IntroductionIntroduction
• A deliberate and disciplined approach to software development
• Proven at cost conscious companies like Credit Swiss Life, Daimler Chrysler, First Union National Bank, Ford Motor Company and UBS
• Successful because it stresses customer satisfaction
XP MethodologyXP Methodology
• Designed to deliver the software your customer needs when it is needed
• Empowers your developers to confidently respond to changing customer requirements, even late in the life cycle
• Emphasizes team work• Improves a software project in four essential ways:
Communication Simplicity Feedback Courage
When should XP be Used?When should XP be Used?
• In software environments where requirements change dynamically
• In projects with high risk• In projects with a small team of programmers• In situations where system design allows for
automated unit and functional tests
Rules And Practices of XPRules And Practices of XP
• Planning User Stories Release Planning Project Velocity Iterative Development Move people around
• Designing Simplicity CRC Cards Spike Solutions Refactoring
Rules And Practices of XPRules And Practices of XP
• Coding Standards Pair Programming Integration Collective code ownership Optimization
• Testing Unit Tests Acceptance Tests
User StoriesUser Stories
• Written by customers as things that the system needs to do for them
• Similar to usage scenarios• Used to create time estimates for release planning
meeting• Used instead of a large requirements document• Lead to creation of acceptance tests
Release PlanningRelease Planning
• Follows a set of rules that allows everyone involved with the project to make their own decisions
• Technical people make technical decisions and business people make the business decisions
• Negotiates a schedule everyone can commit to• Quantified by the four variables:
Scope Resources Time Quality
Project velocityProject velocity
• Measure of how much work is getting done on your project
• Determined by simply adding up the estimates of the user stories as well as the tasks that were finished during the iteration
• Increased by allowing developers to ask the customers for another story when their work is completed
Iterative developmentIterative development
• Adds agility to the development process• Iteration length
Constant through out the project Makes measuring progressMakes planning reliable and simple
Move people aroundMove people around
• Cross training is often an important consideration in companies trying to avoid islands of knowledge, which are so susceptible to loss
• Avoids serious knowledge loss and coding bottle necks
• Achieved by moving people around the code base in combination with pair programming
XP MAPXP MAP
SimplicitySimplicity
• Maintain design as simple as possible • Never add functionality before it is scheduled• Extra functionality
slows us down squanders our resources
CCRC CardsRC Cards
• CRC cards are used to represent objectsThe class of the card is written at the topResponsibilities are listed down the left sideCollaborating classes are listed to the right of each
responsibility• Allows people to break away from the procedural
mode of thought and more fully appreciate object technology
• Allows entire project teams to contribute to the design
RefactoringRefactoring
• Removes redundancy• Eliminates unused functionality• Rejuvenates obsolete designs• Saves time and increases quality• Can be achieved by
Keeping the design simple Keeping your code clean and concise so it is
easier to understand, modify and extend
Pair programmingPair programming
• All code to be included in a production release is created by two people working together at a single computer
• Increases software quality without impacting time to deliver
• Add as much functionality as two working separately except that it will be much higher in quality
• With increased quality comes big savings later in the project
Rules Of ThumbRules Of Thumb
• Never pair two people together who are brand new to programming in pairs (always one old-timer with a newcomer)
• When a pair takes the option of working separately (but with joint responsibility), they are not really pair programming
• If both people can not see what is happening on the monitor, they are not really pair programming
• Everyone works in a pair (no lone rangers allowed) • People have to trust each other, and it may take time
to build trust among everyone on the team
Coding PracticesCoding Practices
• Collective Code OwnershipEncourages everyone to contribute new ideas to
all the segments of the project Increase code quality and reduces defectsSpreads knowledge through out the team
• IntegrationXP teams keep the system fully integrated at all
timesContinuous integration avoids or detects
compatibility problems early
XP Flow ChartXP Flow Chart
TestingTesting
• All code must have unit tests• All code must pass all unit tests before it can be
released• When a bug is found tests are created
Acceptance TestingAcceptance Testing
• Acceptance tests are created from user stories• A story can have one or many acceptance tests, what
ever it takes to ensure the functionality works• These are black box system tests• Represents some expected result from the system• Used as regression tests prior to a production release
AcceptanceAcceptance Testing Testing
• Quality assurance (QA) is an essential part of the XP process
• XP requires development to have much closer relationship with QA
• Acceptance tests should be automated so they can be run often
• The acceptance test score is published to the team• The goal of acceptance tests is to guarantee that a
customers requirements have been met and the system is acceptable
Applications for XPApplications for XP
• The VCAPS project at Ford used the unit test framework for both unit tests and acceptance tests
ConclusionConclusion
• Extreme Programming tries to make things happen in ways that people find natural and pleasant
• Focuses on effective forms of communication• Works by bringing the whole team together with
enough feedback to tune the practices of the team to their unique situation
ReferencesReferences
• www.extremeprogramming.org• www.xpuniverse.com• www.xprogramming.com• www.acs.org.au/certification/Documents/SDVT/