EXTREME MODULARIZATION STRATEGY Case Study
Transcript of EXTREME MODULARIZATION STRATEGY Case Study
THE WORLD…OUR PASSION
EXTREME MODULARIZATION STRATEGY
Case Study
Presented by :
Mr. ANDREA GAZZOLA
THE WORLD… …OUR PASSION
Project: INTEGRATION OF AN OFFSHORE PLATFORM
Site: Canada
Period: OCT 2016 – NOV 2016
(42 DAYS)
THE WORLD… …OUR PASSION
UTILITY PROCESS MODULE (UPM)
WEIGHT: 44,000 T
LENGTH: 71.5
WIDE: 103.75
HEIGHT: 60.5
MAIN MODULES
THE WORLD… …OUR PASSION
DRILLING EQUIPMENT SET (DES)
HEIGHT: 80M
WEIGHT: 3,250T
MAIN MODULES
THE WORLD… …OUR PASSION
DRILLING SUPPORT MODULE (DSM)
LENGTH: 54 M
WEIGHT: 3,900 T
MAIN MODULES
THE WORLD… …OUR PASSION
LIVING QUARTER MODULE (LQ)
LENGTH:58M
WIDTH: 17M
HEIGHT: 30M HIGH
WEIGHT: 4,000T
MAIN MODULES
THE WORLD… …OUR PASSION
ANCILLARIES MODULES:
HELIDECK: 115 T
LIFE BOAT STATIONS: 210 / 230 T
FLARE BOOM: 340 T
ANCILLARIES
THE WORLD… …OUR PASSION
INTEGRATION STRATEGY:
Modularized system
THE WORLD… …OUR PASSION
SKIDDING SYSTEM DEVELOPMENT FOR UPM: LOAD OUT KOREA – LOAD IN CANADA
FOR UPM MODULE A SPECIFIC SKIDDING SYSTEM HAD TO BE DEVELOPED TO TAKE INTO ACCOUT FOR:
- HIGH WEIGHT OF MODULE (44.000T)
- REQUIRED LOAD DISTRIBUTION ONTO PIER AT P.O.D.
- PUSH & PULL SYSTEM REQUIRED TO REDUCE WEIGHTS IMPOSED ONTO FINGER PIER AT P.O.A.
- REQUIRED WEIGHING OPERATION 2 WEEK BEFORE LOAD OUT
- REQUIRED SYNCRONIZED SYSTEM REMOTELY CONTROLLED TO CONTROL LOADS REAL TIME
THE WORLD… …OUR PASSION
SKIDDING SYSTEM DEVELOPMENT FOR UPM: LOAD OUT KOREA – LOAD IN CANADA
- 64 SKID SHOES: 1,000 TON CAPACITY EACH
- SKID SHOES SYSTEM DEVELOPED BY FAGIOLI
- PUSH & PULL SYSTEM
- SYNCRONIZED SYSTEM REMOTELY CONTROLLED
THE WORLD… …OUR PASSION
Lift Capacity: 1,000 T / 1,200 t
SKIDDING SYSTEM DEVELOPMENT FOR UPM: LOAD OUT KOREA – LOAD IN CANADA
THE WORLD… …OUR PASSION
KOREA CANADA
SKIDDING SYSTEM DEVELOPMENT FOR UPM: LOAD OUT KOREA – LOAD IN CANADA
THE WORLD… …OUR PASSION
MODULAR LIFTING AND SKIDDING SYSTEM RE-DESIGNED FOR DES – DSM MODULES IN CANADA
FOR DES AND DSM MODULES THE EXISTING LIFTING AND SKIDDING FAGIOLI TECHNOLOGY HAD TO BE RE-DESIGNED TO TAKE INTO ACCOUT FOR:
- SPECIFIC MODULES GEOMETRY
- HIGH WEIGHT AND DIMENSIONS OF MODULES
- REQUIRED LOAD DISTRIBUTION ONTO PIER IN CANADA
- REQUIRED TRANSVERSAL SKIDDING AND JACK DOWN ONTO FINAL POSITION
- REDUCED TIME FOR INTEGRATION AFTER ARRIVAL OF THE 44K TON UPM MODULE
THE WORLD… …OUR PASSION
ELEVATOR Modularized Lifting System
MODULAR LIFTING AND SKIDDING SYSTEM RE-DESIGNED FOR DES – DSM MODULES IN CANADA
• 12 SKID SHOES : 1,200 TON CAPACITY EACH
• ELEVATOR SYSTEM : 10,800 TON CAPACITY
• 2 KM SKID TRACKS
• MAIN GIRDERS : 35m
• 38 TOWER SECTIONS
• 16 STRAND JACKS UP TO 750 TON EACH
THE WORLD… …OUR PASSION
SPAIN: ADRIATIC LNG PROJECT
• WORLD’ s First Concrete Offshore LNG Receiving Terminal
• 12 + 6 modules from 700 to 4,800 ton
MODULAR LIFTING AND SKIDDING SYSTEM RE-DESIGNED FOR DES – DSM MODULES IN CANADA
THE WORLD… …OUR PASSION
CHINA: BLAST FURNACE REPLACEMENT
• First Concrete Offshore LNG Receiving Terminal
• Replacent of an old top boiler section weighing 2,533 ton with a new one weighing 2,111 ton
MODULAR LIFTING AND SKIDDING SYSTEM RE-DESIGNED FOR DES – DSM MODULES IN CANADA
THE WORLD… …OUR PASSION
CANADA PROJECT • Modularized system engineered by Fagioli
MODULAR LIFTING AND SKIDDING SYSTEM RE-DESIGNED FOR DES – DSM MODULES IN CANADA
THE WORLD… …OUR PASSION
Modularized lifting system : DSM 3,900 T
MODULAR LIFTING AND SKIDDING SYSTEM RE-DESIGNED FOR DES – DSM MODULES IN CANADA
THE WORLD… …OUR PASSION
Modularized lifting system : DES 3,250 T
MODULAR LIFTING AND SKIDDING SYSTEM RE-DESIGNED FOR DES – DSM MODULES IN CANADA
THE WORLD… …OUR PASSION
REQUIRED EQUIPMENT FOR THE INSTALLATION OF THE LIVING QUARTER
FOR LQ MODULE AN INNOVATIVE SPMT AND BARGE INSTALLATION METHOD HAD TO BE ENGINEERED TO ACCOUT FOR:
- SPECIFIC REQUIRED LQ MODULE POSITION ON UPM STORED ON FINGER PIER IN CANADA
- REQUIRED INCREASED ELEVATION OF LQ MODULE TO AVOID POSSIBLE ICEBERG CLASH WHEN INSTALLED ONTO GBS
- AVOID OFFSHORE INSTALLATION BY HEAVY LIFT VESSEL TO REDUCE COSTS AND INTEGRATION SCHEDULE
- GRANT A FAST AND SAFE INSTALLATION METHOD TO AVOID SCHEDULE IMPACT OF POSSIBLE ADVERSE WEATHER
CONDITIONS
THE WORLD… …OUR PASSION
REQUIRED EQUIPMENT FOR THE INSTALLATION OF THE LIVING QUARTER
• 230 AXLE LINES SPMTS
• NO. 12 TRANSPORT BEAMS
• NO. 10 SUPPORT TOWERS
• NO. 4 TOWER LIFT PROVIDED WITH WITH NO. 8 X
L750 STRAND JACKS
THE WORLD… …OUR PASSION
REQUIRED EQUIPMENT FOR THE INSTALLATION OF THE LIVING QUARTER
• LQ LIFTED AT A HEIGTH OF 15 M
THE WORLD… …OUR PASSION
REQUIRED EQUIPMENT FOR THE INSTALLATION OF THE LIVING QUARTER
• Barge: 140 m long; 36 m wide
THE WORLD… …OUR PASSION
LIVING QUARTER LOAD OUT
THE WORLD… …OUR PASSION
LIVING QUARTER: FINAL INSTALLATION
THE WORLD… …OUR PASSION
LIVING QUARTER: FINAL INSTALLATION
THE WORLD… …OUR PASSION
Installation of Helideck (115 ton) by means of Fagioli LR11350 Crawler Crane
CONVENTIONAL LIFTING SYSTEM USED FOR THE INSTALLATION OF ANCILLARY MODULES
Installation of Helideck
THE WORLD… …OUR PASSION
CONVENTIONAL LIFTING SYSTEM USED FOR THE INSTALLATION OF ANCILLARY MODULES
Installation of Flare Boom
Installation of Flare Boom (340 ton) by means of Fagioli LR11350 Crawler Crane and Shear-leg
THE WORLD… …OUR PASSION
CONVENTIONAL LIFTING SYSTEM USED FOR THE INSTALLATION OF ANCILLARY MODULES
Installation of Life Boat Stations (East / West)
Installation of Life Boat Stations (210 ton / 230 ton) by means of Fagioli LR11350 Crawler Crane (West Side ) onto the LQ module and Shear-leg (East side)
THE WORLD… …OUR PASSION
PROJECT EXECUTION
EXECUTION FIGURES
INTEGRATION PHASE: 42 DAYS
SEPT 2016 OCT 2016 INSTALLATION OF DSM INSTALLATION OF DES INSTALLATION OF LQ
THE WORLD… …OUR PASSION
EXECUTION FIGURES
THE WORLD… …OUR PASSION
THE INDUSTRY REQUIRES TO MINIMIZE TIME FOR
ENGINEERING, FABRICATION, INTEGRATION AND
COMMISSIONING AS WELL AS INCREASING COST EFFICIENCY,
QUALITY CONTROL AND SAFETY. IS MORE AND MORE LEADING
TO AN EXTREME MODULARIZATION STRATEGY.
CONCLUSIONS
EXTREME MODULARIZATION STRATEGY REQUIRES THE DESIGN
OF NEW LIFTING AND TRANSPORT SYSTEMS LIKE FAGIOLI
ELEVATOR AND SKIDDING SYSTEMS WHICH NEED THEMSELVES
TO BE MODULAR IN ORDER TO BE EASILY RECONFIGURATED
AND TRANSPORTED FROM/TO SITE.
THE WORLD… …OUR PASSION
THE RAISE OF THE EXTREME MODULARIZATION
CONTRUCTION STRATEGY MAY LEAD TYPICAL
CONSTRUTION EQUPMENT, AS SPMT AND LARGE
CAPACITY CRANES, TO BE SEEN BY CLIENTS AS
«ACCESSORIES» TO MAIN LIFTING/TRANSPORT
SYSTEMS.
IN THE WORSE CASES, DUE TO THE PRESENT LOW
MARKET CONDITIONS, CLIENT MAY BE MISSLEAD TO SEE
THE TYPICAL CONSTRUTION EQUPMENT AS A
«COMODITY» WITHOUT GIVING IT THE CORRECT VALUE.
CONCLUSIONS
THE WORLD… …OUR PASSION
- LEADING HEAVY LIFT AND HEAVY HAULAGE GLOBAL
SERVICE PROVIDERS NEED TO DEVELOP NEW
TECHNOLOGIES AND ADAPT ITS ORGANIZATIONS IN
TERMS OF SALES, ENGINEERING AND PROJECT
MANAGEMENT TO FOLLOW THE NEW INDUSTRY
STANDADS, STANDARDS WHICH WERE ALMOST
UNTHINKABLE JUST FEW YEARS AGO
CONCLUSIONS