Exel Computer Systems SME 2014 presentation Engineer Scheduling

17
Exel Computer Systems SME 2014 presentation Engineer Scheduling “Get it right, first time & every time”

description

Exel Computer Systems SME 2014 presentation Engineer Scheduling “Get it right, first time & every time”. Exel’s Field Service Solution. Agenda. Engineer Scheduling - “ Get it right, first time & every time”. Why is scheduling so important / key drivers? - PowerPoint PPT Presentation

Transcript of Exel Computer Systems SME 2014 presentation Engineer Scheduling

Page 1: Exel Computer Systems SME 2014 presentation Engineer Scheduling

Exel Computer SystemsSME 2014 presentation

Engineer Scheduling “Get it right, first time & every time”

Page 2: Exel Computer Systems SME 2014 presentation Engineer Scheduling

Exel’s Field Service Solution

Page 3: Exel Computer Systems SME 2014 presentation Engineer Scheduling

Agenda

• Simon Spriggs

• Why is scheduling so important / key drivers?• Types of scheduling available in field service • The Eagle “assisted” scheduler – a different approach

Engineer Scheduling - “Get it right, first time & every time”

Page 4: Exel Computer Systems SME 2014 presentation Engineer Scheduling

Key “Field Service” drivers when scheduling

•Knowing engineers’ whereabouts (today & tomorrow)

•Knowing when jobs need to be done by (the SLA)

•Who is the right engineer for the job? (area / skill / customer)

•How well utilised is each engineer?

•Real time updates – can engineer have more work today?

•Knowing the local area / geography

•Does the customer need a timeslot

•Are the scheduling decisions correct?

Page 5: Exel Computer Systems SME 2014 presentation Engineer Scheduling

Types of scheduling currently on market

•Simple Allocation

•Intelligent Scheduling = huge expense

Eagle Approach =

•Assisted Scheduling

Page 6: Exel Computer Systems SME 2014 presentation Engineer Scheduling

• To get the right engineer…

• To the right place…

• At the right time.

• With the right kit.

Assisted Scheduling

Making it simple for any individual

Get plan right first time = better customer service = value to your business

Page 7: Exel Computer Systems SME 2014 presentation Engineer Scheduling

•Show engineers’ whereabouts (today, tomorrow etc)

•Shows when jobs need to be done by (the SLA)

•Shows who is the right engineer for the job? (area / skill / customer)

•Shows how well utilised is each engineer?

•Gives real time updates – showing engineers that could have more work

•Shows the local area / geography

•Gives timeslot options

•Presents correct scheduling options for the user to choose from?

Assisted Scheduling

Page 8: Exel Computer Systems SME 2014 presentation Engineer Scheduling

• Make the screen familiar for the user

Assisted Scheduling

How Eagle makes it simpler…

Similar to other Office applications

Page 9: Exel Computer Systems SME 2014 presentation Engineer Scheduling

• Make information available as and when required

Assisted Scheduling

How Eagle makes it simpler…

Expand panels / pull in hidden panels

Page 10: Exel Computer Systems SME 2014 presentation Engineer Scheduling

• Make information available as and when required

Assisted Scheduling

How Eagle makes it simpler…

Split over multiple screens

Page 11: Exel Computer Systems SME 2014 presentation Engineer Scheduling

• When booking utilise a configurable rule engine

Assisted Scheduling

How Eagle makes it simpler…

Guide the operator to the best decision Best for your customer & for your business

Response / SLARecommended Engineer / SkillTravel + travel legs (grouping of calls)Reservation of capacityDifferent rules for PM vs Reactive cases+ many more

Page 12: Exel Computer Systems SME 2014 presentation Engineer Scheduling

Assisted Scheduling

Plus ordering/routing & optimisation

Getting more jobs done each day Making sure the plan is achievable/realistic

• Real time ordering for optimum efficiency• Plus takes into account all travelling times• Optional job optimisation if required

Page 13: Exel Computer Systems SME 2014 presentation Engineer Scheduling

Key “Field Service” drivers when scheduling

•Knowing engineers’ whereabouts (today & tomorrow)

•Knowing when jobs need to be done by (the SLA)

•Who is the right engineer for the job? (area / skill / customer)

•How well utilised is each engineer?

•Real time updates – can engineer have more work today?

•Knowing the local area / geography

• Time slots for

•Are the scheduling decisions correct?Assisted Scheduling

Page 14: Exel Computer Systems SME 2014 presentation Engineer Scheduling

In Summary

Assisted Scheduling = Keeping your customers & boss happyAssisted Scheduling = making it simple for your users

Page 15: Exel Computer Systems SME 2014 presentation Engineer Scheduling

In Summary

Assisted Scheduling = “de-mystification” of the scheduling process

Get plan right first time = better customer service = value to your business

Page 16: Exel Computer Systems SME 2014 presentation Engineer Scheduling

Summary

Page 17: Exel Computer Systems SME 2014 presentation Engineer Scheduling

Thank you for Listening

Any questions

Stand M1470