than 3mm gap around the top and sides of the door, please take this into consideration when installing EZY Jamb. The provided instructions allow for this, leaving the required minimum clearance of 5mm at the bottom of the door.
www.ezconcept.co.uk Phone 020 3488 9655
Step 1Ensure that the structural opening is square, level, and is the correct size.
Manufactured by STUDCO Building Systems
SCAN CODE TO VIEW INSTALLATION VIDEO
EZYJAMB EZC INSTALLATION INSTRUCTIONSStep 2
• Fasten hinge side first, making sure jamb is level andas tight against stud opening as possible. • Then screw at 200mm centers up stile, screwing backthrough drywall into stud jamb. • Double screw all ends as Detail D. and beside hingeposition - both above and below hinge if using concealedhinges as Detail E.
Elevation
SCREW
DOUBLE WOOD ORSTEEL STUD
DOUBLE WOOD ORSTEEL STUD
EZY JAMB
EZY JAMBEZY JAMB
DOOR
JAMB DETAIL DETAIL "D"
"D"
"E"
LEVEL
200mm
DETAIL "C"
"B"
DETAIL "E"
FLOOR LEVEL
Step 2AHead Installation Instructions
Head joiner as inserted in jamb.
Locate head into joiner and make flush with jamb so thehead joiner is not seen.
Remove the remaining head joiner out of the strike jamb intothe end of the head (as shown) to receive the strike jamb.
2A
FRAME WIDTH + 15mmFOR STRUCTURAL OPENING
OPENING
FLOOR LEVEL
Elevation
FRAMEHEIGHT + 10mm
FORSTRUCTURAL
OPENING
3mm
DRYWALL
Important: Important:
When installing the Astra Concealed closer it is important to double screw above and below the closer and add extra �xings to the side of the closer.
Make sure the structural opening has double studs,the manufacturer strongly recommends wood studs or a minimum 20 gauge .030 metal studs on both sides of the opening. UK Fire Standards require no more than 3mm gap around the top and sides of the door, please take this into consideration when installing EZY Jamb. The provided instructions allow for this, leaving the required minimum clearance of 5mm at the bottom of the door.
www.ezconcept.co.uk Phone 020 3488 9655
Step 1Ensure that the structural opening is square, level, and is the correct size.
Manufactured by STUDCO Building Systems
SCAN CODE TO VIEW INSTALLATION VIDEO
EZYJAMB EZC INSTALLATION INSTRUCTIONSStep 2
• Fasten hinge side first, making sure jamb is level andas tight against stud opening as possible. • Then screw at 200mm centers up stile, screwing backthrough drywall into stud jamb. • Double screw all ends as Detail D. and beside hingeposition - both above and below hinge if using concealedhinges as Detail E.
Elevation
SCREW
DOUBLE WOOD ORSTEEL STUD
DOUBLE WOOD ORSTEEL STUD
EZY JAMB
EZY JAMBEZY JAMB
DOOR
JAMB DETAIL DETAIL "D"
"D"
"E"
LEVEL
200mm
DETAIL "C"
"B"
DETAIL "E"
FLOOR LEVEL
Step 2AHead Installation Instructions
Head joiner as inserted in jamb.
Locate head into joiner and make flush with jamb so thehead joiner is not seen.
Remove the remaining head joiner out of the strike jamb intothe end of the head (as shown) to receive the strike jamb.
2A
FRAME WIDTH + 15mmFOR STRUCTURAL OPENING
OPENING
FLOOR LEVEL
Elevation
FRAMEHEIGHT + 10mm
FORSTRUCTURAL
OPENING
3mm
DRYWALL
Important: Important:
When installing the Astra Concealed closer it is important to double screw above and below the closer and add extra �xings to the side of the closer.
Make sure the structural opening has double studs,the manufacturer strongly recommends wood studs or a minimum 20 gauge .030 metal studs on both sides of the opening. UK Fire Standards require no more than 3mm gap around the top and sides of the door, please take this into consideration when installing EZY Jamb. The provided instructions allow for this, leaving the required minimum clearance of 5mm at the bottom of the door.
www.ezconcept.co.uk Phone 020 3488 9655
Step 1Ensure that the structural opening is square, level, and is the correct size.
Manufactured by STUDCO Building Systems
SCAN CODE TO VIEW INSTALLATION VIDEO
EZYJAMB EZC INSTALLATION INSTRUCTIONSStep 2
• Fasten hinge side first, making sure jamb is level andas tight against stud opening as possible. • Then screw at 200mm centers up stile, screwing backthrough drywall into stud jamb. • Double screw all ends as Detail D. and beside hingeposition - both above and below hinge if using concealedhinges as Detail E.
Elevation
SCREW
DOUBLE WOOD ORSTEEL STUD
DOUBLE WOOD ORSTEEL STUD
EZY JAMB
EZY JAMBEZY JAMB
DOOR
JAMB DETAIL DETAIL "D"
"D"
"E"
LEVEL
200mm
DETAIL "C"
"B"
DETAIL "E"
FLOOR LEVEL
Step 2AHead Installation Instructions
Head joiner as inserted in jamb.
Locate head into joiner and make flush with jamb so thehead joiner is not seen.
Remove the remaining head joiner out of the strike jamb intothe end of the head (as shown) to receive the strike jamb.
2A
FRAME WIDTH + 15mmFOR STRUCTURAL OPENING
OPENING
FLOOR LEVEL
Elevation
FRAMEHEIGHT + 10mm
FORSTRUCTURAL
OPENING
3mm
DRYWALL
Important: Important:
When installing the Astra Concealed closer it is important to double screw above and below the closer and add extra �xings to the side of the closer.
Make sure the structural opening has double studs,the manufacturer strongly recommends wood studs or a minimum 20 gauge .030 metal studs on both sides of the opening. UK Fire Standards require no more than 3mm gap around the top and sides of the door, please take this into consideration when installing EZY Jamb. The provided instructions allow for this, leaving the required minimum clearance of 5mm at the bottom of the door.
Head Installation Instructions
2A
• Fasten hinge side first, making sure jamb is level and as tight against stud opening as possible.
• Then screw at 200mm centers up stile, screwing back through plasterboard into stud work. See detail B
• Double screw all ends as Detail D. and beside hinge position - both above and below hinge if using concealed hinges as Detail E.
Step 2 Step 2A
Head joiner as inserted in jamb.
Locate head into joiner and make flush with jamb so the head joiner is not seen.
Remove the remaining head joiner out of the strike jamb intothe end of the head (as shown) to receive the strike jamb.
CLEAN LINES!… The Flush Finish Door Jamb System
Step 1
Ensure that the stud opening is square and level and measures:• Single Door width +15mm maximum• Double Door width +18mm maximum• Door height +8mm at header +25mm at floor level (depending on floor clearance. Check with the Project Manager on site to confirm floor coverings.)
Important: The manufacturer strongly recommends a timber stud or a 0.75 BMT metal stud on both sides of the opening.
DOOR WIDTH + 15mmPLASTERBOARD SURFACE
DOOR OPENING
FLOOR LEVEL
Elevation
Step 2
Fasten hinge side first, making sure jamb is level and as tight against stud opening as possible. Then screw at 200mm centers up stile, screwing back through plasterboard into stud work See Detail 'B' and 'C'. Double screw all ends as Detail D. and beside hinge position - both above and below hinge as Detail E.
Elevation
PLASTERBOARDSCREW
WOOD OR STEEL STUD
EZYJAMB
JAMB DETAIL DETAIL "D"
"D"
"E"
LEVEL
200mm(8")
DETAIL "C"
"B"
DETAIL "E"
FLOOR LEVEL
SEE STEP 2A
DOOR HEIGHT + 33MM
(+ 8mmat header,+25mm
at floor level)
Installation Instructions
EZY
_IN
STI
_161
2201
5
EzyJ
amb
EZC
Inst
alla
tion
Inst
ruct
ions
EZ
_AU
_II_
WB_
JAN
18
www.ezconcept.co.uk Phone 020 3488 9655
Installation Detail
Information printed in this document or communicated by the designers, manufacturers, distributors or any agent issubject to change without notice to allow further development in design, manufacture and technology.
Step 4Insure the perforated side strips sit flat against thedrywall to enable the jamb sections to be easily plasteredinto the wall surface. All the corners must beplaster taped and plastered in as Detail F.Finish the jamb with drywall compound. Hang the door inposition leaving about 3mm clearance from the top andthe hinged side using the Ezy Jamb Standard or InvisibleHinges. Surface mount the striker plate into position toalign with the latch plate punching.
FLOOR LEVEL
DOOR
DETAIL"F"
DRYWALL
EZY JAMB
DOOR
3mm DRYWALL
DOUBLE STUD
3mm
SET INTO WALLSURFACE
Elevation
Step 3Fasten the final vertical section (strike jamb) below the headsection. Insure that the spacing between the two verticalsections are spaced evenly at the required distance.
FLOOR LEVEL
Elevation
EQUAL DISTANCE
EQUAL DISTANCE
EQUAL DISTANCE
STRIKE PLATE INSTALLATION DETAIL
TYPICAL T-STRIKEASSEMBLY
Fasten the final vertical section (strike jamb) below the headsection. Ensure that the spacing between the two verticalsections are spaced evenly at the required distance.
ie: 820 door, spacing is 825mm 720 door, spacing is 725mm
Step 3
For Sales and Technical Inquiries, please contact EZ Concept AustraliaT: (03) 9737 2500 | E: [email protected] | W: ezconcept.com.au
Step 2A
Head Installation Instructions
Head joiner as inserted in jamb.
Locate head into joiner and make flush with jamb so the head joiner is not seen.
Remove the remaining head joiner out of the strike jamb into the end of the head (as shown) to receive the strike jamb.
Step 3
Fasten the final vertical section (strike jamb)below the head section. Ensure that the spacing between the two vertical sections are spaced evenly at the required distance.
ie: 820 door, spacing is 825mm 720 door, spacing is 725mm
FLOOR LEVEL
Elevation
EQUAL DISTANCE
EQUAL DISTANCE
EQUAL DISTANCE
EXAMPLE OF 820mm DOOR - 825mm
EZY
_IN
STI
_161
2201
5
EZY
_IN
STI
_161
2201
5
Ensure the perforated side strips sit flat against the plasterboard to enable the jamb sections to be easily plastered into the wall surface.
All the corners must be paper taped and plastered in as Detail F.
Finish the jamb with plasterboard compound. Hang the door inposition leaving about 3mm clearance from the top and the hinged side using the EzyJamb Standard or Invisible Hinges.
Surface mount the striker plate into position to align with the latch plate punching.
Lift-Off Hinge Options
Step 4
SP
EC
DA
TA
Version
Dimension A
Hinges Available from Manufacturer
EZC CLASSIC ADJUSTDOOR FRAME(FOR 44mm DOORS)
20 GAUGE EZYJAMB TRIMLESS DOOR FRAME(FOR 44mm DOORS)
STANDARD STRIKE PLATE HEIGHT FROM FINISHEDFLOOR TO CENTERLINE:for for 2040mm door, 910mmfor 2400mm door, 960mm
|
PLASTERBOARD
PLASTERBOARD
STEEL DOORFRAME
(EVERY 200mm)
PLASTERBOARD
DOUBLE
TYPICAL CORNER ASSEMBLY
STRIKE OPTIONS:
TYPICAL T-STRIKEASSEMBLY
3mm
3mm
INSTALLATION DETAIL
1. INVISIBLE TYPE:RocYork RY-30, RY-45, RY-50, RY-80Tectus 340Soss 216 & 416 2. EZY-JAMB STANDARD HINGESAll standard hinges are surface applied
4” Stainless Steel (SS)4” Satin Chrome (SC)4” Oil Rubbed Bronze (OB)
Specifications20 Gauge galvanneal steel door frame adjustable for wall thicknesses upto 225mm.
Fire Rated for upto US 90minute.UK FD30 andFD60 pending
4-7/8" ASA Strike2-3/4" T-Strike2-3/4" Deadbolt Strike
EZY
UK
_EZC
_SD
_011
7
Information contained within this document supersedes all previous versions and is subject to change without notice. 1/1
For Sales and Technical Enquiries, please contact Ezyjamb UK T: 02034889655 | E: [email protected] | W: www.ezyjamb.co.uk
www.ezconcept.co.uk Phone 020 3488 9655
Installation Detail
Information printed in this document or communicated by the designers, manufacturers, distributors or any agent issubject to change without notice to allow further development in design, manufacture and technology.
Step 4Insure the perforated side strips sit flat against thedrywall to enable the jamb sections to be easily plasteredinto the wall surface. All the corners must beplaster taped and plastered in as Detail F.Finish the jamb with drywall compound. Hang the door inposition leaving about 3mm clearance from the top andthe hinged side using the Ezy Jamb Standard or InvisibleHinges. Surface mount the striker plate into position toalign with the latch plate punching.
FLOOR LEVEL
DOOR
DETAIL"F"
DRYWALL
EZY JAMB
DOOR
3mm DRYWALL
DOUBLE STUD
3mm
SET INTO WALLSURFACE
Elevation
Step 3Fasten the final vertical section (strike jamb) below the headsection. Insure that the spacing between the two verticalsections are spaced evenly at the required distance.
FLOOR LEVEL
Elevation
EQUAL DISTANCE
EQUAL DISTANCE
EQUAL DISTANCE
STRIKE PLATE INSTALLATION DETAIL
TYPICAL T-STRIKEASSEMBLY
Installation Detail
CLEAN LINES!… The Flush Finish Door Jamb System
Step 4
Ensure the perforated side strips sit flat against the plasterboard to enable the jamb sections to be easily set into the wall surface. All the corners must be taped and plastered/jointed in as Detail F. Finish the jamb with approved plaster/jointing compound. Hang the door in position leaving about 3mm clearance from the top and the hinged side using the EZYJamb Standard or Invisible Hinges. Surface mount the striker plate into position to align with the latch plate punching.
200mm
PLASTERBOARD
WOOD OR STEEL WALL
STUD
SCREW FASTEN ONLY
REINFORCEDROLLED EDGE PERFORATED
SIDE STRIPSADJUSTABLE SIDE SECTION FRICTION FITTED TO STOP
STEEL JAMB
DOOR
HINGE
PLASTER/JOINTING COMPOUND
VARYING SIZES
SCREWSLATCH PLATE
LATCH PLATE INSERT
Standard Herline EZYJamb Lift-Off hinges Rocyork concealed hinges
For all semi solid and solid core doors, outerleaf of hinge must be fixed to stile so that at least two screws are fixed back to the walls’ primary structure.
Installation Detail
Hinges Available
PLASTER
HINGE
DOOR
SCREW BACKTO SUBSTRATE
STEEL JAMB
SCREW FIXING ONLY
TIMBER OR STEEL WALL
STUD
FLOOR LEVEL
DOOR
DETAIL"F"
PLASTERBOARD
EZYJAMB
DOOR
3mm PLASTERBOARD
STUD
3mm
Elevation
SET INTO WALL SURFACE
2008
SCREWS
EZY
_IN
STI
_161
2201
5
SP
EC
DA
TA
Version
Dimension A
Hinges Available from Manufacturer
EZC CLASSIC ADJUSTDOOR FRAME(FOR 44mm DOORS)
20 GAUGE EZYJAMB TRIMLESS DOOR FRAME(FOR 44mm DOORS)
STANDARD STRIKE PLATE HEIGHT FROM FINISHEDFLOOR TO CENTERLINE:for for 2040mm door, 910mmfor 2400mm door, 960mm
|
PLASTERBOARD
PLASTERBOARD
STEEL DOORFRAME
(EVERY 200mm)
PLASTERBOARD
DOUBLE
TYPICAL CORNER ASSEMBLY
STRIKE OPTIONS:
TYPICAL T-STRIKEASSEMBLY
3mm
3mm
INSTALLATION DETAIL
1. INVISIBLE TYPE:RocYork RY-30, RY-45, RY-50, RY-80Tectus 340Soss 216 & 416 2. EZY-JAMB STANDARD HINGESAll standard hinges are surface applied
4” Stainless Steel (SS)4” Satin Chrome (SC)4” Oil Rubbed Bronze (OB)
Specifications20 Gauge galvanneal steel door frame adjustable for wall thicknesses upto 225mm.
Fire Rated for upto US 90minute.UK FD30 andFD60 pending
4-7/8" ASA Strike2-3/4" T-Strike2-3/4" Deadbolt Strike
EZY
UK
_EZC
_SD
_011
7
Information contained within this document supersedes all previous versions and is subject to change without notice. 1/1
For Sales and Technical Enquiries, please contact Ezyjamb UK T: 02034889655 | E: [email protected] | W: www.ezyjamb.co.uk
CLEAN LINES!… The Flush Finish Door Jamb System
Step 4
Ensure the perforated side strips sit flat against the plasterboard to enable the jamb sections to be easily set into the wall surface. All the corners must be taped and plastered/jointed in as Detail F. Finish the jamb with approved plaster/jointing compound. Hang the door in position leaving about 3mm clearance from the top and the hinged side using the EZYJamb Standard or Invisible Hinges. Surface mount the striker plate into position to align with the latch plate punching.
200mm
PLASTERBOARD
WOOD OR STEEL WALL
STUD
SCREW FASTEN ONLY
REINFORCEDROLLED EDGE PERFORATED
SIDE STRIPSADJUSTABLE SIDE SECTION FRICTION FITTED TO STOP
STEEL JAMB
DOOR
HINGE
PLASTER/JOINTING COMPOUND
VARYING SIZES
SCREWSLATCH PLATE
LATCH PLATE INSERT
Standard Herline EZYJamb Lift-Off hinges Rocyork concealed hinges
For all semi solid and solid core doors, outerleaf of hinge must be fixed to stile so that at least two screws are fixed back to the walls’ primary structure.
Installation Detail
Hinges Available
PLASTER
HINGE
DOOR
SCREW BACKTO SUBSTRATE
STEEL JAMB
SCREW FIXING ONLY
TIMBER OR STEEL WALL
STUD
FLOOR LEVEL
DOOR
DETAIL"F"
PLASTERBOARD
EZYJAMB
DOOR
3mm PLASTERBOARD
STUD
3mm
Elevation
SET INTO WALL SURFACE
2008
SCREWS
EZY
_IN
STI
_161
2201
5
TYPICALSTRIKER PLATE ASSEMBLY
CLEAN LINES!… The Flush Finish Door Jamb System
Step 4
Ensure the perforated side strips sit flat against the plasterboard to enable the jamb sections to be easily set into the wall surface. All the corners must be taped and plastered/jointed in as Detail F. Finish the jamb with approved plaster/jointing compound. Hang the door in position leaving about 3mm clearance from the top and the hinged side using the EZYJamb Standard or Invisible Hinges. Surface mount the striker plate into position to align with the latch plate punching.
200mm
PLASTERBOARD
WOOD OR STEEL WALL
STUD
SCREW FASTEN ONLY
REINFORCEDROLLED EDGE PERFORATED
SIDE STRIPSADJUSTABLE SIDE SECTION FRICTION FITTED TO STOP
STEEL JAMB
DOOR
HINGE
PLASTER/JOINTING COMPOUND
VARYING SIZES
SCREWSLATCH PLATE
LATCH PLATE INSERT
Standard Herline EZYJamb Lift-Off hinges Rocyork concealed hinges
For all semi solid and solid core doors, outerleaf of hinge must be fixed to stile so that at least two screws are fixed back to the walls’ primary structure.
Installation Detail
Hinges Available
PLASTER
HINGE
DOOR
SCREW BACKTO SUBSTRATE
STEEL JAMB
SCREW FIXING ONLY
TIMBER OR STEEL WALL
STUD
FLOOR LEVEL
DOOR
DETAIL"F"
PLASTERBOARD
EZYJAMB
DOOR
3mm PLASTERBOARD
STUD
3mm
Elevation
SET INTO WALL SURFACE
2008
SCREWS
EZY
_IN
STI
_161
2201
5
CLEAN LINES!… The Flush Finish Door Jamb System
Step 4
Ensure the perforated side strips sit flat against the plasterboard to enable the jamb sections to be easily set into the wall surface. All the corners must be taped and plastered/jointed in as Detail F. Finish the jamb with approved plaster/jointing compound. Hang the door in position leaving about 3mm clearance from the top and the hinged side using the EZYJamb Standard or Invisible Hinges. Surface mount the striker plate into position to align with the latch plate punching.
200mm
PLASTERBOARD
WOOD OR STEEL WALL
STUD
SCREW FASTEN ONLY
REINFORCEDROLLED EDGE PERFORATED
SIDE STRIPSADJUSTABLE SIDE SECTION FRICTION FITTED TO STOP
STEEL JAMB
DOOR
HINGE
PLASTER/JOINTING COMPOUND
VARYING SIZES
SCREWSLATCH PLATE
LATCH PLATE INSERT
Standard Herline EZYJamb Lift-Off hinges Rocyork concealed hinges
For all semi solid and solid core doors, outerleaf of hinge must be fixed to stile so that at least two screws are fixed back to the walls’ primary structure.
Installation Detail
Hinges Available
PLASTER
HINGE
DOOR
SCREW BACKTO SUBSTRATE
STEEL JAMB
SCREW FIXING ONLY
TIMBER OR STEEL WALL
STUD
FLOOR LEVEL
DOOR
DETAIL"F"
PLASTERBOARD
EZYJAMB
DOOR
3mm PLASTERBOARD
STUD
3mm
Elevation
SET INTO WALL SURFACE
2008
SCREWS
EZY
_IN
STI
_161
2201
5
EZYJamb lift-off hinges allow forremoval of a hinged door withouthaving to unscrew the hinges.The lift-off hinges are finished inbrushed stainless steel for a look withclass and style and are easy to fit.Lift-off Hinges are available in bothleft and right handing andrecommended for internal use.
The Lift-off channelsupplied is designedto fit over the headerstop and affixed withconstruction adhesive.
STEP 1
INSTALLATION INSTRUCTIONS
ELEVATION
ENSURE THAT THE DOOR OPENING ISSQUARE AND PLUMB AND MEASURES:• Door width + 15mm maximum• Door height + 33mm
(depending on floor clearance)
Manufactured by STUDCO AUSTRALIA PTY LTD
www.ezyjamb.com.auT: 1300 399 5262
STEP 4
ELEVATION
Ensure the perforated side strips sit flat against theplaster to enable the jamb sections to be easily setinto the wall surface. ALL THE CORNERS MUSTBE PAPER TAPED AND SET IN AS Detail D.
Set jamb with approved plaster compound. Hangthe door in position leaving about 2mm clearancefrom the top and the hinged side using the EZYJambHirline Hinge.
Surface mount the striker plate into position to alignwith the latch plate punching.
INSTALLATION DETAIL
Information printed in this document or communicated by the designers, manufacturers, distributors or any agent is subject to change without notice to allow further development in design, manufacture and technology.
EZYJamb lift-off hinges allow for removal of a hinged door without having to unscrew the hinges. The lift-off hinges are finished in brushed stainless steel for a look with class and style and are easy to fit.Lift-off Hinges are available in both left and right handing and recommended for internal use.
The Lift-off channel supplied is designed to fit over the header stop and affixed with construction adhesive.
EZYJamb
Lift-off Channel Lift-off Channel Installed
Right (AUSTRALIAN HANDING)
Left (AUSTRALIAN HANDING)
LIFT-OFF HINGE OPTION
(+ 8mmat header,+25mm
at floor level)
STEP 1
INSTALLATION INSTRUCTIONS
ELEVATION
ENSURE THAT THE DOOR OPENING ISSQUARE AND PLUMB AND MEASURES:• Door width + 15mm maximum• Door height + 33mm
(depending on floor clearance)
Manufactured by STUDCO AUSTRALIA PTY LTD
www.ezyjamb.com.auT: 1300 399 5262
STEP 4
ELEVATION
Ensure the perforated side strips sit flat against theplaster to enable the jamb sections to be easily setinto the wall surface. ALL THE CORNERS MUSTBE PAPER TAPED AND SET IN AS Detail D.
Set jamb with approved plaster compound. Hangthe door in position leaving about 2mm clearancefrom the top and the hinged side using the EZYJambHirline Hinge.
Surface mount the striker plate into position to alignwith the latch plate punching.
INSTALLATION DETAIL
Information printed in this document or communicated by the designers, manufacturers, distributors or any agent is subject to change without notice to allow further development in design, manufacture and technology.
EZYJamb lift-off hinges allow for removal of a hinged door without having to unscrew the hinges. The lift-off hinges are finished in brushed stainless steel for a look with class and style and are easy to fit.Lift-off Hinges are available in both left and right handing and recommended for internal use.
The Lift-off channel supplied is designed to fit over the header stop and affixed with construction adhesive.
EZYJamb
Lift-off Channel Lift-off Channel Installed
Right (AUSTRALIAN HANDING)
Left (AUSTRALIAN HANDING)
LIFT-OFF HINGE OPTION
(+ 8mmat header,+25mm
at floor level)
EzyJ
amb
EZC
Inst
alla
tion
Inst
ruct
ions
EZ
_AU
_II_
WB_
JAN
18