Excavator X63 Verification
description
Transcript of Excavator X63 Verification
![Page 1: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/1.jpg)
Excavator X63 Verification
![Page 2: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/2.jpg)
• This Webinar is LISTEN only
Questions will be answered in writing at the end of the
Webinar.
QUESTIONS?
![Page 3: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/3.jpg)
Last Week Webinar Update
Correction on installation informationNo software termination for bucket sensorHardware termination on bucket sensorCAN filter for GX60
7010-0916
Bucket Termination
CAN Isolator
![Page 4: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/4.jpg)
Reference Material
7010-0697 Excel Verification
![Page 5: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/5.jpg)
Excavator X63 VerificationWebinar September 11th, 2009
• Verification Excel Work Sheets
•TS-1 Calibration Verification
• MC-A1 Position Verification
![Page 6: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/6.jpg)
Excel Verification Work Sheet
![Page 7: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/7.jpg)
Verification
No Verification(Rotation error)
Graphics only
Not critical
![Page 8: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/8.jpg)
Start 3DMC and enter simulation mode.
TS-1 Calibration and Implement Length Verification
![Page 9: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/9.jpg)
TS-1 Calibration and Implement Length Verification
In Simulation
Set Level String
Match Elevation
![Page 10: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/10.jpg)
Antenna Measurements (using GPS)
Compare GPS measured distance to the physical measured distance to adjust Main/Aux Antenna position
RTK Solution (Single point localization )
Planner Surface
Rover with Pocket 3D
![Page 11: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/11.jpg)
Verifying Main Antenna to Boom Length
Position the machine directly North
Mark bucket location and record Northing value
Rotate 180o
Position the machine directly North
Mark bucket location and record Northing value
![Page 12: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/12.jpg)
Verifying Main Antenna to Boom Length
Subtract the two Northing values to get a GPS distance•15.50’
Using a tape or Rover measure the actual distance•15.30’
Subtract the two values and divide by 2•(15.50-15.30 = .20)/2 = .10
If the GPS measured(Northing) value is larger shorten the length in 3D-MCIf the tape measured value is larger lengthen the length in 3D-MC
![Page 13: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/13.jpg)
Excel Verifying Main Antenna to Boom Length
![Page 14: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/14.jpg)
Verifying Aux Antenna to Boom Length
Rotational Heading
![Page 15: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/15.jpg)
Verifying Aux Antenna to Boom Length
Position the machine directly North
Curl the bucket in and record:•3DMC Easting of a bucket corner (position screen)•Easting with Rover and Pocket 3D
Extend the bucket to its fullest and record:•3DMC Easting of the same corner (position screen)•Easting with Rover and Pocket 3D
![Page 16: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/16.jpg)
Verifying Aux Antenna to Boom Length
Curled bucket Easting:•3DMC 520.35•Rover 520.38
Extended bucket Easting:•3DMC 520.36•Rover 520.51
The difference in curled position•520.38 - 520.35 = .03
The difference in extended position•520.51 – 520.36 = .15
Measured distance from curled to extended•20’
![Page 17: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/17.jpg)
Verifying Aux Antenna to Boom Length
Determine the Aux antenna correction amount using this formula:
A(Distance Between Antennas) C(Ext Easting – D (Curl Easting) X B (Curl To Ext Distance)
=
7.5 .15 - .03 X 20
= X=.045
Rover Easting's larger (decrease)3DMC Easting’s larger (Increase)
Curled bucket Easting:•3DMC 520.35•Rover 520.38
Extended bucket Easting:•3DMC 520.36•Rover 520.51
![Page 18: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/18.jpg)
Excel Verifying Aux Antenna to Boom Length
![Page 19: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/19.jpg)
Verifying Main Antenna Offset
Position the machine directly North
Curl the bucket in and record:•3DMC Easting of a bucket corner (position screen)•Easting with Rover and Pocket 3D
Extend the bucket to its fullest and record:•3DMC Easting of the same bucket corner (position screen)•Easting with Rover and Pocket 3D
![Page 20: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/20.jpg)
Verifying Main Antenna Offset
Curled bucket Easting:•3DMC 520.35•Rover 520.38
Extended bucket Easting:•3DMC 520.48•Rover 520.51
The difference in curled position•520.38 - 520.35 = .03
The difference in extended position•520.51 – 520.48 = .03
If Rover Easting's are larger (increase)
If 3DMC Easting’s are larger (decrease)
![Page 21: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/21.jpg)
Excel Verifying Main Antenna Offset
![Page 22: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/22.jpg)
Verifying Main Antenna Height
•If 3DMC elevations are higher than the rover increase the antenna height•If 3DMC elevations are lower than the rover decrease the antenna height.
Record several 3DMC bucket elevations and corresponding survey rover elevations
Subtract the elevations and find the average
![Page 23: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/23.jpg)
Excel Verifying Main Antenna Height
![Page 24: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/24.jpg)
Testing Machine Sensors for Accuracy
![Page 25: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/25.jpg)
Elevation/Position Errors
Wedge errors or Inconsistent elevation errorsPerform Elevation Accuracy Verification to check machine and sensor calibration
Overall bias between machine and roverPerform Main Antenna Height Verification
Northing Errors:Perform Main Antenna to Boom Length Verification
Rotational Errors: (curled to extended)Perform Aux Antenna to Boom Length Verification
Easting Errors:Perform Main Antenna Offset Verification
![Page 26: Excavator X63 Verification](https://reader036.fdocuments.in/reader036/viewer/2022062500/568150a4550346895dbea9d6/html5/thumbnails/26.jpg)
• Address to download all TU-Live Webinars: ftp://TUlive+topconuniversity.com:[email protected]/
– Recorded Webinar– PP Presentation; Introduction to Paver System
Five– Webinar Q & A
• Additional requests for TU staff:
Email: [email protected]
Questions?