P. 2
Challenges for Wafer Fabs increase over time...
Obsolescence
Unpredictability of costs
Technical support
availability
Capability/quality of
used tools
Options for extendibility
Ever-increasing
environmental and
regulatory demands
70% of all Fabs built before 2001
Challenges to cost reduction for mature technologies
impact vast majority of European wafer Fabs
P. 3
Cost Reduction Have the OEMs introduced measures to address the challenge?
OEMs have been… Reducing direct support of
older products • But not supporting /
engaging with alternative sources
• And not supporting customer self sufficiency
Not adequately supporting
extendibility
Creating expensive and inflexible solutions
• And little help to make them affordable
Slow to respond to
Environmental demands
So…what should the OEMs be doing? Source: Gartner
Focused on
leading edge
technology
P. 4
OEMs must adopt changes to reflect the customers needs now and in the future…
Support extendibility of older products
• Don’t focus only on 300mm
• Actively help customers become self sufficient
Be more focused on reducing your costs
• And be more flexible – charge only for what is needed
• Upgrades ideally have payback under 6 months but no more than 1 year
Help to manage the risks of using older equipment
• Be willing to engage and enable 3rd parties to provide support
• Help reduce the risks associated with buying used tools
Do more to support efforts to go green
…So, who is Novellus today and
what are we doing ?
P. 5
Who is Novellus?
Acquired 1997
Acquired 2001
Acquired 2002
Acquired 2004
Thin Film Systems
P. 6
Our 150-200mm Product Portfolio
C1D –C1W
C2 Sequel
C2 Altus
C2 Speed
Sabre
Inova
XM8 & XM90
Inline 3180/90
Inline 3280/90
M2000
M2i
MBB
372/472
676/776
AURIGA
CMP V
MV200
A – Series
L – Series
PEP – Series
Gamma 2100
PM200
Apollo
Over 40 Different Configurations continue to be supported by Novellus
P. 7
Our RSB & CS Engineering Focus
Business Segment is > 65nm up to 2μm Source: SICAS Feb 2007
NVLS Strategic Marketing
<150mm
Cost
300mm
Technology Value
200mm
Wafe
r C
ap
acit
y
(no
rma
lized
)
65nm 90n
m
130nm 180n
m
0.25m 0.35m 0.5m 0.75m 45nm 1m 2m
Technology nodes for
Refurbished Business
P. 8
What are we doing ? Novellus is… Supporting Extendibility
Increased engineering resources on mature products • Dedicated Engineering
resources to 150 / 200mm tools • Obsolescence, CIP, Process
and Technical Support
Created over 100 Performance Enhancements • Customer Driven • 300mm concepts adapted to
200mm tools • Enabling tool reuse,
extendibility and Greener
Expanded online information
Made refurbished equipment available with latest technical and safety options
Novellus Systems Proprietary InformationNovellus Systems Proprietary InformationP. P. 3636
Online Information Online Information -- InfoSourceInfoSource
www.Novellus.comwww.Novellus.com
P. 9
Refurbished Systems Portfolio
P. 10
Novellus is… Helping to Manage Risks Partnering with 3rd party companies
Fab
3rd Parties
Current Relationship New Relationship
Fab
Separation of OEM & 3rd parties
wastes time, energy & money
for the Fab
STS (Varian PVD)
N-Star / M+W (Services)
Rite Track (Service)
Point35 (C1 + C2 Platforms)
EUPT (Gasonics Platforms)
Teltec (CMP Service)
CyberOptics (Automation)
Kotec (RPC & RF)
SEMCO (PVD ESC)
Licensed
3rd Parties
OEMs Novellus
Lower cost of engineering
Products tailored to Fab needs
OEM safety and quality standards
P. 11
Novellus is changing…
Help to go green
Help manage the risks of
using older equipment
Be more focused on
reducing your costs
Support extendibility of
older products
300mm Green technology scaled to <200mm
Additional Green product options being added
Expanded obsolescence engineering
Low-Risk, Low-Cost Refurbished Tools
Able to leverage specialists with 3rd party Partners
Substantial increase in number of Refurbished Parts
Introduced Balanced Payment options
All upgrades have payback < 1 year
Added dedicated engineering resources
Increased information available online
> 100 Performance Enhancements and adding more…
Better… but we still have work to do and …
P. 12
We Need your Help ...
We must move beyond an adversarial relationship • Negotiation “battles” rarely lead to the best solutions
IP must be protected – both yours and ours • Ongoing support is funded by our IP
• Enabling second-sources to counterfeit our designs is counterproductive
Help us to innovate • Give us feedback and ideas
• Data sharing is critical to lowering costs
Contact the OEM first – we can provide a broader range
of solutions • We can tailor those solutions to your needs
• ... and if a 3rd party is needed, we’ll facilitate it!
The challenge for Customers and OEMs is to find ways to
productively change our existing relationship
THE END
Many Thanks!
Tech ARENA Forum, SEMICON Europa 11th Oct 2011
BACK UP
P. 15
Example1 PECVD: Novellium Showerheads Materials CIP – Improved Availability & Lifetime
Problem Statement:
• High in-films defects on PECVD Tools are directly linked to AlFx powder formed on the shower heads
• Shower head life is limited by AlFx Formation that impacts process results
Goal • Eliminate AlFx powder/particles from shower
head surface
Solution • New Novellium aluminum alloy that grows a
thin surface passivation layer which does not become thicker over time
Status • Hardware:
– Incorporated all the existing learning from Vector pedestal & SH development
– Verified formation of passivation layer
• Results: – Passed Alpha test at NVLS
• Stable wafer metrics and defects • Process transparent (oxide & SiN
processes) – Currently in customer Beta
• Over 85,000 wafers passed • On-wafer performance equal or better
than POR 6061 SH • Milestone
– Customer will provide official update in Oct’09
85k chamber opening Devi
ce X
Yield data (arb. Unit)
Devi
ce X
P. 16 Novellus Systems Proprietary Information
Example 2 PECVD: Brazed Heater Block Component Design CIP – Lifetime & COO Improvement
Project Statement: Current heater block experiences premature failure due to the heating element reliability.
Deliverables/Goals: A brazed design heater block will eliminate thermal
stress on the heating element thereby providing
improved reliability
Milestones/Status: •Complete Alpha Test Oct 30, 2009
•Complete Beta Test Jan 31. , 2010
•ECO release Feb. 25, 2010
P. 17 Novellus Systems Proprietary Information
Example3 PECVD: Adjustable Showerheads Component Design CIP – Ease of Service Improvement
Project Statement: Current showerhead assembly has excessive down time during PM (showerhead change and
gapping setup).
Deliverables/Goals: A bellows driven drop in replacement will reduce tool
down time by over 50%, and provide repeatable
showerhead spacing setup between showerhead and
heater block
Milestones/Status: •Complete Alpha Test Sept. 30, 2009
•Complete Beta Test Dec. 31 , 2009
•ECO release Jan. 25, 2010
P. 18
Example4 WCVD: Altus Pulsed Nucleation Layer (PNLTM) Technology CIP - Tool Extendibility
Shrinking Geometries difficult to fill As device geometries shrink, conventional CVD
nucleation does not meet requirements for step coverage, thickness and resistivity
Technology Breakthrough! PNL hardware capable of meeting extreme
geometry requirements (down to 45nm node)
No loss of tool productivity! Tool throughput maintained!
70 nm
17:1 AR
110 nm
14:1 AR
Fully Retrofittable! Can be installed on all existing Altus tools –
allows use of older tools for newer technology
nodes!
New Hardware Gasbox
Pneumatic Box
Software
50 nm
6:1 AR
P. 19
C2 Altus Tools Performance Enhancement Pulsed Nucleation Layer (PNLTM)
The PNL configuration allows
nucleation at stations 1 and 2
The PNL hardware allows stations to
run independently Nucleation and CVD bulk fill can be deposited
simultaneously on different stations
Provides leading edge technology
for fraction of new tool cost!!
Can be installed with under two
weeks downtime!
Plug Fill
PNL
PNL
CVD
CVD CVD
1
2
Ar or Ar/H2 flow
SiH4 Divert /
Line charge
SiH4 flow Purge WF6 flow Purge WF6 Divert/
Line charge
One Cycle
Repeat
40 Torr, 300°C
Standard Altus system. Stations are Well Isolated
Uses Dual Divert technology
100% Step Coverage and
Excellent Uniformity on All TiN
0.11m
P. 20
C2 ALTUS PNL™ BKM3 Yield and CMP Impact
BKM3 provides greater
process window and
corresponding yield
improvement
Dramatic post-CMP
coring reduction with
PNL vs CVD
nucleation
wf # Contact Via-1 Yield
1
2
4
CVD Nucl CVD Nucl Baseline
11
12
13
14
PNL BKM3 80Å
PNL BKM3 80Å
Baseline + 8.1%
CVD Nucl PNL BKM3
P. 21
Lower Rc, tighter distribution and higher yield with PNL
CVD Nucleation
PNL Nucleation 10
0K c
hai
n
N+
Reg
ion
100K
ch
ain
P+
Reg
ion
25K
ch
ain
N+
, un
lan
ded
25K
ch
ain
P+
, un
lan
ded
ALTUS Pulsed Nucleation Layer (PNL) Electrical & Yield Performance Examples
Yie
ld
70
72
74
76
78
80
82
84
86
CVD BKM 2 BKM 3
P. 22
Example5 HDP: SPEED B-Manifold Clean Process CIP - MWBWC & Defectivity Improvement
C-manifold Clean: over-etch (clean) at top of dome • Over-etched dome increases chance of film flaking as a function
of wafer accumulation within PM cycle
B-Manifold Clean: reduce over-etch at top of dome • Multi point injection shifts to a higher concentration of NF3 at
the bottom of the chamber
Entered Beta in Sept-09, complete Nov-09, Release Dec-09
Injection through C-manifold Injection through B-manifold
Localized over etch on the top
of dome
Uniformly etch the
whole dome
P. 23
B-Manifold Clean (Uniform Clean)
Typical STI: Dome and long injectors at ~ 2000 wafers with BKM Man-C clean and active EPD (BKM - 25 % OE)
Bay 20 SPD 1, STI, Dome and long injectors after ~ 5000 eq. wafers with Uniform Clean and active EPD
SJ Bay 20-1 STI: Dome and long injectors after ~ 2500 eq. wafers with Uniform Clean and active EPD
Purpose: Improves MWBC (reduced overetch) & reduces random particle events
P. 24
B-Manifold Clean (Uniform Clean) STI Particle Performance
HDPB101A (Particle and Wafer Counts)
0
50
100
150
200
250
300
350
400
450
500
8/1
/2004
8/8
/2004
8/1
4/2
004
8/1
9/2
004
8/2
4/2
004
8/2
6/2
004
9/3
/2004
9/8
/2004
9/1
3/2
004
9/1
5/2
004
9/1
7/2
004
9/2
2/2
004
9/2
3/2
004
9/2
4/2
004
9/3
0/2
004
10/
8/2
004
10/
9/2
004
10/
13/2
004
10/
14/2
004
10/
18/2
004
10/
21/2
004
10/
22/2
004
10/
26/2
004
10/
30/2
004
11/
3/2
004
11/
5/2
004
11/
6/2
004
11/
8/2
004
11/
12/2
004
11/
18/2
004
11/
19/2
004
11/
23/2
004
11/
29/2
004
Date
Part
icle
Coun
ts
0
500
1000
1500
2000
2500
3000
3500
4000
Wafe
r C
ounts
Adder Area Count Spec<70 Resetable
B-Manifold Clean / Biased PC
Significant defect reduction and increased MWBWC
sampled over 18 weeks volume production
P. 25
Increased Throughput
Lowering PFC Emissions in 200mm Fabs
• PFCs from etch and CVD chamber cleaning account for up to 90% of emissions
• RPC can reduce tool Cx/Fx emissions by 50%*
• Beta Test on Concept One underway
*Airproducts/Novellus 2005
PECVD: Remote Plasma Clean Hardware CIP – Helps Go Green & Throughput Increase
RF 7umRPC 7um
RPC 12um
12.7
20.4
24.0
0
5
10
15
20
25TEOS 12.7k TPH Improvement
• RPC NF3 = higher etch rates vs in-situ clean
• Shorter clean times = Larger batch sizes
• Up to 90% Improvement in T-put for TEOS*
• Up to 2% improvement in SiON Yield
Increasing Productivity and Reducing Environmental Impact
P. 26
Example6: PECVD / HDP RF Endpoint Process CIP in Partnerships – Additional Green Options
C1D BKM C2F6 in-situ clean optimized
Trace-Rite RF End Point Detection is
more powerful than optical due to the
intrinsic signal to noise ratio
Sampling the load with the powered
electrodes provides more information
than the small solid angle of acceptance
possible with a fiber optics
Result is higher sensitivity & no time lag
P. 27
Mood Median Test: ADDERS Before versus After
Mood median test for ADDERS
Chi-Square = 6.23 DF = 1 P = 0.013
Individual 95.0% CIs
Before/After N<= N> Median Q3-Q1 ----+---------+---------+---------+--
After 31 15 5.00 7.25 (---*-------)
Before 72 83 9.00 23.00 (-------*-----------)
----+---------+---------+---------+--
5.0 7.5 10.0 12.5
Before
After
200150100500
Be
fore
Aft
er
95% Bonferroni Confidence Intervals for StDevs
Before
After
300250200150100500
Be
fore
Aft
er
ADDERS
Test Statistic 0.00
P-Value 0.000
Test Statistic 3.59
P-Value 0.060
F-Test
Levene's Test
Test for Equal Variances for ADDERS
There is a statistically
significant difference
between “Before & After”
Customer Particles Statistics
Many Thanks
P. 29
Performance Enhancement Catalogue All Product Groups , All CIP Areas
80 Product Enhancement
Datasheets across all
toolsets
Each one provides
Performance Data and ROI
based on Novellus BKM
All are available in
Softcopy from local
Service and Sales team
P. 30
1. Particle Performance Endpoint/Toggle
installed
Right after WC
Justification