Burner Boom Systems / Expro Excellence Expro develops first flare boom with express, integrated hoisting winch, reducing HSE risk and improving rig operational efficiency Burner Boom Systems Expro Excellence exprogroup.com Objectives Client wanted to reduce HSE risk during flare boom deployment operations To help client increase rig operational efficiency by not having to tie crane up for lengthy periods of time to sling booms Expro Excellence Expro worked with the client to develop a concept for dedicated winching units to safely deploy booms from vertical storage position to horizontal operational position Two 90 foot vertical racking booms and kingposts (port and starboard) were supplied, along with 3-Head Sea Emerald Burners With a boom of 90 feet, and subsequent weights/forces, a base plate was designed to sweep through 90 degrees and support the weight of the boom Front end engineering was performed to verify the strength of the design under all loads and environmental conditions according to American Bureau of Shipping (ABS) Classification of Drilling Systems (CDS) rules, performed using STAAD.Pro software – design and manufacture was certified by ABS in accordance with the CDS standard The boom was supplied in a 30 foot lengths to facilitate easy transportation and was assembled in Singapore at the Keppel Fels shipyard Testing of the boom and winching system was undertaken using water bags The booms were installed onto the rig within one year from initial order Value to client Working direct with Expro was more cost effective and collaborate working delivered a customised solution to their requirements Crane operations are avoided – express winching means it take 2-3 minutes to mobilise the booms up and down into position Contact For further information, please contact: [email protected] or visit: www.exprogroup.com

Transcript of Expro Excellence Burner Boom Systems… · • With a boom of 90 feet, and subsequent...

Page 1: Expro Excellence Burner Boom Systems… · • With a boom of 90 feet, and subsequent weights/forces, a base plate was designed to sweep through 90 degrees and support the weight

Burner Boom Systems

/ Expro Excellence

Expro develops first flare boom withexpress, integrated hoisting winch,reducing HSE risk and improving rigoperational efficiency

Burner Boom Systems

Expro E x c e l l e n c e exprogroup.com

Objectives

• Client wanted to reduce HSE risk duringflare boom deployment operations

• To help client increase rig operationalefficiency by not having to tie crane up forlengthy periods of time to sling booms

Expro Excellence

• Expro worked with the client to develop aconcept for dedicated winching units tosafely deploy booms from vertical storageposition to horizontal operational position

• Two 90 foot vertical racking booms andkingposts (port and starboard) weresupplied, along with 3-Head Sea EmeraldBurners

• With a boom of 90 feet, and subsequentweights/forces, a base plate was designedto sweep through 90 degrees and supportthe weight of the boom

• Front end engineering was performed toverify the strength of the design under allloads and environmental conditionsaccording to American Bureau of Shipping(ABS) Classification of Drilling Systems(CDS) rules, performed using STAAD.Prosoftware – design and manufacture wascertified by ABS in accordance with theCDS standard

• The boom was supplied in a 30 footlengths to facilitate easy transportation andwas assembled in Singapore at the KeppelFels shipyard

• Testing of the boom and winching systemwas undertaken using water bags

• The booms were installed onto the rigwithin one year from initial order

Value to client

• Working direct with Expro was more costeffective and collaborate workingdelivered a customised solution to theirrequirements

• Crane operations are avoided – expresswinching means it take 2-3 minutes tomobilise the booms up and down intoposition