PRE-QUALIFICATION FOR CATEGORY 16 E NGINEERING , P ROCUREMENT AND C ONSTRUCTION OF M AJOR O NSHORE O IL AND G AS P IPELINE P ROJECT

Transcript of EXTENSION OF FEMALE GYMNASIUM AT€¦  · Web viewb) Lead Process Engineer. c) Lead...

Page 1: EXTENSION OF FEMALE GYMNASIUM AT€¦  · Web viewb) Lead Process Engineer. c) Lead Civil/Structural Engineer. d) Lead Mechanical Equipment Engineer. e) Mechanical Piping Engineer.

PRE-QUALIFICATION

FOR

CATEGORY 16ENGINEERING, PROCUREMENT AND

CONSTRUCTION OF MAJOR ONSHOREOIL AND GAS PIPELINE PROJECT

Page 2: EXTENSION OF FEMALE GYMNASIUM AT€¦  · Web viewb) Lead Process Engineer. c) Lead Civil/Structural Engineer. d) Lead Mechanical Equipment Engineer. e) Mechanical Piping Engineer.

KUWAIT OIL COMPANY (K.S.C.) (REGISTER OF COMMERCE – 21835)

PRE-QUALIFICATION- FOR -CATEGORY 16: EPC OF MAJOR ONSHORE O IL AND GAS P IPELINE PROJECTS

B. PRE-QUALIFICATION QUESTIONNAIRE

SECTION 1 – MANDATORY QUESTIONS

The Applicant must respond to all questions in this questionnaire using the attached format. The response to each question must refer specifically to the Applicant's engineering office for which qualification is being sought.

1. Has the Applicant independently executed at least two (2) engineering, procurement and construction projects in extending onshore underground, coated and wrapped (30) inch pipelines (minimum diameter), in accordance with the specification of the American Petroleum Institute API 5L, designated to transit crude oil, or gas liquid with all the relevant accessories, motor operated valves, fittings, pigging launchers and receivers, gas scrubbers, gas slug catchers, from basic design through construction, including all the associated civil, electrical and instrument works, which individually has a value equal to or in excess of US$ 70,000,000 and where the commissioning dates were within the past five (5) years?

Please Check One. Yes No

Details of the projects, which enable the Applicant to answer affirmatively, must be provided in Section Three of this questionnaire.

2. Has the Applicant's Purchasing Department executed purchase orders for major onshore oil and gas pipeline project materials within the past (5) years of a total value in excess of US$ 45,000,000 and an overall procurement period not exceeding eighteen (18) months?

Please Check One. Yes No

Applicant is requested to submit an attachment to Section 3 of this questionnaire, details of such Purchase Orders executed with dates including values, material description, procurement period and continents, /countries from which materials were purchased.

3. Is Applicant's Engineering Office staffed with numbers of personnel exceeding each of those listed below with not less than two (2) continuous years relevant experience with the Applicant?

a) Project Manager (5)b) Project Engineers (20)c) Design and Specialist Engineers (60)d) Procurement Specialist and buyers (excluding clerical staff) (15)e) Project Control personnel (planners, estimators, accountant's) (25)

Page 3: EXTENSION OF FEMALE GYMNASIUM AT€¦  · Web viewb) Lead Process Engineer. c) Lead Civil/Structural Engineer. d) Lead Mechanical Equipment Engineer. e) Mechanical Piping Engineer.

KUWAIT OIL COMPANY (K.S.C.) (REGISTER OF COMMERCE – 21835)

PRE-QUALIFICATION- FOR -CATEGORY 16: EPC OF MAJOR ONSHORE O IL AND GAS P IPELINE PROJECTS

B. PRE-QUALIFICATION QUESTIONNAIRE

SECTION 1 – MANDATORY QUESTIONS

3. (Cont’d)

f) Construction staff on direct payroll (foreman and above) totaling (75)g) Overall direct, full time employees, (excluding admin, support and clerical staff,

and (a) through (f) above, of not less than 200.

Please Check One. Yes No

4. Is Applicant willing to submit lump sum turnkey, tenders? If so, is he in a position to do so with within a ten (10) week period of receiving the invitation to bid?

Please Check One. Yes No

5. Is Applicant adequately established financially to handle the project on turnkey basis mentioned above and, if so, has the applicant been in the international engineering/contracting business for not less than 10 years?

Please Check One. Yes No

6. Can the Applicant confirm that it can perform EPC contracts of value equal to or in excess of US$ 70,000,000 each with all the following work performed with its own resources, manpower and expertise, without requiring to subcontract:-

EngineeringProcurementProject ManagementConstruction Supervision

Please Check One. Yes No

Signed :

Name :

In the capacity of :

Authorized signatory for and on behalf of :

Date :

Page 4: EXTENSION OF FEMALE GYMNASIUM AT€¦  · Web viewb) Lead Process Engineer. c) Lead Civil/Structural Engineer. d) Lead Mechanical Equipment Engineer. e) Mechanical Piping Engineer.

KUWAIT OIL COMPANY (K.S.C.) (REGISTER OF COMMERCE – 21835)

PRE-QUALIFICATION- FOR -CATEGORY 16: EPC OF MAJOR ONSHORE O IL AND GAS P IPELINE PROJECTS

B. PRE-QUALIFICATION QUESTIONNAIRE

SECTION 3 – APPLICANT'S PREVIOUS EXPERIENCE

1. Attach (as attachment 1 to this Section 3) a listing of all major relevant engineering, construction and procurement contracts completed over the past ten years from the Applicant's own operational office. Only contracts that were awarded in the Applicant's own name should be listed. Where the contract awarded was a subcontract for a larger project, or was for a portion of work related to a larger project, then the relationship and scope of the work performed by the Applicant must be clearly defined so that it is clear that the Applicant was not the prime contractor for the entire project.

The following information must be provided for each project listed:-

a) Name of Client,

b) Title, Location and Type of Contract,

c) Name of Project Manager responsible for supervision,

d) Applicant's scope of work,

e) Contract Price (approximate),

f) Approximate man-hours expended by Applicant (planned v. actual),

g) Date of Commencement,

h) Date of Completion (planned vs. actual),

i) Percentage of contract subcontracted out, and the nature of the service

subcontracted,

j) If this contract was a part of a larger project, state percentage of the larger

project, which this contract represented.

2. Provide (as Attachment 2 to this Section 3) detailed information in a typical format to 1 above for each contract which enable the Applicant to answer affirmatively to Section 1, Mandatory Questions for the required two projects.

Applicant is advised that the minimum possible number of contracts to be detailed is two. The Applicant is invited to submit further examples of contracts complying with the mandatory questions up to a maximum of 10 contracts example.

Page 5: EXTENSION OF FEMALE GYMNASIUM AT€¦  · Web viewb) Lead Process Engineer. c) Lead Civil/Structural Engineer. d) Lead Mechanical Equipment Engineer. e) Mechanical Piping Engineer.

KUWAIT OIL COMPANY (K.S.C.) (REGISTER OF COMMERCE – 21835)

PRE-QUALIFICATION- FOR -CATEGORY 16: EPC OF MAJOR ONSHORE O IL AND GAS P IPELINE PROJECTS

B. PRE-QUALIFICATION QUESTIONNAIRE

SECTION 3 – APPLICANT'S PREVIOUS EXPERIENCE

3. Provide (As Attachment 3 to this Section 3) details of Purchase Orders executed with dates including values, materials description, procurement period and continents/countries from which materials were purchased which support Applicant's affirmative response to question 2 of Part I and Part II of Section 1: Mandatory Questions.

Signed :

Name :

In the capacity of :

Authorized signatory for and on behalf of :

Date :

Page 6: EXTENSION OF FEMALE GYMNASIUM AT€¦  · Web viewb) Lead Process Engineer. c) Lead Civil/Structural Engineer. d) Lead Mechanical Equipment Engineer. e) Mechanical Piping Engineer.

KUWAIT OIL COMPANY (K.S.C.) (REGISTER OF COMMERCE – 21835)

PRE-QUALIFICATION- FOR -CATEGORY 16: EPC OF MAJOR ONSHORE O IL AND GAS P IPELINE PROJECTS

B. PRE-QUALIFICATION QUESTIONNAIRE

SECTION 4 – APPLICANT'S CURRENT WORKLOAD

1. Attach (As Attachment 1 to this Section 4) a listing of all major a listing of all major engineering, construction and procurement projects (exceeding 20,000 engineering man-hours) presently under progress in the Applicant's operational office, including the following information:

a) Name of Client,b) Title, Location and Type of Project,c) Name of Project Manager responsible for supervision,d) Applicant's scope of worke) Contract Price (approximate)f) Percentage of engineering completed to date.g) Percentage procurement completed to date.h) Percentage construction completed to date.i) Approximate total contract man-hours plannedj) Man-hours expended by Applicant to datek) Date of Commencementl) Due date for Completionm) Percentage of contract subcontracted out; the nature if the work subcontracted;

and names of subcontractors.n) If this contract was part of a larger project, state percentage of the larger project,

which this contract represented.

Note that if any contracts are for project management only, or are only for part of a project, (such as the engineering portion only) this must be clearly indicated by the Applicant.

2. State the overall value of other work in hand with the Applicant, which has not listed in 1 above as follows:-

a) Value of this other work in total.

b) Number of man-hours required until completion.

c) Total normal monthly man-hour expenditure on these other work items.

Page 7: EXTENSION OF FEMALE GYMNASIUM AT€¦  · Web viewb) Lead Process Engineer. c) Lead Civil/Structural Engineer. d) Lead Mechanical Equipment Engineer. e) Mechanical Piping Engineer.

KUWAIT OIL COMPANY (K.S.C.) (REGISTER OF COMMERCE – 21835)

PRE-QUALIFICATION- FOR -CATEGORY 16: EPC OF MAJOR ONSHORE O IL AND GAS P IPELINE PROJECTS

B. PRE-QUALIFICATION QUESTIONNAIRE

SECTION 4 – APPLICANT'S CURRENT WORKLOAD

3. Attach (As Attachment 2 to this Section 4) separate charts for total engineering design, total procurement and total construction supervision resources versus the data on present workload per item 1 and 2 above. These charts should utilize the data provided by the applicant in Section 5 of this questionnaire.

4. Attach (As Attachment 3 to this Section 4) a listing of the total number of projects presently in the proposal stage in the Applicant's operational office, along with the forecasted approximate total installed cost, total estimated engineering man-hours, total procurement man-hours and total construction supervision man-hours. It is not necessary to list these projects individually or give specifics of each, but merely combine in summary form for the overall total.

Signed :

Name :

In the capacity of :

Authorized signatory for and on behalf of :

Date :

Page 8: EXTENSION OF FEMALE GYMNASIUM AT€¦  · Web viewb) Lead Process Engineer. c) Lead Civil/Structural Engineer. d) Lead Mechanical Equipment Engineer. e) Mechanical Piping Engineer.

KUWAIT OIL COMPANY (K.S.C.) (REGISTER OF COMMERCE – 21835)

PRE-QUALIFICATION- FOR -CATEGORY 16: EPC OF MAJOR ONSHORE O IL AND GAS P IPELINE PROJECTS

B. PRE-QUALIFICATION QUESTIONNAIRE

SECTION 5 – APPLICANT'S RESOURCES

1. EXPERTISE AND PERSONNEL RESOURCES

1.1 The present number of permanent employees on Applicant's payroll at the office which is responsible for and which performs project management, engineering, project control, procurement and construction management services is ________________________.

Provide a breakdown of the stated numbers as follows. (Please do not list the same individual in more than one category):

Engineering/Procurement/Construction No. of Personnel

a) Project Managers & Senior Staffb) Project Engineersc) Process and P & ID Engineersd) Civil/structural Engineerse) Mechanical Engineersf) Piping Engineersg) Material Specialist/QA/QC/ inspector/controllersh) Electrical Engineersi) Instrument Engineersj) Plannersk) Estimators/Cost Controllersl) Procurement/Purchasing/Store Control Personnelm) Expediting Personneln) Contracts Managero) Safety Engineerp) Field Construction/Operating Personnel

Services and Miscellaneous No. of Personnel

a) Accountantsb) Legal Personnelc) Computer (IT) Specialistsd) Audit Personnele) Secretarial Personnelf) Others

GRAND TOTAL

Page 9: EXTENSION OF FEMALE GYMNASIUM AT€¦  · Web viewb) Lead Process Engineer. c) Lead Civil/Structural Engineer. d) Lead Mechanical Equipment Engineer. e) Mechanical Piping Engineer.

KUWAIT OIL COMPANY (K.S.C.) (REGISTER OF COMMERCE – 21835)

PRE-QUALIFICATION- FOR -CATEGORY 16: EPC OF MAJOR ONSHORE O IL AND GAS P IPELINE PROJECTS

B. PRE-QUALIFICATION QUESTIONNAIRE

SECTION 5 – APPLICANT'S RESOURCES

2. Is it a normal practice for the Applicant to utilise sub-contract or agency personnel to supplement your permanent engineering, drafting, procurement, shop inspection or construction supervision of the work force?

Yes No

If Yes, attach (As Attachment 1 to this Section 5) a separate sheet explaining your normal practices in this regard and the names and details of agencies normally used to supplement Applicant's resources.

3. How many sub-contract or agency personnel and in what category are currently working for the Applicant, in addition to the direct payroll listed in 1.1 above?

4. What was the largest number of personnel ever carried on Applicant's direct payroll, and in what year was this maximum payroll?

5. What was the largest number of sub-contract or agency personnel to ever work for the Applicant at any one time, and in what year was this? Name of client and project.

6. State the total number of Project Managers currently on the Applicant's direct payroll who has successfully managed at least one project equal to or in excess of US$ 70,000,000 million in value.

7. Do you maintain a regular construction group down to supervisor level?

Yes No

8. Attach (As Attachment 1 to this Section Five) detailed resumes of the following personnel (the personnel detailed must currently be on the Applicant's direct payroll):-

Page 10: EXTENSION OF FEMALE GYMNASIUM AT€¦  · Web viewb) Lead Process Engineer. c) Lead Civil/Structural Engineer. d) Lead Mechanical Equipment Engineer. e) Mechanical Piping Engineer.

KUWAIT OIL COMPANY (K.S.C.) (REGISTER OF COMMERCE – 21835)

PRE-QUALIFICATION- FOR -CATEGORY 16: EPC OF MAJOR ONSHORE O IL AND GAS P IPELINE PROJECTS

B. PRE-QUALIFICATION QUESTIONNAIRE

SECTION 5 – APPLICANT'S RESOURCES

8. (Cont’d)

a) For the total number of Project Managers stated in 6 above.

One example for each of the following job titles:-

b) Lead Process Engineer

c) Lead Civil/Structural Engineer

d) Lead Mechanical Equipment Engineer

e) Mechanical Piping Engineer

f) Lead Electrical Engineer

g) Instrument Engineer

h) Lead Field Engineer

i) Lead Inspection Engineer

j) Site Inspection Engineer and QA/QC Engineer

k) Metallurgical Engineer

l) Planner

m) Fire/ Safety Engineer

n) Resident Construction Manager

9. Attach (As Attachment 2 to this Section 5) a typical organization chart for a project team to perform Engineering, Procurement and Construction of a Major Onshore Oil & Gas Pipeline Project, indicating all the positions, all the way down to the construction foreman level. On the assumption that the typical organization chart is for a project in Kuwait, indicate on the organization chart those positions which would likely be filled by subcontractor's personnel (if any).

10. Attach (as Attachment 3 to this Section 5) a concise description of the Applicant's project control procedures, including scheduling and control of construction work, field material control, purchasing, expediting, engineering and QA/QC procedures together with systems used, and details of accredited international quality standards.

Page 11: EXTENSION OF FEMALE GYMNASIUM AT€¦  · Web viewb) Lead Process Engineer. c) Lead Civil/Structural Engineer. d) Lead Mechanical Equipment Engineer. e) Mechanical Piping Engineer.

KUWAIT OIL COMPANY (K.S.C.) (REGISTER OF COMMERCE – 21835)

PRE-QUALIFICATION- FOR -CATEGORY 16: EPC OF MAJOR ONSHORE O IL AND GAS P IPELINE PROJECTS

B. PRE-QUALIFICATION QUESTIONNAIRE

SECTION 5 – APPLICANT'S RESOURCES

2. EQUIPMENT AND FACILITIES

1. Is the Applicant's office equipped with Computer Aided Design (CAD) (2D or 3D), Engineering and Drafting Systems and fully integrated computerized project control and scheduling system capable of indicating periodical progress and performance in design, specifications, purchasing and project construction, including analysis of the overall project progress.

Yes No

2. Attach (As Attachment 4 to Section 5) a sketch plan of the Applicant's main offices indicating layout and areas. Also, attach brief descriptions of the number and type of CAD workstations and software and of the project management software and systems in use.

3. Does the Applicant own and operate any fabrication or manufacturing facilities related to Construction of Storage Tanks?

Yes No

4. Describe (As Attachment 5 to this Section 5) all such manufacturing or fabrication facilities, including sketch plans and location, which would possibly be used if the Applicant had a Major Onshore Pipeline Facility Project in Kuwait. Indicate the kinds of products manufactured and the quality standard to which such products are made.

6. State which parts of a typical Engineering, Procurement and Construction (EPC) oil/gas facility project the Applicant would normally expect to subcontract.

Page 12: EXTENSION OF FEMALE GYMNASIUM AT€¦  · Web viewb) Lead Process Engineer. c) Lead Civil/Structural Engineer. d) Lead Mechanical Equipment Engineer. e) Mechanical Piping Engineer.

KUWAIT OIL COMPANY (K.S.C.) (REGISTER OF COMMERCE – 21835)

PRE-QUALIFICATION- FOR -CATEGORY 16: EPC OF MAJOR ONSHORE O IL AND GAS P IPELINE PROJECTS

B. PRE-QUALIFICATION QUESTIONNAIRE

SECTION 5 – APPLICANT'S RESOURCES

6. (Cont’d)

Applicant should note that it is not acceptable to the Company for EPC Contractors to subcontract any aspects of the overall project management, engineering design and/or procurement services.

Signed :

Name :

In the capacity of :

Authorized signatory for and on behalf of :

Date :

Page 13: EXTENSION OF FEMALE GYMNASIUM AT€¦  · Web viewb) Lead Process Engineer. c) Lead Civil/Structural Engineer. d) Lead Mechanical Equipment Engineer. e) Mechanical Piping Engineer.

KUWAIT OIL COMPANY (K.S.C.) (REGISTER OF COMMERCE – 21835)

PRE-QUALIFICATION- FOR -CATEGORY 16: EPC OF MAJOR ONSHORE O IL AND GAS P IPELINE PROJECTS

B. PRE-QUALIFICATION QUESTIONNAIRE

Page 14: EXTENSION OF FEMALE GYMNASIUM AT€¦  · Web viewb) Lead Process Engineer. c) Lead Civil/Structural Engineer. d) Lead Mechanical Equipment Engineer. e) Mechanical Piping Engineer.
Page 15: EXTENSION OF FEMALE GYMNASIUM AT€¦  · Web viewb) Lead Process Engineer. c) Lead Civil/Structural Engineer. d) Lead Mechanical Equipment Engineer. e) Mechanical Piping Engineer.

KUWAIT OIL COMPANY (K.S.C.) (REGISTER OF COMMERCE – 21835)

PRE-QUALIFICATION- FOR -CATEGORY 16: EPC OF MAJOR ONSHORE O IL AND GAS P IPELINE PROJECTS

B. PRE-QUALIFICATION QUESTIONNAIRE