    Nokia Siemens Networks

    GSM/EDGE BSS, rel.

    RG10(BSS), operatingdocumentation, issue 05

    Expand and Upgrade

    Expanding Flexi EDGE BTS

    DN70475791

    Issue 4-0Approval Date 2009-06-18

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    2/63

    2 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc368

    The information in this document is subject to change without notice and describes only the

    product defined in the introduction of this documentation. This documentation is intended for the

    use of Nokia Siemens Networks customers only for the purposes of the agreement under whichthe document is submitted, and no part of it may be used, reproduced, modified or transmitted

    in any form or means without the prior written permission of Nokia Siemens Networks. The

    documentation has been prepared to be used by professional and properly trained personnel,

    and the customer assumes full responsibility when using it. Nokia Siemens Networks welcomes

    customer comments as part of the process of continuous development and improvement of the

    documentation.

    The information or statements given in this documentation concerning the suitability, capacity,

    or performance of the mentioned hardware or software products are given "as is" and all liability

    arising in connection with such hardware or software products shall be defined conclusively and

    finally in a separate agreement between Nokia Siemens Networks and the customer. However,

    Nokia Siemens Networks has made all reasonable efforts to ensure that the instructions

    contained in the document are adequate and free of material errors and omissions. Nokia

    Siemens Networks will, if deemed necessary by Nokia Siemens Networks, explain issues which

    may not be covered by the document.

    Nokia Siemens Networks will correct errors in this documentation as soon as possible. IN NO

    EVENT WILL Nokia Siemens Networks BE LIABLE FOR ERRORS IN THIS DOCUMENTA-

    TION OR FOR ANY DAMAGES, INCLUDING BUT NOT LIMITED TO SPECIAL, DIRECT, INDI-

    RECT, INCIDENTAL OR CONSEQUENTIAL OR ANY LOSSES, SUCH AS BUT NOT LIMITED

    TO LOSS OF PROFIT, REVENUE, BUSINESS INTERRUPTION, BUSINESS OPPORTUNITY

    OR DATA,THAT MAY ARISE FROM THE USE OF THIS DOCUMENT OR THE INFORMATION

    IN IT.

    This documentation and the product it describes are considered protected by copyrights and

    other intellectual property rights according to the applicable laws.

    The wave logo is a trademark of Nokia Siemens Networks Oy. Nokia is a registered trademark

    of Nokia Corporation. Siemens is a registered trademark of Siemens AG.

    Other product names mentioned in this document may be trademarks of their respectiveowners, and they are mentioned for identification purposes only.

    Copyright Nokia Siemens Networks 2010. All rights reserved

    f Important Notice on Product SafetyElevated voltages are inevitably present at specific points in this electrical equipment.

    Some of the parts may also have elevated operating temperatures.

    Non-observance of these conditions and the safety instructions can result in personal

    injury or in property damage.

    Therefore, only trained and qualified personnel may install and maintain the system.

    The system complies with the standard EN 60950 / IEC 60950. All equipment connected

    has to comply with the applicable safety standards.

    The same text in German:

    Wichtiger Hinweis zur Produktsicherheit

    In elektrischen Anlagen stehen zwangslufig bestimmte Teile der Gerte unter Span-

    nung. Einige Teile knnen auch eine hohe Betriebstemperatur aufweisen.

    Eine Nichtbeachtung dieser Situation und der Warnungshinweise kann zu Krperverlet-

    zungen und Sachschden fhren.

    Deshalb wird vorausgesetzt, dass nur geschultes und qualifiziertes Personal die

    Anlagen installiert und wartet.

    Das System entspricht den Anforderungen der EN 60950 / IEC 60950. Angeschlossene

    Gerte mssen die zutreffenden Sicherheitsbestimmungen erfllen.

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    3/63

    DN70475791

    Issue 4-0

    3

    Expanding Flexi EDGE BTS

    Id:0900d805806bc368

    Table of ContentsThis document has 63 pages.

    1 Summary of changes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

    2 Overview of expanding Flexi EDGE BTS. . . . . . . . . . . . . . . . . . . . . . . . . 8

    3 Expansion planning principles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

    4 General expansion principles for Nokia Flexi EDGE BTS. . . . . . . . . . . 12

    4.1 Sector expansion principles. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

    4.2 System Extension Module (ESEA) expansion principles. . . . . . . . . . . . 13

    4.3 Remote Tune Combiner Module (ECxA) expansion principles . . . . . . . 14

    4.4 Optional power module or rectifier module expansion principles. . . . . . 15

    4.5 Feederless site expansion principles. . . . . . . . . . . . . . . . . . . . . . . . . . . 16

    4.6 Double Power (DP) expansion principles . . . . . . . . . . . . . . . . . . . . . . . 17

    5 Transmission expansion principles . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18

    6 Advanced expansion principles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

    6.1 Principles for changing from a cost-optimised to an upgrade-optimised con-

    figuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

    6.2 Principles for changing from an upgrade-optimised to an antenna-opti-

    mised configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

    6.3 Principles for expanding an artificially split sector. . . . . . . . . . . . . . . . . 24

    7 Expanding a 2+2+2 bypass 2UD to 4+4+4 2-way 2UD configuration . . 25

    7.1 Expanding a 2+2+2 bypass 2UD to 4+4+4 2-way 2UD configuration with 48

    V DC power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 257.2 Expanding a 2+2+2 bypass 2UD to 4+4+4 2-way 2UD configuration with

    AC or 24 V DC power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33

    8 Expanding to a 2+2+2 DP 2UD configuration . . . . . . . . . . . . . . . . . . . . 36

    9 Expanding to ESEA configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37

    9.1 Expanding to a System Extension Module (ESEA) configuration . . . . . 37

    9.2 Expanding a 4+4 2-Way WBC to an 8+8+8 4-Way WBC configuration 40

    10 Expanding feederless configurations. . . . . . . . . . . . . . . . . . . . . . . . . . . 49

    10.1 Expanding from a 2+2+2 by-pass 2UD to a 4+4+4 2-way 2UD feederless

    configuration on a rooftop . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49

    10.2 Expanding from a 4+4+4 to a 6+6+6 4-way 2UD feederless configuration

    on a rooftop . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53

    10.3 Expanding from a 6+6+6 to an 8+8+8 4-way 2UD feederless configuration

    on a rooftop . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    4/63

    4 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc368

    List of FiguresFigure 1 RF Rx cabling in antenna-optimised configurations . . . . . . . . . . . . . . . . 22

    Figure 2 RF Tx cabling in antenna-optimised configurations . . . . . . . . . . . . . . . . 23

    Figure 3 Modules for 3+3+3/4+4+4 expansion in FCIA . . . . . . . . . . . . . . . . . . . . 26

    Figure 4 Modules for 3+3+3/4+4+4 expansion in FCOA. . . . . . . . . . . . . . . . . . . . 27

    Figure 5 Modules for 3+3+3/4+4+4 expansion in stacks . . . . . . . . . . . . . . . . . . . 28

    Figure 6 Installing Wideband Combiner Sub-module . . . . . . . . . . . . . . . . . . . . . . 29

    Figure 7 RF cables in 3+3+3/4+4+4 2-way 2UD. . . . . . . . . . . . . . . . . . . . . . . . . . 30

    Figure 8 RF cables in 3+3+3/4+4+4 2-way 2UD expansion . . . . . . . . . . . . . . . . . 31

    Figure 9 RF and DP cables in a 2+2+2 DP 2UD configuration . . . . . . . . . . . . . . . 36

    Figure 10 Module installation order for an 8+8+8 configuration in FCIA. . . . . . . . . 41

    Figure 11 Module installation order for an 8+8+8 configuration in FCOA. . . . . . . . 42

    Figure 12 Bus cabling for an 8+8+8 configuration in FCIA . . . . . . . . . . . . . . . . . . 43

    Figure 13 Internal power cabling for an 8+8+8 configuration in FCIA . . . . . . . . . . 44Figure 14 Bus cabling for an 8+8+8 configuration in FCOA. . . . . . . . . . . . . . . . . . 45

    Figure 15 Internal power cabling for an 8+8+8 configuration in FCOA . . . . . . . . . 46

    Figure 16 Rx cabling for an 8+8+8 configuration . . . . . . . . . . . . . . . . . . . . . . . . . . 47

    Figure 17 Tx cabling for an 8+8+8 configuration. . . . . . . . . . . . . . . . . . . . . . . . . . . 47

    Figure 18 Expanding from a 2+2+2 to a 4+4+4 feederless configuration on a rooftop,

    local base . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50

    Figure 19 Expanding from a 2+2+2 to a 4+4+4 feederless configuration on a rooftop,

    remote sector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50

    Figure 20 Expanding from a 4+4+4 to a 6+6+6 feederless configuration on a rooftop,

    local base . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54

    Figure 21 Expanding from a 4+4+4 to a 6+6+6 feederless configuration on a rooftop,remote sectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55

    Figure 22 Module installation order for an 8+8+8 local base in FCOA . . . . . . . . . 59

    Figure 23 Module installation order for an 8+8+8 local base in a stack . . . . . . . . . 60

    Figure 24 Module installation order for an 8+8+8 local base in FCIA . . . . . . . . . . . 61

    Figure 25 Module installation order for an 8+8+8 remote sector . . . . . . . . . . . . . . 62

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    5/63

    DN70475791

    Issue 4-0

    5

    Expanding Flexi EDGE BTS

    Id:0900d805806bc368

    List of TablesTable 1 Common sector expansion cases with downtime and estimated work effort

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

    Table 2 Common BCF expansion cases with downtime and estimated work effort

    11

    Table 3 Expansion kits needed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

    Table 4 Tx cables (applies when the EUCA kit is used) . . . . . . . . . . . . . . . . . . 31

    Table 5 Rx cables (applies when the EUCA kit is used) . . . . . . . . . . . . . . . . . . 31

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    6/63

    6 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc368

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    7/63

    DN70475791

    Issue 4-0

    7

    Expanding Flexi EDGE BTS Summary of changes

    Id:0900d805806bc31a

    1 Summary of changes

    Changes between issues 4-0 and 3-0

    Updated chapter:

    Principles for expanding an artificially split sector: updated with information on

    minimum SW level and tested configurations.

    Changes between issues 3-0 and 2-0

    Updated chapters:

    Expansion planning principles: information on the maximum configurations for the

    Dual Duplexer Module (ERxA) has been updated.

    Transmission expansion principles: information on the EDAP pool size has been

    updated.

    Optional power module or rectifier module expansion principles: Flexi RectifierModules FRMA, FRMB and FRMC have been renamed as Flexi Power Rectifier

    Modules FPRx.

    Changes between issues 2-0 and 1-0

    New chapters:

    Double Power (DP) expansion principles

    Expanding to a 2+2+2 DP 2UD configuration

    Updated chapters:

    Expansion planning principles: the number of maximum TRXs per sector updated

    for configurations having a Dual Duplexer Module.

    Optional power module or rectifier module expansion principles: updated with infor-

    mation on the Flexi Rectifier Modules (FRMx). Chapter renamed from Optional

    power (24 V DC or AC) expansion principles.

    Transmission expansion principles:Updated with information on the FIQA and FIYA

    sub-modules and BSC download of Abis mapping.

    Principles for changing from an upgrade-optimised to an antenna-optimised config-

    uration: RF cabling figures added.

    Expanding a 2+2+2 bypass 2UD to 4+4+4 2-way 2UD configuration:Updated with

    information on the effect of the EUCA kit on RF performance.

    Other changes:

    Appendix A Cabling for feederless configurations has been removed from this doc-ument. This information can be found in the Creating Flexi EDGE BTS Feederless

    Site Configurationsdocument.

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    8/63

    8 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc31d

    Overview of expanding Flexi EDGE BTS

    2 Overview of expanding Flexi EDGE BTSBefore expanding Flexi EDGE BTS, review the following expansion principles:

    Expansion planning principles General expansion principles

    Transmission expansion principles

    Advanced expansion principles

    For instructions on how to expand a configuration, see the following instructions:

    Expanding a 2+2+2 bypass 2UD to 4+4+4 2-way 2UD configuration

    Expanding to a 2+2+2 DP 2UD configuration

    Expanding to ESEA configurations

    Expanding feederless configurations

    For maintenance instructions, see the following documentation:

    Maintaining Flexi EDGE BTS Modules: gives instructions for routine maintenance

    tasks, disconnecting cables, replacing modules and module fans.

    Maintaining Flexi Cabinet for Indoor: gives instructions for

    Removing the back panel for module fan maintenance.

    Replacing batteries

    Maintaining Flexi Cabinet for Outdoor: gives instructions for:

    Maintaining air filter

    Maintaining site support

    Replacing Flexi Cabinet Fire Detector (FCDA) (470144A)

    http://dn7064655.pdf/http://x%3Dd%3Do%3Dc/s-000076.pdfhttp://x%3Dd%3Do%3Dc/s-000094.pdfhttp://x%3Dd%3Do%3Dc/s-000094.pdfhttp://x%3Dd%3Do%3Dc/s-000076.pdfhttp://dn7064655.pdf/
  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    9/63

    DN70475791

    Issue 4-0

    9

    Expanding Flexi EDGE BTS Expansion planning principles

    Id:0900d805806bc320

    3 Expansion planning principlesThe following principles apply to planning expansions.

    Licences are always required for expansions.The maximum configurations for the Dual Duplexer Module (ERxA) are:

    A maximum of 8 TRXs per sector with one ERxA

    A maximum of 12 TRXs per sector with multiple ERxAs

    A maximum of 24 TRXs per BCF

    The maximum configurations for the Remote Tune Combiner Module (ECxA) are:

    A maximum of 12 TRXs is supported per sector

    A maximum of 18 TRXs is supported per BCF

    An ERxA configuration refers to any configuration with Dual Duplexer Modules (ERxA)

    connected to the antenna line. An ECxA configuration refers to any configuration with a

    Remote Tune Combiner Module (ECxA) connected to the antenna line.

    Note that cell capacity can be increased with Multi Base Control Function (BCF). Multi

    BCF is an application software product that allows combining resources of several

    physical base stations into one logical cell. Multi BCF increases the Flexi EDGE BTS

    cell capacity to 36 TRXs, while requiring no extra broadcast control channels (BCCH).

    For more details, see GSM/EDGE BSS, BSC and TCSM Product Documentation.

    Table Common expansion cases with downtime and estimated work effortshows

    common expansion cases and divides the cases into the following categories by

    downtime and work effort:

    Quick and easy: Requires no downtime, except if you are activating a feature which

    requires a reset (for example BB hopping, Extended Cell). Hardware installationwork is not needed.

    Minor: The sector is blocked during expansion work. Existing modules do not need

    to be relocated.

    Major: The BCF is blocked during expansion work. Modules must be relocated.

    Note that the work effort assumes that the original configuration was built as instructed

    in this documentation set.

    For illustrations of common configurations, see Creating Stack, Wall and Pole Configu-

    rations, Creating FCIA Configurationsand Creating FCOA configurations.

    For a description of upgrade-optimised, cost-optimised and antenna-optimised configu-

    rations, see Flexi EDGE BTS configuration featuresin Creating Stack, Wall and PoleConfigurations, Creating FCIA Configurationsor Creating FCIA Configurations.

    http://dn70216298.pdf/http://dn70216298.pdf/http://dn70128463.pdf/http://dn70128475.pdf/http://x%3Dd%3Do%3Dc/s-000146.pdfhttp://x%3Dd%3Do%3Dc/s-000146.pdfhttp://dn70128475.pdf/http://dn70128463.pdf/http://dn70216298.pdf/http://dn70216298.pdf/
  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    10/63

    10 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc320

    Expansion planning principles

    1)Downtime may be required if activating a feature which requires a reset (for exampleBB hopping, Extended Cell).

    2)For BSC work effort, 'Minor' means that existing TEI and TSL allocations do not

    change. 'Major' requires moving a TRX from a double TRX to a new sector.

    Category From To Downtime BSC work

    effort 2)HW work effort

    Quick andEasy

    1 TRX (ERxA orECxA)

    2 TRX (ERxA or ECxA) None 1) Minor None

    3 TRX (ERxA or

    ECxA)

    4 TRX (ERxA or ECxA) None 1) Minor None

    5 TRX (ERxA or

    ECxA)

    6 TRX (ERxA or ECxA) None 1) Minor None

    7 TRX (ERxA) 8 TRX (ERxA) None 1) Minor None

    Minor 1 to 2 TRX (ERxA) 3 to 4 TRX (ERxA) Block sector Minor Add modules.

    Change the combin-ing method.

    5 to 6 TRX (ERxA) 7 to 8 TRX (ERxA) Block sector Minor Add modules.

    Change the combin-ing method.

    1 to 2 TRX (ECxA) 3 to 6 TRX (ECxA) Block sector Minor Add modules.

    Add RF cables.

    3 to 4 TRX (ECxA) 5 to 6 TRX (ECxA) Block sector Minor Add modules.

    Add RF cables.

    1 to 6 TRX (ECxA) 7 to 12 TRX (ECxA) Block sector Minor Add modules.

    Add RF cables.

    1 to 4 TRX (ERxA) 5 to 8 TRX (ERxA) Block sector Minor Add (and possibly

    relocate) modules Change combining

    methods.

    Major Any ERxA sector expansion that br ings the total

    number of TRXs for the BCF to more than 12.

    Block BCF Minor Rearrange modules.

    Add ESEA (includingDC input line).

    Re-configureBUS/PWR/RF

    cabling.

    Table 1 Common sector expansion cases with downtime and estimated work effort

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    11/63

    DN70475791

    Issue 4-0

    11

    Expanding Flexi EDGE BTS Expansion planning principles

    Id:0900d805806bc320

    1)Downtime may be required if activating a feature which requires a reset (for example

    BB hopping, Extended Cell).

    2)In upgrade-optimised configurations, odd-numbered sectors are built like the next

    even-numbered sectors, allowing for easier expansion.

    3)In cost-optimised configurations, the Dual TRX module (EXxA) carriers (A and B) are

    split into separate sectors. Cost-optimised configurations which minimise the number of

    required modules are not recommended if future expansion is possible at the site.

    4)For BSC work effort, 'Minor' means that existing TEI and TSL allocations do not

    change. 'Major' requires moving a TRX from a double TRX to a new sector.

    Category From To Downtime BSC work

    effort 4)Comments

    Quick andeasy

    1+1+1 bypass (ERxA,upgrade optimised) 2)

    2+2+2 bypass (ERxA) None 1) Minor None

    3+3+3 2-Way (ERxA,

    upgrade optimised) 2)4+4+4 2-Way (ERxA) None 1) Minor None

    5+5+5 4-Way (ERxA,

    upgrade optimised) 2)6+6+6 4-Way (ERxA) None 1) Minor None

    7+7+7 4-Way (ERxA,

    upgrade optimised) 2)8+8+8 4-Way (ERxA) None 1) Minor None

    1+1+1 (ECxA) 2+2+2 (ECxA) Block sector Minor No HW installation

    required

    3+3+3 (ECxA) 4+4+4 (ECxA) Block sector Minor No HW installation

    required

    5+5+5 (ECxA) 6+6+6 (ECxA) Block sector Minor No HW installation

    required

    Minor 1+1+1 to 2+2+2

    bypass (ERxA)

    3+3+3 to 4+4+4 2-Way

    (ERxA)

    Block sector Minor Add modules.

    Change the RF com-bining method.

    5+5+5 to 6+6+6 4-Way

    (ERxA)

    7+7+7 to 8+8+8 4-Way

    (ERxA)

    Block sector Minor Add modules.

    Add RF cables.

    1+1+1 to 2+2+2

    (ECxA)

    3+3+3 to 6+6+6 (ECxA) Block sector Minor Add modules.

    Add RF cables.

    3+3+3 to 4+4+4 5+5+5 to 6+6+6 (ECxA) Block sector Minor Add modules.

    Add RF cables.

    Major Any cost-optimised

    ERxA configuration 3)Next even ERxA config-

    uration

    Block BCF Major Rearrange modules.

    Re-configure RFcabling.

    Any ERxA configura-

    tion with 12 or less

    TRXs

    Any ERxA configuration

    with 13 - 24 TRXs

    Block BCF Minor Rearrange modules.

    Add ESEA (includingDC input line).

    Re-configureBUS/PWR/RF

    cabling.

    Table 2 Common BCF expansion cases with downtime and estimated work effort

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    12/63

    12 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc336

    General expansion principles for Nokia Flexi EDGEBTS

    4 General expansion principles for Nokia Flexi

    EDGE BTS

    4.1 Sector expansion principles

    These principles apply to adding one or several TRXs to a sector in a configuration

    which

    has Dual Duplexer Modules (ERxA), and

    does not exceed 12 TRXs per BCF.

    Before visiting the site:

    TRXs for the new configuration must first be created in the BSC. Note that when a

    TRX is created in the BSC, it is in the locked state.

    Check to see if a site visit or hardware changes are required: If RF cables were installed for future expansion but are not in use, a site visit is

    not required. For example, when expanding from a 1+1+1 bypass 1UD configu-

    ration to a 2+2+2 bypass 2UD configuration, all RF cables are already pre-

    installed.

    If the combining method has not changed and the expansion is from an odd-

    numbered (upgrade-optimised) configuration to the next even number (for

    example from a 3+3+3 to a 4+4+4), hardware changes are not required.

    After arriving at the site:

    To minimise downtime, pre-install as many modules and cables in advance with the

    existing configuration still operating, excluding connecting power or RF cables to live

    modules. For the remaining expansion work, block the sector and disable power to

    the System Module (ESMA) power ports for the existing and new Dual TRX Modules

    (EXxA).

    If you are expanding more than one sector of a stack 2+2+2 bypass, an EUCA

    upgrade RF cable kit is required for those Dual TRX Modules which are not physi-

    cally located next to the sector modules in the stack.

    If the combining method has changed, it is easier to remove all existing RF cables

    in the sector and then re-connect them according to the new configuration.

    See the configuration tables for the relationship between different modules for each

    configuration:

    Common sector configurationsin Creating Stack, Wall and Pole Configurations.

    Common stack, wall and pole configurationsin Creating Stack, Wall and Pole

    Configurations.

    Common cabinet configurationsin Creating FCIA Configurationsor Creating

    FCOA Configurations.

    http://x%3Dd%3Do%3Dc/s-000030.pdfhttp://dn70216298.pdf/http://x%3Dd%3Do%3Dc/s-000110.pdfhttp://x%3Dd%3Do%3Dc/s-000110.pdfhttp://dn70216298.pdf/http://x%3Dd%3Do%3Dc/s-000030.pdf
  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    13/63

    DN70475791

    Issue 4-0

    13

    Expanding Flexi EDGE BTS

    Id:0900d805806bc327

    4.2 System Extension Module (ESEA) expansion principles

    The following principles apply to expansions that require adding a System Extension

    Module (ESEA) to a configuration having a Dual Duplexer Module (ERxA), that is, when

    expanding from 12 TRXs or less per BCF to more than 12 TRXs.

    Before visiting the site:

    TRXs for the new configuration must first be created in the BSC. Note that when a

    TRX is created in the BSC, it is in the locked state.

    Check if the site was built in preparation for future expansion with the System Exten-

    sion Module pre-installed. If so, follow the sector expansion principles (see Sector

    expansion principles).

    After arriving at the site:

    Nokia Siemens Networks recommends to use separate fused DC input lines for the

    System Extension Module. If a separate line is not available, double rubber boots

    must be ordered as a spare part. See Expanding to a System Extension Module(ESEA) configurationfor details.

    Adding a System Extension Module typically requires modules to be relocated and

    new bus/internal power cabling numbering. To reduce cable work, disconnect the

    bus/internal power cables from the System Module (ESMA) and keep the other end

    connected to the Dual TRX Modules (EXxA).

    To minimise downtime, pre-install as many modules and cables in advance with the

    existing configuration still operating, excluding connecting power or RF cables to live

    modules. The cable for the new System Extension Module DC input line should also

    be prepared in advance. Block the BCF, undo commissioning, and shut off mains

    power for the remaining expansion work.

    It is easier to remove all existing RF cables in the sector and re-connect themaccording to the new configuration.

    See Common cabinet configurationsin Creating FCIA Configurationsor Creating

    FCOA Configurationsfor the relationship between different modules for each con-

    figuration.

    For instructions on how to expand to a configuration that requires a System Extension

    Module, see Expanding to a System Extension Module (ESEA) configuration.

    http://x%3Dd%3Do%3Dc/s-000110.pdfhttp://x%3Dd%3Do%3Dc/s-000110.pdf
  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    14/63

    14 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc32a

    4.3 Remote Tune Combiner Module (ECxA) expansion princi-

    ples

    The following principles apply to expansions that involve adding Remote Tune

    Combiner Modules (ECxA).

    Before visiting the site:

    TRXs for the new configuration must first be created in the BSC. Note that when a

    TRX is created in the BSC, it is in the locked state.

    If RF cables were installed for future expansion but are not in use, a site visit is not

    required. For example, when expanding from a 5+5+5 to a 6+6+6 configuration with

    Remote Tune Combiner Modules, all RF cables are already be pre-installed.

    Confirm this before visiting the site.

    After arriving at the site:

    If you are expanding from a 2-6 to a 7-12 TRX sector:

    An EUCA upgrade RF cable kit is required. The longer RF cables are required

    to connect the RX external output and input ports on the two Remote Tune

    Combiner Modules in the sector without blocking the modules in between.

    Some modules will need to be relocated. To reduce cable work, disconnect the

    bus/internal power cables from the System Module (ESMA) or System Exten-

    sion Module (ESEA), and keep the other end connected to the Dual TRX or

    Remote Tune Combiner Modules.

    To minimise downtime, pre-install as many modules and cables in advance with the

    existing configuration still operating, excluding connecting power or RF cables to live

    modules. For the remaining expansion work, block the sector and disable power to

    the System Module or System Extension Module power ports for the existing and

    new Dual TRX or Remote Tune Combiner Modules in the sector.

    In configurations having a Remote Tune Combiner Module, you typically do not

    need to remove existing RF cables for expansion.

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    15/63

    DN70475791

    Issue 4-0

    15

    Expanding Flexi EDGE BTS

    Id:0900d805806bc32d

    4.4 Optional power module or rectifier module expansion

    principles

    The following principles apply to expansions with optional Flexi Power Modules (FPMA

    or FPDA) or Flexi Power Rectifier Modules (FPRx).

    Before visiting the site:

    If the existing configuration has an FPDA or FPMA, verify that additional power

    modules or sub-modules are needed to support the new configuration. You can do

    this by comparing the current configuration with the new configuration in the

    common configuration tables:

    Common stack, wall and pole configurationsin Creating Stack, Wall and Pole

    Configurations.

    Common cabinet configurationsin document Creating FCIA Configurationsor

    Creating FCOA Configurations.

    Common sector configurationsin document Creating Stack, Wall and Pole Con-figurations.

    If the existing configuration has a Flexi Power Rectifier Module (FPRx), verify that

    additional rectifiers or modules are needed to support the new configuration. You

    can do this by comparing the output power of the installed module(s) and the power

    consumption of the new configuration.

    For more information on FPRx, see the installation instructions in NOLS.

    After arriving at the site:

    If you need to add any power or rectifier modules or sub-modules during the expan-

    sion, block the BCF, and make sure that the mains power is disconnected before

    you start the expansion work.

    For details about FPDA, FPMA, FPAA or FPBA locations, see Optional power

    modules in Flexi EDGE BTS configurationsin document Installing Flexi EDGE BTS

    Optional Items. If you are installing a second FPDA, it must be placed directly on top

    of the existing one.

    Note that the FPMA or FPDA is not supported in some large cabinet configurations

    because there is not enough space for the required modules.

    For details about FPRx module locations, see Principles for installing FPRx in Flexi

    EDGE BTS configurationsin document Installing Flexi EDGE BTS Optional Items.

    http://dn70216298.pdf/http://x%3Dd%3Do%3Dc/s-000110.pdfhttp://x%3Dd%3Do%3Dc/s-000030.pdfhttp://dn70470757.pdf/http://dn70470757.pdf/http://dn70470757.pdf/http://dn70470757.pdf/http://dn70470757.pdf/http://dn70470757.pdf/http://dn70470757.pdf/http://dn70470757.pdf/http://x%3Dd%3Do%3Dc/s-000030.pdfhttp://x%3Dd%3Do%3Dc/s-000110.pdfhttp://dn70216298.pdf/
  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    16/63

    16 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc330

    4.5 Feederless site expansion principles

    Before visiting the site:

    TRXs for the new configuration must first be created in the BSC. Note that when a

    TRX is created in the BSC, it is in the locked state.

    Make sure that locally sourced DC power feed cable will be available at the site.

    After arriving at the site:

    Verify that any EECA cable kits required for the configuration are included in the

    delivery.

    To minimise downtime, pre-install as many modules and cables in advance with the

    existing configuration still operating, excluding connecting power or RF cables to live

    modules. For the remaining expansion work:

    If you are not adding a System Extension Module (ESEA) or you do not need to

    change the mains power configuration, traffic can be blocked and power turned

    off to each sector individually. For all other cases, the BCF needs to be blocked and mains power turned off to

    all sectors.

    Always perform expansion work one sector at a time, starting with the local base and

    followed by the remote sectors.

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    17/63

    DN70475791

    Issue 4-0

    17

    Expanding Flexi EDGE BTS

    Id:0900d805806bc333

    4.6 Double Power (DP) expansion principles

    Double Power TRX is a licensed application software product.

    Follow these principles with Double Power (DP) TRX configurations.

    Before visiting the site:

    Order the SW licence file that contains DP TRX, and install it at the BSC.

    Double Power TRXs for the new configuration must first be created in the BSC. Note

    that when a TRX is created in the BSC, it is in the locked state.

    If hardware was pre-installed for future expansion but is not in use, a site visit is not

    required. For example, when expanding from a 1+1+1 DP 4UD to a 2+2+2 DP 4UD,

    a site visit is not required if all hardware was pre-installed as recommended.

    After arriving at the site:

    The same principles as in Sector expansion principlesapply.

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    18/63

    18 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc338

    Transmission expansion principles

    5 Transmission expansion principlesThe growing amount of traffic in the network requires flexible transmission capacity

    expansion. To expand transmission capacity, connect additional transmission interfaces

    to the transmission sub-module when needed.

    The transmission sub-module, which is a part of the System Module (ESMA), has the

    following variants available:

    8 x E1/T1 balanced 120/100 Ohms (FIPA)

    8 x E1 coaxial 75 Ohms (FIEA)

    2 x Nokia Flexbus Interfaces 16 x 2Mbit/s (FIFA)

    4 x E1/T1 balanced 120/100 Ohms or 2 x Fast Ethernet and 1 Gigabit Ethernet inter-

    faces (FIQA)

    4 x E1 coaxial 75 Ohms or 2 x Fast Ethernet and 1 Gigabit Ethernet interfaces (FIYA)

    Note that for the Gigabit Ethernet Interface, an additional compatible small form-factor

    pluggable (SFP) module is required. The SFP module is a separate sales item.

    The following principles apply to transmission expansions:

    Configuration of Abis traffic allocation in the BTS must match the configuration in the

    BSC.

    TRX signalling channels and traffic channels (TCH) must be at the same E1/T1

    interface or pseudowire.

    The EGPRS Dynamic Abis Pool (EDAP) size at the BSC and BTS and the time slot

    order at the BSC and BTS EDAPs must be the same. For maintenance reasons,

    Nokia Siemens Network recommends using the same timeslot allocation at the BSC

    and BTS.

    The EDAP pool must be at the same E1/T1 interface or pseudowire as the EDGETRXs.

    The maximum EDAP sizes in Flexi EDGE BTS are 1 - 29 TSLs for E1 and 1 - 22

    TSLs for T1. The maximum EDAP size in BSC is 24.

    Up to 12 TRXs are supported on a single E1 2 Mbit/s PCM line or pseudowire and up to

    10 TRXs are supported on a single T1 1.5 Mbit/s PCM line. With the Compressed Abis

    Timeslot Allocation software product, up to 15 TRXs are supported on a single E1 2

    Mbit/s PCM line or pseudowire and up to 11 TRXs are supported on a single T1 1.5

    Mbit/s PCM line. For Compressed Abis Timeslot Allocation, the TRX signalling channel

    is set on top of the traffic channel.

    For more information, see document BSS Transmission Configurationin GSM/EDGE

    BSS, BSC and TCSM Product Documentationin NOLS.

    Transmission sub-modules FIPA (E1/T1), FIEA (E1), FIQA (E1/T1), FIYA (E1) - TDM

    mode

    The transmission sub-module FIPA for E1/T1 or FIEA for E1 supports up to 8 TDM inter-

    faces.

    The transmission sub-module FIQA for E1/T1 or FIYA for E1 supports up to 4 TDM inter-

    faces.

    If the Abis allocation requires more than one PCM line, further E1/T1 interfaces can be

    deployed. The configuration and the settings of the Line Interface (LIF) will be done with

    Flexi EDGE BTS Manager.

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    19/63

    DN70475791

    Issue 4-0

    19

    Expanding Flexi EDGE BTS Transmission expansion principles

    Id:0900d805806bc338

    For T1 settings, the Line Coding must be AMI or B8ZS, and it must be the same as the

    far end.

    As default, two interfaces can be deployed. For further two interfaces, a software licence

    is required for the Flexi EDGE Additional 2 E1, T1 IF (BSS30285) application softwareproduct. This licence is trust-based in the BSS12 release, and licence-key controlled in

    BSS13. For more information, see Technical Note TN_2GBTSf_SW_2007_1.

    Transmission sub-modules FIQA (E1/T1), FIYA (E1) - PWE mode

    The FIQA and FIYA transmission sub-modules contain two fast Ethernet ports and one

    SFP connector/cage for an optical Gigabit SFP module. The fast Ethernet port 2 is dis-

    abled. These ports provide support for Abis over IP. Abis signalling and traffic from the

    BSC is converted into Ethernet traffic using a far-end pseudowire (PW) device. Traffic

    reaches the BTS through an IP network. The FIQA and FIYA sub-modules in the

    pseudowire emulation (PWE) mode offer 8 pseudowires (which map to 8 virtual inter-

    faces with E1 capacity) within a single pseudowire tunnel.

    An additional SFP module is needed to support a Gigabit Ethernet interface.

    For Abis over IP, a software license is required.

    The Ethernet Interfaces (EIF) are configured with Flexi EDGE BTS Manager.

    Flexbus transmission sub-module FIFA

    One FIFA transmission sub-module is used per Flexi EDGE BTS with two Flexbus inter-

    faces, allowing for microwave radio tail and chain site topologies using Nokia FlexiHop-

    per and MetroHopper. The FIFA sub-module offers up to 16 x E1 interfaces. Each of

    these 16 E1 signals can be made operational, and the frame format can be selected.

    Flexbus 1 can be used without a licence. Using Flexbus 2 requires a separate Additional

    Flexbus (FB) interface licence to be installed. For more information, see Technical NoteTN_2GBTSf_SW_2007_1.

    You can manage the FIFA sub-module locally and remotely using Nokia FlexiHub

    manager. The configuration of the internal Line Interface (LIF) settings will be done with

    the Flexi EDGE BTS Manager.

    For more information, see Establishing transmission linkin document Flexi EDGE BTS

    Commissioning.

    Abis loop protection

    The Nokia PDH Loop Protection functionality provides instant recovery from transmis-

    sion failures in a network of network elements, where each element is assigned two

    independent transmission routes. If there is a fault in one route, the system switchestraffic, synchronisation and Q1 management functions to the intact route.

    When changing the topology from a chain configuration to loop protection, define the

    parameter and condition bits with the Flexi EDGE BTS Manager. The Abis protection

    menu allows you to specify a protecting interface for the traffic allocations created on the

    selected interface.

    Additionally you need to configure the synchronisation protection, and the traffic of the

    other BTSs in the loop must be by-passed with bi-directional cross-connections. If BSC

    polling is used for transmission supervision, Q1 loop protection must also be configured.

    The settings must match the loop master settings.

    Abis loop protection, synchronisation protection and Q1 protection are not available with

    the FIQA and FIYA sub-modules in the PWE mode.

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    20/63

    20 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc338

    Transmission expansion principles

    The BSS 30280 Abis loop protection feature needs a software licence with BSS13

    onwards. For more information, see Technical Note TN_2GBTSf_SW_2007_1. See

    also BSS 30280 Abis loop protectionin document Flexi EDGE BTS Feature Descrip-

    tions.

    Cross-connections

    Cross-connections define how signals are routed from a transmission interface to

    another transmission interface. They are the basic building blocks for creating the path

    for transmitting the Abis capacity from the BSC to the BTS via interconnecting nodes. If

    there are changes in the traffic allocation during the expansions, this must be taken into

    account in the cross-connection.

    Cross-connections and Abis grooming are not available with the FIQA and FIYA sub-

    modules in the PWE mode.

    The BSS 21129 Abis Grooming feature needs a SW license with BSS13 onwards. For

    more information, see Technical Note TN_2GBTSf_SW_2007_1.

    BSC download of Abis mapping

    Abis mapping automates the process of providing Abis allocations on the BTS. The BTS

    must be able to configure the allocation of the Abis using the information received from

    the BSC, instead of getting the information in a site configuration file (SCF). This config-

    uration is performed by the BTS, by using mapping algorithms to convert the BSC data

    into BTS Abis allocations. The mapping between the BSC data and the interfaces at the

    BTS relies on reference signals that are collectively known as the Abis Termination infor-

    mation of the BTS. The Abis mapping information is provided to the BTS. The Abis Ter-

    mination information is provided to the BTS during commissioning via the site

    configuration file from the Flexi EDGE BTS Manager. One reference signal per interface

    is supported at the BTS.

    An Abis mapping Information Element (IE) consists of Abis channels (TRXSIG and

    TCH) in BTS_CONF_DATA grouped into a bundle. The BTS_CONF_DATA can carry

    several instances of Abis mapping IE(s), one for each bundle or interface. The interface

    timeslots in the Abis mapping IE(s) from the BSC are the timeslots at the BSC interface.

    OMUSIG configuration is still taken from the Abis Termination information already

    stored at the BTS, and not from the Abis mapping IE. The timeslot information provided

    in the Abis mapping IE is converted into timeslot information for the BTS via the Abis

    mapping algorithm. EGPRS Dynamic Abis Pool (EDAP) information is provided using

    the Dynamic Pool Info IE(s) in the BTS_CONF_DATA. The interface timeslots in the

    Dynamic Pool Info IE(s) are the timeslots at the BSC interface.

    The Flexi EDGE BTS Manager has been enhanced with the Abis mapping download

    function.

    For configuration instructions and settings, see Manual Commissioningin document

    Flexi EDGE BTS Commissioning.

    http://dn70124104.pdf/http://dn70130343.pdf/http://dn70130343.pdf/http://dn70124104.pdf/
  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    21/63

    DN70475791

    Issue 4-0

    21

    Expanding Flexi EDGE BTS Advanced expansion principles

    Id:0900d805806bc344

    6 Advanced expansion principles

    6.1 Principles for changing from a cost-optimised to anupgrade-optimised configuration

    Follow these principles when changing from a cost-optimised to an upgrade-optimised

    configuration:

    One TRX from a Dual TRX Module (EXxA) must be moved to a new sector. This

    requires changing TEI and TSL allocations in the BSC.

    During expansion, lock both sectors that were cost-optimised.

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    22/63

    22 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc33e

    6.2 Principles for changing from an upgrade-optimised to an

    antenna-optimised configuration

    Follow these principles when changing from an upgrade-optimised to an antenna-opti-

    mised configuration:

    When changing from a 4 TRX (2 Dual TRX Modules (EXxA) and 2 antennas)

    upgrade-optimised to a 6 TRX antenna-optimised (3 Dual TRX Modules and 3

    antennas):

    You will need a Dual Duplexer Module (ERxA) from which the third antenna is

    taken.

    Connect the Rx diversity from the existing Dual Duplexer Module to the new

    Dual TRX Module.

    When changing from a 4+4 upgrade-optimised to a 6+6 TRX antenna-optimised:

    You will need 2 Dual TRX Modules and 1 Dual Duplexer Module in addition.

    First disconnect all existing Rx cables. Then connect the cables normally exceptthe Tx cables connected to the new Dual Duplexer Module must come from dif-

    ferent sectors.

    An upgrade RF cable kit (EUCA) is required.

    Figure 1 RF Rx cabling in antenna-optimised configurations

    DN

    DN

    DN

    RxA-RxA2 RxB-RxA2

    RxB1-RxBRxA1-RxA

    RxB3-RxB

    RxA1-RxA

    RxA1-RxA

    RxB2-RxA

    RxB4-RxB

    RxB2-RxB

    RxA4-RxA

    RxB1-RxB

    DN70542315

    RxAO-RxAI*

    *pre-installed

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    23/63

    DN70475791

    Issue 4-0

    23

    Expanding Flexi EDGE BTS

    Id:0900d805806bc33e

    Figure 2 RF Tx cabling in antenna-optimised configurations

    DN

    DN

    DN

    DN70542327

    TxA-TxA

    OUT-TxB

    TxB-TxB

    TxA-TxA

    TxA-TxA

    TxA-TxA

    TxA-TxA

    TxA-TxA

    TxB-TxB

    TxB-TxB

    TxB-TxB

    TxB-TxB

    TxB-TxB

    TxA-OUT

    TxA-OUT

    TxA-OUTOUT-TxB

    TxB-OUT

    RxAO-RxAI*

    *pre-installed

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    24/63

    24 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc341

    6.3 Principles for expanding an artificially split sector

    An artificially split sector refers to a situation when two separate sectors transmit to the

    same direction using the same antenna.

    If you are expanding an artificially split sector (for example, a 1+3 to a 1+5 or 7), change

    the combining method to 4-Way for the sector that already has more TRX objects con-

    figured. Furthermore, the following configurations have been tested without problems:

    2+6, 3+5, 4+4. It is required to use the EP1.1 CD1.0 SW level as a minimum.

    Note that RF cabling must be defined manually during commissioning to get the artifi-

    cially split sector working.

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    25/63

    DN70475791

    Issue 4-0

    25

    Expanding Flexi EDGE BTS Expanding a 2+2+2 bypass 2UD to 4+4+4 2-way 2UDconfiguration

    Id:0900d805806bc34c

    7 Expanding a 2+2+2 bypass 2UD to 4+4+4 2-

    way 2UD configuration

    7.1 Expanding a 2+2+2 bypass 2UD to 4+4+4 2-way 2UD con-

    figuration with 48 V DC power

    Purpose

    These instructions show how to expand up to three sectors from a 2+2+2 bypass 2UD

    configuration to a 4+4+4 2-way 2UD configuration with 48 V DC.

    Before you start

    TRXs for the new configuration must first be created in the BSC.

    You will need the following new modules, depending on the number of expansionsectors.

    One sector

    1 Dual TRX Module (EXxA)

    2 Wideband Combiner Sub-module (EWxx)

    With stack installation, one 2U casing kit (EMTA)

    Two sectors

    2 Dual TRX Modules (EXxA)

    4 Wideband Combiner Sub-module (EWxx)

    With stack installation, two 2U casing kits (EMTA) and one upgrade cable kit

    (EUCA)

    Three sectors

    3 Dual TRX Modules (EXxA)

    6 Wideband Combiner Sub-module (EWxx)

    With stack installation, three 2U casing kits (EMTA) and two upgrade cable kits

    (EUCA)

    Note that the effect of using the Upgrade Cable Kit (EUCA) for Tx cabling is 0.7 dB with

    high band, and 0.45 dB with low band. Nokia Siemens Networks recommends not to use

    these cables for Tx cabling in configurations when RF performance is critical.

    Summary

    The figures below show the module installation order for expanding all three sectors for

    FCIA, FCOA, and stack installations. The modules that need to be added are indicated

    in the figures.

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    26/63

    26 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc34c

    Expanding a 2+2+2 bypass 2UD to 4+4+4 2-way 2UDconfiguration

    Figure 3 Modules for 3+3+3/4+4+4 expansion in FCIA

    4 HU

    DN

    DN

    DN

    EXxA

    EXxA

    EXxA

    EWxx

    EWxx

    EWxx

    EWxx

    EWxx

    EWxx

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    27/63

    DN70475791

    Issue 4-0

    27

    Expanding Flexi EDGE BTS Expanding a 2+2+2 bypass 2UD to 4+4+4 2-way 2UDconfiguration

    Id:0900d805806bc34c

    Figure 4 Modules for 3+3+3/4+4+4 expansion in FCOA

    EXxA

    DN70363641

    EWxx

    EWxx

    EXxA

    EWxx

    EWxx

    EXxA

    EWxx

    EWxx

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    28/63

    28 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc34c

    Expanding a 2+2+2 bypass 2UD to 4+4+4 2-way 2UDconfiguration

    Figure 5 Modules for 3+3+3/4+4+4 expansion in stacks

    Steps

    1 Verify that the new TRXs have been created in the BSC.Note that when a TRX is created in the BSC, it is in the locked state.

    2 If casings are used, install the casing for the new Dual TRX Module.

    3 If casings are used, remove the front covers from the System Module and DualTRX Module in the sector being expanded.

    4 Install the new Dual TRX Module.

    5 If casings are used, install the cable entries on the new Dual TRX Module.

    DN

    DN

    DN

    DN

    DN

    DN

    DN70125509

    EWxx

    EWxx

    EWxx

    EWxx

    EXxA

    EWxx

    EXxA

    EWxx

    EXxA

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    29/63

    DN70475791

    Issue 4-0

    29

    Expanding Flexi EDGE BTS Expanding a 2+2+2 bypass 2UD to 4+4+4 2-way 2UDconfiguration

    Id:0900d805806bc34c

    6 Install the Wideband Combiner Sub-modules.

    Figure 6 Installing Wideband Combiner Sub-module

    7 Connect the bus cable for the new Dual TRX Module.

    8 Notify the appropriate personnel and block the sector with Flexi EDGE BTSManager.

    Alternatively, you can request a sector lock from the BSC.

    9 Wait for stable yellow LED to be displayed on the existing Dual TRX Module.It takes one minute for the LED to change to yellow.

    1 Using Flexi EDGE BTS Manager, disable power to the System Module port on theexisting and new Dual TRX Modules.

    11 Connect the power cable for the new Dual TRX Module.

    DN

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    30/63

    30 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc34c

    Expanding a 2+2+2 bypass 2UD to 4+4+4 2-way 2UDconfiguration

    12 For sectors using standard RF cables, connect the cables as shown in the picturebelow.

    Figure 7 RF cables in 3+3+3/4+4+4 2-way 2UD

    From To Expansion cable kits

    needed

    2+2+2 2+2+4 0

    2+2+2 2+4+4 1

    2+2+2 4+4+4 2

    Table 3 Expansion kits needed

    TX Cables

    DN

    TxA-TxA

    TxA-OUT

    TxB-TxB

    OUT-TxB

    TxA-TxA

    TxB-TxB

    RxAO-RxAI*

    *pre-installed

    RX Cables

    DN

    RxB-RxB2

    RxA-RxA1

    RxA-RxA2

    RxB-RxB1

    *pre-installed

    RxAO-RxAI*

    DN70154222

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    31/63

    DN70475791

    Issue 4-0

    31

    Expanding Flexi EDGE BTS Expanding a 2+2+2 bypass 2UD to 4+4+4 2-way 2UDconfiguration

    Id:0900d805806bc34c

    13 For sectors using the Upgrade Cable Kit (EUCA), connect the cables as shown inthe picture below.

    Figure 8 RF cables in 3+3+3/4+4+4 2-way 2UD expansion

    DN70125548

    RxA-RxA2

    RxA-RxA1 RxB-RxB1

    x - x

    OUT-TxB

    x - x

    TxA-TxA TxB-TxB

    x - x

    TxA-OUT

    *pre-installed

    RxAO-RxAI*

    Number Cable From - to

    1 994931 TxA (ERxA) - TxA (EWxx)

    2 994931 TxB (ERxA) - TxB (EWxx)

    3 994931 OUT (EWxx) - TxB (ERxA)

    4 994931 TxA (EXxA) - TxA (EWxx)

    5 994931 TxB (EXxA) - TxB (EWxx)

    6 994936 OUT (EWxx) - TxA (ERxA)

    Table 4 Tx cables (applies when the EUCA kit is used)

    Number Cable From - to

    Table 5 Rx cables (applies when the EUCA kit is used)

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    32/63

    32 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc34c

    Expanding a 2+2+2 bypass 2UD to 4+4+4 2-way 2UDconfiguration

    14 Enable power to the Dual TRX Modules.

    15 Unblock the new TRXs with Flexi EDGE BTS Manager.Alternatively, you can request to unlock the TRXs from the BSC.

    16 Unblock the sector with Flexi EDGE BTS Manager.Alternatively, if the sector was locked from the BSC, request to unlock it from the BSC.

    17 Reset the sector with Flexi EDGE BTS Manager.

    18 If front covers are used, re-install them.

    7 994936 RxA (EXxA) - RxA1 (ERxA)

    8 994936 RxB (ERxA) - RxB4 (EXxA)

    9 994931 RxA (ERxA) - RxA2 (EXxA)

    10 994931 RxB (ERxA) - RxB1 (EXxA)

    Table 5 Rx cables (applies when the EUCA kit is used) (Cont.)

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    33/63

    DN70475791

    Issue 4-0

    33

    Expanding Flexi EDGE BTS

    Id:0900d805806bc349

    7.2 Expanding a 2+2+2 bypass 2UD to 4+4+4 2-way 2UD con-

    figuration with AC or 24 V DC power

    PurposeThese instructions show how to expand all three sectors from a 2+2+2 bypass 2UD con-

    figuration with 24 V DC or AC power to a 4+4+4 2-way 2UD configuration.

    When AC or 24 V DC is used, an additional power module needs to be installed, which

    requires mains power to the BTS to be turned off.

    If only 1 or 2 sectors are being expanded, an additional power module is not needed. In

    this case, follow the instructions in Expanding to a 3+3+3/4+4+4 2-way 2UD configura-

    tion with 48V DC power.

    Before you start

    See Optional power (24V DC or AC) expansion principles.

    TRXs for the new configuration must first be created in the BSC.

    The following new hardware is needed:

    3 Dual TRX Modules (EXxA)

    6 Wideband Combiner Sub-module (EWxx)

    If 24 V DC power is used, an additional FPDA and three upgrade cable kits (EUCA)

    are needed

    If AC power is used, then an additional FPAA is needed and two upgrade cable kits

    (EUCA) are needed.

    If the BTS is using short-term battery backup (FPBA), then an FPBA needs to be

    added, along with the FPAA. Follow the same instructions for adding FPAA.

    Note that the effect of using the upgrade cable kit (EUCA) for TX cabling is 0.7 dB with

    high band, and 0.45 dB with low band. Nokia Siemens Networks recommends not to use

    these cables for TX cabling in configurations when RF performance is critical.

    Steps

    1 Notify the appropriate personnel and block the BCF with Flexi EDGE BTSManager.

    Alternatively, you can request a BCF lock from the BSC.

    2 Connect the ESD wrist strap.

    3 Wait for stable yellow LED to be displayed.It takes one minute for the LED to change to yellow.

    4 Disconnect the mains power breaker.

    5 If this is a stack installation, remove the front covers.

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    34/63

    34 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc349

    6 If 24V DC power is used, do as follows:a) Install the new FPDA directly on top of the existing FPDA.

    b) Connect the external DC power cables to the DC inputs of the new FPDA.c) Connect the DC output of the new FPDA to the DC output of the existing FPDA.

    Route the cables using the double rubber boot provided in the FPDA delivery.

    d) Chain the alarm cable for the new FPDA to the existing FPDA.

    7 If AC power is used, install and cable the new FPAA sub-module as described inReplacing AC DC sub-module FPAA.

    8 If this is a stack installation, install the casing for the new Dual TRX Module.

    9 Install the new Dual TRX Module.

    1 If this is a stack installation, install the cable entries.

    11 Install the Wideband Combiner Sub-modules.

    12 Connect the power and bus cable for the new Dual TRX Module.

    13 For sectors using RF cables, connect the RF cables.See figure RF cables in 3+3+3/4+4+4 2-way 2UDin Expanding a 2+2+2 bypass 2UD to

    4+4+4 2-way 2UD configuration with 48 V DC power.

    14 For sectors using the Upgrade Cable Kit (EUCA), connect the cables.See figure RF cables in 3+3+3/4+4+4 2-way 2UD expansionand tables Tx cables

    (applies when the EUCA kit is usedand Rx cables (applies when the EUCA kit is used

    in Expanding a 2+2+2 bypass 2UD to 4+4+4 2-way 2UD configuration with 48 V DC

    power.

    15 Connect the mains power breaker.

    16 Switch on the power to the FPDAs or FPAAs.

    17 Unblock the new TRXs with Flexi EDGE BTS Manager.Alternatively, you can request to unlock the TRXs from the BSC.

    18 Unblock the BCF with Flexi EDGE BTS Manager.Alternatively, you can request to unlock the BCF from the BSC.

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    35/63

    DN70475791

    Issue 4-0

    35

    Expanding Flexi EDGE BTS

    Id:0900d805806bc349

    19 Reset the sector with Flexi EDGE BTS Manager.

    2 If this is a stack configuration, re-install the front covers.

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    36/63

    36 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc351

    Expanding to a 2+2+2 DP 2UD configuration

    8 Expanding to a 2+2+2 DP 2UD configurationWhen expanding from a 2+2+2 bypass or 1+1+1 DP 2UD configuration to a 2+2+2 DP

    2UD configuration, you need the same modules as for a 4+4+4 2-Way 2UD configura-

    tion, except DP Wideband Combiner Sub-Modules (EWxA) are required.

    DP TRX is a licensed application software product. The licence file must be ordered and

    installed before the expansion.

    The following figure shows how to connect the DP cables and the RF cables. Otherwise

    follow the instructions for Expanding a 2+2+2 bypass 2UD to 4+4+4 2-way 2UD config-

    uration with 48 V DC poweror Expanding a 2+2+2 bypass 2UD to 4+4+4 2-way 2UD

    configuration with AC or 24 V DC power.

    Figure 9 RF and DP cables in a 2+2+2 DP 2UD configuration

    TX Cables

    DN

    x - x

    TxA-OUT

    x - x

    OUT-TxB

    TxA-TxA

    TxB-TxB

    RxAO-RxAI*

    *pre-installed

    RX Cables

    DN

    RxB-RxB2

    RxA-RxA1

    RxA-RxA2

    RxB-RxB1

    *pre-installed

    RxAO-RxAI*

    DN70513262

    DP-DP

    DP-DP

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    37/63

    DN70475791

    Issue 4-0

    37

    Expanding Flexi EDGE BTS Expanding to ESEA configurations

    Id:0900d805806bc35b

    9 Expanding to ESEA configurations

    9.1 Expanding to a System Extension Module (ESEA) config-uration

    Purpose

    The following System Extension Module (ESEA) expansion cases are instructed here:

    Expanding from a 12 TRX or less Dual Duplexer Module (ERxA) configuration to a

    13-24 TRX Dual Duplexer Module configuration.

    Expanding from a 12 TRX or less Dual Duplexer Module configuration to any

    Remote Tune Combiner Module (ECxA) configuration.

    Both cases require adding a System Extension Module. For details, see Bus and internal

    power cabling principles for System Extension Module (ESEA)in Creating FCIA Config-

    urationsor Creating FCOA Configurations.

    Before you start

    If the BTS has 24V DC or AC power, see Optional power (24V DC or AC) expansion

    principles.

    TRXs must be created in the BSC.

    Nokia Siemens Networks recommends that the System Module (ESMA) and System

    Extension Module (ESEA) have separate fused DC input lines from the external power

    source for safety reasons. The rubber boots provided in the System Module and System

    Extension Module deliveries are only allowed for use with single DC cables. Fault inves-

    tigation is also easier with separate DC lines.

    If separate fused DC lines are not available for the System Module and System Exten-

    sion Module, the DC lines can be chained. If chaining is used, one double rubber boot

    (822862) per chained power terminal is required for safety and must be ordered as a

    spare part. For an example of DC chaining, see Installing Flexi Power DC/DC Module

    24V (FPDA)in document Installing Flexi EDGE BTS Optional Items.

    Steps

    1 Verify that the new TRXs have been created in the BSC.Note that when a TRX is created in the BSC, it is in the locked state.

    2 Notify the appropriate personnel and block the BCF with Flexi EDGE BTSManager.

    Alternatively, you can request a BCF lock from the BSC.

    3 Connect the ESD wrist strap.

    4 Wait for stable yellow LED on the System Module to be displayed.It takes one minute for the LED to change to yellow.

    http://x%3Dd%3Do%3Dc/s-000050.pdfhttp://x%3Dd%3Do%3Dc/s-000050.pdfhttp://dn70470757.pdf/http://dn70470757.pdf/http://dn70470757.pdf/http://dn70470757.pdf/http://x%3Dd%3Do%3Dc/s-000050.pdfhttp://x%3Dd%3Do%3Dc/s-000050.pdf
  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    38/63

    38 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc35b

    Expanding to ESEA configurations

    5 Power off the System Module with the power switch.

    6 Make sure that the mains power breaker is off for both the System Module and theSystem Extension Module power feeds.

    7 Disconnect all bus and power cables on the System Module.

    8 Install the modules and sub-modules as required by the configuration.See the installation instructions for the appropriate configuration for recommended

    module installation order in Creating FCIA Configurationsor Creating FCOA Configura-

    tions.

    See also Installing a System Extension Module (ESEA)in document Installing Flexi

    EDGE BTS Optional Items.

    9 Connect mains power to the System Extension Module.See

    Connecting external power cables in FCIA installationin document Creating FCIA

    Configurations or

    Connecting external power cables in FCOA installationin document Creating FCOA

    Configurations.

    1 Install the cables as required by the configuration.See Bus and internal power cabling principles for System Extension Module (ESEA)in

    Creating FCIA Configurationsor Creating FCOA Configurations.

    11 Unblock the new TRXs with Flexi EDGE BTS Manager.Alternatively, you can request to unlock the TRXs from the BSC.

    12 Unblock the BCF with Flexi EDGE BTS Manager.Alternatively, you can request to unlock the BCF from the BSC.

    13 Power on the System Module and System Extension Module.

    14 If RF Cabling Auto-detection is used for the configuration, reset the BCF with RFCabling Auto-detection using Flexi EDGE BTS Manager.

    Note that adding a System Extension Module changes the internal module identifiers of

    the Dual TRX Modules (EXxA) and Dual Duplexer Modules (ERxA) that were previously

    connected to the System Module. This forces the BTS to update the RF autodetected

    cabling with the new internal module identifiers for both the old and new Dual TRX

    Modules. This resolves some issues that could occur during commissioning in step 15

    below.

    http://dn70128463.pdf/http://dn70128475.pdf/http://dn70128475.pdf/http://dn70470757.pdf/http://dn70128463.pdf/http://dn70128475.pdf/http://dn70128475.pdf/http://x%3Dd%3Do%3Dc/s-000050.pdfhttp://x%3Dd%3Do%3Dc/s-000050.pdfhttp://dn70128475.pdf/http://dn70128463.pdf/http://dn70470757.pdf/http://dn70128475.pdf/http://dn70128475.pdf/http://dn70128463.pdf/
  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    39/63

    DN70475791

    Issue 4-0

    39

    Expanding Flexi EDGE BTS Expanding to ESEA configurations

    Id:0900d805806bc35b

    15 Save the current BTS site configuration file (SCF) to hard disk.This allows you to reload the HW and Transmission data in step 14 below so that

    existing HW and Transmission settings such as IBBU, MHA, and passive unit details donot need to be defined again.

    16 Uncommission the BTS.

    17 Commission the BTS.Note that adding a System Extension Module changes the internal module identifiers of

    the Dual TRX Modules (EXxA) and Dual Duplexer Modules (ERxA) that were previously

    connected to the System Module. Therefore you need to re-define the antenna cabling

    when commissioning. Antenna cabling is not autodetected. For example, if antenna 1

    had previously been connected to AntA of ERxA1, antenna 1 must now be defined asbeing connected to AntA of ERxA601, even if the sector configuration has not changed.

    Note that if RF cable autodetection is not available for the new configuration, every

    module identified in the RF cabling section must be modified to use the new module

    identifiers as well as adding the new cables. For example, a TX cable from source unit

    EXxA1 port TxA to destination unit ERxA1 port TXA must be modified to specify a TX

    cable from source unit EXxA601 port TxA to destination unit ERxA601 port TXA.

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    40/63

    40 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc358

    9.2 Expanding a 4+4 2-Way WBC to an 8+8+8 4-Way WBC con-

    figuration

    Before you start These instructions assume that the site was not built for expansion and thus a

    System Extension Module (ESEA) needs to be installed. See System Extension

    Module (ESEA) expansion principlesfor more details.

    If the BTS has 24V DC or AC power, see Optional power (24V DC or AC) expansion

    principles.

    Create the TRXs for the new configuration in the BSC before the expansion.

    Review Bus and internal power cabling principles for System Extension Module

    (ESEA)in Creating FCIA Configurationsor Creating FCOA Configurations.

    Nokia Siemens Networks recommends that the System Module (ESMA) and System

    Extension Module (ESEA) have separate fused DC input lines from the external power

    source for safety reasons. The rubber boots provided in the System Module and System

    Extension Module deliveries are only allowed for use with single DC cables. Fault inves-

    tigation is also easier with separate DC lines.

    If separate fused DC lines are not available for the System Module and System Exten-

    sion Module, the DC lines can be chained. If chaining is used, one double rubber boot

    (822862) per chained power terminal is required for safety and must be ordered as a

    spare part. For an example of DC chaining, see Installing Flexi Power DC/DC Module

    24V (FPDA)in document Installing Flexi EDGE BTS Optional Items.

    Steps

    1 Verify that the new TRXs have been created in the BSC.Note that when a TRX is created in the BSC, it is in the locked state.

    2 Notify the appropriate personnel and block the BCF with Flexi EDGE BTSManager. Alternatively, you can request a BCF lock from the BSC.

    3 Connect the ESD wrist strap.

    4 Wait for stable yellow LED on the System Module to be displayed.It takes one minute for the LED to change to yellow.

    5 Power off the System Module with the power switch.

    6 Make sure that the mains power breaker is off for both the System Module and theSystem Extension Module power feeds.

    7 Disconnect all bus and power cables on the System Module and all existing RFcables.

    http://x%3Dd%3Do%3Dc/s-000050.pdfhttp://x%3Dd%3Do%3Dc/s-000050.pdfhttp://dn70470757.pdf/http://dn70470757.pdf/http://dn70470757.pdf/http://dn70470757.pdf/http://x%3Dd%3Do%3Dc/s-000050.pdfhttp://x%3Dd%3Do%3Dc/s-000050.pdf
  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    41/63

    DN70475791

    Issue 4-0

    41

    Expanding Flexi EDGE BTS

    Id:0900d805806bc358

    8 Install new modules and relocate any existing ones that need to be relocated sothat the module order matches the figures below.

    Figure 10 Module installation order for an 8+8+8 configuration in FCIA

    3U space

    DN70466497

    EXxA

    EWxx

    ESMA

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    EXxA

    EWxx

    EXxA

    EWxx

    EXxA

    EWxx

    ESEA

    EXxAEWxx

    EXxA

    EWxx

    EXxA

    EWxx

    EXxA

    EWxx

    DN

    DN

    EXxA

    EWxx

    EXxA

    EWxx

    EXxA

    EWxx

    EXxA

    EWxx

    ERxA

    ERxA

    ERxA

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    42/63

    42 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc358

    Figure 11 Module installation order for an 8+8+8 configuration in FCOA

    9 Connect the mains power to the System Extension Module.See

    Connecting 48 V DC power feed to the System Module or System Extension Module

    in FCIA installationin document Creating FCIA Configurations or

    Connecting 48 V DC power feed to the System Module or System Extension Module

    in FCOA installationin document Creating FCOA Configurations.

    See Connecting 48V DC power cables.

    EXxA

    EWxx

    ESMA

    ESEA

    DN70466504

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    Air Guide plate

    Air Guide plate

    Dummy plates(3U)

    ERxA

    EXxA

    EWxx

    EXxA

    EWxx

    ERxA

    EXxA

    EWxx

    EXxA

    EWxx

    EXxA

    EWxx

    EXxA

    EWxx

    ERxA

    EXxA

    EWxx

    EXxA

    EWxx

    EXxA

    EWxx

    EXxA

    EWxx

    EXxA

    EWxx

    http://dn70128463.pdf/http://dn70128463.pdf/http://dn70128475.pdf/http://dn70128475.pdf/http://dn70128475.pdf/http://dn70128475.pdf/http://dn70128463.pdf/http://dn70128463.pdf/
  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    43/63

    DN70475791

    Issue 4-0

    43

    Expanding Flexi EDGE BTS

    Id:0900d805806bc358

    1 Connect the bus and power cables according to the figures below.See Bus and internal power cabling principles for System Extension Module (ESEA)in

    Creating FCIA Configurationsor Creating FCOA Configurations.Connect the bus cable 994939 included in the System Extension Module delivery to

    EXxA 12 (the farthest from the System Extension Module).

    Figure 12 Bus cabling for an 8+8+8 configuration in FCIA

    3U space

    DN70466543

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    BUS OUT-BUS IN

    DN

    DN

    BUS 1

    BUS 2

    BUS 3

    BUS 4

    ExxA 1

    ExxA 2

    ExxA 3

    ExxA 4

    BUS 5

    BUS 6

    BUS 7

    BUS 8

    BUS 9

    BUS 10

    BUS 11

    BUS 12

    ExxA 5

    ExxA 6

    ExxA 7

    ExxA 8

    ExxA 9

    ExxA 10

    ExxA 11

    ExxA 12

    http://x%3Dd%3Do%3Dc/s-000050.pdfhttp://x%3Dd%3Do%3Dc/s-000050.pdf
  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    44/63

    44 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc358

    Figure 13 Internal power cabling for an 8+8+8 configuration in FCIA

    3U space

    DN70466555

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    ESEA PWR 1/7 ExxA 1

    ExxA 2

    ExxA 3

    ExxA 4

    ExxA 5

    ExxA 6

    ExxA 7

    ExxA 8

    ExxA 9

    ExxA 10

    ExxA 11

    ExxA 12

    ESEA PWR 2/8

    ESEA PWR 3/9

    ESEA PWR 4/10

    ESEA PWR 5/11

    ESEA PWR 6/12

    ESMA PWR 4/10

    ESMA PWR 5/11

    ESMA PWR 6/12

    ESMA PWR 1/7

    ESMA PWR 2/8

    ESMA PWR 3/9

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    45/63

    DN70475791

    Issue 4-0

    45

    Expanding Flexi EDGE BTS

    Id:0900d805806bc358

    Figure 14 Bus cabling for an 8+8+8 configuration in FCOA

    DN70472061

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    BUS 12

    BUS 11

    BUS 10

    BUS 9

    BUS 8

    BUS 7

    BUS 6

    BUS 5

    BUS 4

    BUS 3

    BUS 2

    BUS 1

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    46/63

    46 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc358

    Figure 15 Internal power cabling for an 8+8+8 configuration in FCOA

    DN70472085

    ESMA PWR 3/9

    ESMA PWR 2/8

    ESMA PWR 1/7

    ESMA PWR 6/12

    ESMA PWR 5/11

    ESMA PWR 4/10

    ESEA PWR 6/12

    ESEA PWR 5/11

    ESEA PWR 4/10

    ESEA PWR 3/9

    ESEA PWR 2/8

    ESEA PWR 1/7

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

    DN

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    47/63

    DN70475791

    Issue 4-0

    47

    Expanding Flexi EDGE BTS

    Id:0900d805806bc358

    11 Connect the RF cables according to figure below.

    Figure 16 Rx cabling for an 8+8+8 configuration

    Figure 17 Tx cabling for an 8+8+8 configuration

    DN70466567

    RxB - RxB3

    RxB - RxB2

    RxB - RxB1

    RxA - RxA3

    RxA - RxA1

    RxAO - RxAI*

    RxA - RxA2

    DN RxB - RxB4

    x - x

    DN70466601

    TxB - TxB

    OUT - TxA

    TxB - TxB

    OUT - TxB

    TxB - TxB

    TxB - OUT

    TxB - TxB

    TxA - OUT

    TxA - TxA

    TxA - TxA

    TxA - TxA

    TxA - TxA

    TxB - OUT

    TxA - OUT

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    48/63

    48 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc358

    12 Power on the System Module and System Extension Module.

    13 Unblock the new TRXs with Flexi EDGE BTS Manager.Alternatively, you can request to unlock the TRXs from the BSC.

    14 Unblock the BCF with Flexi EDGE BTS Manager.Alternatively, you can request to unlock the BCF from the BSC.

    15 Reset the BCF with RF Cabling Auto-detection using Flexi EDGE BTS Manager.Note that adding a System Extension module changes the internal module identifiers of

    the Dual TRX and Dual Duplexer Modules that were previously connected to the System

    Module. This forces the BTS to update the RF auto-detected cabling with the newinternal module identifiers for both the old and new Dual TRX Modules. This resolves

    some issues that could occur during commissioning in step 16 below.

    16 Save the current BTS site configuration file (SCF) to hard disk.This allows you to reload the HW and Transmission data in step 16 below so that

    existing settings such as IBBU, MHA, and passive unit details do not need to be defined

    again.

    17 Uncommission the BTS.

    18 Commission the BTS.Note that adding a System Extension module changes the internal module identifiers of

    the Dual TRX and Dual Duplexer Modules that were previously connected to the System

    Module. Therefore, you need to re-define the antenna cabling when commissioning.

    Antenna cabling is not auto-detected. For example, if antenna 1 had previously been

    connected to AntA of ERxA1, antenna 1 must now be defined as being connected to

    AntA of ERxA601, even if the sector configuration has not changed.

    19 After the BTS is successfully commissioned, tie down any loose cables. Ifcasings are used, re-install the front covers.

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    49/63

    DN70475791

    Issue 4-0

    49

    Expanding Flexi EDGE BTS Expanding feederless configurations

    Id:0900d805806bc366

    10 Expanding feederless configurations

    10.1 Expanding from a 2+2+2 by-pass 2UD to a 4+4+4 2-way2UD feederless configuration on a rooftop

    Purpose

    These instructions show how to expand local and remote sectors from a rooftop 2+2+2

    to a 4+4+4 feederless configuration. These instructions assume the original installation

    was optimised for expansion (see Feederless site expansion principles).

    In this expansion case, you can expand each sector one at a time to minimise site down-

    time. This expansion case does not require you to shut down the entire site.

    Before you start

    You will need the following new hardware for the sector in the local base:

    1 Dual TRX Module (EXxA)

    2 Wideband Combiner Sub-modules (EWxx)

    1 2U casing kit (EMTA)

    Needed only if the existing modules are in casings.

    You will also need the following new hardware for each remote sector:

    1 Dual TRX Module (EXxA)

    2 Wideband Combiner Sub-modules (EWxx)

    TRXs for the new configuration must first be created in the BSC.

    Summary

    The figures below show the module installation order for expanding local and remote

    sectors in feederless configurations. The figures indicate the modules that you need to

    add.

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    50/63

    50 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc366

    Expanding feederless configurations

    Figure 18 Expanding from a 2+2+2 to a 4+4+4 feederless configuration on a rooftop,

    local base

    Figure 19 Expanding from a 2+2+2 to a 4+4+4 feederless configuration on a rooftop,

    remote sector

    For instructions on how to connect the cables, see Cabling for a 4+4+4 feederless con-

    figuration on a rooftopin document Creating Flexi EDGE BTS Feederless Site Configu-

    rations. The tables indicate which cables are needed for expansion.

    Steps

    1 Verify that the new TRXs have been created in the BSC.When a TRX is created in the BSC, it is in the locked state.

    DN

    DN

    DN70486523

    EOCA

    EWxx

    EXxA

    EWxx

    EMTA

    DN

    DN

    EXxA

    DN70486535

    EWxx

    EWxx

    http://dn70465602.pdf/http://dn70465602.pdf/http://dn70465602.pdf/http://dn70465602.pdf/
  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    51/63

    DN70475791

    Issue 4-0

    51

    Expanding Flexi EDGE BTS Expanding feederless configurations

    Id:0900d805806bc366

    2 If this is the local base and casings are used, install the casing for the new DualTRX Module.

    3 If casings are used, remove the front covers from the following modules: System Module

    Remote and local Optical Converter Modules (EOCA) for the sector

    Existing Dual TRX Module in the sector

    4 Install the new Dual TRX Module.

    5 If casings are used, install the cable entries on the new Dual TRX Module.

    6 Install the Wideband Combiner Sub-modules.

    7 Notify the appropriate personnel and block the sector with Flexi EDGE BTSManager.

    Alternatively, you can request a sector lock from the BSC.

    8 Wait for stable yellow LED to be displayed on the existing Dual TRX Module.It takes one minute for the LED to change to yellow.

    9 If this is the local base sector, use Flexi EDGE BTS Manager to disable power tothe System Module port on the existing and new Dual TRX Modules.

    1 If this is a remote sector, turn off the mains power breakers to the local and remoteOptical Converter Modules for the sector.

    11 Remove the existing RF cables for the sector.

    12 Connect the new power and bus cables.For instructions, see tables Internal power cablingand Bus cablingin Cabling for a

    4+4+4 feederless configuration on a rooftop, document Creating Flexi EDGE BTS Feed-

    erless Site Configurations.

    13 Connect the RF cables for the new configuration.

    14 If this is the local base, enable power to the Dual TRX Modules.

    15 If this is a remote sector, turn on the mains power breakers to the local and remoteOptical Converter Modules.

    http://dn70465602.pdf/http://dn70465602.pdf/http://dn70465602.pdf/http://dn70465602.pdf/
  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    52/63

    52 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc366

    Expanding feederless configurations

    16 Unblock the new TRXs with Flexi EDGE BTS Manager.Alternatively, you can request to unlock the TRXs from the BSC.

    17 Unblock the sector with Flexi EDGE BTS Manager.Alternatively, if the sector was locked from the BSC, request to unlock it from the BSC.

    18 Reset the sector with Flexi EDGE BTS Manager.

    19 If casings are used, re-install the front covers.If you are expanding additional sectors, do not re-install the front cover for the System

    module until you complete the last sector.

    2 Repeat for additional sector(s).

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    53/63

    DN70475791

    Issue 4-0

    53

    Expanding Flexi EDGE BTS

    Id:0900d805806bc360

    10.2 Expanding from a 4+4+4 to a 6+6+6 4-way 2UD feederless

    configuration on a rooftop

    PurposeThese instructions show how to expand local and remote sectors from a 4+4+4 to a

    6+6+6 feederless configuration on a rooftop. These instructions assume the original

    installation was optimised for expansion (see Feederless site expansion principles.

    This expansion case requires adding a System Extension Module (ESEA) and rearrang-

    ing all bus cables. Therefore BCF will need to be blocked and all mains power lines must

    be turned off during the expansion work.

    Before you start

    For the local base, you will need the following new hardware:

    1 System Extension Module (ESEA)

    1 Dual TRX Module (EXxA)

    3 Wideband Combiner Sub-modules (EWxx)

    1 3U casing kit (EMHA)

    Needed only if existing modules are in casings.

    1 2U casing kit (EMTA)

    Needed only if existing modules are in casings.

    Jumper DC power cables from the System Module (ESMA) to the System Extension

    Module (the cables are not included in the Flexi EDGE product delivery)

    For each remote sector, you will need the following new hardware:

    1 Dual TRX Module (EXxA)

    3 Wideband Combiner Sub-modules (EWxx)

    1 2U casing kit (EMTA)

    TRXs for the new configuration must first be created in the BSC.

    Summary

    The figures below show the module installation order for expanding local and remote

    sectors in feederless configurations. The modules that need to be added are indicated

    in the figures.

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    54/63

    54 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc360

    Figure 20 Expanding from a 4+4+4 to a 6+6+6 feederless configuration on a rooftop,

    local base

    DN70486547

    ESEA EMHA

    EXxAEMTA

    EWxx

    EWxx

    EWxx

  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    55/63

    DN70475791

    Issue 4-0

    55

    Expanding Flexi EDGE BTS

    Id:0900d805806bc360

    Figure 21 Expanding from a 4+4+4 to a 6+6+6 feederless configuration on a rooftop,

    remote sectors

    For instructions on how to connect the cables, see Cabling for a 6+6+6 feederless con-

    figuration on a rooftopin document Creating Flexi EDGE BTS Feederless Site Configu-

    rations. The tables indicate which cables are needed for expansion.

    Steps

    1 Verify that the new TRXs have been created in the BSC.Note that when a TRX is created in the BSC, it is in the locked state.

    2 Notify the appropriate personnel and block the BCF with Flexi EDGE BTSManager.

    Alternatively, you can request a BCF lock from the BSC.

    3 Wait for stable yellow LED to be displayed on the existing Dual TRX Module.It takes one minute for the LED to change to yellow.

    4 Turn off power from the System Module with the power switch on the module.

    5 Turn off the mains power breakers for the System Module and remote sectors.

    6 At the local base, complete the following steps:a) Connect the ESD wrist strap.

    b) If casings are used, install the casings for the new Dual TRX and System Extension

    Modules.

    DN

    DN

    DN

    DN70486559

    EXxA

    EWxx

    EWxx

    EMTA

    http://dn70465602.pdf/http://dn70465602.pdf/http://dn70465602.pdf/http://dn70465602.pdf/
  • 8/14/2019 Expanding Flexi EDGE BTS1 .pdf

    56/63

    56 DN70475791

    Issue 4-0

    Expanding Flexi EDGE BTS

    Id:0900d805806bc360

    c) Install the new System Extension Module, Dual TRX Modules, and Wideband

    Combiner Sub-modules.

    d) If casings are used, install the cable entries for the new modules.

    e) If casings are used, remove the front covers from the remaining modules.f) Disconnect the external power, internal power and bus cables from the System

    Module and remove all RF cables from the Dual TRX Modules.

    g) Connect the DC power feed to the System and System Extension Modules as

    shown in Table DC power feedin Cabling for a 6+6+6 feederless configuration on a

    rooftop, document Creating Flexi EDGE BTS Feederless Site Configurations.

    h) Connect the internal power, bus, and RF cables for the local base as shown in

    Cabling for a 6+6+6 feederless configuration on a rooftop.

    7 For each remote sector, complete the following steps:

    a) Connect the ESD wrist strap.b) If casings are used, install the casing for the new Dual TRX Module.

    c) Install the new Dual TRX and Wideband Combiner Sub-modules.

    d) If casings are used, install the cable entries for the new Dual TRX Module.

    e) Disconnect all RF cables.

    f) Connect the internal power and bus cables for the new Dual TRX Module.

    g) Connect the RF cables for the entire sector.

    8 Turn on the mains power breakers for the System Module and remote sectors.

    9 Unblock the new TRXs with Flexi EDGE BTS Manager.Alternatively, you can request to unlock the TRXs from the BSC.

    1 Unblock the BCF with Flexi EDGE BTS Manager.Alternatively, you can request to unlock the BCF from the BSC.

    11 Reset the BCF with RF Cabling Auto-detection using Flexi EDGE BTS Manager.Note that adding a System Extension Module changes the internal module identifiers of

    the Dual TRX and Dual Duplexer Modules that were previously connected to the System

    Module. This forces the BTS to update the RF auto-detected cabling with the newinternal module identifiers for both the old and new Dual TRX Modules. This resolves

    some issues that could occur during commissioning in step 12 below.

    12 Save the current BTS site configuration file (SCF) to hard disk.This allows you to reload the HW and Transmission data in step 12 below so that

    existing settings such as IBBU, MHA, and passive unit details do not need to be defined

    again.

    13 Uncommission the BTS.