PROJECT : DESIGN & CONSTRUCT ALWAKRAH BYPASS ROAD P015 , DOHA-QATAR
PROJECT ID: IA 12/13 C 049 STITP No.:
EXW-P015-0000-QM-LNT-IT-00066 Rev CB
Inspection & Test Plan: 3x220kV DUCT CROSSING AT 11+125 Page 1 of 4
Sl
Description of works/activity/characteristics
Applicable specification and clause reference
Type of Check
Frequency ofinspection
and/or testing
Acceptance Criteria The verifying records
Level of Control Required Responsibility for signature(s)
on verifying records
Sub C
L&T ENGTPI/TPL
Legends L&T = Larsen & Toubro Limited – Infrastructure IC
SE = Section Engineer/Site Engineer
ME = Material EngineerNA = Not ApplicablePQP WP = Project Quality Plan Procedure
Level of Control:
KM- KHARAMAA SIS - Service Information SheetPTW- Permit to Work
DR = Document ReviewT = Test ConductionMTC = Manufacturer Test CertificateMAN = Material Arrival Notification.DN = Delivery Note = Manufacturer Test Certificate
Sub C = Subcontractor QCE = QA/QC Engineer
QCM = QA/QC Manager H = activity to be inspected/ signed-off by relevant prior to the next activity
S = Surveillance
CM = Construction Manager, SM = Section Manager PE = Project Engineer
ENG = Engineer’s Representative
TPI/L = Third Party Inspection/Laboratory
W = activity may proceed with or without inspection by relevant party
C = Inspection ,Testing & Control on activity
(Applicable Method Statement: Method Statement - EXW-P015-0000-EE-LNT-MT-00103)
1 Prequalification of Subcontractor
PQP WP 10Document
ReviewBefore start of work
QCS 2010 :S1 :P7 & Project Specification
ENG approval
Transmittal Form
LTCD/QMS/PLAN/01
H H QCM /ME/ CM/SM and
ENG
2
Submission:2.1 Method Statement 2.2 Drawing – IFC/ Shop Drawing2.3 Material Submittal2.4 Stakeholders approvals2.5 Work Permits (prior to start related activity)
PQP WP 11 Document Review
Before start of work
Approval Consent from Engineer’s Representative
ENG approval
Transmittal Form
LTCD/QMS/PLAN/01
and Stakeholders Approval
C & H H HQCM /ME/ CM/SM and
ENG
3 MATERIAL INSPECTION & TESTING
QM-LNT-IT-00066-Rev.CB Date: 26.04.2015
PROJECT : DESIGN & CONSTRUCT ALWAKRAH BYPASS ROAD P015 , DOHA-QATAR
PROJECT ID: IA 12/13 C 049 STITP No.:
EXW-P015-0000-QM-LNT-IT-00066 Rev CB
Inspection & Test Plan: 3x220kV DUCT CROSSING AT 11+125 Page 2 of 4
Sl
Description of works/activity/characteristics
Applicable specification and clause reference
Type of Check
Frequency ofinspection
and/or testing
Acceptance Criteria The verifying records
Level of Control Required Responsibility for signature(s)
on verifying records
Sub C
L&T ENGTPI/TPL
3.1HDPE Pipes and Fittings, Joints
QCS 2010 Section 8, Part
3 Project Specification, Manufacturer
ITP
Document Review/Inspection and
Testing
MTC review for each delivery
As per QCS 2010 Section 21 Part 30,(as per applicability) and Project Specification
Test reports as per Supplier ITP
C & H H H
ME / QCE / QCM and
ENG
3.2 Lean Mix ConcreteApproved Shop /IFCDrawing
Mix Design Review of Supplier
Once for each Supplier
As per Approved Shop Drawing/IFC Drawing
Supplier’s Mix Design
C & H H H
3.3 Pulling RopeApproved Shop /IFCDrawing
MTC Review
Each SourceAs per Approved Shop Drawing/IFC Drawing
MTC C & H H H
3.4 Concrete SurroundApproved Shop /IFCDrawing
Mix Design Review of Supplier
Once for each Supplier
As per Approved Shop Drawing/IFC Drawing
Supplier’s Mix Design
C & H H H T
3.5
Selected Backfill from excavation or imported fill material (if applicable)
Approved Shop/IFC Drawing
Test1000 cubic meter
As per QCS 2010 S8:P2 & KM Standard, Approved Shop Drawing.
Test Report
C & H H H T
3.6 Warning Tape
As per QCS 2010 Section
21 Part 30 Cl 30.2.7
MTC Review
Each SourceAs per QCS 2010 Section 21 Part 30 Cl 30.2.7 and Drawing
Supplier’s Test Report
C & H H H
3.7 1000G Polythene sheetAs per QCS 2010
MTC Review
Each Source As per KHARAMAA StandardsSupplier’s Test Report C & H H H
3.8Storage & Handling of Pipe/Materials
QCS 2010Visual
inspectionEach Source
As per QCS 2010, KM Standards & Manufacturer’s Recommendation.
DN C & H H H
4 TRIAL HOLES (if Required) – Refer ITP QM-LNT-IT-00018
PE/SM/CM and ENG
5 TRENCH EXCAVATION
5.1Survey & Setting out works for alignment
Refer ITP : EXW-P015-0000-QM-LNT-IT-00051
QM-LNT-IT-00066-Rev.CB Date: 26.04.2015
PROJECT : DESIGN & CONSTRUCT ALWAKRAH BYPASS ROAD P015 , DOHA-QATAR
PROJECT ID: IA 12/13 C 049 STITP No.:
EXW-P015-0000-QM-LNT-IT-00066 Rev CB
Inspection & Test Plan: 3x220kV DUCT CROSSING AT 11+125 Page 3 of 4
Sl
Description of works/activity/characteristics
Applicable specification and clause reference
Type of Check
Frequency ofinspection
and/or testing
Acceptance Criteria The verifying records
Level of Control Required Responsibility for signature(s)
on verifying records
Sub C
L&T ENGTPI/TPL
5.2 Mark out line QCS 2010 S21:P30 Inspection
Ahead of trench excavation
Confirm the lines, dimension and depth as per approved shop drawing
Survey IR Form
C & H H HSurveyor & ENG
5.3Record of Existing Ground level
QCS 2010 S6:P1 Cl 1.3 IR
Every 50 meters
Survey IR Form
C & H H HSurveyor & ENG
5.4
Identification of utilities, Protect, Relocate, Demolition and removal of Existing utilities upon Approval from Authority
QCS 2010 S 2 P2, S6 P 11,
S8:P4Inspection
Ahead of trench excavation
Identify the existing utility and removal as per stakeholder requirements
IR Form C & H H H
PE/SM/CM/ ENG
5.5 Excavation QCS 2010 S 6 P3 Inspection Each section
Approved Shop drawing, method statement
IR Form C & H H W
5.6
Width , depth and bottom preparation of Trench and their side supporting if required
QCS 2010 S:8 P:2 Cl
2.2.6
Visual Inspection/Test/Measuremen
t/IR Survey
After Trench Excavation
Firm Bottom as per Approved Shop Drawing having 95% compaction of MDD if strata is soil
Approved Shop Drawing/FDT Report
C & H H H T
6 DEWATERING IF APPLICABLE : Refer ITP: EXW-P015-0000-QM-LNT-IT-00055
7 DUCT BANK/ SLEEVE PIPE INSTALLATION
7.1
Filling the extra excavation depth with Flow able Lean Mix Concrete & Inspection
Approved Shop Drawing
DR Each DNFlow able Mix specification and as per Approved Shop Drawing
DN C & H H W
7.2Bedding Preparation & Inspection
Approved Shop Drawing
Inspection/ Test
One SectionAs per Approved Shop Drawing, Compaction with Plate compactor
IR-Works C & H H H
7.3HDPE Pipe laying, joining with concrete cradle support.
Approved Shop Drawing
Temperature, Pressure with
TimeEach joint
Approved Method Statement/ Manufacture’s recommendation
IR-Survey C & H H SSurveyor &
ENG
7.4 Duct Profile Approved Shop Drawing
Inspection Each Section Approved Method Statement IR-Survey C & H H H
QM-LNT-IT-00066-Rev.CB Date: 26.04.2015
PROJECT : DESIGN & CONSTRUCT ALWAKRAH BYPASS ROAD P015 , DOHA-QATAR
PROJECT ID: IA 12/13 C 049 STITP No.:
EXW-P015-0000-QM-LNT-IT-00066 Rev CB
Inspection & Test Plan: 3x220kV DUCT CROSSING AT 11+125 Page 4 of 4
Sl
Description of works/activity/characteristics
Applicable specification and clause reference
Type of Check
Frequency ofinspection
and/or testing
Acceptance Criteria The verifying records
Level of Control Required Responsibility for signature(s)
on verifying records
Sub C
L&T ENGTPI/TPL
7.5Pulling Rope placing in side duct while jointing the pipe
Approved Shop
Drawing / Method
Statement
Inspection Each Section
6mm diameter nylon rope placed inside the duct with 2m extra length tie with rod. / As per Approved Shop Drawing
IR-Works C & H H H
7.6Formwork (if applicable ) and Concrete Surround pipes - Casting
Approved Shop
DrawingRefer ITP: EXW-P015-0000-QM-LNT-IT-00004 and ITP: EXW-P015-0000-QM-LNT-IT-00052
8Backfilling with suitable fill material ( if applicable)
QCS 2010 IR1 test every 20m on Each Layer.
As per Approved Shop Drawing, Compaction of 95% of MDD for each layer
FDT Report
C & H H H T
9Duct Final Inspection by mandrel
Method Statement
Inspection Each Section As per method statement IR-Works C & H H H
Name : Signature: Position Date:
Prepared by: Binu John QA/QC Manager 26/04/2015
Reviewed by: Gica Pricop Head QA/QC 26/04/2015
Authorized by: Manuel Abella Project Director 26/04/2015
Approved by Engineer’s Representative
QM-LNT-IT-00066-Rev.CB Date: 26.04.2015