Expo 2015 Ungarian Pavilion

19

description

 

Transcript of Expo 2015 Ungarian Pavilion

1

Feeding the planet,energy for lifeFrom the purest sources.

Vitali GroupA partner forThe Hungarian PavilionAt Expo 2015

32

1 Construction partner

Vitali’s group is one of the most important operator in themanagement and the construction sector.It develops property areas, designs and builds office buildings,shopping centers, warehouses for logistics and structures fortop events, trade fairs and exhibitions.Vitali group is able to operate in the whole Italian and European territory and it is a perfect partner for international designer and architects.Its strenght is the ability to act as a single interlocutor able toanswer to each need of costumers.

Vitali is a leading international partner of Public Administrations and Multinational Companies for the construction of structures for top events, trade fairs and international exhibitions. From the initial idea to the design, from the implementation to the management and also to the disassembly, in full compliance with the timing and with a careful monitoring of the costs, providing integrated and customized solutions.Thanks to its experience, Vitali is able to design, buildand manage temporary or permanent facilities for exhibitionsor sporting and social events, combining a high constructive capacity with the flexibility and the know-how of a dynamic and evolved company, always attentive to the needs of its customers.

Vitali combines a cultural wealth that crossesthis family for three generations with the certainty of excellentacquired technics. Vitali is a leader of the Italian Real EstateMarket, introducing the most advanced professional standardsand an innovative business model. Thanks to the whole process,simplified in “production-project-execution”, the groupnow operates as a International Contractor, and is fully qualifiedand supported by a structure that allows the execution of works,from the concept to the final delivery of the product and the specific and innovative adoptive relocation.

Projecting/co-projecting;• Engineering;• Project and construction management;• Construction;• Disassembly;• Control and management;• Facility management;• Relocation.

VitaliGroup

Eventconstruction

Integrated process: management, construction, relocation

54

PALAHOCKEY OLimPiC GAmEs 2006 - stadioArata Isozaki - Tokio

2

Sports infrastructures, construction for social events, fairs and exhibitions.

Reference

76

PERmANENT EXHiBiTiON miCROsOfTFlores & Prats Architect - Barcelona

2 Reference

In a permanent two floors building of 2,500 sqm, extremely flexible and functional, characterized by elegant interiors and by tricks of light, it was created a special exhibition space dedicated to new technologies proposed by the Redmond company.Microsoft, in these spaces, offers the possibility to its partners to touch the new products in advance.

98

EXHiBiTiON HALLs

2

We realize pavilions for exhibitions and roadshows, organized by the most important brands in the world and with great affluence of public.Our experience makes us a reliable partner, able to give concrete form to the ideas, even the more curious.A full range of possibilities for our clients.

Reference

1110

EXPO 2015 - DOOR Of EXPOCitterio & Viel and partner - Milano

3

It’s the most important project of Lombardy’s roads network, which connects the exhibition area to the main roads (A4 and A8) and the secondary roads.The intervention aims to create a full integration between the exhibition area of Expo 2015 and the territory guaranteeing an appropriate site accessibility.

EXPO

1312

EXPO 2015 - DOOR Of EXPOCitterio & Viel and partner - Milano

3 EXPO

CLIENT: Infrastrutture Lombarde

DEsignER: Pro Iter; Antonio Citterio Patricia Viel and Partners

WORK PERiOD: about 2 years

14

4

For Vitali group respect for the environment is the philosophy at the basis of every iniziative. For this purpose, the group has set out its own construction guidelines, arising from a constant search for eco-sustainable and technologically advanced solutions and for carrying out building compatible with certified environmental quality through use of environmentally friendly materials, solar and geothermal energy, district heating, etc. ... (able to ensure low energy consumption and high living standards). The main certification for Vitali are: LEED (Leadership in Energy and Environmental Design); BREEAM (Building Research Establishment Environmental Assessment Method) and Carbon Neutral.

Certification

1716

5

UNGHERIA

“Who would want to live on a planet where everything has been dirtied, where everything is drying out and drinking water is dwindling due to climate changes?”.

The challenge launched by the Expo 2015 is “Feeding the Planet”. And this challenge was fully embraced by the country that Dante Alighieri defined as “The crown of that land that the Danube crosses” that dedicated its pavilion to a key theme “From the purest sources”.

13.06.2013

géza szócsCommissioner general of the Hungarian Pavilion

THERmAL sPRiNG - miNERAL TERRACEEgerszalok - Hungary

Hungary and EXPO

1918

Organization& General Planning

2120

6 Organization and general planning

ORGANIZATION &CONCEPT

Expo 2015 participation fee + fees

Country Expo Committee management fee

Concept draft

Preliminary project design

milan operational headquarters identification and outfitting

Accueil

PROJECT &MANAGEMENT

final project design

Executive project design

Energy design

Construction project design

Design supervision

Project management

specialist on-site analyses

safety coordination project design

Environmental

Cronoprogram

CONSTRUCTION &MANAGEMENT

Temporary works

Construction management

Expo 2015 pavilion construction Civil Works Foundations Structure Enclosure

Exterior finishing Flooring Landscaping Urban furnishing

Systems Mechanical Electricity and computer networks Fire prevention and security Plumbing

Utility hook-up Mechanical Electricity and computer networks Fire prevention and security Plumbing

DISPOSAL &DEMOLITION

Tear down and demolition works

Demolition and safety work design

Exterior works and finishing tear down

Tear down

System tear down

Structure tear down

Foundation demolition

Area reclamation

FACILITY & BUILDING MANAGEMENT

Building management during Expo 2015 period - 6 months

Facility management and maintenance

Utilities

Security

Marketing, events, advertising, promotion, press room, catering, etc.

Cleaning

Staff, hostesses, translators, administration

RELOCATION & ADAPTATION

identification of potential pavilion relocation and repositioning

hip 1 Innovation Campus

hip 2 Italy

hip 3 Hungary

hip 4 Europe

FIT OUT MANAGEMENTS

Project Interior Design Engineering Security Management

Furnishings Furniture Video Lighting Installations

2322

Feb 2016

Jan 2016

Dec 2015

Nov 2015

Oct 2015

Sep 2015

Aug 2015

Jul 2015

Jun 2015

May 2015

Apr 2015

Mar 2015

Feb 2015

Jan 2015

Dec 2014

Nov 2014

Oct 2014

Sep 2014

Aug 2014

Jul 2014

Jun 2014

May 2014

Apr 2014

Mar 2014

Feb 2014

Jan 2014

Dec 2013

Nov 2013

1 2 3 4 5 6

PROJECT &MANAGEMENT

6 Project and crono road map

Timing

CONSTRUCTION &MANAGEMENT

DISPOSAL &DEMOLITION

RELOCATION BUDGET

Relocation and innovation

hip 1 Innovation Campus

hip 2 Italia

hip 3 Ungheria

hip 4 Europa

Phase Phase

ORGANIZATION &CONCEPT

OR

GA

NIZ

ATIO

N B

UD

GE

T

EX

EC

UT

ION

BU

DG

ET

PROJECT &MANAGEMENT

6 Project and crono road map

Timing

CONSTRUCTION &MANAGEMENT

DISPOSAL &DEMOLITION

RELOCATION BUDGET

Relocation and innovation

hip 1 Innovation Campus

hip 2 Italy

hip 3 Hungary

hip 4 Europe

ORGANIZATION &CONCEPT

OR

GA

NIZ

ATIO

N B

UD

GE

T

EX

EC

UT

ION

BU

DG

ET

FACILITY & BUILDING MANAGEMENT

FIT OUT MANAGEMENTS

2524

Work quality is the result of expert planning

2726

7 Project design and management phases

Organization & concept Hungarian designerHungary Expo Committee

Design architect recruitment;

Preliminary context analysis;

Main Expo theme "Feeding the planet, Energy for life";

Analysis of the identified Expo theme (water and research);

Design concept identification

Overall budget;

Overall budget item identification;

Preliminary design Hungarian designerVitali SpA

Identification of the design phases to be implemented and their logical sequence as well as scheduling;

Identification of the design levels and graphs and descriptions to be drafted;

Recruitment of the structural designer to draft the feasibility plan

Identification of the general goals to be achieved and strategies to achieve them;

Identification of needs and demands to be met;

Identification of the rules and technical regulations to be observed;

Identification of legal restrictions concerning the work context;

Job profile identification;

Identification of the technical requirements to be met;

Identification of the financial ceilings to be met and cost estimates and funding sources;

Identification of the implementation system to be used;

Preliminary geological and hydro geological surveys;

Initial indications and draft of the safety plans;

Expense forecast and consistency check with preliminary budget;

Special standards and performance plan;

Draft of design documents that set the most significant characteristics according to the above analysis;

Preliminary schedule;

Final design Hungarian designerVitali SpA

Final architectural, structural and system design;

Geological, geotechnical, hydrological, hydraulic, seismic reports;

Height and distance surveys;

Environmental feasibility study;

General specialty design (energy savings, certifications, noise impact);

Descriptive and performance regulations for technical elements;

Forecasted bill of quantities;

Budget;

Special contract specifications;

Fire inspection application;

Preparation of the documents required to obtain any licenses/authorisations from other boards;

Schedule check and update;

Executive design Hungarian designerVitali SpA

Executive design that includes engineering of all work and, therefore, defines all and every architectural, structural and system detail to be implemented ;

Executive design of architectural, structural and system finishes and environmental reclamation and improvement;

Specialty design (energy savings, certifications, noise impact);

Work and piece maintenance plans

Safety and coordination plans in the design phase;

Final bill of quantities and budget

Scheduling

Unit pricelist and analysis;

Percent labour incidence for the various work or labour categories;

Contract and special contract standard outline

Energy design for environmental certification Vitali SpA

System and enclosure energy design;

Architectural and system design coordination;

Business plan draft for provisioning and implementation according to the certification procedure;

PROJECT & MANAGEMENT

2928

7

Vitali SpA

Vitali SpA

Design supervision Hungarian designer

Architectural, structural and system design supervision

Project management (general progress coordination) Vitali SpA

Overall design plan draft and management;

Overall action plan draft and management;

Budget and scheduling;

Work site assistance and regulations;

Safety coordination during the design phase;

Engineering coordination (Plan and Schedule);

Architectural, system and structural design coordination;

Design and standard specifications;

Coordination with the design supervisor;

Design coordination for environmental certification;

Design phase validation.

Design phase identification

Construction management Vitali SpA

Work Management;

Work site business plans;

Provisioning plans;

Purchasing department assistance to manage provisioning

Safety coordination and plan during the execution phase;

Executive temporary works plan;

Work accounting (Initial budget, Bill of quantities, Deviation control and analysis);

Quality management;

Purchaser relations management;

Coordination system management;

Construction phase coordination for environmental certification;

Budget and scheduling;

Inspection assistance.

Pavilion construction Vitali SpA

Safety action plans;

Material provisioning;

Construction and structural works

System installation

Interior finishes

Outfitting

Pavilion tear down and demolition Vitali SpA

General management and identification of the work phases

Nomination of job positions and professionals

Foundation demolition

Structure tear down

Finishing tear down

System tear down

Outfitting and equipment tear down

Area reclamation

Identification of possible pavilion relocation sites

CONSTRUCTION & MANAGEMENT

FACILITY MANAGEMENT & GESTIONE BUILDING

DISPOSAL & DEMOLITION

RELOCATION

3130

Hungary in Italy, Together to build a concept and enhance a project

3332

8 Technical job organisational chart*

Position HU IT

Purchaser

Architectural designer

Structural designer

Electrical and mechanical system designer

Sound designer

Plumbing designer

Fire inspection designer

Landscaper

Specialist surveys (geological, environmental, etc.)

Safety manager during the design and construction phases

Work Director

Work Manager

General Contractor, Project and Construction Management

Work inspectors

Design supervision

Interior Designer

Work management committee

Technical job organisational chart *Nominations according Italian Public Works Regulation

Registered OfficeVia Alberto Da Giussano, 1520145 Milano Tel.: +39 02 74281998Fax : +39 02 45490814

Administrative OfficeVia Bisone, 7Cisano Bergamasco – BergamoTel. : +39 035 783107Fax. : +39 035 783345

Business officevia Lombardia, 2A20068 Peschiera BorromeoTel. +39 02-74281998Fax +39 02-45490814