Extended-Reach Slant Drilling Application MacKay River SAGD Project
Extended-Reach Slant Drilling Application MacKay River SAGD Project
Dwight Teotico & Amy van ThielJune 3, 2008
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 2
Introduction - ObjectivesIntroduction - Objectives
Oil Sands in Alberta
MacKay Area Overview
Objectives for MRX
MRX Extended Reach Planning
Execution & Accomplishments
Going Forward
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 3
Oil Sands in AlbertaOil Sands in Alberta
Athabasca Oil SandsSpans 40 000 square kmOver one trillion barrels of OBIP
10% accessible through economical surface mining methodsThermal in-situ method
Injection of steam to reduce viscosity of oilWell pairs drilled horizontal, parallel and vertically alignedFirst field tested at AOSTRA’s Underground Test FacilityEnvironmental surface impacts are minimized
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 4
MacKay Area OverviewMacKay Area Overview
Located 60 km northwest of Fort McMurray
Petro-Canada’s first commercial SAGD project.
Estimated lifespan of 25 to 30 years
Fort McMurray
Oil Sands Oil Sands RegionsRegions
Mining AreaALBERTA
Calgary
Edmonton
CROWN
MacKay River
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 5
MacKay Area Overview (Cont.)MacKay Area Overview (Cont.)
Executed Drilling ProgramsPad 20/21 – 25 well pairs (Sept. 2001)Pad 22/23 – 21 well pairs (Jul. 2005)Pad 40 – 2 well pairs (Jan. 2005)Pad 24/25 – 20 well pairs (Apr. 2008)
Current Drilling Program H Pattern – 4 well pairs to be completed June 2008
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 6
Objectives of MRXObjectives of MRX
Design the optimum well pairsEnsure bitumen supply of 40 000 bbl/day at central facilityDesign injector and producer to minimize liquid level build-upOptimize SOR by even steam chamber development
Conventional or … Larger Extended Reach Well Bores
Reduction of logistics costsReduction of drilling costsReduction of facilities costs
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 7
Extended Reach Cost SAVINGS Extended Reach Cost SAVINGS
Original plan -> 4 pads to drain 8 patterns (54 pairs)Revised plan -> 2 pads to drain 5 patterns (42 pairs)Reduction in pads equated to a savings for several areas
Drilling Facilities Logistics
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 8
Rig UtilizationRig Utilization
Horizon 301650 m Surface RigVertical or 45 degree slant drilling capabilityUtilized due to scheduling constraints
Precision Drilling 295SL2200 m Super SingleTM
45 degree slant drilling capabilityDesigned for specialty drilling such as SAGD
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 9
GeologyGeology
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 10
Geological ChallengesGeological Challenges
FormationsSURFACE - Unconsolidated sand, boulders, and gravel seamsINT. - High clay contentMAIN - Unconsolidated saturated highly porous bitumen pay
Limited True Vertical DepthSurface Casing (Kick of Point) ~ 60 mTVD ICP of ~ 135 mTVDSlant drilling with aggressive build ratesExtreme pull downs
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 11
Well Design ChallengesWell Design Challenges
Large diameter hole/casing sizes for surface and intermediate strings
BHA Design
Unconventional Torque and Drag Issues
Torque limitations for installation of slotted liner
Directional profile constraints
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 12
MRX Planning and Preparation MRX Planning and Preparation
Encapsulating Drilling Fluid System
Eliminate accretion issuesReduces abrasiveness Allows for mechanical solids separationProvides lubricity
Hole Cleaning CapabilityMaintain minimum annular velocityModeration of drilling rate to match hole cleaning capabilityMechanical cleaning methodsPremium fluid handling and solids control equipment
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 13
MRX Planning and PreparationMRX Planning and Preparation
Mud Cooling SystemIncreased well bore stabilityDecreased torque and dragReduction in cuttings volume
MGT ConveyanceSAGD producers were ranged to the existing OB wellsSAGD injectors were ranged to the producers
TractorCoiled Tubing
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 14
MRX Directional PlanningMRX Directional Planning
ChallengesMaintaining angle in sand on surface holeDrilling at base of producing zone without entering non-producing Limestone formationRanging constraints
Directional Planning & Execution
Maximum planned dogleg of 8’s on build sectionsClose directional control to reduce DLS and tortuosity
Extended reach drilling technologies investigated
Rotary SteerableAG-itatorSlider
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 15
711mm Hole Opener711mm Hole Opener
Used to ream open 311mm pilot hole to 711mm
~ 7000 lbs
Top Section Bottom Section
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 16
Liner Running Installation LimitsLiner Running Installation Limits
Torque limitations under combined loading of tension/ compression
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 17
SAGD Extended Reach Well DesignSAGD Extended Reach Well Design
7" WELL DESIGNPRODUCER INJECTOR
Spud @ 45deg inclinationG.ELEV (m): (see survey)KB. ELEV (m) :(see directional plan)Class I BOP (Diverter)
PETRO-CANADA MR1 SAGD
Surface Casing 13 3/8" (339.7mm) Surface Casing
177.8 x 244.5mm Debris Seal Packer
9 5/8" (244.5mm) Interm. Casing,
2 Blank Joints Overlap
7" (177.8mm) Inj./Prod Slotted Liner
INJECTOR
PRODUCER
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 18
AccomplishmentsAccomplishments
PC NNP1 – 1533mMD, 131mTVD, 1480m V.S.
11.3:1 V.S to TVD ratio
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 19
Accomplishments – NNP1Accomplishments – NNP1
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 20
Going ForwardGoing Forward
Continued Well DesignCasing/Tubing ConfigurationsSlotting DesignCement Integrity
Drilling ChallengesEquipment LimitationsRig Modifications
2006 Petro-CanadaMarch 24, 2006 MRX Well Design 21
QuestionsQuestions