exchange_eZone_March4_2013

72
C ontractor’s Z one weekly newspaper March 4, 2013 Vol. 7, No. 09 Placer County Contractors Association & Builders Exchange BBQ Master Jeff Henry Cooks Up A Storm At PCCA BBQ & Mixer

description

 

Transcript of exchange_eZone_March4_2013

Page 1: exchange_eZone_March4_2013

Contractor’s Zone

Contractor’s Zoneweekly newspaper

March 4, 2013Vol. 7, No. 09Placer County Contractors Association & Builders Exchange

BBQ Master Jeff Henry Cooks Up A Storm At PCCA BBQ & Mixer

Page 2: exchange_eZone_March4_2013

March 4, 2013Page 2 Contractor’s Zone• .Contractor’s Zone

About the cover . . .ThefreeBBQlunchwasprovidedbyPCCAtomembersandguests,manyofwhomwerealreadyatthePCCARosevilleofficeastheyhadattended the morning legal semi-narprovidedbyLisaNicholisfromthe firm of MurphyAustinAdamsShoenfeldLLP.

FormoreinformationabouttheLe-galUpdateMs.Nicholisprovided,whichwascalled,CriticalChangesThatCouldCostYouYourMoneyor Your Freedom, please contactheratheroffice,916-446-2300.

PCCAhostsmonthlyMembershipMixers, often in conjunction withimportantseminars,onceamonth.Details are always available righthere in the newspaper, or youcan contact Jeff Henry, DirectorofBusinessDevelopment,at916-771-7229.

Upcoming PCCA events . . .•March14:CPRClass,RosevilleOffice

•March19:PG&EResidentailEnergyEfficiencyTrainingCourse

•March21:PrevalingWageSeminar

•March22:PCCAandHomewoodBuildingSupplyMixer

•April2:PlansOnlineMarketingandPlanTakeoffClass

•May31:SpringGolfTournament

Page 3: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

Inside This Issue

This table of contents is linked to make it easy for you to get to the information you want. If it looks like a link (blue & underlined) then it is! Just click on it to go directly to the page you want. Use the navigation bar at the bottom of the right-hand pages to return to this page.

InspirationfortheWeek Page2

YourWeeklySmile Page2

IndustryLinks Page2

TheWeek’sWeatherForecast Page3

PCCACalendarofEvents Pages4-5

ContractorYellowPages Page6

NewsBriefs Pages7-9

IndustryNews Pages10-13

ClassifiedAds Pages14-16

WeeklySafetyMeeting Page17

NewPlans Pages18-19

WeekAtAGlance Pages20-22

PlansOnFile Pages23-63

BidResults Pages64-65

LegalAds Pages65-69

BottomlineLawyers Page32 WebsiteBozzutoInsurance Page64 WebsiteCapitalRubberCo.,Inc. Page6 WebsiteDiamondPacific Page7 WebsiteInlandBusinesSystems Page24 WebsiteJensenMasonry Page28 WebsitePhiladelphiaInsurance Page15Q&AInsurance Page69 WebsiteSmithChiropracticandMassage Page6 WebsiteTheCappsGroup Page36 WebsiteTrePazziTrattoria Page26 WebsiteStateFundInsurance Page19 Website

SUPPORT OUR ADVERTISERS!They support the PCCA

and deserve your business!

Don’t let the money ship

sail without you!A recent study confirmed that Internet sales accounted for a whopping 5% of all US sales in 2010 — and it’s growing yearly. Don’t be left behind. Run your affordable ad in this modern, digital newspaper, published weekly. Call Steve Berlin at 916.729.5432 for advertising rates. PCCA members get 15% off published ad rates!

Page 4: exchange_eZone_March4_2013

March 4, 2013Page 2 Contractor’s Zone• .Contractor’s Zone

Association Links CSLB Contractor’s State License Board OSHA Occupational Safety & Health Administration GSBE Golden State Builders Exchange AIA American Institute of Architects AGC Associated general Contractors BIA Building Industry Association SCIF State Compensation Insurance Fund Employers Guardian Human Resources American Subcontractors Association

Projects Online DGS Contracts DOT DOT District 3 SMUD CSI Code List Fed Biz Opps

Safety OSHA Hazard Communication OSHA Safety & Health Topics Click SafetyOnline OSHA Safety Classes Employer Records of Occupational Injury & Illness Governor’s Office of Emergency Services Injury & Illness Prevention Program Risk Management – IIPP

State & Federal Links California Building Standards California Prevailing Wage Rates Federal Prevailing Wage Rates California Dept. of Industrial Relations California Environmental Protection Agency Mechanics Lien Law Information Mechanics Lien Guide

Local Government Links California Chamber of Commerce City of Auburn City of Rocklin City of Roseville City of Lincoln County of Placer

Construction Industry Links

What lies behind us and what lies before us are tiny matters compared to what lies within us.

— Ralph Waldo Emerson

Q: Why did the architect’s lack of money mean he couldn’t move a column?

A: Because he couldn’t budge it.

Yes!We’ve saved advertising space for you!

Call us at 916-729-5432

Page 5: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

PCCA:

PresidentPatrick RemingtonRemington Construction

Vice PresidentChris HarrisJames L. Harris Painting, Inc.

DirectorCheryl GibsonVon-Jac Development

DirectorCyndi CookCook Design Company

DirectorAdam NooraniHomewood Lumber

DirectorEdward JohnsonWarren G. Bender Co.

DirectorMaggie MarfiaMoule’s Foothill Glass

VP Public RelationsTim BuskHeritage Painting

VP Governmental AffairsJack RemingtonAndregg Geomatics

PBX:PresidentJohn BrunJohn Brun Masonry

Vice PresidentChad TwardusTwardus Construction

DirectorNick ForestiereGurnee & Daniels LLP

DirectorMike BennettBennett Tile

Staff:Chae Gale-Director of [email protected]

Jeff Henry-Director of Business [email protected]

Kellie Russell-Auburn Planroom [email protected]

Dianne Barnao-Roseville Planroom [email protected]

Jim Couk - Scan Technician

Placer County Contractors Association10656 Industrial Ave., Ste.160, Roseville, CA 95678 - 916-771-7229

231 Cherry Ave., Ste.101, Auburn, CA 95603 - 530-889-3953Open Monday-Friday: 8am-5pm

www.placerbx.com

Board of Directors

RosevilleToday66oSunny66o-37o

65o

46o

Tuesday Wednesday Thursday Friday

59o

37o57o

39o65o

42o

AuburnToday62oSunny62o-40o

61o

44o

Tuesday Wednesday Thursday Friday

53o

37o52o

39o60o

43o

Page 6: exchange_eZone_March4_2013

March 4, 2013Page 4 Contractor’s Zone• .Contractor’s Zone

M a r c h 2 0 1 35 QSP/QSDTrainingSeminar hostedbyBTConsulting8:30am to4:30pmRoseville

6 QSP/QSDTrainingSeminar hostedbyBTConsulting8:30am to4:30pmRoseville

7 QSP/QSDTrainingSeminarhosted byBTConsulting8:30amto4:30pm Roseville

14 CPRClassRosevillePCCA Classroom.9:00amto2:00pm $75.00perstudent.

19 PG&EResidentialEnergyEfficiency TrainingCourseatRoseville

21 PrevailingWageSeminarhosted byBluePointPayrollatRoseville Planroom

21 MonthlyMixeratHomewoodLumber.

A p r i l 2 0 1 3

2 PlansOnlineMarketingand PlanTakeoffClass.

8 QSP/QSDTrainingSeminarhosted byBTConsulting8:30amto4:30pm Roseville

9 QSP/QSDTrainingSeminarhosted byBTConsulting8:30amto4:30pm Roseville

10 QSP/QSDTrainingSeminarhosted byBTConsulting8:30amto4:30pm Roseville

11 CPRClassRosevillePCCA Classroom.9:00amto2:00pm $75.00perstudent.

M a y 2 0 1 39 CPRClassRosevillePCCA Classroom.9:00amto2:00pm $75.00perstudent.

PCCA’sSpringGolfTournamentFriday,,May31st,2013

Timber Creek Golf CourseRoseville, CA

Check-in Time: 7:030 a.m.Breakfast: 7:00 a.m.Start Time: 8:00 a.m.

4 Person Scramble ~ Shotgun Start

$100.00 per Player$400.00 per Foursome

Registration Includes: Green Fees, Cart, Range Balls, Tee-Prizes,BreakfastBurrito&AwardsLuncheon

Tri-TipandBBQChickenLunch,RafflePrizes,Games,VendorBooths,allthemakingsofyetanotherspectaculargolfevent!

REGISTER EARLYFAXTO916-771-0556~InvoiceWillBeSent

Proceeds to help fund the Roseville High School Geometry In Construction Trades Program. Students will be on the course displaying samples of the trades they are learning in this exceptional course. Help us support this extremely im-portant educational effort, as well as further our scholarship program. Golf and Sponsorship Opportunities are available.

10656 Industrial Ave., St 160, Roseville, CA 95678Phone: (916) 771-7229 Fax: (916) 771-0556

231 Cherry Ave Suite 101, Auburn, CA 95603Phone: (530) 889-3953 Fax: (530) 889-3956

TeamName

Player1:

Player2:

Player3:

Player4:

Page 7: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

MarchSUNDAY MONDAY TUESDAY WED. THURSDAY FRIDAY SAT.

2 4 2 6

19

1 3 14

22

9

18 20 21

29 30

10

2 5 2 8

March 3

1 7

6

23

11

7

16

2 7

4

12

5

15

QSP/QSDTrainingSeminarhostedbyBTConsulting8:30amto4:30pmRoseville

CPRClassRosevillePCCAClassroom

PG&EResidentialEnergyEfficiencyTrainingCourse

WageSeminarhostedbyBluePointPayroll

MonthlyMixeratHomewoodLumber

8

Page 8: exchange_eZone_March4_2013

March 4, 2013Page 6 Contractor’s Zone• .Contractor’s Zone

Contractor Yellow Pages

MasonryJensen

Full Service Masonry ContractorLicense # 804650

Mark Jensen916.663.3429

[email protected]

Smith Chiropractic and MassageAuburn

13136LincolnWayAuburn,CA95603-4114

[email protected]

http://www.smithchiropractic.net

Family runand family friendlyhealthcarefor all ages. Includes chiropractic careandmassagetherapy.ServingtheAuburnregion formore than49years.Call (530) 885-8205foranappointment.

928 Lincoln Way, AuburnOpen 11:30 am - 9:00 pm M-F

Open at 4:30 Saturday & Sunday

530.823.2994

Traditional Italian Cuisinein Downtown Auburn

www.trepazzi.net Outdoor dining!

The Capps GroupA Professional Real Estate Team

Kevin Capps - Managing [email protected] (DRE 01705659)

Carolyn Hearn - [email protected] (DRE 01483632)

530-823-2111 Office www.cappsgroup.com856 Lincoln Way, Auburn, CA 95603

LegaloptionstoimproveyourfinancialfutureBankruptcy•Company&PersonalDebt•Foreclosure

CALL TODAY (530) 888-7100www.BottomLineLawyers.com985LincolnWay,Auburn,CA95603

WebSiteAboutUsOfficeInfoNewPatientsBulletinsProductsCouponSpecialsLife&ChiropracticHydroMassageAvailable

Smith Chiropractic and MassageAuburn

Back Pain? You don’t need to live with the pain.Chiropractic care can help. Call Dr. Keith Smith inAuburnforafreeconsultation.ServingtheAuburncommunityfor49years.Clickalink,attheright,formoreinformation.

Page 9: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

Two new Bridges Planned

The cities of Sacramento and WestSacramento are working together tofinancetwobridges,anefforttheysaywillboostdevelopmentonbothbanksandknitthecommunitytogether.Sac-ramento has just three downtownriver crossings in its downtown andthemodestTowerBridgeandtheanti-quatedIStreetspanarenotsufficientto handle current traffic, never mindanticipatedtrafficloads.

Thetwocitieshavejointlyappliedfor$77 million in federal funds to builda bridge into Sacramento’s down-townrailyardjustnorthoftheIStreetBridge.Andtheyareabouttolaunchafundingefforttobuildanotherbridgesouth of downtown that would likelylink Broadway in Sacramento with15thStreetinWestSacramento.Officialsalsotalkaboutbuildingape-destrian-and-bicyclebridgebetweentwobuddingneighborhoodsnear theriver, theRStreetCorridor inSacra-mentoandtheBridgeDistrictnexttotheRaleyFieldbaseballparkinWestSacramento.

WestSacramentohasspentmillionsofdollarsinthelastfewyearsonnewstreets in the Raley Field area, andis about to launch riverside housingandofficeprojects.TheCity ofSac-ramentothisyearwillextendFifthandSixthstreetsintoitsemptydowntownrailyardnexttotheriver,opening200acres fordevelopment.Justsouthofdowntown, Sacramento plans newhousing and businesses at thewestendoftheBroadwaycorridor,aswellasariverfrontdevelopmentjustsouthofdowntown.

Officials in the two cities have beenstudying bridge concepts for severalyears, but previously said the firstspanwas probablymore than a de-cadeaway.Now,theysaybothbridg-es could be reality in as few as sixyears.Wordon the initial$77million

News Briefs

Continued on next page

fundingrequestisexpectedshortly.

“Unofficially,weheard(ourapplica-tion) is really strong,exactly in thewheelhouse,” Sacramento PublicWorksDirectorJerryWaysaid.

Themoneywouldgotoanorthernbridge to replacecarusageon the101-year-old I Street Bridge. Thatspan,whichisownedbytheUnionPacific Railroad, would remain atrain bridge. But its elevated carramps likely would be torn down,opening up acreage for develop-mentalongtheriver.

Thecitiesarepreparinganotherre-questthisspringforfederalfundstolaunchaBroadwaybridgeeffort.

$24 Million Secured For King’s Beach Work

TheKingsBeachthree-laneprojectwill be moving forward this sum-mer.With$24millioninconstructionfunding secured out of a needed$34million,certainelementsoftheKingsBeachCommercialCore Im-

provement Project have been pri-oritizedintothe“CoreoftheCore,”with construction targeted to startmid-August. As for the additional$10million,thecountywillapplyforfundingthroughtheStateTranspor-tation Improvement Program, andothergrantprograms.

Projects within the “Core of theCore”whichisexpectedtotakeupto three construction seasons tocompleteinclude:

•FullstreetscapeimprovementsfromSeclineStreettotheMinnowparkinglot entrance, including Highway 28resizing, installation of roundaboutsandcreationofbikelanes.

• Bike lanes and roadway stripingfrom Highway 267 to ChipmunkStreet.

•Fiveofsevenstormdrainsystems/crossings.

• Three of four remaining satelliteparkinglots.

http://designcenters.paccoast.com

Page 10: exchange_eZone_March4_2013

March 4, 2013Page 8 Contractor’s Zone• .Contractor’s Zone

• Improved transit facilitiesandbusshelters.

Residential Construction Sector Continues To Grow

U.S. sales of previously occupiedhomes rose in January to the sec-ond-highest level in three years, asignthatthehousingmarketissus-tainingitsrecoveryandhelpingbol-ster theeconomy.TheNationalAs-sociation of Realtors reported lastweek thatsales rose0.4percent inJanuary compared with Decembertoaseasonallyadjustedannualrateof4.92million.Thatwasthesecond-highestsalespacesinceNovember2009,whenatemporaryhomebuyertaxcredithadboostedsales.

ThemedianpriceforahomesoldinJanuarywas$173,600,a12.3per-centincreasefromayearago.

Analysts say purchases would behigher if more homes were avail-able.The supply of homes for saledroppedtonearlyaneight-yearlowin January. The 1.74 million pre-viously owned homes for sale atthe end of January represented a4.2-monthsupplyatJanuary’ssalespace.That’sthelowestsupplysinceApril2008.The inventoryofhomesfor sale is 25.3 percent below thelevelayearago,whentherewasa6.2-monthsupplyofunsoldhomes.

Risingdemandforhomesisencour-agingbuilderstostepupproduction.In January, builders started con-struction at a seasonally adjustedannualrateof890,000homes.Thatwas down fromDecember butwasstillthethird-highestpacesincemid-2008 and nearly 24 percent abovethelevelayearago.

Andapplicationsforbuildingpermits,

asignoffutureconstruction,roseinJanuary to theirhighestpoint sinceJune2008.

Voters Approve Casino

Unofficial results from the YurokTribe’s special election are in andthe vote tally supports building thefirst Yurok owned hotel-casino inKlamath.

Yurok Tribe Chairman ThomasO’RourkesaidconstructionwilllikelystartinlateMarch.

The councilmailed special electionballotsonJan.25tovoteonwhethera portion of the $27.5 million wonfromaclassactionsuitagainst theUnitedStateswould fund construc-tionofthehotel-casino.

Facebook West Campus Project Moves Forward

Facebook’s plan to build a secondcampusonthewestsideofBayfrontExpressway moves to the MenloPark Planning Commission thisweek. The city council has alreadyapproved the development agree-mentfortheWestCampusproject.

The social network company hasaskedthecity torezone its22-acreWest Campus site because thebuilding height there is now limitedto35feet.

The 43,555-square-foot office androoftopparkthatFacebookwantstobuild above a surface-level parkinglotwould reachaheightof73 feet.ThebuildinghasbeendesignedbycelebratedarchitectFrankGehry.

The commission is to consider al-lowingremovalof175heritagetreesand approving Facebook’s agree-menttoprovideeither$4.5millionin

feestothecityforaffordablehousingorputup15affordablehousingunitselsewhere,oracombinationofboth.

George Reed, Inc. Wins Western Parkway Bid

Fifteen companies bid on the $1million Western Parkway projectinYubaCity,whichwill construct anewsignalizedintersectiononStateRoute20(SR20)atWesternPark-waytoprovideimprovedtrafficcircu-lationtothearea.

GeorgeReed Inc. ofModesto sub-mittedthelowbidof$836,782whileSierraNationalConstructionofCar-michael’sbidof$1.7millionwasthehighestamongthe15contractors

Project construction is expected tobegininAprilwithcompletioninSep-tember,duetothelongleadtimeforthetrafficsignalequipment.

Sacramento Mixed-Use Project To Start Up

After15yearsofplanning, construc-tionwill begin soonona$42millionprojectindowntownSacramentothatofficials say will be a transformativehousing project featuring live-workspace for artists. It’s called the “TheWal” – short for Warehouse ArtistsLofts – a mix of apartments, retailshops,restaurantsandofficespackedintotwosix-storybuildingsonRStreetbetween11thand12thstreets.

Thedenseurbanconceptispartofa years-long effort to turn the for-mer industrialcorridor intoanartsandcultureneighborhood.

“Ithinkthereiscoolenergydevel-opingonRStreet,”saidAliYousse-fiofCFYDevelopment,theprojectleader. “It’sour intention toadd tothat.”

News BriefsContinued from last page

Page 11: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

To Run Your Legal Ad, Please Visitwww.thedailyreporter.net

Or Give Us A Call 916-729-5432

CFY, which turned the former GlobeMillsplantinAlkaliFlatintoapartments,willteamwithHollidayDevelopmentoftheBayAreaandtheCapitalAreaDe-velopmentAuthority,orCADA,toreha-bilitateawarehouseandcoupleitwithanewbuildingnextdoor.

Thetwostructureswillhousemorethan 150 residents in 116 apart-ments,featuringarts-relatedstoreson the ground floor and a restau-rant with outdoor seating at the11thStreetcorner,toberunbytheownersofBurgers&Brew.

Developers plan to add to thestreet’sofferingssoonbyturningaformerstateofficebuildingat15thand R streets into restaurant andretail space.To thewest, the Foxand Goose restaurant and adja-cent properties have seen recentupgrades.

Work Flurry Expected In Vallejo

Betweenfaceliftsforexistingparks

and plans to expand others andcreatestillmore,theGreaterValle-joRecreationDistrictisgearingupfor “a flurry ofwork this summer,”says General Manager ShaneMcAffee.

Some frugality and about $1 mil-lion collected from theMeasureKparceltaxpassedinApril isallow-ingthedistricttomoveforwardwithsomelong-stalledprojects,hesaid.Measure K is a six-year, $48-per-householdparceltax.

“We’regoingtobeputtingupshadestructuresinthedogpark,paintingthe(Vallejo)CommunityCenter(onAmador Street) and re-paving theDan Foley parking lot,” McAffeesaid.“Wehopetobuildtwoorthreenew parks/playgrounds to replaceexistingones,thissummer,also.”

DaalwykParkislikelyamongthosegetting a facelift, he said. Othersthat may be in line for work areFederalTerracePark,NorthValle-jo’s Setterquist Park, CastlewoodPark near Hogan Middle Schooland central Vallejo’s WashingtonPark,hesaid.

Longer-term projects in theworks include a park in Hid-denbrooke’s south end, some-thing residents there havebeenawaitingnearlyadecade,McAffee said. InApril, the CityCouncil approved the project,which will be overseen by thecity. The park will be operatedand maintained by GVRD. TheVallejoCityUnifiedSchoolDis-trict owns the site, where aschool had been planned. Anyfutureschoolwillabutthepark.

Thursday March 14th from 9:00 am to NoonCPR 2 Year Certification Class

RosevillePCCAClassroom10656IndustrialAve,Suite160Roseville,CA95678

CourseandCertificateis$70.00PerStudent.Youcanpayatthedoor.AlloftheclassesofferedbySimplyCPRarebasedontheAmericanHeartAssociationstandards.StudentscompletingtherequirementsoftheSimplyCPRcourseswillreceiveaCPRorfirstaidcard.

MonthlyTrainingProgramtohavethecertificationclassesavailableonaregularbasis,thesecondThursdayofeachmonthatthePCCARosevilleClassroom.

Calltoscheduleatrainingsessionforlargergroupsinyourownofficeifyouwouldpreferanonsiteclass.

RegisterNow!CallJeffat916-771-7229orfaxthisbackto916-771-0556

Page 12: exchange_eZone_March4_2013

March 4, 2013Page 10 Contractor’s Zone• .Contractor’s Zone

The purpose of construction fieldcrew time cards is to keep trackofemployeehourssoyoucanpaythem properly, right? Not entirely.If you alsowant to know your jobcosts, your timecardcanbecomean importantbusiness tool tohelpyou make more money. You mayopttousesoftwareapplicationstotrack employee hours, but if youare still tracking hours on paper,you need to make sure that youaremaking themost of your timecard.Tomakethishappen,designyour time card to reflect how youdobusiness.

Designed properly, your time cardcan be an invaluable tool to tracklaborproduction,fieldquantitiesin-stalled,equipmentusageandma-terials consumed. After gatheringinformation from time cards, youcan create a production trackingsystem to give your field foremenand superintendents updated job-cost data so they will know howwellthey’reperformingeveryweek.To design an integrated time cardtoworkforyou,haveyourestima-tor, project manager and foremangathertogethertodeterminewhichwork-task cost codes youwant totrack.

When you bid a job, the estima-tor calculates exact quantities ofwork for each part of the project.Forexample,tobidanewconcrete

Industry News

Track Production Properly

aretryingtohitandreceiveaweek-ly updateof howwell theyaredo-ing.Before the job starts, the esti-matorshouldmeetwith theprojectmanagerandforemantoreviewthebidandquantitiesallocated toper-formthejob.Theforemanthenwillhaveabudgetgoaltomeet.Tokeeptrackofhowwell thecrew isdoingversusthejobestimateandbudget,make sure your foreman recordsthe quantities installed everyweekasnotedonthetimecard.Thisway,the foreman and project managercan review the progressweekly toseeiftheyarestayingonbudget.

Estimators also calculate the num-ber of equipment hours required tobuildprojects.Thetimecardcanbeused to track equipment usage aswell.Setupyourtimecardtoincludea listing of all of your equipment,andhavetheforemanrecordwhichequipmentisusedonthetimecard.Your accountingmanager can thenjob charge your equipment usageweeklytothecorrectjobs,basedonwhereitwasused.Attheendofthejob,youcan review theestimateofequipment usage versus the actualhours spent on the projects. Yourforeman and project manager canalsomonitorthebudgetversusactu-alcostforequipmentifgivenaweek-lyupdateofthesenumbers.Youcandothesamethingwithmaterials.

At the end of eachweekly pay pe-

slab warehouse floor, the estima-tor“takesoff”theamountof labor,materialandequipmenttoformtheslabedge,placeconcretematerial,finishtheslab,strip theformsandcleanup.Eachoftheseoperationsrequires a bid estimate of crewhours. Your time card cost-codecategories must match how youestimate and bid so you have theinformation required to estimatedifferentpartsofthejob.

On every time card, the workshouldbebrokendownexactlyastheestimatorbidthejob.Byhavingthecodesmatchthetimecard,youcan calculate the hours requiredto perform each task after projectcompletion to see if your produc-tionratesareaccurateforthesakeoffutureestimation.

When team leaders know whattheyare trying toaccomplish, it iseasierforthemtohit their targets.Inordertomotivateyourforemen,theymustknowthequantitiesthey

Still using time cards? Design them so they earn money for you.

your time card can become an

important business tool to help you

make more money

Page 13: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

Track Production ProperlyStill using time cards? Design them so they earn money for you.

riod,addupthenumberof hours spent in eachcost-code work item,andcompareittothejobbudget. Review thesenumbers with your fieldforeman every Mondaymorning to make surethey know where theystand and what theyhave to do to keep thejobonbudget.Youresti-matoristhebestpersonto prepare this weeklyrecapbecauseheorsheclearly understands thecostcodesandjobbud-gets.Plus,theestimatorwillbethefirsttodiscov-erwhether the estimateiscorrect.Bydiscoveringany hours that are overbudget early, the fieldteamcanmakeimmedi-ateadjustmentstobringthejobinonbudget.

Tracking production iseasy if you design yourtimecardproperly.Haveyourforemanturninev-eryfieldemployee’stimecarddailytomaintainac-curacy.Keepyourcostsupdated every week,make sure the foremanknowswhetherthejobisonbudgetandthenstartmakingmoreprofit.

Page 14: exchange_eZone_March4_2013

March 4, 2013Page 12 Contractor’s Zone• .Contractor’s Zone

Work is expected to start as soonas next week to widen Highway 99throughsouthStockton,a$214millionprojectintendedtorelievetrafficcon-gestionandcreateasaferandmoremodernroadway.

Constructionworkwillbringtemporarydelaysanddetoursuntil theproject’sexpected completion date in 2015.Anddriverswillseesomepermanentchanges taking shape, with the re-placementoradditionofinterchangesinplacesandtheremovalofon-andoff-rampsinothers.

Spanning from near the CrosstownFreewaysouth toArch-AirportRoad,it is part of anotherwidening projectunderwaythatwillwidenHighway99from four to six lanes through Man-teca.AndthehighwayisseeingotherimprovementsoutsideofSanJoaquinCounty,too.

Highway 99 constructionRoadworkalongHighway99insouthStocktonisexpectedtocontinueinto2015. There are four stages of con-structionthatmightoverlapinparts.Stage 1: Build new interchange andrail bridge at Golden Gate Avenue.Includeswideningofmostofthefour-mileprojectandconstructionofatem-porarybridgefortrainsuntilaperma-nentreplacementisbuilt.

Stage 2: On- and offramps at Dr.Martin LutherKing Jr. Boulevardwillremain open until newGolden Gateinterchangeopens.MLK interchangewill be replacedwith two-way bridgeoverhighwaythatconnectswithMainStreet.

Stage 3: Replaces the Main Streetbridgetowidenthehighwaybeneath.Stage4:ReplacestheMariposaRoadinterchange,whichwillfullyclosetheaccessforatleastsixmonths.

Callingitthe“MainStreetofCalifornia,”it’saconnectionbetweentheregion’sagricultureandthemarketplace,saidMalcolm Dougherty, director of theCalifornia Department of Transporta-tion,orCaltrans.“It’sveryimportanttotheSanJoaquinValley.”

Dougherty was at a groundbreakingceremonyWednesdaythatdrewlocaltransportationofficialsandelectedof-ficialsfromStocktonandcountygov-ernment.

There,too,wasRep.JerryMcNerney,D-Stockton,whopraisedtheproject’seconomic impact. “It’s creating jobsrightnow,righthere...anditalsoim-provesourinfrastructure,”whichposi-tionstheareatoattractmoreemploy-ers,hesaid.

Designstandardshavechangedsincethe building of Highway 99, whichpredates theconstructionof I-5,saidCaltransprojectmanagerJesPadda.The project replaces access pointsatthesamelevelasthehighway,in-stead using interchanges with moreroomtospeeduptomergewithtraffic.Thechangemakes fora safer road,hesaid.“We’reupgradingHighway99fromanexpresswaytoafreeway.”

Those changes also require morespace,whichmeansCaltransneededto acquire property. It amounts to allor part of 133 parcels of land.Most

of these were already bought fromthepropertyowners,andCaltransof-fers relocation assistance, too, saidspokeswomanChantelMiller.

Millersaidthereareninepropertiesinthecondemnationprocessthatwouldlikelybeacquiredthroughcourtaction.

Wanda Waybright’s family soldpartoflandithasownedformorethan three decades. Waybright,63, said she’s going to miss thecherries and apricots from thetrees her brother planted in thebackyard.

BothpropertiesarenearGoldenGateAvenue.SoisJodyShahan’s.Butit’sfar enoughaway that hedidn’t havetosell.

Ahousethatwassoldandleftvacanton the corner had caught fire, once,andhewasglad tosee it torndownrecently.Shahan,53,saidhe’s inter-ested in seeing how noisy the newfreewaywillbe.

Buttheplanistoturnhisstreetintoacul-de-sac.Shahansaidhelikesthat,becauseitwouldstopspeedingtrafficinhisneighborhood.

Originally slated as a $250 millionproject, the south-Stockton widen-ing came in from bidding at $214million.Itispaidforwith$132millionfromProposition1B,a transportationbond approved by voters statewidein2006.Italsoreceives$47.5millionfrom Measure K, the 1/2-cent salestaxapprovedbyvotersinSanJoaquinCounty.

California Highway UpdateIndustry News

Page 15: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

By Shauna Krause and David KalbCapitol Services, Inc.

When contractors must be on-the-job you can count on the CapitolConnection to keep you up on thelatestmeetingoftheCaliforniaCon-tractor’s State License Board. Welearned a great deal of interest tocontractorsdirectlyrelatedtogettingpaid…

Overtheyearswe’vereceivedmanyquestions regarding thestate’sMe-chanicsLienlaws.AsdiscussedattheContractorBoard’srecentmeet-inginSacramento,anumberoflegalrevisionstookplaceonJuly1,2012,whichmainlychangedthewordingand format of theMechanics Liennotices. Because of these chang-es,theCSLBhasupdatedreleaseforms to reflect the new languageandmade them available on theirwebsite(www.cslb.ca.gov).

Contractors can use these docu-ments to protect their lien rightson construction projects. Amongthe forms included by the CSLBare: theNotice toPropertyOwnerstatement, required as part of thePreliminaryNotice(formallyknownas the20-dayPreliminaryNotice);NoticeofMechanicsLien;andtheConditionalandUnconditionalRe-lease of Progress and Final Pay-ments.

As most subcontractors and sup-pliers know, it is important to usetheproperformsinordertoprotectyour lien rights. As a refresher,the CSLB has summarized someof the requirements including thatThe Preliminary Notice should bedeliveredtothehomeownerinper-son or by certified, registered, orexpress mail, or overnight deliv-

Capitol Connection Q&A Resource For ContractorsKalb Q & A

Shauna KrauseDavid Kalb

ery,withareceiptofthemailingasproof.“Noticecanbegivenatanytimebeforeworkstartsorproductsare delivered, and up to 20 daysafter. If notice is givenmore than20daysafterworkordelivery,yourlienrightsonlyapplytotheworkorproducts provided 20 days beforethenoticewasgiven,andanytimethereafter.”

TheNoticeofMechanicsLienmustaccompany the lien claim and besent via certified, registered, orFirstClassmail(proofofmailingisrequired).As indicated in a CSLBIndustry Bulletin, “Failure to sendtheproperlywordedNoticewiththelien claim could result in the lienbeingunenforceable.”

If youhaveanyspecificquestionsregardinglienlaws,itwouldbead-visabletodiscussthiswithyourle-galcounsel.

AlsohighlightedattherecentCSLBmeeting was the Senior ScamStoppersprogramaimedatprovid-inginformationaboutconstruction-related scams and how seniorscan protect themselves when hir-

ing a contractor. The CSLB of-fers these seminars several timesamonthfeaturingexpertspeakersfrommanylocal,state,andfederalagencies.

InlinewiththeSeniorScamStop-per program, the CSLB has alsolaunched the “Consumer ScamStopper” program. This new pro-gramprovidesvaluableinformationtoconsumersofallagesandaudi-encestohelpthemmakeinformedchoicesrelatedtoconstructionandhome improvement, and also pro-vides information about currentscamsinthelocalregion.

Check out the CSLB’s website orcallCapitolServices formore infor-mationregardingthedatesandloca-tionsoftheseupcomingseminars.

Whileknowledgeispower,knowingwheretogofortheanswersishalfthe battle. Get expert assistanceimmediately when you call 866-443-0657, email [email protected],orwriteusatCapitolServic-es,Inc.,12258thSt.Ste.580,Sac-ramento,CA95814.Researchpastcolumnsatwww.cutredtape.com.

Page 16: exchange_eZone_March4_2013

March 4, 2013Page 14 Contractor’s Zone• .Contractor’s Zone

Classified AdsFor Sale:CommercialGeneralContractorRETIRINGsellingeverythingfromofficefurnituretohandtools, includingplantablewithdigitizerandportabledigitizer.Toomuchtolist,callifinterested.Rick916-870-9637

For Sale:StainlessSteelThermadorDoubleOvenModel#PODC302JNewInBox$5,500.00BobHilton916-508-0723

“Surplus” Sale: GHHisdoingsomeSpringcleaning!Wehaveavarietyofconstructionmaterialsandtoolsrangingfrompipefittingstocompressorsandgenerators.Stopby,seewhatwehaveandmakeusanoffer!

Date:February15,2013Time: 9:00am-3:00pmLocation:11960HeritageOakPlace,Ste.2BAuburn,California95603Questions:(530)886-3100

Welder/Fabricator (Newcastle)ANewcastlecompanyislookingforanexperiencedwelder/fabricatortoleadourwelding/fabricationdepartment.

ApplicantmustbeproficientinWeldingwithmultipleprocessesinALLpositions:Stick,Mig,AirArc

Experience: •Relevantworkexperienceinfabrication,partsmanufacturingordirectlyrelatedfields.*4yearsexperienceinwelding/fabricationorrelatedfield.

Skills, Knowledge, & Abilities: *Musthaveleadershipskills•Mustbeabletocomprehendbasicbusinessmathcalculations.•MustbeabletocommunicateeffectivelybothinwritingandverballyinEnglish.*Musthaveknowledgeofshoptoolsandsafeusage.*Mustbeabletoworksafelyinateamenvironment*Selfstarterandhardworker*OrganizationskillsaMust*Applicantmustbecleanshavenandneatinappearance

Ifyoufeelyoufittheabovecriteriapleasesendyourresumealongwithtwo(2)workreferences.Pleasemakesuretoinclude“JobApplication”intheSubjectline.

ThankYou.“Pleasevisitouronlinecatalog”ChrisFerreiraGeneralManagerP.916-663-2026/F.916-663-1858D.V.B.E./[email protected]

Page 17: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

Page 18: exchange_eZone_March4_2013

March 4, 2013Page 16 Contractor’s Zone• .Contractor’s Zone

Page 19: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

Ensuresafedrivingbyincludinganinspectionofanymotorvehicleyoudrive,onoroff the job.Checkalllights,brakelightsandturnsignals;besurethatwind-shieldwipers, thehorn, and if applicable, theback-upwarning device are in working order. Check thebrakes,boththefootpedalaswellasthehandbrake.Checkthestatusoftheinspectionsticker.Checktheoilandmakesureyouhaveenoughfuel.Reportanydefectiveorbrokenpartsoncompanyvehiclestoyoursupervisor.

Asthedriveroroperatoryouareresponsibletomakesurethatallbinsareclosed,theloadissecure,andthe area is CLEAR before moving the vehicle. Ex-tremecautionmustbeusedwhenbackingvehicles.Turnaround insteadofbackingupwheneverpossi-ble.Ifyoumustback-upandyouhavesomeoneridingwithyou,haveyourpassengergetoutanddirectyousoyoucanback-upsafely.Whenbackingavehicleinthevicinityofotherworkersorinacongestedarea,asignalpersonshouldalwaysbeused.

Motor Vehicles

Company Name: Job Name: Date:

Special topics for your project:

Employee Safety Recommendations:

Reviewed MSDS # Subject

Meeting attended by:

Supervisor’s Signature: Date:

Weekly Safety Meeting

SEAT BELTS SAVE LIVES! BUCKLE UP - THE LIFE YOU SAVE MAY BE YOUR OWN!

:::::: ::::::

Theoperatormustobservepostedspeedlimits.Manyaccidentsarecausedbydrivingtooslowlyaswellastoofast.Useturnsignalswhenturningandwhenpull-ingoutontotheroadorhighway.Itistheresponsibil-ityof everyemployeewhodrivesa companymotorvehicletobelicensed,andtoknowandobeyallstateandlocalregulationspertainingtoitsoperation.

Always carry your driver’s license with you. Manystatesalsorequirethatthevehicleregistrationbecar-riedinyourcar,vanortruck.Everypersonwhooper-atesamotorvehiclehasanobligationtothemselves,their family, theiremployer,otherdriversandpedes-trianstooperatetheirvehicleinasafeandcourteousmanner.Beadefensivedriver!Makeallowancesformistakes, lackofskilland lackofknowledgeon thepartof theotherdriver.Controlyour temperandbealert at all times, looking far enough ahead to rec-ognizeandavoidimpendingsituations.You’reinthedriver’sseat--a lotrestsonyourshoulders.DRIVEDEFENSIVELY!

Page 20: exchange_eZone_March4_2013

March 4, 2013Page 18 Contractor’s Zone• .Contractor’s Zone

All published entries in this report are obtained from sources deemed reliable. Placer County Contractors Association and Builders Exchange assumes no responsibility for any inaccuracies listed in this report. It is up to the individual to verify all information.

New Plans

Lodi WATER METER PROGRAM PHASE 3 METER INSTALLATION/MAIN REPLACEMENT 190092Sacramento HOWE AVE. ELEMENTARY SCHOOL - WROUGHT IRON FENCING-ITB ONLY 36011Anaheim SPRING HILL SUITES HOTEL 299048Sacramento CALIFORNIA FIREFIGHTER 2560 RIVER PLAZA TI 17012Union City US HEALTHWORKS TI 69067Milpitas EDDIE BAUER OUTLET TI 231089Belmont PET FOOD EXPRESS 281051Carmichael SYSTEM 3 T.I 5020San Francisco VITAMIN SHOPPE POTRERO CENTER 127065Gilroy PAVEMENT MAINTENANCE 199058Woodland PAVEMENT MAINTENANCE PROJECT 249063Sacramento DOLLAR GENERAL SACRAMENTO - MORRISON-BUILDING IMPROVEMENTS & 12009San Jose FIVE (5) 2013 VERMEER CHIPPER BC 1500 W/WINCH, OR APPROVED EQUAL 169090El Dorado Co. SERVERS 203003San Jose RE-ROOFING CERONE DIVISION BUILDING G 77067Los Angeles NEW IPIC THEATER - LOS ANGELES (NO GC OPENINGS) 135011Victorville WALMART SUPERCENTER 4392-00 294038Magalia 6482 IMPERIAL WAY - HOME REHAB 141059Tracy JACKSON ALLEY & 9TH STREET STORM DRAINAGE IMPROVEMENTS 217078Moraga CAMPOLINDO HIGH SCHOOL ALTERATIONS 328001Mountain House ALTAMONT ELEMENTARY SCHOOL IN MT HOUSE 121079Sacramento THEATRICAL LIGHTING - CONCERT STAGE 241001San Jacinto WALMART 298031Lodi HUTCHINS STREET SQUARE KIRST HALL HVAC REPLACEMENT PROJECT 1024Tulare SANTA FE TRAIL LIGHTING IMPROVEMENTS 97067Sacramento GATEWAY 5A - DUDLEY BOULEVARD IMPROVEMENTS PROJECT 106094San Jose INFLUENT MAGNETIC METER & VALVE REPLACEMENT FOR NITRIFICATION 214095Tulare SHOULDER STABILIZATION ON VARIOUS STREETS 215083San Joquin Co. LIVE OAK ROAD RESURFACING 329001Rohnert Park WALGREENS PHARMACY 306017Sonoma HAYSTACK BRIDGE OPERATOR’S HOUSE - DESIGN PACKAGE NO. 2 125085Davis LEHR GROUNDWATER EXTRACTION TREATMENT SYSTEM ITB ONLY 159080San Francisco ROOF REPLACEMENT - ETHNIC STUDIES-PSYCHOLOGY BUILDING 196089Nevada City HELLING LIBRARY CTC MODULARS 205012San Mateo FIRE STATION NO. 24 RE-BID 244095San Francisco ROOF REPAIRS, CREATIVE ARTS BUILDING 266048Richmond WAYSIDE FENCE REFURBISHMENT, R-LINE 277040Orinda ORINDA UNION SCHOOL DISTRICT OFFICE BUILDING 318010Los Altos SAFEWAY STORE 2814 322002Sacramento EAST SACRAMENTO WATER MAIN REPLACEMENT PROJECT PHASE 1 10022Pollock Pines CHLORINE CONVERSION RESERVOIR “A” WATER TREATMENT PLANT 123084Elk Grove 911 COMMUNICATIONS CENTER RELOCATION PROJECT 161063San Jose RFQ - PORTLAND CONCRETE AND ASPHALT 181003San Jose RFQ - PORTLAND CONCRETE AND ASPHALT 186093Citrus Heights MARIPOSA L & I - ITB ONLY 19029

Page 21: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

McClellan Park MCCLELLAN BUILDING 88 BUILD BACK (DENTAL CLINIC) 107090San Jose RFP - HOMELESS ENCAMPMENT CLEAN-UP 182002Carmichael CHARLES PECK ELEMENTARY SCHOOL - L & I 28021San Jose LIGHT RAIL SAFETY ENHANCEMENTS 92076Roseville HIGHLAND RESERVE BIKE TRAIL BRIDGE PROJECT 110085Vallejo HYPOCHLORITE TANK REPLACEMENT PROJECT 160068Sonoma RUSSIAN RIVER COUNTY SANITATION DISTRICT TREATMENT PLANT BIOLOGICAL 162065Alameda FIXED ROUTE SHUTTLE SERVICE FOR THE CITY OF ALAMEDA PARATRANSIT 171097Vallejo MARE ISLAND PUMP STATION & BIO TOWER IMPROVEMENT PROJECT 193093Clovis ADA CURB RETURN RAMPS, PHASE 5 320012San Rafael MANZANITA ROOM HVAC REPLACEMENT MARIN CENTER EXHIBIT HALL 32017Alameda and BERKELEY VIEW REGULATOR AND BERKELEY VIEW, LAS AROMAS, MADRONE, 158064San Jose RUNWAY RUBBER REMOVAL FOR SAN JOSE AIRPORT 174005San Jose COATING SERVICES FOR CLARIFIER REHABILITATION 177095San Jose RFQ - PREMANUFACTURED OR CUSTOM BUILT STAIRWAYS 188091Oroville BRAD B. FREEMAN BIKE TRAIL REALIGNMENT 200096Coalinga FARM OF THE FUTURE PHOTOVOLTAIC ARRAY 259047Fairfield PEABODY ROAD WATER AND SEWER LINE RELOCATION PROJECT 39019Redding REDDING FIELD OFFICE RECONFIGURATION - DMV 187075Contra Costa Co. CONTRA COSTA CENTRE INFRASTRUCTURE IMPROVEMENTS 297036Fresno REPLACE EMERGENCY GENERATOR 178004Oroville 13-060/13-061, 202 & 205 MIRA LOMA DESS CALL CENTER 29016Clayton MOUNT DIABLO SP, LOWER SUMMIT ADA IMPROVEMENTS 38024Long Beach LONG BEACH WATER RECLAMATION PLANT EFFLUENT METERING WEIR 102093San Jose SANTA TERESA WATER TREATMENT PLANT INCOMPATIBLE MATERIALS PROJECT 307013Long Beach LONG BEACH MAIN PUMPING PLANT FACILITY UPGRADES 119084Oakland BART 17TH STREET GATEWAY 6035

Page 22: exchange_eZone_March4_2013

March 4, 2013Page 20 Contractor’s Zone• .Contractor’s Zone

Week At A GlanceMonday, March 04, 2013

TILE INSTALLATION FOR FIRE STATION 109 Carmichael Plan # 7022SAM’S CLUB - 4704-205 Fresno Plan # 35015PIONEER TRAIL PEDESTRIAN IMPROVEMENT PROJECT South Lake Tahoe Plan # 104087RETROFIT OF EXISTING HYDRAULIC ELEVATORS San Jose Plan # 207094PET FOOD EXPRESS Belmont Plan # 281051FAIRBAIRN WATER TREATMENT PLANT RE-ROOF PROJECT Sacramento Plan # 293045RFQ - MSCS CARPET REPLACEMENT Santa Rosa Plan # 313010

Tuesday, March 05, 2013

SYSTEM 3 T.I Carmichael Plan # 5020MACE RANCH PARK PASSIVE RECREATION AREA Davis Plan # 20005NAPA COUNTY JAIL HOT WATER STORAGE TANK REPLACEMENT PROJECT Napa Plan # 23021CRITTENDEN RECYCLED WATER MAIN REPLACEMENT AND EXTENSION Mountain View Plan # 64093LAFAYETTE SEWER RENOVATIONS, PHASE 8 Lafayette Plan # 95064ASHBY AND NORTH BERKELEY STATIONSS SIDEWALK AND WAYFINDING Berkeley Plan # 113072IMPROVEMENTSPALOS VERDES LANDFILL POWER PLANT DEMOLITION Los Angeles Co. Plan # 116080CONSTRUCTION OF SOUTH SACRAMENTO CORRIDOR PHASE 2, CIVIL, Sacramento Plan # 124078TRACK, STRUCTURES, STATIONS & SYSTEMSJENNINGS WASTEWATER TREATMENT PLANT IMPROVEMENTS Modesto Plan # 144063OROVILLE DMV PARKING LOT SWEEPING/STEAM CLEANING Oroville Plan # 198001LOON LAKE PASSIVE REFLECTOR DOWNSIZE PROJECT Pollock Pine Plan # 201092LIGHTING RETROFIT EQUIPMENT AND SERVICES San Jose Plan # 212084RFQ - CABLE PULLING UNIT Roseville Plan # 251044STOCK RANCH NATURE PRESERVE Citrus Heights Plan # 252044RFP - FIRE AND BURGLAR ALARM SYSTEMS, MONITORING, REPAIR AND San Jose Plan # 261054MAINTENANCEVALLEJO COMMUNITY CENTER EXTERIOR PAINTING PROJECT Vallejo Plan # 264048ROSEVILLE AQUATICS COMPLEX AQUATIC FILTRATION Roseville Plan # 265038WOOD POLE INSPECTION Sacramento Plan # 290046HEATING VENTILATION AND AIR CONDITIONING SERVICES Modesto Plan # 308011

Wednesday, March 06, 2013

FIVE MILE RECREATION AREA OFFICE WASTE WATER SYSTEM REPAIR (RE- Chico Plan # 13023BID)MULTI-MODAL STATION CONCRETE PAVEMENT Lodi Plan # 21019RSTP ROAD RESURFACING PROGRAM PHASE E Stanislaus Co. Plan # 51095BASS LAKE ROAD FULL IMPROVEMENTS - PHASE 1A El Dorado Co. Plan # 540082011-12 CONCRETE SIDEWALK AND CURB REPAIRS, AND INSTALLATION OF Mountain View Plan # 65099ADA CURB RAMPS, PHASE VIRAYMOND SUBSTATION STORAGE STRUCTURE Santa Clara Plan # 9307328TH AVENUE PAVEMENT RENOVATION AND SEWER REPLACEMENT San Francisco Plan # 155063MCKINLEYVILLE HIGH SCHOOL BLEACHERS AND SNACK-BAR PROJECT McKinleyville Plan # 254063

Page 23: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

CONCRETE SIDEWALKS, CURBS, GUTTERS AND DRIVEWAY APPROACHES- Sunnyvale Plan # 2580522013GRAPELINE BUS STOP IMPROVEMENTS 2012 Lodi Plan # 287045TASMAN SUBSTATION DEMOLITION Santa Clara Plan # 317012

Thursday, March 07, 2013

DETERDING ELEMENTARY SAFE ROUTE TO SCHOOL PROJECT Sacramento Co. Plan # 4014COTTONWOOD - ROSEVILLE 203-KV TRANSMISSION LINE - STRUCTURE Various Locations Plan # 15023REPLACEMENTS & OPGW ADDITIONOFFICE REMODEL FOR TW DUFOUR & ASSOCIATES (SELECT BIDDERS) Chico Plan # 22013NEW ELK GROVE MONTESSORI SCHOOL Elk Grove Plan # 49012MADISON AVE./GREENBACK LANE MEDIAN IMPROVEMENT PROJECT Folsom Plan # 53097MILLERTON LAKE SRA-NORTH SHORE ENTRANCE ROAD ASPHALT REPAIRS Madera Co. Plan # 82074& SLURRY SEALSAN FERNANDO STREET ENHANCED BIKEWAY AND PEDESTRIAN ACCESS San Jose Plan # 83072

PERALTA OAKS SEISMIC & TI (RE-BID) Oakland Plan # 122081VITAMIN SHOPPE POTRERO CENTER San Francisco Plan # 127065TILDEN CORPORATION YARD MAINTENANCE FACILITY Orinda Plan # 128067CONSTRUCTION MANAGEMENT/IRON HORSE TRAIL-FROM Dublin and Pleasanton Plan # 137064DUBLIN/PLEASANTON BART TO SANTA RITA ROADFURNISHING LABOR, MATERIALS, & EQUIPMENT FOR GENERAL BLDG Oakland Plan # 153066CONTRACTORS SERVICES FOR PORT OF OAKLAND FACILITIESMODESTO JUNIOR COLLEGE WEST CAMPUS INFRASTRUCTURE Modesto Plan # 166073INCREMENT 2 PH 2SIGNAL LOOP REPLACEMENT PROJECT Sacramento Plan # 172007PARKING LOT SWEEP AND STEAM CLEANING SERVICES Redwood City Plan # 173082CCTV SYSTEMS MAINTENANCE FOR DMV FIELD OFFICES Various Locations Plan # 191083PAVEMENT MAINTENANCE Gilroy Plan # 199058GURR ROAD OVERLAY PROJECT Merced Co. Plan # 206094RIVER ROAD AND VINEWOOD AVENUE ASPHALT CONCRETE OVERLAY Merced Plan # 225025PROJECTDOOR REPLACEMENT - ADMINISTRATION, BURK HALL, CREATIVE ARTS, San Francisco Plan # 245055FINE ARTS & HUMANITFIBER OPTIC LINE PROJECT Galt Plan # 246064PAVEMENT MAINTENANCE PROJECT Woodland Plan # 249063AUDIO VISUAL SYSTEMS SCVMC BED BUILDING 1 & SERVICES BUILDING San Jose Plan # 267044REPLACEMENTWATER METER PAVEMENT PROJECT Woodland Plan # 268048OLEANDER HOUSE DEMOLITION PROJECT Manteca Plan # 275049OFFICE OF SYSTEMS INTEGRATION, NEW SPACE - SFIS Sacramento Plan # 280046GOLDEN STATE BOULEVARD AND F STREET INTERSECTION IMPROVEMENTS Turlock Plan # 284047DODDS ROAD RESURFACING Escalon Plan # 286050FULKERTH TANK AND PUMP STATION PROJECT Turlock Plan # 288047LAMMERS ROAD AND SCHULTE ROAD RESURFACING Tracy Plan # 289044RFQ / RFP DESIGN-ASSIST CONSTRUCTION SERVICES/INTERMODAL PHASE Sacramento Plan # 2920472 - SACRAMENTO VALLEY STATIONBAKER ROAD AND DUNCAN ROAD INTERSECTION IMPROVEMENTS Stockton Plan # 383055

Page 24: exchange_eZone_March4_2013

March 4, 2013Page 22 Contractor’s Zone• .Contractor’s Zone

Week At A GlanceFriday, March 08, 2013

DOLLAR GENERAL SACRAMENTO - MORRISON-BUILDING IMPROVEMENTS & Sacramento Plan # 12009SITEWORKMETAL SHADE STRUCTURE AT (VALLEY OAK GOLF COURSE) Visalia Plan # 57003YUROK CASINO AND HOTEL Klamath Plan # 71074FIVE (5) 2013 VERMEER CHIPPER BC 1500 W/WINCH, OR APPROVED EQUAL San Jose Plan # 169090SERVERS El Dorado Co. Plan # 203003REPAIR SERVICES OF (3) ARTISAN WELLS San Jose Plan # 229096GRAVES AVE DUPLEX REHAB 2013 Sacramento Plan # 236096SONNEN PORSCHE - REBID Mill Valley Plan # 500051

Page 25: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

Page 26: exchange_eZone_March4_2013

March 4, 2013Page 24 Contractor’s Zone• .Contractor’s Zone

Plans On FileMonday, March 04, 2013

TILE INSTALLATION FOR FIRE STATION 109PLAN #: 7022 Bid Date: 3/4/2013 Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Carmichael Online and PlanroomPREBID: MAND 2/25 @ 11am OWNER: Sacramento Metropolitan Fire District Ph: 916-566-4317 DESCR: Contact, Douglas Dolezal, ([email protected])Install tile one a bathroom with one shower, one toilet and one wall-mounted sink and install floor base and base trim tile in the janitors closet.

SAM’S CLUB - 4704-205 (ITB ONLY)PLAN #: 35015 Bid Date: 3/4/2013 Bid Time: 11:00 AM PLANS AT: Print OnDemand Location: Fresno Online & Print On Demand# OF ADDENDA: 1G.C.: Shames Construction Ph: 925-606-3000 FAX: 925-606-6656

DESCR: Contact, Shames Construction, 925-606-3000. (WILL BE RECEIVING PROJECT) Demolition, Grading, Erosion Control, Paving, Tactile Warning System, Concrete Striping and Signage, Pavement Sealcoat, Struc Shoring, Masonry, Partial Interior Slab Concrete Replacement, Concrete Polishing, Epoxy Flooring, Structural/Misc Steel, Sheet Metal, Roofing, Stucco/EIFS, Paint, Caulking & Sealants, Metal Stud Drywall, Insulation, FRP, DFH, Millwork, Rough Carpentry, Glass and Glazing, Flooring, Acoustical Ceilings, Toilet Accessories, Fixture Anchoring, Dock Equipment, Overhead Doors, Fencing, Fire Sprinklers, HVAC, Plumbing, Electrical, Refrigeration, EMS

PIONEER TRAIL PEDESTRIAN IMPROVEMENTPLAN #: 104087 Bid Date: 3/4/2013 Bid Time: 2:00 PM PLANS AT: Location: South Lake PREBID: MAND 2/14 @ 10 AM OWNER: City of South Lake Tahoe DESCR: Contact, Stan Hill, (530) 542-6039, ([email protected])Traffic Control, Tree removal, storm drain improvements, retaining wall, concrete pedestrain ramps, bus shelter pads, electrical and lighting, asphalt concrete sidewalks, adjust utilities to grade, concrete curn and gutter, and pavement striping.BIDDERS LIST:

1500 North Market Boulevard, Sacramento, CA 95834Sacramento Area (916) 928-0770 • Grass Valley Area (530) 272-1801

At Inland, we don’t just sell copiers, we provide digital printing solutions. Our account representatives will assess your printing needs and develop an individualized plan of products and services that will serve your company best.

&Dealer

Your Authorizedwww.igoinland.com

PCCA member since 2004

Page 27: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

Sub Contractor: Graham Concrete 530-993-4598 530-993-4758

RETROFIT OF EXISTING HYDRAULIC ELEVATORSPLAN #: 207094 Bid Date: 3/4/2013 Bid Time: 3:00 PM PLANS AT: Location: San JoseEst Cost: $250,000.00 # OF ADDENDA: 3PREBID: MAND 2/11 @ 10am OWNER: City of San Jose DESCR: Contact, [email protected] City of San Jose is soliciting bids from qualified Contractors to provide all labor, material and standard equipment necessary for the retrofit of seven (7) elevators at the Norman Y. Mineta San Jose

PET FOOD EXPRESSPLAN #: 281051 Bid Date: 3/4/2013

Bid Time: 3:00 PM PLANS AT: Print On Demand Location: BelmontG.C.: Argos Construction Ph: (415) 391-3947 FAX: (415) 391-3947DESCR: Contact, Argos Construction, Argos Construction Lijonel Cabral (415) 391-3947. Selective demolition of interior wall partitions, construction of interior partitions and ceilings as noted, plumbing, electrical and mechanical and fire sprinkler systems. Plans (no specs) from Argos Construction, Inc., do not fax bids, email to [email protected] BIDDERS LIST:General Contractor: Argos Construction 415-391-3947 415-391-3947 Psr West Coast Builders 925-299-0518 925-299-0517

FAIRBAIRN WATER TREATMENT PLANT RE-ROOF PROJECTPLAN #: 293045 Bid Date: 3/4/2013 Bid Time: 12:00 PM PLANS AT: Location: SacramentoEst Cost: $750,000.00 PREBID: MAND 2/22 @ 1pm OWNER: City of Sacramento - Dept. of General Services FAX: 916-399-9263DESCR: Contact, Jeff Blanton ([email protected]) Phone: (916) 808-8337 City of Sacramento solicits qualifications and proposals for Design-Build services necessary to complete design and construction ot the Fairbairn Water Treatment Plant Re-Roof Project.

RFQ - MSCS CARPET REPLACEMENTPLAN #: 313010 Bid Date: 3/4/2013Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Santa Rosa PlanroomPREBID: MAND 2/21 @ 10am OWNER: City of Santa Rosa DESCR: Contact, Amy Carter, 707-543-3702. City of Santa Rosa is requesting quotes for MSCS Carpet Replacement.

Tuesday, March 05, 2013

SYSTEM 3 T.IPLAN #: 5020 Bid Date: 3/5/2013

Bid Time: 12:00 PM PLANS AT: Print OnDemand Location: CarmichaelG.C.: SD Deacon Corp. Ph: 916-969-0900 FAX: 916-735-0800DESCR: Contact, S D Deacon, Chad, 916-969-0900. Tenant Improvements of existing office building with the enclosure of the existing loading dock. Trades include: demo, asphalt paving, pavement markings, concrete, framing, millwork, insulation, doors and hardware, overhead doors, portland cement plaster, drywall, metal framing, tile, acoustical ceilings, flooring, paint, concrete floor sealer, hvac, electrical, and fire alarm. BIDDERS LIST:General Contractor: Sd Deacon Corp. 916-969-0900 916-735-0800

MACE RANCH PARK PASSIVE RECREATION AREAPLAN #: 20005 Bid Date: 3/5/2013Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Davis Online and Planroom Est Cost: $114,400.00 OWNER: City of Davis # OF ADDENDA: 2 DESCR: Contact, Robert Clarke, 530-757-5686. Work is within the existing 2.9 acre fenced area and consists of installing a crushed rock pathway, erosion/sedimentation control, gate modification; interpretive signs; benches, landscaping; irrigation; including all labor, materials, equipment and incidentals to completely install an operating facility. BIDDERS LIST:General Contractor: Murray Building Inc 707-939-9001 707-939-9048

NAPA COUNTY JAIL HOT WATER STORAGE TANK REPLACEMENT PROJECTPLAN #: 23021 Bid Date: 3/5/2013Bid Time: 3:30 PM PLANS AT: Print On Demand Location: Napa Online & Print On Est Cost: $55,000.00 # OF ADDENDA: 1Demand PREBID: MAND 2/20 @ 8am OWNER: County of Napa Ph: 707-253-4351 FAX: 707-253-4627DESCR: Contact, County of Napa, Zandra Massari, ([email protected])Replace water storage tank at the Napa County Jail.

Continued on next page

Click on the blue underline to go to the Online Planroom

Page 28: exchange_eZone_March4_2013

March 4, 2013Page 26 Contractor’s Zone• .Contractor’s Zone

Plans On File

Tuesday, March 05, 2013

CRITTENDEN RECYCLED WATER MAIN REPLACEMENT AND EXTENSIONPLAN #: 64093 Bid Date: 3/5/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Mountain View Online & Print On Est Cost: $800,000.00 DemandOWNER: City of Mountain View DESCR: Contact, City of Mountain View, 650-903-6311. Replacement of existing 6” recycled water main with a new 12” recycled water main and extension of the new 12” main.

LAFAYETTE SEWER RENOVATIONS, PHASE PLAN #: 95064 Bid Date: 3/5/2013 Bid Time: 2:00 PM PLANS AT: Location: LafayetteEst Cost: $1,500,000.00 PREBID: 2/19 @ 2pm OWNER: Central Contra Costa Sanitary Dist. DESCR: Contact, Nancy Molina, 925-335-7794 ([email protected])The work generally consists of renovation of approximatley 8,500 linear feet of sewer pipe by open-cut, pipe-burst, and HDD methods, installationBIDDERS LIST:General Contractor: Ghilotti Construction Co 707-585-1221 707-585-1601

ASHBY AND NORTH BERKELEY STATIONSS SIDEWALK AND WAYFINDING IMPROVEMENTSPLAN #: 113072 Bid Date: 3/5/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Berkeley Planroom

Est Cost: $800,000.00 PREBID: 2/13 @ 10am OWNER: San Francisco Bay Area Rapid Transit District Ph: 510-464-6547 DESCR: Contact, San Francisco Bay Area Rapid Transit District (510) 464-6545. The work, in general, consists of: furnishing all labor, equipment, materials and services required for Ashby and North Berkeley Station sidewalk and wayfinding improvements. The work includes but is not limited to mobilization, construction phasing, demolition, excavation, site preparation, traffic control and maintenance during construction, removal of excess material and clean up after construction; obtain permits required to execute the work; replace concrete topping slabs, sidewalk, curbs, curb walls, and curb ramps; replace asphalt concrete pavement; provide waterproofing membrane; provide signage; replace pavement marking and striping; and misc and incidental work. BIDDERS LIST:General Contractor: Cf Contracting 415-721-7160 415-296-6437

PALOS VERDES LANDFILL POWER PLANT DEMOLITIONPLAN #: 116080 Bid Date: 3/5/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Los Angeles Planroom# OF ADDENDA: 1 PREBID: MAND 2/12 @ 10am OWNER: Sanitation Districts of Los Angeles County DESCR: Contact, Joe Smisko, 562-908-4288, ext. 2105. Palos Verdes Landfill Power Plant Demolition: The work includes, but is not necessarily limited to, the following: demolition of a 12 MW power plant with selective demolition of the cooling tower and remodeling of the control room; installation of new electric utility equipment including 480V substation and 800kW stationary emergency generator; abandonment of an existing 18-inch storm drain lateral using confined space entry; construction of

Continued from last page

We have created a menu consisting of Traditional Italian Cuisine. All of our dishes are made in house and prepared to order using local ingredients when available. Simplicity and freshness are the key to authentic Italian cooking. Our menu will change frequently depending on seasonality. All wines & beer imported from Italy.

Traditional Italian Cuisine in Auburn

928 Lincoln Way, Auburn530.823.2994www.trepazzi.net

Outdoor dining in downtown!

Page 29: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

approximately 180 linear feet of new 21-inch storm drain lateral; demolition of two field office trailers with on-site transportation of contents; placement of approximately 350 square yards of asphalt

CONSTRUCTION OF SOUTH SACRAMENTO CORRIDOR PHASE 2, CIVIL, TRACK, STRUCTURES, STATIONS & SYSTEMSPLAN #: 124078 Bid Date: 3/5/2013 Bid Time: 2:00 PM PLANS AT: Location: SacramentoPlans on Disk PREBID: MAND 2/6 @ 10 am # OF ADDENDA: 2 DESCR: Design / manufacture / supply / construct / install / test and make operational the South Sacramento Corridor Phase 2, civil, track, structures, stations and systems, including earthwork, trackwork, grade crossing panels, plinths, detention basin, street / parking lot construction, drainage, utilities, associated sitework, retaining walls / soundwalls, pedestrian bridges, station platforms, shelters, utility buildings, site furniture, planting, tree removal, irrigation, irrigation modification, electrical, lighting, protection of existing shrubs / trees, overhead contact system, underground system ductbanks, traction power systems, train-to-wayside system, fiber optic backbone / laterals, communcation system, foundation work, dust control, noise control, fencing, pump stations, signage, striping and paving. **Prequalification questionnaires are due 2/15.BIDDERS LIST:General Contractor:*Olpmans Construction 562-948-4242 562-699-3128 Suulutaaq, Inc. Unit 2 707-427-3209 707-419-4851 Ghilotti Brothers Inc 415-454-7011 415-454-8376Supplier: Groeniger & Company 916-455-3333 916-455-3402 Ferguson Enterprises, 916-381-6100 916-381-7445

JENNINGS WASTEWATER TREATMENT PLANT IMPROVEMENTSPLAN #: 144063 Bid Date: 3/5/2013 Bid Time: 11:00 AM PLANS AT: Print On Demand Location: Modesto Online & Print On Est Cost: $875,000.00 # OF ADDENDA: 2Demand PREBID: MAND 2/8 @ 9am OWNER: City of Modesto, Public Works Dept. DESCR: Contact, City of Modesto, (209) 577-5462 The work generally involves construction of the Jennings WWTP Improvements Project complete and ready for operation. The Project includes: Construction of new sun shade structures over the Chemical Storage Area, Permeate Pump Pad Area, and UV Disinfection Area; construction of a new Irrigation Water flow meter vault, including installation of a new flow meter and appurtenances; and application of shotcrete to the perimeter banks of the Oxidation Ditch. BIDDERS LIST:General Contractor: Preston Pipelines 408-262-1418 408-262-1870 Gse Construction 925-447-0292 925-447-0962Sub Contractor:

Bockmon & Woody 209-993-2633 209-464-2615 Stormwater Specialists 707-280-2510 916-405-4180Supplier: Sierra Trench Protection / 530-887-9413 530-887-9112

OROVILLE DMV PARKING LOT SWEEPING/STEAM CLEANINGPLAN #: 198001 Bid Date: 3/5/2013 Bid Time: 1:30 PM PLANS AT: Roseville OfficeLocation: Oroville Online and PlanroomPREBID: MAND 2/14 @ 10:30am # OF ADDENDA: 1 OWNER: Department of Motor Vehicles Ph: 916-657-7822 DESCR: Contact, Melanie Pilliard, DMV, 916-657-6975. Parking Lot Sweeping/Steam Cleaning at the Oroville DMV.

LOON LAKE PASSIVE REFLECTOR DOWNSIZEPLAN #: 201092 Bid Date: 3/5/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Pollock Pine Online & Print On # OF ADDENDA: 3 DemandPREBID: 2/7 @ 9am recommended OWNER: Sacramento Municipal Utility District Ph: 888-742-7683 DESCR: Contact, Phleacia Christopher, 916-732-5262, [email protected] The work generally consists of the removal of an existing microwave reflector, replacement with a new, smaller reflector, and alignment at Loon Lake.

LIGHTING RETROFIT EQUIPMENT AND SERVICESPLAN #: 212084 Bid Date: 3/5/2013 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose Online & Print On Demand PREBID: MAND 2/28 @ 10am OWNER: City of San Jose DESCR: Contact, Jamil Colemant, City of San Jose, ([email protected])The City of San José is soliciting bids from qualified contractors to provide all equipment, material and labor necessary to perform lighting retrofit services asspecified in Attachment 1, in support of the Public Works Department.2.1.2 Work will be performed at the following locations, and shall be done concurrently and require 2 crews: 2.1.2.1 Police Administration Building (PAB), 201 West Mission Street, San Jose, CA 95110 2.1.2.2 Police and Fire Communications Building (PAC), 855 N. San Pedro Street, San Jose,CA 95110 2.1.2.3 2.1.3 The estimated quantities provided by the City are not guaranteed. listed for information purposes only. The quantities may vary depending on the demands of the City. Any variations from to these estimated quantities shall not entitle the contractor to an adjustment in the unit price or to any additional compensation.

Continued on next page

Page 30: exchange_eZone_March4_2013

March 4, 2013Page 28 Contractor’s Zone• .Contractor’s Zone

Tuesday, March 05, 2013

THE INSTALLATION OF PEDESTRIAN RAMPS AT VARIOUS LOCATIONS IN THE UNINCORPORATED AREAS OF ALAMEDA CO.PLAN #: 233075 Bid Date: 3/5/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Alameda Co. Online and PlanroomPREBID: MAND 2/20 @ 10AM at 951 Turner Ct., Rm 230A DESCR: Contact: County of Alameda (510) 670-5450.Traffic control system; providing construction area signs; furnishing & applying water; removal of concrete; construction of pedestrian ramps; reconstruction of concrete curb & gutter; removing & replacing sprinkler system; removing & replacing landscape materials; the cleaning of the

RFQ - CABLE PULLING UNITPLAN #: 251044 Bid Date: 3/5/2013Bid Time: 3:00 PM PLANS AT: Roseville OfficeLocation: Roseville Online and PlanroomOWNER: City of Roseville DESCR: Contact, City of Roseville, 916-774-5720. City of Roseville is requesting quotes to provide one new, unused 2013 or newer Hogg & Davis Hydra 985 Cable Pulling unit.

STOCK RANCH NATURE PRESERVEPLAN #: 252044 Bid Date: 3/5/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Citrus Heights Planroom# OF ADDENDA: 2PREBID: MAND 2/12 @ 10am OWNER: City of Citrus Heights DESCR: Contact, Chris Myers, (916) 727-4770, Fax: (916) 727-1454, ([email protected])The stock ranch nature preserve, which consists of interactive exhibits, identification and education signage, demonstration garden, oak restoration area, and outdoor classroom area; and all other work as shown on the contract documents.BIDDERS LIST:General Contractor: C & C Construction 916-434-5280 916-434-5288Supplier: Sunbelt Rentals 916-789-1234 916-789-7077

RFP - FIRE AND BURGLAR ALARM SYSTEMS, MONITORING, REPAIR AND MAINTENANCEPLAN #: 261054 Bid Date: 3/5/2013 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose Planroom# OF ADDENDA: 2 OWNER: City of San Jose DESCR: Contact, City of San Jose, (408) 535-7047. Package 1 - Fire alarm and Burglar alarm systems monitoring services of unauthorized entry and exit activity at various city facilities. Package 2 - Emergency response fire alarm and Burglar alarm systems maintenance, repair, replacement/new install services at various city facilities.

VALLEJO COMMUNITY CENTER EXTERIOR PAINTING PROJECTPLAN #: 264048 Bid Date: 3/5/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Vallejo Online & Print On Demand PREBID: MAND 2/20 @ 11am OWNER: Greater Vallejo Recreation District Ph: 707-648-4600 DESCR: Contact, Steve Pressley, Greater Vallejo Recreation

Continued from last page

Plans On File

[email protected]

www.Jensen-Masonry.com

Mark Jensen, Master Mason

• BBQ’s • Fireplaces • Brick • Rock • Etc.

JensenMasonry

916.663.3429

CCL#:804650

Page 31: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

modestogov.com)HVAC Services, including fountain pump equipment repair, for the modesto centre plaza. services shall include scheduled monthly and annual maintenance, and call service repairs on an “as-needed” basis.

Wednesday, March 06, 2013

FIVE MILE RECREATION AREA OFFICE WASTE WATER SYSTEM REPAIR (RE-BID)PLAN #: 13023 Bid Date: 3/6/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Chico Online & Print On Est Cost: $38,600.00 DemandPREBID: MAND 2/10 @ 10am OWNER: City of Chico DESCR: Contact, City of Chico, 530-879-6931. Installing a new septic system and abandoning the existing septic tank.

MULTI-MODAL STATION CONCRETE PAVEMENTPLAN #: 21019 Bid Date: 3/6/2013Bid Time: 11:00 AM PLANS AT: Location: LodiOnline & Print On # OF ADDENDA: 3DemandOWNER: City of Lodi DESCR: Contact, City of Lodi, 209-333-6740. Replacing 7,600 sq ft., of concrete pacement, driveway, sidewalk and wheelchair ramps; installing 1,130 s.f of concrete pavement; and other incidental and related work.BIDDERS LIST:General Contractor: All-american Constructio 916-870-8312 530-673-9470 A-vet Construction, Inc. 209-371-8880 209-371-8960 B & M Builders, Inc. 916-862-0095 866-903-3437 Sierra Valley Construction 916-772-0800 916-772-0825 F & H Construction 209-931-3738 209-931-4427 Bobo Construction, Inc. 916-685-2285 916-714-4850 Andrew L. Lee, Inc. 209-369-8077 209-368-2435 Bc Construction 209-531-1252 209-531-1254 C & C Construction 916-434-5280 916-434-5288Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797 Rmp Concrete Construct 916-635-3832 916-635-7265

District, 707-648-4600. Repair or replace of wood surfaces that are not of sound condition or construction; preparation, priming and painting of all designated exterior surfaces.

ROSEVILLE AQUATICS COMPLEX AQUATICPLAN #: 265038 Bid Date: 3/5/2013 Bid Time: 3:00 PM PLANS AT: Location: RosevillePREBID: MAND 2/19 @ 1 PM OWNER: City of Roseville DESCR: Contact, City of Roseville Alexa Pritchard ([email protected]). Remove / dispose of existing filters / sand and purchase / install four new filters and sand

WOOD POLE INSPECTIONPLAN #: 290046 Bid Date: 3/5/2013 Bid Time: 2:00 PM PLANS AT: SacramentoEst Cost: $3,000,000.00 # OF ADDENDA: 2 PREBID:2/19 @ 10am (recommended) OWNER: SMUD Ph: 888-742-7683 DESCR: Contact, Cheryl Brooks, (916) 732-5607, ([email protected])Contractor shall furnish all supervision, labor, tools, equipment, materials, and incidentals necessary to inspect approximately 25,000 wood poles for two years (including jointly owned poles) located within the District’s service area. Poles will be identified and assigned to the Contractor through individual task orders. The term of the contract is anticipated to be for 24 months. The procedure for testing and inspecting wood poles includes: • Visual Evaluation of New or Seasoned Pole • Sounding Pole Above Ground • Excavation • Additional Excavation • Deep Excavation • Sounding Pole Below Ground Level • Boring Pole For Intrusive Evaluation(Test Holes) • Boring Pole For Evaluation and Treatment(Treatment Holes)(Fumigation) • Shell Condition and Thickness Gauging • Fumigation (Treatment) • Plugging of Pole Holes • External Treatment Of Pole • Backfilling And Restoration Of Work Area • Installation Of Labels, Tags, And Markings • Data Collection And Delivery • Seven Hole “Test Hole” Pattern for Existing Reinforced Poles and Cellon Poles • Reinforcement Of Pole when necessary Testing Conditions: • Pole In Soil • Pole In Pavement • Pole In Water • Reinforced Pole(Stubbed Pole) • Cellon Pole • Through Bored Pole In Soil • Through Bored Pole In Pavement Test Types: • Visual Inspection of “New Pole” • (No Excavation) (No Fumigation) • (Excavation) (No Fumigation) • (No Excavation) (Fumigation) • (Excavation) (Fumigation) NOTE: The Test Type and or work performed will determine which of the Work Components will apply

HEATING VENTILATION AND AIR CONDITIONING SERVICESPLAN #: 308011 Bid Date: 3/5/2013 Bid Time: 11:00 AM PLANS AT: Print On DemandLocation: Modesto Online and PlanroomPREBID: 2/13 @ 2pm # OF ADDENDA: 1 OWNER: City of Modesto, Public Works Dept. DESCR: Contact, Ken Masasso, (209) 577-5420, (kmasasso@ Continued on next page

Don’t get thrown out on your way home! DVBE/UDBE Good Faith ads are

often required.This newspaper is state-certified.

Email your ad to: [email protected]

Page 32: exchange_eZone_March4_2013

March 4, 2013Page 30 Contractor’s Zone• .Contractor’s Zone

RAYMOND SUBSTATION STORAGE STRUCTUREPLAN #: 93073 Bid Date: 3/6/2013 Bid Time: 3:00 PM PLANS AT: Print On Demand Location: Santa Clara Online & Print On Demand PREBID: 2/12 @ 10am OWNER: City of Santa Clara DESCR: Contact, City of Santa Clara, Rocco Colicchia, 925-348-1098 ([email protected]) Project consists of the design and construction of a storage structure, a transformer pad with oil containment, upgrading a road inside the Raymond Substation and associated equipment on Space Park Drive. Drawings are 8.5X11 PDF files in the Plans folder.BIDDERS LIST:General Contractor: C. Overaa And Co. 510-234-0926 510-237-2435

28TH AVENUE PAVEMENT RENOVATION AND SEWER REPLACEMENTPLAN #: 155063 Bid Date: 3/6/2013 Bid Time: 2:30 PM Location: San FranciscoPREBID: 2/21 @ 1pm OWNER: County of San Francisco DESCR: Contact, Ramon Kong, 415-554-8280. Paving, curb ramp, sewer replacement and traffic routing work.BIDDERS LIST:General Contractor: Ghilotti Brothers Inc 415-454-7011 415-454-8376Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

MCKINLEYVILLE HIGH SCHOOL BLEACHERS AND SNACK-BAR PROJECTPLAN #: 254063 Bid Date: 3/6/2013 Bid Time: 2:00 PM PLANS AT: McKinleyvillePREBID: MAND 2/20 @ 2pm # OF ADDENDA: 2 OWNER: Humboldt Union High School ARCHITECT: David Pierce Architect Ph: 707-786-4266 DESCR: Contact, David Pierce, Architect, 707-786-4266.Work consists of installing new bleachers and a new snack-bar at McKinleyville High School. BIDDERS LIST:General Contractor: Donald F. Gallino, Inc. 530-246-7671 530-246-8714

CONCRETE SIDEWALKS, CURBS, GUTTERS AND DRIVEWAY APPROACHES-2013PLAN #: 258052 Bid Date: 3/6/2013

Wednesday, March 06, 2013

RSTP ROAD RESURFACING PROGRAM PHASE EPLAN #: 51095 Bid Date: 3/6/2013 Bid Time: 2:00 PM PLANS AT: Stanislaus Co.Est Cost: $1,068,000.00 # OF ADDENDA: 3OWNER: County of Stanislaus DESCR: Contact, County of Stanislaus, ([email protected]) for fax: 209-541-2509.The work to be accomplished includes asphalt concrete overlay of existing roadway, placement of thermoplastic striping and pavement markings, and construction of aggregate base shoulders. BIDDERS LIST:General Contractor: Herback General Engin 775-267-6800 775-786-7595Sub Contractor: Stormwater Specialists 707-280-2510 916-405-4180

BASS LAKE ROAD FULL IMPROVEMENTS - PHASE 1APLAN #: 54008 Bid Date: 3/6/2013 Bid Time: 2:00 PM PLANS AT: Location: PlacervillePREBID: 2/27 @ 1:30pm OWNER: County of El Dorado DESCR: Contact, County of El Dorado, 530-621-5230. Construction of 48 feet of double 5’ x 3’ precast box culvert placed across Bass Lake Road under 1 weekend Rd closure.BIDDERS LIST:General Contractor: Cw Fox Construction 530-823-0591 888-400-8169 Westcon Construction 916-663-2425 916-663-2448Supplier: Blain Stumpf Sand & 916-933-1555 916-933-2925

2011-12 CONCRETE SIDEWALK AND CURB REPAIRS, AND INSTALLATION OF ADA CURB RAMPS, PHASE VIPLAN #: 65099 Bid Date: 3/6/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Mountain View Online & Print On Est Cost: $460,000.00 DemandOWNER: City of Mountain View DESCR: Contact, City of Mountain VIew, 650-903-6311. Removing and disposing of PCC sidewalk & driveway, PCC curb and gutter and base materials; cutting and disposing of any interfering tree roots; importing and placing of base rock; constructing new sidewalks, driveways, curbs, gutters, ADA curb ramps, PCC valley gutter and apron; removal and replacement of asphalt concrete pavement; and completing all other appurtenant work described herein.

Continued from last page

Plans On File

Page 33: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone Continued on next page

Bid Time: 3:00 PM PLANS AT: Roseville OfficeLocation: Sunnyvale PlanroomOWNER: City of Sunnyvale DESCR: Contact, David Gakle, 408-730-7403. Remove and reconstruct certain curbs, gutters, sidewalks, driveway approaches and construction of curb ramps.

GRAPELINE BUS STOP IMPROVEMENTS 2012PLAN #: 287045 Bid Date: 3/6/2013Bid Time: 11:00 AM PLANS AT: Print On Demand Location: Lodi Online & Print On # OF ADDENDA: 2 DemandOWNER: City of Lodi DESCR: City of Lodi Paula Fernandez (x 2667) ([email protected]) (209) 333-6800. Install eight bus shelters, benches and trash cans at various bus stop locations. BIDDERS LIST:General Contractor: M C I Engineering, Inc. 209-472-1607 209-472-1859 A-vet Construction, Inc. 209-371-8880 209-371-8960 Bobo Construction, Inc. 916-685-2285 916-714-4850

TASMAN SUBSTATION DEMOLITIONPLAN #: 317012 Bid Date: 3/6/2013 Bid Time: 3:00 PM PLANS AT: Print On DemandLocation: Santa Clara Online & Print On Demand PREBID: 2/13 @ 1pm OWNER: City of Santa Clara DESCR: Contact, City of Santa Clara, 925-348-1098. The Tasman Substation Demolition project consists of the demolition and salvage of the Tasman Substation on Tasman Drive and associated equipment.

Thursday, March 07, 2013

DETERDING ELEMENTARY SAFE ROUTE TO SCHOOL PROJECTPLAN #: 4014 Bid Date: 3/7/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom Est Cost: $260,000.00 # OF ADDENDA: 4OWNER: County of Sacramento - Municipal Services Agency Ph: 916-875-6789 DESCR: Contact, Sacramento County General Services (916) 874-6544.Clearing and grubbing, roadway excavation, installation of curbs, gutters, sidewalks, and ramps, installation of drainage system, pavement, traffic striping, and doing all other work specified on the plans and in the BIDDERS LIST:General Contractor: B & M Builders, Inc. 916-862-0095 866-903-3437 American River Constr 530-621-1785 530-621-0360 C & C Construction 916-434-5280 916-434-5288 Lamon Construction Co., 530-671-1370 530-671-7482

COTTONWOOD - ROSEVILLE 203-KV TRANSMISSION LINE - STRUCTURE REPLACEMENTS & OPGWPLAN #: 15023 Bid Date: 3/7/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Various Online & Print On Est Cost : $5,000,000.00 PREBID: 2/20 @ 10am (RSVP to [email protected]) DESCR: Contact, Western Area Power Administration Eric Jordan ([email protected]) (602) 605-2665.Furnish / install insulator assemblies, optical overhead ground wire assemblies, ACSR conductor on 6.3 miles of three-phase single-circuit 230 kV transmission line, 141 miles of optical overhead ground wire, vibration dampers for conductor and optical overhead ground wite and miscellaneous transmission line hardware; furnish / install fiber optics at Roseville and Cottonwood substations and the Wick’s Corner In-Line Fiver Optic Amplifier (WIC) communication site; furnish / install a precast concrete building and associated foundation system, fencing, meter and power cable; remove 6.3 miles of three-phase 230 kV transmission line conductor and 68.7 miles of overhead ground wire; remove 43 single-circuit direct-embedded Type 218L steel pole structures; remove suspension insulator assemblies, tension insulator assemblies, overhead ground wire suspension assemblies, overhead ground wire tension assemblies and vibration dampers; construct 28 reinforced concrete foundations for Type 284L steel pole structures; furnish / install 28 Type 284L single-circuit steel pole structures on reinforced concrete foundations. **100% Small-Business Set-Aside. **Locations are in Shasta, Tehama, Butte, Yuba, Sutter, Sacramento and Placer Counties. BIDDERS LIST:General Contractor: Bcm Construction Co. 530-342-1722 530-342-1768Sub Contractor: Bob’s Discount Carpet 530-272-2100 530-272-9233 Coast Casework Inc. 530-889-2859 530-889-2851

OFFICE REMODEL FOR TW DUFOUR & ASSOCIATES (SELECT BIDDERS)PLAN #: 22013 Bid Date: 3/7/2013 Bid Time: 4:00 PM PLANS AT: Location: ChicoOnline & Print On DemandPREBID: 2/7 @ 11am # OF ADDENDA: 1 OWNER: TW DuFour & Associates ARCHITECT: Larry E. Coffman, Architect Ph: 530-898-8220 FAX: 530-543-6358 DESCR: Contact, Larry E. Coffman Architect (530) 898-8220. Construct a new carport freestanding structure adjacent to the existing office building and remodel the existing office building into an office for a State of Californa agency. BIDDERS LIST:General Contractor: Bcm Construction Co. 530-342-1722 530-342-1768Sub Contractor: Bob’s Discount Carpet 530-272-2100 530-272-9233 Coast Casework Inc. 530-889-2859 530-889-2851 Henderson Electric 530-893-1191 530-342-5278

Page 34: exchange_eZone_March4_2013

March 4, 2013Page 32 Contractor’s Zone• .Contractor’s Zone

Thursday, March 07, 2013

NEW ELK GROVE MONTESSORI SCHOOLPLAN #: 49012 Bid Date: 3/7/2013 Bid Time: 2:00 PM PLANS AT: Location: Elk GroveEst Cost: $4,500,000.00 # OF ADDENDA: 1PREBID: MAND 2/27 @ 10am ARCHITECT: ANOVA Architects Ph: 530-626-1810 FAX: 530-626-1931DESCR: Contact, Anova Architects, Inc. (530) 626-1810.Work consists of concrete foundations for approximately 22,000 square feet of relocatable and modular buildings (buildings provided by Owner under separate contract), flooring and other selected finishes, building low voltage systems and approximately 9 acres of site work, including utilities, septic system and off site road work. BIDDERS LIST:General Contractor: United Building Cont 530-345-8455 530-345-8885 Jeff Luchetti Construction 707-527-5788 707-636-5509 Bobo Construction, Inc. 916-685-2285 916-714-4850 Seward L. Schreder 530-229-0001 530-229-0070 American River Constr 530-621-1785 530-621-0360 C & C Construction 916-434-5280 916-434-5288 Diede Construction 209-369-8255 209-368-0600Sub Contractor: Ceiling Experts 916-225-5097 916-987-5741 Cabar Electric 916-739-6616 916-739-0922

MADISON AVE./GREENBACK LANE MEDIAN IMPROVEMENT PROJECTPLAN #: 53097 Bid Date: 3/7/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Folsom PlanroomOWNER: City of Folsom

DESCR: Contact, Brian Reed, City of Folsom, 916-355-8322. Landscaping, irrigation systems, meters, conduit and conductors, traffic signal loops, roadside signs, roadway excavation, paving, sidewalk replacement and imported topsoil.BIDDERS LIST:General Contractor: C & C Construction 916-434-5280 916-434-5288Supplier: Sunbelt Rentals 916-789-1234 916-789-7077

MILLERTON LAKE SRA-NORTH SHORE ENTRANCE ROAD ASPHALT REPAIRS & SLURRY SEALPLAN #: 82074 Bid Date: 3/7/2013 Bid Time: 4:00 PM PLANS AT: Location: Madera Co.PREBID: MAND 2/21 @ 11am OWNER: California SkateParks DESCR: Contact, Kristi Darby, 209)536-2912. Furnish all labor, materials, tools, supplies, equipment, all other items of expense and transportation to apply a Type II Slurry Seal asphalt treatment to the North Shore Entrance Station Road and pullouts at Millerton Lake State Recreation Area in in Madera County, California as set forth in the Contract Bid Specifications which is attached hereto. The work includes conducting asphalt road surface preparation, sweeping and cleaning, crack sealing with hot applied sealant on three (3) miles of road surfaces and pullouts and applying Type II Slurry Seal using a polymer modified asphaltic emulsion and utilizing Table Mountain Black Aggregate near Sonora, California as the aggregate. BIDDERS LIST:General Contractor: Central Valley Engineerin 916-791-1609 916-791-6424 SAN FERNANDO STREET ENHANCED BIKEWAY AND PEDESTRIAN ACCESSPLAN #: 83072 Bid Date: 3/7/2013 Bid Time: 3:00 PM PLANS AT: Location: San Jose

Continued from last page

Plans On File

INFO CENTER

CONTACT

WEB SITE

ABOUT

LegaloptionstoimproveyourfinancialfutureBankruptcy•Company&PersonalDebt•Foreclosure

CALL TODAY (530) 888-7100www.BottomLineLawyers.com 985 Lincoln Way, Auburn, CA 95603

Page 35: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

OWNER: City of San Jose DESCR: Contact, City of San Jose, 408-535-8300. Sitework, street lighting, curb and gutter, sewer & storm drain, sidewalk and driveway, street construction, concrete, electrical & cable construction.

PERALTA OAKS SEISMIC & TI (RE-BID)PLAN #: 122081 Bid Date: 3/7/2013 Bid Time: 2:00 PM PLANS AT: Location: OaklandG.C.: Alten Construction, Inc. Ph: 510-234-4200 FAX: 510-234-4221OWNER: County of Alameda DESCR: Contact, Alten Construction, Erik Andresen, 510-234-4200. Owner: Alameda County-General Services Agency.Trades Needed (but not limited to): Seismic Tie-Downs; Select. Bldg. Demo; Earth Moving; Water / Sanitary Sewer & Storm Drain Utilities; Concrete; Rebar; Concrete Rehab; Asphalt Paving; Pavement Markings; Site Furnishings; Manual & Autom. Gates; Chainlink Fences; Reinf. UnitMasonry; Structural & Misc Steel; Steel Deck; Metal Fab; Rough & Finish Carpentry; Arch. Woodwork; Waterproofing; Insulation; Vapor Retarder; Bldg. Envel. Underlayment; TPO Roof; Sheet Metal & Flashing; Metal Roof; Joint Sealants; Exp. Joint Cover Assembl’s; Doors, Frames & Hdwr; Access & Rolling Cntr Doors; Entrances/Storefronts & Windows; Glass & Glazing; Cement Plaster; Gypboard; Tiling; Acoustic Ceilings; Resilient Tile Floor, etc.; Seamless Floor; Resinous Terrazzo & Epoxy Resin Floor; Floor Systems; Tile Carpet; Wall Cladding & Panels; Painting & Coatings; Visual Display Bds; Signage; Toilet Access. & Partitions; Misc Specialties; Bullet-Resistant Constr.; Ext. Bldg Maint. Equip.; Resid. Appliances; Misc. Equip.; Autopsy & Morgue Equip.; Window Shades; Lab Casewk & Accessories; Buckling Restrained Braces; Temp. Control Rms; RF Shielded Rms; Elevator Renov.; Fire Suppression; Plumbing; HVAC; Electrical; Energy Mgmnt & Control Syst.; Fire Alarm Syst; Telecomm Cabling Syst.BIDDERS LIST:General Contractor: Arntz Builders, Inc. 415-382-1188 415-883-7529 Roebbelen Contracting, 916-939-1110 916-939-4027Sub Contractor: Forderer Cornice Works 510-783-4200 510-783-6646

VITAMIN SHOPPE POTRERO CENTERPLAN #: 127065 Bid Date: 3/7/2013

Bid Time: 12:00 PM PLANS AT: Print On Demand Location: San Francisco Online & Print On DemandG.C.: Tri-North Builders, Inc. Ph: 760-804-1838 DESCR: Contact, Tri-North Builders (760) 804-1838 Fax: (760) 804-1878Demising wall, concrete slab, interior partition walls, gypsum board curtain walls & soffits, suspended gypsum board ceilings, suspended acoustical ceiling tile,

painting, resilient tile & base, storefronts, cleaning & touch up, fire sprinklers, alarm systems. HVAC, plumbing & electrical systems. PLEASE DO NOT CALL OWNER, ARCHITECT/CONSULTANTS

TILDEN CORPORATION YARD MAINTENANCE FACILITYPLAN #: 128067 Bid Date: 3/7/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Orinda Online & Print On # OF ADDENDA: 3 Demand PREBID: 12/10 @ 10am OWNER: East Bay Regional Park District DESCR: Contact, East Bay Regional Park District, 510-544-2300. Construction of an Equipment Maintenance Building within the existing Tilden Park Corporation yard. Approx. 5,700 SF CMU building,fully sprinklered, with 3 repair bays, shop, office and storage. Site work includes replacement paving and underground utility work. BIDDERS LIST:General Contractor: Pacific-mountain Contrac 925-603-2652 925-687-8430 Diede Construction 209-369-8255 209-368-0600 S W Allen Construction 916-344-2098 916-344-0307 Swank Construction 707-446-8808 707-446-8303 Robert L. Brown Const. 925-228-4944 925-228-2533 D.l. Falk Construction, 510-887-6500 510-887-6501 Menghetti Construction 209-524-2465 209-524-2495 Re West Builders 707-576-1224 707-541-0117 Broward Builders Inc. 530-666-5635 530-666-5723 Younger General Contra 916-631-8000 916-631-8293Sub Contractor: Culbert Installs Doors, 916-675-4050 916-992-0133 Swan Engineering, Inc. 916-474-5299 916-474-5139 Mcpeak Electric 925-229-3473 925-229-3393 B.a. Retro Inc. 916-564-9523 916-564-9526 Parc Services, Inc. 925-371-4610 925-606-8704 G. D. Long Electric Co 707-252-3512 707-252-8340 Monterey Structural Steel 831-768-1277 831-768-1352 Mission City Rebar, Inc 925-449-6999 925-447-8797

Continued on next page

Don’t get thrown out on your way home! DVBE/UDBE Good Faith ads are

often required.This newspaper is state-certified.

Email your ad to:

[email protected]

Page 36: exchange_eZone_March4_2013

March 4, 2013Page 34 Contractor’s Zone• .Contractor’s Zone

Thursday, March 07, 2013

CONSTRUCTION MANAGEMENT/IRON HORSE TRAIL- FROM DUBLIN/PLEASANTON BART TO SANTA RITAPLAN #: 137064 Bid Date: 3/7/2013 Bid Time: 2:00 PM PLANS AT: Location: Dublin and PREBID: 2/19 @ 10am OWNER: East Bay Regional Park District DESCR: Contact, East Bay Regional Park District (510) 544-2360.Watering, construction staging & access areas, mobilization, traffic control, clearing & grubbing, installation of project signs, tree trimming, removal of asbestos & hazardous substances, disposal of materials, saw cut existing pavement, remove asphalt & concrete, remove storm drain line & structures, earthwork, finish grading, aggregate base, asphalt concrete, concrete paving, storm drain structures, storm drain lines, subsurface drains, painting, luminaires, electrical, traffic stripes & pavement markings, roadside & pole mounted signs, landscaping, fencing, site furnishings, play equipment, irrigation, tennis court, striping, decomposed granite pavement, trail signage

FURNISHING LABOR, MATERIALS, & EQUIPMENT FOR GENERAL BLDG CONTRACTORS SERVICES FOR PORT OF OAKLAND FACILITIESPLAN #: 153066 Bid Date: 3/7/2013 Bid Time: 2:00 PM PLANS AT: Location: OaklandEst Cost: $250,000.00 PREBID: 2/20 @ 9am OWNER: Port Of Oakland DESCR: Contact, Port of Oakland, 510-627-1439.The work of this annual Contract [Contract No. X2012-09-S7] and of the concurrent annual Contract put out to bid under the same title but not restricted to SBE bidders [Contract No. X2012- 09-S6] consists, in general, of furnishing both scheduled and on-call general construction services for repairing, remodeling, and constructing building related improvements for the period indicated. Design services may also be required occasionally. The work will be performed at such times as ordered by the Chief Engineer. The intention of the Port is to execute contracts for the said work with up to three contractors. The Port’s preference is to award at least one contract under the terms of this SBE Contract No X2012-09-S7. The estimated total annual cost for the work to be performed under all awarded contracts is $1,000,000, but in no case will the cost of work to be performed under all contracts exceed $2,500,000 for the maximum two and one half (2½) year term of these contracts, unless subsequently approved by the Board.

Continued from last page

Plans On FileMODESTO JUNIOR COLLEGE WEST CAMPUS INFRASTRUCTURE INCREMENT 2 PH 2PLAN #: 166073 Bid Date: 3/7/2013 Bid Time: 4:00 PM PLANS AT: Location: ModestoEst Cost: $250,000.00 PREBID: 2/14 @ 10am OWNER: Yosemite Community College District Ph: 209-575-6521 FAX: 209-575-6516DESCR: Contact, Yosemite Community College District, 209-575-6521. Work consists of demolition, grading, storm drainage, paving, fencing, landscaping, electrical and site furnishings. BIDDERS LIST:General Contractor: Sierra Valley Constructio 916-772-0800 916-772-0825 Seward L. Schreder 530-229-0001 530-229-0070

SIGNAL LOOP REPLACEMENT PROJECTPLAN #: 172007 Bid Date: 3/7/2013Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Planroom Est Cost: $225,000.00OWNER: County of Sacramento - Municipal Services Agency Ph: 916-875-6789 DESCR: Contact, County of Sacramento Tim Cress (916) 875-4736.Includes repairs to failed pavement areas, replacement of signal detector loops, handholes / conduits, running detector loop cables, installation of pull boxes, replacement of pavement striping / markings / markers, etc. PARKING LOT SWEEP AND STEAM CLEANINGPLAN #: 173082 Bid Date: 3/7/2013 Bid Time: 1:30 PM PLANS AT: Redwood CityPREBID: MAND 2/20 @ 10am, OWNER: Dmv Ph: 916-657-7822 DESCR: Contact, Nadine Valenzuela, 916-657-9918. Parking Lot Sweep and Steam Cleaning Services at DMV on Brewster Ave., in Redwood City.

CCTV SYSTEMS MAINTENANCE FOR DMV FIELDPLAN #: 191083 Bid Date: 3/7/2013Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Various PlanroomOWNER: Department of Motor Vehicles Ph: 916-657-7822 DESCR: Contact, Cindy Huynh, DMV., 916-657-6972. Contractor shall provide all labor, tools, materials, equipment and travel necessary to perform preventative maintenance services, technical support services, existing system disconnection and dismounting services, existing system reinstallation and

Page 37: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

metal doors, door hardware, automatic door operators, etc. Construction estimate is $100,000. Contract duration is one ninety (90) consecutive calendar days with liquidated damages of $500.00 per day for each day completion is delayed beyond the time prescribed. Bidder must possess a valid Class C-61 license with a D-28 Door Specialty.

FIBER OPTIC LINE PROJECTPLAN #: 246064 Bid Date: 3/7/2013 Bid Time: 2:00 PM PLANS AT: Location: GaltEst Cost: $368,000.00 OWNER: City of Galt # OF ADDENDA: 1 DESCR: Contact, Trung Trinh, 209-366-7260. Installing a Gigabit Ethernet fiber optic link between the City of Galt Public Works Building and Galt City Hall.BIDDERS LIST:Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

PAVEMENT MAINTENANCE PROJECTPLAN #: 249063 Bid Date: 3/7/2013

Bid Time: 2:00 PM PLANS AT: Location: WoodlandEst Cost: $250,000.00PREBID: To view site call Tami Burnham OWNER: City of Woodland DESCR: Contact, City of Woodland, 530-661-5820. Place Type II slurry seal, Type II micorsurfacing, pavement markers and markings and perform all other miscellaneous work.

AUDIO VISUAL SYSTEMS SCVMC BED BUILDING 1 & SERVICES BUILDING REPLACEMENTPLAN #: 267044 Bid Date: 3/7/2013 Bid Time: 2:00 PM PLANS AT: Location: San Jose# OF ADDENDA: 1 PREBID: MAND 2/8 @ 1pm OWNER: County of Santa Clara DESCR: Contact, County of Santa Clara, (408) 885-4400.Audio Visual systems for SCVMC Bed Building I, Services Replacement Building.

WATER METER PAVEMENT PROJECTPLAN #: 268048 Bid Date: 3/7/2013 Bid Time: 2:00 PM PLANS AT: Location: WoodlandOWNER: City of Woodland DESCR: Contact, City of Woodland, Tamera Burnham, 530-661-5968. Placing Type II Slurry Seal, Type Ii Microsurgacing, and placing pavement markers and markings as well as other miscellaneous work. BIDDERS LIST:General Contractor: Central Valley Engineerin 916-791-1609 916-791-6424

setup services, and replacement system installation and setup services for Closed Circuit Television (CCTV) systems for the 75 Northern CA region DMV field offices. If interested in bidding, please download, read, and follow all instructions in the attached Invitation For Bid (IFB) package. No mandatory or optional pre-bid conference is scheduled for this bid effort.

PAVEMENT MAINTENANCEPLAN #: 199058 Bid Date: 3/7/2013

Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Gilroy Online & Print On Demand OWNER: City of Gilroy DESCR: Contact, City of Gilroy, (408) 846-0450. Pavement preparation and point repairs, sweeping, crack seal, weed kill, type II slurry seal, type III slurry seal, pavement striping and markings, and clean up on various City Streets.

GURR ROAD OVERLAY PROJECTPLAN #: 206094 Bid Date: 3/7/2013 Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Merced Co. Online and Planroom# OF ADDENDA: 3OWNER: County of Merced FAX: 209-722-7690DESCR: Contact, Joe Giulian, 209-385-7601. Work consists of: Furnish all labor, materials, tools equipment transportation and incidentals necessary to construct an Asphalt Concrete Overlay on Gurr Road.

RIVER ROAD AND VINEWOOD AVENUE ASPHALT CONCRETE OVERLAY PROJECTPLAN #: 225025 Bid Date: 3/7/2013 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Merced PlanroomEst Cost: $565,098.00 # OF ADDENDA: 3OWNER: County of Merced FAX: 209-722-7690DESCR: Contact, County of Merced, (209) 385-7601. Furnish all labor, materials, tools, equipment transportation and incidentals necessary to construct the River Road and Vinewood Avenue asphalt concrete overlay project.

DOOR REPLACEMENT - ADMINISTRATION, BURK HALL, CREATIVE ARTS, FINE ARTS & HUMANITPLAN #: 245055 Bid Date: 3/7/2013Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: San Francisco Planroom Est Cost: $100,000.00 PREBID: MAND 2/21 @ 10am OWNER: University of California, San Francisco DESCR: Contact, Haro Kagemoto, 415-338-2547. Work includes furnishing all labor & materials necessary to remove and replace exterior doors in five (5) campus buildings: Administration, Burk Hall, Creative Arts, Fine Arts and Humanities. Work includes demolition, modify storefront systems, modify steel frame systems, aluminum doors, Continued on next page

Page 38: exchange_eZone_March4_2013

March 4, 2013Page 36 Contractor’s Zone• .Contractor’s Zone

Thursday, March 07, 2013

OLEANDER HOUSE DEMOLITION PROJECTPLAN #: 275049 Bid Date: 3/7/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Manteca PlanroomPREBID: MAND 2/14 @ 9am OWNER: County of San Joaquin, Purchasing & Support Services Ph: 209-468-3240 FAX: 209-468-3393DESCR: Contact, Ricardo Delatorre ([email protected])Destroy septic tank, remove all trash, remove burned out structures and level / grade, remove / dispose of concrete fence attached to burned out house, remove / dispose of all debris on concrete pad where gazebo stands, remove / dispose of debris where pool / sauna stands and backfill both, etc. OFFICE OF SYSTEMS INTEGRATION, NEW SPACE -PLAN #: 280046 Bid Date: 3/7/2013Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Sacramento Online & Print On Demand PREBID: MAND 2/14 @ 9:30am OWNER: State of CA - Dept of General Services DESCR: Contact, Tim Wick, 916-375-4249. Minor demolition, gypsum board assemblies, doors/frames/hardware, flooring, baseboard, paint, access control and related work.BIDDERS LIST:Sub Contractor: Coast Casework Inc. 530-889-2859 530-889-2851

GOLDEN STATE BOULEVARD AND F STREET INTERSECTION IMPROVEMENTSPLAN #: 284047 Bid Date: 3/7/2013Bid Time: 3:00 PM PLANS AT: Location: TurlockPREBID: 2/20 @ 10am OWNER: City of Turlock DESCR: Contact, City of Turlock, (209) 668-5599. Remove

thermoplastic tarffic stripes, markings & pavement markers; grinding (cold plane method); potable water improvements; storm drain improvements; sanitary sewer improvements; hardscape improvements; earthwork; aggergate base; hot mix asphalt; pavement reinforcing fabric; minor concrete; access ramp; adjust frames & covers to grade; landscaping; irrigation; signals, lighting & electrical systems; thermoplastic pavement markings; pavement markers; signage; fencing; replace chain link fencing; monuments, erosion control, storm water pollution prevention control. BIDDERS LIST:General Contractor: Rodgers Construction & 209-464-5780 209-464-5782Sub Contractor: M C I Engineering, Inc. 209-472-1607 209-472-1859

DODDS ROAD RESURFACINGPLAN #: 286050 Bid Date: 3/7/2013 Bid Time: 1:30 PM PLANS AT: Print On DemandLocation: Escalon Online & Print On Demand OWNER: County of San Joaquin DESCR: Contact, San Joaquin Co Public Works (209) 468-3043. Road resurfacing on Dodds Road (Murphy Rd to Carrolton Rd)BIDDERS LIST:General Contractor: Mck Services, Inc. 925-957-9200 925-957-9292 Lamon Construction Co.. 530-671-1370 530-671-7482

FULKERTH TANK AND PUMP STATION PROJECTPLAN #: 288047 Bid Date: 3/7/2013 Bid Time: 2:00 PM PLANS AT: Location: TurlockEst Cost: $4,375,000.00 OWNER: City of Turlock DESCR: Contact, City of Turlock, Engineering Division (209) 668-5520. Includes one-million gallon AWWA D-110 concrete water storage reservoir (Type I or II), booster pump station, well abandonment / destruction, site demolition, additions / modifications of local street sewer / storm drain piping and

Continued from last page

Plans On File

Located in the heart of Downtown Auburn, serving Buyers & Sellers since 1987 Residential, Commercial & Investment

The Capps GroupA Professional Real Estate Team 530-823-2111 Office

www.cappsgroup.com

856 Lincoln Way, Auburn, CA 95603

Kevin Capps - Managing [email protected] (DRE # 01705659)

Carolyn Hearn - [email protected] (DRE # 01483632)

Page 39: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

appurtenances, additions / modifications of grading and paving repairs to the existing street and repair / reconstruction of existing utilities and structures affected by the work. BIDDERS LIST:General Contractor: Sierra Mountain Constr 415-896-2859 800-507-5295 Preston Pipelines 408-262-1418 408-262-1870 Mcfadden Construction,. 209-478-7407 209-478-1516Sub Contractor: Bockmon & Woody Ele 209-993-2633 209-464-2615 LAMMERS ROAD AND SCHULTE ROADPLAN #: 289044 Bid Date: 3/7/2013 Bid Time: 1:30 PM PLANS AT: Print On Demand Location: Tracy Online & Print On Demand OWNER: County of San Joaquin DESCR: Contact, County of San Joaquin (209) 468-3240.Work consists of resurfacing and repairing approximately 1.77 miles of existing rural roadway with asphalt concrete, placement of pavement reinforcing fabric, constructing gravel shoulders on both sides, and other items or details that are required by the plans. BIDDERS LIST:General Contractor: Mck Services, Inc. 925-957-9200 925-957-9292 Lamon Construction Co.. 530-671-1370 530-671-7482

RFQ / RFP DESIGN-ASSIST CONSTRUCTION SERVICES/INTERMODAL PHASE 2 - SACRAMENTO VALLEY STATIONPLAN #: 292047 Bid Date: 3/7/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Sacramento PlanroomPREBID: 2/13 @ 3pm OWNER: City of Sacramento # OF ADDENDA: 1 DESCR: Contact, Jose Ledesma, ([email protected])Provide design-assist construction services for the next phase of work on the Sacramento Valley Station which will focus on the adaptive reuse of the building, historic restoration, building system upgrades and development of future lease spaces within the building. **The agreement will be separated into two phases, the first phase will focuson pre-construction activities and the second phase will focus on construction improvements.

BAKER ROAD AND DUNCAN ROAD INTERSECTION IMPROVEMENTSPLAN #: 383055 Bid Date: 3/7/2013 Bid Time: 1:30 PM PLANS AT: Print On Demand Location: Stockton Online and PlanroomOWNER: County of San Joaquin DESCR: Co of San Joaquin - Public Works (209) 468-3043. BIDDERS LIST:Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

Friday, March 08, 2013

DOLLAR GENERAL SACRAMENTO - MORRISON- BUILDING IMPROVEMENTS & SITEWORKPLAN #: 12009 Bid Date: 3/8/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Sacramento Online & Print On DemandG.C.: Pickett & Sons Construction, Inc. Ph: 559-225-2500 FAX: 559-225-2505DESCR: Contact, Pickett & Sons Construction, Paul O’Neal, ([email protected]) Office: (559) 225-2500.Demolish an +/- 2,366 SF single-family residence, detached garage and associated existing site improvements and construct a new +/- 9,230 SF Dollar General store with onsite work and offsite improvements. BIDDERS LIST:General Contractor: Bogart Construction 000-000-0000 000-000-0000 The Hatch Group 714-257-4600 714-000-0000 Pickett & Sons Constr 559-225-2500 559-225-2505 Moorefield Construction 916-614-7888 916-614-7898 Tilton Pacific Constructi 916-630-7200 916-630-4982Sub Contractor: On-site Engineering 916-652-0600 916-652-0610 Ceiling Experts 916-225-5097 916-987-5741 Bonham Electric 916-564-3530 916-564-3532

METAL SHADE STRUCTURE AT (VALLEY OAK GOLF COURSE)PLAN #: 57003 Bid Date: 3/8/2013 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Visalia Planroom Est Cost: $20,000.00 PREBID: 2/22 @ 10am OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, City of Visalia, 559-713-4334. Construct a metal shade structure over some existing ewuipment at the Valley Oaks Golf Course.BIDDERS LIST:General Contractor: Gary Interrante Constr 559-561-4115 559-561-4115

Continued on next page

C&S Publishing’s exclusive Delivery Manager

software will deliver this newspaper to you every

week automatically!Click this button

for more information

Page 40: exchange_eZone_March4_2013

March 4, 2013Page 38 Contractor’s Zone• .Contractor’s Zone

Friday, March 08, 2013

YUROK CASINO AND HOTELPLAN #: 71074 Bid Date: 3/8/2013 Bid Time: 2:00 PM PLANS AT: Location: KlamathG.C.: Flintco Ph: 916-351-5400 FAX: 916-294-0557OWNER: Yurok Tribe Planning & Community Dev. Dept. Ph: 707-482-1366 FAX: 707-482-1365DESCR: Contact, Flintco, ([email protected]) 916-797-7400. Construct a three-story wood framed Hotel, a steel-framed casino, utilities and associated site improvements; trades include field engineering, SWPPP, site clearing, earthwork, asphalt paving, fencing, landscaping, utilties, wastewater treatment, concrete paving, CIP concrete, reinforcing steel, masonry, stone veneer, structural steel, steel decking, miscellaneous metals, rough carpentry, millwork, FRP, waterproofing, insulation, fiber cement siding, roofing, sheetmetal, fireproofing, joint sealants, doors / frames / hardware, overhead doors, glazing, louvers, cement plaster, gypsum board, metal stud framing, tile, acoustical ceilings, flooring, access flooring, vinyl wall coverings, sealed concrete, paint, specialties, equipment, hotel /casino furnishings and elevators. **EXCLUDES food service equipment, swimming pool, fire suppression, plumbing, electrical and low voltage systemsBIDDERS LIST:Sub Contractor: Coast Casework Inc. 530-889-2859 530-889-2851 Ceiling Experts 916-225-5097 916-987-5741

FIVE (5) 2013 VERMEER CHIPPER BC 1500 W/WINCH, OR APPROVED EQUAL

PLAN #: 169090 Bid Date: 3/8/2013 Bid Time: 3:00 PM PLANS AT: Print OnDemand Location: San Jose Online & Print On DemandOWNER: County of Santa Clara DESCR: Contact, William Shaw, 408-491-7416. County of Santa Clara requesting bids from suppliers for five 2013 Vermeer Chipper BC 1500 w/winch, or Approved Equal.

SERVERSPLAN #: 203003 Bid Date: 3/8/2013

Bid Time: 3:00 PM PLANS AT: Roseville Office Location: El Dorado Co. Online and PlanroomDESCR: Contact, Eric van Leeuwen, 530-621-5834. County

of El Dorado is requesting bids for Serviers to be purchased by various department located throughout El Dorado Co.

REPAIR SERVICES OF (3) ARTISAN WELLSPLAN #: 229096 Bid Date: 3/8/2013Bid Time: 3:00 PM PLANS AT: Print OnDemand Location: San Jose Online & Print On # OF ADDENDA: 1 DemandPREBID: MAND 2/15 @ 1pm OWNER: City of San Jose DESCR: Contact, ([email protected]) Scope of Work: Contractor to provide repair/capping or well destruction services of three (3) inactive wells based on well conditions which may be determined during the pre-bid conference. Wells are approximately 12” diameter x 350 feet deep with debris. It is the Contractor’s responsibility to verify diameter and depth of each well at the pre-bid conference/site visit.

GRAVES AVE DUPLEX REHAB 2013PLAN #: 236096 Bid Date: 3/8/2013Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Sacramento Online & Print On Est Cost: $75,000.00 Demand# OF ADDENDA: 1PREBID: 2-13@10am & 2-19@10am OWNER: Sacramento Housing & Redevelopment Agency Ph: 916-566-1200 FAX: 916-927-6963DESCR: Contact, Sacramento Housing And Redevelopment Agency (916) 440-1352.Asbestos removal, cabinet, millwork, finish carpentry,concrete, construction clean up, doors, gates, activating devices, drywall, electrical, flooring, floor covering, framing, rough carpentry, glazing, hydroseed spraying, landscaping, lathing, plastering, painting, decorating, roofing, and warm air heating, ventilation and AC. BIDDERS LIST:Sub Contractor: Elite Wood Design 916-856-7709 916-467-7451 Coast Casework Inc. 530-889-2859 530-889-2851Supplier: Blain Stumpf Sand 916-933-1555 916-933-2925

SONNEN PORSCHE - REBIDPLAN #: 500051 Bid Date: 3/8/2013 Bid Time: 2:00 PM PLANS AT: Location: Mill ValleyG.C.: Midstate Construction Ph: (707) 762-3200 FAX: (707) 762-0700DESCR: Contact, Midstate Construction,707-762-0700. The

Continued from last page

Plans On File

Page 41: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

Project consists of Relocation of Storm Drainage along with associated manholes, etc., a new Service Building addition and an expanded Showroom. Proposed Service Addition is approximately 1,417 sf. The proposed Showroom Addition is approximately 4,227 sf. BIDDERS LIST:General Contractor: Midstate Construction 707-762-3200 707-762-0700

Monday, March 11, 2013

RE-ROOFING CERONE DIVISION BUILDING G

PLAN #: 77067 Bid Date: 3/11/2013 Bid Time: 1:30 PM PLANS AT: Roseville Office Location: San Jose Online and PlanroomPREBID: 02/27 @ 10:00 am DESCR: Contact: VTA (408) 321-7189.The work consists of furnishing all labor, materials, and equipment necessary for removal, repair, and replacement of the existing roofing systems with a single-ply cool roof system, including but not limited to ancillary system or devices on the roof such as electrical conduits, wood support blocking, and any other rooftop item as described in this

NEW IPIC THEATER - LOS ANGELES (NO GCPLAN #: 135011 Bid Date: 3/11/2013

Bid Time: 1:30 PM PLANS AT: Los AngelesG.C.: RSR Construction Co. Ph: 503-645-8531 FAX: 503-645-5357DESCR: Contact, RSR Cnstruction Company (503) 645-8531 Fax: (503) 645-5357 This project consists of the renovation & finish-out of a complete six screen, food service theater with kitchen facilities, offices & bar areas. The project occupies four levels above grade & the utility room below grade & all other work as indicated in the contract documents

VINEYARD WEDDING VENUE - MERITAGE RESORT &PLAN #: 143058 Bid Date: 3/11/2013 Bid Time: 2:00 PM PLANS AT: Location: NapaG.C.: Midstate Construction Ph: (707) 762-3200 FAX: (707) 762-0700DESCR: Contact, Midstate Construction ([email protected])Description: New 2,000 sf deck in the vineyards of the Meritage Resort & Spa property. The deck will be 6” below the existing gazebo and be built out of wood columns, wood beams and a composite type decking. There will be built in storage and a wrought iron guardrail around the perimeter with tie in to two stairs at opposite sides of the deck. The deck surface will be “Trex”, the paved area of the trail and parking area will be concrete pavers, and the area immediately surrounding the existing gazebo structure will be concrete on grade.

BIDDERS LIST:General Contractor: Midstate Construction 707-762-3200 707-762-0700

MOBILE HOME PARK TREE REMOVALPLAN #: 180004 Bid Date: 3/11/2013 Bid Time: 3:00 PM PLANS AT: Roseville OfficeLocation: Yuba City Online and PlanroomPREBID: 2/26 @ 10am OWNER: Regional Housing Authority of Sutter & Nevada County DESCR: Contact, Regional Housing Authority of Sutter & Nevada County Larry Tinker ([email protected]) (x 130) (530) 671-0220 Includes tree removal, stump grinding and debris removal.

ASPHALT TRENCH REPAIR @ PELICAN BAY STATE PRISONPLAN #: 228096 Bid Date: 3/11/2013 Bid Time: 2:00 PM Location: Cresent CityEst Cost: $84,000.00 PREBID: MAND 2/28 @ 9:30am# OF ADDENDA: 1 OWNER: State of CA - Dept of Corrections & Rehabilitation DESCR: Contact, Tracey Morrison, 916-255-5658. Asphalt Trench Repair @ Pelican Bay State Prison located in Cresent City, Ca

WALMART SUPERCENTER 4392-00PLAN #: 294038 Bid Date: 3/11/2013

Bid Time: 2:00 PM PLANS AT: Location: Victorville# OF ADDENDA: 7G.C.: Shames Construction Ph: 925-606-3000 FAX: 925-606-6656DESCR: Contact, Shames Construction, Office: 925-606-3000 | Estimating Fax: 925-606-6656.New Supercenter Store with Site and Offsite Work. Offsite work is Prevailing Wage for Caltrans.BIDDERS LIST:General Contractor: Shames Construction 925-606-3000 925-606-6656

Continued on next page

C&S Publishing has several key publications that go directly to the companies who will be getting those major work contracts, and who will need to buy services, supplies and materials. Is that money going to go to you or your competitors?

For rates, call Steve at (916) 257-8177

Page 42: exchange_eZone_March4_2013

March 4, 2013Page 40 Contractor’s Zone• .Contractor’s Zone

Tuesday, March 12, 2013

NORTH BUTTE COUNTY COURTHOUSE (PREQUALIFIED BIDDERS)PLAN #: 2018 Bid Date: 3/12/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Chico Online & Print On Est Cost: $39,000,000.00 # OF ADDENDA: 6Demand PREBID: MAND 1/24 @ 10am 2/6 @ 1pm OWNER: North Butte County Courts DESCR: Contact, Turner Construction Co.,Jim Hull (916) 444-4421 Questions MUST be in writing Administrative Office of the Courts, Mike Courtney ([email protected]) Construct a two-story facility with five mulit-use courtrooms, along with support spaces that totals +/- 77,400 SF with a basement level containing the main In-custody holding area and a below grade vehicle sallyport; the structure is a steel moment frame system on spread footings; exterior finishes include aluminum and glass curtain wall, veneer brick, EIFS and metal panels; a glass curtain wall along the south face of the building provides natural daylight to most public areas with a deep roof overhang for shading; work will include site, landscaping, architectural, structural, mechanical, plumbing and electrical. BIDDERS LIST:General Contractor: Swinerton Construction 916-388-9158 916-388-9197 Otto Construction 916-441-6870 916-441-6138 C W Driver, Inc. 650-212-2421 650-286-0509 Mccarthy Building Co. 916-786-3833 916-786-3234Sub Contractor: Jds Electric 916-645-0187 916-645-2480 Tolar Avl, Inc. 530-342-8860 530-342-8022 Mesa3, Inc.-test Adjust & 916-803-0268 916-783-6246 T & R Communications 916-286-3300 916-570-1181 Bennett Fencing 530-852-2618 000-000-0000 K S Telecom, Inc. 916-652-4735 916-652-4296 Advance Sound & Elect 916-334-9800 916-334-0455 New West Partitions 916-456-8365 916-456-2862

HICKEY BOULEVARD/CALLAN BOULEVARD TRAFFIC SIGNAL MODIFICATIONPLAN #: 16024 Bid Date: 3/12/2013 Bid Time: 2:00 PM PLANS AT: Location: Daly CityPREBID: 2/26 @ 9am OWNER: City of Daly City DESCR: Contact, City of Daly, 650-991-8064. The work includes

installation of new traffic signal poles and related apparatus, construction of new concrete curb, gutter, and ramp replacement, removal of existing street lights and project reporting.

COOLING TOWER PLATFORM CONSTRUCTIONPLAN #: 55098 Bid Date: 3/12/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Planroom Est Cost: $233,000.00 PREBID: MAND 2/27 @ 10am OWNER: State of CA - Dept of General Services DESCR: Contact, Armando Soliz, 916-552-9036. Provide and install cooling tower platforms at the East End Complex.BIDDERS LIST:General Contractor: D.g. Granade, Inc. 530-677-7484 530-677-7550 United Building Contrac 530-345-8455 530-345-8885 United Building Contra 530-345-8455 530-345-8885 Bobo Construction, Inc. 916-685-2285 916-714-4850 American River Construc 530-621-1785 530-621-0360

DRY CREEK HABITAT ENHANCEMENT DEMONSTRATION PROJECT, PHASE IIPLAN #: 59006 Bid Date: 3/12/2013 Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Sonoma Planroom Est Cost: $3,800,000.00 PREBID: MAND 2/19 @ 10 AM or 2/21 @ 2 PM OWNER: Sonoma County Water Agency Ph: 707-526-5370 FAX: 707-544-6123DESCR: Contact, Greg Guensch, 707-547-1900. Construct habitat modifications, including new side channels, ponds, alcoves and rock weir riffles; enhancements to existing pools through selective grading; installation of woody debris, log jams and large boulders as anchor material; vegetation planting; installation of erosion control measures; excavation and dewatering. BIDDERS LIST:General Contractor: Ghilotti Construction C 707-585-1221 707-585-1601

WALMART SUPERCENTER 2621-212PLAN #: 69068 Bid Date: 3/12/2013 Bid Time: 11:00 AM PLANS AT: Location: Simi Valley# OF ADDENDA: 3G.C.: Shames Construction Ph: 925-606-3000 FAX: 925-606-6656DESCR: Contact, Shames Construction, 925-606-3000. Limited Remodel of Existing Supercenter. Scope of Work, Trades Needed: Striping, Demolition/Concrete Cutting, Concrete, Concrete Slab Grinding, Misc Steel Fab, Sheet Metal,

Continued from last page

Plans On File

Page 43: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

EIFS/Stucco Repair, Roof Repair, Carpentry, Doors, Glazing, Metal Stud Framing, Drywall, Ceramic Tile, Acoustical Ceilings, Painting, Millwork, Floor Coverings, FRP, Toilet Accessories, FireSprinklers, Electrical, Plumbing, HVAC, Refrigeration, Caulking/Sealants, Tire/Lube Equipment

FORT BRAGG HIGH SCHOOL MODERNIZATION BIDS PHASE 2PLAN #: 77066 Bid Date: 3/12/2013 Bid Time: 1:00 PM PLANS AT: Print On DemandLocation: Fort Bragg Online & Print On Demand PREBID: MAND 2/5 @ 10am, OWNER: Fort Bragg Unified School District DESCR: Contact, Quattrocchi Kwok Architects (707) 576-0829. Modernize Fort Bragg High School, including exterior sitework modifications of Buildings A, B, C, D and E; minor demolition of existing building parts; new exterior finishes; accessibility upgrades of toilets / sinks; restoration of interior finishes and technology upgrades. BIDDERS LIST:Sub Contractor: Bennett Fencing 530-852-2618 000-000-0000

EMERGENCY OPERATIONS CENTER - TRAFFIC CCTV TRAFFIC MONITORING CAMERA INSTALLATIONPLAN #: 84082 Bid Date: 3/12/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Elk Grove PlanroomPREBID: Contact Danielle Dees, for prebid info (916-627-3218) OWNER: City of Elk Grove DESCR: Contact, David Yatabe, 916-478-2253. Installation of ten (10) CCTV Traffic Monitoring Cameras on existing traffic signal poles at ten (10) signalized intersections within the City.BIDDERS LIST:General Contractor: Studebaker Brown Ele 530-333-3423 530-823-1341

CITY OF CLOVIS SURFACE WATER TREATMENT PLANT EXPANSION TO 22.5 MGDPLAN #: 130071 Bid Date: 3/12/2013 Bid Time: 2:00 PM PLANS AT: Location: ClovisEst Cost: $2,530,000.00 PREBID: MAND 2/14 @ 10am OWNER: City of Clovis DESCR: Contact, Lisa Koehn, 559-324-2607. The construction involves the expansion of the Clovis Surface Water Treatment Plant to 22.5 MGD. Work includes modification and installation of membrane system racks, installation of a plate settler, addition of a new membrane feed pump and strainer, addition of a new backwash recovery system, replacement of a CIP caustic day tank, site piping, electrical, instrumentation and controls improvements..BIDDERS LIST:General Contractor: Preston Pipelines 408-262-1418 408-262-1870

Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

6482 IMPERIAL WAY - HOME REHABPLAN #: 141059 Bid Date: 3/12/2013

Bid Time: 3:30 PM PLANS AT: Roseville Office Location: Magalia PlanroomPREBID: 3/1 @ 10:30 OWNER: Regional Housing Authority of Sutter & Nevada County DESCR: Contact, Larry Tinker, 530-671-0220. Rehabilatate home at 6482 Imperial Way in Magalia, Ca. Septic system leach field, kitchen vinyl flooring, window replacement, bathroom exhaust fan, kitchen oven, permanent foundation, master bathroom vinyl replacement, front door lock, garage side door lock, etc. BIDDERS LIST:General Contractor: United Building Contrac 530-345-8455 530-345-8885

STATEWIDE ALARM MONITORING AND MAINTENANCE - RE-BIDPLAN #: 170098 Bid Date: 3/12/2013 Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Various PlanroomOWNER: Department of Motor Vehicles Ph: 916-657-7822 DESCR: Contact, Dyan Rose-Clemons ([email protected])Alarm services for various DMV field office locaitons throughout the state.

REPAIRS/REHABILITATION OF WELLS 402 & 403PLAN #: 208082 Bid Date: 3/12/2013 Bid Time: 2:30 PM PLANS AT: Location: Chowchilla# OF ADDENDA: 3 PREBID: MAND 2/13 @ 9am OWNER: State of CA - Dept of Corrections & Rehabilitation DESCR: Contact, Bruce Hubble 559-665-5531x5128. Contractor shall provide all parts, labor, materials, supplies, tools, equipment, permits and licenses, bonds, transportation, including travel and per diem, and every other item of expense necessary to repair/rehabilitate two (2) wells 402 & 403. All services provided will be for the California Department of Corrections and Rehabilitation (CDCR), Central California Women’s Facility (CCWF), located at 23370 Road 22, Chowchilla, California, 93610.Wells 402 and 403 are currently pumping at bowl depths of approximately 410’ and 372’ respectively. All water produced by the well pumps is pumped into a common horizontal underground supply line and flows into a 2.2 million gallon storage tank with a three (3) foot vertical rise at the tank entrance. Supply line pressure ranges between 10-15 PSIG. At a pumping depth of 520’, total vertical rise for the supply line, from pump bowls to storage tank entrance, will be approximately 525’.

Continued on next page

Page 44: exchange_eZone_March4_2013

March 4, 2013Page 42 Contractor’s Zone• .Contractor’s Zone

Tuesday, March 12, 2013

JACKSON ALLEY & 9TH STREET STORM DRAINAGE IMPROVEMENTSPLAN #: 217078 Bid Date: 3/12/2013 Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Tracy Planroom # OF ADDENDA: 1 OWNER: City of Tracy DESCR: Contact, City of Tracy Binh Bguyen ([email protected]) (209) 831-64 Install +/- 160 LF of 6” and 10” storm drainage pipe and associated catch basins and concrete / AC pavement at Jackson Alley. BIDDERS LIST:Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

LANDSCAPE IMPROVEMENTS FOR LOS NOGALES IMPROVEMENTS AND JOHN MUIR PARKWAY PHASEPLAN #: 221049 Bid Date: 3/12/2013Bid Time: 2:00 PM PLANS AT: Location: BrentwoodEst Cost: $465,000.00OWNER: City of Brentwood Ph: 925-516-5444 FAX: 925-516-5421DESCR: Contact, City of Brentwood, 925-516-5420. Work consists of: Landscape and irrigation related work including a fence with pilasters, all appurtenances etc.

ALARM MONITORING AND MAINTENANCE - INV LOD & CPDPLAN #: 226094 Bid Date: 3/12/2013Bid Time: 2:30 PM PLANS AT: Location: Various OWNER: Dept of Motor Vehicles - Field Operations Division Ph: 916-657-7840 DESCR: Contact, Dyan Rose-Clemons ([email protected])Alarm monitoring and maintenance services for various DMV Licensing,

HVAC SYSTEM INSTALLATION-INDIAN GRINDING ROCK SHP & CALAVERAS BIG TREES SPPLAN #: 238093 Bid Date: 3/12/2013 Bid Time: 4:00 PM PLANS AT: Print On Demand Location: Arnold Online & Print On Est Cost: $40,000.00 # OF ADDENDA: 1Demand PREBID: MAND 2/7 @ 10am OWNER: California State Parks DESCR: Contact, Kristi Darby, 209-536-2912. Provide all

labor, materials, tools, transportation and testing necessary for the removal, disposal and installation of the following, as set forth in Bid Specifications which is attached hereto:1. Two HVAC Systems that includes two (2) twin furnaces, two (2) AC units/ outdoor condensers, temperature controlsystems located at the Indian Grinding Rock State HistoricPark Visitor Center.2. The removal of existing duct work and two associated forced air furnaces, installing two new forced air furnaces, temperature control systems, three (3) new heating ducts and wall registers to heat and the “Prep Room, Men’s and Women’s bathroom facilities”, at Jack Knight Hall in Calaveras Big Trees State Park.BIDDERS LIST:General Contractor: Hometown 916-991-2486 916-991-2881

CAMPOLINDO HIGH SCHOOL ALTERATIONSPLAN #: 328001 Bid Date: 3/12/2013

Bid Time: 2:00 PM PLANS AT: Location: MoragaG.C.: Alten Construction, Inc. Ph: 510-234-4200 FAX: 510-234-4221DESCR: Contact, Alten Construction, 510-234-4200. Trades Needed (but not limited to): Haz Mat; Earthwork; Flexible Paving; Site Concrete; Paving & Striping; Chain Link Fences & Gates; Bollards; Landscape Grading; Concrete Reinforcement; Bldg Concrete; Vapor Emission Treatment; Concrete Finishing; Reinforced Masonry Units; Metal Fab; Rough Carpentry; P-Lam Clad Arch. Cabinets; Waterproofing; Insulation; Vapor Retarders; Built-Up Bit. Roofing; Sheet Metal Flashing & Trim; Flexible Flashing; Roof Hatch & Ladder; Firestopping: Joint Sealants; Seismic Joint Cover Assemblies; Doors, Frames & Hardware; Alum Windows; Glass & Glazing; Louvers & Vents; PC Plaster; Gypboard; Tiling; Susp. Acoustical Ceilings; FRP Panels; Sheet Carpet & Resilient Flooring; Tackable & Acoustic Wall Panels; Acoustic Ceiling Board; Painting & Coating; Markerbds & Visual Display Surfaces; Signage; Toilet Accessories & Compartments; Wire Mesh Partitions; Fire Prot. Specialties; Metal Lockers; Assit. Listening Devices; Proj. Screens; Portable Seating Riser; Vert. Louver Blinds; Music Educ. Storage Casewk; Fire Sprinklers; Plumbing; HVAC; Electrical; Communications;

Wednesday, March 13, 2013

301 E. COOLIDGE AVE., WATER MAIN REPLACEMENT AND PAVING OF PARKING LOTPLAN #: 37014 Bid Date: 3/13/2013 Bid Time: 3:00 PM PLANS AT: Location: Modesto

Continued from last page

Plans On File

Page 45: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

C&S Publishing’s exclusive Delivery Manager software will deliver this newspaper to you

every week automatically!

Click this button for more information

# OF ADDENDA: 1 PREBID: 2/20 (call for time) OWNER: Housing Authority of County of Stanislaus Ph: 209-557-2008 FAX: 209-557-2011DESCR: Contact, Housing Authority of the County of Stanislaus, (209) 557-2008 or Timothy Huff & Associates (209) 571-2232. selective demolition, site clearing, excavating, filling & grading, hot mic asphalt paving, portland cement concrete paving, pavement marking paint, detectable warning surfaces. BIDDERS LIST:General Contractor: Diede Construction 209-369-8255 209-368-0600 Bc Construction 209-531-1252 209-531-1254 Diede Construction 209-369-8255 209-368-0600

NEW CORPORATION YARD HEATING AND AIR CONDITIONING PROJECTPLAN #: 70078 Bid Date: 3/13/2013 Bid Time: 3:00 PM PLANS AT: Location: ParadisePREBID: MAND 2/14 @ 10:30am OWNER: Paradise Irrigation District Ph: (530) 877-4971 FAX: (530) 876-0483 DESCR: Contact Paradise Irrigation District (530) 877-4971. Design, supply and install heating and air conditioning and ventilation systems for the District’s new Corporation Yard building which will provide fully conditioned office, restroom, locker and training room space as well as a heated warehouse and shop space for the Paradise Irrigation District’s field operations division.

ALTAMONT ELEMENTARY SCHOOL IN MT HOUSEPLAN #: 121079 Bid Date: 3/13/2013Bid Time: 2:00 PM PLANS AT: Location: Mountain G.C.: Turner Construction Company Ph: (916) 444-4421 FAX: 1-916-444-9214DESCR: Contact, Turner Construction, 916-444-4421, fax: 916-444-9214.New K-8 school consisting of a Multi-purpose Building, Library/Administration Building, 5 similar Classroom Buildings, a Lunch Shelter Building and an Entry Pavilion totaling 107,095 ft² and associated site improvements on a 16 acre site. The buildings are wood framed with masonry and cement shake siding with standing seam metal roofing. All subcontractors must be pre-qualified to submit a Proposal. THE DUE DATE FOR PRE-QUALIFICATION PACKAGES IS @ March 7, 2013 10:00 A.M. ONLY PRE-QUALIFIED SUBCONTRACTOR’S PROPOSALS WILL BE ACCEPTED. Pre-qualification packages may be requested from Kim Prock @ 916-554-7930 or via e-mail at [email protected] BIDDERS LIST:General Contractor: Turner Construction Co 916-444-4421 191-644-4921Sub Contractor: Who Built Creative 707-763-6210 707-658-2513

WATER LINE REPLACEMENT 2012-2013 PHASE 2PLAN #: 146062 Bid Date: 3/13/2013

Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Sunnyvale Online and Planroom# OF ADDENDA: 1 OWNER: City of Sunnyvale DESCR: Contact, David Gakle, 408-730-7403. Furnishing all labor, materials, and equipment and performing all work necessary and incidental to the completion of the project known as “Water Line Replacement 2012-2013 Phase 2, Project No. UW-12/03- 13” consisting of installation of new water mains, valves, and fire hydrants, tie-in of new mains to existing mains, replacement of service laterals up to existing water meters, and replacement of water meters and water meter boxes where appropriate. The new mains shall be installed, tested, and ready for use, according to plans and specifications prepared by the City of Sunnyvale and according to the contract documents.

THEATRICAL LIGHTING - CONCERT STAGEPLAN #: 241001 Bid Date: 3/13/2013

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and PlanroomOWNER: State of California Exposition & State Fair DESCR: Contact, Janice Risso, Contracts Office, 916-263-4042, ([email protected])Contractor to install, maintain and operate theatrical lighting, on a rental basis, for the concert stage at the California State Fair, held July 12 through July 28, 2013 in Sacramento.

WALMARTPLAN #: 298031 Bid Date: 3/13/2013

Bid Time: 11:00 AM PLANS AT: Location: San Jacinto# OF ADDENDA: 1G.C.: Shames Construction Ph: 925-606-3000 FAX: 925-606-6656DESCR: Contact, Shames Construction, 925-606-3000. Striping, detectable warning systems, demolition, concrete, misc steel fab, carpentry, millwork, FRP, sheet metal, roof repair, caulking/sealants, door installlation, glazing, metal stud framing, drywall, ceramic tile, acoustical ceilings, floor coverings, painting, toilet accessories, fire sprinklers, electrical, plumbing, tire/lube equipment installation.BIDDERS LIST:General Contractor: Shames Construction 925-606-3000 925-606-6656

Continued on next page

Page 46: exchange_eZone_March4_2013

March 4, 2013Page 44 Contractor’s Zone• .Contractor’s Zone

Thursday, March 14, 2013

HUTCHINS STREET SQUARE KIRST HALL HVAC REPLACEMENT PROJECTPLAN #: 1024 Bid Date: 3/14/2013 Bid Time: 11:00 AM PLANS AT: Location: LodiOnline & Print On DemandOWNER: City of Lodi DESCR: Contact, City of Lodi, 209-333-6740. The work consists of Removal and Replacement of two (2) twenty-five (25) ton and one (1) three (3) ton rooftop mounted HVAC units. Units are located on the roof of Hutchins Street Square Kirst Hall, located at 125 S. Hutchins Street in Lodi, California. The work includes removal and disposal of existing units; modifications to/installation of: existing curb adaptors, electrical, temperature controls, smoke detectors, CO sensors and duct work as necessary to accommodate new units for a complete and operational system, and other incidental and related work, all as shown on the plans and specifications for the above project. BIDDERS LIST:General Contractor: Hometown 916-991-2486 916-991-2881

SPRECKLES SANITARY SEWER FORCE MAIN SUPPLEMENT AND PUMP STATION REHABILITATIONPLAN #: 60095 Bid Date: 3/14/2013 Bid Time: 3:00 PM PLANS AT: Location: San JosePREBID: 2/21 @ 9am OWNER: City of San Jose DESCR: Contact, City of San Jose, 408-535-8300. This request for bids is registered under the following classifications(s): 913-81 Maintenance and repair, Sewer and Storm Drain (including removal), 910-63 Public Utilities: Water, Sewer and Gas Maintenance Repair, 913-55 Construction, Tunnel, 914-38, Electrical, 928-49 Hydraulics (pump, Hydraulic Motor, Valves, Gauges, Etc.) Maintenance Repair, 929-43, Hydraulics (pump, Hydraulic Motor, Valves, Gauges, Etc.) Maintenance and Repair, and 936-62 Pumps and Pump Accessories Maintenance BIDDERS LIST:Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797

FIBER OPTIC NETWORK EXPANSION-WESTON RANCH & SJRTD OFFICEPLAN #: 85060 Bid Date: 3/14/2013Bid Time: 2:00 PM PLANS AT: Location: StocktonPREBID: MAND 2/28 @ 9am

OWNER: City of Stockton DESCR: Contact, Dennis Yep, 209-937-8825. Furnish, install & terminate fiber optic cables, conduits, and accessories in Weston Ranch area and at San Joaquin Regional Transit office.BIDDERS LIST:General Contractor: Bockmon & Woody Elec 209-993-2633 209-464-2615 Cf Contracting 415-721-7160 415-296-6437

DUDLEY PARKING LOT PAVING REPAIR PROJECTPLAN #: 86065 Bid Date: 3/14/2013 Bid Time: 2:00 PM PLANS AT: Auburn Office Location: Antelope PlanroomPREBID: MAND 2/22 @ 2 pm DESCR: Contact: Center Joint Unified School District (916)338-6400.The furnishing of all labor, materials, equipment, services, and incidentals necessary for work of the Dudley Parking Lot Paving Repair BIDDERS LIST:General Contractor: Lamon Construction Co. 530-671-1370 530-671-7482

SANTA FE TRAIL LIGHTING IMPROVEMENTSPLAN #: 97067 Bid Date: 3/14/2013

Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Tulare OWNER: City of Tulare DESCR: Contact, Mike Whitlock, City Engineer (559) 684-4207 Fax” (559) 685-5631 [email protected] of lighting improvements to the Santa Fe Trail, between lnyo Avenue and West Street, and Mooney Blvd and Prosperity Avenue. The work to be done consists in general of the installation of underground electrical conduits, lighting system, and related appurtenances, within the Santa Fe Trail.

TRAFFIC SIGNAL CONTROLLER UPGRADE AND RETIMING PROJECTPLAN #: 99074 Bid Date: 3/14/2013 Bid Time: 2:00 AM PLANS AT: Location: StocktonEst Cost: $500,000.00 PREBID: MAND 2/28 @ 9am OWNER: City of Stockton DESCR: Contact, Dennis Yep, 209-937-8825. Traffic signal controller upgrade at 20 existing signalized locations on March Lane, Harding Way, and Wilson Way;upgrade seven traffic signal cabinets. BIDDERS LIST:General Contractor: Bockmon & Woody 209-993-2633 209-464-2615

Continued from last page

Plans On File

Page 47: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

GRANT LINE ROAD WIDENING AND IMPROVEMENT PROJECTPLAN #: 103086 Bid Date: 3/14/2013 Bid Time: 2:00 PM PLANS AT: Location: TracyPREBID: 3/7 @ 10 AM OWNER: City of Tracy DESCR: Contact, City of Tracy, 209-831-6400. Widen / reconstruct Grant Line Road from two lanes to six lanes, including demolition; reconstruction of curb, gutter, sidewalk, median island, street lights, utilities, traffic signals, landscaping, signing and striping; installation of laterals, storm drainage system, waterlines, sewer system, utilities, manholes, valves, fire hydrants, inlets, monuments, etc.; new sewer lift station, irrigation pump station and associated equipment; new traffic signals; modification of two existing traffic signals, flashers and fiber interconnect system that connect from the east City limits to a traffic signal at MacArthur Drive; construction of storm drainge channel and culverts to connect storm drainage system from roadway to the channel.

GATEWAY 5A - DUDLEY BOULEVARD IMPROVEMENTS PROJECTPLAN #: 106094 Bid Date: 3/14/2013

Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Sacramento Online and Planroom Est Cost: $1,534.00 # OF ADDENDA: 1PREBID: 3/4 @ 1:30pm OWNER: County of Sacramento - Municipal Services Agency Ph: 916-875-6789 DESCR: Contact, County of Sacramento James Eslabon ([email protected]) (916) 874-6743. Construct improvement on Dudley Boulevard from the railroad tracks 425’ east of Forcum Avenue to 1,900’ east of the railroad tracks, including concrete curbs / gutter / sidewalks, driveway reconstruction, roadway excavation, paving, striping, roadside signs, storm drain pipes, inlets, manholes, roadway medians with landscaping, imported topsoil, new street lighting, installation of landscaping / irrigation systems, etc.BIDDERS LIST:General Contractor: C & C Construction 916-434-5280 916-434-5288Supplier: Sierra Trench Protection 530-887-9413 530-887-9112 DEANZA HIGH SCHOOL FF&EPLAN #: 111085 Bid Date: 3/14/2013Bid Time: 3:00 PM PLANS AT: Location: RichmondPlans on Disk Est Cost: $1,150,000.00PREBID: MAND 2/25 @ 2pm OWNER: West Contra Costa Unified School District Ph: 510-412-5657 FAX: 510-236-0464DESCR: West Contra Costa Unified School District (510) 307-4540.The West Contra Costa Unified School Distrist are requesting proposals from qualified school furnishings vendors to provide furniture, fixtures

EASTRIDGE TRANSIT CENTER AND BUSPLAN #: 117074 Bid Date: 3/14/2013Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Jose Online and Planroom # OF ADDENDA: 6 PREBID: 8/10 @ 10 am. OWNER: Santa Clara Valley Transportation Authority Ph: 408-321-7189 FAX: 408-955-9729DESCR: Contact: VTA (408) 321-7189 .The work generally includes clearing and grubbing, demolition, excavation, street improvements, AC paving, addition of curb and gutter and sidewalk, multiuse path, street and pedestrian lighting, landscaping new utilities, conduits, service connections, signing and striping and misc other work. BIDDERS LIST:General Contractor: Robert Bothman, Inc. 408-279-2277 408-279-2286Sub Contractor: Gehvac Co. 209-204-0100 209-566-9995 Pacific Underground 408-977-1655 408-977-1659 Parc Services, Inc. 925-371-4610 925-606-8704 Stormwater Specialists 707-280-2510 916-405-4180 Mission City Rebar, Inc 925-449-6999 925-447-8797 R.l. Ziegenbein Constr 925-820-9245 925-831-3093 Monterey Bay Rebar 831-724-3013 831-724-3151Supplier: Reed & Graham Inc 916-381-9900 916-388-1486

Continued on next page

Call Steve Berlin or Catherine Woodat 916-729-5432

Page 48: exchange_eZone_March4_2013

March 4, 2013Page 46 Contractor’s Zone• .Contractor’s Zone

Thursday, March 14, 2013

PORTOLA MIDDLE SCHOOL AT CASTROPLAN #: 136058 Bid Date: 3/14/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: El Cerrito Online & Print On Est Cost: $34,000,000.00 Demand# OF ADDENDA: 2 PREBID: MAND2/7/13 AT 10 AMOWNER: West Contra Costa Unified School District Ph: 510-412-5657 FAX: 510-236-0464DESCR: WCCUSD (510) 412-5657. Project consists of both major & minor modernization of the existing main school building & construction of 3 new buildings to house Portola Middle School at the current Castro site & associated site work. The scope also includes, but is not limited to, bicycle parking for 15% of the school population, on-site parking for approximately 46 cars, accessible buildings & routes to all buildings & exterior spaces on site, covered walkways connecting new building to the existing campus, gym with public access for community use, including student locker rooms, and Multipurpose Room with public access for communityBIDDERS LIST:General Contractor: Arntz Builders, Inc. 415-382-1188 415-883-7529 Roebbelen Contracting,. 916-939-1110 916-939-4027 Zovich Construction 510-784-1273 510-784-0173 Midstate Construction 707-762-3200 707-762-0700 Alten Construction, Inc. 510-234-4200 510-234-4221Sub Contractor: Monterey Structural Stee 831-768-1277 831-768-1352 Stormwater Specialists 707-280-2510 916-405-4180 Bennett Fencing 530-852-2618 000-000-0000 Quality Erectors & Const 707-746-1233 707-751-3962 Universal Security & Fire 916-563-1700 916-563-1755

8-INCH DUCTILE IRON PIPE MAIN INSTALLATION IN 25TH STREET, NOE STREET, HOFFMAN AVENUE, AND DOUGLASS STREETPLAN #: 154067 Bid Date: 3/14/2013 Bid Time: 2:00 PM Location: San FranciscoPlans on Disk PREBID: 2/21 (no time indicated ) OWNER: City & County of San Francisco DESCR: Contact, City & County of San Francisco, (415) 551-4603 Install approximately 5843 LF of 4”, 6”, 8” & 12” ductile iron pipe & 2300 LF of copper services at 23rd Street from Church St to Hoffman Ave. BIDDERS LIST:General Contractor: Cf Contracting 415-721-7160 415-296-6437

RFQ - GENERAL CONTRACTORS AND ROOFING SUBCONTRACTORS FOR THE EVERGREEN VALLEY COLLEGE GULLOW STUDENT CENTER ENVELOPE UPGRADE PROJECTPLAN #: 183078 Bid Date: 3/14/2013Bid Time: 3:00 PM PLANS AT: Location: San JosePlanroomOWNER: San Jose/Evergreen Community College District DESCR: Contact, Carlos Marques, Evergreen Community College District (408) 274-6700. San Jose / Evergreen Community College District is pre-Qualifying Generals & Roofing Subs for bidding on anticipated work associated with the construction of the Evergreen Valley College.

REPLACE EXTERIOR WALL WOOD SHINGLE FINISHES WITH A CEMENT PLASTER SYSTEMPLAN #: 184004 Bid Date: 3/14/2013 Bid Time: 1:30 PM PLANS AT: Roseville Office Location: Placerville Est Cost: $52,000.00PREBID: MAND 2/22 @ 10am OWNER: Department of Motor Vehicles Ph: 916-657-7822 DESCR: Contact, Corey Hollowell, ([email protected])Provide the Dept of Motor Vehicles labor, tools, materials, equipment and travel necessary to replace the existing exterior wall wood shingle finishes with a new cement plaster system

CITRUS HEIGHTS TRANSIT SERVICES MANAGEMENT STUDYPLAN #: 192080 Bid Date: 3/14/2013 Bid Time: 3:00 PM Location: Citrus HeightsPlanroom OWNER: City of Citrus Heights DESCR: Contact, Mary Poole, 916-727-4770. The subject of this RFP is the provision of professional consultant services to assist with the service agreement review and the transit services management study. The project will result in a written report of findings and recommendations related to the City’s current service agreement with RT, consideration of up to three (3) alternatives to the current service agreement structure, including a negotiated annexation into the RTDistrict as well as the possibility of contracting out services. The findings andrecommendations will be utilized to assist with the development of a next

WILFRED AVENUE IMPROVEMENTS ITB ONLYPLAN #: 195098 Bid Date: 3/14/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Rohnert Park Est Cost: $14,770,000.00# OF ADDENDA: 1 OWNER: City of Rohnert Park

Continued from last page

Plans On File

Page 49: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

FAX: 707-588-2238DESCR: Contact, City of Rohnert Park, 707-588-2232. Construction of a new pedestrian/bicycle bridge over Bellevue-Wilfred Channel, three new traffic signals, modification of a fourth traffic signal at Redwood Drive, undergrounding overhead utilities and constructing utility infrastructure improvements. BIDDERS LIST:General Contractor: Suulutaaq, Inc. Unit 2 707-427-3209 707-419-4851 Ghilotti Construction Co 707-585-1221 707-585-1601Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

RFQ - DESIGN-BUILD PROPOSED INFILL PROJECTS LEVEL II DORMSPLAN #: 213073 Bid Date: 3/14/2013 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Various PlanroomPREBID: MAND 2/5 @ 9am OWNER: State of CA - Dept of Corrections & Rehabilitation DESCR: Contact, Mardu Hanzalik, 916-255-6197 ([email protected])The Department of Corrections and Rehabilitation (CDCR) is accepting qualifications from Design-Build Entities for the design and construction of Level II Dorm facilities adjacent to one or more existing CDCR institutions. The institutions under consideration are:1. Folsom State Prison2. California State Prison, Sacramento3. California Medical Facility4. California State Prison, Solano5. Mule Creek State Prison6. California Institution for Men7. Richard J. Donovan Correctional FacilityThe two Proposed Infill Projects will be located within the boundaries of existing State property at existing CDCR institutions. It is anticipated that one site will house a 792-Bed semi-autonomous facility with three Level II Dorm housing units and the other site will house a 1584-Bed semi-autonomous facility with six Level II Dorm housing units. In addition to the housing units, each project will include programming, health care, visitation, and other support components. BIDDERS LIST:Sub Contractor: Sapphos Environmental 626-683-3547 000-000-0000

INFLUENT MAGNETIC METER & VALVE REPLACEMENT FOR NITRIFICATION

CLARIFIERSPLAN #: 214095 Bid Date: 3/14/2013 Bid Time: 3:00 PM PLANS AT: Print On DemandLocation: San Jose Online & Print On Demand PREBID: MAND 3/4 @ 10AM OWNER: City of San Jose

DESCR: Contact, City of San Jose, Rajani Nair (408) 535-8306. The Work consists of furnishing all labor, supervision, materials, equipment, applicable tax and other necessary items to perform all Work necessary and incidental to the construction of the Project known as the 7076 – Influent

SHOULDER STABILIZATION ON VARIOUS STREETS

PLAN #: 215083 Bid Date: 3/14/2013 Bid Time: 2:30 PM PLANS AT: Print OnDemand Location: Tulare Online & Print On Demand OWNER: City of Tulare DESCR: Contact, Mike Whitlock, City Engineer (559) 684-4207 Fax:(559) 685-5631 [email protected] of shoulder stabilization on Pratt Street, between Paige Avenue and Bardsley Avenue; and Bardsley Avenue, between Enterprise Street and West Street. The work consists of the re-construction of the shoulders on both streets, by excavation of existing materials, grading, the placement of aggregatebase and asphalt concrete, and striping as required, and other such details not specifically mentioned herein that are required by the Plans, Standard Specifications, and the Special Provisions shall be performed, placed, constructed, or installed. BIDDERS LIST:General Contractor: Avison Construction, Inc. 559-431-0317 559-431-0321Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

HIGHWAY 99 WIDENING SANITARY SEWERPLAN #: 218098 Bid Date: 3/14/2013 Bid Time: 2:00 PM PLANS AT: Location: StocktonEst Cost: $250,000.00OWNER: City of Stockton DESCR: Contact, City of Stockton, 209-937-8790.The work includes the demolition, abandonment, installation, and construction of sanitary sewer sewer-lines, ranging in size from 6- to 30-inches in diameter, and sewer laterals by open trench means in east Stockton.

MAXWELL PARKING STRUCTURE REPLACEMENTPLAN #: 270045 Bid Date: 3/14/2013 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Berkeley Online and PlanroomOWNER: University of California - Berkeley DESCR: Contact, Kevin Hufferd, 510-642-4672 ([email protected])The University of California, Berkeley is soliciting statements of qualification from developers to construct and operate a parking structure for approximately 400 to 500 parking spaces at the present site of Maxwell Family Field on the Berkeley Campus.

Continued from last page

Page 50: exchange_eZone_March4_2013

March 4, 2013Page 48 Contractor’s Zone• .Contractor’s Zone

Thursday, March 14, 2013

BYRON ROAD AND GRANT LINE ROAD INTERSECTION IMPROVEMENTSPLAN #: 309010 Bid Date: 3/14/2013 Bid Time: 1:30 PM PLANS AT: Print On Demand Location: Tracy Online and PlanroomOWNER: County of San Joaquin DESCR: Contact, County of San Joaquin - Public Works (209) 468-3043.Installing a four-legged traffic signal with preemptive devices to coordinate traffic flow with railroad crossing, widen westbound Grant Line Rd for a turn lane, lengthen left-turn pocket on southbound Byron Rd, BIDDERS LIST:General Contractor: Mck Services, Inc. 925-957-9200 925-957-9292

LIVE OAK ROAD RESURFACINGPLAN #: 329001 Bid Date: 3/14/2013

Bid Time: 1:30 PM PLANS AT: Print On Demand Location: San Joquin Online & Print On Est Cost: $340,000.00 DemandOWNER: County of San Joaquin DESCR: Contact, County of San Joaquin, (209) 468-3043. Sitework & concrete on Live Oak Rd. (State Route 99 Frontage Rd East to Furry Rd.)

Friday, March 15, 2013

ANOKA REHAB 2013PLAN #: 31016 Bid Date: 3/15/2013Bid Time: 2:00 PM PLANS AT: Location: SacramentoPlans on Disk Est Cost: $130,000.00PREBID: 2/20 or 2/26 @ 10 AM OWNER: Sacramento Housing & Redevelopment Agency FAX: 916-927-6963DESCR: Contact, Mike Pek, 916-449-6277.Possible trades include asbestos removal, cabinets, millwork, finish carpentry, concrete, concrete related services, construction clean-up, drywall, electrical, fencing, flooring, framing, rough carpentry, glazing, hardware, locks / safes, insulation, acoustical, landscaping, lathing / plastering, lead removal, mold removal, painting, decorating, plumbing, roofing, sheet metal, synthetic products / countertops / tub surrounds, warm-air heating / ventilation / AC and window coverings.

BIDDERS LIST:General Contractor: Clp Construction 916-344-6646 916-331-4335Sub Contractor: Coast Casework Inc. 530-889-2859 530-889-2851

RFB - BIO MONITORING SERVICES (WASTEWATER TREATMENT PLANT)PLAN #: 41016 Bid Date: 3/15/2013 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Visalia Online and PlanroomOWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, City of Visalia, Grant Knight, 559-713-4334. City of Visalia purchasing Division is soliciting bids for an annual contract for quarterly bio monitoring services at the Waste Water Treatment Plant.

NEIL CUMMINS E.S. MODERNIZATIONPLAN #: 81075 Bid Date: 3/15/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Larkspur Online & Print On Est Cost: $5,900,000.00 DemandG.C.: Alten Construction, Inc. Ph: 510-234-4200 FAX: 510-234-4221DESCR: Contact, Alten Construction, 510-234-4200. Classroom & restroom modenization & additions to Buildings A, B & C, including selective site demolition & new construction to provide ADA accessibility & vehicular control on campus & installing new clasroom finishes & signage, plumbing fixtures, electrical & lighting & an exterior canopy. Trades Needed:earthwork; drilled piers; AC paving; pavement markings; site concrete; synthetic paly turf (non in-fill): CL fencing; DG paving; landscape & irrigation; utilities; bldg demolition & minor demo for remodel; rebar; bldg concrete; structural & miscellaneous steel; metal fabrications; handrails & railings; rough & finish carpentry; arch wood casework; roofing repair; dampproofing & waterproofing; insulation; vapor retarders; fiber cement siding; thermoplastic roofing; sheet metal flashing & trim; doors, frames & hardware; access doors & panels; aluminum windows; glazing; skylights; gypboard; tiling; acoustic & direct applicaion acoustic ceilings, wall covering; FRP panels; painting & coatings; bldg signage, toilet compartments; miscellaneous specialties & access; fixed sun screens; window shade systems; site furnishings; play equipment; fabric shade structures; plumbing; HVAC; Electrical; Communications & electronic safety & security. BIDDERS LIST:General Contractor:

Continued from last page

Plans On File

Page 51: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

Alten Construction, Inc. 510-234-4200 510-234-4221Sub Contractor: Nalevia Wall 916-941-9364 916-941-9364

HALL MIDDLE SCHOOL MODERNIZATIONPLAN #: 87074 Bid Date: 3/15/2013 Bid Time: 2:00 PM PLANS AT: Location: LarkspurEst Cost: $1,050,000.00OWNER: Alten Construction, Inc. Ph: 510-234-4200 FAX: 510-234-4221DESCR: Contact, Erk Andresen, 510-234-4200, ([email protected])Renovation of existing toilet rooms & construction of addition to the toilet rooms at buildings 400 & 500 & minor associated sitework & installation pf WiFi system throughout campus, including earthwork, site drainage, asphalt concrete paving & base, site concrete, metal fabrication, rough & finish carpentry, roofing repair, wood siding, elastomeric rooding, insulation, sheet metal flashing & trim, vapor retarders, joint sealers, doors, frames & hardware, aluminum storefronts & windows, special windows, glass & glazing, tubular skylights, gypboard, tile, direct applied acoustic ceilings, wall coverings, FRP panels, painting & coatings, bldg signage, toilet compartments, toilet, bath & laundry accessories, fire extinguisher & cabinets, plumbing, HVAC, electrical, data communications system, fire alarm system, security system. BIDDERS LIST:General Contractor: Cf Contracting 415-721-7160 415-296-6437Sub Contractor: Coast Casework Inc. 530-889-2859 530-889-2851

PAVEMENT STRIPING, MARKING AND DELINEATIONPLAN #: 138062 Bid Date: 3/15/2013 Bid Time: 2:00 PM PLANS AT: Location: LafayetteEst Cost: $34,000.00 OWNER: City of Lafayette DESCR: Contact, David Terhune, 925-934-3908. Mobilization, pavement striping in thermoplastic and paint, application of buttons and reflectors, removal of old thermoplastic, and road closures as well as traffic control necessary to perform the pavement striping and delineation for the streets in Lafayette.

RFP - UTILITY BILLING AND CUSTOMER SERVICEPLAN #: 194098 Bid Date: 3/15/2013Bid Time: 1:00 PM PLANS AT: Roseville Office Location: Visalia PlanroomOWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, Purchasing Division, 559-713-4334. City of Visalia is seeking proposals for Utility Billing and Customer Service.

Monday, March 18, 2013

BIJOU AREA EROSION CONTROL PROJECTPLAN #: 147061 Bid Date: 3/18/2013

Bid Time: 2:00 PM PLANS AT: Location: So. Lake Est Cost: $9,500,000.00 # OF ADDENDA: 4PREBID: MAND 2/7 @ 10 AM OWNER: City of So. Lake Tahoe DESCR: Contact, Sarah Hussong-Johnson, 530-542-6033. Includes construction / installation of storm drainage pipe, storm drainge inlets, storm drainage manholes, storm drainage sediment / treatment vaults, storm water pumping system, storm water force main, storm water infiltration basins, sediment traps, rock lined channels, grass lined swales, concrete double box culvert, sanitary sewer pipe, sanitary sewer manholes, water supply pipe, asphalt concrete roadway, aggregate base, landscaping, revegetation, irrigation system, etc. BIDDERS LIST:General Contractor: Preston Pipelines 408-262-1418 408-262-1870Sub Contractor: Graham Concrete 530-993-4598 530-993-4758 Soil-tech, Inc. 775-324-5547 775-324-5548

2012 ROAD SEALS PROJECTPLAN #: 68066 Bid Date: 3/18/2013 Bid Time: 10:00 AM PLANS AT: Location: Sutter CoEst Cost: $300,000.00OWNER: County of Sutter DESCR: Contact, County of Sutter, 530-822-7450. 2013 Road Seals, Chip seal and micro-surfacing to form a single durable layer. The micro-surfacing process will blend together a graded aggregate, a binder, fines and additives to form a polymer-modified asphalt emulsion that will allow traffic to return to the road much faster.

FIBER OPTICS INSTALLATION FROM CITY HALL TO TRANSIT CENTERPLAN #: 257067 Bid Date: 3/18/2013 Bid Time: 5:00 PM PLANS AT: Location: TracyDESCR: Contact, City of Tracy Ripon Bhatia ([email protected]) (fax #) (209) 831-4636 Install fiber optics from City Hall to the Transit Center.

WALGREENS PHARMACYPLAN #: 306017 Bid Date: 3/18/2013

Bid Time: 2:00 PM PLANS AT: Rohnert ParkG.C.: Huff Construction Co. Ph: 209-545-7505 FAX: 209-545-2674DESCR: Contact, Huff Construction, ([email protected]) 209-545-7505.New construction of ~13,624sf Walgreens retail pharmacy facility with BIDDERS LIST:General Contractor: Woodland Construction 209-545-1987 209-545-2114 Huff Construction Co. 209-545-7505 209-545-2674

Continued on next page

Page 52: exchange_eZone_March4_2013

March 4, 2013Page 50 Contractor’s Zone• .Contractor’s Zone

Tuesday, March 19, 2013

SOE FAN COIL AND HVAC PIPING REPLACEMENT (ITB ONLY)PLAN #: 43038 Bid Date: 3/19/2013 Bid Time: 2:00 PM PLANS AT: Location: DavisEst Cost: $1,500,000.00 PREBID: MAND 2/28 @ 10am OWNER: University Of California, Davis DESCR: Contact, Chris McGuire, 530-754-1021. PLANS & SPECS WILL NOT BE AVAILABLE UNTIL 2/22.***********Provide all Design Work, labor, material, tools, equipment, commissioning, insurance, transportation and all necessary general conditions that may be reasonably inferred from the Contract Documents to provide all Design Work and Construction Work for: comprehensive removal and replacement of fan coils and HVAC piping, gypsum board with acoustical tile corridor ceiling removal and placement of T-bar grid acoustical ceiling tile, necessary removal and replacement of hard lid ceiling in office spaces to effect removal and installation of HVAC piping and fan coils, communications above ceiling and surface raceway, boxes and faceplates, including cat5e wiring and terminations in and throughout the School Of Education (SOE) building.

HAYSTACK BRIDGE OPERATOR’S HOUSE - DESIGN PACKAGE NO. 2PLAN #: 125085 Bid Date: 3/19/2013

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sonoma # OF ADDENDA: 3G.C.: Midstate Construction Ph: (707) 762-3200 FAX: (707) 762-0700DESCR: Contact, Midstate Construction, 707-762-3200. Div 3, 5, 9-10, 26 & 31-34. Design Package 2 is a portion of Contract No. CV-DB-12-001 Design & Construction of Civil, Structures & Architectural Improvements – Contract BIDDERS LIST:General Contractor: Midstate Construction 707-762-3200 707-762-0700

PUENTE HILLS LANDFILL CANYON 4 LIQUIDS STORAGE IMPROVEMENTSPLAN #: 129067 Bid Date: 3/19/2013Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Los Angeles PlanroomPREBID: MAND 2/21 @ 1pm OWNER: Sanitation Districts of Los Angeles County DESCR: Malika Jones, 562-908-4288, x 2175. Puente Hills Landfill Canyon 4 Liquids Storage Improvements: The proposed

project consists of replacing a rental tank with a District-owned storage tank, constructing a level asphalt pad for tank placement, installing new HDPE pipe and motor operated valves; electrical modifications; and all other appurtenant work. License Required: A

ROOF REPLACEMENT - ETHNIC STUDIES- PSYCHOLOGY BUILDINGPLAN #: 196089 Bid Date: 3/19/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Francisco PlanroomPREBID: 3/5 @ 10am OWNER: San Francisco State Un DESCR: Contact, Haro Kagemoto, 415-338-2547. Furnishing all labor and materials necessary to provide roof repairs of the Creative Arts Building.

RFP - AIRPORT AUTOMATED ACCESS CONTROL SYSTEM SERVICESPLAN #: 210003 Bid Date: 3/19/2013 Bid Time: 12:00 PM PLANS AT: Print On DemandLocation: San Jose Online & Print On Demand OWNER: City of San Jose DESCR: Contact, [email protected] of San Jose is requesting proposals for Airport Automated Access Control System Services

LEHR GROUNDWATER EXTRACTION TREATMENT SYSTEM ITB ONLYPLAN #: 159080 Bid Date: 3/19/2013

Bid Time: 2:00 PM PLANS AT: Location: DavisEst Cost: $200,000.00 PREBID: MAND 3/6 @ 10am OWNER: University Of California, Davis DESCR: Contact, Chris McGuire, University of California, Davis, 530-754-1021. Provide all labor, materials, equipment, tools, transportation, insurance and services for the construction, development and testing for: eight (8) rotary wash-drilled extraction wells, one (1) rotary wash-drilled monitoring well, and five (5) hollow-stem auger drilled monitoring wells including but not limited to, site preparation, sanitary seal, rotary wash borehole drilling, geophysical logging, casing installation, filter pack placement, transition and annular seals, well development and testing, and/or other work necessary to complete the Project as described in the specifications and drawings. The bore holes depths vary and are approximately 55 to 105 feet below ground surface. The project site is located at the LEHR / Old Campus Landfill Superfund Site at the University of California, Davis.

ROOF REPLACEMENT - ETHNIC STUDIES- PSYCHOLOGY BUILDINGPLAN #: 196089 Bid Date: 3/19/2013

Continued from last page

Plans On File

Page 53: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Francisco PlanroomPREBID: 3/5 @ 10am OWNER: San Francisco State University DESCR: Contact, Haro Kagemoto, 415-338-2547. Furnishing all labor and materials necessary to provide roof repairs of the Creative Arts Building.

HELLING LIBRARY CTC MODULARSPLAN #: 205012 Bid Date: 3/19/2013

Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Nevada City Online & Print On Demand PREBID: 3/5 @ 8:30 am OWNER: County of Nevada Ph: 530-265-1403 DESCR: Contact, County of Nevada, 530-265-1747.Work to include but is not limited to, site prep, replace 12 sheets of siding and trim, demolition, construction of breezeway opening between the Library and the modular buildings, framing, drywall, doors and hardware, windows, acoustical ceiling, carpet tile, painting, fire alarm, fire sprinklers, HVAC, and electrical per specifications. Contractor’s B license

RFP - AIRPORT AUTOMATED ACCESS CONTROL SYSTEM SERVICESPLAN #: 210003 Bid Date: 3/19/2013 Bid Time: 12:00 PM PLANS AT: Print OnDemand Location: San Jose Online & Print On Demand OWNER: City of San Jose DESCR: Contact, [email protected] of San Jose is requesting proposals for Airport Automated Access Control System Services

RFP CONCEPTUAL DESIGN WITH ARCHITECT AND ENGINEERING SERVICES FOR THE PACIFIC STATION TRANSIT CENTERPLAN #: 220080 Bid Date: 3/19/2013 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Santa Cruz Online and PlanroomPREBID: 2/26 @ 10am OWNER: Santa Cruz Metro Transit District Ph: 831-426-0199 FAX: 831-426-1958DESCR: Contact, Erron Alvey, 831-426-0199. Santa Cruz Metro requesting proposals for Conceptual Design with Architect and Engineering Services for the Pacific Station Transit Center.

THE INSTALLATION OF PEDESTRIAN RAMPS AT VARIOUS LOCATIONS IN THE UNINCORPORATED AREAS OF ALAMEDA CO.PLAN #: 233075 Bid Date: 3/19/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office

Location: Alameda Co. Online and Planroom OF ADDENDA: 2PREBID: MAND 2/20 @ 10AM at 951 Turner Ct., Rm 230A, Hayward DESCR: Contact: County of Alameda (510) 670-5450.Traffic control system; providing construction area signs; furnishing & applying water; removal of concrete; construction of pedestrian ramps; reconstruction of concrete curb & gutter; removing & replacing sprinkler system; removing & replacing landscape materials; the cleaning of the

UNDERGROUND STORAGE TANK SERVICE ANDPLAN #: 242085 Bid Date: 3/19/2013

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Planroom# OF ADDENDA: 1 PREBID: MAND 3/5 @ 9am OWNER: State of CA - Dept of General Services DESCR: Contact, Marissa Enos, 916-327-3895. Provide monthly, annual and 36-month inspections, certifications and training as required by the California State Water Resources Control Board and local regulatory agencies; the USTs contain diesell fuel for emergency generators.

FIRE STATION NO. 24 RE-BIDPLAN #: 244095 Bid Date: 3/19/2013 Bid Time: 2:00 PM PLANS AT: Location: San MateoEst Cost: $3,325,000.00 # OF ADDENDA: 2PREBID: MAND 3/5 @ 10am OWNER: City of San Mateo DESCR: Contact, City of San Mateo, (650) 522-7300.City of San Mateo Fire Station No. 24: The Project consists of construction of a new fire station and the disassembly, relocation, reconstruction and ultimately the removal of the temporary facilities and improvements necessary to maintain the station’s service coverage during construction of the new station. The Project requires demolition and/or construction on three separate sites within the City of San Mateo. The Work is specifically defined in the Contract Documents but, in general terms, is composed of the following five interrelated, sequential phases: (1) Disassembly of Existing Temporary Fire Station No. 23 and Restoration of the Site; (2) Construction of Temporary Fire Station No. 24 and Associated Site Improvements; (3) Demolition of Existing Fire Station No. 24; (4) Construction of New Fire Station No. 24; and (5) Disassembly of Temporary Fire Station No. 24 and Restoration of the Site.

Continued on next page

To Run Your Legal Ad, Please Visitwww.thedailyreporter.net

Or Give Us A Call 916-729-5432

Page 54: exchange_eZone_March4_2013

March 4, 2013Page 52 Contractor’s Zone• .Contractor’s Zone

Continued from last page

Tuesday, March 19, 2013

ROOF REPAIRS, CREATIVE ARTS BUILDINGPLAN #: 266048 Bid Date: 3/19/2013 Bid Time: 2:00 PM PLANS AT: Location: San FranciscoPREBID: 3/5 @ 2pm OWNER: San Francisco State University DESCR: Contact, Haro Kagemoto, 415-338-2547. Roof repairs at the Creative Arts Building at the University of San Francisco.

WAYSIDE FENCE REFURBISHMENT, R-LINEPLAN #: 277040 Bid Date: 3/19/2013

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Richmond Planroom Est Cost: $900,000.00 PREBID: MAND 3/1 @ 10AM at 3:00 OWNER: San Francisco Bay Area Rapid Transit District Ph: 510-464-6547 DESCR: Contact, San Francisco Bay Area Rapid Transit District (510) 464-6545.Remove & replace approximately 4,820 linear feet of existing chain link fence with new chain link fence & gates.

ORINDA UNION SCHOOL DISTRICT OFFICE BUILDING

PLAN #: 318010 Bid Date: 3/19/2013 Bid Time: 1:00 PM PLANS AT: Location: OrindaG.C.: Huff Construction Co. Ph: 209-545-7505 FAX: 209-545-2674DESCR: Contact, Huff Construction, 209-545-7505. New construction of 8,750sf office building shell. Project consists of 2-story warm shell structure with elevator, and a small restroom-maintenance building on the adjacent parcel. Preliminary tenant improvement layout and finishes are also provide, for preliminary budgeting. Your proposals shall require separate pricing for the following: 1) Costs for Shell 2) Prelim Budget for TI based on documents provided & 3) Costs for Restroom/Maintenance Building. Direct all RFI’s to Bob Ott @ Huff Construction - [email protected] - DO NOT CONTACT the architect, owner or consultants directly. THIS PROJECT WILL BE SUBJECT TO CALIFORNIA BIDDERS LIST:General Contractor: Huff Construction Co. 209-545-7505 209-545-4767

Plans On FileSAFEWAY STORE 2814PLAN #: 322002 Bid Date: 3/19/2013

Bid Time: 2:00 PM PLANS AT: Location: Los AltosG.C.: Midstate Construction Ph: (707) 762-3200 FAX: (707) 762-0700DESCR: Contact, Midstate Construction, 707-762-3200. Requesting sub-bids for Construction of new store in Los Altos, CaBIDDERS LIST:General Contractor: Midstate Construction 707-762-3200 707-762-0700

Wednesday, March 20, 2013

EAST SACRAMENTO WATER MAIN REPLACEMENT PROJECT PHASE 1PLAN #: 10022 Bid Date: 3/20/2013

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom Est Cost: $3,900,000.00OWNER: City of Sacramento - Dept of Utilities DESCR: Contact, Rosa Millino, 916-808-1451. Replacing 6 in, 8 in and 12 in diameter water mains. Also included is furnishing and installing fittings, valves, fire hydrants, other appurtenances, water services, meter setters, meter boxes, meter lids, and meters at various commercial an residential properties within designated areas of the City of Sacramento. BIDDERS LIST:General Contractor: United Building Contracto 530-345-8455 530-345-8885Supplier: Sierra Trench Protection / 530-887-9413 530-887-9112 Ferguson Enterprises, Inc. 916-381-6100 916-381-7445

SMART OPERATIONS & MAINTENANCE FACILITYPLAN #: 66085 Bid Date: 3/20/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Santa Rosa Online & Print On # OF ADDENDA: 3 DemandG.C.: Midstate Construction Ph: (707) 762-3200 FAX: (707) 762-0700DESCR: Contact, Midstate Construction, 707-762-3200. Construct an +/- 47,800 SF Operations and Maintenance Facility for the Sonoma-Marin Area Rail Transit project. **Design Package 3 is a portion of Contract No. CV-DB-12-001 Design and Construction of Civil, Structures and Architectural Improvements – Contract Package 4 (CP4). BIDDERS LIST:

Page 55: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

General Contractor: Midstate Construction 707-762-3200 707-762-0700

OAK PARK REGIONAL STORAGE FACILITYPLAN #: 94068 Bid Date: 3/20/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Planroom Est Cost: $11,573,000.00 PREBID: 3/5 @ 10am OWNER: City of Sacramento - Dept of Utilities DESCR: Contact, Gary Gulseth, 916-808-1412. Construction of an underground storage system for combined sewage to be located in the City’s Oak Park. The major components of the project include a diversion structure located at the intersection of 8th Avenue and San Carlos Way, utility relocation and new piping in San Carlos Way, an inlet/outlet structure, 120-inch diameter storage pipes, and a pump station and force main. The work shall be in conformance with the plans andspecifications hereinafter identified; including furnishing all material, labor, plant, tools, equipment, and services necessary to complete this project BIDDERS LIST:Supplier: Ferguson Enterprises. 916-381-6100 916-381-7445

WASTEWATER COLLECTION SYSTEM REHABILITATION AND REPLACEMENT PROJECTPLAN #: 142055 Bid Date: 3/20/2013 Bid Time: 3:00 PM PLANS AT: Location: Yuba CityEst Cost: $8,360,000.00 PREBID: 2/14 @ 9am OWNER: City of Yuba City DESCR: Contact, City of Yuba City, Diana Langley, 530-822-4626. Spot Repair of existing 8” sanitary sewer lines, remove and replace existing 6” & 8” sanitary sewer lines, construct 8” sanitary sewer lines by open cut method, rehabilitate existing 8” sanitary sewer lines by cured in place pipe method, construct sanitary sewer manholes and cleanouts, reroute sewer services from the backyard or sideyard to new sewer main, construct sewer service from back of walk to new sewer main, reinstate sewer service after CIPP, sewer flow control, remove and replace minor amount of 10” storm drain line and storm drain inlet.BIDDERS LIST:Sub Contractor: The Trenchless Co 916-455-4433 916-454-4859Supplier: Sierra Trench Protection 530-887-9413 530-887-9112 Sierra Trench Protection 530-887-9413 530-887-9112

DISTRICT PIPELINE REPLACEMENT 2013PLAN #: 164074 Bid Date: 3/20/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Truckee Online & Print On Demand PREBID: 3/6 @ 2pm OWNER: Truckee Donner Public Utility District

Ph: 530-587-3896 DESCR: Contact, Truckee Donner Public Utility District, 530-528-3956. Replacement of approximately 2,300 ft., of water main, approx. 700 ft of water service lateral, water meter boxes, fire hydrants and laterals connections to existing pipelines and ancillary itms such as fittings, valves, locater wire, marking tape and other appurtenances. BIDDERS LIST:General Contractor: Sierra Valley Construc. 916-772-0800 916-772-0825Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

MCDONALDS - 04-1745PLAN #: 303017 Bid Date: 3/20/2013Bid Time: 2:00 PM PLANS AT: Location: FresnoG.C.: Wells Construction Ph: 916-788-4485 FAX: (916) 788-4481DESCR: Contact, Wells Construction, ([email protected])Div 1 - Final Cleaning, Temporary Fencing, Tent EnclosureDiv 2 - Soft Demolition, Hard Demolition, Site Concrete, Striping & Signage, LandscapingDiv 3 - Structural Concrete, ReinforcingDiv 4 - Brick VeneerDiv 5 - Structural Steel, Misc. MetalsDiv 6 - Rough Carpentry, Finish Carpentry, Millwork, CountertopsDiv 7 - Insulation, Roofing, Flashing and Sheet MetalDiv 8 - Hollow Metal Doors, Wood Doors, Storefront, GlazingDiv 9 - Metal Frame & Drywall, Lath & Plaster, Acoustical Ceiling, Ceramic Tile, Painting, WallcoveringsDiv 10 - Restroom Accessories, Code Signage, Canopies (Trellis)Div 12 - UpholsteryDiv 15 - Plumbing, HVACDiv 16 - ElectricalBIDDERS LIST:General Contractor: Wells Construction 916-788-4485 916-788-4481

Thursday, March 21, 2013

GARLAND RANCH REGIONAL PARK VISITOR CENTERPLAN #: 26093 Bid Date: 3/21/2013 Bid Time: 2:00 PM PLANS AT: Location: MontereyPREBID: MAND 2/8 @ 2pm (Garland Ranch Reg. Park Visitor Center OWNER: Monterey Peninsula Regional Park District Ph: 831-372-3196 FAX: (831) 372-3197DESCR: Contact, Monterey Peninsula Regional Park District, 831-372-3196.Remodeling the existing Visitors Center Office are and new office

Continued on next page

Page 56: exchange_eZone_March4_2013

March 4, 2013Page 54 Contractor’s Zone• .Contractor’s Zone

Thursday, March 21, 2013

LOWER SACRAMENTO ROAD SAFETYPLAN #: 34013 Bid Date: 3/21/2013 Bid Time: 1:30 PM PLANS AT: San Joaquin Est Cost: $495,000.00 PREBID: 3/12 @ 1:30pm OWNER: County of San Joaquin DESCR: Contact, County of San Joaquin, (209) 468-3043.Roadway widening, constructing left turn lanes, installing street lights and speed feedback signs, signing and striping, and performing the work as required on the plans and specifications.

CHLORINE CONVERSION RESERVOIR “A” WATER TREATMENT PLANTPLAN #: 123084 Bid Date: 3/21/2013

Bid Time: 3:00 PM PLANS AT: Print On Demand Location: Pollock Pines Online & Print On Demand PREBID: MAND 3/7 @ 1 PM OWNER: El Dorado Irrigation District Ph: 530-622-4513 FAX: 530-622-8597DESCR: Contact, El Dorado Irrigation District Bob Rice ([email protected]) (fax #) (530) 642-4379. Includes partial building, roof and lime silo demolition; building addition and roof construction; chemical feed system construction; heating and ventilating installation plus related plumbing, electrical and instrumentation and construction sequencing got work within a continuously operating water treatment facility. BIDDERS LIST:General Contractor: J J M Engineering Const 916-992-2840 916-992-1000

911 COMMUNICATIONS CENTER RELOCATIONPLAN #: 161063 Bid Date: 3/21/2013

Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Elk Grove Online & Print On Est Cost: $5,063,835.00 DemandPREBID: 3/5 @ 10am OWNER: County of Sacramento DESCR: Renovate the essential services Sacramento County Sheriff’s South Station facility to accomodate the Sheriff’s 911 Communication Center operations, including tenant improvements to the existing building, site improvements to fit the new use, enclosure of the existing electrical yard to convert it into an electrical room, removal / installation of existing roof membrane, seismic upgrades to the building structure, demolition of existing interior partitions, construction of new structural / non-structual demising walls, addition of access

Continued from last page

Plans On Fileflooring, miscellaneous equipment, finishes for a complete and functional 911 facility, modifications to existing plumbing systems, additions / improvements to the building mechanical systems, improvements to the building’s fire protection systems / security systems, highly technical improvements to the buildings normal power / emergency back-up power systems, masonry block site walls, modifications to landscaping / paving, new ornamental iron fencing, modifications to existing fencing / vehicle and pedestrian access gates and new electrical yard to replace existing to fit new emergency generators and fuel tank. **Use ([email protected]) as email for questions. BIDDERS LIST:General Contractor: D.g. Granade, Inc. 530-677-7484 530-677-7550 United Building Contrac 530-345-8455 530-345-8885 C & C Construction 916-434-5280 916-434-5288 Gwinn Construction, Inc. 530-889-1360 530-823-8092 Diede Construction 209-369-8255 209-368-0600

RFQ - PORTLAND CONCRETE AND ASPHALTPLAN #: 181003 Bid Date: 3/21/2013

Bid Time: 3:00 PM PLANS AT: Print OnDemand Location: San Jose Online & Print On Demand OWNER: City of San Jose DESCR: Contact, John Pham ([email protected])City of San Jose requesting quotes for the supply and delivery of Portland Concrete and Asphalt for various locations in the City of San Jose.

RFQ - PORTLAND CONCRETE AND ASPHALTPLAN #: 186093 Bid Date: 3/21/2013

Bid Time: 3:00 PM PLANS AT: Print OnDemand Location: San Jose Online & Print On Demand OWNER: City of San Jose DESCR: Contact, City of San Jose, John Pham, 408-535-7046. The City of San Jose is seeking quotes for supply and delivery of Portland cement concrete and asphalt in support for Parks, Recreation, and Neigborhood Services.

Monday, March 25, 2013

MARIPOSA L & I - ITB ONLYPLAN #: 19029 Bid Date: 3/25/2013

Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Citrus Heights Online & Print On Est Cost: $582,000.00 Demand

Page 57: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

PREBID: MAND 3/11 @ 10am OWNER: San Juan Unified School District DESCR: Contact, Danny Martin, innovative Construction Services, Inc., 916-333-5701(PLANS WILL BE AVAILABLE AFTER MANDATORY) New decorative concrete walks with compliant paths to front of campus, courtyard improvements include; utility & drainage improvements, new concrete flatwork and landscape. Upgrade irrigation system to fully automatic, trees and landscaping. New wrought iron fence, trash enclousre and lighting improvements.

MCCLELLAN BUILDING 88 BUILD BACK (DENTALPLAN #: 107090 Bid Date: 3/25/2013

Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: McClellan Park Online & Print On Est Cost: $2,000,000.00 DemandPREBID: 2/28 @ 10 AM OWNER: US Department of Veterans Affairs DESCR: Contact, US Department of Veterans Affairs Michael Dean Dupalo ([email protected]) (916) 923-4525. Reconstruct +/- 7,286 SF of the existing fire damaged single-story dental clinic. **Service-Disabled Veteran-Owned Small-Business Set-Aside.

RFP - HOMELESS ENCAMPMENT CLEAN-UPPLAN #: 182002 Bid Date: 3/25/2013

Bid Time: 12:00 PM PLANS AT: Print OnDemand Location: San Jose Online & Print On Demand OWNER: City of San Jose DESCR: Contact, ([email protected]), The City has been in-sourcing all abatement work. The purpose of this RFP is to seek proposals from qualified firms to perform this work in place of City crews. In 2012, the City performed clean-ups for over 20 sites removing over 150 tons of debris and 100 bags of personal property. It is anticipated that there will be 40 to 60 clean-ups per year on an ongoing basis. The City anticipates a minimum contract term of one year, with four one-year options to renew the agreement.

Tuesday, March 26, 2013

MODERNIZATION OF EXISTING RESTROOMPLAN #: 27021 Bid Date: 3/26/2013 Bid Time: 2:00 PM PLANS AT: Location: StocktonEst Cost: $1,400,000.00 PREBID: MAND 2/14 @ 11am OWNER: San Joaquin Delta Community College District Ph: 209-954-5065 FAX: 209-954-5601DESCR: Darrin Cline, ([email protected])Modernization of existing restrooms including removal and replacement of: tile and substrate, plumbing fixtures, light fixtures, electrical outlets, fire alarm, toilet prtitions and accessories, doors,

frames, hardware, and automatic door operators. BIDDERS LIST:General Contractor: D.g. Granade, Inc. 530-677-7484 530-677-7550 Menghetti Construction 209-524-2465 209-524-2495 Sierra Valley Constructi 916-772-0800 916-772-0825 Bobo Construction, Inc. 916-685-2285 916-714-4850 Younger General Contra 916-631-8000 916-631-8293 Bc Construction 209-531-1252 209-531-1254 Diede Construction 209-369-8255 209-368-0600Sub Contractor: Gehvac Company 209-204-0100 209-566-9995

CHARLES PECK ELEMENTARY SCHOOL - L & I

PLAN #: 28021 Bid Date: 3/26/2013 Bid Time: 2:00 PM PLANS AT: Location: CarmichaelEst Cost: $1,105,500.00 PREBID: MAND 3/12 @ 10am OWNER: San Juan Unified School District DESCR: Contact, Danny Martin, Innovative Construction Services, 916*-333-5701.**** (Plans will be available after mandatory)***Requesting bids for new wrought iron fencing along front of School, new front gathering area with planters & tables, LEDS architectural lighting in parking lot, upgrade irrigation, new concrete in courtyards, drought resistant trees, shrubs and landscaping, new trash enclosure.BIDDERS LIST:General Contractor: United Building 530-345-8455 530-345-8885

MARSH CREEK ROAD SHOULDER WIDENINGPLAN #: 91066 Bid Date: 3/26/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Contra Costa Est Cost: $897,700.00PREBID: 3/11 @ 10 AM OWNER: County of Contra Costa FAX: 925-313-2333DESCR: Contact, County of Contra Costa, Larry Theis, 925-313-2166.Widen +/- 2,700 LF of the shoulder along Marsh Creek Road between the entrance to the Round Valley Regional Park and Lydia Lake, including curve realignment, roadside sign modifcation, culvert extensions, traffic striping and pavement markings. BIDDERS LIST:General Contractor: Suulutaaq, Inc. Unit 2 707-427-3209 707-419-4851 Ghilotti Construction Co 707-585-1221 707-585-1601 Mck Services, Inc. 925-957-9200 925-957-9292 Lamon Construction Co., 530-671-1370 530-671-7482 Ghilotti Brothers Inc 415-454-7011 415-454-8376

Continued on next page

CLICK HERE to place your Legal ad online

Page 58: exchange_eZone_March4_2013

March 4, 2013Page 56 Contractor’s Zone• .Contractor’s Zone

Tuesday, March 26, 2013

LIGHT RAIL SAFETY ENHANCEMENTSPLAN #: 92076 Bid Date: 3/26/2013

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Jose PlanroomPREBID: 03/06 @ 10:00 am DESCR: Contact: VTA (408) 321-7189.The work of this Contract consists of relocating tactile warning band, replace drop chain fence with pipe-handrail fence, install new swing gates, extend concrete sidewalk, shorten existing pedestrian gate, installation of set of flashers, train bell, and fence work. The work also includes, but is not limited to, furnish and install new pipe-rail fence, street signs, and tactile warning stripe.

HIGHLAND RESERVE BIKE TRAIL BRIDGE PROJECTPLAN #: 110085 Bid Date: 3/26/2013

Bid Time: 3:00 PM PLANS AT: Print OnDemand Location: Roseville Online & Print On Demand PREBID: MAND 3/5 @ 10am G.C.: City of Roseville DESCR: Contact, City of Roseville ([email protected]) Includes removal of asphalt concrete pavement, clearing, grubbing, imported borrow, structure excavation of the bridge, structure backfill of the bridge, erosion control, class 2 aggregate base, decomposed granite, asphalt concrete, structural concrete, joint seal, roadside sign, bar reinforcing steel, installation of metal railings on wingwalls, cable railing, painting traffic stripes and erection of railroad car. BIDDERS LIST:General Contractor: All-american Constructi. 916-870-8312 530-673-9470 Pbm Construction Inc. 916-315-2614 916-315-2619 Lamon Construction Co.. 530-671-1370 530-671-7482 Westcon Construction Co 916-663-2425 916-663-2448

BLUE ANCHOR PARK WATER SPRAY PAD PROJECTPLAN #: 24012 Bid Date: 3/29/2013 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Loomis Online and PlanroomOWNER: Town of Loomis Ph: 916-652-1840 FAX: 916-652-1847DESCR: Contact, Brian Fragiao, 916-652-1840. Project will consist of chain link fencing the project area, removing the existing decomposed granite material within the 24 foot diameter

circle, pour in-place a concrete pad, install of a drainage system, install of a water spray pad system and equipment, install of a push button timer for the water spray system, and all electrical wiring, conduit and plumbing installation.There will also be alternative options to propose a soft material pad surface and the type of pumping circulation system.

HYPOCHLORITE TANK REPLACEMENT PROJECT

PLAN #: 160068 Bid Date: 3/26/2013 Bid Time: 2:30 PM PLANS AT: Location: VallejoEst Cost: $152,000.00 PREBID: MAND 3/6 @ 10am OWNER: Vallejo Sanitation and Flood Control District Ph: 707-644-8949 DESCR: Contact, Vallejo Sanitation & Flood Control District Rolf Ohlemutz ([email protected]) (x 231) (707) 644-8949. Replace two existign fiberglass reinforced plastic hypochlorite tanks with new polyethylene tanks and repair / recosntruct existing piping affected by the work.

RUSSIAN RIVER COUNTY SANITATION DISTRICT TREATMENT PLANT BIOLOGICAL

NUTRIENT REMOVALPLAN #: 162065 Bid Date: 3/26/2013 Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Sonoma PlanroomPREBID: MAND 3/5 @ 10 AM or 3/7 @ 2 PM OWNER: Russian River CSD DESCR: Contact, Sonoma County Water Agency [email protected] (707) 547-1900. Construct a biological nutrient removal system at the treatment plant, including construction of baffle walls, pumping recirculation, micro diffuser aeration, blowers, mixers, motor control center, electrical panels, instruments, and controls.

FIXED ROUTE SHUTTLE SERVICE FOR THE CITY OF ALAMEDA PARATRANSIT PROGRAMPLAN #: 171097 Bid Date: 3/26/2013

Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Alameda PlanroomOWNER: City of Alameda DESCR: Contact, City of Alameda, 510-747-7948. City of Alameda requesting proposals for Paratransit Program.

MARE ISLAND PUMP STATION & BIO TOWER IMPROVEMENT PROJECTPLAN #: 193093 Bid Date: 3/26/2013

Bid Time: 3:00 PM PLANS AT: Print On

Continued from last page

Plans On File

Page 59: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

Demand Location: Vallejo Online & Print On Est Cost: $350,000.00 # OF ADDENDA: 1Demand PREBID: MAND 3/6 @ 10:00am OWNER: Vallejo Sanitation and Flood Control District Ph: 707-644-8949 DESCR: Contact, Vallejo Sanitation & Flood Control District Rolf Ohlemutz ([email protected]) (x 231) (707) 644-8949.Perform structural repairs to the Mare Island Pump Station, including limited demolition, structural repairs, fiberglass reinforcement for concrete wall panels, joint sealing / repairing; Bio Tower improvements include access platform modifications, crack injection and repair / reconstruction of existing facilities.

ADA CURB RETURN RAMPS, PHASE 5PLAN #: 320012 Bid Date: 3/26/2013

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Clovis Est Cost: $211,800.00OWNER: City of Clovis DESCR: Contact, City of Clovis, Contact: Eric Easterling, 324-2358, 2nd Contact:Scott Redelfs, 324-2382.Reconstruction of concrete curb ramps, driveways, drive approaches, curbs, gutters and sidewalks, inclusive of concrete and asphalt removal, adjustment of existing utilities and infrastructure to finish grade, grinding concrete surfaces, striping, landscape and irrigation modifications and furnish and install detectable warning devices at each curb ramp location.Reconstruction of concrete curb ramps, driveways, drive approaches, curbs, gutters and sidewalks, inclusive of concrete and asphalt removal, adjustment of existing utilities and infrastructure to finish grade, grinding concrete surfaces, striping, landscape and irrigation modifications and furnish and install detectable warning devices at each curb ramp

Wednesday, March 27, 2013

MANZANITA ROOM HVAC REPLACEMENT MARIN CENTER EXHIBIT HALLPLAN #: 32017 Bid Date: 3/27/2013

Bid Time: 2:30 PM PLANS AT: Roseville Office Location: San Rafael Planroom Est Cost: $280,000.00 PREBID: 3/5 @ 1:30pm OWNER: County of Marin DESCR: Contact, County of Marin, 415-473-4186. Demolition of existing HVAC unit and components and installation of new duct work, and installation of five new packaged roof mounted air conditioning units, demolition and installation of curbs, selective demolition of existing roof covering, structural strengthening of select existing beams and installation of new electrical components. BERKELEY VIEW REGULATOR AND BERKELEY VIEW, LAS AROMAS, MADRONE, SCHAPIRO AND SKYLINE PUMPING PLANTS IMPROVEMENTSPLAN #: 158064 Bid Date: 3/27/2013

Bid Time: 1:30 PM PLANS AT: Roseville Office Location: Alameda and Planroom Est Cost: $2,000,000.00 PREBID: 3/13 @ 8am OWNER: East Bay MUD Ph: 510-287-1040 DESCR: Contact, Douglas Higashi, 510-287-1677. Demolish and replace all pumps, motors, electric components and associated piping at Berkeley View pumping plants; demolish Berkeley View Regulator: install new crane, regulator, double doors and drain line in Berkeley View Pumping Plant; demolish Las aromas pumping plant building, demolish all pumps, motors, electric components and associated piping at Las Aromas Pumping Plant, re-grade site and replace with concrete building, install new pumps, motors, crane, drain line, electric components and associated piping within the new Las Aromas Pumping Plant building; demolish existing piping , furnishing and installing piping at three pumping plant facilities including all appurtenances and fittings; provide training of District Personnel on new equipment and system at the Berkeley View and Las Aromas pumping plants.BIDDERS LIST:Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797

RUNWAY RUBBER REMOVAL FOR SAN JOSE AIRPORTPLAN #: 174005 Bid Date: 3/27/2013

Bid Time: 3:00 PM PLANS AT: Print OnDemand Location: San Jose Online and PlanroomOWNER: City of San Jose DESCR: Contact, John Pham, ([email protected])City of San Jose is soliciting proposals to provide runway rubber removal services at the Mineta San Jose International Airport.

COATING SERVICES FOR CLARIFIERPLAN #: 177095 Bid Date: 3/27/2013

Bid Time: 3:00 PM PLANS AT: Print On DemandLocation: San Jose Online & Print On Demand PREBID: MAND 3/7 @ 10:30am OWNER: City of San Jose DESCR: Contact, Susie Velez, 408-535-7047. The City of San Jose is soliciting bids to for Coating Services for Clarifier Rehabilitation at the Water Pollution Control Plant.

Continued on next page

ThisnewspaperhasbeencertifiedbytheStateofCaliforniaasaTRADEPAPER?ThatmeansyoucanrunyourSBEandDVBEadsrighthere! It’seasyandinexpensivetopublishanad.Callusat916-729-5432

Page 60: exchange_eZone_March4_2013

March 4, 2013Page 58 Contractor’s Zone• .Contractor’s Zone

Wednesday, March 27, 2013

RFQ - PREMANUFACTURED OR CUSTOM BUILT STAIRWAYSPLAN #: 188091 Bid Date: 3/27/2013

Bid Time: 3:00 PM PLANS AT: Print OnDemand Location: San Jose Online & Print On Demand OWNER: City of San Jose DESCR: Contact CIty of San Jose 408-535-7058. The City of San Jose is seeking quotes for premanufactured or custom built stairways (10 quantity) to replace old stairs at the Water Pollution Control Plant located at 700 Los Esteros Rd, San Jose, specifically for the Nitrification Clarifier Scum Trough landing for safe access to equipment in place, and pursuant to attached specifications and diagram.

BRAD B. FREEMAN BIKE TRAIL REALIGNMENT

PLAN #: 200096 Bid Date: 3/27/2013Bid Time: 2:00 PM PLANS AT: Location: OrovillePREBID: 3/7 @ 9am OWNER: State of California Natural Resources Agency-Parks and Recreations DESCR: Contact, Jim Veres, 916-653-4867 ([email protected]) Realignment of the Brad B. Freeman Bike Trail as shown to include: a. Aggregate base. b. Geotextile fabric material. c. Type 1 and Type 2 rock fill. The rock fill must be transported by barge or other means not using land access to the placement locations. The rock fill must be clean in order to prevent contamination of the Thermalito Diversion Pool. d. Corrugated metal pipe. e. Chain link fencing with gates and metal protective covers in certain areas.

Thursday, March 28, 2013

FARM OF THE FUTURE PHOTOVOLTAIC ARRAYPLAN #: 259047 Bid Date: 3/28/2013

Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Coalinga Planroom Est Cost: $2,900,000.00OWNER: West Hills Community College District ARCHITECT: AP Architects Ph: 661-327-1690 FAX: 661-327-7204DESCR: Contact, AP Architects, 661-327-1690. Photovoltaic array - Design built at the West Hills Community College District.

BARSTOW/WEST - TRAFFIC SIGNAL MODIFICATION !!REBID!!PLAN #: 303018 Bid Date: 3/28/2013Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Fresno Online & Print On # OF ADDENDA: 1 DemandOWNER: County of Fresno Ph: 559-262-4866 DESCR: Contact, County of Fresno, Faxed: 559-600-4399. Removing and salvaging existing traffic signal and lighting equipment, installation of new traffic signal facilities, including signals heads, controller, electrical service equipment, conduits and wiring.

BLUE ANCHOR PARK WATER SPRAY PAD PROJECTPLAN #: 24012 Bid Date: 3/29/2013 Bid Time: 3:00 PM PLANS AT: Roseville Officeocation: Loomis Online and PlanroomOWNER: Town of Loomis Ph: 916-652-1840 FAX: 916-652-1847DESCR: Contact, Brian Fragiao, 916-652-1840. Project will consist of chain link fencing the project area, removing the existing decomposed granite material within the 24 foot diameter circle, pour in-place a concrete pad, install of a drainage system, install of a water spray pad system and equipment, install of a push button timer for the water spray system, and all electrical wiring, conduit and plumbing installation.There will also be alternative options to propose a soft material pad surface and the type of pumping circulation system.

Monday, April 01, 2013

!!!POSTPONED!!PARKING LOT REPAIR @ STOCKTON STATE OFFICE BUILDINGPLAN #: 276045 Bid Date: 4/1/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Stockton Online and Planroom Est Cost: $47,000.00 # OF ADDENDA: 2PREBID: MAND 11/29 @ 10am OWNER: State of CA - Dept of General Services DESCR: Contact, CA Department of General Services Peter Flores, ([email protected]) (916) 375-4951 Provide parking lot repairs, sealing and striping.

Tuesday, April 02, 2013

JOB ORDER CONTRACTPLAN #: 237092 Bid Date: 4/2/2013

Continued from last page

Plans On File

Page 61: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom Est Cost: $750,000.00 PREBID: MAND 3/12 @ 1:30pm OWNER: California State University, Sacramento Ph: 916-278-4895 DESCR: Suzanne Swartz, 916-278-5797. The Notice to Contractors is for the award of two (2) Job Order Contracts. Work includes a collection of detailed repair and construction tasks and specifications that have established unit prices. It is placed with the Contractor for the accomplishment of repair, alteration, modernization, maintenance, rehabilitation, demolition and construction of infrastructure,

PEABODY ROAD WATER AND SEWER LINE RELOCATION PROJECTPLAN #: 39019 Bid Date: 4/2/2013

Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Fairfield Online & Print On Demand PREBID: MAND 3/11 @ 10am OWNER: City of Fairfield DESCR: Contact, Thanh Vuong, 707-428-7017. Installing 16-inch diameter buried potable water transmission piping; buried butterfly isolation valves; combination air-vacuum release valves; blow off assemblies and covers, fire hydrants; bore and jack / microtunnel steel casing; 12-, 15-, 21- and 27-inch buried sanitary sewer piping; sanitary sewer manholes, appurtenances; connections to existing potable water transmission and sanitary sewer pipelines and restoration necessary to provide complete operating water transmission and sanitary sewer lines in preparation for the Fairfield Vacaville Train Station. All equipment shall be installed in accordance with the manufacturer’s requirements and recommendations. The Contract includes any other work as shown on the Project Plans, as specified in the Contract Documents, and as directed by the City Engineer. Specifically, a portion of the trenching and de-watering operations will involve the handling and disposal of hydrocarbon contaminated soils and water.BIDDERS LIST:Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

REDDING FIELD OFFICE RECONFIGURATION - DMV

PLAN #: 187075 Bid Date: 4/2/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Redding Online and PlanroomPREBID: MAND 3/12 @ 9:30am OWNER: Department of Motor Vehicles Ph: 916-657-7822 DESCR: Contact, Eric Waddell, 916-376-1768. Reconfiguration of the DMV Redding Field Office, within the Redding State Office Building and will include the remodel of the existing building restrooms. The project will also include including interior and exterior demolition, site improvements,

framing, interior finishes, roofing, mechanical, plumbing, electrical, fire alarm, and security systems, fire/life safety, ADA code compliance, signage and HazMat abatement. Placement, maintenance and removal of temporary on-site modular DMV Field Office and Restroom facilities during the construction duration.BIDDERS LIST:General Contractor: J. H. Mack Construction 530-547-4515 530-547-4569

Tuesday, April 02, 2013

JOB ORDER CONTRACTPLAN #: 237092 Bid Date: 4/2/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom Est Cost: $750,000.00 PREBID: MAND 3/12 @ 1:30pm OWNER: California State University, Sacramento Ph: 916-278-4895 DESCR: Contact, Suzanne Swartz, 916-278-5797. The Notice to Contractors is for the award of two (2) Job Order Contracts. Work includes a collection of detailed repair and construction tasks and specifications that have established unit prices. It is placed with the Contractor for the accomplishment of repair, alteration, modernization, maintenance, rehabilitation, demolition and construction of infrastructure,BIDDERS LIST:General Contractor: United Building Contrac 530-345-8455 530-345-8885

CONTRA COSTA CENTRE INFRASTRUCTURE IMPROVEMENTSPLAN #: 297036 Bid Date: 4/2/2013

Bid Time: 2:00 PM PLANS AT: Contra Costa Est Cost: $600,000.00 PREBID: 3/14 @ 11 AM OWNER: County of Contra Costa FAX: 925-313-2333DESCR: County of Contra Costa Rich Shimano (925) 313-2168. Includes construction of concrete sidewalk, curb ramp upgrades, colored concrete crosswalks, traffic signal pushbutton relocations, in-roadway warning lights, pedestrian signal head replacements, thermoplastic striping / removal, curb painting and sidewalk tree landscaping improvements.

Wednesday, April 03, 2013

REPLACE EMERGENCY GENERATORPLAN #: 178004 Bid Date: 4/3/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Fresno PlanroomPREBID: MAND 3/19 @ 10am OWNER: State of CA - Dept of General Services DESCR: Contact, Armando Soliz, 916-552-9036. Replace Emergency Generator at Hugh M. Burns State Building (701).

Continued on next page

Page 62: exchange_eZone_March4_2013

March 4, 2013Page 60 Contractor’s Zone• .Contractor’s Zone

Wednesday, April 03, 2013

RFP - PROFESSIONAL ENGINEERING SERVICS (AS CITY ENGINEER)PLAN #: 243053 Bid Date: 4/3/2013 Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Oakdale Online and Planroom# OF ADDENDA: 1 OWNER: City of Oakdale DESCR: Contact, City of Oakdale, Engineering Division, 209-845-3600. City of Oakdale are seeking proposals from qualified civil engineering

Thursday, April 04, 2013

13-060/13-061, 202 & 205 MIRA LOMA DESS CALL

PLAN #: 29016 Bid Date: 4/4/2013 Bid Time: 2:30 PM PLANS AT: Location: OrovilleEst Cost: $175,000.00 PREBID: 3/12 @ 10:30am OWNER: County of Butte FAX: 530-538-7171DESCR: Contact, Butte County General Services, 530/538-7097 ([email protected])Furnishing of all labor, material, equipment, transportation, services and expertise required and/or necessary for modular workstation furniture with installation at 202 and 205 Mira Loma Dr. Oroville, California. 95965

MOUNT DIABLO SP, LOWER SUMMIT ADA IMPROVEMENTSPLAN #: 38024 Bid Date: 4/4/2013

Bid Time: 2:00 PM PLANS AT: Location: ClaytonEst Cost: $440,000.00 PREBID: MAND 3/14 @ 10am OWNER: State of CA - Dept. of Parks and Rec. - DESCR: Contact, Christina Soares, Dept of Parks & Recreation (707) 769-5665.Furnish all labor, materials, tools & equipment necessary to perform ADA remedial work as described in the plans and specifications at Mount Diablo State Park in Contra Costa County, CA, complete & in accordance with the plans & specifications therefore & such addenda thereto as may be issued prior to bid opening date. BIDDERS LIST:General Contractor: Parc Services, Inc. 925-371-4610 925-606-8704

LONG BEACH WATER RECLAMATION PLANT EFFLUENT METERING WEIR REPLACEMENTPLAN #: 102093 Bid Date: 4/4/2013

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Long Beach PlanroomPREBID: MAND 3/19 @ 10am OWNER: Sanitation Districts of Los Angeles County DESCR: Contact, John Chung (562) 908-4288 ext 2183. Long Beach Water Reclamation Plant Effluent Metering Weir Replacement: The project consists of demolishing the existing effluent metering weir, modifying chlorine contact tanks, installing a stainless steel weir on the chlorine contact tanks, electrical and instrumentation, and all appurtenant

PASO ROBLES UPTOWN FAMILY PARK PROJECTPLAN #: 296048 Bid Date: 4/4/2013 Bid Time: 2:00 PM PLANS AT: Paso RoblesEst Cost: $2,138,490.00OWNER: City of El Paso de Robles DESCR: Contact, City of Paso Robles, Freda Berman, 805-227-7245.Installation of entry elements, buildings, community garden, amphitheatre, pervious pavement and asphaltic concrete parking lot; play equipment, shade structures, site furnishings, hardscape, poured-in place resilient surfacing, walkways, stairs, walls, fencing, railings, drainage elements, utilities, irrigation, electrical, and surrounding

Wednesday, April 10, 2013

SANTA TERESA WATER TREATMENT PLANT INCOMPATIBLE MATERIALS PROJECT STAGE II

PLAN #: 307013 Bid Date: 4/10/2013 Bid Time: 2:00 PM PLANS AT: Location: San JoseEst Cost: $3,500,000.00PREBID: MAND 3/19/13 AT 9 AM OWNER: Santa Clara Valley Water District Ph: 408-265-2607 DESCR: Contact, SCVWD (408) 265-2607. The work to be completed under this Contract shall consist of furnishing all labor, equipment, materials & other items required to construct the Santa Teresa Water Treatment Plant Incompatible Materials Project Stage II. The work includes, but is not limited to, the following: Prepare & submit all permit applications & comply with all permitting requirements by the agencies having jurisdiction for the demolition & installation of all permanent & temporary hazardous materials systems. See Special Provisions Article 17.01 of the contract documents for permit application preparation requirements. Perform site survey & prepare piping shop drawings for the existing chemical trenches to meet hazardous permitting requirements. Provide engineering and design services for components of construction as described in

Continued from last page

Plans On File

Page 63: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

the special provisions & technical specifications to include, but not be limited to: A. Professional Land Surveyor licensed in the State of California B. Professional Civil or Mechanical Engineer licensed in the State of California C. Professional Civil or Structural Engineer licensed in the State of California Repair existing aboveground temporary chemical piping system to meet plant operational requirements during construction. Remove all existing temporary chemical piping systems prior to completion of construction. Demolish approximately 8000 ft of existing single-walled and/or double-contained chemical piping & replace with single-walled and/or double-contained piping for liquid alum (aluminum sulfate)/ferric chloride, phosphoric acid, caustic soda, aqua ammonia (ammonium hydroxide), sodium hypochlorite & cationic polymer chemical systems. Install leak detection monitoring systems for new double-contained piping & secondary containment areas to include, but not be limited to sensors, control panels & alarms to SCADA. Remove existing chemical trench covers & replace with aluminum trench covers. Install chemical resistant coating for secondary containment areas. Install caustic soda heating system to include, but not be limited to, replacement of existing circulation pump, new circulation heater, insulation on the existing

Thursday, April 11, 2013

MAINTENANCE OF TRAFFIC SIGNALS DPW MAINTENANCE PROJECTPLAN #: 312010 Bid Date: 4/11/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: El Paso deOnline & Print On DemandOWNER: City of El Paso de Robles DESCR: Contact, City of El Paso de Robles, 805-237-3861. Maintenance of traffic signals at various locations within the city.

BARNEY SCHWARTZ PARK SLURRY SEAL AND STRIPEPLAN #: 316010 Bid Date: 4/11/2013 Bid Time: 2:30 PM PLANS AT: Print On DemandLocation: El Paso De Online & Print On DemandOWNER: City of El Paso de Robles DESCR: Contact, El Paso De Robles, 805-237-3861. City of Parking lot slurry seal and painting. Painting of stall lines and ADA required stencil to match existing and all incidental work necessary in order to complete work according to specifications prepared by the City of Paso Robles.

MAINTENANCE OF AUTOMATED ROLL-UP DOORSPLAN #: 319007 Bid Date: 4/11/2013

Bid Time: 3:00 PM PLANS AT: Print On DemandLocation: El Paso de Online & Print On Demand PREBID: 3/28 @ 10am OWNER: City of El Paso de Robles DESCR: City of El Paso de Robles, 805-237-3861. Maintenance for automated roll up doors for the City of El Paso de Robles.

Thursday, April 18, 2013

48-INCH FORCE MAIN RELIABILITY IMPROVEMENT PROJECT UNIT 1 - MAPLE ST TO BAIR ISLANDPLAN #: 163073 Bid Date: 4/18/2013 Bid Time: 2:00 PM PLANS AT: Auburn & Roseville Office Locat ion: Redwood Ci ty Online & Print On Demand PREBID: MAND 11/28 @ 10AM DESCR: Contact, Jill Chamberlain. Kennedy/Jenks Consultants, @ 650-852-2800. Div_02-environmental protection, decontamination, demolition, site preparation, earthwork, ground improvement, contact grouting, cellular grout backfill, microtunneling, shafts & near surface excavations, pilot tube, steel casing, carrier pipe installation in steel casing, secant pile shafts, geotechnical instrumentation, water system piping & accessories, sewer & storm drain piping & accessories, paving, resurfacing, pavement markings & appurtenances, concrete curb, gutters & sidewalk, site furnishings; Div_03-cast-in-place concrete; Div_05-metal & hardware; Div_06-carepentry; Div_09-painting; Div_10-signage; Div_13-prefabricated restroom building, fiber optic conduit system components; Div_16-site electrical system.

MODERNIZATION DEPARTMENT OF WATER RESOURCES DATA CENTERPLAN #: 271050 Bid Date: 4/18/2013Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Sacramento Online & Print On Est Cost: $1,140,000.00 DemandPREBID: MAND 2/19 @ 9:30am OWNER: State of CA - Dept of General Services DESCR: Contact, Eric Waddell, 916-376-1768. Install electrical infrastructure upgrade equipment and devices, including installation of four 200 kW motor-generated sets, Generator Control Gear with associated software package for control and monitoring system, a 12 kW switch gear and synchronizer, a 250 kW load bank, fabrication / installation of a support platform in addition to installation of an Owner-furnished 5 Breaker Bypass SB, associated electrical power cabling, low / high voltage wiring, controls wiring, connections, conduits, rigging, placement / hookups of Owner-furnished hardware modification to andBIDDERS LIST:General Contractor: Bobo Construction, Inc. 916-685-2285 916-714-4850 Perryman Mechanical, . 916-371-8888 916-371-8990

Continued on next page

Page 64: exchange_eZone_March4_2013

March 4, 2013Page 62 Contractor’s Zone• .Contractor’s Zone

Thursday, April 25, 2013

LONG BEACH MAIN PUMPING PLANT FACILITY UPGRADESPLAN #: 119084 Bid Date: 4/25/2013

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Long Beach PlanroomPREBID: MAND 3/12 @ 9am OWNER: Sanitation Districts of Los Angeles County DESCR: Contact, Joe Smisko, 562-908-4288, ext 2105..Long Beach Main Pumping Plant Facility Upgrades: The project consists of construction of a new wastewater pumping plant and an adjacent twostory office and electrical building. The pumping plant includes a reinforced concrete below-grade wet well and drywell and a reinforced masonry above-grade structure with a freight elevator, cranes, dry-pit submersible pumps, and associated piping and valves. The two-story reinforced masonry office and electrical building includes a passenger elevator, variable frequency drives and associated medium and low voltage electrical power supply and distribution equipment, and electrical and instrumentation equipment for pumping plant monitoring and control. Yard piping includes construction of large diameter sewer junction structures and connecting concrete and fiberglass pipe and replacement of large diameter valves and fittings in a pressure manifold structure. Associated work includes demolition of existing buildings and installation of sheet pile shoring, precast concrete piles, jet grouting for soil improvement, HVAC systems, vibration monitoring, fencing, yard piping and duct banks, shoring, dewatering, grading, paving, and mechanical, electrical, and instrumentation systems.

Friday, April 26, 2013

SWETZER ROAD & KING ROAD TRAFFIC SIGNAL PROJECTPLAN #: 209007 Bid Date: 4/26/2013 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Loomis Online and PlanroomOWNER: Town of Loomis Ph: 916-652-1840 FAX: 916-652-1847DESCR: Contact, Town of Loomis, 916-652-1840. Traffic Signal Project on Swetzer Rd., and King Rd., in the Town of Loomis.BIDDERS LIST:General Contractor: Studebaker Brown Elect 530-333-3423 530-823-1341

Tuesday, December 31, 2013

LIST OF QUALIFIED CONTRACTORS/YUBA CITYPLAN #: 211098 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Yuba City PlanroomOWNER: City of Yuba City DESCR: ([email protected]) 530-822-4694. THe City of Yuba City invites all licensed contractors to submit their name for inclusion on the CIty’s list of qualified bidders for calendar year 2013.

Friday, June 28, 2013

BART 17TH STREET GATEWAYPLAN #: 6035 Bid Date: 6/28/2013

Bid Time: 12:00 PM PLANS AT: Location: OaklandEst Cost: $900,000.00 PREBID: 3/5 @ 10am OWNER: City of Oakland DESCR: Contact, Denise Louie, 510-238-3682. Demolition and construction of approximately 3,244 sf of plaza re-paving, vent modification, drainage, lighting, guardrail to stairs, Bart sign installation

Tuesday, December 31, 2013

LIST OF QUALIFIED CONTRACTORS/YUBA CITYPLAN #: 211098 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Yuba City PlanroomOWNER: City of Yuba City DESCR: Contact, ([email protected]) 530-822-4694. THe City of Yuba City invites all licensed contractors to submit their name for inclusion on the CIty’s list of qualified bidders for calendar year 2013.

PLACER COUNTY OFFICE OF EDUCATION - LIST OF QUALIFIED CONTRACTORSPLAN #: 223091 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Placer Co. Online and PlanroomOWNER: Placer Office Education Ph: 916-415-4424 DESCR: In accordance with the State of California Uniform Public Construction Cost Accounting Commission, The Placer County Office of Education (PCOE) is inviting all interested licensed contractors to submit their company for inclusion on the PCOE list of qualified bidders for the calendar year 2013. You must resubmit to be included on the 2013 list even if your company has submitted an application in prior years. Per California Public

Continued from last page

Plans On File

Page 65: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

Contract Code 22032, any Public Works Project that is estimated to be below $175,000 is subject to the Contact, Matt Shawver, 530-889-8020. Informal Bidding Procedures set forth by the State of California Uniform Construction Cost Accounting Commission. All trade categories are subject to Informal Bidding Procedures. Contactors that are interested in being on the 2013 Informal Bidding Contractor List are required to have a current license and are subject to verification through the Contractors State License Board.BIDDERS LIST:Sub Contractor: Kitchen Art, Inc. 916-852-8111 916-852-7981

COUNTY OF TUOLUMNE - QUALIFIED BIDDERS LISTPLAN #: 247054 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Tuolumne Co. Online and PlanroomOWNER: County of Tuolumne DESCR: County of Tuolumne, Sharon Mikesell, ([email protected]) Inviting all licensed contractors to submit the name of their firm for inclusion on the Agency’s list of qualified bidders for 2013.

SOLANO COUNTY WATER AGENCY - QUALIFIED CONTRACTORS LISTPLAN #: 248050 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Solano Online and PlanroomOWNER: Solano County Water Agency DESCR: Contact, Sandra McLean, 707-451-6090. Inviting contractors to submit their company’s information to be placed on the Agency’s list of qualified bidders for the following year.

QUALIFIED BIDDERS - CITY OF CUPERTINOPLAN #: 253057 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Cupertino Online and PlanroomOWNER: City of Cupertino Ph: 408-777-3354 DESCR: Contact, City of Cupertino, 408-777-3354. City of Cupertino is in the process of updating their Contractors List to establish and maintain a list of qualified contractors to receive future public projects.

APPLICATION - CALIFORNIA UNIFORM PUBLIC CONSTRUCTION COST ACCOUNT ACT/2013 CALENDAR YEARPLAN #: 256052 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Carmichael Online and PlanroomOWNER: San Juan Unified School District DESCR: Contact, Aida Gonzales, ([email protected]) Complete form and return to San Juan Unified School

District Purchasing Department if you wish to be included in the 2013 Calendar year California Uniform Public Construction Cost Accounting Program for San

FOLSOM-CORDOVA USD BIDDERS LISTPLAN #: 274042 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Folsom/Ranch Online and PlanroomOWNER: Folsom Cordova USD Ph: 916-355-1111 DESCR: Contact, Folsom Cordova Unified School District, 916-294-9000. Requesting all licensed contractors to submit the name of their firm to the District’s list of qualified bidders for 2013.

SUMMERVILLE UNION HIGH SCHOOL DISTRICTPLAN #: 291049 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Summerville Online and PlanroomOWNER: Summerville Union High School District Ph: 209-928-1955 FAX: 209-928-4454DESCR: Contact, ([email protected]) or 209-928-1955. Summerville Union H.S. District, Maintenance Dept. in Tuolumne Co., is requesting Contractors’s Pre-Qualification Applications for upcoming year.

TWIN RIVERS UNIFIED SCHOOL DISTRICT - QUALIFIED CONTRACTORSPLAN #: 301009 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: North Online and PlanroomOWNER: Twin River Unified School District Ph: 916-566-1600 FAX: 916-286-4959DESCR: Contact, Twin Rivers Unified School District, Facilities Planning & Construction. Requesting all licensed contractors to submit the name of their firm to the District’s list of qualified bidders for 2013.

SANTA CRUZ PORT DISTRICT’S/LIST OF QUALIFIED BIDDERSPLAN #: 304012 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville OfficeLocation: Santa Cruz Online and PlanroomOWNER: Santa Cruz Port District DESCR: Contact, Santa Cruz Port District, (831) 475-6161. Santa Cruz Port District is inviting licensed contractors to submit the name of their firm for inclusion on the Port Districts list of potential bidders. Provide the name and address to which a Notice to Contractors or proposal should be mailed, a phone number, the type of work in which you are interested and are currently licensed to do, the class of contractor’s licenses held and the contractor license numbers. Mail information to Santa Cruz Port District at [email protected] and reference “Contractor List” in the subject line.

Page 66: exchange_eZone_March4_2013

March 4, 2013Page 64 Contractor’s Zone• .Contractor’s Zone

Bid ResultsWednesday, February 13, 2013

SHERIDAN WATER SUPPLY AND DISTRIBUTION PROJECT, Placer County

Plan 36009 Number:

DIVISION 5-15, INC. $1,726,515 Westcon Construction Corp. $1,788,817 Koch & Koch, Inc. $1,908,071

Thursday, February 14, 2013

LAGUNA WATER METER INSTALLATION PROJECT - AREA A , Sacramento

Plan 224097 Number:

Teichert $2,024,385 GM Construction & Developers Inc. $2,053,160 SWEDE CREEK ROAD (3J07) AT LITTLE COW CREEK BRIDGE , Shasta Co.

Plan 160066 Number:

R N R CONSTRUCTION, INC. $2,915,777 Q & D CONSTRUCTION $3,188,104.50 RA Nemetz Construction $3,220,235 Tuesday, February 19, 2013

CAMBRIDGE BOOSTER PUMPING STATION UPGRADES, Antioch

Plan 267043 Number:

Koch & Koch, Inc. $651,956 JMB Construction, Inc $708,800 GSE Construction $740,300 2013 CITYWIDE CURB RAMP ACCESSIBILITY IMPROVEMENTS PROJECT, Elk Grove

Plan 169089 Number:

David Engineering & Construction Inc. $115,413 B & M Builders Inc. $136,800.25

Wednesday, February 20, 2013

FOLSOM BOULEVARD/BLUE RAVINE ROAD CURB RAMP IMPROVEMENTS, Folsom

Plan 91065 Number:

Pacific Excavation, Inc. $158,602 May-Han Electric $164,419 B & M Builders Inc. $171,200

Page 67: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

PLACER COUNTY CHILDREN’S EMERGENCY SHELTER PHASE II RECREATION AND SECURITY UPGRADES, Placer Co.

Plan 123083 Number:

D.G. Granade, Inc. $229,511 Bobo Construction, Inc $272,000 C & C Construction $324,900 ADA YEAR 1 TRANSITION PLAN IMPROVEMENTS PROJECT, Yuba City

Plan 1023 Number:

B & M Builders Inc. $117,509 Cazadores Construction $127,801 Big Valley Group $128,183

Thursday, February 21, 2013 ELKHORN BOULEVARD/SCHOFIELD WAY STORM DRAIN IMPROVEMENT PROJECT PHASE 3,

Plan 39018 Number:

Sanco Pipelines $2,076,796 Civil Engineering Construction $2,193,980 Mountain Cascade, Inc. $2,368,545 RIDGE ROAD REHABILITATION PROJECT - FROM PLIOCENE RIDGE TO ALLEGHANY, Sierra County

Plan 6034 Number:

Knife River Construction $1,996,466.25 Mc Guire Hester $2,055,078.75

Broward Builders, Inc. is requesting quotations from qualified subcontractors & material suppliers

for the following project:

Ella Elementary School New Classroom Building & SiteworkJob 8083 for Marysville Joint Unified School DistrictBID DATE: March 7, 2013 at 2:00 p.m.

Project Description: This project is for the construction of a new two-story 19,000 square foot wood & steel frame class-room building with parking lot, bus loop, site work, preschool portable relocation from Ella to Cedar Lane, and demolish ex-isting preschool portable at Cedar Lane. The estimated cost of construction is $6,500,000.

Project Requirements: DVBE and Local Contracting. We are actively soliciting bids from all qualified subcontractors, sup-pliers and truckers including MBE/WBE/SBEIDVBE and local firms. This project has a 3% DVBE participation goal.

LCP. This project is subject to a Labor Compliance Program and requires payment of prevailing wages.

LLB. This is a Lease-Leaseback project. Under the terms of the lease-leaseback agreement, ifGC plans on submitting a quote in an effort to self-perform work, the GC must request bids from subcontractors for this work be delivered directly to the Owner. The Owner will then compare the subcontractor quote to that submitted by the GC in their bid. If the subcontractor’s bid is lower for the same scope of work, then the subcontractor bid will be substituted for the GC quote. This process will assure a fair bidding process for the subcontractor.

Broward Builders plans to submit quotes for the following self-performed work: Earthwork, site utilities, AC paving, site con-crete, building concrete, rough carpentry and drywall.

Subcontractors bidding any of the above work must submit bids directly to the Owner (Marysville Joint Unified School Dis-trict). Bids can be submitted to Denise DeVaughn by email to [email protected]. Please address your bid to Bro-ward Builders, Inc. c/o Owner.

All other subcontractor/supplier quotes should be submitted di-rectly to Broward Builders, Inc. at 530-666-5723.

Substitutions. No substitutions or value engineering will be tol-erated or accepted during this RFP and may be cause for rejec-tion of such proposal.

Bonding. 100% payment and performance bonds in the amount of the subcontract price may be required. Bond premium will be reimbursed by Broward up to 1.5%. Include cost as a sepa-rate amount on bid.

Bidding Information: Estimator, Dan Delorefice, [email protected] p 530-666-5635; f 530-666-5723 Estimator, Chuck Klenzendorf, [email protected]

Broward Builders, Inc. is signatory to the Carpenters Collective Bargaining Agreement.Broward Builders, Inc1200 E. Kentucky Ave., Woodland, CA 95776License No.: 602146(530) 666-5635 Fax: (530) 666-5723Equal Opportunity Employer

Legal Ads

Page 68: exchange_eZone_March4_2013

March 4, 2013Page 66 Contractor’s Zone• .Contractor’s Zone

Legal Ads

To Run Your Legal Ad, Please Visitwww.thedailyreporter.net

Or Give Us A Call 916-729-5432

Sub Bids Requested From QualifiedSLBE, ELBE, DBE, UDBE, DVBE, SBE, MBE, WBE and OBE Subcontractors and/or Suppliers

UUP Serra Mesa (6Z) Asphalt Overlay/Slurry Seal Maintenance Project Project No: K-13-5745-DBB-3

Various Streets in the City of San DiegoBid Date: March 19, 2013 at 2:00 p.m.

SUBTRADES: NAICS CODE 237310, Highway, street, and bridge construction (Includes: Asphalt Concrete, Cold Planing, Rub-ber Polymer Modified Slurry Seal, Trucking, PCC Flatwork Demo & Replace, Striping and Markings).

Please contact Hazard Construction Company should you need assistance in obtaining bonding, lines of credit or required insurance, equipment, supplies and or materials. Visit our website to view Hazard Construction Company’s Insurance Requirements for Gen-eral Liability, Auto and Workers’ Compensation for Subcontractors: http://www.hazardconstruction.com/HCCInsReq.pdf

Hazard Construction6465 Marindustry Place, San Diego, CA 92121

Contact Person: Jim Burns License No.: 750542A/BEmail Address: [email protected](858) 587-3600 Fax: (858) 453-6034

Equal Opportunity Employer

Sub Bids Requested From QualifiedSLBE, ELBE, DBE, UDBE, DVBE, SBE, MBE, WBE and OBE Subcontractors and/or Suppliers

Paseo Del Sur (Phases 3 & 4) Potomac Ridge Rd and Camino San Bernardo, San Diego, CA

THIS IS A NON-PREVAILING WAGE PROJECTBid Date: March 18, 2013 at 2:00 p.m.

SUBTRADES: NAICS CODE 237310, Highway, street, and bridge construction (Includes: Street Lights, Curb and Gutter, AC Berm, Striping and Signage, Traffic Signals, Landscape and Irrigation, Traffic Control)

Please contact Hazard Construction Company should you need assistance in obtaining bonding, lines of credit or required insurance, equipment, supplies and or materials. Visit our website to view Hazard Construction Company’s Insurance Requirements for Gen-eral Liability, Auto and Workers’ Compensation for Subcontractors: http://www.hazardconstruction.com/HCCInsReq.pdf

Hazard Construction6465 Marindustry Place, San Diego, CA 92121

Contact Person: Bill Rogers License No.: 750542A/BEmail Address: [email protected]

(858) 587-3600 Fax: (858) 453-6034Equal Opportunity Employer

Page 69: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

ADVERTISEMENT FOR BIDS

Subject to conditions prescribed by the University of California, Davis, sealed bids for a lump-sum contract are invited for the fol-lowing Work: LEHR Groundwater Extraction Treatment System, Project Number: 9522200.

DESCRIPTION OF WORK: Provide all labor, materials, equipment, tools, transportation, insurance and services for the construc-tion, development and testing for: eight (8) rotary wash-drilled extraction wells, one (1) rotary wash-drilled monitoring well, and five (5) hollow-stem auger drilled monitoring wells including but not limited to, site preparation, sanitary seal, rotary wash borehole drilling, geophysical logging, casing installation, filter pack placement, transition and annular seals, well development and testing, and/or other work necessary to complete the Project as described in the specifications and drawings. The bore holes depths vary and are approximately 55 to 105 feet below ground surface. The project site is located at the LEHR / Old Campus Landfill Superfund Site at the University of California, Davis.

Estimated Construction Cost of this project is $200,000.00 (Base Bid)

Contract Time: 45 days.

Procedures: NOTE: Only credit card orders for documents are accepted on our Reprographics website at http://reprographics.ucdavis.edu/store/ Downloadable Bidding Documents will be available to Bidders on Tuesday, March 5, 2013. A non-refundable fee will be required in the amount of $25.00. All payments must be received at UCD Reprographics before documents can be made available for download.

Plan Holder’s List and Bid Results are available on our website at http://dcm.ucdavis.edu/index.htm (Contractors) or by calling (530) 754-1021 or 754-1111 or by fax (530) 754-0116.

A MANDATORY Pre-Bid Conference and MANDATORY Job Walk will be conducted on Wednesday, March 6, 2013 beginning promptly at 10:00 a.m. Participants shall meet at Design and Construction Management, 255 Cousteau Place, Davis, CA 95618. Bidders must be present at the Pre-Bid Conference no later than the scheduled start time. Only bidders who participate in both the Conference and the Job Walk in their entirety will be allowed to bid on the Project as prime contractors. For further information, contact Chris McGuire at (530) 754-1021 or (530) 754-1111. It is currently anticipated that the Conference/Job Walk will last approximately 2 hours. Transportation will be provided to the Job Walk.

Bids will be received only at: Design and Construction Management, University of California, 255 Cousteau Place, Davis, Califor-nia 95618

Bid Deadline: Sealed bids must be received on or before: 2:00 p.m., Tuesday, March 19, 2013Bids will be opened at: 2:01 P.M. or promptly thereafter.

Bids will be received only at: Design and Construction Management, University of California, 255 Cousteau Place, Davis, Califor-nia 95618

The successful Bidder will be required to have the following California current and active contractor’s license at the time of submis-sion of the Bid: “C-57” Well Drilling.

Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the Univer-sity within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work.

The work described in the contract is a public work subject to section 1771 of the California Labor Code.

THE REGENTS OF THE UNIVERSITY OF CALIFORNIAUniversity of California, DavisFebruary 27, 2013

Page 70: exchange_eZone_March4_2013

March 4, 2013Page 68 Contractor’s Zone• .Contractor’s Zone

ANNOUNCEMENT TO PREQUALIFIED PROPOSERS

Subject to conditions prescribed by the University of California, Davis, sealed proposals for a design build contract are invited from prequalified proposers for the following work: Jan Shrem and Maria Manetti Shrem Museum of Art , Project Number: 9521100.

Description of Work: The Work shall include all architectural, engineering and consultant services, labor, material, tools, equip-ment and general conditions that may be reasonably inferred from the Contract Documents to provide Design Work and Construc-tion Work for the Jan Shrem and Maria Manetti Shrem Museum of Art.

The museum is to be accessible and approachable for the campus and regional community with a strong emphasis on maximizing flexible space to mount simultaneous exhibitions, performances and events. Exhibitions will include display of the university’s fine arts collection, a growing teaching collection with notable holdings of antiquities, prints and works on paper in addition to a contemporary core of paintings, ceramics and sculpture that represents UC Davis’s illustrious alumni and faculty. Exhibition spaces meeting international curatorial and conservation museum standards will also be provided for traveling exhibitions.

Indoor and outdoor social and public spaces for education programs, performances, art display, events and community are crucial to the success of the museum. Spaces that support student engagement are especially important.

The museum is to excel in environmental sustainability, incorporating opportunities for public education and connections between the environment and the arts as well as being reflective of the strong institutional commitment of UC Davis to education and research for a sustainable future. Functionality, flexibility, durability and future expandability are all elements of sustainability.

Target Contract Amount: $23,200,000.00Maximum Acceptance Cost: $23,200,000.00

Procedures: NOTE: Only credit card orders for documents are accepted on our Reprographics website at http://reprographics.ucdavis.edu/store/Downloadable Bidding Documents will be available to Bidders on Thursday, March 7, 2013. A non-refundable fee will be required in the amount of $50.00. All payments must be received at UCD Reprographics before documents can be made available for download.

Prequalified contractors will be issued 1 set of documents at no charge.

The following design builders have previously been prequalified to submit proposals on this project:

Team Name(s): Kitchell, WORK, Westlake Oliver, Henning Larsen, Gould Evans Whiting Turner, SO-IL, Bohlin Cywinski Jackson

PLEASE NOTE: Subcontractors wishing to bid on this project should contact the prequalified General Contractors directly.

A MANDATORY Pre-Proposal Conference will be conducted on Thursday, March 7, 2013 beginning promptly at 2:00 p.m. Only Proposers who participate in its entirety, will be allowed to propose on the Project as prime design builder. Proposers must be pres-ent at the Pre-Proposal Conference no later than the scheduled start time. Persons arriving after the conference has started will not be allowed to submit proposals as design builder on the project. Participants shall meet at Design and Construction Management, 255 Cousteau Place, Davis, CA 95618. For further information, contact Chris McGuire at (530) 754-1021 or (530) 754-1111. The Conference will last approximately 1.5 hours.

Proposals will be received only at: Design and Construction Management, University of California, 255 Cousteau Place, Davis,

Legal Ads

Page 71: exchange_eZone_March4_2013

Contractor’s ZoneContractor’s Zone

California 95616, (530) 754-1111.

Proposals must be received on or before: 2:00 P.M., Monday, March 25, 2013.

Proposal Security in the amount of 10% of the Lump Sum Base Proposal, excluding alternates, shall accompany each bid. The surety issuing the Bid Bond shall be, on the bid deadline, an admitted surety insurer (as defined in the California Code of Civil Pro-cedure Section 995.120)

All insurance policies required to be obtained by Design Builder shall be subject to approval by University for form and substance. All such policies shall be issued by a company rated by Best as A- or better with a financial classification of VIII or better, or have equivalent rating by Standard and Poor’s or Moody’s.

The successful proposer and its subcontractors will be required to follow the nondiscrimination requirements set forth in the pro-posal documents and to pay prevailing wage rates at the location of the work. Contractor and every Subcontractor is required to sub-mit certified payrolls and labor compliance documentation and shall use the FM International Labor Compliance Program software “LCPtrackerTM” provided by the University.

The successful proposer will be required to have the following California contractor’s license at the time of the proposal opening: “B” General Building.

Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the Univer-sity within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work.

The work described in the contract is a public work subject to section 1771 of the California Labor Code.

THE REGENTS OF THE UNIVERSITY OF CALIFORNIAUniversity of California, DavisFebruary 28, 2013

Page 72: exchange_eZone_March4_2013

March 4, 2013Page 70 Contractor’s Zone• .Contractor’s Zone

PCCAPlacer County Contractors Association & Builders Exchange

Newspaper Rate Sheet

Ad Type Ad Size 1 run 6 runs 13 runs 26 runs 52 runs

Two Page Spread 17 1/4” wide by 11 1/4” tall $782 $639 $497 $355 $209

Full page (bleed) 8 5/8” wide by 11 1/4” tall $427 $355 $284 $213 $139

Full page (boxed) 8” wide by 9 3/4” tall $427 $355 $284 $213 $139

Half page 8” wide by 4 3/4” tall $229 $193 $158 $123 $87

One Third (V) 2 7/8” wide by 7 1/2” tall $171 $144 $118 $92 $63

One Third (H) 8” wide by 3 1/8” tall $171 $144 $118 $92 $63

Quarter Page 3 7/8” wide by 4 3/4” tall $97 $81 $64 $47

Contractor Yellow Pages (Business Card Sized Ad) $39 $32 $24 $19

Legal ads • 3 7/8” wide and up to 2 1/4” tall $50 • 3 7/8” wide and up to 3 1/2” tall $75

• 3 7/8” wide and up to 5” tall $95 • 3 7/8” wide and up to 6 1/2” tall $135

The Placer County Contractors Association (PCCA) weekly newspaper is published 52 times a year and distributed free of charge to building & construction firms in the greater Placer and Sacramento county area. PCCA reserves the right to determine position and placement of all advertising. Special positioning may be purchased for an additional 20% if space is available. The Inside Cover is our best position, and is available for an additional 20% on a long-term advertising ocntract only. 15% off these rates for PCCA members!

Upgraded format, larger ad sizes, lowered rates:

Rates above are for full color ads per insertion. Flash animation (.swf files), animations (.gif format) and video clips can be added to any ad. There is no extra charge for video clips or multi-media in ads unless “assembly” of the ad is required. Some file size limitations apply. For information call Steve Berlin, at 916-729-5432, or email him at: mailto:[email protected]. Email camera-ready ads in high resolution Adobe Acrobat (.pdf) format to: [email protected]. Ad creation and graphic design services are available through C&S Publishing at $75 an hour — FREE to PCCA members!

Reading the price chart: Each column shows the price per run based on the number of times the ad is run. For example, a 1/4 page ad, run 13 times (which is every week for 3 months or every other week for 6 months) is $81 per run. That same ad, run every week for a year, would only cost $47 per run. Ads are invoiced monthly after the last ad run of the month. Net 30 days is offered. Take 15% off the rates shown below if you are a member of the Placer County Contractors Asociation. Take another 3% off if you prepay your ad contract entirely. Multiple ads can be run on a rotation basis under one advertising contract.

For more information: Call Steve Berlin, at 916-729-5432, or email him at: mailto:[email protected] See the news-paper onlne at www.PCCAe-Zone.com

Publisher reserves the right to refuse any advertisement with or without reason or explaination including any ad that in the opinion of PCCA is unethical, makes extravagant claims, misrepresents, is unfair or harmful to other advertisers; violates postal, anti-trust or U.S. currency regulations; or is deemed inconsistent with the objectives of the Association.

Display Advertising Policy, Rates and InformationREVJULY2012

Our LOWEST rates