Sand Hill Wind Repowering Project A1 March 2016 ICF 00630.15 Exhibit A Sand Hill Wind Repowering Project Written Findings of Significant Effects In accordance with State CEQA Guidelines Sections 15091, the following findings and supporting facts address each significant environmental effect that has been changed (including adoption of mitigation measures) to avoid or substantially reduce the magnitude of the effect, as identified in the Final PEIR (which evaluated the project at a general, programmatic level in 2014), together with the Environmental Checklist and supporting documentation for the Sand Hill Wind Repowering Project. The findings described below are organized by resource issue, in the same order as the effects are discussed in the Environmental Checklist. No findings are required regarding project alternatives, as these were previously made when the East County Board of Zoning Adjustments certified the Final PEIR. The findings reference the final PEIR (part of the record upon which the East County Board of Zoning Adjustments [EBZA] bases its decision) and mitigation measures in support of the findings. For some specific resource mitigation measures, the section and page number in the PEIR where the full text of the mitigation measure is described is noted in the finding. Introduction The project area is located in the Altamont Hills of eastern Alameda County near the San Joaquin County line, approximately 56 miles east of San Francisco. The Altamont Hills are at the geographical interface between the coastal mountains and the Central Valley. Existing predominant uses of the area are windfarms and cattle grazing. The project area is in the central portion of the APWRA and lies north and south of I‐580. The Sand Hill Wind Project area is comprised of eight land parcels grouped in three distinct areas: four west parcels, two northeast parcels, and two southeast parcels, all clustered within 1–3 miles of each other. The parcels total approximately 875 acres on Sand Hill Wind LLC, a subsidiary of Ogin, Inc., proposes to repower an existing wind energy facility in the AWPRA program area to replace outdated and inefficient wind turbines with fewer and more efficient turbines. The proposed project would decommission and remove the existing wind turbines on the wind energy facility site, install new and fewer turbines, and make improvements to related infrastructure. Proposed project area ingress/egress would be via Altamont Pass Road, North Midway Road, Grant Line Road, and Mountain House Road. Existing site entrances would be used. The proposed project would install up to 24 new 1.5 to 3.0 MW turbines and related infrastructure with a resulting capacity between 33 MW and 72 MW. The specific equipment chosen for the current project would depend on final micrositing. However, the proponent is considering range of turbines; each would have a nameplate capacity of up to 3.0 MW, a rotor diameter of 90–125 meters (295– 410 feet), towers up to 100 meters (382 feet), and a maximum turbine height of 151 meters (495 feet). For example, the Goldwind GW121 2.5 MW turbine, has a 121‐meter (397–foot) rotor diameter, 90‐meter (295‐foot) hub height, and turns at 13.5 rpm. The tubular steel towers would have internal ladders to the nacelle, the color of towers and rotors would be neutral and nonreflective (e.g., dull white or light gray), and nacelles would be completely enclosed to minimize perching opportunities.

Transcript of Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each...

Page 1: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

 

Sand Hill Wind Repowering Project A‐1 

March 2016ICF 00630.15

 

Exhibit A  Sand Hill Wind Repowering Project 

Written Findings of Significant Effects 

InaccordancewithStateCEQAGuidelinesSections15091,thefollowingfindingsandsupportingfactsaddresseachsignificantenvironmentaleffectthathasbeenchanged(includingadoptionofmitigationmeasures)toavoidorsubstantiallyreducethemagnitudeoftheeffect,asidentifiedintheFinalPEIR(whichevaluatedtheprojectatageneral,programmaticlevelin2014),togetherwiththeEnvironmentalChecklistandsupportingdocumentationfortheSandHillWindRepoweringProject.Thefindingsdescribedbelowareorganizedbyresourceissue,inthesameorderastheeffectsarediscussedintheEnvironmentalChecklist. Nofindingsarerequiredregardingprojectalternatives,asthesewerepreviouslymadewhentheEastCountyBoardofZoningAdjustmentscertifiedtheFinalPEIR.ThefindingsreferencethefinalPEIR(partoftherecorduponwhichtheEastCountyBoardofZoningAdjustments[EBZA]basesitsdecision)andmitigationmeasuresinsupportofthefindings.Forsomespecificresourcemitigationmeasures,thesectionandpagenumberinthePEIRwherethefulltextofthemitigationmeasureisdescribedisnotedinthefinding.

Introduction TheprojectareaislocatedintheAltamontHillsofeasternAlamedaCountyneartheSanJoaquinCountyline,approximately56mileseastofSanFrancisco.TheAltamontHillsareatthegeographicalinterfacebetweenthecoastalmountainsandtheCentralValley.Existingpredominantusesoftheareaarewindfarmsandcattlegrazing.TheprojectareaisinthecentralportionoftheAPWRAandliesnorthandsouthofI‐580.

TheSandHillWindProjectareaiscomprisedofeightlandparcelsgroupedinthreedistinctareas:fourwestparcels,twonortheastparcels,andtwosoutheastparcels,allclusteredwithin1–3milesofeachother.Theparcelstotalapproximately875acresonSandHillWindLLC,asubsidiaryofOgin,Inc.,proposestorepoweranexistingwindenergyfacilityintheAWPRAprogramareatoreplaceoutdatedandinefficientwindturbineswithfewerandmoreefficientturbines.Theproposedprojectwoulddecommissionandremovetheexistingwindturbinesonthewindenergyfacilitysite,installnewandfewerturbines,andmakeimprovementstorelatedinfrastructure.Proposedprojectareaingress/egresswouldbeviaAltamontPassRoad,NorthMidwayRoad,GrantLineRoad,andMountainHouseRoad.Existingsiteentranceswouldbeused.

Theproposedprojectwouldinstallupto24new1.5to3.0MWturbinesandrelatedinfrastructurewitharesultingcapacitybetween33MWand72MW.Thespecificequipmentchosenforthecurrentprojectwoulddependonfinalmicrositing.However,theproponentisconsideringrangeofturbines;eachwouldhaveanameplatecapacityofupto3.0MW,arotordiameterof90–125meters(295–410feet),towersupto100meters(382feet),andamaximumturbineheightof151meters(495feet).Forexample,theGoldwindGW1212.5MWturbine,hasa121‐meter(397–foot)rotordiameter,90‐meter(295‐foot)hubheight,andturnsat13.5rpm.Thetubularsteeltowerswouldhaveinternalladderstothenacelle,thecoloroftowersandrotorswouldbeneutralandnonreflective(e.g.,dullwhiteorlightgray),andnacelleswouldbecompletelyenclosedtominimizeperchingopportunities.

Page 2: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐2 

March 2016ICF 00630.15

 

TheEnvironmentalChecklistwaspreparedinresponsetoaconditionalusepermitapplicationtoauthorizetherepoweringoftheformerSeawestPowerResourceswindturbinesintheprojectarea.Theleaseagreementsandturbineassetsandinfrastructurewereacquiredin2012byOgin,Inc.(formerlyknownasFloDesignWindTurbineCorporation)fromAESSeawest.Ogin,Inc.ownsSHWind,aswellasForebayWind,LLC.SHWind,haswindenergyeasementscoveringallofthepropertiesassociatedwiththeproject.ForebayWind,LLC,ownstheexistinggenerationassetsandoperatesthembyasubeasementthroughSandHillWind,LLC.SeawestPowerResources(orAES),whichpreviouslyownedthewindturbinesnowheldbytheApplicant,heldfivepermitsontheeightpropertiesfortheoperationof433windturbineswithareportednameplategeneratingcapacity,asof2005,ofroughly25.4MW.Thesepermitsexpiredbetween2002and2004,andwererenewedin2005alongwith26otherCUPsforotherwind‐energycompanies,withspecificconditionsthatweredirectedtowardsreducingavianmortalityandestablishingarepoweringprogramasaresultoflitigation(hereafterreferredtoasthe2007SettlementAgreement).Amongotherrequirements,theconditionsofthe2007SettlementAgreementrequiredtheremovalofindividualturbinesdefinedasuniquelyorespeciallyhazardoustobirds,establishedaScientificReviewCommitteefortheAPWRA,andinstitutedaMonitoringTeamtoevaluateprogressonreducingavianmortality.

Record of Proceedings and Custodian of Record  Therecorduponwhichallfindingsanddeterminationsrelatedtotheapprovaloftheprojectarebasedcomprisestheitemslistedbelow.

ThePEIR,theEnvironmentalChecklist,andalldocumentsreferencedinorrelieduponbythePEIRandEnvironmentalChecklist.

Allinformation(includingwrittenevidenceandtestimony)providedbyCountystafftotheEBZArelatingtothePEIR,theapprovals,andtheproject.

Allinformation(includingwrittenevidenceandtestimony)presentedtotheEBZAbytheenvironmentalconsultantswhopreparedthePEIRorincorporatedintoreportspresentedtotheEBZA.

Allinformation(includingwrittenevidenceandtestimony)presentedtotheCountyfromotherpublicagenciesrelatedtotheprojectorthePEIR.

Allapplications,letters,testimony,andpresentationsrelatingtotheproject.

Allinformation(includingwrittenevidenceandtestimony)presentedatanyCountyhearingrelatedtotheprojectandthePEIR.

AllCounty‐adoptedorCounty‐preparedlanduseplans,ordinances,includingwithoutlimitationgeneralplans,specificplans,andordinances,togetherwithenvironmentalreviewdocuments,findings,mitigationmonitoringprograms,andotherdocumentsrelevanttolandusewithinthearea.

TheMitigationMonitoringandReportingProgramfortheproject.

AllotherdocumentscomposingtherecordpursuanttoPublicResourcesCodeSection21167.6(e).

Page 3: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐3 

March 2016ICF 00630.15

 

ThecustodianofthedocumentsandothermaterialsthatconstitutetherecordoftheproceedingsuponwhichtheCounty’sdecisionsarebasedisSandraRivera,AssistantPlanningDirector,orherdesignee.Suchdocumentsandothermaterialarelocatedat224WintonAvenue,Room111,Hayward,California94544.

Consideration and Certification of the PEIR  InaccordancewithCEQA,theEBZApreviouslycertified,inNovember2014,thatthePEIRhasbeencompletedincompliancewithCEQA.TheEBZAhasindependentlyreviewedtherecordandthePEIRpriortocertifyingthePEIRandapprovingtheproject.Bythesefindings,theEBZAconfirms,ratifies,andadoptsthefindingsandconclusionsofthePEIRandtheEnvironmentalChecklistassupplementedandmodifiedbythesefindings.ThePEIR,theEnvironmentalChecklistandthesefindingsrepresenttheindependentjudgmentandanalysisoftheCountyandtheEBZA.TheEBZArecognizesthatthePEIRandtheEnvironmentalChecklistmaycontainclericalerrors.TheEBZAreviewedtheentiretyofthePEIRandbasesitsdeterminationonthesubstanceoftheinformationitcontains.TheEBZAcertifiesthatthePEIRandtheEnvironmentalChecklistareadequatetosupporttheapprovaloftheactionthatisthesubjectoftheResolutiontowhichtheseCEQAfindingsareattached.

TheEBZAcertifiesthatthePEIRandtheEnvironmentalChecklistareadequatetosupportapprovaloftheproposedSandHillWindRepoweringProjectdescribedinthestaffreport,eachcomponentandphaseoftheprojectdescribedinthePEIR,anyvariantoftheprojectdescribedinthePEIR,anyminormodificationstotheprojectorvariantsoftheprojectdescribedinthePEIR,andthecomponentsoftheproject.

Absence of Significant New Information  TheEBZArecognizesthattheEnvironmentalChecklistincorporatesinformationobtainedandproducedaftertheFinalPEIRwascompleted,andthattheEnvironmentalChecklistcontainsadditions,clarifications,andmodifications.Mostnotably,theEnvironmentalChecklist issupplementedbyattachmentsthatevaluateanddescribeactivitiesrelatedtoandnecessaryforimplementationoftheproposedproject.

TheEBZAhasreviewedandconsideredtheFinalPEIRandthissubsequentinformation.TheEnvironmentalChecklist,includingthesupportingdocumentation,doesnotaddsignificantnewinformationtothePEIRthatwouldrequirerecirculationofthePEIRunderCEQA.ThenewinformationaddedtothePEIRdoesnotinvolveanewsignificantenvironmentalimpact,asubstantialincreaseintheseverityofanenvironmentalimpact,orafeasiblemitigationmeasureoralternativeconsiderablydifferentfromotherspreviouslyanalyzedthattheprojectsponsordeclinestoadoptandthatwouldclearlylessenthesignificantenvironmentalimpactsoftheproject.NoinformationindicatesthatthePEIRwasinadequateorconclusoryorthatthepublicwasdeprivedofameaningfulopportunitytoreviewandcommentonthePEIR.Thus,recirculationofthePEIRisnotrequired.TheEBZAfindsthattheSandHillWindRepoweringProjectpresentedintheEnvironmentalChecklist,sincetheFinalPEIRwascirculatedforpublicreviewandcommentdonotindividuallyorcollectivelyconstitutesignificantnewinformationwithinthemeaningofPublicResourcesCodeSection21092.1orSection15088.5oftheStateCEQAGuidelines.

Page 4: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐4 

March 2016ICF 00630.15

 

Severability  Ifanyterm,provision,orportionoftheseFindingsortheapplicationoftheseFindingstoaparticularsituationisheldbyacourtofcompetentjurisdictiontobeinvalid,voidorunenforceable,theremainingprovisionsoftheseFindings,ortheirapplicationtootheractionsrelatedtotheproject,shallcontinueinfullforceandeffectunlessamendedormodifiedbytheCounty.

Findings and Recommendations Regarding Significant and Unavoidable Impacts 

Air Quality  

ImpactAQ‐2:Violateanyairqualitystandardorcontributesubstantiallytoanexistingorprojectedairqualityviolation

PotentialImpact:ConstructionoftheSandHillWindRepoweringProjectwouldoccuroveraperiodof6‐9months.Itisestimatedthattherewouldbe180workdaysthatwouldinvolvetheuseofheavyconstructionequipment(seeSandHillWindRepowerProjectDescriptionTable2‐7,DecommissioningandConstructionEquipmentRequirements).AsdescribedinPEIRSection3.3,AirQuality,itisexpectedthatthemajorityofequipmentandmaterial‐relatedtrucktripswouldoriginateatthePortofStocktonandinthecityofTracyandthattheconstructionworker‐relatedcommutetripswouldoccurentirelywithintheSFBAAB.Theportionoftheequipment,material,andaggregatehaultripsthatwouldoriginateatthePortofStocktonandinthecityofTracywouldbegeneratedintheSJVAB,whichisunderSJVAPCD’sjurisdiction.Therefore,theheavy‐dutytrucktripexhaustemissionsthatwouldbegeneratedintheSJVABhavebeenquantifiedandcomparedtoSJVAPCD’sannualsignificancethresholds(PEIRTable3.3‐7).

Duringconstruction,theproject’smaximumdailyunmitigatedexhaustemissionsofNOxareexpectedtoexceedBAAQMD’ssignificancethreshold,evenwithmitigation,resultinginasignificantimpact.

MitigationMeasures:Thefollowingmitigationmeasures,discussedintheDraftPEIRatpages3.3‐25through3.3‐27,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

AQ‐2a:Reduceconstruction‐relatedairpollutantemissionsbyimplementingapplicableBAAQMDBasicConstructionMitigationMeasures

AQ‐2b:Reduceconstruction‐relatedairpollutantemissionsbyimplementingmeasuresbasedonBAAQMD’sAdditionalConstructionMitigationMeasures

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresAQ‐2a,andAQ‐2bwillreducetheproject’sconstruction‐relatedemissionsbutwillnotmitigatethisimpacttoaless‐than‐significantlevel,asthereisnofeasiblewaytoavoidthesignificantimpact.Theprojectapplicantwillberequiredtoimplementthefollowingactions.

Page 5: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐5 

March 2016ICF 00630.15

 

AQ‐2a:Reduceconstruction‐relatedairpollutantemissionsbyimplementingapplicableBAAQMDBasicConstructionMitigationMeasures

Theprojectproponentswillrequireallcontractorstocomplywiththefollowingrequirementsforallareaswithactiveconstructionactivities. Allexposedsurfaces(e.g.,parkingareas,stagingareas,soilpiles,gradedareas,andunpaved

accessroads)willbewateredasneededtomaintaindustcontrolonsite—approximatelytwotimesperday.

Allhaultruckstransportingsoil,sand,orotherloosematerialoffsitewillbecovered. Allvisiblemudordirttrack‐outontoadjacentpublicroadswillberemovedusingwet

powervacuumstreetsweepersatleastonceperday.Theuseofdrypowersweepingisprohibited.

Allvehiclespeedsonunpavedroadswillbelimitedto15mph. Allroadways,driveways,andsidewalkstobepavedwillbecompletedassoonaspossible.

Buildingpadswillbelaidassoonaspossibleaftergradingunlessseedingorsoilbindersareused.

Idlingtimeswillbeminimizedeitherbyshuttingequipmentoffwhennotinuseorreducingthemaximumidlingtimeto5minutes(asrequiredbytheCaliforniaairbornetoxicscontrolmeasureTitle13,Section2485ofCaliforniaCodeofRegulations[CCR]).Clearsignagewillbeprovidedforconstructionworkersatallaccesspoints.

Allconstructionequipmentwillbemaintainedandproperlytunedinaccordancewithmanufacturer’sspecifications.Allequipmentwillbecheckedbyacertifiedvisibleemissionsevaluator.

Postapubliclyvisiblesignwiththetelephonenumberandpersontocontactattheleadagencyregardingdustcomplaints.Thispersonwillrespondandtakecorrectiveactionwithin48hours.Theairdistrict’sphonenumberwillalsobevisibletoensurecompliancewithapplicableregulations.

AQ‐2b:Reduceconstruction‐relatedairpollutantemissionsbyimplementingmeasuresbasedonBAAQMD’sAdditionalConstructionMitigationMeasures

Theprojectproponentswillrequireallcontractorstocomplywiththefollowingrequirementsforallareaswithactiveconstructionactivities. Duringconstructionactivities,allexposedsurfaceswillbewateredatafrequencyadequate

tomeetandmaintainfugitivedustcontrolrequirementsofallrelevantairqualitymanagemententities.

Allexcavation,grading,and/ordemolitionactivitieswillbesuspendedwhenaveragewindspeedsexceed20mph,asmeasuredattheLivermoreMunicipalAirport.

Windbreaks(e.g.,trees,fences)willbeinstalledonthewindwardside(s)ofactivelydisturbedareasofconstruction.Windbreaksshouldhaveatmaximum50%airporosity.

Vegetativegroundcover(e.g.,fast‐germinatingnativegrassseed)willbeplantedindisturbedareasassoonaspossibleandwateredappropriatelyuntilvegetationisestablished.

Iffeasibleandpracticable,thesimultaneousoccurrenceofexcavation,grading,andground‐disturbingconstructionactivitiesonthesameareaatanyonetimewillbelimited.

Alltrucksandequipment,includingtheirtires,willbewashedoffpriortoleavingthesite.

Page 6: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐6 

March 2016ICF 00630.15

 

Siteaccessestoadistanceof100feetfromthepavedroadwillbetreatedwitha6to12inchcompactedlayerofwoodchips,mulch,orgravel.

Sandbagsorothererosioncontrolmeasureswillbeinstalledtopreventsiltrunofftopublicroadwaysfromsiteswithaslopegreaterthan1%.

Theidlingtimeofdieselpoweredconstructionequipmentwillbeminimizedto2minutes. Theprojectwilldevelopaplandemonstratingthattheoffroadequipment(morethan50

horsepower)tobeusedintheconstructionproject(i.e.,owned,leased,andsubcontractorvehicles)wouldachieveaprojectwidefleet‐average20%NOXreductionand45%PMreductioncomparedtothemostrecentARBfleetaverage.Acceptableoptionsforreducingemissionsincludetheuseoflatemodelengines,low‐emissiondieselproducts,alternativefuels,engineretrofittechnology,after‐treatmentproducts,add‐ondevicessuchasparticulatefilters,and/orotheroptionsassuchbecomeavailable.

UselowVOC(i.e.,ROG)coatingsbeyondthelocalrequirements(i.e.,Regulation8,Rule3:ArchitecturalCoatings).

Allconstructionequipment,dieseltrucks,andgeneratorswillbeequippedwithBACTforemissionreductionsofNOXandPM.

AllcontractorswilluseequipmentthatmeetsARB’smostrecentcertificationstandardforoffroadheavydutydieselengines.

RemainingImpacts:Remainingimpactsrelatedtotheprojectconstructionactivities’contributiontotheconstruction‐relatedairpollutantemissionswillbesignificantandunavoidable.

OverridingConsiderations:AsmorefullyexplainedintheStatementofOverridingConsiderationscontainedinExhibitCtotheResolutiontowhichtheseCEQAFindingsareattached,theCountyfindsthatthereareenvironmental,economic,orotherbenefitsoftheapprovedprojectthatoverridetheremainingsignificantandunavoidableimpactsonairquality.Therearenootherfeasiblemitigationmeasuresorchangestotheprojectthatwouldreducethisimpacttoaless‐than‐significantlevel.

ImpactAQ‐3:Resultinacumulativelyconsiderablenetincreaseofanycriteriapollutantforwhichtheprojectregionisanonattainmentareaforanapplicablefederalorstateambientairqualitystandard(includingreleasingemissionsthatexceedquantitativethresholdsforozoneprecursors)

PotentialImpact:OperationoftheSandHillWindRepoweringProjectwouldnotresultinnewpermanentstationarysourcesofcriteriapollutants,norwoulditincreasecriteriapollutantemissionsfromanyexistingstationarysources.Duringconstruction,theproject’smaximumdailyunmitigatedexhaustemissionsofNOxareexpectedtoexceedBAAQMD’sproject‐leveldailymassthresholdsindicatedinTable3.3‐5oftheDraftPEIR.Noadditionalairemissionsmodelingwaspreparedfortheproposedprojecttoshowthattheemissionslevelsforthespecificprojectwouldnotexceedthestandards;therefore,thePEIRmitigationmeasuresarerequiredandtheproposedprojectisconsideredtohavethesignificantandunavoidableimpactasidentifiedinthePEIR.

BecauseconstructionemissionsofNOXundertheSandHillWindRepoweringProjectaregreaterthantheBAAQMDthresholdsafterimplementationofMitigationMeasuresAQ‐2aandAQ‐2b,constructionimpactsaresignificantandunavoidable.

Page 7: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐7 

March 2016ICF 00630.15

 

MitigationMeasures:Thefollowingmitigationmeasures,discussedintheDraftPEIRatpages3.3‐25through3.3‐27,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

AQ‐2a:Reduceconstruction‐relatedairpollutantemissionsbyimplementingapplicableBAAQMDBasicConstructionMitigationMeasures

AQ‐2b:Reduceconstruction‐relatedairpollutantemissionsbyimplementingmeasuresbasedonBAAQMD’sAdditionalConstructionMitigationMeasures

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresAQ‐2a,andAQ‐2bwillreducetheproject’sconstruction‐relatedemissionsbutwillnotmitigatethisimpacttoaless‐than‐significantlevel,asthereisnofeasiblewaytoavoidthesignificantimpact.

RemainingImpacts:Remainingimpactsrelatedtotheprojectconstructionactivities’contributiontocumulativeconstruction‐relatedairpollutantemissionswillbesignificantandunavoidable.

OverridingConsiderations:AsmorefullyexplainedintheStatementofOverridingConsiderationscontainedinExhibitCtotheResolutiontowhichtheseCEQAFindingsareattached,theCountyfindsthatthereareenvironmental,economic,orotherbenefitsoftheapprovedprojectthatoverridetheremainingsignificantandunavoidableimpactsonairquality.Therearenootherfeasiblemitigationmeasures,orchangestotheprojectthatwouldreducethisimpacttoaless‐than‐significantlevel.

Biological Resources  

ImpactBIO‐11:Avianmortalityresultingfrominteractionwithwindenergyfacilities

PotentialImpact:Theoperationofwindenergyfacilitieshasbeenshowntocauseavianfatalitiesthroughcollisionswithwindturbinesandpowerlinesandthroughelectrocutiononpowerlines.Althoughrepoweringisintendedtoreducefatalities,enoughuncertaintyremainsinlightofproject‐andsite‐specificdatatowarrantaconservativeapproachintheimpactanalysis.Accordingly,thecontinuedorincreasedlossofbirds(includingspecial‐statusspecies)atarateexceedingthebaselineratewouldbeasignificantadverseimpact.AsitingprocesswasconductedfortheSandHillWindRepoweringProjecttochoosespecificturbinesitesbasedonavianspeciesflightpatterns,aswellasinrecognitionofterrestrialspecies,wetlandecologies,windconditions(orresources)andtopography,safetysetbackrequirementsandotherfactors.MoredetailedsitinganalysisinaccordancewithBIO‐11aandfortheprojectAPPisongoingandmaycontinueuntilthebuildingpermitapplicationissubmitted.However,thereisalsoevidencethattheproposedSandHillWindRepoweringProjectwouldresultincontinuedavianmortalityinconflictwithspecificlawsandregulations(e.g.,ESA,CESA,MBTA)thatarenotbasedonmortalityrates,asdescribedinDeterminationofSignificanceonpages3.4‐58and3.4‐59oftheFinalPEIR,andwiththeobjectivesofthe2007SettlementAgreementthatboundthewindenergyoperatorsandtheCountytoprovidestrategiesandmeasurestoconserveavianspeciesofconcernandtheirhabitats.Thisconflictisconsideredasignificantimpactonprotectedandspecial‐statusavianspecies,andadoptingaconservativeexpectationthatsomelevelofavianmortalitywillcontinueevenwiththeimplementationofeveryfeasiblemitigationmeasureandconservationstrategy,thiswouldbeasignificantandunavoidableimpact.

Page 8: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐8 

March 2016ICF 00630.15

 

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.4.2ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

BIO‐11a:Prepareaproject‐specificavianprotectionplan

BIO‐11b:Siteturbinestominimizepotentialmortalityofbirds

BIO‐11c:Useturbinedesignsthatreduceavianimpacts

BIO‐11d:Incorporateavian‐safepracticesintodesignofturbine‐relatedinfrastructure

BIO‐11e:Retrofitexistinginfrastructuretominimizerisktoraptors

BIO‐11f:Discouragepreyforraptors

BIO‐11g:Implementpostconstructionavianfatalitymonitoringforallrepoweringprojectsandimplementadaptivemanagementmeasuresasnecessary

BIO‐11h:Compensateforthelossofraptorsandotheravianspecies,includinggoldeneagles,bycontributingtoconservationefforts

BIO‐11i:Implementanavianadaptivemanagementprogram

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresBIO‐11a,BIO‐11b,BIO‐11c,BIO‐11d,BIO‐11e,BIO‐11f,BIO‐11g,BIO‐11h,andBIO‐11iwillreducetherateofavianmortalityassociatedwiththeprojectbutwillnotmitigatethisimpacttoaless‐than‐significantlevel,asthereisnofeasiblewaytoavoidthesignificantimpact.Theprojectapplicantwillberequiredtoimplementthefollowingactionspriortoandduringoperations.

BIO‐11a:Prepareaproject‐specificavianprotectionplan

Allprojectproponentswillprepareaproject‐specificAPPtospecifymeasuresandprotocolsconsistentwiththeprogram‐levelmitigationmeasuresthataddressavianmortality.Theproject‐specificAPPswillinclude,ataminimum,thefollowingcomponents. Informationandmethodsusedtositeturbinestominimizerisk. Documentationthatappropriateturbinedesignsarebeingused. Documentationthatavian‐safepracticesarebeingimplementedonprojectinfrastructure. Methodsusedtodiscouragepreyforraptors. Adetaileddescriptionofthepostconstructionavianfatalitymonitoringmethodstobeused

(consistentwiththeminimumrequirementsoutlinedinMitigationMeasureBIO‐11g). Methodsusedtocompensateforthelossofraptors(consistentwiththerequirementsof

MitigationMeasureBIO‐11h).Eachprojectapplicantwillprepareandsubmitadraftproject‐specificAPPtotheCounty.ThedraftAPPwillbereviewedbytheTACforconsistencyandtheinclusionofappropriate

Page 9: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐9 

March 2016ICF 00630.15

 

mitigationmeasuresthatareconsistentwiththePEIRandrecommendedforapprovalbytheCounty.EachprojectapplicantmusthaveanapprovedFinalAPPpriortocommercialoperation.

BIO‐11b:Siteturbinestominimizepotentialmortalityofbirds

Micro‐sitingofturbines—usinganalysesoflandscapefeaturesandlocation‐specificbirduseandbehaviordatatoidentifylocationswithreducedcollisionrisk—mayresultinreducedfatalities(Smallwoodetal.2009).Allprojectproponentswillconductasitingprocessandprepareasitinganalysistoselectturbinelocationstominimizepotentialimpactsonbirdandbatspecies.Proponentswillutilizeexistingdataaswellascollectnewsite‐specificdataaspartofthesitinganalysis.

ProjectproponentswillutilizecurrentlyavailableguidelinessuchastheAlamedaCountySRCguidelinesforsitingwindturbines(AlamedaCountySRC2010)and/orothercurrentlyavailableresearchorguidelinestoconductsitinganalysis.Additionally,projectproponentswillusetheresultsofprevioussitingeffortstoinformtheanalysisandsitingmethodsasappropriatesuchthatthescienceofsitingcontinuestobeadvanced.Allprojectproponentswillcollectfielddatathatidentifyorconfirmthebehavior,utilization,anddistributionpatternsofaffectedavianandbatspeciespriortotheinstallationofturbines.Projectproponentswillcollectandutilizeavailableexistinginformation,includingbutnotnecessarilylimitedto:sitingreportsandmonitoringdatafrompreviouslyinstalledprojects;publisheduseandabundancestudiesandreports;andtopographicfeaturesknowntoincreasecollisionrisk(trees,riparianareas,waterbodies,andwetlands).

Projectproponentswillalsocollectandutilizeadditionalfielddataasnecessarytoinformthesitinganalysisforgoldeneagle.AsrequiredinMitigationMeasureBIO‐8a,surveyswillbeconductedtolocategoldeneaglenestswithin2milesofproposedprojectareas.Sitingofturbineswithin2milesofanactiveoralternativegoldeneaglenestoractivegoldeneagleterritorywillbebasedonasite‐specificanalysisofriskbasedontheestimatedeagleterritories,conductedinconsultationwithUSFWS.

MitigationMeasureBIO‐11c:Useturbinedesignsthatreduceavianimpacts

Useofturbineswithcertaincharacteristicsisbelievedtoreducethecollisionriskforavianspecies.Projectproponentswillimplementthedesign‐relatedmeasureslistedbelow. Turbinedesignswillbeselectedthathavebeenshownorthataresuspectedtoreduceavian

fatalities,basedontheheight,color,configuration,orotherfeaturesoftheturbines. Turbinedesignwilllimitoreliminateperchingopportunities.Designswillincludeatubular

towerwithinternalladders;externalcatwalks,railings,orladderswillbeprohibited. Turbinedesignwilllimitoreliminatenestingorroostingopportunities.Openingson

turbineswillbecoveredtopreventcavity‐nestingspeciesfromnestingintheturbines. LightingwillbeinstalledonthefewestnumberofturbinesallowedbyFAAregulations,and

allpilotwarninglightswillfiresynchronously.Turbinelightingwillemployonlyredordualred‐and‐whitestrobe,strobe‐like,orflashinglights(U.S.FishandWildlifeService2012).Alllightingonturbineswillbeoperatedattheminimumallowableintensity,flashingfrequency,andquantityallowedbyFAA(Gehringetal.2009;U.S.FishandWildlifeService2012).DurationbetweenflasheswillbethelongestallowablebytheFAA.

Page 10: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐10 

March 2016ICF 00630.15

 

BIO‐11d:Incorporateavian‐safepracticesintodesignofturbine‐relatedinfrastructure

Allprojectproponentswillapplythefollowingmeasureswhendesigningandsitingturbine‐relatedinfrastructure.Thesemeasureswillreducetheriskofbirdelectrocutionandcollision. Permanentmeteorologicalstationswillavoiduseofguywires.Ifitisnotpossibletoavoid

usingguywires,thewireswillbeatleast4/0gaugetoensurevisibilityandwillbefittedwithbirddeterrentdevices.

AllpermanentmeteorologicaltowerswillbeunlitunlesslightingisrequiredbyFAA.Iflightingisrequired,itwillbeoperatedattheminimumallowableintensity,flashingfrequency,andquantityallowedbyFAA.

Totheextentpossible,allpowerlineswillbeplacedunderground.However,linesmaybeplacedabovegroundimmediatelypriortoenteringthesubstation.Allabovegroundlineswillbefittedwithbirdflightdivertersorvisibilityenhancementdevices(e.g.,spiraldampingdevices).Whenlinescannotbeplacedunderground,appropriateavianprotectiondesignsmustbeemployed.Asaminimumrequirement,thecollectionsystemwillconformwiththemostcurrenteditionoftheAvianPowerLineInteractionCommitteeguidelinestopreventelectrocutions.

Lightingwillbefocuseddownwardandminimizedtolimitskywardillumination.Sodiumvaporlampsandspotlightswillnotbeusedatanyfacility(e.g.,laydownareas,substations)exceptwhenemergencymaintenanceisneeded.Lightingatcollectionfacilities,includingsubstations,willbeminimizedusingdowncastlightingandmotion‐detectiondevices.Theuseofhigh‐intensitylighting;steady‐burningorbrightlightssuchassodiumvapor,quartz,orhalogen;orotherbrightspotlightswillbeminimized.Wherelightingisrequireditwillbedesignedfortheminimumintensityrequiredforsafeoperationofthefacility.Greenorbluelightingwillbeusedinplaceofredorwhitelighting.

BIO‐11e:Retrofitexistinginfrastructuretominimizerisktoraptors

Anyexistingpowerlinesinaspecificprojectareathatareownedbythewindprojectoperatorandthatareassociatedwithelectrocutionofaneagleorotherraptorwillberetrofittedwithin30daystomakethemraptor‐safeaccordingtoAvianPowerLineInteractionCommitteeguidelines.Allotherexistingstructurestoremaininaprojectareaduringrepoweringwillberetrofitted,asfeasible,accordingtospecificationsofMitigationMeasureBIO‐11cpriortorepoweredturbineoperation.

BIO‐11f:Discouragepreyforraptors

Allprojectproponentswillapplythefollowingmeasureswhendesigningandsitingturbine‐relatedinfrastructure.Thesemeasuresareintendedtominimizeopportunitiesforfossorialmammalstobecomeestablishedandtherebycreateapreybasethatcouldbecomeanattractantforraptors.

Rodenticidewillnotbeutilizedontheprojectsitetoavoidtheriskofraptorsscavengingtheremainsofpoisonedanimals.

Boulders(rocksmorethan12inchesindiameter)excavatedduringprojectconstructionmaybeplacedinabovegroundpilesintheprojectareasolongastheyaremorethan500meters(1,640feet)fromanyturbine.Existingrockpilescreatedduringconstructionoffirst‐andsecond‐generationturbineswillalsobemovedatleast500meters(1,640feet)fromturbines.

Page 11: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐11 

March 2016ICF 00630.15

 

Gravelwillbeplacedaroundeachtowerfoundationtodiscouragesmallmammalsfromburrowingnearturbines.

BIO‐11g:Implementpostconstructionavianfatalitymonitoringforallrepoweringprojects

Apostconstructionmonitoringprogramwillbeconductedateachrepoweringprojectforaminimumof3yearsbeginningonthecommercialoperationdate(COD)oftheproject.Monitoringmaycontinuebeyond3yearsifconstructioniscompletedinphases.Moreover,iftheresultsofthefirst3yearsindicatethatbaselinefatalityrates(i.e.,nonrepoweredfatalityrates)areexceeded,monitoringwillbeextendeduntiltheaverageannualfatalityratehasdroppedbelowbaselinefatalityratesfor2years,andtoassesstheeffectivenessofadaptivemanagementmeasuresspecifiedinMitigationMeasureBIO‐11i.Anadditional2yearsofmonitoringwillbeimplementedatyear10(i.e.,thetenthanniversaryoftheCOD).ProjectproponentswillprovideaccesstoqualifiedthirdpartiesauthorizedbytheCountytoconductanyadditionalmonitoringaftertheinitial3‐yearmonitoringperiodhasexpiredandbeforeandaftertheadditional2‐yearmonitoringperiod,providedthatsuchadditionalmonitoringutilizesscientificallyvalidmonitoringprotocols.

Atechnicaladvisorycommittee(TAC)willbeformedtooverseethemonitoringprogramandtoadvisetheCountyonadaptivemanagementmeasuresthatmaybenecessaryiffatalityratessubstantiallyexceedthosepredictedfortheproject(asdescribedbelowinMitigationMeasureBIO‐11i).TheTACwillhaveastandingmeeting,whichwillbeopentothepublic,every6monthstoreviewmonitoringreportsproducedbyoperatorsintheprogramarea.Inthesemeetings,theTACwilldiscussanyissuesraisedbythemonitoringreportsandrecommendtotheCountynextstepstoaddressissues,includingschedulingadditionalmeetings,ifnecessary.

TheTACwillcompriserepresentativesfromtheCounty(includingoneormoretechnicalconsultants,suchasabiostatistician,anavianbiologist,andabatbiologist),andwildlifeagencies(CDFW,USFWS).AdditionalTACmembersmayalsobeconsidered(e.g.,arepresentativefromAudubon,alandownerintheprogramarea,arepresentativeoftheoperators)atthediscretionoftheCounty.TheTACwillbeavoluntaryandadvisorygroupthatwillprovideguidancetotheCountyPlanningDepartment.Tomaintaintransparencywiththepublic,allTACmeetingswillbeopentothepublic,andnoticeofmeetingswillbegiventointerestedparties.

TheTACwillhavethreeprimaryadvisoryroles:(1)toreviewandadviseonprojectplanningdocuments(i.e.,project‐specificAPPs)toensurethatproject‐specificmitigationmeasuresandcompensatorymitigationmeasuresdescribedinthisPEIRareappropriatelyandconsistentlyapplied,(2)toreviewandadviseonmonitoringdocuments(protocolsandreporting)forconsistencywiththemitigationmeasures,and(3)toreviewandadviseonimplementationoftheadaptivemanagementplans.

ShouldfatalitymonitoringrevealthatimpactsexceedthebaselinethresholdsestablishedinthisPEIR,theTACwilladvisetheCountyonrequiringimplementationofadaptivemanagementmeasuresasdescribedinMitigationMeasureBIO‐11i.TheCountywillhavethedecision‐makingauthority,asitistheorganizationissuingtheCUPs.However,theTACwillcollaborativelyinformthedecisionsoftheCounty.

Page 12: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐12 

March 2016ICF 00630.15

 

Operatorsarerequiredtoprovideforavianusesurveystobeconductedwithintheprojectareaboundariesforaminimumof30minutesduration.SurveyorswillbequalifiedandtrainedandsubjecttoapprovalbytheCounty.

Carcasssurveyswillbeconductedateveryturbineforprojectswith20orfewerturbines.Forprojectswithmorethan20turbines,suchsurveyswillberequiredataminimumof20turbines,andasampleoftheremainingturbinesmaybeselectedforcarcasssearches.Theoperatorwillberequiredtodemonstratethatthesamplingschemeandsamplesizearestatisticallyrigorousanddefensible.Wheresubstantialvariationinterrain,landcovertype,management,orotherfactorsmaycontributetosignificantvariationinfatalityrates,thesamplingschemewillbestratifiedtoaccountforsuchvariation.Thesurveyprotocolforsetsandsubsetsofturbines,aswellasproposedsamplingschemesthatdonotentailasearchofallturbines,mustbeapprovedbytheCountyinconsultationwiththeTACpriortothestartofsurveys.

Thesearchintervalwillnotexceed14daysfortheminimumof20turbinestobesurveyed;however,thesearchintervalfortheadditionalturbines(i.e.,thoseexceedingthe20‐turbineminimum)thataretobeincludedinthesamplingschememaybeextendedupto28daysorlongerifrecommendedbytheTAC.

Theestimationofdetectionprobabilityisarapidlyadvancingfield.Carcassplacementtrials,broadlydefined,willbeconductedtoestimatedetectionprobabilityduringeachyearofmonitoring.Samplesizeswillbelargeenoughtopotentiallydetectsignificantvariationbyseason,carcasssize,andhabitattype.

OperatorswillberequiredtosubmitcopiesofallrawdataformstotheCountyannually,willsupplyrawdatainareadilyaccessibledigitalformattobespecifiedbytheCounty,andwillpreparerawdataforinclusionasappendicesintheannualreports.TheintentistoallowtheCountytoconductindependentanalysesandmeta‐analysesofdataacrosstheAPWRA,andtosupplythesedatatotheregulatoryagenciesifrequested.

AnnualreportssubmittedtotheCountywillprovideasynthesisofallinformationcollectedtodate.Eachreportwillprovideanintroduction;descriptionsofthestudyarea,methods,andresults;adiscussionoftheresults;andanysuitablerecommendations.Reportswillproviderawcountsoffatalities,adjustedfatalityrates,andestimatesofproject‐widefatalitiesonbothaperMWandperturbinebasis.

BIO‐11h:Compensateforthelossofraptorsandotheravianspecies,includinggoldeneagles,bycontributingtoconservationefforts

Discussion

Severaloptionstocompensateforimpactsonraptorsarecurrentlyavailable.Somearetargetedtobenefitcertainspecies,buttheymayalsohavebenefitsforotherraptorandnon‐raptorspecies.Forexample,USFWS’sECPGuidelinescurrentlyoutlineacompensatorymitigationstrategyforgoldeneaglesusingtheretrofitofhigh‐riskpowerpoles(polesknownorsuspectedtoelectrocuteandkilleagles).Thegoalofthisstrategyistoeliminatehazardsforgoldeneagles.However,becausethepolesarealsodangerousforotherlargeraptors(e.g.,red‐tailedhawk,Swainson’shawk),retrofittingthemcanbenefitsuchspeciesaswellaseagles.

Similarly,althoughtheretrofittingofelectricalpolesmayhavebenefitsforlargeraptors,suchanapproachmayprovideminimalbenefitsforsmallerraptorssuchasAmericankestreland

Page 13: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐13 

March 2016ICF 00630.15

 

burrowingowl.Consequently,additionalmeasureswouldberequiredcomponentsofanoverallmitigationpackagetocompensateforimpactsonraptorsingeneral.

TheSecretaryoftheInteriorissuedOrder3330onOctober31,2013,outlininganewapproachtomitigationpoliciesandpracticesoftheDepartmentoftheInterior.Thisapproachrecognizesthatcertainstrategiesaimedatsomespecies(e.g.,raptors)canprovidesubstantialbenefittoothers(e.g.,non‐raptors)andtotheecologicallandscapeasawhole.Thelandscape‐scaleapproachtomitigationandconservationeffortsisnowcentraltotheDepartment’smitigationstrategy.AlthoughtheOrderwasintendedforusebyfederalagenciesandassuchisnotdirectlyapplicabletotheCounty,itisevidentthatsuchanapproachwouldlikelyhavethegreatestmitigationbenefits,especiallywhenconsideringongoingandlong‐termimpactsfromwindenergyprojects.

Withtheseconsiderationsinmind,theCountyhasoutlinedseveraloptionsthatarecurrentlyavailabletocompensateforimpactsonraptorsandotheravianspecies.Theoptionsdiscussedbelowarecurrentlyconsideredacceptableapproachestocompensationforimpactsonraptorsandotherspecies.Althoughnoteveryoptionisappropriateforallspecies,itishopedthatastimeproceeds,amorecomprehensivelandscape‐levelapproachtomitigationwillbeadoptedtobenefitabroadersuiteofspeciesthanmightbenefitfrommorespecies‐specificmeasures.TheCountyrecognizesthatthescienceofraptorconservationandtheunderstandingofwind‐wildlifeimpactsarecontinuingtoevolveandthatthesuiteofavailablecompensationoptionsmayconsequentlychangeoverthelifeoftheproposedprojects.

ConservationMeasures

Topromotetheconservationofraptorsandotheravianspecies,projectproponentswillcompensateforraptorfatalitiesestimatedwithintheirprojectareas.Mitigationwillbeprovidedin10‐yearincrements,withthefirstincrementbasedontheestimates(raptors/MW/year)providedinthisPEIRfortheVascoWindsProject(Table3.4‐10)ortheproject‐specificEIRforfutureprojects.TheVascoWindsfatalityrateswereselectedbecausetheVascoturbinesarethemostsimilartothoselikelytobeproposedforfuturerepoweringprojectsandconsequentlyrepresentthebestavailablefatalityestimates.Eachprojectproponentwillconductpostconstructionfatalitymonitoringforatleast3yearsbeginningatprojectstartup(dateofcommercialoperation)andagainfor2yearsatyear10,asrequiredunderMitigationMeasureBIO‐11g,toestimatetheaveragenumberofraptorstakeneachyearbyeachindividualproject.Theprojectproponentwillcompensateforthisnumberofraptorsinsubsequent10‐yearincrementsforthelifeoftheproject(i.e.,three10‐yearincrements)asoutlinedbelow.MitigationMeasureBIO‐11galsorequiresadditionalfatalitymonitoringatyear10oftheproject.Theresultsofthefirst3yearsofmonitoringand/orthemonitoringatyear10mayleadtorevisionsoftheestimatedaveragenumberofraptorstaken,andmitigationprovidedmaybeadjustedaccordinglyonaone‐timebasiswithineachofthefirsttwo10‐yearincrements,basedontheresultsofthemonitoringrequiredbyMitigationMeasureBIO‐11g,inconsultationwiththeTAC.

Priortothestartofoperations,projectproponentswillsubmitforCountyapprovalanavianconservationstrategy,aspartoftheproject‐specificAPPoutlinedinMitigationMeasureBIO‐11a,outliningtheestimatednumberofraptorfatalitiesbasedonthenumberandtypeofturbinesbeingconstructed,andthetypeortypesofcompensationoptionstobeimplemented.Projectproponentswillusetheavianconservationstrategytocraftanappropriatestrategy

Page 14: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐14 

March 2016ICF 00630.15

 

usingabalancedmixoftheoptionspresentedbelow,aswellasconsideringnewoptionssuggestedbythegrowingbodyofknowledgeduringthecourseoftheprojectlifespan,assupportedbyaResourceEquivalencyAnalysis(REA)(seeexampleinAppendixC)orsimilartypeofcompensationassessmentacceptabletotheCountythatdemonstratestheefficacyofproposedmitigationforimpactsonraptors.

TheCountyPlanningDirector,inconsultationwiththeTAC,willconsider,basedontheREA,whethertheproposedavianconservationstrategyisadequate,includingconsiderationofwhethereachavianmitigationplanincorporatesalandscape‐scaleapproachsuchthattheconservationeffortsachievethegreatestpossiblebenefits.Compensationmeasuresasdetailedinanapprovedavianconservationstrategymustbeimplementedwithin1yearofthedateofcommercialoperations.AvianconservationstrategieswillbereviewedandmayberevisedbytheCountyevery10years,andonaone‐timebasisineachofthetwo10‐yearincrementsbasedonthemonitoringrequiredbyMitigationMeasureBIO‐11g. Retrofittinghigh‐riskelectricalinfrastructure.USFWS’sECPGuidelinesoutlinea

compensatorymitigationstrategyusingtheretrofitofhigh‐riskpowerpoles(polesknownorsuspectedtoelectrocuteandkilleagles).USFWShasdevelopedanREA(U.S.FishandWildlifeService2013a)asatooltoestimatethecompensatorymitigation(numberofretrofits)requiredforthetakeofeagles.TheREAtakesintoaccountthecurrentunderstandingofeaglelifehistoryfactors,theeffectivenessofretrofittingpoles,theexpectedannualtake,andthetimingofimplementationofthepoleretrofits.Theprojectproponentsmayneedtocontractwithautilityorathird‐partymitigationaccount(suchastheNationalFishandWildlifeFoundation)toretrofitthenumberofpolesneededasdemonstratedbyaproject‐specificREA.Ifcontractingdirectly,theprojectproponentwillconsultwithutilitycompaniestoensurethathigh‐riskpoleshavebeenidentifiedforretrofitting.Proponentswillagreeinwritingtopaytheutilityowner/operatortoretrofittherequirednumberofpowerpolesandmaintaintheretrofitsfor10yearsandwillprovidetheCountywithdocumentationoftheretrofitagreement.Thefirstretrofitswillbebasedontheestimatednumberofeaglefatalitiesasdescribedaboveinthismeasureorasdevelopedintheproject‐specificEIRforfutureprojects.Subsequentnumbersofretrofitsrequiredforadditional10‐yeardurationswillbebasedontheresultsofproject‐specificfatalitymonitoringasoutlinedinMitigationMeasureBIO‐11g.Iffewereaglefatalitiesareidentifiedthroughthemonitoring,thenumberoffuturerequiredretrofitsmaybereducedthroughaproject‐specificREA.Althoughretrofittingpoleshasnotbeenidentifiedasappropriatemitigationforotherlargeraptors,theywouldlikelybenefitfromsuchefforts,asthey(particularlyred‐tailedandSwainson’shawks)constitutethelargestnon‐eaglegrouptosufferelectrocutiononpowerlines(AvianPowerLineInteractionCommittee2006).

MeasuresoutlinedinanapprovedEagleConservationPlanandBirdandBatConservationStrategy.ProjectproponentsmayelecttoapplyforprogrammaticeagletakepermitsfromUSFWS.TheprogrammaticeagletakepermitprocesscurrentlyinvolvespreparationofanECPandaBirdandBatConservationStrategy(BBCS).TheECPspecifiesavoidanceandminimizationmeasures,advancedconservationpractices,andcompensatorymitigationforeagles—conditionsthatmeetUSFWS’scriteriaforissuanceofapermit.TheBBCSoutlinesmeasuresbeingimplementedbytheapplicanttoavoidandminimizeimpactsonmigratorybirds,includingraptors.Ifprogrammaticeagletakepermitsareobtainedbyprojectproponents,thosepermitterms,includingthemeasuresoutlinedintheapproved

Page 15: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐15 

March 2016ICF 00630.15

 

ECPandBBCS,mayconstituteanappropriateconservationmeasureforestimatedtakeofgoldeneaglesandotherraptors,providedsuchtermsaredeemedbytheCountytobecomparabletoormoreprotectiveofraptorsthantheotheroptionslistedherein.

Contributetoraptorconservationefforts.Projectproponentswillcontributefunds,intheamountof$580/raptorfatality,in10‐yearincrementstolocaland/orregionalconservationeffortsdesignedtoprotect,recover,andmanagelandsforraptors,ortoconductresearchinvolvingmethodstoreduceraptorfatalitiesorincreaseraptorproductivity.The$580amountisbasedontheaveragecosttorehabilitateoneraptorattheCaliforniaRaptorCenter,affiliatedwiththeUCDavisSchoolofVeterinaryMedicine,whichreceivesmorethan200injuredorillraptorsannually(Stedmanpers.comm.).Ten‐yearinstallmentsaremoreadvantageousthanmorefrequentinstallmentsforplanningandbudgetingpurposes.Thefundswillbecontributedtoanentityorentitiesengagedintheseactivities,suchastheEastBayRegionalParkDistrictandtheLivermoreAreaRegionalParkDistrict.Conservationeffortsmayincludeconstructingandinstallingnestboxesandperches,conductinganawarenesscampaigntoreducetheuseofrodenticide,andconductingresearchtobenefitraptors.ThespecificconservationefforttobepursuedwillbesubmittedtotheCountyforapprovalaspartoftheavianconservationstrategyreviewprocess.ThedonationreceiptwillbeprovidedtotheCountyasevidenceofpayment.

Thefirstcontributionsforanygivenprojectwillbebasedontheestimatednumberofraptorfatalitiesasdescribedaboveinthismeasureorasdevelopedintheproject‐specificEIRforfutureprojects.Fundsforsubsequent10‐yearinstallmentswillbeprovidedonthebasisoftheaverageannualraptorfatalityratesdeterminedthroughpostconstructionmonitoringefforts,allowingforaone‐timeadjustmentwithineach10‐yearincrementaftertheresultsofthemonitoringeffortsareavailable.Iffewerraptorfatalitiesaredetectedthroughthemonitoringeffort,thesecondinstallmentamountmaybereducedtoaccountforthedifferencebetweenthefirstestimatednumbersandthemonitoringresults.

Contributetoregionalconservationofraptorhabitat.ProjectproponentsmayaddressregionalconservationofraptorhabitatbyfundingtheacquisitionofconservationeasementswithintheAPWRAoronlandsinthesameeco‐regionoutsidetheAPWRA,subjecttoCountyapproval,forthepurposeoflong‐termregionalconservationofraptorhabitat.Landsproposedforconservationmustbewell‐managedgrazinglandssimilartothoseonwhichtheprojectshavebeendeveloped.Projectproponentswillfundtheregionalconservationandimprovementoflands(throughhabitatenhancement,leadabatementactivities,eliminationofrodenticides,and/orothermeasures)usinganumberofacresequivalenttotheconservationbenefitoftheraptorrecoveryandconservationeffortsdescribedabove,orasdeterminedthroughaproject‐specificREA(seeexampleREAinAppendixC).Theconservationlandsmustbeprovidedforcompensationofaminimumof10yearsofraptorfatalities,as10‐yearincrementswillminimizethetransactioncostsassociatedwiththeidentificationandconservationoflands,therebyincreasingoverallcosteffectiveness.Theconservationeasementswillbeheldbyanorganizationwhosemissionistopurchaseand/orotherwiseconservelands,suchasTheTrustforPublicLands,TheNatureConservancy,CaliforniaRangelandTrust,ortheEastBayRegionalParksDistrict.TheprojectproponentswillobtainapprovalfromtheCountyregardingtheamountofconservedlands,anyenhancementsproposedtoincreaseraptorhabitatvalue,andtheentityholdingthelandsand/orconservationeasement.

Page 16: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐16 

March 2016ICF 00630.15

 

OtherConservationMeasuresIdentifiedintheFuture.Asnotedabove,additionalconservationmeasuresforraptorsmaybecomeavailableinthefuture.ConservationmeasuresforraptorsarecurrentlybeingdevelopedbyUSFWSandnongovernmentalorganizations(e.g.,AmericanWindWildlifeInstitute)—forexample,activitiesservingtoreducesuchfatalitieselsewhere,andenhancingforagingandnestinghabitat.Additionaloptionsforconservationcouldincludepurchasingcreditsatanapprovedmitigationbank,creditsfortheretirementofwindfarmsthatareparticularlydangeroustobirdsorbats,thecurtailmentofpreyeliminationprograms,andhunter‐educationprogramsthatremovesourcesofleadfromtheenvironment.Underthisoption,theprojectproponentmaymakealternativeproposalstotheCountyforconservationmeasures—basedonanREAorsimilarcompensationassessment—thattheCountymayacceptasmitigationiftheyaredeemedbytheCountytobecomparabletoormoreprotectiveofraptorspeciesthantheotheroptionsdescribedherein.

BIO‐11i:Implementanavianadaptivemanagementprogram

IffatalitymonitoringdescribedinMitigationMeasureBIO‐11gresultsinanestimatethatexceedsthepreconstructionbaselinefatalityestimates(i.e.,estimatesatthenonrepoweredturbinesasdescribedinthisPEIR)foranyfocalspeciesorspeciesgroup(i.e.,individualfocalspecies,allfocalspecies,allraptors,allnon‐raptors,allbirdscombined),projectproponentswillprepareaproject‐specificadaptivemanagementplanwithin2monthsfollowingtheavailabilityofthefatalitymonitoringresults.Theseplanswillbeusedtoadjustoperationandmitigationtotheresultsofmonitoring,newtechnology,andnewresearchtoensurethatthebestavailablescienceisusedtominimizeimpactstobelowbaseline.Project‐specificadaptivemanagementplanswillbereviewedbytheTAC,revisedbyprojectproponentsasnecessary,andapprovedbytheCounty.TheTACwilltakecurrentresearchandthemosteffectiveimpactreductionstrategiesintoaccountwhenreviewingadaptivemanagementplansandsuggestingmeasurestoreduceimpacts.Theproject‐specificadaptivemanagementplanswillbeimplementedwithin2monthsofapprovalbytheCounty.Theplanswillincludeasteppedapproachwherebyanadaptivemeasureormeasuresareimplemented,theresultsaremonitoredforsuccessorfailureforayear,andadditionaladaptivemeasuresareaddedasnecessary,followedbyanotheryearofmonitoring,untilthesuccesscriteriaareachieved(i.e.,estimatedfatalitiesarebelowthebaseline).Projectproponentsshouldusethebestmeasuresavailablewhentheplanispreparedinconsiderationofthespecificadaptivemanagementneeds.Forexample,ifonlyonethresholdisexceeded,suchasgoldeneaglefatalities,theplanandmeasuresusedwilltargetthatspecies.AssetforthinotheragreementsintheAPWRA,projectproponentsmayalsofocusadaptivemanagementmeasuresonindividualormultipleturbinesifthoseturbinesareshowntocauseasignificantlydisproportionatenumberoffatalities.

Ingeneral,thefollowingtypesofmeasureswillbeconsideredbytheTAC,intheordertheyarepresentedbelow;however,theTACmayrecommendanyoftheseorothermeasuresthatareshowntobesuccessfulinreducingtheimpact.

ADMM‐1:VisualModifications.Theprojectproponentcouldpaintapatternonaproportionoftheturbineblades.TheproportionandthepatternofthebladestobepaintedwillbedeterminedbytheCountyinconsultationwiththeTAC.USFWSrecommendstestingmeasurestoreducemotionsmear—theblurringofturbinebladesduetorapidrotationthatrendersthemlessvisibleandhencemoreperiloustobirdsinflight.Suggestedtechniquesincludepaintingbladeswithstaggeredstripesorpaintingonebladeblack.Theprojectproponentwillconduct

Page 17: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐17 

March 2016ICF 00630.15

 

fatalitystudiesonacontrollednumberofpaintedandunpaintedturbines.TheprojectproponentwillcoordinatewiththeTACtodeterminethelocationofthepaintedturbines,buttheintentistoimplementthismeasureinareasthatappeartobecontributingmosttothehighnumberoffatalitiesdetected.

ADMM‐2:Anti‐PerchingMeasures.TheCountywillconsultwiththeTACregardingtheuseofanti‐perchingmeasurestodiscouragebirduseofthearea.TheTACwillusethemostrecentresearchandinformationavailabletodetermine,onacase‐by–casebasis,ifanti‐perchingmeasureswillbeaneffectivestrategytoreduceimpacts.Ifdeterminedtobefeasible,anti‐perchingdeviceswillbeinstalledonartificialstructures,excludingutilitypoles,within1mileofprojectfacilities(withlandownerpermission)todiscouragebirduseofthearea.

ADMM‐3:PreyReduction.Theprojectproponentwillimplementapreyreductionprogramaroundthemosthazardousturbines.Examplesofpreyreductionmeasuresmayincludechangesingrazingpracticestomakethearealessdesirableforpreyspecies,activereductionthroughdirectremovalofpreyspecies,orothermeasuresprovidedtheyareconsistentwithmanagementgoalsforthreatenedandendangeredspecies.

ADMM‐4:ImplementationofExperimentalTechnologies.Projectproponentscandeployexperimentaltechnologiesattheirfacilitiestotesttheirefficacyinreducingturbine‐relatedfatalities.Examplesmayinclude,butarenotlimitedto,visualdeterrents,noisedeterrents,andactiveradarsystems.

ADMM‐5:TurbineCurtailment.Ifpostconstructionmonitoringindicatespatternsofturbine‐causedfatalities—suchasseasonalspikesinfatalities,topographicorotherenvironmentalfeaturesassociatedwithhighnumbersoffatalities,orotherfactorsthatcanpotentiallybemanipulatedandthatsuggestthatcurtailmentofaspecificturbine’soperationwouldresultinreducingfutureavianfatalities—theprojectoperatorcancurtailoperationsoftheoffendingturbineorturbines.CurtailmentrestrictionswouldbedevelopedincoordinationwiththeTACandbasedoncurrentlyavailablefatalitydata,usedata,andresearch.

ADMM‐6:Cut‐inSpeedStudy.Changesincut‐inspeedcouldbeconductedtoseeifchangingcut‐inspeedsfrom3meterspersecondto5meterspersecond(forexample)wouldsignificantlyreduceavianfatalities.TheproponentwillcoordinatewiththeTACindeterminingthefeasibilityofthemeasurefortheparticularspeciesaffectedaswellastheamountofthechangeinthecut‐inspeed.

ADMM‐7:Real‐TimeTurbineCurtailment.Theprojectproponentcanemployareal‐timeturbinecurtailmentprogramdesignedinconsultationwiththeTAC.Theintentwouldbetodeployabiologisttomonitoronsiteconditionsandissueacurtailmentorderwhenraptorsarenearoperatingturbines.Alternatively,radar,video,orothermonitoringmeasurescouldbedeployedinplaceofabiologicalmonitorifthereisevidencetoindicatethatsuchasystemwouldbeaseffectiveandmoreefficientthanuseofahumanmonitor.

RemainingImpacts:Remainingimpactsrelatedtotheprojectimpactsonavianmortalitywillbesignificantandunavoidable.

OverridingConsiderations:AsmorefullyexplainedintheStatementofOverridingConsiderationscontainedinExhibitCtotheResolutiontowhichtheseCEQAFindingsareattached,theCountyfindsthatthereareenvironmental,economic,orotherbenefitsoftheapprovedprojectthatoverridetheremainingsignificantandunavoidableimpactsonbiological

Page 18: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐18 

March 2016ICF 00630.15

 

resources.Therearenootherfeasiblemitigationmeasures,orchangestotheprojectthatwouldreducethisimpacttoalessthansignificantlevel.

ImpactBIO‐14:Turbine‐relatedfatalitiesofspecial‐statusandotherbats

PotentialImpact:ResidentandmigratorybatsflyinginandthroughtheSandHillWindRepoweringProjectareamaybekilledbycollisionwithwindturbinebladesorotherinteractionwiththewindturbinegenerators.Extrapolatingfromexistingfatalitydataandfromtrendsobservedatotherwindenergyfacilitieswherefourth‐generationturbinesareinoperation,itappearslikelythatfatalitieswouldoccurpredominantlyinthelatesummertomid‐fallmigrationperiod;thatfatalitieswouldconsistmostlyofmigratorybats,particularlyMexicanfree‐tailedbatandhoarybat;thatfatalitieswouldoccursporadicallyatothertimesofyear;andthatfatalitiesofoneormoreotherspecieswouldoccurinsmallernumbers.Despitethehighlevelofuncertaintyinestimatesofbatfatalityrates,allavailabledatasuggestthatrepoweringwouldresultinasubstantialincreaseinbatfatalities.

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.4.2ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

BIO‐14a:Siteandselectturbinestominimizepotentialmortalityofbats

BIO‐14b:Implementpostconstructionbatfatalitymonitoringprogramforallrepoweringprojects

BIO‐14c:Prepareandpublishannualmonitoringreportsonthefindingsofbatuseoftheprojectareaandfatalitymonitoringresults

BIO‐14d:Developandimplementabatadaptivemanagementplan

BIO‐14e:Compensateforexpensesincurredbyrehabilitatinginjuredbats

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresBIO‐14a,BIO‐14b,BIO‐14c,BIO‐14d,andBIO‐14ewillreducetherateofbatmortalityassociatedwiththeprojectbutwillnotmitigatethisimpacttoaless‐than‐significantlevel,asthereisnofeasiblewaytoavoidthesignificantimpact.Theprojectapplicantwillberequiredtoimplementthefollowingactions.

BIO‐14a:Siteandselectturbinestominimizepotentialmortalityofbats

Allprojectproponentswillusethebestinformationavailabletositeturbinesandtoselectfromturbinemodelsinsuchamannerastoreducebatcollisionrisk.Thesitingandselectionprocesswilltakeintoaccountbatuseoftheareaandlandscapefeaturesknowntoincreasecollisionrisk(trees,edgehabitats,riparianareas,waterbodies,andwetlands).Measuresincludebutarenotlimitedtositingturbinesthegreatestdistancefeasibleupto500meters(1,640)feetfromstillorflowingbodiesofwater,riparianhabitat,knownroosts,andtreestands(CaliforniaBatWorkingGroup2006:6).

Page 19: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐19 

March 2016ICF 00630.15

 

Togeneratesite‐specific“bestinformation”toinformturbinesitingandoperationdecisions,abathabitatassessmentandroostsurveywillbeconductedintheprojectareatoidentifyandmaphabitatofpotentialsignificancetobats,suchaspotentialroostsites(treesandshrubs,significantrockformations,artificialstructures)andwatersources.TurbinesitingdecisionswillincorporaterelevantbatusesurveydataandbatfatalityrecordspublishedbyotherprojectsintheAPWRA.RoostsurveyswillbecarriedoutaccordingtothemethodsdescribedinMitigationMeasure‐BIO‐12a.

BIO‐14b:Implementpostconstructionbatfatalitymonitoringprogramforallrepoweringprojects

Ascientificallydefensible,postconstructionbatfatalitymonitoringprogramwillbeimplementedtoestimateactualbatfatalitiesanddetermineifadditionalmitigationisrequired.Bat‐specificmodificationstothe3‐yearpostconstructionmonitoringprogramdescribedinMitigationMeasureBIO‐11g,developedinaccordancewithCEC2007andwithappropriaterecommendationsfromCaliforniaBatWorkingGroupguidelines(2006),willbeimplemented.

InadditiontotherequirementsoutlinedinMitigationMeasureBIO‐11g,thefollowingtwobat‐specificrequirementswillbeadded. IncludeontheTACatleastonebiologistwithsignificantexpertiseinbatresearchandwind

energyimpactsonbats. Conductbatacousticsurveysconcurrentlywithfatalitymonitoringintheprojectareato

estimatenightly,seasonal,orannualvariationsinrelativeactivityandspeciesusepatterns,andtocontributetothebodyofknowledgeonseasonalbatmovementsandrelationshipsbetweenbatactivity,environmentalvariables,andturbinefatality.Shouldemergingresearchsupporttheapproach,thesedatamaybeusedtogeneratesite‐specificpredictivemodelstoincreasetheprecisionandeffectivenessofmitigationmeasures(e.g.,theseason‐specific,multivariatemodelsdescribedbyWellerandBaldwin2011:11).Acousticbatsurveyswillbedesignedanddataanalysisconductedbyqualifiedbiologistswithsignificantexperienceinacousticbatsurveytechniques.Methodswillbeinformedbythelatestavailableguidelines(CaliforniaEnergyCommissionguidelines,2007);CaliforniaBatWorkingGroupguidelines,2006),exceptwherebestavailablesciencesupportstechnologicalormethodologicalupdates.High‐quality,sensitiveacousticequipmentwillbeusedtoproducedataofsufficientqualitytogeneratespeciesidentifications.Surveydesignandmethodswillbescientificallydefensibleandwillinclude,ataminimum,thefollowingelements.

Acousticdetectorswillbeinstalledatmultiplestationstoadequatelysamplerangeofhabitatsintheprojectareaforbothresidentandmigratorybats.Thenumberofdetectorarraysinstalledperprojectsitewillincorporateemergingresearchonthedensityofdetectorsrequiredtoadequatelymeetsamplinggoalsandinformmitigationapproaches(WellerandBaldwin2011:10).

AcousticdetectorarrayswillsamplemultipleairspaceheightsincludingasclosetotherepoweredrotorsweptareaaspossibleVerticalstructuresusedformountingmaybepreexistingormaybeinstalledfortheproject(e.g.,temporaryorpermanentmeteorologicaltowers).

SurveyswillbeconductedsuchthatdataarecollectedcontinuouslyfromearlyJulytoearlyNovembertocovertheactivitytransitionfrommaternitytomigrationseasonand

Page 20: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐20 

March 2016ICF 00630.15

 

determineifthereiselevatedactivityduringmigration.Surveyseasonmaybeadjustedtomoreaccuratelyreflectthefullextentofthelocalmigrationseasonand/orseason(s)ofgreatestlocalbatfatalityrisk,ifscientificallysounddatasupportdoingso.

Anticipatedadaptivemanagementgoals,suchasdeterminingjustifiabletimeframestoreducerequiredperiodsofcut‐inspeedadjustments,willbereviewedwiththeTACandincorporatedindesigningtheacousticmonitoringanddataanalysisprogram.

Modificationstothefatalitysearchprotocolwillbeimplementedtoobtainbetterinformationonthenumberandtimingofbatfatalities(e.g.,Johnstonetal.2013:85).Modificationswillincludedecreasesinthetransectwidthandsearchintervalforaperiodoftimecoincidingwithhighlevelsofbatmortality,i.e.,thefallmigrationseason(roughlyAugusttoearlyNovember,orasappropriateintheviewoftheTAC).Thenatureofbat‐specifictransectdistanceandsearchintervalswillbedeterminedinconsultationwiththeTACandwillbeguidedbyscientificallysoundandpertinentdataonratesofbatcarcassdetectionatwindenergyfacilities(e.g.,Johnstonetal.2013:54–55)andsite‐specificdatafromAPWRArepoweringprojectfatalitymonitoringprogramsasthesedatabecomeavailable.

OthermethodstoachievethegoalsofthebatfatalitymonitoringprogramwhileavoidingprohibitivecostsmaybeconsideredsubjecttoapprovalbytheTAC,ifthesemethodshavebeenpeerreviewedandevidenceindicatesthemethodsareeffective.Forexample,ifprojectproponentswishtohavetheoptionofalteringsearchmethodologytoanewlydevelopedmethod,suchassearchingonlyroadsandpads(Goodetal.2011:73),astatisticallyrobustfieldstudytoindextheresultsofthemethodologyagainststandardsearchmethodswillbeconductedconcurrentlytoensuresite‐specific,long‐termvalidityofthenewmethods.

Finally,detectionprobabilitytrialswillutilizebatcarcassestodevelopbat‐specificdetectionprobabilities.Careshouldbetakentoavoidintroducingnoveldiseasereservoirs;suchavoidancewillentailusingonsitefatalitiesorusingcarcassesobtainedfromwithinareasonablyanticipatedflightdistanceforthatspecies.

BIO‐14c:Prepareandpublishannualmonitoringreportsonthefindingsofbatuseoftheprojectareaandfatalitymonitoringresults

Annualreportsofbatuseresultsandfatalitymonitoringwillbeproducedwithin3monthsoftheendofthelastdayoffatalitymonitoring.Special‐statusbatspeciesrecordswillbereportedtoCNDDB.

BIO‐14d:Developandimplementabatadaptivemanagementplan

InconcertwithMitigationMeasureBIO‐14b,allprojectproponentswilldevelopadaptivemanagementplanstoensureappropriate,feasible,andcurrentincorporationofemerginginformation.Thegoalsoftheadaptivemanagementplansaretoensurethatthebestavailablescienceandemergingtechnologiesareusedtoassessimpactsonbats,andthatimpactsareminimizedtothegreatestextentpossiblewhilemaximizingenergyproduction.

Theproject‐specificadaptivemanagementplanswillbeusedtoadjustoperationandmitigationtoincorporatetheresultsofprojectareamonitoringandnewtechnologyandresearchresultswhensufficientevidenceexiststosupportthesenewapproaches.TheseplanswillbereviewedbytheTACandapprovedbytheCounty.Alladaptivemanagementmeasureswillbeimplementedwithinareasonabletimeframe,sufficienttoallowthemeasurestotakeeffectin

Page 21: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐21 

March 2016ICF 00630.15

 

thefirstfallmigrationseasonfollowingtheyearofmonitoringinwhichtheadaptivemanagementthresholdwascrossed.ADMMsmaybemodifiedbytheCountyinconsultationwiththeTACtotakeintoaccountcurrentresearch,site‐specificdata,andthemosteffectiveimpactreductionstrategies.ADMMswillincludeascientificallydefensible,controlledresearchcomponentandminimumpost‐implementationmonitoringtimetoevaluatetheeffectivenessandvalidityofthemeasures.Theminimummonitoringtimewillconsistofthreesequentialfallseasonsofthebat‐specificmortalitymonitoringprogramcoveringthe3–4monthsoftheyearinwhichthehighestbatmortalityhasbeenobserved:likelyAugust–November.Thestartandenddatesofthe3–4monthsofbat‐specificmortalitymonitoringperiodwillbebasedonexistingfatalitydataandinconsultationwiththeTAC.

Determiningafatalitythresholdtotriggeradaptivemanagementisnotstraightforward,asinsufficientinformationexistsonthestatusandvitalityofthepopulationsofmigratorybatspeciessubjecttomortalityintheAPWRA.ThelowestimateofanticipatedbatfatalityratesisfromtheVascoWindsprojectintheAPWRA.Applyingthisrateprogrammaticallywouldresultinanestimateof21,000batskilledoverthe30‐yearlifeoftheprogram.ThehighestimateisfromtheMontezumaHillsWindResourceArea.Applyingthisrateprogrammaticallywouldresultinanestimateof49,050batskilledoverthe30‐yearlifeoftheprogram.Batsareslowtoreproduce,andturbinesmaybemorelikelytokilladultbatsthanjuveniles,suggestingthataconservativeapproachiswarranted.Accordingly,aninitialadaptivemanagementthresholdwillbeestablishedusingthelowfatalityestimates,or1.679fatalities/MW/year,toensurethatthemostconservativetriggerforimplementationofadaptivemanagementmeasuresisadopted.

Ifpostconstructionfatalitymonitoringresultsinapointestimateforthebatfatalityratethatexceedsthe1.679fatalities/MW/yearthresholdbyastatisticallysignificantamount,then,inconsultationwiththeTAC,ADMM‐7andADMM‐8(describedbelow)forbatswillbeimplemented.

Itisimportanttonotethatneitherthehighnorthelowestimatespeakstotheabilityofbatpopulationstowithstandtheassociatedlevelsoftake.TheinitialfatalityratethresholdtriggeringadaptivemanagementmaybemodifiedbytheTACifappropriateandifsuchadaptationissupportedbythebestavailablescience.

TheTACmaydirectimplementationofadaptivemanagementmeasuresforotherappropriatereasons,suchasanunexpectedlyandmarkedlyhighfatalityrateobservedforanybatspecies,orspecial‐statusspeciesbeingkilledinunexpectedlyhighnumbers.

ADMMsforbatsmaybeimplementedusingasteppedapproachuntilnecessaryfatalityreductionsarereached,andmonitoringmethodsmustberevisedasneededtoensureaccuratemeasurementoftheeffectivenessoftheADMMs.AdditionalADMMsforbatsshouldbedevelopedasnewtechnologiesorsciencesupportsdoingso.

ADMM‐7:SeasonalTurbineCut‐inSpeedIncrease.Cut‐inspeedincreasesofferthemostpromisingandimmediatelyavailableapproachtoreducingbatfatalitiesatfourth‐generationwindturbines.Reductionsinfatalities(53–87%)wereobservedwhenincreasingmodernturbinecut‐inspeedto5.0–6.5m/s(Arnettetal.2009:3;Goodetal.2012:iii).Whileimplementingthismeasureimmediatelyuponaproject’scommencementwouldlikelyreducebatfatalities,thatassumptionisnotyetsupportedbyconclusivedata.Moreover,withoutestablishingbaselinefatalityatrepoweredprojects,therewouldbenowaytodeterminethe

Page 22: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐22 

March 2016ICF 00630.15

 

effectivenessoftheapproachorwhetherthecostsofincreasedcut‐inspeeds(andconsequentpowergenerationreductions)wereprovidingfatalityreductions.

Cut‐inspeedincreaseswillbeimplementedasoutlinedbelow,witheffectivenessassessedannually. Theprojectproponentwillincreasecut‐inspeedto5.0m/sfromsunsettosunriseduring

peakmigrationseason(generallyAugust–October).Ifthisisineffective,theprojectproponentwillincreaseturbinecut‐inspeedbyannualincrementsof0.5m/suntiltargetfatalityreductionsareachieved.

Theprojectproponentmayrefinesite‐specificmigrationstartdatesonthebasisofpre‐andpostconstructionacousticsurveysandongoingreviewofdatesoffatalityoccurrencesformigratorybatsintheAPWRA.

Theprojectproponentmayrequestashorterseasonofrequiredcut‐inspeedincreaseswithsubstantialevidencethatsimilarlevelsofmortalityreductioncouldbeachieved.ShouldresourceagenciesandtheTACfindthereissufficientsupportforashorterperiod(aslowas8weeks),evidenceinsupportofthisshorterperiodwillbedocumentedforthepublicrecordandtheshorterperiodmaybeimplemented.

Theprojectproponentmayrequestshorternightlyperiodsofcut‐inspeedincreaseswithsubstantialevidencefromdefensibleonsite,long‐termpostconstructionacousticsurveysindicatingpredictablenightlytimeframeswhentargetspeciesappearnottobeactive.Targetspeciesareheredefinedasmigratorybatsoranyotherspeciesappearingrepeatedlyinthefatalityrecords.

Theprojectproponentmayrequestexceptionstocut‐inspeedincreasesforparticularweathereventsorwindpatternsifsubstantialevidenceisavailablefromonsiteacousticorothermonitoringtosupportsuchexceptions(i.e.,allavailableliteratureandonsitesurveysindicatethatbatactivityceasesduringspecificweathereventsorotherpredictableconditions).

Intheabsenceofdefensiblesite‐specificdata,mandatorycut‐inspeedincreaseswillcommenceonAugust1andcontinuethroughOctober31,andwillbeineffectfromsunsettosunrise.

ADMM‐8:EmergingTechnologyasMitigation.Theprojectproponentmayrequest,withconsultationandapprovalfromagencies,replacementoraugmentationofcut‐inspeedincreaseswithdevelopingtechnologyoranothermitigationapproachthathasbeenproventoachievesimilarbatfatalityreductions.

Theprojectproponentmayalsorequestthesecondtierofadaptivemanagementtobetheadoptionofapromisingbutnotfullyproventechnologyormitigationmethod.TheserequestsaresubjecttoreviewandapprovalbytheTACandmustincludeacontrolledresearchcomponentdesignedbyaqualifiedprincipalinvestigatorsothattheeffectivenessofthemethodmaybeaccuratelyassessed.

Someexamplesofsuchemergingtechnologiesandresearchareasthatcouldbeincorporatedinadaptivemanagementplansarelistedbelow. Theuseofacousticdeterrents(Arnettetal.2013:1). Theuseofaltitude‐specificradar,nightvisionand/orothertechnologyallowingbatuse

monitoringandassessmentofat‐riskbatbehavior(Johnstonetal.2013:90‐91)ifresearchintheseareasadvancessufficientlytoalloweffectiveapplicationofthesetechnologies.

Page 23: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐23 

March 2016ICF 00630.15

 

Applicationofemergingpeer‐reviewedstudiesonbatbiology(suchasstudiesdocumentingmigratorycorridorsorbatbehaviorinrelationtoturbines)thatsupportspecificmitigationmethods.

BIO‐14e:Compensateforexpensesincurredbyrehabilitatinginjuredbats

Thecostofreasonable,licensedrehabilitationeffortsforanyinjuredbatstakentowildlifecarefacilitiesfromtheprogramareawillbeassumedinfullbyprojectproponents.

RemainingImpacts:Remainingimpactsrelatedtotheprojectimpactsonbatmortalitywillbesignificantandunavoidable.

OverridingConsiderations:AsmorefullyexplainedintheStatementofOverridingConsiderationscontainedinExhibitCtotheResolutiontowhichtheseCEQAFindingsareattached,theCountyfindsthatthereareenvironmental,economic,orotherbenefitsoftheapprovedprojectthatoverridetheremainingsignificantandunavoidableimpactsonbiologicalresources.Therearenootherfeasiblemitigationmeasures,orchangestotheprojectthatwouldreducethisimpacttoaless‐than‐significantlevel.

ImpactBIO‐19:Potentialimpactonthemovementofanynativeresidentormigratorywildlifespeciesorestablishednativeresidentormigratorywildlifecorridors,andtheuseofnativewildlifenurserysites

PotentialImpact:ConstructionactivitiesassociatedwiththeSandHillWindRepoweringProjectandfencingofworkareasmaytemporarilyimpedewildlifemovementthroughtheworkareaorcauseanimalstotravellongerdistancestoavoidtheworkarea.Thiscouldresultinhigherenergyexpenditureandincreasedsusceptibilitytopredationforsomespeciesandisapotentiallysignificantimpact.Becausetheconstructionperiodforindividualprojectsintheproposedprojectwouldbe9months,itwouldlikelyencompassthemovement/migrationperiodforsomespecies(e.g.,Californiatigersalamandermovementto/frombreedingponds).Inparticular,smalleranimals,whoseenergyexpenditurestotravelaroundoravoidtheareawouldbegreaterthanforlargeranimals,couldbemoreseverelyaffected.Theoperationofwindturbinesafterrepoweringwouldadverselyaffectraptors,otherbirds,andbatsmigratingthroughandwinteringintheprojectareabecausetheycouldbeinjuredorkillediftheyflythroughtherotorplaneofoperatingwindturbines.Thiswouldbeasignificantandunavoidableimpact.

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.4.2ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

BIO‐1e:Retainabiologicalmonitorduringground‐disturbingactivitiesinenvironmentallysensitiveareas

BIO‐3a:Conductpreconstructionsurveysforhabitatforspecial‐statuswildlifespecies

Page 24: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐24 

March 2016ICF 00630.15

 

BIO‐5a:Implementbestmanagementpracticestoavoidandminimizeeffectsonspecial‐statusamphibians

BIO‐5c:Restoredisturbedannualgrasslands

BIO‐7a:Implementbestmanagementpracticestoavoidandminimizeeffectsonspecial‐statusreptiles

BIO‐8a:Implementmeasurestoavoidandminimizepotentialimpactsonspecial‐statusandnon–special‐statusnestingbirds

BIO‐8b:Implementmeasurestoavoidandminimizepotentialimpactsonwesternburrowingowl

BIO‐10a:ImplementmeasurestoavoidandminimizepotentialimpactsonSanJoaquinkitfoxandAmericanbadger

BIO‐11b:Siteturbinestominimizepotentialmortalityofbirds

BIO‐11c:Useturbinedesignsthatreduceavianimpacts

BIO‐11d:Incorporateavian‐safepracticesintodesignofturbine‐relatedinfrastructure

BIO‐11e:Retrofitexistinginfrastructuretominimizerisktoraptors

BIO‐11i:Implementanavianadaptivemanagementprogram

BIO‐12a:Conductbatroostsurveys

BIO‐12b:Avoidremovingordisturbingbatroosts

BIO‐14a:Siteandselectturbinestominimizepotentialmortalityofbats

BIO‐14d:Developandimplementabatadaptivemanagementplan

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresBIO‐1b,BIO‐1e,BIO‐3a,BIO‐4a,BIO‐5a,BIO‐5c,BIO‐7a,BIO‐8a,BIO‐8b,BIO‐10a,BIO‐11b,BIO‐11c,BIO‐11d,BIO‐11e,BIO‐11i,BIO‐12a,BIO‐12b,BIO‐14a,andBIO‐14dwillreducetheproject’simpactsonnativeresidentormigratorywildlifecorridors,andtheuseofnativewildlifenurserysites,butwillnotmitigatethisimpacttoaless‐than‐significantlevel,asthereisnofeasiblewaytoavoidthesignificantimpact.Theprojectapplicantwillberequiredtoimplementthefollowingactions.

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

Page 25: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐25 

March 2016ICF 00630.15

 

ProjectproponentswillensurethatthefollowingBMPs,inaccordancewithpracticesestablishedintheEACCS,willbeincorporatedintoindividualprojectdesignandconstructiondocuments. Employeesandcontractorsperformingdecommissioningandreclamationactivitieswill

receiveenvironmentalsensitivitytraining.Trainingwillincludereviewofenvironmentallaws,mitigationmeasures,permitconditions,andotherrequirementsthatmustbefollowedbyallpersonneltoreduceoravoideffectsonspecial‐statusspeciesduringconstructionactivities.

Environmentaltailboardtrainingswilltakeplaceonanas‐neededbasisinthefield.Thesetrainingswillincludeabriefreviewofthebiologyofthecoveredspeciesandguidelinesthatmustbefollowedbyallpersonneltoreduceoravoidnegativeeffectsonthesespeciesduringdecommissioningandreclamationactivities.Directors,managers,superintendents,andthecrewleaderswillberesponsibleforensuringthatcrewmemberscomplywiththeguidelines.

Vehiclesandequipmentwillbeparkedonpavement,existingroads,andpreviouslydisturbedareastotheextentpracticable.

Offroadvehicletravelwillbeavoided. Materialwillbestockpiledonlyinareasthatdonotsupportspecial‐statusspeciesor

sensitivehabitats. Gradingwillberestrictedtotheminimumareanecessary. Priortoground‐disturbingactivitiesinsensitivehabitats,projectconstructionboundaries

andaccessareaswillbeflaggedandtemporarilyfencedduringconstructiontoreducethepotentialforvehiclesandequipmenttostrayintoadjacenthabitats.

Vehiclesorequipmentwillnotberefueledwithin100feetofawetland,stream,orotherwaterwayunlessabermedandlinedrefuelingarea(i.e.,acreatedbermmadeofsandbagsorotherremovablematerial)isconstructed.

Erosioncontrolmeasureswillbeimplementedtoreducesedimentationinnearbyaquatichabitatwhenactivitiesarethesourceofpotentialerosion.Plasticmonofilamentnetting(erosioncontrolmatting)orsimilarmaterialcontainingnettingwillnotbeusedattheproject.Acceptablesubstitutesincludecoconutcoirmattingortackifiedhydroseedingcompounds.

Significantearthmoving‐activitieswillnotbeconductedinriparianareaswithin24hoursofpredictedstormsoraftermajorstorms(definedas1‐inchofrainormore).

Thefollowingwillnotbeallowedatornearworksitesforprojectactivities:trashdumping,firearms,openfires(suchasbarbecues)notrequiredbytheactivity,hunting,andpets(exceptforsafetyinremotelocations).

BIO‐1e:Retainabiologicalmonitorduringground‐disturbingactivitiesinenvironmentallysensitiveareas

Allprojectproponentswillretainaqualifiedbiologist(asdeterminedbyAlamedaCounty)toconductperiodicmonitoringofdecommissioning,repowering,andreclamationactivitiesthatoccuradjacenttosensitivebiologicalresources(e.g.,special‐statusspecies,sensitivevegetationcommunities,wetlands).MonitoringwilloccurduringinitialgrounddisturbancewheresensitivebiologicalresourcesarepresentandweeklythereafterorasdeterminedbytheCountyincoordinationwithaqualifiedbiologist.Thebiologistwillassistthecrew,asneeded,tocomplywithallprojectimplementationrestrictionsandguidelines.Inaddition,thebiologistwillbe

Page 26: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐26 

March 2016ICF 00630.15

 

responsibleforensuringthattheprojectproponentoritscontractorsmaintainexclusionareasadjacenttosensitivebiologicalresources,andfordocumentingcompliancewithallbiologicalresources–relatedmitigationmeasures.

BIO‐3a:Conductpreconstructionsurveysforhabitatforspecial‐statuswildlifespecies

Nomorethan3yearspriortoground‐disturbingrepoweringactivities,aqualifiedbiologist(asdeterminedbyAlamedaCounty)willconductfieldsurveyswithindecommissioning,repowering,andrestorationworkareasandtheirimmediatesurroundingstodeterminethepresenceofhabitatforspecial‐statuswildlifespecies.TheprojectproponentwillsubmitareportdocumentingthesurveyresultstoAlamedaCountyforreviewpriortoconductinganyrepoweringactivities.Thereportwillincludethelocationanddescriptionofallproposedworkareas,thelocationanddescriptionofallsuitablehabitatforspecial‐statuswildlifespecies,andthelocationanddescriptionofothersensitivehabitats(e.g.,vernalpools,wetlands,riparianareas).Additionally,thereportwilloutlinewhereadditionalspecies‐and/orhabitat‐specificmitigationmeasuresarerequired.Thisreportmayprovidethebasisforanyapplicablepermitapplicationswhereincidentaltakemayoccur.

BIO‐4a:Implementmeasurestoavoidorprotecthabitatforvalleyelderberrylonghornbeetle

IfitisdeterminedthroughpreconstructionsurveysconductedpursuanttoMitigationMeasureBIO‐3athatelderberryshrubsarepresentwithinproposedworkareasorwithin100feetoftheseareas,thefollowingmeasureswillbeimplementedtoensurethattheproposedprojectdoesnothaveasignificantimpactonvalleyelderberrylonghornbeetle. Avoidremovalofelderberryshrubs. Elderberryshrubs/clusterswithin100feetoftheconstructionareathatwillnotbe

removedwillbeprotectedduringconstruction.Aqualifiedbiologist(i.e.,withelderberry/VELBexperience)willmarktheelderberryshrubsandclustersthatwillbeprotectedduringconstruction.Orangeconstructionbarrierfencingwillbeplacedattheedgeofthebufferareas.ThebufferareadistanceswillbeproposedbythebiologistandapprovedbyUSFWS.Noconstructionactivitieswillbepermittedwithinthebufferzoneotherthanthoseactivitiesnecessarytoerectthefencing.Signswillbepostedevery50feet(15.2meters)alongtheperimeterofthebufferareafencing.Thesignswillcontainthefollowinginformation:Thisareaishabitatofthevalleyelderberrylonghornbeetle,athreatenedspecies,andmustnotbedisturbed.ThisspeciesisprotectedbytheEndangeredSpeciesActof1973,asamended.Violatorsaresubjecttoprosecution,fines,andimprisonment.

Bufferareafencesaroundelderberryshrubswillbeinspectedweeklybyaqualifiedbiologicalmonitorduringground‐disturbingactivitiesandmonthlyafterground‐disturbingactivitiesuntilprojectconstructioniscompleteoruntilthefencesareremoved,asapprovedbythebiologicalmonitorandtheresidentengineer.Thebiologicalmonitorwillberesponsibleforensuringthatthecontractormaintainsthebufferareafencesaroundelderberryshrubsthroughoutconstruction.BiologicalinspectionreportswillbeprovidedtotheprojectproponentandUSFWS.

BIO‐5a:Implementbestmanagementpracticestoavoidandminimizeeffectsonspecial‐statusamphibians

Page 27: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐27 

March 2016ICF 00630.15

 

AllprojectproponentswillensurethatBMPsandotherappropriatemeasures,inaccordancewithmeasuresdevelopedfortheEACCS,beincorporatedintotheappropriatedesignandconstructiondocuments.ImplementationofsomeofthesemeasureswillrequirethattheprojectproponentobtainincidentaltakepermitsfromUSFWS(Californiared‐leggedfrogandCaliforniatigersalamander)andfromCDFW(Californiatigersalamanderonly)beforeconstructionbegins.Additionalconservationmeasuresorconditionsofapprovalmayberequiredinapplicableprojectpermits(e.g.,ESAorCESAincidentaltakeauthorization).TheapplicantwillcomplywiththeStateofCaliforniaStateWaterResourcesControlBoardNPDESconstructiongeneralrequirementsforstormwater.

Ground‐disturbingactivitieswillbelimitedtodryweatherbetweenApril15andOctober31.Noground‐disturbingworkwilloccurduringwetweather.Wetweatherisdefinedaswhentherehasbeen0.25inchofrainina24‐hourperiod.GrounddisturbingactivitieshaltedduetowetweathermayresumewhenprecipitationceasesandtheNationalWeatherService72‐hourweatherforecastindicatesa30%orlesschanceofprecipitation.Noground‐disturbingworkwilloccurduringadry‐outperiodof48hoursaftertheabovereferencedwetweather.

Whereapplicable,barrierfencingwillbeinstalledaroundtheworksitetopreventamphibiansfromenteringtheworkarea.Barrierfencingwillberemovedwithin72hoursofcompletionofwork.

Beforeconstructionbegins,aqualifiedbiologistwilllocateappropriaterelocationareasandpreparearelocationplanforspecial‐statusamphibiansthatmayneedtobemovedduringconstruction.TheproponentwillsubmitthisplantoUSFWSandCDFWforapprovalaminimumof2weekspriortothestartofconstruction.

Aqualifiedbiologistwillconductpreconstructionsurveysimmediatelypriortoground‐disturbingactivities(includingequipmentstaging,vegetationremoval,grading).Thebiologistwillsurveytheworkareaandallsuitablehabitatswithin300feetoftheworkarea.Ifindividuals(includingadults,juveniles,larvae,oreggs)arefound,workwillnotbeginuntilUSFWSand/orCDFWiscontactedtodetermineifmovingtheselife‐stagesisappropriate.Ifrelocationisdeemednecessary,itwillbeconductedinaccordancewiththerelocationplan.IncidentaltakepermitsarerequiredforrelocationofCaliforniatigersalamander(USFWSandCDFW)andCaliforniared‐leggedfrog(USFWS).Relocationofwesternspadefootandfoothillyellow‐leggedfrogrequiresaletterfromCDFWauthorizingthisactivity.

Nomonofilamentplasticwillbeusedforerosioncontrol. Allprojectactivitywillterminate30minutesbeforesunsetandwillnotresumeuntil30

minutesaftersunriseduringthemigration/activeseasonfromNovember1toJune15.SunriseandsunsettimesareestablishedbytheU.S.NavalObservatoryAstronomicalApplicationsDepartmentforthegeographicareawheretheprojectislocated.

Vehicleswillnotexceedaspeedlimitof15mphonunpavedroadswithinnaturallandcovertypes,orduringoffroadtravel.

Trenchesorholesmorethan6inchesdeepwillbeprovidedwithoneormoreescaperampsconstructedofearthfillorwoodenplanksandwillbeinspectedbyaqualifiedbiologistpriortobeingfilled.Anysuchfeaturesthatareleftopenovernightwillbesearchedeachdaypriortoconstructionactivitiestoensurenocoveredspeciesaretrapped.Workwillnotcontinueuntiltrappedanimalshavemovedoutofopentrenches.

Page 28: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐28 

March 2016ICF 00630.15

 

Workcrewsortheonsitebiologicalmonitorwillinspectopentrenches,pits,andunderconstructionequipmentandmaterialleftonsiteinthemorningandeveningtolookforamphibiansthatmayhavebecometrappedorareseekingrefuge.

Ifspecial‐statusamphibiansarefoundintheworkareaduringconstructionandcannotordonotmoveoffsiteontheirown,aqualifiedbiologistwhoisUSFWSand/orCDFW‐approvedunderabiologicalopinionand/orincidentaltakepermitforthespecificproject,willtrapandmovespecial‐statusamphibiansinaccordancewiththerelocationplan.Relocationofwesternspadefootandfoothillyellow‐leggedfrogrequiresaletterpermitfromCDFWauthorizingthisactivity.

BIO‐5c:Restoredisturbedannualgrasslands

Within30dayspriortoanygrounddisturbance,aqualifiedbiologistwillprepareaGrasslandRestorationPlanincoordinationwithCDFWandsubjecttoCDFWapproval,toensurethattemporarilydisturbedannualgrasslandsandareasplannedfortheremovalofpermanentroadsandturbinepadareasarerestoredtopreprojectconditions.TheGrasslandRestorationPlanwillincludebutnotbelimitedtothefollowingmeasures. Gravelwillberemovedfromareasproposedforgrasslandrestoration. Tothemaximumextentfeasible,topsoilwillbesalvagedfromwithinonsiteworkareas

priortoconstruction.Importedfillsoilswillbelimitedtoweed‐freetopsoilsimilarintexture,chemicalcomposition,andpHtosoilsfoundattherestorationsite.

Whereappropriate,restorationareaswillbeseeded(hydroseedingisacceptable)toensureerosioncontrol.Seedmixeswillbetailoredtocloselymatchthatofreferencesite(s)withintheprogramareaandshouldincludenativeornaturalized,noninvasivespeciessourcedwithintheprojectareaorfromthenearestavailablelocation.

Reclaimedroadswillberestoredinsuchawayastopermanentlypreventvehiculartravel.Theplanwillincludearequirementtomonitorrestorationareasannually(betweenMarchandOctober)forupto3yearsfollowingtheyearofrestoration.Therestorationwillbeconsideredsuccessfulwhenthepercentcoverforrestoredareasis70%absolutecoveroftheplanted/seededspeciescomparedtothepercentabsolutecoverofnearbyreferencesites.Nomorethan5%relativecoverofthevegetationintherestorationareaswillconsistofinvasiveplantspeciesratedas“high”inCal‐IPC’sCaliforniaInvasivePlantInventoryDatabase(http://www.cal‐ipc.org).Remedialmeasuresprescribedintheplanwillincludesupplementalseeding,weedcontrol,andotheractionsasdeterminednecessarytoachievethelong‐termsuccesscriteria.Monitoringmaybeextendedifnecessarytoachievethesuccesscriteriaorifdroughtconditionsprecluderestorationsuccess.Otherperformancestandardsmayalsoberequiredastheyrelatetospecial‐statusspecieshabitat;thesewillbeidentifiedincoordinationwithCDFWandincludedintheplan.TheprojectproponentwillprovideevidencethatCDFWhasreviewedandapprovedtheGrasslandRestorationPlan.Additionally,theprojectproponentwillprovideannualmonitoringreportstotheCountybyJanuary31ofeachyear,summarizingthemonitoringresultsandanyremedialmeasuresimplemented(ifanyarenecessary)duringthepreviousyear.

BIO‐7a:Implementbestmanagementpracticestoavoidandminimizeeffectsonspecial‐statusreptiles

WheresuitablehabitatforBlainville’shornedlizard,Alamedawhipsnake,orSanJoaquincoachwhipisidentifiedinproposedworkareas,allprojectproponentswillensurethatBMPs

Page 29: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐29 

March 2016ICF 00630.15

 

andotherappropriatemeasures,inaccordancewithmeasuresdevelopedfortheEACCS,beincorporatedintotheappropriatedesignandconstructiondocuments.ImplementationofsomeofthesemeasureswillrequirethattheprojectproponentobtainincidentaltakepermitsfromUSFWSandCDFW(Alamedawhipsnake)beforeconstructionbegins.Additionalconservationmeasuresorconditionsofapprovalmayberequiredinapplicableprojectpermits(i.e.,ESAincidentaltakepermit). Aqualifiedbiologistwillconductpreconstructionsurveysimmediatelypriortoground‐

disturbingactivities(e.g.,equipmentstaging,vegetationremoval,grading)associatedwiththeprogram.IfanyBlainville’shornedlizards,Alamedawhipsnakes,orSanJoaquincoachwhipsarefound,workwillnotbeginuntiltheyaremovedoutoftheworkareatoaUSFWS‐and/orCDFW‐approvedrelocationsite.IncidentaltakepermitsfromUSFWSandCDFWarerequiredforrelocationofAlamedawhipsnake.RelocationofBlainville’shornedlizardandSanJoaquincoachwhiprequiresaletterfromCDFWauthorizingthisactivity.

Nomonofilamentplasticwillbeusedforerosioncontrol. Whereapplicable,barrierfencingwillbeusedtoexcludeBlainville’shornedlizard,Alameda

whipsnake,andSanJoaquincoachwhip.Barrierfencingwillberemovedwithin72hoursofcompletionofwork.

Workcrewsoranonsitebiologicalmonitorwillinspectopentrenchesandpitsandunderconstructionequipmentandmaterialsleftonsiteforspecial‐statusreptileseachmorningandeveningduringconstruction.

Grounddisturbanceinsuitablehabitatwillbeminimized. Vegetationwithintheproposedworkareawillberemovedpriortograding.Priorto

clearingandgrubbingoperations,aqualifiedbiologistwillclearlymarkvegetationwithintheworkareathatwillbeavoided.Vegetationoutsidetheworkareawillnotberemoved.Wherepossiblehandtools(e.g.,trimmer,chainsaw)willbeusedtotrimorremovevegetation.Allvegetationremovalwillbemonitoredbythequalifiedbiologisttominimizeimpactsonspecial‐statusreptiles.

Ifspecial‐statusreptilesarefoundintheworkareaduringconstructionandcannotordonotmoveoffsiteontheirown,aqualifiedbiologistwhoisUSFWS‐and/orCDFW‐approvedunderanincidentaltakepermitforthespecificprojectwilltrapandmovetheanimal(s)toaUSFWSand/orCDFW‐approvedrelocationarea.IncidentaltakepermitsfromUSFWSandCDFWarerequiredforrelocationofAlamedawhipsnake.RelocationofBlainville’shornedlizardandSanJoaquincoachwhiprequiresaletterfromCDFWauthorizingthisactivity.

BIO‐8a:Implementmeasurestoavoidandminimizepotentialimpactsonspecial‐statusandnon–special‐statusnestingbirds

Wheresuitablehabitatispresentforraptorswithin1mile(within2milesforgoldeneagles)andfortree/shrub‐andground‐nestingmigratorybirds(non‐raptors)within50feetofproposedworkareas,thefollowingmeasureswillbeimplementedtoensurethattheproposedprojectdoesnothaveasignificantimpactonnestingspecial‐statusandnon–special‐statusbirds. Removesuitablenestinghabitat(shrubsandtrees)duringthenon‐breedingseason

(typicallySeptember1–January31)fornestingbirds. Totheextentfeasible,avoidconstructionactivitiesinornearsuitableoroccupiednesting

habitatduringthebreedingseasonofbirds(generallyFebruary1–August31). Ifconstructionactivities(includingvegetationremoval,clearing,andgrading)willoccur

duringthenestingseasonformigratorybirds,aqualifiedbiologistwillconduct

Page 30: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐30 

March 2016ICF 00630.15

 

preconstructionnestingbirdsurveyswithin7dayspriortoconstructionactivities.Theconstructionareaanda1‐milebufferwillbesurveyedfortree‐nestingraptors(exceptforgoldeneagles),anda50‐footbufferwillbesurveyedforallotherbirdspecies.

Surveystolocateeaglenestswithin2milesofconstructionwillbeconductedduringthebreedingseasonpriortoconstruction.A1‐mileno‐disturbancebufferwillbeimplementedforconstructionactivitiestoprotectnestingeaglesfromdisturbance.ThroughcoordinationwithUSFWS,theno‐disturbancebuffermaybereducedto0.5mileifconstructionactivitiesarenotwithinline‐of‐sightofthenest.

Ifanactivenest(otherthangoldeneagle)isidentifiednearaproposedworkareaandworkcannotbeconductedoutsidethenestingseason(February1–August31),ano‐activityzonewillbeestablishedaroundthenestbyaqualifiedbiologistincoordinationwithUSFWSand/orCDFW.Fencingand/orflaggingwillbeusedtodelineatetheno‐activityzone.Tominimizethepotentialtoaffectthereproductivesuccessofthenestingpair,theextentoftheno‐activityzonewillbebasedonthedistanceoftheactivitytothenest,thetypeandextentoftheproposedactivity,thedurationandtimingoftheactivity,thesensitivityandhabituationofthespecies,andthedissimilarityoftheproposedactivitytobackgroundactivities.Theno‐activityzonewillbelargeenoughtoavoidnestabandonmentandwillbebetween50feetand1milefromthenest,orasotherwiserequiredbyUSFWSand/orCDFW.

BIO‐8b:Implementmeasurestoavoidandminimizepotentialimpactsonwesternburrowingowl

Wheresuitablehabitatforwesternburrowingowlisinorwithin500feetofproposedworkareas,thefollowingmeasureswillbeimplementedtoavoidorminimizepotentialadverseimpactsonburrowingowls. Tothemaximumextentfeasible(e.g.,wheretheconstructionfootprintcanbemodified),

constructionactivitieswithin500feetofactiveburrowingowlburrowswillbeavoidedduringthenestingseason(February1–August31).

Aqualifiedbiologistwillconductpreconstructiontakeavoidancesurveysforburrowingowlnolessthan14dayspriortoandwithin24hoursofinitiatingground‐disturbingactivities.Thesurveyareawillencompasstheworkareaanda500‐footbufferaroundthisarea.

Ifanactiveburrowisidentifiednearaproposedworkareaandworkcannotbeconductedoutsidethenestingseason(February1–August31),ano‐activityzonewillbeestablishedbyaqualifiedbiologistincoordinationwithCDFW.Theno‐activityzonewillbelargeenoughtoavoidnestabandonmentandwillextendaminimumof250feetaroundtheburrow.

Ifburrowingowlsarepresentatthesiteduringthenon‐breedingseason(September1–January31),aqualifiedbiologistwillestablishano‐activityzonethatextendsaminimumof150feetaroundtheburrow.

Ifthedesignatedno‐activityzoneforeitherbreedingornon‐breedingburrowingowlscannotbeestablished,awildlifebiologistexperiencedinburrowingowlbehaviorwillevaluatesite‐specificconditionsand,incoordinationwithCDFW,recommendasmallerbuffer(ifpossible)and/orothermeasurethatstillminimizesdisturbanceoftheowls(whileallowingreproductivesuccessduringthebreedingseason).Thesite‐specificbuffer(and/orothermeasure)willconsiderthetypeandextentoftheproposedactivityoccurringneartheoccupiedburrow,thedurationandtimingoftheactivity,thesensitivityandhabituationoftheowls,andthedissimilarityoftheproposedactivitytobackgroundactivities.

Page 31: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐31 

March 2016ICF 00630.15

 

Ifburrowingowlsarepresentinthedirectdisturbanceareaandcannotbeavoidedduringthenon‐breedingseason(generallySeptember1throughJanuary31),burrowingowlsmaybeexcludedfromburrowsthroughtheinstallationofone‐waydoorsatburrowentrances.Aburrowingowlexclusionplan,preparedbytheprojectproponent,mustbeapprovedbyCDFWpriortoexclusionofowls.One‐waydoors(e.g.,modifieddryerventsorotherCDFW‐approvedmethod)willbeleftinplaceforaminimumof1weekandmonitoreddailytoensurethattheowl(s)havelefttheburrow(s).Excavationoftheburrowwillbeconductedusinghandtools.Duringexcavationoftheburrow,asectionofflexibleplasticpipe(atleast3inchesindiameter)willbeinsertedintotheburrowtunneltomaintainanescaperouteforanyanimalsthatmaybeinsidetheburrow.Owlswillbeexcludedfromtheirburrowsasalastresortandonlyifotheravoidanceandminimizationmeasurescannotbeimplemented.

Avoiddestructionofunoccupiedburrowsoutsidetheworkareaandplacevisiblemarkersnearburrowstoensurethattheyarenotcollapsed.

Conductongoingsurveillanceoftheprojectsiteforburrowingowlsduringprojectactivities.Ifadditionalowlsareobservedusingburrowswithin500feetofconstruction,theonsitebiologicalmonitorwilldetermine,incoordinationwithCDFW,iftheowl(s)areorwouldbeaffectedbyconstructionactivitiesandifadditionalexclusionzonesarerequired.

BIO‐10a:ImplementmeasurestoavoidandminimizepotentialimpactsonSanJoaquinkitfoxandAmericanbadger

WheresuitablehabitatispresentforSanJoaquinfitfoxandAmericanbadgerinandadjacenttoproposedworkareas,thefollowingmeasures,consistentwithmeasuresdevelopedintheEACCS,willbeimplementedtoensurethatproposedprojectsdonothaveasignificantimpactonSanJoaquinkitfoxorAmericanbadger.ImplementationofsomeofthesemeasureswillrequirethattheprojectproponentobtainincidentaltakepermitsfromUSFWSandCDFW(SanJoaquinkitfox)beforeconstructionbegins.ImplementationofstateandfederalrequirementscontainedinsuchauthorizationmayconstitutecompliancewithcorrespondingmeasuresinthisPEIR.

Tothemaximumextentfeasible,suitabledensforSanJoaquinkitfoxandAmericanbadgerwillbeavoided.

Allprojectproponentswillretainqualifiedapprovedbiologists(asdeterminedbyUSFWS)toconductapreconstructionsurveyforpotentialSanJoaquinkitfoxdens(U.S.FishandWildlifeService2011).ResumesofbiologistswillbesubmittedtoUSFWSforreviewandapprovalpriortothestartofthesurvey.

PreconstructionsurveysforAmericanbadgerswillbeconductedinconjunctionwithSanJoaquinkitfoxpreconstructionsurveys.

AsdescribedinU.S.FishandWildlifeService2011,thepreconstructionsurveywillbeconductednolessthan14daysandnomorethan30daysbeforethebeginningofgrounddisturbance,oranyactivitylikelytoaffectSanJoaquinkitfox.ThebiologistswillconductdensearchesbysystematicallywalkingtransectsthroughtheprojectareaandabufferareatobedeterminedincoordinationwithUSFWSandCDFW.Transectdistanceshouldbebasedontheheightofvegetationsuchthat100%visualcoverageoftheprojectareaisachieved.Ifapotentialorknowndenisfoundduringthesurvey,thebiologistwillmeasurethesizeoftheden,evaluatetheshapeofthedenentrances,andnotetracks,scat,preyremains,andrecentexcavationsatthedensite.Thebiologistswillalsodeterminethestatusofthedensandmapthefeatures.Denswillbeclassifiedinone

Page 32: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐32 

March 2016ICF 00630.15

 

ofthefollowingfourdenstatuscategoriesdefinedbyUSFWS(U.S.FishandWildlifeService2011).

o Potentialden:Anysubterraneanholewithinthespecies’rangethathasentrancesofappropriatedimensionsandforwhichavailableevidenceissufficienttoconcludethatitisbeingusedorhasbeenusedbyakitfox.Potentialdensinclude(1)anysuitablesubterraneanhole;or(2)anydenorburrowofanotherspecies(e.g.,coyote,badger,redfox,groundsquirrel)thatotherwisehasappropriatecharacteristicsforkitfoxuse;oranartificialstructurethatotherwisehasappropriatecharacteristicsforkitfoxuse.

o Knownden:AnyexistingnaturaldenorartificialstructurethatisusedorhasbeenusedatanytimeinthepastbyaSanJoaquinkitfox.Evidenceofusemayincludehistoricalrecords;pastorcurrentradiotelemetryorspotlightingdata;kitfoxsignsuchastracks,scat,and/orpreyremains;orotherreasonableproofthatagivendenisbeingorhasbeenusedbyakitfox(USFWSdiscouragesuseofthetermsactiveandinactivewhenreferringtoanykitfoxdenbecauseagreatpercentageofoccupieddensshownoevidenceofuse,andbecausekitfoxeschangedensoften,withtheresultthatthestatusofagivendenmaychangefrequentlyandabruptly).

o Knownnatalorpuppingden:Anydenthatisused,orhasbeenusedatanytimeinthepast,bykitfoxestowhelpand/orreartheirpups.Natal/puppingdensmaybelargerwithmorenumerousentrancesthandensoccupiedexclusivelybyadults.Thesedenstypicallyhavemorekitfoxtracks,scat,andpreyremainsinthevicinityoftheden,andmayhaveabroaderapronofmatteddirtorvegetationatoneormoreentrances.Anatalden,definedasadeninwhichkitfoxpupsareactuallywhelpedbutnotnecessarilyreared,isamorerestrictiveversionofthepuppingden.Inpractice,however,itisdifficulttodistinguishbetweenthetwo;therefore,forpurposesofthisdefinitioneithertermapplies.

o Knownatypicalden:AnyartificialstructurethathasbeenorisbeingoccupiedbyaSanJoaquinkitfox.Atypicaldensmayincludepipes,culverts,anddiggingsbeneathconcreteslabsandbuildings.

WrittenresultsofthesurveyincludingthelocationsofanypotentialorknownSanJoaquinkitfoxdenswillbesubmittedtoUSFWSwithin5daysfollowingcompletionofthesurveyandpriortothestartofgrounddisturbanceorconstructionactivities. Afterpreconstructiondensearchesandbeforethecommencementofrepoweringactivities,

exclusionzoneswillbeestablishedasmeasuredinaradiusoutwardfromtheentranceorclusterofentrancesofeachden.Repoweringactivitieswillbeprohibitedorgreatlyrestrictedwithintheseexclusionzones.Onlyessentialvehicularoperationonexistingroadsandfoottrafficwillbepermitted.Allotherrepoweringactivities,vehicleoperation,materialandequipmentstorage,andothersurface‐disturbingactivitieswillbeprohibitedintheexclusionzones.Barrierfencingwillberemovedwithin72hoursofcompletionofwork.Exclusionzoneswillbeestablishedusingthefollowingparameters.o Potentialandatypicaldens:Atotaloffourorfiveflaggedstakeswillbeplaced50feet

fromthedenentrancetoidentifythedenlocation.o Knownden:Orangeconstructionbarrierfencingwillbeinstalledbetweentheworkarea

andtheknowndensiteataminimumdistanceof100feetfromtheden.Thefencingwillbemaintaineduntilconstruction‐relateddisturbanceshaveceased.Atthattime,allfencingwillberemovedtoavoidattractingsubsequentattentiontotheden.

Page 33: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐33 

March 2016ICF 00630.15

 

o Natal/puppingden:USFWSwillbecontactedimmediatelyifanatalorpuppingdenisdiscoveredinorwithin200feetoftheworkarea.

AnyoccupiedorpotentiallyoccupiedbadgerdenwillbeavoidedbyestablishinganexclusionzoneconsistentwithaSanJoaquinkitfoxpotentialburrow(i.e.,fourorfiveflaggedstakeswillbeplaced50feetfromthedenentrance).

Incaseswhereavoidanceisnotareasonablealternative,limiteddestructionofpotentialSanJoaquinkitfoxdensmaybeallowedasfollows.o Natal/puppingdens:Natalorpuppingdensthatareoccupiedwillnotbedestroyeduntil

theadultsandpupshavevacatedthedensandthenonlyafterconsultationwithUSFWS.Removalofnatal/puppingdensrequiresincidentaltakeauthorizationfromUSFWSandCDFW.

o Knowndens:Knowndenswithinthefootprintoftheactivitymustbemonitoredfor3dayswithtrackingmediumoraninfraredcameratodeterminecurrentuse.Ifnokitfoxactivityisobservedduringthisperiod,thedenshouldbedestroyedimmediatelytoprecludesubsequentuse.Ifkitfoxactivityisobservedduringthisperiod,thedenwillbemonitoredforatleast5consecutivedaysfromthetimeofobservationtoallowanyresidentanimaltomovetoanotherdenduringitsnormalactivity.Useofthedencanbediscouragedbypartiallypluggingitsentrance(s)withsoilinsuchamannerthatanyresidentanimalcanescapeeasily.Onlywhenthedenisdeterminedtobeunoccupiedwillthedenbeexcavatedunderthedirectionofabiologist.Ifthefoxisstillpresentafter5ormoreconsecutivedaysofmonitoring,thedenmaybeexcavatedwhen,inthejudgmentofthebiologist,itistemporarilyvacant,suchasduringthefox’snormalforagingactivities.RemovalofknowndensrequiresincidentaltakeauthorizationfromUSFWSandCDFW.

o Potentialdens:Ifincidentaltakepermitshavebeenreceived(fromUSFWSandCDFW),potentialdenscanberemoved(preferablybyhandexcavation)bybiologistorunderthesupervisionofabiologistwithoutmonitoring,unlessotherrestrictionswereissuedwiththeincidentaltakepermits.Ifnotakeauthorizationshavebeenissued,thepotentialdenswillbemonitoredasiftheyareknowndens.Ifanydenwasconsideredapotentialdenbutwaslaterdeterminedduringmonitoringordestructiontobecurrentlyorpreviouslyusedbykitfoxes(e.g.,kitfoxsignisfoundinside),thenallconstructionactivitieswillceaseandUSFWSandCDFWwillbenotifiedimmediately.

Nighttimeworkwillbeminimizedtotheextentpossible.Thevehicularspeedlimitwillbereducedto10milesperhourduringnighttimework.

Pipes,culverts,andsimilarmaterialsgreaterthan4inchesindiameterwillbestoredsoastopreventwildlifespeciesfromusingtheseastemporaryrefuges,andthesematerialswillbeinspectedeachmorningforthepresenceofanimalspriortobeingmoved.

Arepresentativeappointedbytheprojectproponentwillbethecontactforanyemployeeorcontractorwhomightinadvertentlykillorinjureakitfoxorwhofindsadead,injured,orentrappedkitfox.Therepresentativewillbeidentifiedduringenvironmentalsensitivitytraining(MitigationMeasureBIO‐1b)andhis/hernameandphonenumberwillbeprovidedtoUSFWSandCDFW.Uponsuchincidentorfinding,therepresentativewillimmediatelycontactUSFWSandCDFW.

TheSacramentoUSFWSofficeandCDFWwillbenotifiedinwritingwithin3workingdaysoftheaccidentaldeathorinjuryofaSanJoaquinkitfoxduringproject‐relatedactivities.

Page 34: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐34 

March 2016ICF 00630.15

 

Notificationmustincludethedate,time,andlocationoftheincident,andanyotherpertinentinformation.

BIO‐11b:Siteturbinestominimizepotentialmortalityofbirds

ForthetextofMitigationMeasureBIO‐11b,pleaserefertothediscussionofImpactBIO‐11above.

BIO‐11c:Useturbinedesignsthatreduceavianimpacts

ForthetextofMitigationMeasureBIO‐11c,pleaserefertothediscussionofImpactBIO‐11above.

BIO‐11d:Incorporateavian‐safepracticesintodesignofturbine‐relatedinfrastructure

ForthetextofMitigationMeasureBIO‐11d,pleaserefertothediscussionofImpactBIO‐11above.

BIO‐11e:Retrofitexistinginfrastructuretominimizerisktoraptors

ForthetextofMitigationMeasureBIO‐11e,pleaserefertothediscussionofImpactBIO‐11above.

BIO‐11i:Implementanavianadaptivemanagementprogram

ForthetextofMitigationMeasureBIO‐11i,pleaserefertothediscussionofImpactBIO‐11above.

BIO‐12a:Conductbatroostsurveys

Priortodevelopmentofanyrepoweringproject,aqualifiedbatbiologistwillconductaroosthabitatassessmenttoidentifypotentialcolonialroostsitesofspecial‐statusandcommonbatspecieswithin750feetoftheconstructionarea.Ifsuitableroostsitesaretoberemovedorotherwiseaffectedbytheproposedproject,thebatbiologistwillconducttargetedroostsurveysofallidentifiedsitesthatwouldbeaffected.Becausebatactivityishighlyvariable(bothspatiallyandtemporally)acrossthelandscapeandmaymoveunpredictablyamongseveralroosts,severalseparatesurveyvisitsmayberequired.Surveyswillberepeatedatdifferenttimesofyearifdeemednecessarybythebatbiologisttodeterminethepresenceofseasonallyactiveroosts(hibernacula,migratorystopovers,maternityroosts).Appropriatefieldmethodswillbeemployedtodeterminethespecies,type,andvulnerabilityoftheroosttoconstructiondisturbance.Methodswillfollowbestpracticesforroostsurveyssuchthatspeciesarenotdisturbedandadequatetemporalandspatialcoverageisprovidedtoincreaselikelihoodofdetection.

Roostsurveysmayconsistofbothdaylightsurveysforsignsofbatuseandevening/nightvisit(s)toconductemergencesurveysorevaluatethestatusofnightroosts.Surveytimingshouldbeadequatetoaccountforindividualbatsorspeciesthatmightnotemergeuntilwellafterdark.

Methodsandapproachesfordeterminingroostoccupancystatusshouldincludeacombinationofthefollowingcomponentsasthebiologistdeemsnecessaryfortheparticularroostsite. Passiveand/oractiveacousticmonitoringtoassistwithspeciesidentification.

Page 35: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐35 

March 2016ICF 00630.15

 

Guanotrapstodetermineactivitystatus. Night‐visionequipment. Passiveinfraredcameratraps.Atthecompletionoftheroostsurveys,areportwillbeprepareddocumentingareassurveyed,methods,results,andmappingofhigh‐qualityhabitatorconfirmedroostlocations.

BIO‐12b:Avoidremovingordisturbingbatroosts Activebatroostswillnotbedisturbed,andwillbeprovidedaminimumbufferof500feet

wherepreexistingdisturbanceismoderateor750feetwherepreexistingdisturbanceisminimal.ConfirmationofbufferdistancesanddeterminationoftheneedforabiologicalmonitorforactivematernityroostsorhibernaculawillbeobtainedinconsultationwithCDFW.Ataminimum,whenanactivematernityroostorhibernaculumispresentwithin750feetofaconstructionsite,aqualifiedbiologistwillconductaninitialassessmentoftheroostresponsetoconstructionactivitiesandwillrecommendbufferexpansioniftherearesignsofdisturbancefromtheroost.

Structures(naturalorartificial)showingevidenceofsignificantbatusewithinthepastyearwillbeleftinplaceashabitatwhereverfeasible.Shouldsuchastructureneedtoberemovedordisturbed,CDFWwillbeconsultedtodetermineappropriatebuffers,timingandmethods,andcompensatorymitigationforthelossoftheroost.

Allprojectproponentswillprovideenvironmentalawarenesstrainingtoconstructionpersonnel,establishbuffers,andinitiateconsultationwithCDFWifneeded.

Artificialnightlightingwithin500feetofanyroostwillbeshieldedandangledsuchthatbatsmayenterandexittheroostwithoutartificialilluminationandtheroostdoesnotreceiveartificialexposuretovisualpredators.

Treeandvegetationremovalwillbeconductedoutsidethematernityseason(April1–September15)toavoiddisturbanceofmaternitygroupsoffoliage‐roostingbats.

Ifamaternityroostorhibernaculumispresentwithin500feetoftheconstructionsitewherepreexistingdisturbanceismoderateorwithin750feetwherepreexistingdisturbanceisminimal,aqualifiedbiologicalmonitorwillbeonsiteduringgroundbreakingactivities.

BIO‐14a:Siteandselectturbinestominimizepotentialmortalityofbats

ForthetextofMitigationMeasureBIO‐14a,pleaserefertothediscussionofImpactBIO‐14above.

BIO‐14d:Developandimplementabatadaptivemanagementplan

ForthetextofMitigationMeasureBIO‐14d,pleaserefertothediscussionofImpactBIO‐14above.

RemainingImpacts:Remainingimpactsrelatedtotheprojectimpactsonthemovementofanynativeresidentormigratorywildlifespeciesorestablishednativeresidentormigratorywildlifecorridors,andtheuseofnativewildlifenurserysiteswillbesignificantandunavoidable.

OverridingConsiderations:AsmorefullyexplainedintheStatementofOverridingConsiderationscontainedinExhibitCtotheResolutiontowhichtheseCEQAFindingsareattached,theCountyfindsthatthereareenvironmental,economic,orotherbenefitsoftheapprovedprojectthatoverridetheremainingsignificantandunavoidableimpactsonbiological

Page 36: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐36 

March 2016ICF 00630.15

 

resources.Therearenootherfeasiblemitigationmeasures,orchangestotheprojectthatwouldreducethisimpacttoaless‐than‐significantlevel.

Findings and Recommendations Regarding Significant Impacts that are Mitigated to a Less‐Than‐Significant Level 

Aesthetics  

ImpactAES‐1:Temporaryvisualimpactscausedbyconstructionactivities

PotentialImpact:ConstructionassociatedwiththeSandHillWindRepoweringProjectwouldcreatetemporarychangesinviewsofandfromtheSandHillWindRepoweringProjectarea.Constructionisexpectedtolast6–9months,andconstructionactivitieswouldcreateviewsofheavyequipmentandassociatedvehicles(seeSection1.4,ProjectConstruction,oftheEnvironmentalChecklist),andstorageareaswithintheviewshedofresidents,businesses,recreationareas,state‐designatedscenichighways(I‐580),andAlamedaCounty–designatedscenicroutes.Inaddition,high‐voltagelightingusedfornighttimeconstructionwouldnegativelyaffectnighttimeviewsofandfromtheworkareaandcouldbeanuisancetonearbyresidents,whoareconsideredtohavehighvisualsensitivity.Motoristsalongstate‐designatedscenichighwaysandCounty‐designatedscenicroutes,nearbyresidences,recreationistsusingtherecreationareasandtrails,andemployeesofnearbybusinesseswouldbetheprincipalviewergroups.Constructionimpactswouldbetemporaryandshort‐term,anddecommissioningandconstructionactivitieswouldoccurinamannerconsistentwithAlamedaCountyrequirementsforworkdaysandhours.However,thehighlysensitiveviewersintheproposedprojectarea(residentsandrecreationists)couldperceivetheseimpactsassignificant.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinthePEIRatpage3.1‐13,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

AES‐1:Limitconstructiontodaylighthours.

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureAES‐1willensurethattheimpactsassociatedwithtemporaryvisualimpactsduringconstructionwillbemitigatedtoaless‐than‐significantlevel.Theprojectapplicantwillberequiredtoimplementthefollowingactions.

AES‐1:Limitconstructiontodaylighthours.

Majorconstructionactivitieswillnotbeundertakenbetweensunsetandsunriseoronweekends.Constructionactivityisspecificallyprohibitedfromusinghigh‐wattagelightingsourcestoilluminateworksitesaftersunsetandbeforesunrise,withtheexceptionofnighttimedeliveriesundertheapprovedtransportationcontrolplanorotherconstructionactivitiesthatrequirenighttimeworkforsafetyconsiderations.

Page 37: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐37 

March 2016ICF 00630.15

 

RemainingImpacts:Anyremainingimpactassociatedwithtemporaryvisualimpactsduringconstructionwillbelessthansignificant.

ImpactAES‐2:Haveasubstantialadverseeffectonascenicvista

PotentialImpact:Anumberofscenicvistasareavailablefromlocalroadwaysneartheprojectarea.Inaddition,scenicvistasexistfromlocalrecreationaltrailsandresidencesandbusinessesonhillsidesintheprogramarea.Theseareasconsistofwideopenviewsoftherolling,grass‐covered,rurallandscapedottedwithexistingturbines.Thehubheightoffirst‐andsecond‐generationturbinesrangesfrom18to55meters(approximately59to180feet)andthird‐generationrangefrom41to68meters(approximately134to223feet).Theproposedfourth‐generationtowersinstalledunderrepoweringactivitieswouldbe80–96meters(262–315feet)tall.Therefore,theproposedfourth‐generationtowerswouldbe28–62meters(92–203feet)tallerthantheexistingturbines.Viewsoftheproposedturbinesmaybemoreorlessprevalentdependingonaviewer’slocationwithinthelandscapeandiftheviewerhasmoredirectviewsoftheturbinesorviewsthatarepartiallyorfullyscreenedbytopography.

Althoughthenew,moreefficientturbinesarelargerthantheexistingturbines,thenewwidelyspacedconfigurationdetractslessfromthenaturallandscapethantheexistingstringconfiguration.

Figures3.1‐3to3.1‐7inChapter3.1ofthePEIRshowexistingviewsoftheprogramareaandsimulatedviewswithbuildoutoftheprogramunderbothalternatives.Thenew,less‐clutteredconfigurationallowsforviewsoftherolling,grassyterraintobecomemoreprominent,back‐droppedagainstthesky,andlessinterruptedbyanthropogenicfeatures.Whilethelargerturbineswoulddrawviewers’attentiontowardthem,theeyeisalsoabletofollowtheridgelineofthehillsinamorecohesivemannerthanexistingconditions.Withexistingconditions,theeyeisdrawntoandfocusedonthenumerousturbinesthatcluttertheviewbystickingupandacrossthehillsidesandridgelines.Placementofnewturbinesonundevelopedportionsoftheprogramareawouldintroducelargestructureswherenonepresentlyexist,alteringtheundevelopedcharacteroftheseparcels.

TherearealsoscenicvistasfromTeslaRoad,whichisanAlamedaCounty–designatedscenicroutenearthesouthernboundaryoftheprogramareawherenoturbinescurrentlyexist.Installingturbinesinthesescenicvistaareaswouldconstituteasignificantimpactonviewsfromlocalroadways(includingTeslaRoad),recreationaltrails,andresidencesandbusinesseslocatedonhillsides.Policies170and215oftheEastCountyAreaPlanrequiretheCounty,respectively,toprotectnearbyexistingusesfromthevisualimpacts(amongothereffects)ofwindfarms’constructionandoperation,andtomaintainandenhancescenicvaluesintheseareasthroughreviewofdevelopmentanduseofconservationpolicies(seeSection3.1,RegulatorySetting).

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.1.3ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

AES‐2b:Maintainsitefreeofdebrisandrestoreabandonedroadways

AES‐2c:Screensurpluspartsandmaterials

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresAES‐2bandAES‐2cwillensurethattheimpactsassociatedwithadverseeffectonascenicvistawill

Page 38: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐38 

March 2016ICF 00630.15

 

bemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

AES‐2b:Maintainsitefreeofdebrisandrestoreabandonedroadways

Projectsiteswillbecleanedofallderelictequipment,windturbinecomponentsnotrequiredfortheproject,andlitteranddebrisfromoldturbinesandpastturbineoperations.Suchlitteranddebrismayincludederelictturbines,obsoleteanemometers,unusedelectricalpoles,andbrokenturbineblades.Inaddition,abandonedroadsthatarenolongerinuseonsuchparcelswillberestoredandhydroseededtoreclaimthesitesandremovetheirvisualtracesfromtheviewscape,exceptincaseswheretheresourceagencies(USFWSandCDFW)recommendthatthefeaturesbeleftinplaceforresourceprotection.Allparcelswithnewturbineswillbemaintainedinsuchamannerthroughthelifeofprojectoperationsanduntiltheparcelsarereclaimedinaccordancewiththeapprovedreclamationplan.

AES‐2c:Screensurpluspartsandmaterials

Surpluspartsandmaterialsthatarekeptonsitewillbemaintainedinaneatandorderlyfashionandscreenedfromview.Thiscanbeaccomplishedbyusingaweatherproofcamouflagematerialthatcanbedrapedoversurpluspartsandmaterialsstockpiles.Drapingmaterialswillbechangedouttoaccommodateforseasonalvariationssothatsurplusmaterialsarecamouflagedinaneffectivemannerwhengrassesarebothgreenandbrown.

RemainingImpacts:Anyremainingimpactassociatedwithscenicvistaswillbelessthansignificant.

ImpactAES‐3:Substantiallydamagescenicresources,includingbutnotlimitedtotrees,rockoutcroppings,andhistoricbuildingsalongascenichighway.

PotentialImpact:I‐580fromtheSanJoaquinCountylinetoSR205,a0.4‐mile‐longsegment,isastate‐designatedscenichighway.Althoughmotoristsareconsideredmoderatelysensitive,itwouldbeasignificantimpacttolocateturbinesaroundthisdesignatedscenichighwaywherenoturbinescurrentlyexist.Inaddition,thereareseveralCounty‐designatedscenicroutesintheprogramarea.ThenewSandHillWindRepoweringProjectturbineswouldbelocatedadjacenttoonestate‐designatedscenicroute,I‐580.TurbineswouldbevisiblefromI‐580aswellasseveralCounty‐designatedscenicroutes,AltamontPassRoad,GrantLineRoad,andMountainHouseRoad.Thenewturbineswouldbelocatedinanareawithexistingturbines.Motoristsontheseroadsareaccustomedtoseeingwindturbinesalongtheroute,sotheywouldnotbeadverselyaffected.Additionally,wherethereareexistingturbines,althoughthenew,moreefficientturbineswouldbe28–62meters(92–203feet)tallerthantheexistingturbines,thenewwidelyspacedconfigurationdetractslessfromthenaturallandscapethantheexistingstringconfiguration(asillustratedinFigures3.1‐3to3.1‐7ofthePEIRandFigures3.1‐2to3.1‐6oftheSandHillWindRepoweringProjectEnvironmentalChecklist).However,thehighlysensitiveviewersintheproposedprojectarea(residentsandrecreationists)couldperceivetheseimpactsassignificant.

MitigationMeasures:Thefollowingmitigationmeasures,discussedinthePEIRatpage3.1‐16,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

AES‐2b:Maintainsitefreeofdebrisandrestoreabandonedroadways

AES‐2c:Screensurpluspartsandmaterials

Page 39: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐39 

March 2016ICF 00630.15

 

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureAES‐2bandAES‐2cwillensurethattheimpactsassociatedwithdamagetoscenicresourcesalongscenichighwayswillbemitigatedtoaless‐than‐significantlevel.Theprojectapplicantwillberequiredtoimplementthefollowingactions.

AES‐2b:Maintainsitefreeofdebrisandrestoreabandonedroadways

ForthetextofMitigationMeasureAES‐2b,pleaserefertothediscussionofImpactAES‐2above.

AES‐2c:Screensurpluspartsandmaterials

ForthetextofMitigationMeasureAES‐2c,pleaserefertothediscussionofImpactAES‐2above.

RemainingImpacts:Anyremainingimpactassociatedwithdamagetoscenicresourcesalongscenichighwayswillbelessthansignificant.

ImpactAES‐4:Substantiallydegradetheexistingvisualcharacterorqualityofthesiteanditssurroundings

PotentialImpact:Theproposedprojectwouldprimarilybevisibletorecreationists,arearesidents,motorists,andemployeesofareabusinesses.Stringsofturbines,pluspowerlines,transformers,accessroads,andsubstationsarethemostvisuallydistinctartificialfeaturethroughoutmostoftheprogramarea.AccordingtoPolicy170oftheECAP,AlamedaCountyisobligatedtoprotectnearbyexistingusesfrompotentialvisualandotherimpactsgeneratedbytheconstructionandoperationofwindfarmfacilities(seeRegulatorySettingsectionofPEIRSection3.1.3).OfparticularvisualconcernistheareasouthofPattersonPassRoad,whichiscurrentlyundevelopedwithwindfarmfacilities.TheSandHillWindRepoweringProjectareaisnorthofPattersonPassRoad;therefore,theproposedprojectwouldplacenoturbinesinthesouthernportionoftheprogramarea,southofPattersonPassRoad.However,thepotentialexistsforviewerstoperceivetheproposedprojectasdegradingtheprojectarea’sexistingvisualcharacterorquality.

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.1.3ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

AES‐2b:Maintainsitefreeofdebrisandrestoreabandonedroadways

AES‐2c:Screensurpluspartsandmaterials

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresAES‐2bandAES‐2cwillreduceimpactsassociatedwithsubstantialdamagetoscenicresourcesalongascenichighway,butwillnotreducethisimpacttoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

AES‐2b:Maintainsitefreeofdebrisandrestoreabandonedroadways

ForthetextofMitigationMeasureAES‐2b,pleaserefertothediscussionofImpactAES‐2above.

AES‐2c:Screensurpluspartsandmaterials

ForthetextofMitigationMeasureAES‐2c,pleaserefertothediscussionofImpactAES‐2above.

Page 40: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐40 

March 2016ICF 00630.15

 

RemainingImpacts:Remainingimpactsrelatedtodegradationoftheexistingvisualcharacterorqualityofthesiteanditssurroundingswillbelessthansignificant.

ImpactAES‐5:Createanewsourceofsubstantiallightorglarethatwouldadverselyaffectdaytimeornighttimeviewsinthearea

PotentialImpact:Bladerotationcouldcauseshadowflickerthatcouldbeavisualintrusiontoviewersandcouldbeespeciallydisruptivetoresidentswhowouldbeexposedtotheseconditionsforlongperiodsoftime.AsshowninTable2‐2ofthePEIR,AlamedaCountyhasdevelopedsetbackrequirementsforsitingturbinesinrelationtocertaintypesoflanduses,andturbineswouldnotbeallowedtobelocatedwithinthesesetbackdistances.However,thesesetbacksmaynotbesufficienttopreventshadowflickerwiththenew,tallerturbines.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinSection3.1.3ofthePEIR,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

AES‐5:Analyzeshadowflickerdistanceandmitigateeffectsorincorporatechangesintoprojectdesigntoaddressshadowflicker

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing

EffectsofMitigation:ImplementationofthemitigationrecommendedbyMitigationMeasureAES‐5willensurethattheimpactsassociatedwithnewsourcesofsubstantiallightandglarewillbemitigatedtoaless‐than‐significantlevel.Theprojectapplicantwillberequiredtoimplementthefollowingactions.

AES‐5:Analyzeshadowflickerdistanceandmitigateeffectsorincorporatechangesintoprojectdesigntoaddressshadowflicker

Whereshadowflickercouldresultfromtheinstallationofwindturbinesproposednearresidences(i.e.,within500meters[1,640feet]inagenerallyeastorwestdirectiontoaccountforseasonalvariations),theprojectapplicantwillprepareagraphicmodelandstudytoevaluateshadowflickerimpactsonnearbyresidences.Noshadowflickerinexcessof30minutesinagivendayor30hoursinagivenyearwillbepermitted.IfitisdeterminedthatexistingsetbackrequirementsasestablishedbytheCountyarenotsufficienttopreventshadowflickerimpactsonresidences,AlamedaCountywillrequireanincreaseintherequiredsetbackdistancestoensurethatresidencesarenotaffected.Ifanyresidenceisaffectedbyshadowflickerwithinthe30‐minute/30‐hourthresholds,theapplicantwillimplementmeasurestominimizetheeffect,suchasrelocatingtheturbine;providingopaquewindowcoverings,windowawnings,landscapebuffers,oracombinationofthesefeaturestoreduceflickertoacceptablelimitsfortheaffectedreceptor;orshuttingdowntheturbineduringtheperiodshadowflickerwouldoccur.Suchmeasuresmaybeundertakeninconsultationwithowneroftheaffectedresidence.Iftheshadowflickerstudyindicatesthatanygiventurbinewouldresultinshadowflickerexceedingthe30‐minute/30‐hourthresholdsandthepropertyownerisnotamenabletowindowcoverings,windowawnings,orlandscapingandtheturbinecannotbeshutdownduringtheperiodofshadowflicker,thentheturbinewillberelocatedtoreducetheeffecttoacceptablelimits.

RemainingImpacts:Anyremainingimpactassociatedwithnewsourcesoflightorglarewillbelessthansignificant.

ImpactAES‐6:Consistencywithstateandlocalpolicies

Page 41: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐41 

March 2016ICF 00630.15

 

PotentialImpact:Theturbineswouldbeneutralandnonreflective(e.g.,dullwhiteorlightgray)soastoblendwiththesurroundings.TheCaliforniaAqueductTrailborderstheprojectarea(Arnaudo&Castilloproperties,eastofMountainHouseRoad),asshownonFigure3.1‐1.Anotherplannedtrail,theSanJoaquinCountytoShadowCliffsTrail,alsoshownonFigure3.1‐1,wouldborderthewestsideofthesouthernmostprojectparcels(thetwoGriffithparcels),alongMidwayRoad.AlthoughnovisualsimulationisprovidedspecificallyfortheviewofturbinesfromMidwayRoad,theymayclearlyberecognizedascomparabletothesimulatedviewsprovidedinFigures3.1‐3and3.1‐4oftheEnvironmentalChecklist.However,theproposedprojectwouldstillintroducelarge,visuallyobtrusiveturbineswithinexistingscenicviewshedsinproximitytosensitiveviewersandresidences.

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.1.3ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

AES‐2b:Maintainsitefreeofdebrisandrestoreabandonedroadways

AES‐2c:Screensurpluspartsandmaterials

AES‐5:Analyzeshadowflickerdistanceandmitigateeffectsorincorporatechangesintoprojectdesigntoaddressshadowflicker

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresAES‐2b,AES‐2c,andAES‐5willensurethattheimpactsassociatedwithnewsourcesofsubstantiallightandglarewillbemitigatedtoaless‐than‐significantlevel.Theprojectapplicantwillberequiredtoimplementthefollowingactions.

AES‐2b:Maintainsitefreeofdebrisandrestoreabandonedroadways

ForthetextofMitigationMeasureAES‐2a,pleaserefertothediscussionofImpactAES‐2above.

AES‐2c:Screensurpluspartsandmaterials

ForthetextofMitigationMeasureAES‐2a,pleaserefertothediscussionofImpactAES‐2above.

AES‐5:Analyzeshadowflickerdistanceandmitigateeffectsorincorporatechangesintoprojectdesigntoaddressshadowflicker

ForthetextofMitigationMeasureAES‐5,pleaserefertothediscussionofImpactAES‐5above.

RemainingImpacts:Anyremainingimpactassociatedwithconsistencywithstateandlocalpoliceswillbelessthansignificant.

Air Quality  

ImpactAQ‐4:Exposesensitivereceptorstosubstantialpollutantconcentrations

PotentialImpact:Constructionactivitieswouldgenerateairpollutantemissions,includingequipmentexhaustemissionsandsuspendedandinhalablePM.However,constructionactivitieswouldoccuroverarelativelyshortperiodofapproximately6‐9months,andassociatedemissionswouldbespatiallydispersedovertheapproximately1,000‐acreprojectarea.Theclosestsensitive

Page 42: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐42 

March 2016ICF 00630.15

 

receptortotheprojectareaisaresidencelocatedapproximately900feetfromthenearestproposedwindturbine(seeFigure3.1‐7oftheEnvironmentalChecklist).

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.3.2ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

AQ‐2a:Reduceconstruction‐relatedairpollutantemissionsbyimplementingapplicableBAAQMDBasicConstructionMitigationMeasures

AQ‐2b:Reduceconstruction‐relatedairpollutantemissionsbyimplementingmeasuresbasedonBAAQMD’sAdditionalConstructionMitigationMeasures

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresAQ‐2aandAQ‐2bwillensurethattheimpactsassociatedwiththeexposureofsensitivereceptorstosubstantialpollutantconcentrationswillbemitigatedtoaless‐than‐significantlevel.Theprojectapplicantwillberequiredtoimplementthefollowingactions.

AQ‐2a:Reduceconstruction‐relatedairpollutantemissionsbyimplementingapplicableBAAQMDBasicConstructionMitigationMeasures

Theprojectproponentswillrequireallcontractorstocomplywiththefollowingrequirementsforallareaswithactiveconstructionactivities. Allexposedsurfaces(e.g.,parkingareas,stagingareas,soilpiles,gradedareas,andunpaved

accessroads)willbewateredasneededtomaintaindustcontrolonsite—approximatelytwotimesperday.

Allhaultruckstransportingsoil,sand,orotherloosematerialoffsitewillbecovered. Allvisiblemudordirttrack‐outontoadjacentpublicroadswillberemovedusingwetpower

vacuumstreetsweepersatleastonceperday.Theuseofdrypowersweepingisprohibited. Allvehiclespeedsonunpavedroadswillbelimitedto15mph. Allroadways,driveways,andsidewalkstobepavedwillbecompletedassoonaspossible.

Buildingpadswillbelaidassoonaspossibleaftergradingunlessseedingorsoilbindersareused.

Idlingtimeswillbeminimizedeitherbyshuttingequipmentoffwhennotinuseorreducingthemaximumidlingtimeto5minutes(asrequiredbytheCaliforniaairbornetoxicscontrolmeasureTitle13,Section2485ofCaliforniaCodeofRegulations[CCR]).Clearsignagewillbeprovidedforconstructionworkersatallaccesspoints.

Allconstructionequipmentwillbemaintainedandproperlytunedinaccordancewithmanufacturer’sspecifications.Allequipmentwillbecheckedbyacertifiedvisibleemissionsevaluator.

Postapubliclyvisiblesignwiththetelephonenumberandpersontocontactattheleadagencyregardingdustcomplaints.Thispersonwillrespondandtakecorrectiveactionwithin48hours.Theairdistrict’sphonenumberwillalsobevisibletoensurecompliancewithapplicableregulations.

AQ‐2b:Reduceconstruction‐relatedairpollutantemissionsbyimplementingmeasuresbasedonBAAQMD’sAdditionalConstructionMitigationMeasures

Page 43: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐43 

March 2016ICF 00630.15

 

Theprojectproponentswillrequireallcontractorstocomplywiththefollowingrequirementsforallareaswithactiveconstructionactivities.• Duringconstructionactivities,allexposedsurfaceswillbewateredatafrequencyadequateto

meetandmaintainfugitivedustcontrolrequirementsofallrelevantairqualitymanagemententities.

• Allexcavation,grading,and/ordemolitionactivitieswillbesuspendedwhenaveragewindspeedsexceed20mph,asmeasuredattheLivermoreMunicipalAirport.

• Windbreaks(e.g.,trees,fences)willbeinstalledonthewindwardside(s)ofactivelydisturbedareasofconstruction.Windbreaksshouldhaveatmaximum50%airporosity.

• Vegetativegroundcover(e.g.,fast‐germinatingnativegrassseed)willbeplantedindisturbedareasassoonaspossibleandwateredappropriatelyuntilvegetationisestablished.

• Iffeasibleandpracticable,thesimultaneousoccurrenceofexcavation,grading,andground‐disturbingconstructionactivitiesonthesameareaatanyonetimewillbelimited.

• Constructionvehiclesandmachinery,includingtheirtires,willbecleanedpriortoleavingtheconstructionareatoremovevegetationandsoil.Cleaningstationswillbeestablishedattheperimeteroftheconstructionarea.

• Siteaccessestoadistanceof100feetfromthepavedroadwillbetreatedwitha6to12inchcompactedlayerofwoodchips,mulch,orgravel.

• Sandbagsorothererosioncontrolmeasureswillbeinstalledtopreventsiltrunofftopublicroadwaysfromsiteswithaslopegreaterthan1%.

• Theidlingtimeofdieselpoweredconstructionequipmentwillbeminimizedto2minutes.• Theprojectwilldevelopaplandemonstratingthattheoffroadequipment(morethan50

horsepower)tobeusedintheconstructionproject(i.e.,owned,leased,andsubcontractorvehicles)wouldachieveaprojectwidefleet‐average20%NOXreductionand45%PMreductioncomparedtothemostrecentARBfleetaverage.Acceptableoptionsforreducingemissionsincludetheuseoflatemodelengines,low‐emissiondieselproducts,alternativefuels,engineretrofittechnology,after‐treatmentproducts,add‐ondevicessuchasparticulatefilters,and/orotheroptionsassuchbecomeavailable.

• UselowVOC(i.e.,ROG)coatingsbeyondthelocalrequirements(i.e.,Regulation8,Rule3:ArchitecturalCoatings).

• Allconstructionequipment,dieseltrucks,andgeneratorswillbeequippedwithBACTforemissionreductionsofNOXandPM.

• AllcontractorswilluseequipmentthatmeetsARB’smostrecentcertificationstandardforoffroadheavydutydieselengines.

RemainingImpacts:Anyremainingimpactassociatedwithexposureofsensitivereceptorstopollutantconcentrationswillbelessthansignificant.

Biological Resources  

ImpactBIO‐1:Potentialforground‐disturbingactivitiestoresultinadverseeffectsonspecial‐statusplantsorhabitatoccupiedbyspecial‐statusplants

PotentialImpact:Ground‐disturbingactivitiesassociatedwiththeSandHillWindRepoweringProjectcouldresultinadverseeffectsonspecial‐statusplantsortheirhabitat.Directeffectsincludethoseeffectswhereplantsmayberemoved,damaged,orcrushed(seedlings)byground‐disturbingactivities,themovementorparkingofvehicles,and/ortheplacementofequipmentandsupplies.

Page 44: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐44 

March 2016ICF 00630.15

 

Grounddisturbancecankillordamagematureindividualsoreliminatetheirhabitat.Excavationalterssoilpropertiesandmaycreateconditionsunsuitableforthegrowthofsomespeciesorfavortheirreplacementbyotherspecies.Therootsofshrubsandotherperennialspeciesaresusceptibletodamagefromsoilcompactionbyequipmentorconstructionmaterials.Possibleindirecteffectsonplantscouldresultfromerosionthatdegradeshabitatoraccidentalignitionofafirethatdamagesorkillsindividuals.

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.4.2ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

BIO‐1a:Conductsurveystodeterminethepresenceorabsenceofspecial‐statusplantspecies

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

BIO‐1c:Avoidandminimizeimpactsonspecial‐statusplantspeciesbyestablishingactivityexclusionzones

BIO‐1d:Compensateforimpactsonspecial‐statusplantspecies

BIO‐1e:Retainabiologicalmonitorduringground‐disturbingactivitiesinenvironmentallysensitiveareas

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresBIO‐1a,BIO‐1b,BIO‐1c,BIO‐1d,andBIO‐1ewillensurethattheimpactsassociatedwiththepotentialforground‐disturbingactivitiestoresultinadverseeffectsonspecial‐statusplantsorhabitatoccupiedbyspecial‐statusplantswillbemitigatedtoaless‐than‐significantlevel.Theprojectapplicantwillberequiredtoimplementthefollowingactions.

BIO‐1a:Conductsurveystodeterminethepresenceorabsenceofspecial‐statusplantspecies

Projectproponentswillconductsurveysforthespecial‐statusplantspecieswithinandadjacenttoallprojectsites.Allsurveyswillbeconductedbyqualifiedbiologistsinaccordancewiththeappropriateprotocols.

Special‐statusplantsurveyswillbeconductedinaccordancewithProtocolsforSurveyingandEvaluatingImpactstoSpecialStatusNativePlantPopulationsandNaturalCommunities(CaliforniaDepartmentofFishandGame2009)duringtheseasonthatspecial‐statusplantspecieswouldbeevidentandidentifiable—i.e.,duringtheirbloomingseason.Nomorethan3yearspriortoground‐disturbingrepoweringactivitiesandduringtheappropriateidentificationperiodsforspecial‐statusplants(Table3.4‐4),aqualifiedbiologist(asdeterminedbyAlamedaCounty)willconductfieldsurveyswithindecommissioningworkareas,proposedconstructionareas,andtheimmediatelyadjacentareastodeterminethepresenceofhabitatforspecial‐statusplantspecies.TheprojectproponentwillsubmitareportdocumentingthesurveyresultstoAlamedaCountyforreviewandapprovalpriortoconductinganyrepoweringactivities.Thereportwillincludethelocationand

Page 45: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐45 

March 2016ICF 00630.15

 

descriptionofallproposedworkareas,thelocationanddescriptionofallsuitablehabitatforspecial‐statusplantspecies,andthelocationanddescriptionofothersensitivehabitats(e.g.,vernalpools,wetlands,riparianareas).Additionally,thereportwilloutlinewhereadditionalspeciesand/orhabitat‐specificmitigationmeasuresarerequired.Thisreportwillprovidethebasisforanyapplicablepermitapplicationswhereincidentaltakeoflistedspeciesmayoccur.

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

ForthetextofMitigationMeasureBIO‐1b,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐1c:Avoidandminimizeimpactsonspecial‐statusplantspeciesbyestablishingactivityexclusionzones

Wheresurveysdeterminethataspecial‐statusplantspeciesispresentinoradjacenttoaprojectarea,directandindirectimpactsoftheprojectonthespecieswillbeavoidedthroughtheestablishmentofactivityexclusionzones,withinwhichnoground‐disturbingactivitieswilltakeplace,includingconstructionofnewfacilities,constructionstaging,orothertemporaryworkareas.Activityexclusionzonesforspecial‐statusplantspecieswillbeestablishedaroundeachoccupiedhabitatsite,theboundariesofwhichwillbeclearlymarkedwithstandardorangeplasticconstructionexclusionfencingoritsequivalent.Theestablishmentofactivityexclusionzoneswillnotberequiredifnoconstruction‐relateddisturbanceswilloccurwithin250feetoftheoccupiedhabitat.ThesizeofactivityexclusionzonesmaybereducedthroughconsultationwithaqualifiedbiologistandwithconcurrencefromCDFWbasedonsite‐specificconditions.

BIO‐1d:Compensateforimpactsonspecial‐statusplantspecies

Allprojectproponentswillavoidorminimizetemporaryandpermanentimpactsonspecial‐statusplantsthatoccuronprojectsitesandwillcompensateforimpactsonspecial‐statusplantspecies.Althoughallimpactsonlarge‐floweredfiddleneck,diamond‐petaledCaliforniapoppy,andcaper‐fruitedtropidocarpumwillbeavoided,impactsonotherspecial‐statusplantspecieswillbeavoidedtotheextentfeasible,andanyunavoidableimpactswillbeaddressedthroughcompensatorymitigation.

Whereavoidanceofimpactsonaspecial‐statusplantspeciesisinfeasible,lossofindividualsoroccupiedhabitatofaspecial‐statusplantspeciesoccurrencewillbecompensatedforthroughtheacquisition,protection,andsubsequentmanagementinperpetuityofotherexistingoccurrencesata2:1ratio(occurrencesimpacted:occurrencespreserved).TheprojectproponentwillprovidedetailedinformationtotheCountyandCDFWonthelocationofthepreservedoccurrences,qualityofthepreservedhabitat,feasibilityofprotectingandmanagingtheareasin‐perpetuity,responsibilityparties,andotherpertinentinformation.Ifsuitableoccurrencesofaspecial‐statusplantspeciesarenotavailableforpreservation,thentheprojectwillberedesignedtoremovefeaturesthatwouldresultinimpactsonthatspecies.

BIO‐1e:Retainabiologicalmonitorduringground‐disturbingactivitiesinenvironmentallysensitiveareas

ForthetextofMitigationMeasureBIO‐1e,pleaserefertothediscussionofImpactBIO‐19above.

Page 46: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐46 

March 2016ICF 00630.15

 

RemainingImpacts:Anyremainingimpactassociatedwithspecial‐statusplantswillbelessthansignificant.

ImpactBIO‐2:Adverseeffectsonspecial‐statusplantsandnaturalcommunitiesresultingfromtheintroductionandspreadofinvasiveplantspecies

PotentialImpact:Constructionactivitieshavethepotentialtofacilitatetheintroductionandspreadofinvasivenonnativeplantspeciesbyremovingvegetationanddisturbingsoils.Invasivespeciescompetewithnativespeciesforresourcesandcanalternaturalcommunitiesbyinfluencingfireregimes,hydrology(e.g.,sedimentationanderosion),lightavailability,nutrientcycling,andsoilchemistry.Invasivespeciesalsohavethepotentialtoharmhumanhealthandtheeconomybyadverselyaffectingnaturalecosystems,recreation,agriculturallands,anddevelopedareas.

MitigationMeasure:Thefollowingmitigationmeasures,discussedinSection3.4.2ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

BIO‐2:Preventintroduction,spread,andestablishmentofinvasiveplantspecies

BIO‐5c:Restoredisturbedannualgrasslands

WQ‐1:ComplywithNPDESrequirements

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresBIO‐1b,BIO‐2,BIO‐5c,andWQ‐1willensurethattheimpactsassociatedwiththepotentialfortheintroductionandspreadofinvasiveplantspeciestoresultinadverseeffectsonspecial‐statusplantsorhabitatoccupiedbyspecial‐statusplantswillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

ForthetextofMitigationMeasureBIO‐1b,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐2:Preventintroduction,spread,andestablishmentofinvasiveplantspecies

Toavoidandminimizetheintroductionandspreadofinvasivenonnativeplantspecies,allprojectproponentswillimplementthefollowingBMPs.

Constructionvehiclesandmachinerywillbecleanedpriortoenteringtheconstructionarea.Cleaningstationswillbeestablishedattheperimeteroftheconstructionareaalongallconstructionroutesorimmediatelyoffsite.

Vehicleswillbewashedonlyatapprovedareas.Nowashingofvehicleswilloccuratjobsites.

Page 47: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐47 

March 2016ICF 00630.15

 

Todiscouragetheintroductionandestablishmentofinvasiveplantspecies,seedmixturesandstrawusedwithinnaturalvegetationwillbeeitherricestraworweed‐freestraw,asallowedbystateandfederalregulationofstormwaterrunoff.

Inaddition,theprojectproponentswillprepareandimplementerosionandsedimentcontrolplanstocontrolshort‐termandlong‐termerosionandsedimentationeffectsandtorestoresoilsandvegetationinareasaffectedbyconstructionactivities(MitigationMeasuresBIO‐1bandWQ‐1).Priortoinitiatinganyconstructionactivitiesthatwillresultintemporaryimpactsonnaturalcommunities,arestorationandmonitoringplanwillbedevelopedfortemporarilyaffectedhabitatsineachprojectarea(MitigationMeasureBIO‐5c).RestorationandmonitoringplanswillbesubmittedtotheCountyandCDFWforapproval.Theseplanswillincludemethodsforrestoringsoilconditionsandrevegetatingdisturbedareas,seedmixes,monitoringandmaintenanceschedules,adaptivemanagementstrategies,reportingrequirements,andsuccesscriteria.Followingcompletionofprojectconstruction,theprojectproponentswillimplementtherevegetationplanstorestoreareasdisturbedbyprojectactivitiestoaconditionofequalorgreaterhabitatfunctionthanoccurredpriortothedisturbance.

MitigationMeasureBIO‐5c:Restoredisturbedannualgrasslands

ForthetextofMitigationMeasureBIO‐5c,pleaserefertothediscussionofImpactBIO‐19above.

WQ‐1:ComplywithNPDESrequirements

ProjectcontractorswillobtaincoverageundertheGeneralConstructionPermitbeforetheonsetofanyconstructionactivities,becauseallprojectswillentaildisturbanceof1acreormore.ASWPPPwillbedevelopedbyaqualifiedengineerorerosioncontrolspecialistinaccordancewiththeappropriateBoard’srequirementsforNPDEScomplianceandimplementedpriortotheissuanceofanygradingpermitbeforeconstruction.TheSWPPPwillbekeptonsiteduringconstructionactivityandwillbemadeavailableuponrequesttorepresentativesoftheRegionalWaterBoards.

ComplianceandcoveragewiththeStormWaterManagementProgramandGeneralConstructionPermitwillrequirecontrolsofpollutantdischargesthatutilizeBMPsandtechnologytoreduceerosionandsedimentstomeetwaterqualitystandards.BMPsmayconsistofawidevarietyofmeasurestakentoreducepollutantsinstormwaterandothernonpoint‐sourcerunoff.Measuresrangefromsourcecontrol,suchasreducedsurfacedisturbance,tothetreatmentofpollutedrunoff,suchasdetentionbasins.

BMPstobeimplementedaspartoftheStormWaterManagementProgramandGeneralConstructionPermit(andSWPPP)mayincludethefollowingpractices.

Temporaryerosioncontrolmeasures(suchassiltfences,stakedstrawbales/wattles,silt/sedimentbasinsandtraps,checkdams,geofabric,sandbagdikes,andtemporaryrevegetationorothergroundcover)willbeemployedtocontrolerosionfromdisturbedareas.

Useadrydetentionbasin(whichistypicallydryexceptafteramajorrainstorm,whenitwilltemporarilyfillwithstormwater),designedtodecreaserunoffduringstormevents,preventflooding,andallowforoff‐peakdischarge.Basinfeatureswillincludemaintenanceschedulesfortheperiodicremovalofsediments,excessivevegetation,anddebristhatmayclogbasininletsandoutlets.

Page 48: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐48 

March 2016ICF 00630.15

 

Coverorapplynontoxicsoilstabilizerstoinactiveconstructionareas(previouslygradedareasinactivefor10daysormore)thatcouldcontributesedimenttowaterways.

Encloseandcoverexposedstockpilesofdirtorotherloose,granularconstructionmaterialsthatcouldcontributesedimenttowaterways.

Ensurethatnoearthororganicmaterialwillbedepositedorplacedwhereitmaybedirectlycarriedintoastream,marsh,slough,lagoon,orbodyofstandingwater.

Prohibitthefollowingtypesofmaterialsfrombeingrinsedorwashedintothestreets,shoulderareas,orgutters:concrete,solventsandadhesives,thinners,paints,fuels,sawdust,dirt,gasoline,asphaltandconcretesawslurry,andheavilychlorinatedwater.

Ensurethatgrassorothervegetativecoverwillbeestablishedontheconstructionsiteassoonaspossibleafterdisturbance.

ThecontractorwillselectacombinationofBMPs(consistentwithSectionAoftheConstructionGeneralPermit)thatisexpectedtominimizerunoffandremovecontaminantsfromstormwaterdischarges.ThefinalselectionofBMPswillbesubjecttoapprovalbytheSanFranciscoBayRegionalWaterBoardandtheCentralValleyWaterBoard.

ThecontractorwillverifythatanNOIhasbeenfiledwiththeStateWaterBoardandthataSWPPPhasbeendevelopedbeforeallowingconstructiontobegin.Thecontractorwillperforminspectionsoftheconstructionarea,toverifythattheBMPsspecifiedintheSWPPPareproperlyimplementedandmaintained.ThecontractorwillnotifytheappropriateRegionalWaterBoardimmediatelyifthereisanoncomplianceissueandwillrequirecompliance.Ifnecessary,thecontractorortheiragentwillrequirethatadditionalBMPsbedesignedandimplementedifthoseoriginallyconstructeddonotachievetheidentifiedperformancestandard.

RemainingImpacts:Anyremainingimpactassociatedwiththepotentialfortheintroductionofinvasiveplantspeciestoresultinadverseeffectsonspecial‐statusplantsorhabitatoccupiedbyspecial‐statusplantswillbelessthansignificant.

ImpactBIO‐5:PotentialdisturbanceormortalityofandlossofsuitablehabitatforCaliforniatigersalamander,westernspadefoot,Californiared‐leggedfrog,andfoothillyellow‐leggedfrog

PotentialImpact:ConstructionactivitiesintheprojectareacouldresultindirecteffectsonCaliforniatigersalamander,westernspadefoot,Californiared‐leggedfrog,andfoothillyellow‐leggedfrog(collectivelyreferredtoasspecial‐statusamphibians)ortheirhabitats(seasonalwetland,freshwatermarsh,mixedwillowriparianscrub,ponds,drainages,andsurroundinguplandareas).ThemajorityofconstructionactivitieswouldtakeplaceonsuitableuplandgrasslanddispersalandaestivationhabitatforCaliforniatigersalamander,westernspadefoot,andCaliforniared‐leggedfrog.Aquatichabitatsforspecials‐statusamphibianswouldgenerallybeavoided;however,directimpactsonhabitatandimpactsonwaterqualitycouldresultfromroadconstructionorwideningactivities.

Constructionactivitiessuchasexcavation,grading,orstockpilingofsoil,couldfill,removeorotherwisealtersuitablehabitatforspecial‐statusamphibiansorresultininjuryormortalityofindividualamphibians.Potentialdirectimpactsincludemortalityorinjurybyequipment,entrapmentinopentrenchesorotherprojectfacilities,andremovalordisturbanceofuplandhabitatthatresultsindamageoreliminationofsuitableaestivationburrows.Specificactivitiesthat

Page 49: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐49 

March 2016ICF 00630.15

 

mayaffectthesespeciescouldincludeinstallationofpowercollectionandcommunicationsystems,turbineconstruction,roadinfrastructureconstruction/maintenanceandupgrades,meteorologicaltowerinstallationandremoval,temporarystagingareaset‐up,andreclamationactivities.Special‐statusamphibianscouldbeinjuredorkilledifvehiclesorconstructionequipmentaredriventhroughoccupiedhabitat,orifgasoline,oil,orothercontaminantsenterhabitat.Changesinhydrologyorsedimentationofhabitatfromerosionassociatedwithprojectconstructioncouldalterthesuitabilityoftheirhabitatorcausemortality.

Operationandmaintenanceactivitiesmayalsoresultinimpactsonspecial‐statusamphibiansortheirhabitats.Travelonmaintenanceroadsduringtherainyseasonorwhenamphibiansaredispersingcouldresultinmortalityofindividuals.Roadandfirebreakmaintenancecouldresultindegradationofhabitatorinjuryormortalityofspecial‐statusamphibians.

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.4.2ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

BIO‐1e:Retainabiologicalmonitorduringground‐disturbingactivitiesinenvironmentallysensitiveareas

BIO‐3a:Conductpreconstructionsurveysforhabitatforspecialstatuswildlifespecies

BIO‐5a:Implementbestmanagementpracticestoavoidandminimizeeffectsonspecial‐statusamphibians

BIO‐5b:Compensateforlossofhabitatforspecial‐statusamphibians

BIO‐5c:Restoredisturbedannualgrasslands

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresBIO‐1b,BIO‐1e,BIO‐3a,BIO‐5a,BIO‐5b,andBIO‐5cwillensurethattheimpactsassociatedwiththepotentialdisturbanceormortalityofandlossofsuitablehabitatforCaliforniatigersalamander,westernspadefoot,Californiared‐leggedfrog,andfoothillyellow‐leggedfrogwillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

ForthetextofMitigationMeasureBIO‐1b,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐1e:Retainabiologicalmonitorduringground‐disturbingactivitiesinenvironmentallysensitiveareas

ForthetextofMitigationMeasureBIO‐1e,pleaserefertothediscussionofImpactBIO‐19above.

Page 50: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐50 

March 2016ICF 00630.15

 

BIO‐3a:Conductpreconstructionsurveysforhabitatforspecialstatuswildlifespecies

ForthetextofMitigationMeasureBIO‐3a,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐5a:Implementbestmanagementpracticestoavoidandminimizeeffectsonspecial‐statusamphibians

ForthetextofMitigationMeasureBIO‐5a,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐5b:Compensateforlossofhabitatforspecial‐statusamphibians

Whereimpactsonaquaticanduplandhabitatforspecial‐statusamphibianscannotbeavoidedorminimized,compensatorymitigationwillbeundertakeninaccordancewithmitigationratiosandrequirementsdevelopedundertheEACCS(AppendixC).Intheeventthattakeauthorizationisrequired,compensatorymitigationwillbeundertakeninaccordancewiththetermsoftheauthorizationinconsultationwithUSFWSand/orCDFW.

BIO‐5c:Restoredisturbedannualgrasslands

ForthetextofMitigationMeasureBIO‐5c,pleaserefertothediscussionofImpactBIO‐19above.

RemainingImpacts:AnyremainingimpactassociatedwithpotentialdisturbanceormortalityofandlossofsuitablehabitatforCaliforniatigersalamander,westernspadefoot,Californiared‐leggedfrog,andfoothillyellow‐leggedfrogwillbelessthansignificant.

ImpactBIO‐6:Potentialdisturbanceormortalityofandlossofsuitablehabitatforwesternpondturtle

PotentialImpact:ConstructionactivitiesintheSandHillWindRepoweringProjectareacouldresultindirecteffectsonwesternpondturtleoritshabitats(ponds,reservoirs,drainages,andsurroundingriparianandgrasslandareas).Becausethemajorityofconstructionactivitieswouldtakeplaceongrasslandhabitatalongridgelines,suitableaquatichabitatwouldgenerallybeavoided;however,directimpactsonhabitatandimpactsonwaterqualitycouldresultfromroadconstructionorwideningactivities.

Aquaticandupland(overwintering,nesting)habitatforwesternpondturtlemayberemovedortemporarilydisturbedbyconstructionactivities.Potentialdirectimpactsincludemortalityorinjurybyequipment,entrapmentinopentrenchesorotherprojectfacilities,andremovalordisturbanceofaquaticoruplandnestinghabitat.Westernpondturtlescouldalsobeinjuredorkilledifgasoline,oil,orothercontaminantsenterhabitat.LossofindividualsintheSandHillWindRepoweringProjectareacoulddiminishthelocalpopulationandlowerreproductivepotential,contributingtothefurtherdeclineofthespecies.Thelossofuplandnestingsitesoreggswouldalsodecreasethelocalpopulation.

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.4.2ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

Page 51: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐51 

March 2016ICF 00630.15

 

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

BIO‐1e:Retainabiologicalmonitorduringground‐disturbingactivitiesinenvironmentallysensitiveareas

BIO‐3a:Conductpreconstructionsurveysforhabitatforspecialstatuswildlifespecies

BIO‐6:Conductpreconstructionsurveysforwesternpondturtleandmonitorconstructionactivitiesifturtlesareobserved

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresBIO‐1b,BIO‐1e,BIO‐3a,andBIO‐6willensurethattheimpactsassociatedwiththepotentialdisturbanceormortalityofandlossofsuitablehabitatforwesternpondturtlewillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

ForthetextofMitigationMeasureBIO‐1b,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐1e:Retainabiologicalmonitorduringground‐disturbingactivitiesinenvironmentallysensitiveareas

ForthetextofMitigationMeasureBIO‐1e,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐3a:Conductpreconstructionsurveysforhabitatforspecialstatuswildlifespecies

ForthetextofMitigationMeasureBIO‐3a,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐6:Conductpreconstructionsurveysforwesternpondturtleandmonitorconstructionactivitiesifturtlesareobserved

IfitisdeterminedthroughpreconstructionsurveysconductedpursuanttoMitigationMeasureBIO‐3athatsuitableaquaticoruplandhabitatforwesternpondturtleispresentwithinproposedworkareas,thefollowingmeasures,consistentwithmeasuresdevelopedfortheEACCS,willbeimplementedtoensurethattheproposedprojectdoesnothaveasignificantimpactonwesternpondturtle.

Oneweekbeforeandwithin24hoursofbeginningworkinsuitableaquatichabitat,aqualifiedbiologist(onewhoisfamiliarwithdifferentspeciesofturtles)willconductsurveysforwesternpondturtle.Thesurveysshouldbetimedtocoincidewiththetimeofdayandyearwhenturtlesaremostlikelytobeactive(duringthecoolerpartofthedaybetween8a.m.and12p.m.duringspringandsummer).Priortoconductingthesurveys,thebiologistshouldlocatethemicrohabitatsforturtlebasking(logs,rocks,brushthickets)anddeterminealocationtoquietlyobserveturtles.Eachsurveyshouldincludea30‐minutewaittimeafterarrivingonsitetoallowstartledturtlestoreturntoopenbaskingareas.The

Page 52: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐52 

March 2016ICF 00630.15

 

surveyshouldconsistofaminimum15‐minuteobservationperiodforeachareawhereturtlescouldbeobserved.

Ifwesternpondturtlesareobservedduringeithersurvey,abiologicalmonitorwillbepresentduringconstructionactivitiesintheaquatichabitatwheretheturtlewasobserved.Thebiologicalmonitoralsowillbemindfulofsuitablenestingandoverwinteringareasinproximitytosuitableaquatichabitatandwillperiodicallyinspecttheseareasfornestsandturtles.

Ifoneormorewesternpondturtlesarefoundintheworkareaduringconstructionandcannotordonotmoveoffsiteontheirown,aqualifiedbiologistwillremoveandrelocatetheturtletoappropriateaquatichabitatoutsideandawayfromtheconstructionarea.RelocationofwesternpondturtlerequiresaletterfromCDFWauthorizingthisactivity.

RemainingImpacts:Anyremainingimpactassociatedwithpotentialdisturbanceormortalityofandlossofsuitablehabitatforwesternpondturtlewillbelessthansignificant.

ImpactBIO‐7:PotentialdisturbanceormortalityofandlossofsuitablehabitatforBlainville’shornedlizard,Alamedawhipsnake,andSanJoaquincoachwhip

PotentialImpact:ConstructionactivitiesintheprojectareacouldresultindirecteffectsonBlainville’shornedlizard,Alamedawhipsnake,andSanJoaquincoachwhiportheirhabitats(grassland,chaparral,oakwoodland,andscrub).Itisanticipatedthatthemajorityofconstructionactivitieswouldtakeplaceongrasslandhabitatalongridgelinesandthatlossofchaparral,oakwoodland,andscrubhabitatwouldbeminimal.Potentialdirectimpactsincludemortalityorinjurybyequipment,entrapmentinopentrenchesorotherprojectfacilities,andremovalordisturbanceofhabitat.Operationandmaintenanceactivities,suchasroadandfirebreakmaintenance,mayalsoresultininjuryormortalityofindividuals.Lossofindividualsintheprojectareacoulddiminishthelocalpopulationsofthesespeciesandlowerreproductivepotential,contributingtothefurtherdeclineofthesespecies.

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.4.2ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

BIO‐1e:Retainabiologicalmonitorduringground‐disturbingactivitiesinenvironmentallysensitiveareas

BIO‐3a:Conductpreconstructionsurveysforhabitatforspecialstatuswildlifespecies

BIO‐5c:Restoredisturbedannualgrasslands

BIO‐7a:Implementbestmanagementpracticestoavoidandminimizeeffectsonspecial‐statusreptiles

BIO‐7b:Compensateforlossofhabitatforspecial‐statusreptiles

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

Page 53: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐53 

March 2016ICF 00630.15

 

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresBIO‐1b,BIO‐1e,BIO‐3a,BIO‐5c,BIO‐7a,andBIO‐7bwillensurethattheimpactsassociatedwiththepotentialdisturbanceormortalityofandlossofsuitablehabitatforBlainville’shornedlizard,Alamedawhipsnake,andSanJoaquincoachwhipwillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

ForthetextofMitigationMeasureBIO‐1b,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐1e:Retainabiologicalmonitorduringground‐disturbingactivitiesinenvironmentallysensitiveareas

ForthetextofMitigationMeasureBIO‐1e,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐3a:Conductpreconstructionsurveysforhabitatforspecialstatuswildlifespecies

ForthetextofMitigationMeasureBIO‐3a,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐5c:Restoredisturbedannualgrasslands

ForthetextofMitigationMeasureBIO‐5c,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐7a:Implementbestmanagementpracticestoavoidandminimizeeffectsonspecial‐statusreptiles

ForthetextofMitigationMeasureBIO‐7a,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐7b:Compensateforlossofhabitatforspecial‐statusreptiles

Whereimpactsonhabitatforspecial‐statusreptilescannotbeavoidedorminimized,compensatorymitigationwillbeundertakeninaccordancewithmitigationratiosandrequirementsdevelopedundertheEACCS(AppendixC).IntheeventthatincidentaltakepermitsarerequiredforAlamedawhipsnake,compensatorymitigationwillbeundertakeninaccordancewiththetermsofpermitsinconsultationwithUSFWSandCDFW.

RemainingImpacts:AnyremainingimpactassociatedwithpotentialdisturbanceormortalityofandlossofsuitablehabitatforBlainville’shornedlizard,Alamedawhipsnake,andSanJoaquincoachwhipwillbelessthansignificant.

ImpactBIO‐8:Potentialconstruction‐relateddisturbanceormortalityofspecial‐statusandnon‐special‐statusmigratorybirds

PotentialImpact:Constructionactivitiesduringthenestingseason(generallyFebruary1–August31)ofwhite‐tailedkite,baldeagle,northernharrier,Swainson’shawk,goldeneagle,westernburrowingowl,loggerheadshrike,andtricoloredblackbirdcouldresultindirecteffectsonthesespecies,aswellasonnon–special‐statusmigratorybirds,iftheyarenestingintheprojectarea.Suitablenestinghabitatmaybepresentinnearlyalllandcovertypesintheprojectarea.Removalofgrassland,burrows,wetlandandmarshvegetation,andtreesorshrubswithactivenestsandconstructiondisturbanceduringthebreedingseasonmayresultinnestabandonmentandsubsequentlossofeggsoryoung.Exclusionofburrowingowlsfromtheirburrowsduringthenon‐

Page 54: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐54 

March 2016ICF 00630.15

 

nestingseasonaspartofeffortstoavoidorminimizesomeformsofdirecttakecouldresultinharmofburrowingowls.Suchlossescouldaffectthelocalpopulationofspecial‐statusandnon–special‐statusbirds.

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.4.2ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

BIO‐1e:Retainabiologicalmonitorduringground‐disturbingactivitiesinenvironmentallysensitiveareas

BIO‐3a:Conductpreconstructionsurveysforhabitatforspecialstatuswildlifespecies

BIO‐5c:Restoredisturbedannualgrasslands

BIO‐8a:Implementmeasurestoavoidandminimizepotentialimpactsonspecial‐statusandnon–special‐statusnestingbirds

BIO‐8b:Implementmeasurestoavoidandminimizepotentialimpactsonwesternburrowingowl

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresBIO‐1b,BIO‐1e,BIO‐3a,BIO‐5c,BIO‐8a,andBIO‐8bwillensurethattheimpactsassociatedwiththepotentialconstruction‐relateddisturbanceormortalityofspecialstatusandnon‐special‐statusmigratorybirdswillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

ForthetextofMitigationMeasureBIO‐1b,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐1e:Retainabiologicalmonitorduringground‐disturbingactivitiesinenvironmentallysensitiveareas

ForthetextofMitigationMeasureBIO‐1e,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐3a:Conductpreconstructionsurveysforhabitatforspecialstatuswildlifespecies

ForthetextofMitigationMeasureBIO‐3a,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐5c:Restoredisturbedannualgrasslands

ForthetextofMitigationMeasureBIO‐5c,pleaserefertothediscussionofImpactBIO‐19above.

Page 55: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐55 

March 2016ICF 00630.15

 

BIO‐8a:Implementmeasurestoavoidandminimizepotentialimpactsonspecial‐statusandnon–special‐statusnestingbirds

ForthetextofMitigationMeasureBIO‐8a,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐8b:Implementmeasurestoavoidandminimizepotentialimpactsonwesternburrowingowl

ForthetextofMitigationMeasureBIO‐8b,pleaserefertothediscussionofImpactBIO‐19above.

RemainingImpacts:Anyremainingimpactassociatedwithconstruction‐relateddisturbanceormortalityofspecialstatusandnon‐special‐statusmigratorybirdswillbelessthansignificant.

ImpactBIO‐9:Permanentandtemporarylossofoccupiedhabitatforwesternburrowingowlandforaginghabitatfortricoloredblackbirdandotherspecial‐statusandnon–special‐statusbirds

PotentialImpact:ImplementationoftheSandHillWindRepoweringProjectwouldresultinthetemporaryandpermanentlossofgrasslandthatprovidessuitableforaginghabitatforburrowingowlandanumberofotherspecial‐statusandnon–special‐statusmigratorybirds.BecauseofthelimiteduseoftheproposedprojectareabySwainson’shawksforforaging,nocompensationisproposedforthelossofforaginghabitatforSwainson’shawk.Thelossofgrasslandforaginghabitatforspecial‐statusandnon–special‐statusbirdswouldbecompensatedthroughimplementationofMitigationMeasureBIO‐5b(forspecial‐statusamphibians)and/orthroughthestandardizedmitigationratiosfornonlistedspeciesdevelopedfortheEACCS(AppendixCofthePEIR).

CDFWhasdeterminedthatcompensationisrequiredforpermanentlossofoccupiedburrowingowlhabitat(i.e.,whereburrowingowlshavebeendocumentedtooccupyburrowsinthepreceding3years).

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.4.2ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

BIO‐5b:Compensateforthelossofhabitatforspecial‐statusamphibians

BIO‐5c:Restoredisturbedannualgrasslands

BIO‐9:Compensateforthepermanentlossofoccupiedhabitatforwesternburrowingowl

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresBIO‐5b,BIO‐5c,andBIO‐9willensurethattheimpactsassociatedwiththepotentialforpermanentandtemporarylossofoccupiedhabitatforwesternburrowingowlandforaginghabitatfortricoloredblackbirdandotherspecial‐statusandnon–special‐statusbirdswillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

BIO‐5b:Compensateforthelossofhabitatforspecial‐statusamphibians

ForthetextofMitigationMeasureBIO‐5b,pleaserefertothediscussionofImpactBIO‐5above.

Page 56: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐56 

March 2016ICF 00630.15

 

BIO‐5c:Restoredisturbedannualgrasslands

ForthetextofMitigationMeasureBIO‐5c,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐9:Compensateforthepermanentlossofoccupiedhabitatforwesternburrowingowl

Ifconstructionactivitieswouldresultintheremovalofoccupiedburrowingowlhabitat(determinedduringpreconstructionsurveysdescribedinMitigationMeasureBIO‐8a),thishabitatlosswillbemitigatedbypermanentlyprotectingmitigationlandthroughaconservationeasementorbyimplementingalternativemitigationdeterminedthroughconsultationwithCDFWasdescribedinitsStaffReportonBurrowingOwlMitigation(CaliforniaDepartmentofFishandGame2012:11–13).TheprojectproponentwillworkwithCDFWtodevelopthecompensationplan,whichwillbesubjecttoCountyreviewandapproval.

RemainingImpacts:Anyremainingimpactassociatedwithpermanentandtemporarylossofoccupiedhabitatforwesternburrowingowlandforaginghabitatfortricoloredblackbirdandotherspecial‐statusandnon–special‐statusbirdswillbelessthansignificant.

ImpactBIO‐10:PotentialinjuryormortalityofandlossofhabitatforSanJoaquinkitfoxandAmericanbadger

PotentialImpact:ConstructionactivitiesintheSandHillWindRepoweringProjectareacouldresultindirecteffectsonSanJoaquinkitfoxandAmericanbadgerortheirgrasslandhabitat.Inadditiontothepermanentandtemporaryremovalofhabitat,otherpotentialdirectimpactsincludemortalityorinjuryofindividualsfromconstructionvehiclesorheavyequipment,directmortalityorinjuryofindividualsfromdencollapseandsubsequentsuffocation,temporarydisturbancefromnoiseandhumanpresenceassociatedwithconstructionactivities,andharassmentofindividualsbyconstructionpersonnel.Additionally,exposedpipes,largeexcavatedholes,ortrenchesthatareleftopenafterconstructionhasfinishedforthedaycouldentrapSanJoaquinkitfoxesorAmericanbadgers.Operationandmaintenanceactivities,suchasroadandfirebreakmaintenance,mayalsoresultininjuryormortalityofindividuals.Lossofindividualsintheproposedprojectareacoulddiminishthelocalpopulationsofthesespeciesandreducereproductivepotential,contributingtothefurtherdeclineofthesespecies.

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.4.2ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

BIO‐1e:Retainabiologicalmonitorduringground‐disturbingactivitiesinenvironmentallysensitiveareas

BIO‐3a:Conductpreconstructionsurveysforhabitatforspecialstatuswildlifespecies

BIO‐5c:Restoredisturbedannualgrasslands

BIO‐10a:ImplementmeasurestoavoidandminimizepotentialimpactsonSanJoaquinkitfoxandAmericanbadger

Page 57: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐57 

March 2016ICF 00630.15

 

BIO‐10b:CompensateforlossofsuitablehabitatforSanJoaquinkitfoxandAmericanbadger

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresBIO‐1b,BIO‐1e,BIO‐3a,BIO‐5c,BIO‐10a,andBIO‐10bwillensurethattheimpactsassociatedwiththepotentialforinjuryormortalityofandlossofhabitatforSanJoaquinkitfoxandAmericanbadgerwillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

ForthetextofMitigationMeasureBIO‐1b,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐1e:Retainabiologicalmonitorduringground‐disturbingactivitiesinenvironmentallysensitiveareas

ForthetextofMitigationMeasureBIO‐1e,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐3a:Conductpreconstructionsurveysforhabitatforspecialstatuswildlifespecies

ForthetextofMitigationMeasureBIO‐3a,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐5c:Restoredisturbedannualgrasslands

ForthetextofMitigationMeasureBIO‐5c,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐10a:ImplementmeasurestoavoidandminimizepotentialimpactsonSanJoaquinkitfoxandAmericanbadger

ForthetextofMitigationMeasureBIO‐10a,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐10b:CompensateforlossofsuitablehabitatforSanJoaquinkitfoxandAmericanbadger

ForthetextofMitigationMeasureBIO‐10b,pleaserefertothediscussionofImpactBIO‐9above.

RemainingImpacts:AnyremainingimpactassociatedwithpotentialinjuryormortalityofandlossofhabitatforSanJoaquinkitfoxandAmericanbadgerwillbelessthansignificant.

ImpactBIO‐12:Potentialmortalityordisturbanceofbatsfromroostremovalordisturbance

PotentialImpact:Severalspeciesofbothcommon(Myotisspp.)andspecial‐status(westernredbat,pallidbat,Townsend’sbig‐earedbat)batsareknowntooccurorcouldoccurinoraroundtheSandHillWindRepoweringProjectarea,andcouldusetheareaforforaging,dispersal,andmigration.Batsmayuserockoutcrops,trees,buildings,bridges,andotherstructuresintheproposedprojectareaasmaternityormigratorystopoverroosts.Permanentwaterbodiesandstocktanksinandadjacenttotheproposedprojectareaprovidesourcesoffreshwaterforbothresidentandmigratorybats.

Page 58: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐58 

March 2016ICF 00630.15

 

Constructionanddecommissioningofturbinescouldresultindisturbanceorlossofactivebatrooststhroughincreasedtraffic,noise,lighting,andhumanaccess.Removalordisturbanceoftrees,rockoutcrops,debrispiles,outbuildings,orotherartificialstructurescouldresultinremovalofroosthabitatandmortalityofbatsusingthestructureasaroost.Severalspeciesofbataresensitivetodisturbanceandmayabandonflightlessyoung,ortheymaysimplynotreturntotheroostoncedisturbed,resultinginthelossofthatroostashabitatforthelocalpopulation.Becausesomebatsroostcolonially,removalofspecial‐statusspecies’rooststructuresinaroost‐limitedhabitatcouldresultinthelossofasignificantportionofthelocalbatpopulation.

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.4.2ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

BIO‐3a:Conductpreconstructionsurveysforhabitatforspecialstatuswildlifespecies

BIO‐12a:Conductbatroostsurveys

BIO‐12b:Avoidremovingordisturbingbatroosts

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresBIO‐1b,BIO‐3a,BIO‐12a,andBIO‐12bwillensurethattheimpactsassociatedwiththepotentialformortalityordisturbanceofbatsfromroostremovalordisturbancewillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

ForthetextofMitigationMeasureBIO‐1b,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐3a:Conductpreconstructionsurveysforhabitatforspecial‐statuswildlifespecies

ForthetextofMitigationMeasureBIO‐3a,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐12a:Conductbatroostsurveys

ForthetextofMitigationMeasureBIO‐12a,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐12b:Avoidremovingordisturbingbatroosts

ForthetextofMitigationMeasureBIO‐12a,pleaserefertothediscussionofImpactBIO‐19above.

RemainingImpacts:Anyremainingimpactassociatedwithpotentialmortalityordisturbanceofbatsfromroostremovalordisturbancewillbelessthansignificant.

Page 59: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐59 

March 2016ICF 00630.15

 

ImpactBIO‐15:Potentialforroadinfrastructureupgradestoresultinadverseeffectsonalkalimeadow

PotentialImpact:Roadinfrastructureupgradeswouldincludegrading,widening,andregravellingofexistingroadsandconstructionofnewroadstoaccommodatedecommissionandrepoweringactivities.Culvertswouldbeupgradedforexistingroads,andnewculvertswouldbeinstalledfornewroads.Directeffectswouldconsistoffillofalkalimeadowatlocationswhereroadscrossingthehabitatwouldbewidened.Indirecteffectscouldinvolvealteredhydrologyorrunoffofsedimentandothersubstancesduringroadconstructionactivities.Someeffects,suchasthoseduetorunoff,wouldbeavoidedandminimizedthroughimplementationoferosioncontrolBMPsandpostconstructionreclamation.Installationofnewandupgradedculvertswouldmaintainexistinghydrology.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinSection3.4.2ofthePEIR,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

BIO‐15:Compensateforthelossofalkalimeadowhabitat

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureBIO‐15willensurethattheimpactsassociatedwiththepotentialforroadinfrastructureupgradestoresultinadverseeffectsonalkalimeadowwillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

BIO‐15:Compensateforthelossofalkalimeadowhabitat

Ifalkalimeadowhabitatisfilledordisturbedaspartofarepoweringproject,theprojectproponentwillcompensateforthelossofthishabitattoensurenonetlossofhabitatfunctionsandvalues.Compensationratioswillbebasedonsite‐specificinformationanddeterminedthroughcoordinationwithstateandfederalagencies(CDFW,USFWS,USACE).Unlessspecifiedotherwisebyaresourceagency,thecompensationwillbeataminimum1:1ratio(1acrerestoredorcreatedforevery1acrefilled)andmaybeacombinationofonsiterestoration/creation,offsiterestoration,andmitigationcredits.Arestorationandmonitoringplanwillbedevelopedandimplemented.Theplanwilldescribehowalkalimeadowhabitatwillbecreatedandmonitored.

RemainingImpacts:Anyremainingimpactassociatedwiththepotentialforroadinfrastructureupgradestoresultinadverseeffectsonalkalimeadowwillbelessthansignificant.

ImpactBIO‐16:Potentialforroadinfrastructureupgradestoresultinadverseeffectsonriparianhabitat

PotentialImpact:Roadinfrastructureupgradeswouldincludegrading,widening,andregravellingofexistingroadsandconstructionofnewroadstoaccommodatedecommissionandrepoweringactivities.Culvertswouldbeupgradedforexistingroads,andnewculvertswouldbeinstalledfornewroads.Lossofriparianhabitatasaresultofdirectfillwouldbeasubstantialadverseeffectonasensitivenaturalcommunity.

Page 60: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐60 

March 2016ICF 00630.15

 

MitigationMeasure:Thefollowingmitigationmeasure,discussedinSection3.4.2ofthePEIR,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

BIO‐16:Compensateforthelossofriparianhabitat

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureBIO‐16willensurethattheimpactsassociatedwiththepotentialforroadinfrastructureupgradestoresultinadverseeffectsonriparianhabitatwillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

BIO‐16:Compensateforthelossofriparianhabitat

Ifriparianhabitatisfilledorremovedaspartofaproject,theprojectproponentwillcompensateforthelossofriparianhabitattoensurenonetlossofhabitatfunctionsandvalues.Compensationratioswillbebasedonsite‐specificinformationanddeterminedthroughcoordinationwithstateandfederalagencies(CDFW,USFWS,USACE).Thecompensationwillbeataminimum1:1ratio(1acrerestoredorcreatedforevery1acrefilled)andmaybeacombinationofonsiterestoration/creation,offsiterestoration,andmitigationcredits.Arestorationandmonitoringplanwillbedevelopedandimplemented.Theplanwilldescribehowriparianhabitatwillbecreatedandmonitored.

RemainingImpacts:Anyremainingimpactassociatedwiththepotentialforroadinfrastructureupgradestoresultinadverseeffectsonriparianhabitatwillbelessthansignificant.

ImpactBIO‐18:Potentialforroadinfrastructureupgradestoresultinadverseeffectsonwetlands

PotentialImpact:Roadinfrastructureupgradeswouldincludegrading,widening,andregravellingoftheexistingroadsandconstructionofnewroads.Culvertswouldbeupgradedforexistingroads,andnewculvertswouldbeinstalledfornewroads.Directeffectswouldincludefillofwetlandsatlocationswhereroadscrossingthehabitatwouldbewidened.Indirecteffectscouldincludealteredhydrologyorrunoffofsedimentandothersubstancesduringroadconstructionactivities.Someeffects,suchasthoseduetorunoff,wouldbeavoidedandminimizedthroughtheimplementationoferosioncontrolBMPsandpostconstructionreclamation.Installationofnewandupgradedculvertswouldmaintainexistinghydrology.Thelossofwetlandsasaresultofdirectfillwouldbeasubstantialadverseeffectonasensitivenaturalcommunity.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinSection3.4.2ofthePEIR,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

BIO‐18:Compensateforthelossofwetlands

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureBIO‐18willensurethattheimpactsassociatedwiththepotentialforroadinfrastructure

Page 61: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐61 

March 2016ICF 00630.15

 

upgradestoresultinadverseeffectsonwetlandswillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

BIO‐18:Compensateforthelossofwetlands

Ifwetlandsarefilledordisturbedaspartofaproject,theprojectproponentwillcompensateforthelosstoensurenonetlossofhabitatfunctionsandvalues.Compensationratioswillbebasedonsite‐specificinformationanddeterminedthroughcoordinationwithstateandfederalagencies(CDFW,USFWS,USACE).Thecompensationwillbeataminimum1:1ratio(1acrerestoredorcreatedforevery1acrefilled)andmaybeacombinationofonsiterestoration/creation,offsiterestoration,andmitigationcredits.Arestorationandmonitoringplanwillbedevelopedandimplemented.Theplanwilldescribehowwetlandswillbecreatedandmonitored.

RemainingImpacts:Anyremainingimpactassociatedwiththepotentialforroadinfrastructureupgradestoresultinadverseeffectsonwetlandswillbelessthansignificant.

ImpactBIO‐20:Conflictwithlocalplansorpolicies

PotentialImpact:TheECAPencouragesthepreservationofareasknowntosupportspecial‐statusspecies,nonetlossofriparianandseasonalwetlands,andprotectionofexistingriparianwoodlandhabitat.Additionally,theECAPhasseveralpoliciesrelatedtowindfarms,includingestablishingamitigationprogramtominimizetheimpactsofwindturbineoperationsonbirdpopulations.Lossofspecial‐statusspeciesandtheirhabitat,lossofalkalimeadow,lossofriparianhabitat,andlossofexistingwetlandsasaresultofimplementingtheprogramwouldbeinconflictwiththesepolicies.

ThemitigationmeasuresfortheimpactsofwindturbineoperationsonbirdpopulationsfromtheproposedprogramareconsistentwiththeestablishmentofamitigationprogramrecommendedbytheECAP.

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.4.2ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

BIO‐1a:Conductsurveystodeterminethepresenceorabsenceofspecial‐statusspecies

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

BIO‐1c:Avoidandminimizeimpactsonspecial‐statusplantspeciesbyestablishingactivityexclusionzones

BIO‐1d:Compensateforimpactsonspecial‐statusplantspecies

BIO‐1e:Retainabiologicalmonitorduringground‐disturbingactivitiesinenvironmentallysensitiveareas

BIO‐3a:Implementmeasurestoavoid,minimize,andmitigateimpactsonvernalpoolbranchiopodsandcurved‐footedhygrotusdivingbeetle

Page 62: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐62 

March 2016ICF 00630.15

 

BIO‐4a:Implementmeasurestoavoidorprotecthabitatforvalleyelderberrylonghornbeetle

BIO‐4b:Compensatefordirectandindirecteffectsonvalleyelderberrylonghornbeetle

BIO‐5a:Implementbestmanagementpracticestoavoidandminimizeeffectsonspecial‐statusamphibians

BIO‐5b:Compensateforlossofhabitatforspecial‐statusamphibians

BIO‐5c:Restoredisturbedannualgrasslands

BIO‐7a:Implementbestmanagementpracticestoavoidandminimizeeffectsonspecial‐statusreptiles

BIO‐7b:Compensateforlossofhabitatforspecial‐statusreptiles

BIO‐8a:Implementmeasurestoavoidandminimizepotentialimpactsonspecial‐statusandnon‐special‐statusnestingbirds

BIO‐8b:Implementmeasurestoavoidandminimizepotentialimpactsonwesternburrowingowl

BIO‐9:Compensateforthepermanentlossofforaginghabitatforwesternburrowingowl

BIO‐10a:ImplementmeasurestoavoidandminimizepotentialimpactsonSanJoaquinkitfoxandAmericanbadger

BIO‐10b:CompensateforlossofsuitablehabitatforSanJoaquinkitfoxandAmericanbadger

BIO‐15:Compensateforthelossofalkalimeadowhabitat

BIO‐16:Compensateforthelossofriparianhabitat

BIO‐18:Compensateforthelossofwetlands

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresBIO‐1a,BIO‐1b,BIO‐1c,BIO‐1d,BIO‐1e,BIO‐3a,BIO‐4a,BIO‐4b,BIO‐5a,BIO‐5b,BIO‐5c,BIO‐7a,BIO‐7b,BIO‐8a,BIO‐8b,BIO‐9,BIO‐10a,BIO‐10b,BIO‐15,BIO‐16,andBIO‐18willensurethattheimpactsassociatedwithconflictwithlocalplansorpolicieswillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

BIO‐1a:Conductsurveystodeterminethepresenceorabsenceofspecial‐statusspecies

ForthetextofMitigationMeasureBIO‐1a,pleaserefertothediscussionofImpactBIO‐1above.

Page 63: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐63 

March 2016ICF 00630.15

 

BIO‐1b:Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies

ForthetextofMitigationMeasureBIO‐1b,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐1c:Avoidandminimizeimpactsonspecial‐statusplantspeciesbyestablishingactivityexclusionzones

ForthetextofMitigationMeasureBIO‐1c,pleaserefertothediscussionofImpactBIO‐1above.

BIO‐1d:Compensateforimpactsonspecial‐statusplantspecies

ForthetextofMitigationMeasureBIO‐1d,pleaserefertothediscussionofImpactBIO‐1above.

BIO‐1e:Retainabiologicalmonitorduringground‐disturbingactivitiesinenvironmentallysensitiveareas

ForthetextofMitigationMeasureBIO‐1e,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐3a:Implementmeasurestoavoid,minimize,andmitigateimpactsonvernalpoolbranchiopodsandcurved‐footedhygrotusdivingbeetle

ForthetextofMitigationMeasureBIO‐3a,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐4a:Implementmeasurestoavoidorprotecthabitatforvalleyelderberrylonghornbeetle

ForthetextofMitigationMeasureBIO‐4a,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐4b:Compensatefordirectandindirecteffectsonvalleyelderberrylonghornbeetle

IfelderberryshrubscannotbeavoidedandprotectedasoutlinedinMitigationMeasure4a,theprojectproponentwillobtainanincidentaltakepermitfromUSFWS.

IfelderberryshrubscannotbeavoidedandprotectedasoutlinedinMitigationMeasure4a,theproject

BIO‐5a:Implementbestmanagementpracticestoavoidandminimizeeffectsonspecial‐statusamphibians

ForthetextofMitigationMeasureBIO‐5a,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐5b:Compensateforlossofhabitatforspecial‐statusamphibians

ForthetextofMitigationMeasureBIO‐5b,pleaserefertothediscussionofImpactBIO‐5above.

BIO‐5c:Restoredisturbedannualgrasslands

ForthetextofMitigationMeasureBIO‐5c,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐7a:Implementbestmanagementpracticestoavoidandminimizeeffectsonspecial‐statusreptiles

Page 64: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐64 

March 2016ICF 00630.15

 

ForthetextofMitigationMeasureBIO‐7a,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐7b:Compensateforlossofhabitatforspecial‐statusreptiles

ForthetextofMitigationMeasureBIO‐7b,pleaserefertothediscussionofImpactBIO‐7above.

BIO‐8a:Implementmeasurestoavoidandminimizepotentialimpactsonspecial‐statusandnon‐special‐statusnestingbirds

ForthetextofMitigationMeasureBIO‐8a,pleaserefertothediscussionofImpactBIO‐191above.

BIO‐8b:Implementmeasurestoavoidandminimizepotentialimpactsonwesternburrowingowl

ForthetextofMitigationMeasureBIO‐8b,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐9:Compensateforthepermanentlossofforaginghabitatforwesternburrowingowl

ForthetextofMitigationMeasureBIO‐9,pleaserefertothediscussionofImpactBIO‐9above.

BIO‐10a:ImplementmeasurestoavoidandminimizepotentialimpactsonSanJoaquinkitfoxandAmericanbadger

ForthetextofMitigationMeasureBIO‐10a,pleaserefertothediscussionofImpactBIO‐19above.

BIO‐10b:CompensateforlossofsuitablehabitatforSanJoaquinkitfoxandAmericanbadger

ForthetextofMitigationMeasureBIO‐10b,pleaserefertothediscussionofImpactBIO‐9above.

BIO‐15:Compensateforthelossofalkalimeadowhabitat

ForthetextofMitigationMeasureBIO‐15,pleaserefertothediscussionofImpactBIO‐15above.

BIO‐16:Compensateforthelossofriparianhabitat

ForthetextofMitigationMeasureBIO‐16,pleaserefertothediscussionofImpactBIO‐16above.

BIO‐18:Compensateforthelossofwetlands

ForthetextofMitigationMeasureBIO‐18,pleaserefertothediscussionofImpactBIO‐18above.

RemainingImpacts:Anyremainingimpactassociatedwithconflictwithlocalplansorpolicieswillbelessthansignificant.

Page 65: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐65 

March 2016ICF 00630.15

 

Cultural Resources  

ImpactCUL‐2:Causeasubstantialadversechangeinthesignificanceofanarchaeologicalresource

PotentialImpact:ArchaeologicalresourcesarepresentwithintheSandHillWindRepoweringProjectarea.Giventhelargesizeoftheprojectarea,themoderatetohighsensitivityforburiedsites,thereisapossibilityofencounteringanddamagingpreviouslyunrecordedarchaeologicalresourcesduringground‐disturbingactivities.

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.5.2ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

CUL‐2a:Conductapreconstructionculturalfieldsurveyandculturalresourcesinventoryandevaluation

CUL‐2b:Developatreatmentplanforanyidentifiedsignificantculturalresources

CUL‐2c:Conductworkerawarenesstrainingforarchaeologicalresourcespriortoconstruction

CUL‐2d:Stopworkifculturalresourcesareencounteredduringground‐disturbingactivities

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresCUL‐2a,CUL‐2b,CUL‐2c,andCUL‐2dwillensurethattheimpactswiththepotentialtocauseasubstantialadversechangeinthesignificanceofanarchaeologicalresourcewillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

CUL‐2a:Conductapreconstructionculturalfieldsurveyandculturalresourcesinventoryandevaluation

AlamedaCountywillrequireapplicantstoretainqualifiedpersonneltoconductanarchaeologicalfieldsurveyoftheprogramareatodeterminewhethersignificantresourcesexistwithintheprogramarea.Theinventoryandevaluationwillincludethedocumentationandresultoftheseefforts,theevaluationofanyculturalresourcesidentifiedduringthesurvey,andculturalresourcesmonitoring,ifthesurveyidentifiesthatitisnecessary.

CUL‐2b:Developatreatmentplanforanyidentifiedsignificantculturalresources

Ifanysignificantresourcesareidentifiedthroughthepreconstructionsurvey,atreatmentplanthatcouldincludesiteavoidance,capping,ordatarecoverywillbedevelopedandimplemented.

Page 66: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐66 

March 2016ICF 00630.15

 

CUL‐2c:Conductworkerawarenesstrainingforarchaeologicalresourcespriortoconstruction

Priortotheinitiationofanysitepreparationand/orthestartofconstruction,theprojectapplicantwillensurethatallconstructionworkersreceivetrainingoverseenbyaqualifiedprofessionalarchaeologistwhoisexperiencedinteachingnonspecialists,toensurethatforepersonsandfieldsupervisorscanrecognizearchaeologicalresources(e.g.,areasofshellfishremains,chippedstoneorgroundstone,historicdebris,buildingfoundations,humanbone)intheeventthatanyarediscoveredduringconstruction.

CUL‐2d:Stopworkifculturalresourcesareencounteredduringground‐disturbingactivities

Theprojectapplicantwillensurethatconstructionspecificationsincludeastop‐workorderifprehistoricorhistoric‐eraculturalresourcesareunearthedduringground‐disturbingactivities.Ifsuchresourcesareencountered,theprojectapplicantwillimmediatelyhaltallactivitywithin100feetofthefinduntilaqualifiedarchaeologistcanassessthesignificanceofthefind.Prehistoricmaterialsmightincludeobsidianandchertflaked‐stonetools(e.g.,projectilepoints,knives,scrapers)ortool‐makingdebris;culturallydarkenedsoil(“midden”)containingheat‐affectedrocksandartifacts;stonemillingequipment(e.g.,mortars,pestles,handstones,ormillingslabs);andbattered‐stonetools,suchashammerstonesandpittedstones.Historic‐periodmaterialsmightincludestone,concrete,oradobefootingsandwalls;filledwellsorprivies;anddepositsofmetal,glass,and/orceramicrefuse.Ifthefindisdeterminedtobepotentiallysignificant,thearchaeologist,inconsultationwiththeNativeAmericanrepresentative(ifappropriate),willdevelopatreatmentplanthatcouldincludesiteavoidance,capping,ordatarecovery.

RemainingImpacts:Anyremainingimpactassociatedwithasubstantialadversechangeinthesignificanceofanarchaeologicalresourcewillbelessthansignificant.

ImpactCUL‐3:Disturbanyhumanremains,includingthoseinterredoutsideofformalcemeteries

PotentialImpact:AlthoughthereisnoindicationthattheSandHillWindRepoweringProjectareahasbeenusedforhumanburials,becauseprehistoricsitesareknowntobepresentintheproposedprojectarea,thepossibilitycannotbediscountedentirely.Althoughthepossibilityisunlikely,humanremainscouldbediscoveredduringground‐disturbingactivities.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinSection3.5.2ofthePEIR,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

CUL‐3:Stopworkifhumanremainsareencounteredduringground‐disturbingactivities

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureCUL‐3willensurethattheimpactswiththepotentialtodisturbhumanremainswillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

Page 67: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐67 

March 2016ICF 00630.15

 

CUL‐3:Stopworkifhumanremainsareencounteredduringground‐disturbingactivities

Theprojectapplicantwillensuretheconstructionspecificationsincludeastop‐workorderifhumanremainsarediscoveredduringconstructionordemolition.Therewillbenofurtherexcavationordisturbanceofthesitewithina100‐footradiusofthelocationofsuchdiscovery,oranynearbyareareasonablysuspectedtooverlieadjacentremains.TheAlamedaCountyCoronerwillbenotifiedandwillmakeadeterminationastowhethertheremainsareNativeAmerican.IftheCoronerdeterminesthattheremainsarenotsubjecttohisauthority,hewillnotifytheNativeAmericanHeritageCommission,whowillattempttoidentifydescendantsofthedeceasedNativeAmerican.Ifnosatisfactoryagreementcanbereachedastothedispositionoftheremainspursuanttothisstatelaw,thenthelandownerwillre‐interthehumanremainsanditemsassociatedwithNativeAmericanburialsonthepropertyinalocationnotsubjecttofurthersubsurfacedisturbance.AfinalreportwillbesubmittedtoAlamedaCounty.Thisreportwillcontainadescriptionofthemitigationprogramanditsresults,includingadescriptionofthemonitoringandtestingresourcesanalysismethodologyandconclusionsandadescriptionofthedisposition/curationoftheresources.

RemainingImpacts::Anyremainingimpactassociatedwithdisturbanceofhumanremainswillbelessthansignificant.

Geology, Soils, Mineral Resources, and Paleontological Resources  

ImpactGEO‐1:Exposepeopleorstructurestopotentialsubstantialadverseeffects,includingtheriskofloss,injury,ordeath,asaresultofruptureofaknownearthquakefault

PotentialImpact:Placementofaturbineorpowercollectionsystemonornearafaultcouldresultindamageordestructionoftheturbine.Ifaturbinewereconstructedonornearafault,ruptureofthatfaultcoulddamageaturbineorcauseharmtopersonnelonthesite.Theturbinecouldbedamagedorcollapseandpossiblyinjurepersonnelorpropertyintheimmediatearea.Twoactivefaults,twoofwhicharezonedundertheAlquist‐PrioloAct,arepresentintheprogramarea.Inaddition,athird,theMidwayfault,thoughdesignatedonlyaspotentiallyactive,alsooccursintheprogramarea.

AportionoftheSandHillWindRepoweringProjectareaoverliesasegmentoftheMidwayFaultzonedesignatedasLateQuaternaryFaultDisplacement(duringpast700,000years).AsdiscussedunderImpactGEO‐1a‐1andGEO‐1a‐2ofthePEIR,ifaturbinewereconstructedonornearafault,ruptureofthatfaultcoulddamageaturbineorcauseharmtopersonnelonthesite.Theturbinecouldbedamagedorcollapseandpossiblyinjurepersonnelorpropertyintheimmediatearea.Iftheturbinefoundationandpowercollectionsystemdesignandconstructionwerenotbasedonrigorous,detailed,site‐specificgeotechnicalinvestigation,thefoundationorcollectionsystemcouldbelocatedonornearafaulttracethatrupturesandcausesdamagetoorcollapseoftheturbineorcollectionsystem.

MitigationMeasures:Thefollowingmitigationmeasure,discussedinthePEIRinSection3.6,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

Page 68: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐68 

March 2016ICF 00630.15

 

GEO‐1:Conductsite‐specificgeotechnicalinvestigationandimplementdesignrecommendationsinsubsequentgeotechnicalreport

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureGEO‐1willensurethattheimpactswiththepotentialtoexposepeopleorstructurestopotentialsubstantialadverseeffects,includingtheriskofloss,injury,ordeath,asaresultofruptureofaknownearthquakefaultwillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

GEO‐1:Conductsite‐specificgeotechnicalinvestigationandimplementdesignrecommendationsinsubsequentgeotechnicalreport

Priortoconstructionactivitiesatanysite,theprojectproponentwillretainageotechnicalfirmwithlocalexpertiseingeotechnicalinvestigationanddesigntoprepareasite‐specificgeotechnicalreport.ThisreportwillbepreparedbyalicensedgeotechnicalengineerorengineeringgeologistandwillbesubmittedtotheCountybuildingdepartmentaspartoftheapprovalprocess.Thisreportwillbebasedondatacollectedfromsubsurfaceexploration,laboratorytestingofsamples,andsurfacemappingandwilladdressthefollowingissues.

Potentialforsurfacefaultruptureandturbinesitelocation:ThegeotechnicalreportwillinvestigatetheGreenville,CorralHollow‐Carnegie,andtheMidwayfaults(asappropriatetothelocation)anddeterminewhethertheyposeariskofsurfacerupture.Turbinefoundationsandpowercollectionsystemswillbesitedaccordingtorecommendationsinthisreport.

Stronggroundshaking:Thegeotechnicalreportwillanalyzethepotentialforstronggroundshakinginprojectareaandprovideturbinefoundationdesignrecommendations,aswellasrecommendationsforpowercollectionsystems.

Slopefailure:Thegeotechnicalreportwillinvestigatethepotentialforslopefailure(bothseismicallyandnonseismicallyinduced)anddevelopsite‐specificturbinefoundationandpowercollectionsystemplansengineeredfortheterrain,rockandsoiltypes,andotherconditionspresentattheprogramareainordertoprovidelong‐termstability.

Expansivesoils:Thegeotechnicalreportwillassessthesoiltypesintheprogramareaanddeterminethebestengineeringdesignstoaccommodatethesoilconditions.

Unstablecutorfillslopes:Thegeotechnicalreportwilladdressgeologichazardsrelatedtothepotentialforgradingtocreateunstablecutorfillslopesandmakesite‐specificrecommendationsrelatedtodesignandengineering.

RemainingImpacts:Anyremainingimpactassociatedwiththeexposureofpeopleorstructurestopotentialsubstantialadverseeffectswillbelessthansignificant.

ImpactGEO‐2:Exposepeopleorstructurestopotentialsubstantialadverseeffects,includingtheriskofloss,injury,ordeath,asaresultofstrongseismicgroundshaking

PotentialImpact:Constructionofturbinesorpowercollectionsystemsinareaswithpotentialtoexperiencestronggroundshakingcouldexposepeopleorstructurestopotentialsubstantialadverseeffects.Ifturbinefoundationswerenotproperlydesignedtowithstandtheappropriate

Page 69: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐69 

March 2016ICF 00630.15

 

levelofgroundshaking,theycouldfailandcausedamagetoorcollapseoftheturbinetowers.Thisdamageorcollapsecouldcauseharmtopersonnelorpropertyintheimmediatearea.

Theprogramareaisinaseismicallyactivearea,withthepotentialformoderatelystronggroundshakingfromsourcessuchastheGreenvillefaultandtheCalaverasfault.BoththeStateofCaliforniaandAlamedaCountyhavestringentbuildingsafetyrequirements,andallconstructionwouldhavetocomplywiththeCaliforniaBuildingStandardsCode.However,thismaynotaddressallseismic‐relatedsafetyissues.Iftheturbinefoundationandpowercollectionsystemdesignandconstructionwerenotbasedonrigorous,detailed,site‐specificgeotechnicalinvestigation,thefoundationorcollectionsystemcouldfailduringstronggroundshakingandcausedamagetoorcollapseoftheturbineorcollectionsystem.

MitigationMeasures:Thefollowingmitigationmeasure,discussedinSection3.6.2ofthePEIR,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

GEO‐1:Conductsite‐specificgeotechnicalinvestigationandimplementdesignrecommendationsinsubsequentgeotechnicalreport

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureGEO‐1willensurethattheimpactswiththepotentialtoexposepeopleorstructurestopotentialsubstantialadverseeffects,includingtheriskofloss,injury,ordeath,asaresultofstrongseismicgroundshakingwillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

GEO‐1:Conductsite‐specificgeotechnicalinvestigationandimplementdesignrecommendationsinsubsequentgeotechnicalreport

ForthetextofMitigationMeasureGEO‐1,pleaserefertothediscussionofImpactGEO‐1above.

RemainingImpacts:Anyremainingimpactassociatedwiththeexposureofpeopleorstructurestopotentialsubstantialadverseeffectswillbelessthansignificant.

ImpactGEO‐3:Exposepeopleorstructurestopotentialsubstantialadverseeffects,includingtheriskofloss,injury,ordeath,asaresultofseismic‐relatedgroundfailure,includinglandslidingandliquefaction

PotentialImpact:Constructionofturbinesorpowercollectionsystemsinareaswithpotentialtoexperienceseismic‐relatedgroundfailure,suchaslandsliding,liquefaction,lateralspread,anddifferentialsettlement,couldexposepeopleorstructurestopotentialsubstantialadverseeffects.Ifturbinefoundationsorpowercollectionsystemswerenotproperlydesignedandsitedfortheearthquake‐inducedgroundfailureconditionspresentattheprogramarea,theycouldfailandcausedamagetoorcollapseoftheturbinetowersorcollectionsystem.Thisdamageorcollapsecouldcauseharmtopersonnelorpropertyintheimmediatearea.

Theprogramareaisknowntobesusceptibletoearthquake‐inducedlandslidingandthesouthwesternportionoftheprogramareaisinastate‐designatedearthquake‐inducedlandslidehazardzone.Inaddition,althoughthepotentialforliquefactionislikelylowbecauseofthedepthto

Page 70: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐70 

March 2016ICF 00630.15

 

groundwaterandtheageofthegeologicunitsintheprogramarea,theriskoflateralspreadanddifferentialsettlementisunknown.

BoththeStateofCaliforniaandAlamedaCountyhavestringentbuildingsafetyrequirements,andallconstructionwouldhavetocomplywiththeCaliforniaBuildingStandardsCode.Nonetheless,thismaynotaddressallseismic‐relatedgroundfailureissues.Iftheturbinefoundationandpowercollectionsystemdesignandconstructionwerenotbasedonrigorous,detailed,site‐specificgeotechnicalinvestigation,thefoundationorcollectionsystemcouldfailasaresultoflandsliding,lateralspread,ordifferentialsettlementandcausedamagetoorcollapseoftheturbineorcollectionsystem.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinSection3.6.2ofthePEIR,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

GEO‐1:Conductsite‐specificgeotechnicalinvestigationandimplementdesignrecommendationsinsubsequentgeotechnicalreport

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureGEO‐1willensurethattheimpactswiththepotentialtoexposepeopleorstructurestopotentialsubstantialadverseeffects,includingtheriskofloss,injury,ordeath,asaresultofseismic‐relatedgroundfailure,includinglandslidingandliquefactionwillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

GEO‐1:Conductsite‐specificgeotechnicalinvestigationandimplementdesignrecommendationsinsubsequentgeotechnicalreport

ForthetextofMitigationMeasureGEO‐1,pleaserefertothediscussionofImpactGEO‐1above.

RemainingImpacts:Anyremainingimpactassociatedwiththeexposureofpeopleorstructurestopotentialsubstantialadverseeffectswillbelessthansignificant.

ImpactGEO‐4:Exposepeopleorstructurestopotentialsubstantialadverseeffects,includingtheriskofloss,injury,ordeath,asaresultoflandsliding

PotentialImpact:Constructionofturbinesorpowercollectionsystemsinareaswithpotentialtoexperiencenonseismic‐relatedlandslidingcausedbyheavyprecipitationcouldalsoexposepeopleorstructurestopotentialsubstantialadverseeffects.Ifturbinefoundationsorpowercollectionsystemswerenotproperlydesignedandsitedforthelandslidingconditionspresentattheprogramarea,theycouldfailandcausedamagetoorcollapseoftheturbinetowersorcollectionsystem.Thisdamageorcollapsecouldcauseharmtopersonnelorpropertyintheimmediatearea.

Theprogramareaisinsteep,hillyterraininanareaknowntobesusceptibletolandsliding.BoththeStateofCaliforniaandAlamedaCountyhavestringentbuildingsafetyrequirements,andallconstructionwouldhavetocomplywiththeCaliforniaBuildingStandardsCode.However,thismaynotaddressallseismic‐relatedlandslidingissues.Iftheturbinefoundationandpowercollectionsystemdesignandconstructionwerenotbasedonrigorous,detailed,site‐specificgeotechnicalinvestigation,thefoundationorcollectionsystemcouldfailasaresultoflandslidingandcausedamagetoorcollapseoftheturbineorcollectionsystem.

Page 71: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐71 

March 2016ICF 00630.15

 

MitigationMeasure:Thefollowingmitigationmeasure,discussedinSection3.6.2ofthePEIR,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

GEO‐1:Conductsite‐specificgeotechnicalinvestigationandimplementdesignrecommendationsinsubsequentgeotechnicalreport

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureGEO‐1willensurethattheimpactswiththepotentialtoexposepeopleorstructurestopotentialsubstantialadverseeffects,includingtheriskofloss,injury,ordeath,asaresultoflandslidingwillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

GEO‐1:Conductsite‐specificgeotechnicalinvestigationandimplementdesignrecommendationsinsubsequentgeotechnicalreport

ForthetextofMitigationMeasureGEO‐1,pleaserefertothediscussionofImpactGEO‐1above.

RemainingImpacts:Anyremainingimpactassociatedwiththeexposureofpeopleorstructurestopotentialsubstantialadverseeffects,includingtheriskofloss,injury,ordeath,asaresultoflandsliding,willbelessthansignificant.

ImpactGEO‐6:Belocatedonexpansivesoil,creatingsubstantialriskstolifeorproperty

PotentialImpact:Turbinefoundationsbuiltonexpansivesoilswouldbesubjecttotheexpansionandcontractionofthesesoils,whichcouldcausedamagetostructuresifthesubsoil,drainage,andfoundationarenotproperlyengineered.Themetrologicaltowerandundergroundsystemswouldbesubjecttothesameexpansionandcontraction.

Expansivesoilsoccurinmuchoftheprogramarea,particularlyintheFontana‐Diablo‐Altamontsoilassociation.However,soilsamplingandtreatmentproceduresareaddressedbystateandlocalbuildingcodes.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinSection3.6.2ofthePEIR,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

GEO‐1:Conductsite‐specificgeotechnicalinvestigationandimplementdesignrecommendationsinsubsequentgeotechnicalreport

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureGEO‐1willensurethattheimpactsassociatedwithbeinglocatedonexpansivesoil,includingriskstolifeandproperty,asaresultoflandslidingwillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

Page 72: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐72 

March 2016ICF 00630.15

 

GEO‐1:Conductsite‐specificgeotechnicalinvestigationandimplementdesignrecommendationsinsubsequentgeotechnicalreport

ForthetextofMitigationMeasureGEO‐1,pleaserefertothediscussionofImpactGEO‐1above.

RemainingImpacts:Anyremainingimpactassociatedwithbeinglocatedonexpansivesoilwillbelessthansignificant.

ImpactGEO‐7:Directlyorindirectlydestroyauniquepaleontologicalresourceorsiteoruniquegeologicfeature

PotentialImpact:IffossilsarepresentintheSandHillWindRepoweringProjectarea,theycouldbedamagedbyduringearth‐disturbingactivitiesduringconstructionactivities,suchasexcavationforfoundations,placementoffills,trenchingforpowercollectionsystems,andgradingforroadsandstagingareas.Themoreextensiveanddeepertheearth‐disturbingactivity,thegreaterthepotentialfordamagetopaleontologicalresources.

Becausetheyaresedimentaryrocks,geologicunitswithpotentialtocontainpaleontologicalresourcesincludemostunitsintheprogramarea.Inparticular,theNerolyFormationandsomeunitsoftheGreatValleySequenceareknowntocontainvertebratefossils.SubstantialdamagetoordestructionofsignificantpaleontologicalresourcesasdefinedbytheSocietyofVertebratePaleontology(2010)wouldbeasignificantimpact.

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.6.2ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

GEO‐7a:Retainaqualifiedprofessionalpaleontologisttomonitorsignificantground‐disturbingactivities

GEO‐7b:Educateconstructionpersonnelinrecognizingfossilmaterial

GEO‐7c:Stopworkifsubstantialfossilremainsareencounteredduringconstruction

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresGEO‐7a,GEO‐7b,andGEO‐7cwillensurethattheimpactsassociatedwithdirectlyorindirectlydestroyingauniquepaleontologicalresourceorsiteoruniquegeologicfeaturewillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

GEO‐7a:Retainaqualifiedprofessionalpaleontologisttomonitorsignificantground‐disturbingactivities

TheapplicantwillretainaqualifiedprofessionalpaleontologistasdefinedbytheSVP’sStandardProceduresfortheAssessmentandMitigationofAdverseImpactstoPaleontologicalResources(2010)tomonitoractivitieswiththepotentialtodisturbsensitivepaleontologicalresources.Datagatheredduringdetailedprojectdesignwillbeusedtodeterminetheactivitiesthatwillrequirethepresenceofamonitor.Ingeneral,theseactivitiesincludeanyground‐disturbingactivitiesinvolvingexcavationdeeperthan3feetinareaswithhighpotentialtocontain

Page 73: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐73 

March 2016ICF 00630.15

 

sensitivepaleontologicalresources.Recoveredfossilswillbepreparedsothattheycanbeproperlydocumented.Recoveredfossilswillthenbecuratedatafacilitythatwillproperlyhouseandlabelthem,maintaintheassociationbetweenthefossilsandfielddataaboutthefossils’provenance,andmaketheinformationavailabletothescientificcommunity.

GEO‐7b:Educateconstructionpersonnelinrecognizingfossilmaterial

Theapplicantwillensurethatallconstructionpersonnelreceivetrainingprovidedbyaqualifiedprofessionalpaleontologistexperiencedinteachingnon‐specialiststoensurethattheycanrecognizefossilmaterialsintheeventanyarediscoveredduringconstruction.

GEO‐7c:Stopworkifsubstantialfossilremainsareencounteredduringconstruction

Ifsubstantialfossilremains(particularlyvertebrateremains)arediscoveredduringearthdisturbingactivities,activitieswithin100feetofthefindwillstopimmediatelyuntilastate‐registeredprofessionalgeologistorqualifiedprofessionalpaleontologistcanassessthenatureandimportanceofthefindandaqualifiedprofessionalpaleontologistcanrecommendappropriatetreatment.Treatmentmayincludepreparationandrecoveryoffossilmaterialssothattheycanbehousedinanappropriatemuseumoruniversitycollectionandmayalsoincludepreparationofareportforpublicationdescribingthefinds.Theapplicantwillberesponsibleforensuringthatrecommendationsregardingtreatmentandreportingareimplemented.

RemainingImpacts:Anyremainingimpactassociatedwithdestructionofpaleontologicalresourceswillbelessthansignificant.

Greenhouse Gas Emissions  

ImpactGHG‐2:Conflictwithanapplicableplan,policy,orregulationadoptedforthepurposeofreducingtheemissionsofgreenhousegases

PotentialImpact:TheSandHillWindRepoweringProjectcouldconflictwithcertainGHGreductiongoalssetforthinAB32,includingthe39RecommendedActionsidentifiedbyARBinitsClimateChangeScopingPlan(CaliforniaAirResourcesBoard2008b).Ofthe39measuresidentified,thosethatwouldbeconsideredtobeapplicabletotheproposedprojectwouldprimarilybethoseactionsrelatedtotransportation,theRenewablesPortfolioStandard,andhighglobalwarmingpotentialgases.

MitigationMeasures:Thefollowingmitigationmeasures,discussedinSection3.7.2ofthePEIR,areherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

GHG‐2a:Implementbestavailablecontroltechnologyforheavy‐dutyvehicles

GHG‐2b:InstalllowSF6leakratecircuitbreakersandmonitoring

GHG‐2c:Requirenewconstructiontousebuildingmaterialscontainingrecycledcontent

GHG‐2d:Complywithconstructionanddemolitiondebrismanagementordinance

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

Page 74: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐74 

March 2016ICF 00630.15

 

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasuresGHG‐2a,GHG‐2b,GHG‐2c,andGHG‐2dwillensurethattheimpactsassociatedwithaconflictwithanapplicableplan,policy,orregulationadoptedforthepurposeofreducingtheemissionsofgreenhousegaseswillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

GHG‐2a:Implementbestavailablecontroltechnologyforheavy‐dutyvehicles

Theapplicantwillrequireexistingtrucks/trailerstoberetrofittedwiththebestavailabletechnologyand/orARB‐approvedtechnologyconsistentwiththeARBTruckandBusRegulation(CaliforniaAirResourcesBoard2011).TheARBTruckandBusRegulationappliestoalldiesel‐fueledtrucksandbuseswithagrossvehicleweightrating(GVWR)greaterthan14,000pounds.

StartingJanuary1,2015,theapplicantmustreplacelightertrucks(GVWRof14,001to26,000pounds)withenginesthatare20yearsorolderwithnewertrucks.TheApplicanthastheoptiontoinstallaPMfilterretrofitonalightertruckby2014tomakethetruckexemptfromreplacementuntilJanuary1,2020,andanylightertruckequippedwithaPMfilterretrofitpriortoJuly2011wouldreceivecredittowardthecompliancerequirementsforaheaviertruckorbusinthesamefleet.

StartingJanuary1,2012,theapplicantisrequiredtomeettheenginemodelyearscheduleshownbelowforheaviertrucks(GVWRgreaterthan26,000pounds).Tocomplywiththeschedule,theapplicantwillinstallthebestavailablePMfilteron1996modelyearandnewerenginesandwouldreplacethevehicle8yearslater.TheApplicantwillreplacetruckswith1995modelyearandolderenginesstartingin2015.Replacementswith2010modelyearornewerenginesmeetsthefinalrequirements,buttheapplicantcouldalsoreplacetruckswithusedtrucksthatwouldhaveafuturecompliancedateontheschedule.Forexample,areplacementwitha2007modelyearenginecompliesuntil2023.By2023alltrucksandbusesmusthave2010modelyearengineswithfewexceptions.

EngineModelYearScheduleforHeavierTrucks

EngineYear RequirementfromJanuary1

Pre‐1994 Norequirementsuntil2015,then2010engine

1994–1995 Norequirementsuntil2016,then2010engine

1996–1999 PMfilterfrom2012to2020,then2010engine

2000–2004 PMfilterfrom2013to2021,then2010engine

2005–2006 PMfilterfrom2014to2022,then2010engine

2007–2009 Norequirementsuntil2023,then2010engine

2010 Meetsfinalrequirements

Inaddition,theapplicantcouldcomplywithaphase‐inoptionthatwouldallowtheapplicanttodecidewhichvehiclestoretrofitorreplace,regardlessofenginemodelyear.TheapplicantmustreportinformationaboutallheaviertrucksstartingJanuary31,2012,tousethisoption.

TheApplicantcouldcomplybydemonstratingthattruckshavemetthepercentagerequirementeachyearasshowninthetablebelow.Forexample,by2012theapplicant’sfleetwouldneedtohavePMfilterson30%oftheheaviertrucksinthefleet.Thisoptioncounts2007modelyearandnewerenginesoriginallyequippedwithPMfilterstowardcomplianceandwouldreducethe

Page 75: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐75 

March 2016ICF 00630.15

 

overallnumberofretrofitPMfiltersneeded.AnyenginewithaPMfilterregardlessofmodelyearwouldbecompliantuntilatleast2020.BeginningJanuary1,2020,allheaviertruckswouldneedtomeettherequirementsspecifiedintheComplianceScheduleforHeavierTrucks.

Phase‐InOptionforHeavierTrucks

ComplianceDate VehicleswithPMFilters

1‐Jan‐12 30%

1‐Jan‐13 60%

1‐Jan‐14 90%

1‐Jan‐15 90%

1‐Jan‐16 100%

GHG‐2b:InstalllowSF6leakratecircuitbreakersandmonitoring

TheapplicantwillensurethatanynewcircuitbreakerinstalledatasubstationhasaguaranteedSF6leakrateof0.5%byvolumeorless.TheapplicantwillprovideAlamedaCountywithdocumentationofcompliance,suchasspecificationsheets,priortoinstallationofthecircuitbreaker.Inaddition,theapplicantwillmonitortheSF6‐containingcircuitbreakersatthesubstationconsistentwithScopingPlanMeasureH‐6forthedetectionandrepairofleaks.

GHG‐2c:Requirenewconstructiontousebuildingmaterialscontainingrecycledcontent

Theapplicantwillrequiretheconstructionofallnewsubstationandotherpermanentbuildingstoincorporatematerialsforwhichthesumofpost‐consumerrecycledcontentplusone‐halfofthepost‐industrialcontentconstitutesatleast10%ofthetotalvalueofthematerialsintheproject.

GHG‐2d:Complywithconstructionanddemolitiondebrismanagementordinance

TheapplicantwillcomplywiththeCounty’srevisedGreenBuildingOrdinanceregardingconstructionanddemolitiondebrisasfollows:(1)100%ofinertwasteand50%wood/vegetative/scrapmetalnotincludingAlternativeDailyCover(ADC)andunsalvageablematerialwillbeputtootherbeneficialusesatlandfills,and(2)100%ofinertmaterials(concreteandasphalt)willberecycledorputtobeneficialreuse.

RemainingImpacts:Anyremainingimpactassociatedwithconflictwithapplicableplan,policy,orregulationadoptedforthepurposeofreducingtheemissionsofgreenhousegaseswillbelessthansignificant.

Hazards and Hazardous Materials  

ImpactHAZ‐4:Locationonahazardousmaterialssite,creatingasignificanthazardtothepublicortheenvironment

PotentialImpact:ItisnotknownifhazardousmaterialssitesarepresentwithintheSandHillWindRepoweringProjectarea.However,thepotentialfortheexistenceofhazardousmaterialsisgenerallylow.LandusesintheAPWRAincludeagriculture,grazing,ridingandhikingtrails,andwindfarms.Someoftheselandusesinvolvetheuseofpotentiallyhazardousmaterials(e.g.,

Page 76: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐76 

March 2016ICF 00630.15

 

fertilizer).Becausesoildisturbancewouldbeinvolvedinconstructionactivitiesforbothdecommissioningactivitiesandconstructionofindividualwindprojects,anycontaminatedsoilfoundcouldrepresentasignificantrisktohumanhealthandtheenvironment.

AllprojectsrequiringaCUPfromtheCountywouldbeboundbytheUnifiedHazardousWasteandHazardousMaterialsManagementRegulatoryProgram.Therefore,futurerepoweringprojectswouldrequireCountypermitapprovalofnewCUPs,andMitigationMeasureHAZ‐4wouldbecomeastandardconditionofapprovalfortheCUP.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinSection3.8.2ofthePEIR,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

HAZ‐4:PerformaPhaseIEnvironmentalSiteAssessmentpriortoconstructionactivitiesandremediateifnecessary

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureHAZ‐4willensurethattheimpactsassociatedwithlocatingonahazardousmaterialssitecreatingasignificanthazardtothepublicortheenvironmentwillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

HAZ‐4:PerformaPhaseIEnvironmentalSiteAssessmentpriortoconstructionactivitiesandremediateifnecessary

Priortoconstruction,theprojectproponentwillconductaPhaseIenvironmentalsiteassessmentinconformancewiththeAmericanSocietyforTestingandMaterialsStandardPracticeE1527‐05.Allenvironmentalinvestigation,sampling,andremediationactivitiesassociatedwithpropertiesintheprojectareawillbeconductedunderaworkplanapprovedbytheregulatoryoversightagencyandwillbeconductedbytheappropriateenvironmentalprofessionalconsistentwithPhaseIsiteassessmentrequirementsasdetailedbelow.Theresultsofanyinvestigationand/orremediationactivitiesconductedintheprojectareawillbeincludedintheproject‐levelEIR.

APhaseIenvironmentalsiteassessmentshould,ataminimum,includethecomponentslistedbelow.

Anonsitevisittoidentifycurrentconditions(e.g.,vegetativedieback,chemicalspillresidue,presenceofabove‐orundergroundstoragetanks).

Anevaluationofpossiblerisksposedbyneighboringproperties.

Interviewswithpersonsknowledgeableaboutthesite’shistory(e.g.,currentorpreviouspropertyowners,propertymanagers).

Anexaminationoflocalplanningfilestocheckpriorlandusesandanypermitsgranted.

Filesearcheswithappropriateagencies(e.g.,StateWaterResourcesControlBoard,firedepartment,Countyhealthdepartment)havingoversightauthorityrelativetowaterqualityandgroundwaterandsoilcontamination.

Examinationofhistoricalaerialphotographyofthesiteandadjacentproperties.

Page 77: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐77 

March 2016ICF 00630.15

 

Areviewofcurrentandhistorictopographicmapsofthesitetodeterminedrainagepatterns.

Anexaminationofchain‐of‐titleforenvironmentalliensand/oractivityandlanduselimitations.

IfthePhaseIenvironmentalsiteassessmentindicateslikelysitecontamination,aPhaseIIenvironmentalsiteassessmentwillbeperformed(alsobyanenvironmentalprofessional).

APhaseIIenvironmentalsiteassessmentwouldcomprisethefollowing.

Collectionoforiginalsurfaceand/orsubsurfacesamplesofsoil,groundwater,andbuildingmaterialstoanalyzeforquantitiesofvariouscontaminants.

Ananalysistodeterminetheverticalandhorizontalextentofcontamination(iftheevidencefromsamplingshowscontamination).

IfcontaminationisuncoveredaspartofPhaseIorIIenvironmentalsiteassessments,remediationwillberequired.Ifmaterialssuchasasbestos‐containingmaterials,lead‐basedpaint,orPCB‐containingequipmentareidentified,thesematerialswillbeproperlymanagedanddisposedofpriortoorduringthedemolitionprocess.

AnycontaminatedsoilidentifiedonaprojectsitemustbeproperlydisposedofinaccordancewithDTSCregulationsineffectatthetime.

HazardouswastesgeneratedbytheproposedprojectwillbemanagedinaccordancewiththeCaliforniaHazardousWasteControlLaw(HSC,Division20,Chapter6.5)andtheHazardousWasteControlRegulation(Title22,CCR,Division4.5).

If,duringconstruction/demolitionofstructures,soilorgroundwatercontaminationissuspected,theconstruction/demolitionactivitieswillceaseandappropriatehealthandsafetyprocedureswillbeimplemented,includingtheuseofappropriatepersonalprotectiveequipment(e.g.,respiratoryprotection,protectiveclothing,helmets,goggles).

RemainingImpacts:Anyremainingimpactassociatedwithlocationonahazardousmaterialssitecreatingasignificanthazardtothepublicortheenvironmentwillbelessthansignificant.

ImpactHAZ‐7:Impairimplementationoforphysicallyinterferewithanadoptedemergencyresponseplanoremergencyevacuationplan

PotentialImpact:ExistingvehiculartrafficisassociatedwithoperationsandmaintenanceofprojectfacilitiesandisnotanticipatedtochangeundertheSandHillWindRepoweringProject.Accordingly,operationoftheproposedprojectwouldhavenoimpact.Duringconstruction,therewouldbeanincreaseinvehiculartraffictransportingworkcrews,equipment,andmaterials.

AsspecifiedinPEIRSection3.15,Transportation/Traffic,aTrafficControlPlan(TCP)wouldbepreparedforeachproposedrepoweringprojecttoreducehazardsthatcouldresultfromtheincreasedtrucktraffic,andtoensurethattrafficflowonlocalpublicroadsandhighwaysarenotadverselyaffected.Thisplanwouldincorporatemeasuressuchasinformationalsigns,trafficcones,andflashinglightstoidentifyanynecessarychangesintemporarylandconfiguration.Flaggerswithtwo‐wayradioswouldbeusedtocontrolconstructiontrafficandreducethepotentialforaccidentsalongroads.Speedlimitswouldbesetcommensuratewithroadtype,trafficvolume,vehicletype,andsite‐specificconditionsasnecessarytoensuresafeandefficienttrafficflow.

Page 78: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐78 

March 2016ICF 00630.15

 

ProjectsproposedwithintheunincorporatedareaofthecountyarereviewedbytheAlamedaCountyFireDepartmentduringthebuildingpermitprocesstoensurethattheyareconsistentwithadoptedemergencyresponseplansandemergencyevacuationplans.Consequently,theproposedprojectwouldnotconflictwithanyadoptedemergencyresponseplanoremergencyevacuationplan.

Finally,conveyanceofdecommissionedturbines,towers,andothercomponentsonpublicroadswouldtakeplaceatanirregular,infrequentrate,andwouldbesubjecttostandardCaliforniaDepartmentofTransportation(Caltrans)regulations.Suchconveyancewouldnothinderemergencyaccesstotheprogramarea.Accordingly,decommissioningactivitieswouldnotconflictwithanyadoptedemergencyresponseplanoremergencyevacuationplan.

MitigationMeasures:Thefollowingmitigationmeasure,discussedinSection3.8.2ofthePEIR,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

TRA‐1:Developandimplementaconstructiontrafficcontrolplan

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureTRA‐1willensurethatanyimpactsthatwouldimpairimplementationoforphysicallyinterferewithanadoptedemergencyresponseplanoremergencyevacuationplanwillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

TRA‐1:Developandimplementaconstructiontrafficcontrolplan

Priortostartingconstruction‐relatedactivities,theApplicantshallprepareandimplementaTrafficControlPlan(TCP)thatwillreduceoreliminateimpactsassociatedwiththeproposedprogram.TheTCPshalladheretoAlamedaCountyandCaltransrequirements,andmustbesubmittedforreviewandapprovaloftheCountyPublicWorksDepartmentpriortoimplementation.TheTCPshallincludethefollowingelements.TheCountyandCaltransmayrequireadditionalelementstobeidentifiedduringtheirreviewandapprovaloftheTCP.

Scheduleconstructionhourstominimizeconcentrationsofconstructionworkerscommutingto/fromtheprojectsiteduringtypicalpeakcommutehours(7a.m.to9a.m.and4p.m.to6p.m.).

Limittruckaccesstotheprojectsiteduringtypicalpeakcommutehours(7a.m.to9a.m.and4p.m.to6p.m.).

Requirethatwrittennotificationbeprovidedtocontractorsregardingappropriatehaulroutestoandfromtheprogramarea,aswellastheweightandspeedlimitsonlocalcountyroadsusedtoaccesstheprogramarea.

Provideaccessforemergencyvehiclestoandthroughtheprogramareaatalltimes.

Whenlane/roadclosuresoccurduringdeliveryofoversizedloads,provideadvancenoticetolocalfire,police,andemergencyserviceproviderstoensurethatalternativeevacuationandemergencyroutesaredesignatedtomaintainserviceresponsetimes.

Provideadequateonsiteparkingforconstructiontrucksandworkervehicles.

Page 79: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐79 

March 2016ICF 00630.15

 

Requiresuitablepublicsafetymeasuresintheprogramareaandattheentranceroads,includingfences,barriers,lights,flagging,guards,andsigns,togiveadequatewarningtothepublicoftheconstructionandofanydangerousconditionsthatcouldbeencounteredasaresultthereof.

Completeroadrepairsonlocalpublicroadsasneededduringconstructiontopreventexcessivedeterioration.Thisworkmayincludeconstructionoftemporaryroadwayshoulderstosupportanynecessarydetourlanes.

Repairorrestoretheroadright‐of‐waytoitsoriginalconditionorbetteruponcompletionofthework.

Coordinateprogram‐relatedconstructionactivities,includingschedule,trucktraffic,haulroutes,andthedeliveryofoversizedoroverweightmaterials,withAlamedaCounty,Caltrans,andaffectedcitiestoidentifyandminimizeoverlapwithotherareaconstructionprojects.

RemainingImpacts:Anyremainingimpactassociatedwithinterferencewithanadoptedemergencyresponseplanoremergencyevacuationplanwillbelessthansignificant.

Hydrology and Water Quality  

ImpactWQ‐1:Violateanywaterqualitystandardsorwastedischargerequirements

PotentialImpact:Construction‐relatedearth‐disturbingactivitiesassociatedwiththeSandHillWindRepoweringProjectwouldintroducethepotentialforincreasederosionandsedimentation,withsubsequenteffectsondrainageandwaterquality.Duringconstruction,trenchingandotherconstructionactivitiescreateareasofbaresoilthatcanbeexposedtoerosiveforcesforlongperiodsoftime.Baresoilsaremuchmorelikelytoerodethanvegetatedareasbecauseofthelackofdispersion,infiltration,andretentionpropertiescreatedbycoveringvegetation.Constructionactivitiesinvolvingsoildisturbance,excavation,cutting/filling,stockpiling,andgradingcouldresultinincreasederosionandsedimentationtosurfacewaters,ifproperBMPsarenotused.

WhileexistingactivitiesattheSandHillWindRepoweringProjectareamayalreadyresultinthereleaseofsediment,theextentofearthdisturbanceresultingfromconstructionoftheprojectisanticipatedtoresultinanewandintensifiedpotentialforthereleaseofsedimentsduetostagingareasandturbineconstructionsites.Ifprecautionsarenottakentocontainorcapturesedimentation,earth‐disturbingconstructionactivitiescouldresultinsubstantialsedimentationinstormwaterrunoffandresultinasignificantimpactonexistingsurfacewaterquality.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinSection3.9.2ofthePEIR,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

WQ‐1:ComplywithNPDESrequirements

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureWQ‐1willensurethatanyimpactsthatwouldviolateanywaterqualitystandardsorwastedischargerequirementswillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

Page 80: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐80 

March 2016ICF 00630.15

 

WQ‐1:ComplywithNPDESrequirements

ForthetextofMitigationMeasureWQ‐1,pleaserefertothediscussionofImpactBIO‐2above.

RemainingImpacts:Anyremainingimpactassociatedwithviolationofanywaterqualitystandardsorwastedischargerequirementswillbelessthansignificant.

ImpactWQ‐3:Substantiallyaltertheexistingdrainagepatternofthesiteorarea,includingthroughthealterationofthecourseofastreamorriver,inamannerthatwouldresultinsubstantialerosionorsiltationonsiteoroffsite

PotentialImpact:TheSandHillWindRepoweringProjectwouldnotconstructanyturbineswithinexistingdrainageareasandtheprojectfootprintswouldbedesignedtonotcauseanydownstreamerosionduringthestormseason.Inaddition,theproposedprojectwouldberequiredtoadheretotheNPDESConstructionGeneralPermit.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinSection3.9.2ofthePEIR,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

WQ‐1:ComplywithNPDESrequirements

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureWQ‐1willensurethatanyimpactsthatwouldsubstantiallyaltertheexistingdrainagepatternofthesiteorarea,includingthroughthealterationofthecourseofastreamorriver,inamannerthatwouldresultinsubstantialerosionorsiltationonsiteoroffsitewillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

WQ‐1:ComplywithNPDESrequirements

ForthetextofMitigationMeasureWQ‐1,pleaserefertothediscussionofImpactBIO‐2above.

RemainingImpacts:Anyremainingimpactassociatedwithsubstantiallyalteringtheexistingdrainagepatternofthesiteorarea,includingthroughthealterationofthecourseofastreamorriver,inamannerthatwouldresultinsubstantialerosionorsiltationonsiteoroffsitewillbelessthansignificant.

ImpactWQ‐4:Substantiallyaltertheexistingdrainagepatternofthesiteorarea,includingthroughthealterationofthecourseofastreamorriver,orsubstantiallyincreasetherateoramountofsurfacerunoffinamannerthatwouldresultinfloodingonsiteoroffsite

PotentialImpact:Althoughroadimprovementswouldresultinaroughly30%increaseintheextentofgraveledsurfaces(whichcanresultinincreasedrunoff)fromtheextentofexistinggraveledroads,thesoilsunderlyingtheSandHillWindRepoweringProjectareaarepredominantlyhighrunoffsoils(i.e.,HydrologicSoilGroupD)(SoilConservationService1966,1977).CompactedgravelroadshaverunoffpotentialsimilartothatofHydrologicSoilGroupDsoils.Consequently,theexpandedgraveledroadswouldnotresultinanetincreaseinrunoffpotentialthanpresentlyexistsinthenativesoilswherethenewgravelwouldbeplaced.Accordingly,becausethererunoffwouldnotincreaseasaresultofthewidenedgravelroads,therewouldnotbeanincreaseinfloodingonsiteoroffsite.Inaddition,asdescribedinthePEIR(Section3.9,HydrologyandWaterQuality)all

Page 81: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐81 

March 2016ICF 00630.15

 

projectsconductedundertheAPWRArepoweringprogramwouldberequiredtoadheretotheNPDESstormwaterConstructionGeneralPermit,whichrequiresthatpostconstructionrunoffmanagementmeasuresbeimplementedintheeventthattheproject’sSWPPPdeterminesthataprojectcouldcauseanincreaseinpeakrunoffflowsfromtheprojectarea.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinSection3.9.2ofthePEIR,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

WQ‐1:ComplywithNPDESrequirements

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureWQ‐1willensurethatanyimpactsthatwouldsubstantiallyaltertheexistingdrainagepatternofthesiteorarea,includingthroughthealterationofthecourseofastreamorriver,orsubstantiallyincreasetherateoramountofsurfacerunoffinamannerthatwouldresultinfloodingonsiteoroffsitewillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

WQ‐1:ComplywithNPDESrequirements

ForthetextofMitigationMeasureWQ‐1,pleaserefertothediscussionofImpactBIO‐2above.

RemainingImpacts:Anyremainingimpactassociatedwithsubstantialalterationoftheexistingdrainagepatternofthesiteorarea,includingthroughthealterationofthecourseofastreamorriver,orsubstantiallyincreasetherateoramountofsurfacerunoffinamannerthatwouldresultinfloodingonsiteoroffsitewillbelessthansignificant.

ImpactWQ‐5:Createorcontributerunoffwaterthatwouldexceedthecapacityofexistingorplannedstormwaterdrainagesystemsorprovidesubstantialadditionalsourcesofpollutedrunoff

PotentialImpact:TheSandHillWindRepoweringProjectareadoesnotcurrentlyhaveexistingorplannedstormwaterdrainagefacilitiesandbuildoutoftheproposedprojectwouldnotexceedcapacitiesorincreasetherateofpollutedrunoff.However,constructioncouldgeneratepollutedrunoffassoilwouldbestripped,bareareaswouldbeexposed,andstormwatercouldcausesedimentation.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinSection3.9.2ofthePEIR,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

WQ‐1:ComplywithNPDESrequirements

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureWQ‐1willensurethatanyimpactsthatwouldcreateorcontributerunoffwaterthatwouldexceedthecapacityofexistingorplannedstormwaterdrainagesystemsorprovidesubstantialadditionalsourcesofpollutedrunoffwillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

Page 82: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐82 

March 2016ICF 00630.15

 

WQ‐1:ComplywithNPDESrequirements

ForthetextofMitigationMeasureWQ‐1,pleaserefertothediscussionofImpactBIO‐2above.

RemainingImpacts:Anyremainingimpactthatwouldcreateorcontributerunoffwaterthatwouldexceedthecapacityofexistingorplannedstormwaterdrainagesystemsorprovidesubstantialadditionalsourcesofpollutedrunoffwillbelessthansignificant.

ImpactWQ‐6:Otherwisesubstantiallydegradewaterquality

PotentialImpact:TheSandHillWindRepoweringProjectareadoesnotcurrentlyhaveanysubstantialwaterqualityissuesordrainagesthatcouldcarryasubstantialamountofpollutedrunofftoreceivingwaters.Inaddition,projectoperationisnotanticipatedtoresultinasubstantialamountofadditionalrunoffthatcouldaffectwaterquality.However,constructioncouldgeneratepollutedrunoffassoilwouldbestripped,bareareaswouldbeexposed,andstormwatercouldcausesedimentation..

MitigationMeasure:Thefollowingmitigationmeasure,discussedinSection3.9.2ofthePEIR,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

WQ‐1:ComplywithNPDESrequirements

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureWQ‐1willensurethatanyimpactsthatwouldotherwisesubstantiallydegradewaterqualitywillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

WQ‐1:ComplywithNPDESrequirements

ForthetextofMitigationMeasureWQ‐1,pleaserefertothediscussionofImpactBIO‐2above.

RemainingImpacts:Anyremainingimpactthatwouldotherwisesubstantiallydegradewaterqualitywillbelessthansignificant.

ImpactWQ‐10:Contributetoinundationbyseiche,tsunami,ormudflow

PotentialImpact:Becausetheproposedprogramareaisinrollinghillsandfarfromtheocean,thelikelihoodofaseicheortsunamioccurringisconsideredminimal.Inaddition,amudflowisalsohighlyunlikely,butcouldbepossibleinrollinghillsifproperBMPsarenotusedduringtheconstructionprocess.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinSection3.9.2ofthePEIR,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

WQ‐1:ComplywithNPDESrequirements

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

Page 83: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐83 

March 2016ICF 00630.15

 

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureWQ‐1willensurethatanyimpactsthatwouldcontributetoinundationbyseiche,tsunami,ormudflowwillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

WQ‐1:ComplywithNPDESrequirements

ForthetextofMitigationMeasureWQ‐1,pleaserefertothediscussionofImpactBIO‐2above.

RemainingImpacts:Anyremainingimpactthatwouldcontributetoinundationbyseiche,tsunami,ormudflowwillbelessthansignificant.

Noise  

ImpactNOI‐1:Exposureofresidencestonoisefromnewwindturbines

PotentialImpact:Theprojectwouldremovethemajorityoftheexisting433turbinesintheprojectareaandinstallupto24larger,modern1.5to3.0megawatt(MW)turbines.Basedonmapsandinformationsubmittedbytheapplicant,therewouldbeseveralresidenceswithin2,000feetofthenearestwindturbines(seeEnvironmentalChecklistFigure3.1‐7).Thisinformation,alongwithnoisemeasurements,wereusedtoprepareanoisestudy,includedasAttachment2toSIT‐1SitingMemooftheSandHillWindRepoweringProjectEnvironmentalChecklist,inFebruary2016.

AsdiscussedinSection3.11.2ofthePEIR,therearenodocumentedinstancesofwindturbinescausingexceedanceofnoisestandardsintheexistingCUPs.Inaddition,proposedmodernturbineshaveseveralcharacteristicsthatreduceaerodynamicsoundlevelsandmakeforquieteroperationsthantheexistingturbines.Themodernturbineshaverelativelylowrotationalspeedsandpitchcontrolontherotors,bothofwhichreducesoundlevels.

ThenoisepredictionresultsinTable3.11‐5however,indicatethatresidenceslocatedwithinabout1,500feetofagroupofturbinescouldbeexposedtonoisethatexceeds55dBA(Ldn)orincreasesinnoisegreaterthan5dB.Nonewturbinesareanticipatedtobelocatedwithin1,000feetofexistingresidences.BecauseofthepossibilitythatdailyLdnvaluecausedbywindturbinescouldincreasebymorethan5dBatlocationswherenoisecurrentlyexceeds55dBA(Ldn)orexposeresidencestonoiseinexcessof55dBA(Ldn)wherenoiseiscurrentlylessthan55dBA(Ldn)thisimpactisconsideredtobesignificant.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinthePEIRinSection3.11.2,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

NOI‐1:Performproject‐specificnoisestudiesandimplementmeasurestocomplywithCountynoisestandards

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureNOI‐1willensurethatanyimpactsthatwouldcontributeexposureofresidencestonoisefrom

Page 84: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐84 

March 2016ICF 00630.15

 

newwindturbineswillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

NOI‐1:Performproject‐specificnoisestudiesandimplementmeasurestocomplywithCountynoisestandards

Theapplicantforanyproposedrepoweringprojectwillretainaqualifiedacousticconsultanttoprepareareportthatevaluatesnoiseimpactsassociatedwithoperationoftheproposedwindturbines.Thisevaluationwillincludeanoisemonitoringsurveytoquantifyexistingnoiseconditionsatnoisesensitivereceptorslocatedwithin2,000feetofanyproposedturbinelocation.ThissurveywillincludemeasurementofthedailyA‐weightedLdnvaluesovera1‐weekperiodandconcurrentloggingofwindspeedsatthenearestmeteorologicalstation.Thestudywillincludeasite‐specificevaluationofpredictedoperationalnoiselevelsatnearbynoisesensitiveuses.Ifoperationoftheprojectispredictedtoresultinnoiseinexcessof55dBA(Ldn)wherenoiseiscurrentlylessthan55dBA(Ldn)orresultina5dBincreasewherenoiseiscurrentlygreaterthan55dBA(Ldn),theapplicantwillmodifytheproject,includingselectingnewspecificinstallationsiteswithintheprogramarea,toensurethattheseperformancestandardswillnotbeexceeded.

Methodsthatcanbeusedtoensurecompliancewiththeseperformancestandardsincludebutnotlimitedtoincreasingthedistancebetweenproposedturbinesandnoisesensitiveusesandtheuseofalternativeturbineoperationalmodestoreducenoise.Uponcompletionoftheevaluation,theprojectapplicantwillsubmitareporttotheCountydemonstratinghowtheprojectwillcomplywiththeseperformancestandards.AfterreviewandapprovalofthereportbyCountystaff,theapplicantwillincorporatemeasuresasnecessaryintotheprojecttoensurecompliancewiththeseperformancestandards.

RemainingImpacts:Anyremainingimpactthatwouldcontributetoexposureofresidencestonoisefromnewwindturbineswillbelessthansignificant.

ImpactNOI‐2:Exposureofresidencestonoiseduringdecommissioningandnewturbineconstruction

PotentialImpact:Inanumberofinstances,thereareresidenceslocated600to800feetofwhereturbineconstructionactivitiescouldoccur.TheresultsofnoisemodelingindicatethatconstructionactivitiescouldresultinnoisethatexceedsAlamedaCountynoiseordinancestandardsduringnonexempthours.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinthePEIRinSection3.11.2,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

NOI‐2:Employnoise‐reducingpracticesduringdecommissioningandnewturbineconstruction

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureNOI‐2willensurethatanyimpactsthatwouldcontributeexposureofresidencestonoiseduringdecommissioningandnewturbineconstructionwillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

Page 85: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐85 

March 2016ICF 00630.15

 

NOI‐2:Employnoise‐reducingpracticesduringdecommissioningandnewturbineconstruction

Projectapplicantswillemploynoise‐reducingconstructionpracticessothatconstructionnoisedoesnotexceedAlamedaCountynoiseordinancestandards.Measurestolimitnoisemayincludethefollowing:

Prohibitnoise‐generatingactivitiesbefore7a.m.andafter7p.m.onanydayexceptSaturdayorSunday,andbefore8a.m.andafter5p.m.onSaturdayorSunday.

Locateequipmentasfaraspracticalfromnoisesensitiveuses.

Requirethatallconstructionequipmentpoweredbygasolineordieselengineshavesound‐controldevicesthatareatleastaseffectiveasthoseoriginallyprovidedbythemanufacturerandthatallequipmentbeoperatedandmaintainedtominimizenoisegeneration.

Usenoise‐reducingenclosuresaroundnoise‐generatingequipmentwherepracticable.

ImplementothermeasureswithdemonstratedpracticabilityinreducingequipmentnoiseuponpriorapprovalbytheCounty.

Innocasewilltheapplicantbeallowedtousegasolineordieselengineswithoutmuffledexhausts.

RemainingImpacts:Anyremainingimpactthatwouldcontributetoexposureofresidencestonoiseduringdecommissioningandnewturbineconstructionwillbelessthansignificant.

Transportation/Traffic  

ImpactTRA‐1:Conflictwithanapplicableplan,ordinance,orpolicyestablishingmeasuresofeffectivenessfortheperformanceofthecirculationsystem,takingintoaccountallmodesoftransportation,includingmasstransitandnon‐motorizedtravelandrelevantcomponentsofthecirculationsystem,including,butnotlimitedto,intersections,streets,highwaysandfreeways,pedestrianandbicyclepaths,andmasstransitorconflictwithanapplicablecongestionmanagementprogram,including,butnotlimitedto,level‐of‐servicestandardsandtraveldemandmeasuresorotherstandardsestablishedbythecountycongestionmanagementagencyfordesignatedroadsorhighways

PotentialImpact:Constructiontrafficcouldcauseasubstantialtrafficincreaseonthelocalcountyroadsthatprovidedirectaccesstotheprojectconstructionsites—e.g.,VascoRoad,AltamontPassRoad,PattersonPassRoad,DyerRoad,andFlynnRoad—astheseroadsgenerallyhavelowtrafficvolumes.Theincreaseinconstructiontripswouldrangefrom2to8percentofADTandfrom5to18percentofpeakhourvolumesonAltamontPassRoadandPattersonPassRoad.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinthePEIRinSection3.15.2,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

TRA‐1:Developandimplementaconstructiontrafficcontrolplan

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

Page 86: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐86 

March 2016ICF 00630.15

 

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureTRA‐1willensurethatanyimpactsthatwouldconflictwithanapplicableplan,ordinance,orpolicyestablishingmeasuresofeffectivenessfortheperformanceofthecirculationsystemwillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

TRA‐1:Developandimplementaconstructiontrafficcontrolplan

ForthetextofMitigationMeasureTRA‐1,pleaserefertothediscussionofImpactHAZ‐7above.

RemainingImpacts:Anyremainingimpactthatwouldconflictwithanapplicableplan,ordinance,orpolicyestablishingmeasuresofeffectivenessfortheperformanceofthecirculationsystemwillbelessthansignificant.

ImpactTRA‐4:Substantiallyincreasehazardsbecauseofadesignfeature(e.g.,sharpcurvesordangerousintersections)orincompatibleuses(e.g.,farmequipment)duetoconstruction‐generatedtraffic

PotentialImpact:Thepresenceoflarge,slow‐movingconstruction‐relatedvehiclesandequipmentamongthegeneral‐purposetrafficonroadwaysthatprovideaccesstotheprojectareacouldcauseotherdriverstoactimpatientlyandcreatetrafficsafetyhazards.Inaddition,theslow‐movingtrucksenteringorexitingtheproposedprojectareafrompublicroadscouldposeatraffichazardtoothervehiclesandincreasethepotentialforturningmovementcollisionsattheprojectareaentranceintersection.Heavytrucktrafficdeliveringequipmentandmaterialstotheprojectareacouldresultinroadwearanddamagethatresultinadrivingsafetyhazard.Thedegreetowhichthislatterimpactwouldoccurdependsontheexistingroadwaydesign(pavementtypeandthickness)andexistingconditionoftheroad.FreewayssuchasI‐580aredesignedtoaccommodateamixofvehicletypes,includingheavytrucks,andtheconstructionvehicleimpactsareexpectedtobenegligibleonthoseroads.However,countyroadsarenotdesignedandconstructedtothesamestandardsastheinterstatehighwaysandcouldbedamagedbyconstructiontraffic.

ConstructionassociatedwiththeSandHillWindRepoweringProjectwouldrequirethedeliveryofequipmentandmaterials,suchaswindturbines,thatcouldcausetheconstructiontruckstoexceedroadwayloadorsizelimits.Totransportthisequipment,theprojectapplicantmustobtainspecialpermitsfromCaltransDistrict4andotherrelevantjurisdictionsincludingAlamedaCountytomoveoversizedoroverweightmaterials.Inaddition,theapplicantmustensureproperroutesarefollowed;propertimeisscheduledforthedelivery;andproperescorts,includingadvancedwarningandtrailingvehiclesaswellaslawenforcementcontrolareavailable,ifnecessary.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinthePEIRinSection3.15.2,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

TRA‐1:Developandimplementaconstructiontrafficcontrolplan

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureTRA‐1willensurethatanyimpactsthatwouldsubstantiallyincreasehazardsbecauseofadesignfeatureorincompatibleusesduetoconstruction‐generatedtrafficwillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

Page 87: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐87 

March 2016ICF 00630.15

 

TRA‐1:Developandimplementaconstructiontrafficcontrolplan

ForthetextofMitigationMeasureTRA‐1,pleaserefertothediscussionofImpactHAZ‐7above.

RemainingImpacts:Anyremainingimpactthatwouldsubstantiallyincreasehazardsbecauseofadesignfeatureorincompatibleusesduetoconstruction‐generatedtrafficwillbelessthansignificant.

ImpactTRA‐5:Resultininadequateemergencyaccessduetoconstruction‐generatedtraffic

PotentialImpact:Slow‐movingconstructiontruckscoulddelayorobstructthemovementofemergencyvehiclesonprogramareahaulroutesusedtoaccesstheprojectarea.Inaddition,lane/roadclosuresoccurringduringdeliveryofoversizedloadscouldimpairroadwaycapacityandincreasetheresponsetimeforemergencyvehiclestravelingthroughtheclosurearea.Therefore,constructionwouldhavethepotentialtosignificantlyaffectemergencyvehicleaccess.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinthePEIRinSection3.15.2,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

TRA‐1:Developandimplementaconstructiontrafficcontrolplan

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureTRA‐1willensurethatanyimpactsthatwouldresultininadequateemergencyaccessduetoconstruction‐generatedtrafficwillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

TRA‐1:Developandimplementaconstructiontrafficcontrolplan

ForthetextofMitigationMeasureTRA‐1,pleaserefertothediscussionofImpactHAZ‐7above.

RemainingImpacts:Anyremainingimpactthatwouldresultininadequateemergencyaccessduetoconstruction‐generatedtrafficwillbelessthansignificant.

ImpactTRA‐6:Conflictwithadoptedpolicies,plans,orprogramsregardingpublictransit,bicycleorpedestrianfacilities,orotherwisedecreasetheperformanceorsafetyofsuchfacilities

PotentialImpact:Duringconstruction,slow‐movingoversizedtruckscouldpotentiallydisruptthemovementofbicyclestravelingontheshouldersalongAltamontPassRoad,PattersonPassRoad,andFlynnRoadintheprogramareaandincreasethesafetyconcernsforanybicyclistswhousetheroutes.TheseroadwaysarenottheCountyclassifiedbikeways,butareusedasrecreationalandinter‐regionalaccessroutes.Inaddition,lane/roadclosuresoccurringduringdeliveryofoversizedloadsneartheworksiteaccesspointscouldtemporarilydisruptthebicycleaccessontheroads.Therefore,constructionwouldhavethepotentialtosignificantlyaffectbicycleaccess.

MitigationMeasure:Thefollowingmitigationmeasure,discussedinthePEIRinSection3.15.2,isherebyadoptedandwillbeimplementedasprovidedintheMitigationMonitoringandReportingProgram.

Page 88: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐88 

March 2016ICF 00630.15

 

TRA‐1:Developandimplementaconstructiontrafficcontrolplan

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthefollowing.

EffectsofMitigation:ImplementationofthemitigationsrecommendedbyMitigationMeasureTRA‐1willensurethatanyimpactsthatwouldconflictwithadoptedpolicies,plans,orprogramsregardingpublictransit,bicycleorpedestrianfacilities,orotherwisedecreasetheperformanceorsafetyofsuchfacilitieswillbemitigatedtoaless‐than‐significantlevel.Futureapplicantswillberequiredtoimplementthefollowingactions.

TRA‐1:Developandimplementaconstructiontrafficcontrolplan

ForthetextofMitigationMeasureTRA‐1,pleaserefertothediscussionofImpactHAZ‐7above.

RemainingImpacts:Anyremainingimpactthatwouldconflictwithadoptedpolicies,plans,orprogramsregardingpublictransit,bicycleorpedestrianfacilities,orotherwisedecreasetheperformanceorsafetyofsuchfacilitieswillbelessthansignificant.

Findings for Cumulative Impacts  StateCEQAGuidelinesSection15130requirestheconsiderationofcumulativeimpactsinanEIRwhenaproject’sincrementaleffectsarecumulativelyconsiderable.Cumulativelyconsiderable“meansthattheincrementaleffectsofanindividualprojectaresignificantwhenviewedinconnectionwiththeeffectsofpastprojectstheeffectsofothercurrentprojectsandtheeffectsofprobablefutureprojects.”(CEQAGuidelinesSection15065(a)(3).)Inidentifyingprojectsthatmaycontributetocumulativeimpacts,theStateCEQAGuidelinesallowtheuseofalistofpast,present,andreasonablyanticipatedfutureprojects,producingrelatedorcumulativeimpacts,includingthosethatareoutsideofthecontroloftheleadagency.TheproposedSandHillWindRepoweringProject’scumulativecontributiontovariousimpactswasconsideredinconjunctionwithotherproposedandapprovedprojects,assetforthinChapter5ofthePEIR.

BasedonanalysisinthePEIRandtheentirerecordbeforetheCounty,theCountymakesthefollowingfindingswithrespecttotheproject’scumulativelyconsiderablecontributiontopotentialcumulativeimpacts.

Cumulatively Considerable Contributions to Potentially Significant Impacts that Cannot Mitigated to a Less‐Than‐Significant Level 

Aesthetics  

BasedonthediscussioninthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthattheproposedSandHillWindRepoweringProject’scontributionstocumulativeimpactsonvisualcharacteranddaytime/nighttimeviewswillbereducedbutnotrenderedlessthanconsiderablebyAlamedaCountyPolicyECAP105,togetherwithMitigationMeasuresAES‐2a,AES‐2b,AES‐2c,andAES‐5,andthatthereforetheproposedproject’scontributionstocumulativeimpactsaresignificantandunavoidable.Therearenootherfeasiblemitigationmeasuresthatcanreducetheseimpactstoaless‐than‐significantlevel.AsmorefullyexplainedintheStatementofOverridingConsiderationscontainedinExhibitCtotheResolutiontowhichtheseCEQAFindingsareattached,theCountyfinds

Page 89: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐89 

March 2016ICF 00630.15

 

thatthereareenvironmental,economic,orotherbenefitsoftheprojectthatoverridethesecumulativelyconsiderableimpacts.

Air Quality  

ConstructionemissionsofROGandNOXfortheSandHillWindRepoweringProjectaregreaterthantheBAAQMDthresholdsafterimplementationofMitigationMeasuresAQ‐1andAQ‐2,(seePEIRTable3.3‐11),andthereforetheproject’scontributionstocumulativeconstructionimpactsaresignificantandunavoidable.Therearenootherfeasiblemitigationmeasuresthatcanreducetheseimpactstoaless‐than‐significantlevel.AsmorefullyexplainedintheStatementofOverridingConsiderationscontainedinExhibitCtotheResolutiontowhichtheseCEQAFindingsareattached,theCountyfindsthatthereareenvironmental,economic,orotherbenefitsoftheprojectthatoverridethesecumulativelyconsiderableimpacts.

Transportation/Traffic  

Constructionofmultiplerepoweringprojectssimultaneouslyintheprogramareaandotherdevelopmentandinfrastructureprojectsinthevicinityoftheprojectareacouldpotentiallyresultincumulativeconstructiontrafficimpactsonfreewaysandcountyroadwaysusedforincommonforhaulroutesandworkeraccesstotheprojectsites.Thecumulativeconstructionimpactsontrafficoperation,safetyhazards,emergencyaccess,andbicyclefacilitieswouldbesimilartotheimpactsdiscussedinSection3.15.2andareconsideredtobesignificant.ImplementationofMitigationMeasureTRA‐1wouldreducetheproposedSandHillWindRepoweringProject’scumulativecontributiontothesignificantimpact.However,becausetheconstructionactivitiesandassociatedtrafficfromtheSandHillRepoweringProjectintheprogramareaareexpectedtoresultinasignificantandunavoidabletrafficimpact,anyproposedrepoweringprojectswiththeconstructionactivitiestakingplaceconcurrentlywithconstructionoftheSandHillRepoweringProjectthatsharecommonaccesswouldcontributetoasignificantandunavoidablecumulativeimpactontrafficoperation,safetyhazards,emergencyaccess,andbicyclefacilitiesontheroadwayandbicyclefacilitiesinthevicinityoftheSandHillRepoweringProjectarea.

Therearenootherfeasiblemitigationmeasuresthatcanreducetheseimpactstoaless‐than‐significantlevel.AsmorefullyexplainedintheStatementofOverridingConsiderationscontainedinExhibitCtotheResolutiontowhichtheseCEQAFindingsareattached,theCountyfindsthatthereareenvironmental,economic,orotherbenefitsoftheprojectthatoverridethesecumulativelyconsiderableimpacts.

Contributions to Cumulative Impacts that Can be Mitigated to a Less‐Than‐Significant Level  

Cultural Resources  

Simultaneousconstructionofmultiplerepoweringprojectsintheprogramareaandotherdevelopmentandinfrastructureprojectsinthevicinityoftheprogramareacouldpotentiallyresultinsignificantimpactsonhistoricresources,archaeologicalresources,andhumanremains,shouldtheybepresentwithintheprogramareaorthevicinityoftheSandHillWindRepoweringProjectarea.BasedonthediscussioninthePEIRandtheentirerecordbeforetheCounty,implementationofthemitigationmeasuresidentifiedinthePEIRwillensurethattheproposedprogram’s

Page 90: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐90 

March 2016ICF 00630.15

 

contributionswouldnotbesuchthattheywouldresultinorcontributetoacumulativeimpact.Thecontributionsarethereforelessthansignificant.

Geology, Soils, Mineral Resources, and Paleontological Resources 

Constructioninaseismicallyactiveregionputspeopleandstructuresatriskfromarangeofearthquake‐relatedeffects,particularlyseismicgroundshakingandlandslidingintheprogramarea.BasedonthediscussioninthePEIRandtheentirerecordbeforetheCounty,variousmechanismsareinplacetoreduceseismic‐relatedrisk,includingmitigationmeasuresidentifiedinthePEIRandproject‐specificgeotechnicalinvestigationandseismicdesignstandardspromulgatedbythecountybuildingcodes.TheproposedSandHillWindRepoweringProjectwouldnotcontributeconsiderablytotheexistingcumulativeimpactrelatedtoseismichazards.Thegeographicscopeofpotentialcumulativeeffectswithrespecttopaleontologicalresourcesisusuallylimitedtoareaswithinthephysicalfootprintofaproposedproject.WiththeimplementationofthemitigationmeasurespresentedinthePEIR,theproposedprogramcouldhavealess‐than‐significantcontributiontothecumulativeimpactonpaleontologicalresources.

Hazards and Hazardous Materials 

TheproposedSandHillWindRepoweringProject,aswellasothercontributingprojects,wouldberequiredtoadheretoregulationsthatgovernhazardousmaterialsstorageandhandling,waterqualityBMPs,FAAregulationsrelatedtoairspace,andfirepreventionandmanagement.BasedonthediscussioninthePEIRandtheentirerecordbeforetheCounty,thesemeasureswouldensurethatimpactsrelatedtoexposuretohazardousmaterialswouldbeminimizedand/oravoided.Therefore,theSandHillWindRepoweringProject’sincremental,less‐than‐significantimpactsintheseareaswouldnotbecumulativelyconsiderable.

Hydrology and Water Quality 

BasedonthediscussioninthePEIRandtheentirerecordbeforetheCounty,includingcompliancewithNPDESrequirementsandthemitigationmeasuresforhydrologyandwaterquality,impactsassociatedwithimplementationoftheproposedprojectwouldbelessthansignificant.OtherprojectsinthesamewatershedswouldalsoberequiredtocomplywithNPDESrequirements,ensuringthatsignificantimpactswouldnotoccur.

Noise 

TheanalysisinthePEIRandtheinformationintheentirerecordbeforetheCountyindicatesthatthereispotentialfortheproposedSandHillWindRepoweringProjecttoresultinnoisethatexceedsCountynoisestandardswhichwouldresultinsignificantcumulativeoperationalnoiseimpacts.ImplementationofMitigationMeasureNOI‐1,however,wouldensurecompliancewithCountynoisestandardsandwouldavoidsignificantcumulativeoperationalnoiseimpacts.

Constructionofmultiplerepoweringprojectssimultaneouslyintheprogramareacouldpotentiallyresultinacumulativeconstructionnoiseimpactatresidenceslocatedneartheconstructionactivities.However,theimpactwouldbetemporaryandlocalizedandimplementationofMitigationMeasureNOI‐2wouldreducecumulativeimpactstoaless‐than‐significantlevel.

Page 91: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐91 

March 2016ICF 00630.15

 

BasedonthediscussioninthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthattheproposedprogram’scontributionstocumulativenoiseimpactsonresidencesintheareawouldbelessthansignificant.

No Contribution to a Cumulative Impact  

BasedonthediscussioninChapter5ofthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthattheproposedSandHillWindRepoweringProjectwillnothaveacumulativelyconsiderablecontributiontothefollowingimpactareas.

Agriculturalandforestryresources.

Greenhousegases(theprogramwouldresultinalong‐termnetreductionofapproximately96,049metrictonsofCO2eperyear).

Landuseandplanning.

Populationandhousing.

Publicservices.

Recreation.

Utilitiesandservicesystems.

Findings and Recommendations Regarding Significant Irreversible Changes 

CEQASection21100(b)(2)(B)requiresthatanEIRidentifyanysignificanteffectontheenvironmentthatwouldbeirreversibleiftheSandHillWindRepoweringProjectwereimplemented.Section15126.2(c)oftheStateCEQAGuidelinescharacterizesirreversibleenvironmentalchangesasthoseinvolvingalargecommitmentofnonrenewableresourcesorirreversibledamageresultingfromenvironmentalaccidents.TheStateCEQAGuidelinesdescribethreedistinctcategoriesofsignificantirreversiblechanges:changesinlandusethatwouldcommitfuturegenerationstospecificuses,irreversiblechangesfromenvironmentalactions,andconsumptionofnonrenewableresources.Theprogram’ssignificantandirreversiblechangesarediscussedinSection5.3ofthePEIR.

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthattheSandHillWindRepoweringProjectwouldnotresultinanysignificantirreversibleeffectontheenvironment.

Explanation:Theprojectareaiscurrentlydevelopedasawindfarm,withcoexistinggrazingactivitiesthatwouldcontinue.TheEastCountyAreaPlandesignatestheentireprogramareaasLargeParcelAgriculture,whichcarriesazoningdesignationofAgriculture.Chapter17.06.040oftheAlamedaCountyCodeofOrdinancesindicatesthatprivatelyownedwindfacilitiesareaconditionallypermitteduseonnon‐primefarmlandwithintheAgriculturezoningdistrict.Theproposedprojectwouldnotcommitfuturegenerationsto,orintroduce,changesinlandusethatwouldvaryfromtheexistingconditions.

Theproposedprojectwillresultintheremovalofexistingfoundationsandtheconstructionandrepoweringofexistingwindfarmsonapproximately50,000acres(thetotalareawithintheAPWRA)

Page 92: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐92 

March 2016ICF 00630.15

 

inunincorporatedeasternAlamedaCounty.Theseactivitiesarenotexpectedtoalteroraffectthecoexistinggrazinguses,noraretheyexpectedtoresultinenvironmentalaccidentsthatwouldcauseirreversibledamage.Compliancewithrequiredplans,suchastheAltamontPassWindFarmsFireRequirements,willminimizethepotentialforaccidentsthatcouldresultinenvironmentaldamage.NoirreversiblechangestotheprojectareawouldoccurasaresultoftheproposedSandHillWindRepoweringProject.

Constructionofarepoweredwindfarmwouldrequiretheconsumptionofnonrenewableresources,suchasfuelforconstructionvehiclesandequipment.However,suchusewouldbelimitedtotheshort‐termconstructionperiod.OperationandmaintenanceoftheproposedSandHillWindRepoweringProjectwouldnotincreasetheuseofnonrenewableresourcesrelativetoexistingconditions.Thetemporary,construction‐relatedincreasewouldnotresultinsignificantuseofnonrenewableresourcesandwouldnotcommitfuturegenerationstosimilaruses.Moreover,aprimaryobjectiveoftheproposedSandHillWindRepoweringProjectistoprovideaneconomicallyviablesourceofclean,renewableelectricitygenerationthatmeetsCalifornia’sgrowingdemandforpowerandfulfillsnumerousstateandnationalrenewableenergypolicies.Theintentistospecificallyreducenetconsumptionofnonrenewablesourcesofenergysuchascoal,naturalgas,andotherhydrocarbon‐basedfuels.

Findings and Recommendations Regarding Growth‐Inducing Impacts 

Section15126.2(d)oftheStateCEQAGuidelinesstatesthatanEIRshoulddiscuss“…thewaysinwhichtheproposedprojectcouldfostereconomicorpopulationgrowth,ortheconstructionofadditionalhousing,eitherdirectlyorindirectly,inthesurroundingenvironment.”TheStateCEQAGuidelinesdonotprovidespecificcriteriaforevaluatinggrowthinducementandstatethatgrowthinanyareaisnot“necessarilybeneficial,detrimental,oroflittlesignificancetotheenvironment”(StateCEQAGuidelinesSection15126.2[d]).CEQAdoesnotrequireseparatemitigationforgrowthinducement,asitisassumedthattheseimpactsarealreadycapturedintheanalysisofenvironmentalimpacts.Furthermore,Section15126.2(d)oftheStateCEQAGuidelinesrequiresthatanEIR“discusstheways”aprojectcouldbegrowthinducingandto“discussthecharacteristicofsomeprojectswhichmayencourageandfacilitateotheractivitiesthatcouldsignificantlyaffecttheenvironment.”

Growthcanbeinducedinanumberofways,suchaseliminationofobstaclestogrowth,stimulationofeconomicactivitywithintheregion,andprecedent‐settingactionsuchastheprovisionofnewaccesstoanareaorachangeinarestrictivezoningorgeneralplanlandusedesignation.Ingeneral,aprojectcouldbeconsideredgrowth‐inducingifitdirectlyorindirectlyaffectstheabilityofagenciestoprovideneededpublicservices,orifitcanbedemonstratedthatthepotentialgrowthsignificantlyaffectstheenvironmentinsomeotherway.However,theStateCEQAGuidelinesdonotrequireapredictionorspeculationofwhere,when,andinwhatformsuchgrowthwouldoccur(StateCEQAGuidelines,Section15145).Theprogram’sgrowth‐inducingimpactsarediscussedinSection5.2ofthePEIR.

Findings:BasedonthePEIRandtheentirerecordbeforetheCounty,theCountyfindsthattheproposedprogramwouldnotinducegrowthforthefollowingreasons.

Page 93: Exhibit A Sand Hill Wind Repowering Project Written ... · perching opportunities. ... each component and phase of the project described in the PEIR, any variant of the project ...

Alameda County Community Development Agency  Exhibit A—Findings of Significant Effects 

 

Sand Hill Wind Repowering Project A‐93 

March 2016ICF 00630.15

 

AlthoughtheproposedSandHillWindRepoweringProjectinvolvestheconstructionofnewwindturbines,therewouldbeacommensurateremovalofoldturbines.Consequently,itwouldnotsubstantiallychangetheinstalledelectricalgenerationcapacityoftheAPWRA.Therefore,theSandHillWindRepoweringProjectwouldnotbeexpectedtoindirectlyinducepopulationgrowththroughtheprovisionofsubstantialnewsuppliesofelectricalenergy.

Typically,thegrowth‐inducingpotentialofaprojectisconsideredsignificantifitfostersgrowthoraconcentrationofpopulationinadifferentlocationorinexcessofwhatisassumedinrelevantgeneralplansorlanduseplans,orprojectionsmadebyregionalplanningagencies,suchastheAssociationofBayAreaGovernments.AsdiscussedinPEIRSection3.12,PopulationandHousing,theSandHillWindRepoweringProjectdoesnotincludetheconstructionordemolitionofanyhousing,andsowouldnothaveadirectimpactonpopulationorhousinggrowth.Furthermore,thenatureofthefacilitiesissuchthattherewouldbenodirectcustomersandnoincentiveforotherresidencesorbusinessestolocatenearby.Productionofelectricityfromtheprojectfacilitiesisongoingandwouldnotcreateadditionalavailabilityofenergyresourcesbeyondthosealreadypermittedforthefacilities.

Decommissioningandconstructionactivitieswouldresultinashort‐termincreaseinconstruction‐relatedjobopportunitiesintheAlamedaCountyregion.However,constructionworkerscanbeexpectedtobedrawnfromtheexistingconstructionemploymentlaborforce.Thelimited,short‐termopportunitiesprovidedbydecommissioningandconstructionwouldbeunlikelytoresultintherelocationofconstructionworkerstotheprogramregion.Therefore,theemploymentopportunitiesprovidedbyconstructionarenotanticipatedtoinduceindirectgrowthintheregion.