Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems Rolling Stock Applications

Transcript of Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire...

Page 1: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 1Lightrailday 2011 - Copenhagen

Fire Protection Solutions from one source

FOGTEC Rail Systems

Rolling Stock Applications

Page 2: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 2Lightrailday 2011 - Copenhagen

How innovative fire protection solutions can effect design, safety and weight management of railway

vehicles

Roger – A. Dirksmeier, Lightrailday 7. + 8.11. 2011

Page 3: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 4Lightrailday 2011 - Copenhagen

Index

• Who I am…

• FOGTEC – the Company

• Fire Protection in Light Rail – What is The Status?

• Compensation – The New Magic Aspect in Fire Protection…

• Application Example

• Q & A

Page 4: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 5Lightrailday 2011 - Copenhagen

Who I am?

Roger – A. Dirksmeier

Business Unit Manager Rail SystemsFOGTEC since 2001Shareholder since 2003

Before:Deutsche BahnDepartment for Fire Protection in Passenger Transport

Graduated Engineer in vehicle designSpecialised in- Track guided systems- Traction technology

Page 5: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 6Lightrailday 2011 - Copenhagen

Headquarter in Köln

Sales Office Nord, HamburgOffice Asia, Mumbai, IndienOffice China, Shanghai, China

FOGTEC France, ParisFOGTEC Spain, Madrid

R&D, RostockIFAB, Rostock

FOGTEC Fire Protection

Page 6: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 7Lightrailday 2011 - Copenhagen

Sales

Fixed Maritime Rail SystemsTunnelMobile

Core Business

High Pressure Water Mist Systems

Complete solutions

FOGTEC Fire Protection

Page 7: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 8Lightrailday 2011 - Copenhagen

FOGTEC Rail Systems

Business Unit Rail Systems

• Head Office in Cologne

• Consulting work in regard to Fire Protection in Rolling Stock

• Specialised on development and marketing for complete fire protection solutions in rolling stock applications

• Fire detection / fire suppression• Add on products

• Development and manufacturing of plug-and-play modules

• Full Time Rolling Stock Team

Page 8: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 9Lightrailday 2011 - Copenhagen

Products I

• Consultancy and Support during development phase for new vehicle platforms and concepts

• Support during the approval process of railway vehicles

• Further development of components and systems

• Integration-Engineering, Installation and Commissioning

• After-sales Service and Maintenance

Page 9: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 10Lightrailday 2011 - Copenhagen

Products II

• Fire Detection Systems and their components

• Centre Units

• Data interfaces

• Sensors for smoke, gas, fire and temperatures

• Fire Fighting systems

• High Pressure Water Mist Systems

• Gassystems (Nitrogen)

• Aerosol Generators

Page 10: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 11Lightrailday 2011 - Copenhagen

World Market Leader FOGTEC

Page 11: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 12Lightrailday 2011 - Copenhagen

Innovation and Excellence Awards 2007Kategorie: Safety & Accessibility Innovation of the Year

FOGTEC Rail Systems – Innovative Solutions

UITP – Award

Most innovative Product 2009

Page 12: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 13Lightrailday 2011 - Copenhagen

Quality / Welding

EN 15 085-2

Page 13: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 15Lightrailday 2011 - Copenhagen

FOGTEC Rail Systems

3 main categories of users:

- the „Pessimist by experience“- Negative experience leads to realization (malfunction of vehicle,

significant economic loss)

- the „Compensator“- Reduction of costs at other components

or- Weak points caused by construction material

- the „Norm conformable“- Realization relevant for approval (e.g. ITA, UK)

Page 14: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 16Lightrailday 2011 - Copenhagen

Fahrzeughersteller

Page 15: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 17Lightrailday 2011 - Copenhagen

International the number one – some major orders in 2010/2011

Page 16: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 25Lightrailday 2011 - Copenhagen

Fire Protection in Light Rail Systems

Status Report

Page 17: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 26Lightrailday 2011 - Copenhagen

Light Rail and Fire Protection?

Which regulations are relevant?

Example: in germany the EBA-guideline

has to be taken into account, but vehicles

under BOStrab – requirements can use it…

The requirements for active fire protection

Solutions are mostly related to operation

concept and sensitivty of the operator.

But more and more light rail vehicles run

underground, too.

Page 18: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 27Lightrailday 2011 - Copenhagen

Running Light Rail Projects

• Bombardier Monorail Sao Paulo – FDS and FFS for passenger area on customers request

• Bombardier Flexity Melbourne – FDS for passenger area and drivers cab on customers request

• Bombardier Flexity Bursa – FDS for technical areas on customers request

• Stadler Tango Stuttgart – FDS for passenger area on customers request after fire risk analysis

• Bombardier Flexity RET – FDS for passenger and technical area on customers request after fire risk analysis

Page 19: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 28Lightrailday 2011 - Copenhagen

Running Light Rail Projects

• Bom Sinal VLT – FDS and FFS for diesel power pack after a big fire (pessimist by experience)

• Essener Verkehrs AG (today: VIA)

FDS and FFS for passenger areas for the control of fires and to reduce the scenario for design of infrastructure

Page 20: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 29Lightrailday 2011 - Copenhagen

Compensation

The New Magic Aspect in Fire Protection

Page 21: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 30Lightrailday 2011 - Copenhagen

Compensation

Latin:

Compensare

In our use:

To take another way

than the gudielines

ask for

with the same level

of safety

Page 22: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 31Lightrailday 2011 - Copenhagen

Accepted Aspects by the Approval Bodies

• Against the function guarantee of cables and wires for traction control (here in particular prevention of an automatic train stop due to defects in the case of fire in the BUS system) and communication in the case of danger (here in particular loss of announcement possibilities in person compartments) lower demands can be made. That means for example that a proof of material-characteristics is not necessary and/or further preventive measures can be avoided.

• To the construction materials (e.g. in accordance with EN 45545-2:2008-2) due to the limited fire development lower requirements arose to the flameretardance. This is justified by the small flame heights and/or limited heat release in the starting phase of a fire. The materials in the direct surrounding of the fire source are hardly or only slightly involved at the fire spread due to the active fire fighting. That means for example that an interior ceiling structure could be classified comparably to a side panel construction. Further on toxicity tests can be avodided for small articles/items or for materials behind linings.

Page 23: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 32Lightrailday 2011 - Copenhagen

Accepted Aspects by the Approval Bodies

• Use of small items (e.g. gab covering, hoses, mounting plates) or other construction materials (e.g. interior liners, cables) with deviations from the proof requirement (e.g. normative requirements scarcely missed) would be possible. That means for example that e.g. for rubber elements in the range of the doors or windows an examination of the fire resistance in relation to commercial ignition initials (e.g. gas lighter) is sufficient.

• Lower demands can be made at separations or fire-retarding sealing of compartments (sanitary area, electrical cabinets, train driver compartment), since fire containment inside the compartment and/or prevention of fire spread into neighbouring areas from the outside is given. That means for example that the space-separating effect on basis of a construction evaluation is sufficient and large scale fire tests can be avoided.

Page 24: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 33Lightrailday 2011 - Copenhagen

Accepted Aspects by the Approval Bodies

• Demanded fire wall doors can be omitted, because compartments for persons can be classified as „ area of relative safety” due to the fire suppression at least over duration of the fire fighting process. Further on, time-critical evacuations can be excluded – even in the case of a bigger fire scenario (e.g. arson with a priming charge) than calculated.

• Increased evacuation times in relation to the original conditions can be accorded, since the health endangerment is lower in the fire affected areas and lies within acceptable borders. That means for example that vehicles with an additionally installed fire fighting system can be used in a higher operating category.

• Fire protection requirement concessions to the construction of the vehicles regarding the safety requirements (e.g. observableness of luggage compartments) are possible.

Page 25: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 34Lightrailday 2011 - Copenhagen

Accepted Aspects by the Approval Bodies

• As an effect of the immediate fire fighting there occurs not a thermal load critical for the body shell structure of the vehicle. That means for example that the body shell is not exposed at any time to the thermal load of a full blaze. Out of this reason it is not compellingly necessary to proof the stability of the body shell during a full fire blaze.

• Fire safety concessions to the infrastructure (e.g. lower requirements of fire protection of building parts, smoke outlet and smoke stopping systems) are possible.

• In connection with an automatic fire fighting process in the vehicle the development of a fire is limited to a minimum, so that the limit value defaults can be fallen below the calculated fire scenario concerning the smoke release in the emergency escape routes of the stations as well as the stability of the buildings.

Page 26: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 35Lightrailday 2011 - Copenhagen

Design Examples…

Use of active fire protection measures to:

- Use „Open Gangway Philosophy“- Use different materials than required- To upgrade existing vehicles

for:

- new approvals

- new design approach

- better weight balance

- higher safety level

Page 27: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 36Lightrailday 2011 - Copenhagen

Application Example:

Compensation –

Impact to Infrastructure

FOGTEC R E D

DYNAMICSEFFICIENCY andRAIL

Page 28: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 37Lightrailday 2011 - Copenhagen

Underground Traffic Systems

In this case:

The approval body required

the upgrade of the underground

stations related to fire protection,

main aspect: evacuation concept

Given scenario for concept:

a train under full developed fire

in the station0

5

10

15

20

25

30

35

0 5 10 15 20 25 30 35 40 45Branddauer [min]

En

erg

iefr

eise

tzu

ng

srat

e [M

W]

FOGTEC R E D – Project

Page 29: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 38Lightrailday 2011 - Copenhagen

FOGTEC R E D – Project

Fire Protection System

for P89 of EVAG

( former Dockland train)

Page 30: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 39Lightrailday 2011 - Copenhagen

Problem:

A lot of stations, which are 30 to 40 years old and the measures they have to realise are related to extreme efforts and costs

The FOGTEC idea: reduce the given scenario by active measurements on board, in this case with a fire detection and fire suppression system.

The operator, the fire safety consultant and the approval body accepted this solution, but they gave a approval plan to FOGTEC.

FOGTEC R E D – Project

Page 31: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 40Lightrailday 2011 - Copenhagen

Idea of the operator: to win time for the evacuation

Main question: will the fire come back?

?

FOGTEC R E D – Project

Page 32: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 41Lightrailday 2011 - Copenhagen

Step 1: smoke tests on board of the different running trains to develop a fire detection concept on the base of the ARGE – directive

Step 2: full scale fire test to demonstrate the effectiveness of the fire suppression system

Step 3: Realisation of a prototype system in a running train to demonstrate the feasibility and to get a clear view of the costs

Step 4: safety approval for the complete system and the software

FOGTEC R E D – Project

Page 33: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 42Lightrailday 2011 - Copenhagen

EVAG – Project – Step 1Smoke Tests to develop

detection concept

FOGTEC R E D – Project

Page 34: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 43Lightrailday 2011 - Copenhagen

FOGTEC R E D – Project

Page 35: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 44Lightrailday 2011 - Copenhagen

All types of trains were tested:– Tests during during phase– Tests with open windows as well es during tunnel operation

Validation of smoke detector´s position

Abteilfenster zu Alle Abteilfenster geöffnet

FOGTEC R E D – Project

Page 36: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 45Lightrailday 2011 - Copenhagen

To optimise the amount of water that has to be carried,

the train is splitted in sections:

Section Description

1 Drivers Desk A

2 Drivers Side wagon A

3 Gangway side wagon A

4 Gangway side wagon B

5 Drivers Side Wagon B

6 Drivers Desk B

FOGTEC R E D – Project

Page 37: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 46Lightrailday 2011 - Copenhagen

FOGTEC R E D – Project

Page 38: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 47Lightrailday 2011 - Copenhagen

EVAG – Project – Step 21:1 Full Scale Tests to

validate the efficiency

FOGTEC R E D – Project

Page 39: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 48Lightrailday 2011 - Copenhagen

Transfer from reality to testing:

FOGTEC R E D – Project

Page 40: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 49Lightrailday 2011 - Copenhagen

Full Scale

Test Mock up

FOGTEC R E D – Project

Page 41: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 50Lightrailday 2011 - Copenhagen

Position of

Thermocouples

FOGTEC R E D – Project

Page 42: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 51Lightrailday 2011 - Copenhagen

FOGTEC R E D – Project

Page 43: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 52Lightrailday 2011 - Copenhagen

Fire Test with activation of the System

FOGTEC R E D – Project

Page 44: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 53Lightrailday 2011 - Copenhagen

Fire test without the activation of the system

FOGTEC R E D – Project

Page 45: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 54Lightrailday 2011 - Copenhagen

Fire test without the activation of the system

FOGTEC R E D – Project

Page 46: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 55Lightrailday 2011 - Copenhagen

IMO Cushion on seats without activation of the system

Interruption of the test after 11 minutes!

Extreme damage of

complete mock up

FOGTEC R E D – Project

Page 47: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 56Lightrailday 2011 - Copenhagen

Comparison with and without system (cushion on seats)

With activated FOGTEC System Without activated FOGTEC System

FOGTEC R E D – Project

Page 48: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 57Lightrailday 2011 - Copenhagen

Firetest with FOGTEC system (cushions under seat)

FOGTEC R E D – Project

Page 49: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 58Lightrailday 2011 - Copenhagen

EVAG – Project – Step 3Realise a prototype

FOGTEC R E D – Project

Page 50: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 59Lightrailday 2011 - Copenhagen

FOGTEC R E D – Project

Page 51: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 60Lightrailday 2011 - Copenhagen

Speciality in this project:

Roof design

FOGTEC R E D – Project

Page 52: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 61Lightrailday 2011 - Copenhagen

Points with high

dynamic stresses

Additional measures

FOGTEC R E D – Project

Page 53: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 62Lightrailday 2011 - Copenhagen

Nirtogen Module

High Pressure Pipe Work Roof Installation

Installaton Track

FOGTEC R E D – Project

Page 54: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 63Lightrailday 2011 - Copenhagen

Medium support from outside (on top of

ceiling) into the car

FOGTEC R E D – Project

Page 55: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 64Lightrailday 2011 - Copenhagen

Water Cylinder

Inside the car

FOGTEC R E D – Project

Page 56: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 65Lightrailday 2011 - Copenhagen

Smoke detector

Nozzle

GSM – Service module

FOGTEC R E D – Project

Page 57: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 66Lightrailday 2011 - Copenhagen

EVAG – Project – Step 4Approvals

FOGTEC R E D – Project

Page 58: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 67Lightrailday 2011 - Copenhagen

Page 59: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 68Lightrailday 2011 - Copenhagen

Test Assessment done by IFAB

and TÜV Nord

FOGTEC R E D – Project

Page 60: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 69Lightrailday 2011 - Copenhagen

FOGTEC R E D – Project

Page 61: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 70Lightrailday 2011 - Copenhagen

FOGTEC Rail Days 2012 – be a part of it…

June 2012 in Warnemünde (Rostock), Germany

Page 62: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 71Lightrailday 2011 - Copenhagen

Q & A

Page 63: Experts in Fire Protection The Smarter Way of Fire Fighting 1 Lightrailday 2011 - Copenhagen Fire Protection Solutions from one source FOGTEC Rail Systems.

Experts in Fire Protection

The Smarter Way of Fire Fighting 72Lightrailday 2011 - Copenhagen

Thank you very much for your kind attention !