2
Site Expenses Description Balance labour wages for the month of Nov-15 Electrode (E-7018)D&H Diesel for Dec-15 Gas Consumable (Grinding wheel and hand gloves etc) Chain blocks Wooden sleeper (150 Nos.) Scaffolding clamps and T&P(Movable ladder etc) Welding M/c callibration Drinking water Hard rock for cond. labour colony and lab for C&I agency Site expenses IBR expenses (Misc.) Labour license (Extension from 450 to 550 Nos.) Eletric bill -labour colony 23 T Faranna Staff salary Karni sales (Due payment, wooden sleeper and consumable) Earth work for neutralization pit Chemical cleaning Fagioli Total Other than above we have to pay to agency for 710 T and 250 T cranes Deaerator and placement of condenser tube module respectively.

description

vvvvvvv

Transcript of Expenses

Site ExpensesDescription

Balance labour wages for the month of Nov-15Electrode (E-7018)D&HDiesel for Dec-15GasConsumable (Grinding wheel and hand gloves etc)Chain blocksWooden sleeper (150 Nos.)Scaffolding clamps and T&P(Movable ladder etc)Welding M/c callibrationDrinking waterHard rock for cond.labour colony and lab for C&I agencySite expensesIBR expenses (Misc.)Labour license (Extension from 450 to 550 Nos.)Eletric bill -labour colony23 T FarannaStaff salaryKarni sales (Due payment, wooden sleeper and consumable)Earth work for neutralization pitChemical cleaningFagioli

Total

Other than above we have to pay to agency for 710 T and 250 T cranes required for lifting of Deaerator and placement of condenser tube module respectively.

Site ExpensesProposed Expanses

2000000500000150000300000200000500000150000500000280001200040000

4000001500001650004000038000

400000134000020000040000

150000010000009653000

Other than above we have to pay to agency for 710 T and 250 T cranes required for lifting of Deaerator and placement of condenser tube module respectively.