EVERTON GABLE 8' x 12' (244 x 366 cm) - Walden Academy 8x12 Everton... · ACTUAL FLOOR SIZE IS 96 x...
Transcript of EVERTON GABLE 8' x 12' (244 x 366 cm) - Walden Academy 8x12 Everton... · ACTUAL FLOOR SIZE IS 96 x...
09/20/2011
KEEP THIS MANUAL FOR FUTURE REFERENCEACTUAL FLOOR SIZE IS 96 x 140-5/8" (243,8 x 357,2 cm)
16751
BEFORE YOU BEGIN
IMPORTANT!READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.
- CUSTOMER SERVICE -Call: 1-800-844-9273 email: [email protected]
• BUILDING RESTRICTIONS AND APPROVALS
Be sure to check with local building department and homeowners association for speci� c restrictions and/ or requirements before building
. • ENGINEERED DRAWINGS
Contact our Customer Service Team if engineered drawings are needed to pull local permits.
• SURFACE PREPARATION
To ensure proper assembly you must build your shed on a level surface. Recommended methods and materials to level your shed are
listed on page 7.
• CHECK ALL PARTS
Inventory all parts listed on pages 4 - 6. Contact our Customer Service Team if any parts are missing or damaged.
• ADDITIONAL MATERIALS
You will need additional materials to complete your shed. See page 3 for required and optional materials and quantities.
EVERTON GABLE 8' x 12' (244 x 366 cm)
ASSEMBLY MANUALA Backyard Products Company
2
TOOLS
Safety! Always use approved safety glasses during assembly.
OptionalRequired
HELPFUL REMINDER SYMBOLSLook for these symbols for helpful reminders throughout this manual.
ORIENT LUMBER AND TRIM FOR BEST APPEARANCE
= Assistance Required; two or more people.
= Ensure squareness.
= Important required step or operation.
= Helpful assembly hint.
= Mark part with pencil.
= Beginning of steps for assembly or installation.
= You have � nished the assembly or installation.
= Level
❑ Gloves
Framing lumber is graded for structural strength and not appearance. Exterior trim is graded for one good side.
Always install the material leaving the best edge and best surface visible. Please remember that these blemishes in no waynegatively affect the strength or integrity of our product. (See Fig. A, B, C.)
A
❑ Safety Glasses
❑ Tape Measure
❑ Paint Tools
❑ Ladder
❑ Caulk Gun
❑ Hammer
❑ Level
FINISH
BEGIN
❑ Pencil
❑ Phillips Screwdriver
❑ Drill / Driver
❑ 1/4" Drill Bit❑ 3/8" Drill Bit❑ 1/2" Drill Bit❑ #2 Philips Drive Bit
❑ Tool Belt/ Nail Pouch
❑ Chalk Line
❑ Nail Gun
• gun nails
❑ Tin Snips (for drip edge)
❑ Square or
❑ Utility Knife
❑ Shingle Blades
B C
3
COMPLETING YOUR SHEDYou will need these additional materials:
OPTIONAL MATERIALS
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS
DRIP EDGE ..................... 60 Feet #15 ROOFING FELT To cover 148 Sq. Ft. of roof area.
1" GALVANIZED ROOFING NAILS.........1/4 LbFor roo� ng felt.
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
3-TAB SHINGLES ............................ 7 Bundles
PAINT FOR SIDING .......................... 2 GallonsUse 100% acrylic latex exterior paint. (2) coats recommended.
CAULK ................................................. 3 TubesUse acrylic latex exterior caulk that is paintable.
1" GALVANIZED ROOFING NAILS.... 3 LbsFor shingles.
PAINT FOR TRIM .............................1 QuartUse 100% acrylic latex exterior paint.
WOOD GLUE ....................... Exterior Rated
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT! The included � oor has been designed for general use. Depending on your speci� c use you may want to construct a heavy duty � oor frame by adding additional � oor joists (shown below as shaded). Below is a list of additional materials (not included):
x6
x24
2 x 4 x 8' (5 x 10 x 244 cm) Treated LumberCut to (6) 2 x 4 x 93" (5 x 10 x 236 cm)
ea. 3" (7,6 cm) Hot Dipped Galvanized Nails
Optional 12" (30,5 cm) spacing
Standard 24" (61 cm) spacing
• This shed kit includes a complete wood � oor system.
• This shed kit does not include ANY leveling materials.
• See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your � oor, as this will vary depending on your speci� c site.
WOOD SIZE CONVERSION CHARTNominal Board Size Actual Size
1" x 4".................3/4" x 3-1/2" (1,9 x 8,9 cm)
2" x 4"..............1-1/2" x 3-1/2" (3,8 x 8,9 cm)
2" x 3"..............1-1/2" x 2-1/2" (3,8 x 6,3 cm)
1" x 3".................3/4" x 2-1/2" (3,8 x 6,3 cm)
PARTS IDENTIFICATION AND SIZES
RS RS
Part identi� cationletters are stamped on some parts.
Check these locations forpart stamp.
Treated lumber is stamped:
All treated lumber is stamped:
WA
LLS
x4 2 x 3 x 72" (5,1 x 7,6 x 182,9 cm) OY
x3 2 x 3 x 91" (5,1 x 7,6 x 231,1 cm) PS
x4 2 x 3 x 68-5/8" (5,1 x 7,6 x 174,3 cm) YK
x14 2 x 3 x 68" (5,1 x 7,6 x 172,7 cm) OT
x1 2 x 3 x 47-3/4" (5,1 x 7,6 x 121,3 cm) NN
x1 2 x 3 x 36" (5,1 x 7,6 x 91,4 cm) DU
x1 2 x 3 x 19-3/4" (5,1 x 7,6 x 50,2 cm) WH
PARTS LISTINVENTORY YOUR PARTS before you begin. We suggest sorting parts by the category they are listed in.
RA
FT
ER
S
x2 5/8 x 3-1/4 x 48" (1,6 x 8,3 x 121,9 cm)
x11 7-1/4 x 18-1/4" (18,4 x 46,4 cm)
TR
IM
x8 3/8 x 1-3/4 x 67-3/4" (1 x 4,4 x 172,1 cm)
x2 19/32 x 3 x 36-3/4" (1,5 x 7,6 x 93,3 cm)
x2 19/32 x 3 x 80-1/4" (1,5 x 7,6 x 203,8 cm)
x2 19/32 x 3 x 69" (1,5 x 7,6 x 175,3 cm)
x2 19/32 x 3 x 9" (1,5 x 7,6 x 22,9 cm)
x12 2 x 4 x 68-7/16" (5,1 x 10,2 x 173,8 cm)YJ
x2 2 x 4 x 69-7/8" (5,1 x 10,2 x 177,5 cm)WW
x1 19/32 x 4 x 69-7/8" (1,5 x 10,2 x 177,5 cm)WML
x1 19/32 x 4 x 69-7/8" (1,5 x 10,2 x 177,5 cm)WMR
x1
x2
x1
x2
2 x 3 x 17-1/2" (5,1 x 7,6 x 44,5 cm)
2 x 3 x 13" (5,1 x 7,6 x 33 cm)
2 x 3 x 7-1/4" (5,1 x 7,6 x 30,2 cm)
3/8 x 2 x 5" (1 x 5,1 x 30,2 cm)
BV
RK
WL
WA
WN
WK
EY
x2 2 x 3 x 70-1/4" (5,1 x 7,6 x 178,4 cm) OZ
1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) Gauge Block for 3/4" (1,9 cm) measurementx13/4"
(1,9 cm)GAA
OSB OR WOOD GRAIN
x1 96" (243,8 cm) Z-STRIP
4
FLO
OR
x2
2 x 4 x 93" (5,1 x 10,2 x 236,2 cm)
x2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
x7
2 x 4 x 92-5/8" (5,1 x 10,2 x 235,3 cm)
x2 1 x 2 x 96" (2,5 x 5,1 x 243,8 cm) ZM
x4 2 x 3 x 68-7/16" (5,1 x 7,6 x 173,8 cm) WE
x2 1 x 2 x 43-1/2" (2,5 x 5,1 x 110,5 cm) WS
x4 19/32 x 3 x 23" (1,5 x 7,6 x 58,4 cm) GI
x2 2 x 3 x 18-3/8" (5,1 x 7,6 x 50,2 cm) WJ
OVE
RH
AN
G x2
x2 5/8 x 5-11/16 x 7-3/16" (1,6 x 14,4 x 18,3 cm)
5/8 x 5-11/16 x 7-3/16" (1,6 x 14,4 x 18,3 cm)
SH
ELF
LO
FT
SO
FFIT
DO
OR
UN
OO
WR
x3
x2
x1
2 x 4 x 94-1/2" (5,1 x 10,2 x 240 cm)
19/32 x 3 x 63" (1,5 x 7,6 x 160 cm)
PARTS LIST continued...
x2
x4
x2
x2
x2
x2
x2
2 x 3 x 5-1/8" (5,1 x 7,6 x 13 cm)
2 x 3 x 7-7/8" (5,1 x 7,6 x 20 cm)
3/8 x 7-7/8 x 57-7/8" (1 x 20 x 147 cm)
3/8 x 5-3/16 x 69-3/8" (1 x 13,2 x 176,2 cm)
3/8 x 5-3/16 x 72" (1 x 13,2 x 182,9 cm)
3/8 x 7-7/8 x 7-7/8" (1 x 20 x 20 cm)
3/8 x 5-13/16 x 7-7/8" (1 x 14,8 x 20 cm)
WD
DY
PLx1 2 x 3 x 93" (5,1 x 7,6 x 236,2 cm)
2 x 3 x 69" (5,1 x 7,6 x 175,3 cm) Finger Jointed
x1 7-1/4 x 18-1/4" (18,4 x 46,4 cm) WITH WOOD GRAIN ON FACE
5
PANEL PARTS LIST
RO
OF P
AN
ELS
SH
ELF A
ND
LO
FT
FLO
OR
NOTE: Panel parts are not stamped.
Shelf / Loft panels are 7/16" (1,1 cm) thick.
Floor panels are 5/8" (1,6 cm) thick.
Roof panels are 7/16" (1,1 cm) thick.
7/16 x 11-7/8 x 91"(1,1 x 30,2 x 231,1 cm)
7/16 x 35-7/8 x 82"(1,1 x 91,1 x 231,1 cm)
x1
x1
7/16 x 47-7/8 x 48"(1,1 x 121,6 x 121,9 cm)
x2
7/16 x 22 x 46-1/2"(1,1 x 55,9 x 118,1 cm)x2
7/16 x 8-7/8 x 70"(1,1 x 22,5 x 177,8 cm)
x2
7/16 x 22 x 96"(1,1 x 55,9 x 243,8 cm)x2
7/16 x 48 x 94-1/2"(1,1 x 121,9 x 240 cm)
5/8 x 48 x 96"(1,6 x 121,9 x 243,8 cm)
5/8 x 44-5/8 x 96"(1,6 x 113,3 x 243,8 cm)
x2
x2
x1
x23/8 x 44-5/8 x 72"
(1 x 113,3 x 182,9 cm)
x23/8 x 20 x 72"
(1 x 50,8 x 182,9 cm)
x63/8 x 48 x 72"
(1 x 121,9 x 182,9 cm)
WALL PANEL & DOORS PARTS LIST
x1
x1
x1
x1
x1LEFT DOOR
x1RIGHT DOOR
x2 BOXES
x6 BOXES
x275
x90
x14
x60
x7
x98
x64
x12
NAIL BOXES
VENT, DOOR HARDWARE, AND WINDOW
FASTENER/HARDWARE BAG
6
1-1/4" (3,2 cm)
2" (5,1 cm)
2-1/2" (6,4cm)
3" (7,6 cm)
3/4" (1,9 cm)
2" (5,0 cm)
3" (7,6 cm)
2" (5,1 cm)
1-1/2" (3,8 cm)
x1x2
x8x1
10-1/2 x 32-1/2" (26,7 x 82,6 cm)
x2
1/2" (1,3 cm)
8 x 16" (20,3 x 35,6 cm)
3/4" (1,9 cm)
x121" (2,5 cm)
x4
x21-1/2" (3,8 cm)
7
D O O R
FLOOR LEVELING OPTIONSThere are multiple ways to level your � oor frame. Our recommended leveling method is shown below.
Leveling materials are not included in this kit.
PREFERRED METHOD - 4x4 TREATED RUNNERS
Measurements tocenters of 4x4's.
• 3" Screws angled into 4x4.
• (2) at each point frame• and 4x4 touch.
12"(30,5 cm)
12"(30,5 cm)
• Level under 4x4 runners only.• Locate leveling material 12" from ends of runners and no more than 48" apart.• Asphalt shingles should be used between 4x4 runners and blocks or treated lumber. Never use shingles in direct contact with ground.• For best results and aiding in water drainage use gravel under each concrete block.
LEVELING METHODS
• If you are building your shed on a concrete foundation see the following page.
CONCRETE
MATERIAL REQUIRED
x2 4" x 4" x 12' (10 x 10 x 366 cm)Treated Lumber
Fasteners for Frame to 4"x 4".(3" Screws shown as one option.) Minimum (28) 3" screws / exterior grade.
Use only wood treated for ground contact and fasteners approved for use with treated wood.
Always support frame seams.
Leveling higher than 16" not recommended.
LEVELING MATERIALS
Gravel
2x4 Treated Lumber
Solid Masonry Blocks in 1", 2", 4" or 8" thickness
Asphalt Shingles
8" Block
4" BlockGravelGravel
Do not exceed 16".
4x4 Runner
Shingle
ShingleMaximum between leveling
material locations.48"
12"
2x4 Treated Lumber
2" Block
Level
12"
8
CONCRETE FOUNDATIONYour kit contains all materials to construct a wooden � oor. If you choose to install your kit
on a concrete slab refer to the diagram below.
• A treated 2 x 4" (5,1 x 10,2 cm) sill plate is required when installing your shed on concrete. Hint: Use treated lumber in your kit or purchase full length treated lumber.
• Use a high quality exterior grade caulk beneath all sill plates.
• Fasten 2 x 4" (5,1 x 10,2 cm) sill plates to slab using approved concrete anchors (fasteners not included).
• Check local code for concrete foundation requirements.
NOTES
Allow new concrete slabs to cure for at least seven (7) days.
2" x 4" x 11'-1-5/8" (5,1 x 10,2 x 339,4 cm)
2" x 4" x 8' (5,1 x 10,2 x 244 cm)
Caulk
Requires:
x2
x2
x1
MUST be treated lumber.
MUST be treated lumber.
96" (243,8 cm)96" x 140-5/8" (243,8 x 357,2 cm) 133-5/8" (339,4 cm)8'x 12' (243,8 x 365,8 cm) 140-5/8" (357,2 cm)
AActual Size B CBuilding Size
A
BC
4"(10,2 cm)
3-1/2"(8,9 cm)
DOOR
Treated Sill Plate
Caulk between sill plate and concrete.
9
93"(236,2 cm)
96"(243,8 cm)
140-5/8"(357,2 cm)
116-5/8"(296,2 cm)
92-5/8"(243,8 cm)
72"(182,9 cm)
48"(121,9 cm)
24"(61 cm)
48"(121,9 cm)
92-5/8(235,3 cm)
24"(61 cm)
20-5/8"(52,4 cm)
24"(61 cm)
24"(61 cm)
48"(121,9 cm)
OffsetSeam
Offset Seam
3" (7,6 cm) x2
x7
x32
2 x 4 x 92-5/8" (5,1 x 10,2 x 235,3 cm)
2 x 4 x 93" (5,1 x 10,2 x 236,2 cm)
x2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
PARTS REQUIRED:
Centeron marks
Note this measurement
FLOOR FRAME
Flush
Flush
Look for
StampTREATED
HINT:For easier nailingstand on frame.
2
1
Use two 3" nails at each mark.
Orient parts as shown on � at surface. Measure and mark.
BEGIN
You have � nished your � oor frame. Proceed to level and square frame.FINISH
3
DO
OR
10
DOOR
FINISH
5
LEVEL AND SQUARE FLOOR FRAMEBefore attaching � oor decking, it is important to level and square the � oor frame.
A level and square � oor frame is required to correctly construct your shed.
BEGIN
2
3
4
1
Use level and check the frame is level before applying � oor panels.
Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square. The diagonal measurement will be approximately 170-1/4" (432,4 cm).
When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner. Move to the opposite end of the frame. Secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square (Fig. A).
Once the � oor frame is level and square fasten the frame to the 4x4 runners at each point the frame contacts the 4x4 runners.
See page 7 for the preferred � oor leveling method.
First, secureat ends withone fastener.
Second, secureat ends withone fastener.
170-1/4"(432,4 cm)
170-1/4"(432,4 cm)
Fig. A
11
DO
OR
DO
OR
48"(121,9 cm)
140-5/8"(352,2 cm)
6"(15,2 cm)
Move to the opposite side. Using the long edge of the panel as a lever, move thepanel side-to-side until the top corner is � ush to the � oor frame (Fig. B).Secure panel with two 2" nails in the corners.
2
BEGIN1
3
4 Continue attaching the panel using 2" nails 6" apart on edges and 12" apart inside panel.Use a chalk line or use pre-painted grid lines to nail into joists under panel.
Ensure your � oor frame is square by installing one paneland squaring frame.
Fig. A
Fig. B
Fig. C
Check the � oor frame is square by measuring diagonally across the frame corners. If the measurements are the same your � oor frame is square. The measurement will be approximately 170-1/4" (432,4 cm) (Fig. C).
PARTS REQUIRED:
x1
x55
5/8 x 48 x 96"(1,6 x 121,9 x 243,8 cm)
Grid lines up
Seam
Seam
12" (30,2 cm)
2" (5,1 cm)
Flush
Flush
Flush
(2) Nails
(2) Nails
FLOOR PANELS
3/4"(1,9 cm)
170-1/4" (432,4 cm
170-1/4" (432,4 cm
Attach the 48 x 96" panel with the rough side up (painted-grid lines side) with the 48" edge and corner � ush to the � oor frame (Fig A). Secure panel with two 2" nails in the corners.
12
48"(121,9 cm)
44-5/8"(113,3 cm)
140-5/8"(357,2 cm)
6"(15,2 cm)
12"(30,5) cm
24"(61 cm)
20-5/8"(52,4 cm)
PARTS REQUIRED:
FINISH
7 You have � nished attaching your � oor panels.
Continue installing panels with rough side up (painted grid lines). Position 44-5/8" panel in middle of � oor frame.
Use grid lines on panel for 2" nails 6" apart on edges, and 12" apart inside panels.
5
76
x1 x1
x110
5/8 x 48 x 96"(1,6 x 121,9 x 243,8 cm)
5/8 x 44-5/8 x 96"(1,6 x 113,3 x 243,8 cm)
Grid lines up
2" (5,1 cm)
FLOOR PANELS
Flush
FlushFlush
DO
OR
13
DOOR
DOOR
Back wall
Front wall
Left wall
Right Wall
Check the � oor frame is level after installing � oor panels.Re-level if needed.
HINT:
IMPORTANT!
• The � oor should be used as a stable work surface for wall construction.
• Organize your assembly procedure during the build process to avoid over-handling of the walls.
LEFT WALL FRAMEPARTS REQUIRED:
140-5/8”(352,7cm)
120”(304,8 cm)
96”(243,8 cm)
68-5/8”(174,3 cm)
72”(182,9 cm)
48”(121,9 cm)
72”(182,9 cm)
20-5/8”(52,4 cm)
24”(61 cm)
68”(172,7 cm)
1-1/2”(3,8 cm)
1-1/2”(3,8 cm)
1-1/2”(3,8 cm)OT x7
OYYK
OYYK
HINT:For easier nailingstand on frame.
x2 2 x 3 x 72" (5,1 x 7,6 x 182,9 cm) OY
x2 2 x 3 x 68-5/8" (5,1 x 7,6 x 174,3 cm) YK
x7 2 x 3 x 68" (5,1 x 7,6 x 172,7 cm) OT
x32
14
DO
OR
3" (7,6 cm)
BEGIN
1
Use two 3" nails at each mark and four 3" nails at seams
Orient parts on edge on � oor. Measure and mark.
2
TOENAILING
YOU WILL ASSEMBLE ONE LEFT AND ONE RIGHT WALL SEPARATELY.YOU MUST BUILD THE LEFT AND RIGHT SIDE WALLS EXACTLY AS SHOWN!
IMPORTANT MEASUREMENT
15
For squareness maintain Flush and 3/4" measurement along panel edges.
LEFT SIDE WALL PANELS
48 x 72"(121,9 x 213,4 cm)
PARTS REQUIRED:
x1
x452" (5,1 cm)
Fig. B
BEGIN HERE
Fig. A
3/4"(1,9 cm)
3/4"(1,9 cm)
2 Nails
2 Nails
Flush
DO
OR
48"(121,9 cm)3/4"
(1,9 cm)1”
(2,5 cm)
3/4"(1,9 cm)
12"(30,5 cm) 6"
(15,2 cm)
20-5/8"(52,4 cm)
Place 48 x 72" panel onto wall frame � ush to top of frame with primed side up as shown.
Use the gauge block to mark the 3/4" measurement on the wall stud. Secure panel with two 2" nails in the corners (Fig. A).
Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel.
Ensure your wall frame is square by installing one panel and squaring frame.
YOU WILL ASSEMBLE ONE LEFT AND ONE RIGHT WALL SEPARATELY.
Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until you have a 3/4" measurement on the wall stud. Secure corner with two 2" nails (Fig. B).
4
5
3
3/4" GAUGE BLOCK
GAA
3/4" GAUGE BLOCK
Primedside up
16
3/4"(1,9 cm)
48"(121,9 cm)
12"(30,5 cm)
6"(15,2 cm)
Flush
44-5/8"(113,3 cm)
12"(30,5 cm)
6"(15,2 cm)
Flush
For squareness maintain � ush and 3/4" measurement along panel edges.
For squareness maintain � ush along panel edges.
Place center 48" x 72" panel on frame as shown with primed side facing up.
Nail using 2" nails 6" apart on edges and 12" apart inside panel.
6
Place end 44-5/8" x 72" panel on frame as shown with primed side facing up. Nail using 2" nails 6" apart on edges and 12" apart inside panel.
7
You have � nished building your LEFT WALL.FINISH
9
Primedside up
Primedside up
48 x 72"(121,9 x 213,4 cm)
44-5/8 x 72"(121,9 x 213,4 cm)
x1 x1
x90
LEFT SIDE WALL PANELS
PARTS REQUIRED:2" (5,1 cm)
8 Carefully � ip the LEFT wall over.
DO
OR
DO
OR
3/4" GAUGE BLOCK
GAA
3/4" GAUGE BLOCK
17
DO
OR
RIGHT WALL FRAMEPARTS REQUIRED:
140-5/8”(352,7cm)
120”(304,8 cm)
96”(243,8 cm)
68-5/8”(174,3 cm)
72”(182,9 cm)
48”(121,9 cm)
72”(182,9 cm)
20-5/8”(52,4 cm)
24”(61 cm)
68”(172,7 cm)
1-1/2”(3,8 cm)
1-1/2”(3,8 cm)
1-1/2”(3,8 cm)
OT x7
OYYK
OYYK
HINT:For easier nailingstand on frame.
x2 2 x 3 x 72" (5,1 x 7,6 x 182,9 cm) OY
x2 2 x 3 x 68-5/8" (5,1 x 7,6 x 174,3 cm) YK
x7 2 x 3 x 68" (5,1 x 7,6 x 172,7 cm) OT
x323" (7,6 cm)
BEGIN
1
Use two 3" nails at each mark and four 3" nails at seams
Orient parts on edge on � oor. Measure and mark.
2
TOENAILING
IMPORTANT MEASUREMENT
18
RIGHT SIDE WALL PANELS
48 x 72"(121,9 x 213,4 cm)
PARTS REQUIRED:
x1
x452" (5,1 cm)
Fig. BFig. A
Flush
3/4"(1,9 cm) 3/4"
(1,9 cm)
2 Nails
2 Nails
DO
OR
BEGIN HERE
48"(121,9 cm)
3/4"(1,9 cm)
3/4"(1,9 cm)
20-5/8"(52,4 cm)
12"(30,5 cm)
1”(2,5 cm)
6"(15,2 cm)
Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel.
Ensure your wall frame is square by installing one panel and squaring frame.
Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until you have a 3/4" measurement on the wall stud. Secure corner with two 2" nails (Fig. B).
4
5
3
3/4" GAUGE BLOCK
GAA
3/4" GAUGE BLOCK
Primedside up
For squareness maintain � ush and 3/4" measurement along panel edges.
Place 48 x 72" panel onto wall frame � ush to top of frame with primed side up as shown.
Use the gauge block to mark the 3/4" measurement on the wall stud. Secure panel with two 2" nails in the corners (Fig. A).
19
3/4"(1,9 cm)
48"(121,9 cm)
12"(30,5 cm)
6"(15,2 cm)
Flush
44-5/8"(113,3 cm)
12"(30,5 cm)
6"(15,2 cm)
Flush
For squareness maintain � ush and 3/4" measurement along panel edges.
For squareness maintain � ush along panel edges.
Place center 48" x 72" panel on frame as shown with primed side facing up.
Nail using 2" nails 6" apart on edges and 12" apart inside panel.
6
Place end 44-5/8" x 72" panel on frame as shown with primed side facing up. Nail using 2" nails 6" apart on edges and 12" apart inside panel.
7
You have � nished building both of your sidewalls.FINISH
9
Primedside up
Primedside up
48 x 72"(121,9 x 213,4 cm)
44-5/8 x 72"(121,9 x 213,4 cm)
x1 x1
x90
RIGHT SIDE WALL PANELS
PARTS REQUIRED:2" (5,1 cm)
8 Carefully � ip the RIGHT wall over.
DO
OR
DO
OR
3/4" GAUGE BLOCK
3/4" GAUGE BLOCK
GAA
47-3/4"(121,3 cm)
19-3/4"(50,2 cm)1-1/2"
(3,8 cm)
(2) 3" (7,6 cm)Nails
(2) 3" (7,6 cm)Nails 1-1/2"
(3,8 cm)
1-1/2"(3,8 cm)
1-1/2"(3,8 cm)
PARTS REQUIRED:
2
Orient NN and PS on edge on � oor as shown.
Orient WH and PS on edge on � oor as shown.
Secure using two 3" nails.
Secure using two 3" nails.
BEGIN
1̧
x1
x22 x 3 x 47-3/4" (5 x 7,6 x 121,3 cm)
2 x 3 x 91" (5 x 7,6 x 231,1 cm)
NN
PS
PS
PS
45-1/2"(115,6 cm)
45-1/2"(115,6 cm)
91"(231,1 cm)
91"(231,1 cm)
45-1/2"(115,6 cm)
45-1/2"(115,6 cm)
WHx12 x 3 x 19-3/4" (5,1 x 7,6 x 50,2 cm)
x43" (7,6 cm)
20
BACK WALL FRAME
WH
NN
PARTS REQUIRED:
3
4
5
Secure panel to bottom frame 1" (2,5 cm) from panel bottom using 2" (5,1 cm) nails 6" (15,2 cm) apart along edge and 12" (30,5 cm) apart inside panel.
Place panel with primed side up onto frames with a 1/2" gap as shown.
Maintain 1" measurement at bottom and 3/4 measurement along edge.
x13/8 x 48 x 72" (1 x 121,9 x 182,9 cm)
x142" (5,1 cm)
21
BACK WALL FRAME
20-1/4"(51,4 cm)19-3/4"
(50,2 cm)
20-1/4"(51,4 cm)
48-3/4"(123,8 cm)
47-3/4"(121,3 cm)
1-1/2"(3,8 cm)
1-1/2"(3,8 cm)
2-1/2"(6,4 cm)
1-1/2"(3,8 cm)
12"(30,5 cm)
1-1/2"(3,8 cm)
3/4"(1,9 cm)
3/4"(1,9 cm)
1"(2,5 cm)
1/2" (1,3 cm)
6"(15,2 cm)
Ensure 1/2" gap between top and bottom frame. Hold the 20-1/4" (51,4 cm measurement and secure with 2" (5,1 cm) nails 6" (15,2 cm) apart.
3/4" GAUGE BLOCK
GAA
IMPORTANT MEASUREMENT
3/4" GAUGE BLOCK
22
20-1/4"(51,4 cm)
PARTS REQUIRED:
BACK WALL PANELS
6"(15,2 cm)
6"(15,2 cm)
Flush
48-3/4"(128,8 cm)
12"(30,5 cm)
x13/8 x 48 x 72" (1 x 121,9 x 182,9 cm)
Secure using 2" (5,1 cm) nails 6" (15,2 cm) apart on edges and 12" (30,5 cm) apart on inside of panel.
Place right panel � ush to left panel with primed side up.
x262" (5,1 cm)
6
23
BACK WALL BOTTOM PLATES
1"(2,5 cm)
1"(2,5 cm)
2-1/2"(6,4 cm)
2-1/2"(6,4 cm)
2-1/2"(6,4 cm)
2-1/2"(6,4 cm)
1"(2,5 cm)
1"(2,5 cm)
x22 x 3 x 13" (5,1 x 7,6 x 33 cm)
RK
Position RK on edge as shown (Fig A.)Secure RK to wall panel using (3) 2" Nails.
8
7
Repeat step 7 for RIGHT wall panel. (Fig B.)
You have � nished building your back wall.FINISH
9
PARTS REQUIRED:2" (5,1 cm)
x6
Fig A. Fig B.
RKRK
IMPORTANT MEASUREMENT
IMPORTANT MEASUREMENT
x22 x 3 x 70-1/4" (5,1 x 7,6 x 178,4 cm)
OZ
24
91"(231,1 cm)
56"(142,2 cm)
56"(142,2 cm)
70-1/4"(178,4 cm)
70-1/4"(178,4 cm)
HINT:For easier nailingstand on frame.
17-1/2"(44,5 cm)
17-1/2"(44,5 cm)
x22 x 3 x 91" (5 x 7,6 x 231,1 cm)
PS
3" (7,6 cm) PARTS REQUIRED: x4
FRONT WALL FRAME
BEGIN
1
Use two 3" nails at each mark.
Orient parts on edge on � oor. Measure and mark.
2
OZ
PS
OZ
3/8 x 20 x 72" (1 x 50,8 x 182,9 cm)
x2
OOx22 x 3 x 69" (5,1 x 7,6 x 175,3 cm) TEMPORARY SUPPORT
25
For squareness maintain � ush and 3/4" measurement along panel edges.
3/4"(1,9 cm)
3/4"(1,9 cm)
56"(142,2 cm)
Flush Flush
72"(182,9 cm)
72"(182,9 cm)
20"(50,8 cm)
20"(50,8 cm)
6"(15,2 cm)
6"(15,2 cm)
PARTS REQUIRED:
FRONT WALL FRAME
x34
x2
2" (5,1 cm)
Primedside up
Primedside up
Install OO after panels for temporary brace
3" (7,6 cm)
Place 20 x 72" panel onto wall frame � ush to OZ and 3/4" from top of frame with primed side up as shown.
Secure panel with two 2" nails 6" (15,2 cm) apart.
Repeat step 3 to attach the remaining panel.4
5
3
You have � nished building your front wall.FINISH
6
3/4" GAUGE BLOCK
3/4" GAUGE BLOCK
3/4" GAUGE BLOCK
Use OO as a brace to maintain 56" (142,2 cm) opening. Use two 3" screws to attach.
GAA
26
2" (5,1 cm)
3" (7,6 cm)PARTS REQUIRED (TEMPORARY):
2 x 3 x 93" (5,1 x 7,6 x 236,2 cm)
x1
BACK WALL INSTALLATION
3" (7,6 cm)
PL
Center back wall assembly on the 96" (243,8 cm) � oor dimension.
Use PL as a temporary brace. Secure with two 3" screws.2
BEGIN
1
First, nail lower edge of panel to � oor frame using 2" nails 6" apart.Angle nail to hit � oor frame (Fig. A).
3
You have � nished standing your back wall.FINISH
6
Nail 2" nails � rst.
2" (5,1 cm) Nails
3" (7,6 cm) Nails
Fig. A
3" (7,6 cm)Screw
Fig. B
Secure back wall upright to � oor using two 3" screws (Fig. B).
Secure back wall bottom plates to � oor using three 3" nails (Fig. A).
4
5
x6
x4
x18
96"
(243,8 cm)3" (7,6 cm)
Screws
PT
3" Nails into bottom plate.
4
3
Secure backwall horizontal supports with 3" screws(Fig. D, E) into sidewall corner stud.
Remove temporary brace.Repeat process to secure the left sidewall.
2
BEGIN
Be sure the measurement between the panel edges is the same along the entire length. Then secure with one 2" nail in the upper corner (Fig. B).
Nail along the backwall panel edge into the sidewall stud using 2" nails spaced 6" apart.
Nail along bottom of panel using2" nails 6" apart. Angle nail to hit � oor frame (Fig. C).
Secure the wall frames bottom plate onto � oor using two 3" nails between studs.
Stand right sidewall on � oor. It is important to secure the right sidewall in the following order. ENSURE 20-5/8 MEASUREMENT IS TOWARD BACK OF SHED
3" (7,6 cm) Nail
Center rigtht sidewall on � oor front to back.
Nail the lower backwall corner to the sidewall frame with one 2" nail(Fig. A).
CENTER
DOORFig. A
2" (5 cm) Nail
6"(15,2 cm)
Fig. C
Fig. B
2" (5 cm) Nail
6"(15,2 cm)
Fig. D
Fig. E
3" (7,6 cm) Screw
1
20-5/8"(52,4 cm)
27
You have � nished standing your side walls.FINISH
5
SIDE WALLS INSTALLATION
2" (5,1 cm)
3" (7,6 cm) 3" (7,6 cm)
20-5/8"(52,4 cm)
x24
x78
x4
SAMEMEASUREMENT
6"(15,2 cm)
Fig. C
2" (5 cm) Nail
Fig. D
(2) 3" (7,6 cm) Screws
OO
Center frontwall on � oor side-to-side.
Nail the frontwall � ush to the � oor using 2" nails 6" apart. Angle nails to hit � oor frame (Fig. A).
Nail the lower frontwall corner to the sidewall stud with one 2" nail (Fig. B).
1
CENTER
6"(15,2 cm)
6"(15,2 cm)
56"(142,2 cm)
2" (5,1 cm) Nail Fig. A
Fig. B 2" (5,1 cm) Nail
SAMEMEASUREMENT
You have � nished standing your front wall.FINISH
4
OO
28
3" (7,6 cm)
FRONT WALL INSTALLATION
2" (5,1 cm)x32
x4
2 Be sure the measurement between the panel edges is the same along the entire length. Then secure with one 2" nail in the upper corner (Fig. C).
Nail along the panel edge into the sidewall stud using 2" nails spaced 6" apart.
Secure the frontwall frame using two3" screws (Fig. D).
Repeat process to secure the right side ofthe frontwall.
Remove temporary brace OO.
3
BEGINStand frontwall on � oor. It is important to secure the frontwall in the following order.
x12 x 3 x 7-7/8" (5,1 x 7,6 x20 cm)TEMPORARY SUPPORT
DYx11
7-1/4 x 18-1/4" (18,4 x 46,4 cm)
x122 x 4 x 68-7/16" (5,1 x 10,2 x 173,8 cm)
YJ
OSB OR WOOD GRAIN
29
Fit base of Rafters in cornersof back wall and jig.
PARTS REQUIRED: x132
RAFTERS
FINISH
7 You have � nished assembling your rafters.
Apply glue to rafters where gusset will � t. NOTE: BE SURE TO SET ASSIDE GUSSET WITH FINISHED WOOD GRAIN PATTERN
Secure gusset to rafters using twelve 2" (5,1 cm) Nails as shown.
Flip over rafter assembly and repeat STEPS 2-4 to attach second gusset to other side.SET ONE RAFTER ASSEMBLY ASSIDE WITH ONLY ONE GUSSET ATTACHED.
Repeat STEPS 2-5 to build three additional rafter assemblies. Remove DY.
4
5
6
3
2
107-1/8"(272,1 cm)
Glue
Glue
Center
Gusset
YJTemporarysupport DY
Fig. A
YJ
Flush
Flush
Contact at peak
Flush
2" (5,1 cm)Nails
(12) per side
2" (5,1 cm)
You will build SIX assemblies. (5) with two gussets, and (1) with one gusset.
Place two rafter halves (YJ) in the corner of back and side wall and DQ. Rafters contact at peak.
Position and square DY as temporary jig using two 3" (7,6 cm) screws as shown.
BEGIN
1̧
x2
HINT:Use � oor and walls to help assemble rafters!
3" (7,6 cm)
30
DO
OR
3" (7,6 cm)PARTS REQUIRED:
RAFTERS
x5 x1
x24
FINISH
4
Repeat step 3 to attach 5 remaining rafters.
Place remaining rafters on top plate, aligned over studs as shown (Fig. A) and secure with 3" screws.
Secure rafter to top plate with two 3" screws above notch (Fig. A, Fig. B).
You have � nished attaching your rafters.
3
2
BEGIN
1̧
Align over studs.
Fig. AFig. B
Flush to inside of panel.
Locate � rst (1) GUSSET rafter directly over front stud, � ush to inside of front wall panels, and tight to side wall (Fig. A, B). Face gusset inward. Rest notch on top plate.
(2) 3" (7,6 cm)Screws
(2) 3" (7,6 cm)Screws
Tight to side wall
24"(61 cm)
24"(61 cm)
24"(61 cm)
24"(61 cm)
23-1/4"(59 cm)
Rafter with ONE GUSSET facing inward.
MEASUREMENTS ARE TO CENTER OF RAFTER
PreassembledPreassembled(1) GUSSET
x1
x1
2 x 3 x 17-1/2" (5,1 x 7,6 x 44,5 cm)
2 x 3 x 7-1/4" (5,1 x 7,6 x 18,4 cm)
BV
WL
x1 x1
x141-1/2" (3,8 cm)
TEMPORARY SUPPORT
x22 x 3 x 18-3/8" (5,1 x 7,6 x 50,2 cm)
WJ
31
FRONT WALL GABLE
PARTS REQUIRED:
Primedside up
Primedside up
Flush
Flush
Flush
Orient parts on � at as shown.
Place LEFT front gable panel as shown and secure using 1-1/2" nails, 6" apart.2
1
BEGIN
3 Place RIGHT front gable panel � ush to left panel. Secure using 1-1/2" nails, 6" apart.
You have � nished assembling your front wall gable.
FINISH
4
1-1/4"(3,2 cm)
1-1/4"(3,2 cm)
3/4"(1,9 cm)
7-1/4"(18,4 cm)
17-1/2" (44,5 cm)
WL
BV
6" (15,2 cm)
6" (15,2 cm)
WJ
WJ
WJ
x12
x12 x 3 x 36" (5,1 x 7,6 x 91,4 cm)
DU
1-1/2" (3,8 cm)TEMPORARY SUPPORT
x22 x 3 x 18-3/8" (5,1 x 7,6 x 50,2 cm)
WJ
32
x1 x1
BACK WALL GABLE
PARTS REQUIRED:
Primedside up
Primedside up
Flush
Flush
Orient parts on � at as shown.
Place LEFT back gable panel on DU as shown and secure using 1-1/2" nails, 6" apart.2
1
BEGIN
3 Place RIGHT back gable panel on DU and � ush to left panel. Secure using 1-1/2" nails, 6" apart.
You have � nished assembling your back wall gable.
FINISH
41-1/4"
(3,2 cm)
2-1/2"(6,4 cm)
4" (10,2 cm)
36" (91,4 cm)
48" (121,9 cm)
6" (15,2 cm)
6" (15,2 cm)
96" (243,8 cm)
DU
WJ
WJWJ
x42
x11-1/2" (3,8 cm)
33
FRONT WALL GABLE
PARTS REQUIRED:
Place front gable assembly centered on front wall panel and � ush to rafter peak (Fig. A).
You have � nished attaching your front wall gable panels.
While supporting rafter and assembly, secure gable panels to rafter using 1-1/2" nails, 6" apart.Wipe excess caulk from panels.
Caulk above front wall panels � rst as shown.
Secure front gable panels into top plate using 1-1/2" nails, 6" (15,2 cm) apart.2
3
1
BEGIN
FINISH
4
Fig. A
Flush
1-1/2" (3,8 cm) Nails
6" (15,2 cm)
6" (15,2 cm)
Preassembled
UNx12 x 4 x 94-1/2" (5,1 x 10,2 x 240 cm)
34
3" (7,6 cm)x8
BACK WALL GABLE
PARTS REQUIRED:
Flush
Center UN on back wall top plate and � ush to inside of back of wall panel (Fig. A).
While keeping UN � ush, secure to top plate using eight 3" screws.2
1
BEGIN
3" (7,6 cm)Screws
3" (7,6 cm)Screws
CENTER ON TOP PLATE
INSIDE OF SHED
UN
UN
Fig. A
35
2" (5,1 cm)x7PARTS REQUIRED:
x196" (243,8 cm) Z-STRIP
BACK WALL GABLE
Center Z-Strip on back wall panels (Fig. A).
Secure to UN using eight 2" � nish nails, 16" apart2
1
BEGIN
2" (5,1 cm)Finish Nails
16" (40,6 cm)
2" (5,1 cm)Finish Nails
CENTER ON WALL PANELS
OUTSIDE OF SHED
Fig. A
UN
x1
x182" (5,1 cm)
36
Fig. A
BACK WALL GABLE
PARTS REQUIRED:
Center back wall gable assembly on z-strip and � ush to wall panel as shown (Fig. A).
You have � nished attaching your back wall gable panels.
While keeping panels � ush, secure gable assembly to UN using 2" nails, 6" (15,2 cm) apart.
2
1
BEGIN
FINISH
3
Preassembled
Flush
2" (5,1 cm) Nails
1/2" (1,3 cm) Gap
6" (15,2 cm)
3" (7,6 cm)x8
UNx22 x 4 x 94-1/2" (5,1 x 10,2 x 240 cm)
37
LOFT SUPPORTS
PARTS REQUIRED:
Center � rst loft support UN on top plate and � ush against rafter as shown (Fig. A).
You have � nished attaching your loft supports.
Secure UN to rafter using four 3" screws (Fig. A).
Center second loft support UN on top plate and 13" (33 cm) from rafter (Fig. A).Secure UN to top plate using four 3" screws (Fig. A).
2
1
BEGIN
FINISH
3
3" (7,6 cm)Screws
3" (7,6 cm)Screws
3" (7,6 cm)Screws
Flush
13"(33 cm)
13"(33 cm)
Flush
Flush
Fig. A
x22 x 3 x 18-3/8" (5,1 x 7,6 x 50,2 cm)
WJ
x12 x 3 x 93" (5 x 7,6 x 236,2 cm)
PL
x8
x4
38
SHELF
PARTS REQUIRED:3" (7,6 cm)
2
3
Place shelf support WJ at same height as horizontal wall brace and secure using two 3" screws into back stud and two 3" nails into � rst stud as shown.
SAME HEIGHT
Flush WJ with horizontal wall brace.
Repeat Step 1 to attach second shelf support WJ.
Place PL � ush to shelf supports and 8-5/8" (21,9 cm) from back stud as shown.
(2) 3" (7,6 cm)
Nails
(2) 3" (7,6 cm)
Nails
(2) 3" (7,6 cm)Screws
Flush
(2) 3" (7,6 cm)Screws
(2) 3" (7,6 cm)Screws
8-5/8"(21,9 cm)
8-5/8"(21,9 cm)
(2) 3" (7,6 cm)Screws
WJ WJ
PL
Flush
3" (7,6 cm)
BACK WALLSAME
HEIGHT
BEGIN
1
7/16 x 11-7/8 x 91" (1,1 x 30,2 x 231,1 cm)
x1x10
1-1/2" (3,8 cm)
39
SHELF
PARTS REQUIRED:
4 Place shelf panel on support and � t into groove.
Secure front of panel with 1-1/4" screws, 9" apart.
Secure back of panel with 1-1/2" nails, 9" apart.
11-7/8" (30,2 cm)
Flush against back wall(10) 1-1/2" (3,8 cm)
Nails
(10) 1-1/4" (3,2 cm)Screws
BACK WALL
x101-1/4" (3,2 cm)
FINISH
5 You have � nished installing your shelf.
40
82"(208,3 cm)
Fit panel into gap.
CENTER
Attention: Load not to exceed 300 lbs evenly distributed across loft.
PARTS REQUIRED:
LOFT PANEL
2" (5,1 cm)7/16 x 35-7/8 x 82"(1,1 x 91,1 x 208,3 cm)x1
x6
Place loft panel onto the three loft supports centered from side-to-side and � ush with the back wall panel. Fit panel into gap.
IMPORTANT! Use only SIX 2" nails in the panel, to allow squaring the roof. You will complete nailing the loft panels later.
FINISH
3
2
BEGIN
1
You have temporarily � nished your loft panels.
41
BEGIN
1
HINT:Clamp in position before screwing.
1-1/4" (3,2 cm)Screws
3" (7,6 cm)Screws
BACK GABLE TRIM
FINISH
4
Position one WW � ush to back gable panel edge and center with panel seam (Fig. A). Attach trim with ten 1-1/4" screws from inside approximately 7" (17,8 cm) apart.
Position second WW � ush to panel edge and � ush to WW already attached (Fig. A). Attach trim with ten 1-1/4" screws from inside approximately 7" (17,8 cm) apart.
Reinforce WW with one 3" screw through loft support at each end (Fig. B).
You have � nished attaching your back gable trim.
2
3
PARTS REQUIRED:
1-1/4" (3,2 cm)
WW
Fig. A
Fig. B
7"(17,8 cm)
Flush
Flush with panel edges.
Flush with panel edges.
x22 x 4 x 69-7/8" (5,1 x 10,2 x 177,5 cm)
WW
x20
x23" (7,6 cm)
42
3" (7,6 cm)
4" (10,2 cm)
FRONT WALL OVERHANG FRAMING
PARTS REQUIRED:
Flush
Orient parts on � at as shown. Ensure WE is oriented with 4" � at edge contacting DY.
Secure DY � ush to WE using one 3" (7,6 cm) screw.2
1
BEGIN
3 Repeat step 1-2 to make three additional assemblies.
You have � nished assembling your overhang framing.FINISH
4
x4 DY
Flat
WE
x42 x 3 x 68-7/16" (5,1 x 7,6 x 173,8 cm)
WE
x42 x 3 x 7-7/8" (5,1 x 7,6 x 20 cm)
DY
3" (7,6 cm) Screw
7-7/8"(20 cm)
2-1/2" (6,4 cm)
3-3/16" (8,1 cm)
68-7/16"
(173,8 cm)
x4
43
3" (7,6 cm)x10
x4
PARTS REQUIRED:
FRONT WALL OVERHANG
Fig. AFig. B
3" (7,6 cm) Screws
2" (5,1 cm) Nails
2 x 5"
Flush
Flush
x2 x23/8 x 2 x 5" (1 x 5,1 x 30,2 cm)
HINT:Clamp in position before screwing.
Fig. C
Flush
Flush
BEGIN
1 Position 2 x 5" spacer � ush to front of rafter and secure using two 2" nails (Fig. A).
Position overhang framing � ush to rafter and top of front gable panel (Fig. B, C).Secure using � ve 3" screws
Repeat steps 1-2 on opposite side.
2
3
Preassembled
3" (7,6 cm) Screws
Flush to top of rafter
Flush
2" (5,1 cm)
44
Fig. B
Fig. A
PARTS REQUIRED:
FRONT WALL OVERHANG
1-1/4" (3,2 cm) Screws
1-1/4" (3,2 cm) Screws
Flush
Position right 57-7/8" overhang board Primed Side Down � ush to front walland framing assembly (Fig. B). Secure using six 1-1/4" screws.
Position left 57-7/8" overhang board Primed Side Down � ush to front wall, framing assembly and right overhang board (Fig. A, B). Secure using six 1-1/4" screws.
Ensure overhang boards meet at bottom edge (Fig. A).
5
4
x23/8 x 7-7/8 x 57-7/8" (1 x 20 x 147 cm)
Primed Side Down
Center and Flush
x121-1/4" (3,2 cm)
45
Fig. B
PARTS REQUIRED:
FRONT WALL OVERHANG
2" (5,1 cm) Finish Nails
2" (5,1 cm) Finish Nails
Flush
Flush
Flush
Position right 7-7/8" overhang board Primed Side Down � ush to front walland sof� t framing (Fig. A). Secure using two 2" � nish nails.
Position left 7-7/8" overhang board Primed Side Down � ush to front walland sof� t framing (Fig. B). Secure using two 2" � nish nails.
7
6
x4
x2 3/8 x 7-7/8 x 7-7/8" (1 x 20 x 20 cm)
Primed Side Down Primed Side
Down
2" (5,1 cm)
Fig. A
46
Fig. B
PARTS REQUIRED:
FRONT WALL OVERHANG
2" (5,1 cm) Finish Nails 2" (5,1 cm)
Finish Nails
Flush Flush FlushFlush
Position right 5-13/16" overhang board Primed Side Out � ush to front walland previously installed overhand boards (Fig. A). Secure using two 2" � nish nails.
Position left 5-13/16" overhang board Primed Side Out � ush to front walland previously installed overhand boards (Fig. B). Secure using two 2" � nish nails.
9
8
x4
Primed Side Out
Primed Side Out
2" (5,1 cm)
Fig. A
x2 3/8 x 5-13/16 x 7-7/8" (1 x 14,8 x 20 cm)
47
3" (7,6 cm)x1
Fig. A
PARTS REQUIRED:
FRONT WALL OVERHANG
1-1/4" (3,2 cm) Screws
1-1/4" (3,2 cm) Screws
1-1/4" (3,2 cm) Screws
3" (7,6 cm) Screw
12
11
10
Flush
FIRST 1-1/4" SCREW
LAST 1-1/4"SCREW
FlushFlush
Flush
FlushFlush
Flush
x2
Preassembled
Position overhang framing � ush to front of overhang boards. (Fig. A). Secure bottom of overhang framing � rst as shown using three 1-1/4" screws.
Repeat Step 10 on opposite side.
Continue securing overhang framing while traveling toward peak as shown
Secure overhang framing together using one 3" screw (Fig. A).
x161-1/4" (3,2 cm)
x1 WML
x1 WMR19/32 x 4 x 69-7/8" (1,5 x 10,2 x 177,5 cm)
19/32 x 4 x 69-7/8" (1,5 x 10,2 x 177,5 cm)
48
WML
Fig. A
PARTS REQUIRED:
FRONT WALL OVERHANG
2" (5,1 cm) Finish Nails
14
13
FlushFlush
Flush
WMR Flush
Position WML with primed side out and � ush to peak and overhang framing as shown (Fig. A). Secure using 2" � nish nails, 12" apart as shown.
Repeat Step 12 on opposite side with WMR.
You have completed installing your front wall overhang.FINISH
15
x122" (5,1 cm)
x21 x 2 x 96" (2,5 x 5,1 x 243,8 cm)
ZM
x21 x 2 x 43-1/2" (2,5 x 5,1 x 110,5 cm)
WS
49
PARTS REQUIRED:
SOFFIT NAILER
2" (5,1 cm)x32
USE AS GAUGE BLOCK
Place a square � ush to bottom side of rafter and side wall (Fig. A). Mark wall at each rafter.
2
3
BEGIN
1
Repeat Steps 1-3 on opposite side.
You have � nished installing your sof� t nailer
Align WS � ush to marks (Fig. A) and use WD as a gauge block as shown (Fig. B). Secure at each rafter using 2" nails angled to hit stud (Fig. C). Use two nails at seam.
Place ZM � ush to WS and marks. Secure at each mark using 2" nails angled to hit stud (Fig. C).
FINISH
4
Fig. AFig. B
Fig. C
2" (5,1 cm) Nailsat angle
TOP VIEW
2" (5,1 cm) Nails
1-1/2(3,8 cm)
Use WD as gauge block2" (5,1 cm)
Nails
Stud
WS
WS
ZM
ZM
WS
WS
ZM
x12 x 3 x 5-1/8" (5,1 x 7,6 x 13 cm)
WD
50
2-1/2" (6,4cm)
BEGIN
1
SOFFIT BLOCK
FINISH
3
Position WD � ush against side wall and bottom of WS. Attach with three 2-1/2" screws as shown (Fig. A).
Repeat Step 1 for opposite side (Fig. B).
You have � nished attaching your back wall sof� t block.
2
PARTS REQUIRED:x6
Fig. A Fig. B
Flush
WD WD
Flush
(3) 2-1/2" (6,4 cm) Screws
(3) 2-1/2" (6,4 cm) ScrewsFlush Flush
x22 x 3 x 5-1/8" (5,1 x 7,6 x 13 cm)
WD
51
x2
x2
3/8 x 5-3/16 x 69-3/8" (1 x 13,2 x 176,2 cm)
3/8 x 5-3/16 x 72" (1 x 13,2 x 182,9 cm)
PARTS REQUIRED:
SOFFIT
x522" (5,1 cm)
Place 69-3/8" sof� t board on bottom side of WD, rafter, and nailer (Fig. A, D). Secure � ush to 72" sof� t board and side wall using 2" � nish nails 12" (30,5 cm) apart and angle into rafter (Fig. C).
Place 72" sof� t board primed side down on bottom side of rafter and nailer (Fig. A) and � ush to front overhang (Fig. B) and side wall. Secure using 2" � nish nails12" (30,5 cm) apart and angle into rafter at seam (Fig. C).
2
3
BEGIN
1
Repeat steps 1-2 on opposite side.
You have � nished installing your sof� t panels.FINISH
4
Fig. A
Fig. B
Fig. D
Fig. CSIDE VIEW
2" (5,1 cm) Finish nails
Primed Side Down
2" (5,1 cm) Finish nails
Flush
12" (30,5 cm)Sof� t Nailer
69-3/8"(176,2 cm)
69-3/8"(176,2 cm)
72"(182,9 cm)
72"(182,9 cm)
WD
Flush
2" (5,1 cm) Finish nails
Seam
Rafter
52
BEGIN
1
BACK WALL SOFFIT CAP
FINISH
3
Position LEFT corner sof� t cap primed side up on back wall with 7-13/16" measurement down and � ush to bottom of sof� t board as shown. Attach cap with three 2" � nish nails as shown (Fig. A).
Repeat step 1 to install RIGHT corner sof� t cap (Fig. B).
You have � nished attaching your back wall triangle trim.
2
PARTS REQUIRED:
x1
x1
x6
5-11/16 x 7-13/16" (14,4 x 19,8 cm)
5-11/16 x 7-13/16" (14,4 x 19,8 cm)
Fig. BFig. A
Flush to sof� t board
Flush to sof� t board
Primed Side Up
7-13/16"(19,8 cm)
7-13/16"(19,8 cm)
Primed Side Up
2" (5,1 cm)
53
Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until the top corner is � ush to the peak (Fig. C) and panel is � ush to back wall gable trim (Fig. D).
You may need to move your back wall gable to make panel � ush. Secure panel with two 2" nails in the corners.
2
You must square the roof by attaching one panel � rst. You will use the panels’ long edge as a lever to bring your roof into square. Commonly known as “racking”.
Roof panels may cause serious injury until securely fastened.
1BEGIN
2" (5,1 cm)
PARTS REQUIRED:
ROOF PANELS
Fig. C
Two Nails
48"
(121
,9 c
m)
Flush
Fig. D
Fig. A
Flush at peak.
Fig. B
Flush at peak.
7/16 x 47-7/8 x 48"(1,1 x 121,6 x 121,9 cm)
x2
7/16 x 22 x 46-1/2"(1,1 x 55,9 x 118,1 cm)
x2
7/16 x 8-7/8 x 70"(1,1 x 22,5 x 177,8 cm)
x2
7/16 x 22 x 96"(1,1 x 55,9 x 243,8 cm)
x2
x4
7/16 x 48 x 94-1/2"(1,1 x 121,9 x 240 cm)
x2
3/4" GAUGE BLOCK
Attach the 48 x 94-1/2" panel with the rough side up (painted-grid lines side) with a 3/4" (1,9 cm) measurement on the rafter (Fig A) and the panel � ush at the peak (Fig. B).
Secure panel with two 2" (5,1 cm) nails inthe corners.
3/4"(1,9 cm)
Gauge Block
54
x216
Flush at peak.
Flush at peak.
Fig. G
Fig. F
Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2" nail into each rafter (Fig. E).
Move to the top of the panel and keep spacing between the center of the rafters. Secure with one 2" nail into each rafter (Fig. E).
Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel.
Attach the second 47-7/8 x 48"upper roof panel � ush to � rst panel and peak (Fig. F, G).
3
At back end attach 22 x 46-1/2" roof panel � ush to back gable trim and large roof panel (Fig. H)
Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel.
Attach 22 x 96" roof panel � ush to the installed panel (Fig. I) and front rafter.
Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel.
Attach 8-7/8 x 70" roof panel � ush to the front overhang trim and peak (Fig. J).
Nail the roof panel using 2" nails 6" apart.
Repeat process to attach roof panelson the opposite side.
You have � nished installingyour roof panels.
4
5
6
7
PARTS REQUIRED:
ROOF PANELS
12"(30,5 cm)
12"(30,5 cm)
48"(121,9 cm)
6"(15,2 cm)
6"(15,2 cm)
Fig. E
24"(61 cm)
22-1/2"(57,2 cm)
24"(61 cm)
24"(61 cm)
24"(61 cm)
23-7/8"(60,6 cm)
NOTE: Measurement from outside of rafter.
2" Nail
Fig. H
Fig. J
GableTrim
3/4"(1,9 cm)
3/4"(1,9 cm)
Fig. I
7/16 x 47-7/8 x 48"(1,1 x 121,6 x 121,9 cm)
Flush
FINISH
8
2" (5,1 cm)
Flush Flushto trim
Flush
Flush
70"(177,8 cm)
x25/8 x 3-1/4 x 48" (1,6 x 8,3 x 121,9 cm)
OSB
55
Glue
LOFT
Glue
FlushFlush
PARTS REQUIRED:
COLLAR TIES
2" (5,1 cm)
FINISH
3
2
1BEGIN
Position and level collar tie on second and fourth rafter from back wall.
HINT: For best appearance install collar tie on rafter facing away from door opening.
Glue collar tie and attach with 2" nails as shown.
You have � nished installiing your collar ties.
x12
56
LOFT PANEL
Continue nailing 2" nails in each loft panel support as shown.
FINISH
2
BEGIN
1
You have � nished your loft panel.
2" (5,1 cm)Nails
Attention: Load not to exceed 300 lbs evenly distributed across loft.
2" (5,1 cm)x20
x1 7-1/4 x 18-1/4" (18,4 x 46,4 cm)
x1
x1
5-11/16 x 7-13/16" (14,4 x 19,8 cm)
5-11/16 x 7-13/16" (14,4 x 19,8 cm)
WITH WOOD GRAIN ON FACE
57
FINISH
4
BEGIN
1
2
3
Fig. B
PARTS REQUIRED:
FRONT WALL DECORATIVE TRIM
2" (5,1 cm) Finish Nails
2" (5,1 cm) Finish Nails
Flush
Position right corner sof� t cap Primed Side Out � ush to bottom of overhang as shown. Secure using three 2" � nish nails (Fig. A).
Position left corner sof� t cap Primed Side Out � ush to bottom of overhang as shown. Secure using three 2" � nish nails (Fig. B).
Position center gable decorative trim � ush to peak of overhang as shown. Secure using six 2" � nish nails.
You have � nished installing your front wall decorative trim.
x12
Primed Side Out
2" (5,1 cm)
Fig. A
Primed Side Out
Flush
Flush Flush
58
2" (5,1 cm)
2" (5,1 cm)Finish nails
PARTS REQUIRED:
FASCIA
x219/32 x 2-1/2 x 80-1/4" (1,5 x 6,4 x 203,8 cm)
x219/32 x 2-1/2 x 69" (1,5 x 6,4 x 175,3 cm)
WN
WK
x56
WK
WN
WN
WK
SEAM
BEGIN
1̧
FINISH
3
Attach fascia WN and WK � ush to rafters and under roof panels (Fig. A) using two 2" � nish nails at each rafter and four 2" � nish nails at seam.
Repeat step 1 - 2 to attach fascia on opposite side.
You have attached your fascia.
2
Fig. A
1 x 3 x 5" (2,5 x 7,6 x 12,7 cm)x1 GAA
59
Orient parts as shown on � at surface. 3/8" offset is to top. Look for red (right) and green (left) on hinge board.
PARTS REQUIRED:
x1x1Left Door Right Door
BEGIN1
DOORS
1-1/4" (3,2 cm)
2
3
Attach temporary support OO with 3" screws in middle and at ends as shown. Tighten securely.
Attach temporary support GAA with two 1-1/4" screws as shown. Tighten securely.
HINT:Look for 3/8" SPACER
attached to doors.
OO
GAA
Make sure spacer is attached.
Tighten screws securely.
OFFSET
(4) 3" (7,6 cm)Screws
Screws1-1/4" (3 cm)
Bottom edges � ush.
NOTE:Screw holewill beused later.
3/8"(1 cm)3/8"
(1 cm)
3/8"(1 cm)
3/8"(1 cm)
OFFSETGREEN RED
3" (7,6 cm)
OOx12 x 3 x 69" (5,1 x 7,6 x 175,3 cm)
3/4" (1,9 cm)
23-1/2"(59,7 cm)
23-1/2"(59,7 cm)
3/4"(1,9 cm)
x2
x4
60
4
PARTS REQUIRED:
x13" (7,6 cm)
DOORS
OO
Flushagainst wall panels.
Fig. AOO
OO2 x 3 x 69" (5,1 x 7,6 x 175,3 cm)
Center doors on panel seam as shown (Fig. B).5Check ledger board is still � ush under panels.
Remove temporary supports and check doors open properly.7
FINISH
8 You have � nished installing your doors.
Screw hinge boards into wall supports and � oor using ten 3" screws as shown. Make sure screws go into framing and � oor (Fig. C, D).
6
3" (7,6 cm)Screws into the wall support and � oor frame.
Fig. B
SEAM
Fig. C
3/8"(1 cm)
Fig. D
Angle 3" (7,6 cm)Screw
Attach temporary support OO as a ledger board � ush under wall panels for doors to rest on, using three 3" screws (Fig. A).
x13
WRx119/32 x 2-1/2 x 63" (1,5 x 6,4 x 160 cm)
x419/32 x 3 x 23" (1,5 x 7,6 x 58,4 cm)
GI
61
You have � nished securing your door and trim.
DOOR
PARTS REQUIRED:
2" (5,1 cm)
FINISH
5
BEGIN
4
3
2
1
3/4" (1,9 cm)
Center trim WR over doors and secure using eight 2" � nish nails into framing as shown.
Reinforce the door trim using 3/4" screws through door panel into trim (Fig. A).Locate screws as shown in Fig. B. Use two screws at seams.
Place GI 7" from top and lower cross brace and level (Fig. B). Secure from behind using three 3/4" screws.
Repeat step 1-2 to attach two GI's to other door.
x44
x8
CENTER CENTER
7” (17,8 cm)
7” (17,8 cm)
Center
7"(17,8 cm)
7"(17,8 cm)
2" Nails x8
Fig. B
Nail into framing.
Two Screws
DoorTrim
HingeBoard
Fig. A
DoorPanel
WR
GIGI
62
x1 10-1/2 x 32-1/2"(26,7 x 82,6 cm)
2 Screws
PARTS REQUIRED:
WINDOWS
1-1/4" (3,2 cm)
HINT: Caulk behind frame near edge before installing.
x2
BEGIN
1̧
From outside of shed, position window in opening and level. Use two screws at top of windows.
Do not fully tighten screws.
2
Apply high quality exterior-grade caulk behind frame near edge before installing to seal window.
63
2" (5,1 cm)
TRIMPARTS REQUIRED:
WINDOWS
Do not nail into window � ange.
3
4
5
Center WA 3/4" onto window frame. Secure using two 2" � nish nails as shown.
Position EY on inside window frame as shown. Secure using two 2" � nish nails.Remove 1-1/4" screws.
Position WA centered on inside window frame as shown. Secure using two 2" � nish nails.
Flush Flush
FlushEY x 2
WA
WA Centered
31" (78,7 cm)Centered
Centered
x219/32 x 2-1/2 x 36-3/4" (1,5 x 6,4 x 93,3 cm)
x219/32 x 2-1/2 x 9" (1,5 x 6,4 x 22,9 cm)
WA EYx8
3/4"(1,9 cm)
Remove screws
64
PARTS REQUIRED:
3/4" (1,9 cm) Screws
WINDOWS
x123/4" (1,9 cm)
6
You have � nished installing your window.FINISH
7
Install 3/4" screws as shown.
From inside, snip protruding � nish nails.
Do not screw into window � ange.
INSIDE OF SHED
65
You have nished installing your door weatherstrips.
BEGIN
With left door closed, center a weatherstrip OO vertically on the left door in the door opening (Fig. A). OO will offset the left door 1" OUT past the door trim 1" (Fig. B).
1
PARTS REQUIRED:
2 x 3 x 69" (5,1 x 7,6 x 175,3 cm)x2
x142" (5,1 cm)
DOOR WEATHERSTRIP
OO
FINISH
5
On right door center OO vertically in door opening (Fig. A). OO will offset the right door 1" IN from the door trim (Fig. C).
3
Secure OO using seven 2" screws through outside trim into OO (Fig. C).4
OO
Screws2"
(5,1 cm)
x14
1"(2,5 cm)
OFFSETScrews
2"(5,1 cm)
1"(2,5 cm)
OFFSET
Secure OO using seven 2" screws through outside trim into OO (Fig. B)2
Fig. A C .giFB .giF
Center OO in door
opening.
11" (27,9 cm)
Approximately
BEGIN
Install bolt with screws supplied and drill 5/16" hole for bolt to extend into.
Install bolt with screws supplied and drill 5/16" hole for bolt to extend into.
Place bolt onto OO in open position with bolt end 1/2" up from � oor. Bolt is open when loop is contacting base (Fig B).
3
4
2
Place bolt onto OO in open position with bolt end 3/8" down from frame. Bolt is open when loop is contacting base (Fig A).
Mark and pre-drill holes for screws.
Mark and pre-drill holes for screws.
1
LEFTDOOR
66Fig. B
PARTS REQUIRED:
DOOR
1" (2,5 cm)
x2
x8
5/16" (0,8 cm) Drill Bit
You have � nished installing your barrel bolts.FINISH
5
Fig. A
FLOOR
Loop contacts base.
x4
x4
1/2"5/16" drill forbolt: 1" deep.
Loop contacts base.
PRE-DRILL(4) HOLES
PRE-DRILL(4) HOLES
2 x 3 x 69"
2 x 3 x 69"
3/8" with bolt in open position.
OPEN POSITION, Spring is loose.
OPEN POSITION, Spring is loose.
5/16" drill for bolt:1" deep.
OVER DOOR FRAME
OO
OO
LOCATE AND PRE-DRILL HOLES TO AVOID SPLITTING WOOD
67
1-1/2" (3,8 cm)
SETSCREW
You have � nished installing your T-handle and decorative hinges.FINISH
5
Attach inside handle and secure with set screw as shown.
Install decorative hinges on horizontal trim and � ush against hinge as shown.
3
4
Insert handle in hole and secure using 1-1/2" (3,8 cm) screws.2
3/4" (1,9 cm)x12
1-1/2" (3,8 cm)
35-3/4"90 cm
RIGHT DOOR.
1-1/2"3,8 cm
TOP VIEW
1/4" Pre-drill and 1/2" Drill-through.
DOOR HARDWARE / DECORATIVE HINGES
x1 x4
x2PARTS REQUIRED:1-1/2" (3,8 cm)
Re-drill hole with 1/2" drill.
Keep drilled hole square to trim to avoid breaking edge of 2x3".
BEGIN
1 Measure and mark location of hole on outside of right door as shown (Fig. A). Pre-drill hole with 1/4" drill.
1/2" (1,3 cm) Drill Bit
1/4" (0,6 cm) Drill Bit
Flushto hinge
Fig. A
68
TRIM
PARTS REQUIRED: x562" (5,1 cm)
BEGIN
1̧
FINISH
4
Position second trim � ush to top and edge of previously installed trim (Fig. A, B). Secure using two 2" (5,1 cm) � nish nails as shown.
Attach one trim � ush under sof� t panel and along adjacent wall (Fig. A, B) using two 2" (5,1 cm) � nish nails as shown.
Repeat Steps 1-2 to attach trim to all four corners.
Finish attaching trim � ush to corners (Fig. B ) using six 2" (5,1 cm) � nish nails as shown.
You have attached your corner trim.
3
2
72" (182,9 cm)
72" (182,9 cm)
Flush under sof� t panel.
x43/8 x 1-3/4 x 72" (1 x 4,4 x 182,9 cm)
Seam is � ush. Caulk seam before painting trim.
Fig. A
Fig. A
69
PARTS REQUIRED:
FINISH
3
2
BEGIN
1̧ Locate and mark for two vents in side walls as shown. (1) at top and (1) at bottom
Cut out marked openings.
Caulk behind vent � anges.
Secure using 1/2" (1,3 cm) screws.
You have � nished installing your vents.
x121/2" (1,3 cm)
x2
VENTS
8 x 16" (20,3 x 35,6 cm)
6"(15,2 cm)
3 – 5"(7,6 – 12,7 cm)
14"(35,6 cm)
Caulk
Caulk
4-1/4"(10,8 cm)
4-1/4"(10,8 cm)
6"(15,2 cm)
7 – 8"(17,8 – 20,3 cm)
14"(35,6 cm)
70
• Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim.
• Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: • Bottom edge of all siding and trim • Inside of doors and all 4 edges
Note: Prime all un-primed exterior wood before painting. (Follow directions provided by manufacturer.)
Snip bottom side of drip edge andbend over to other side of roof.
(Follow directions provided by manufacturer.)
PAINT & CAULK- NOT INCLUDED -
ROOF FELT- NOT INCLUDED -
DRIP EDGE- NOT INCLUDED -
• Install felt � ush to all roof edges overlapping 3". Use minimal amount of roo� ng nails to hold in place.
OK to overlap at ridge.3" OVERLAP
Flush
Flush
Edge � ush to trim.
• Install drip edge over roof felt on gable side and under roof felt on eave side (Fig. A).• Do not use nails on side of drip edge that hangs over side of building.• Only nail top of drip edge as shown.
Roof Felt
Drip Edge
Drip Edge
Fig. A
71
• Follow directions provided by manufacturer and these instructions.
SHINGLES- NOT INCLUDED -
Install � rst starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle.Starter row must be straight and level all the way across with lower edge of roof deck.NOTE: If you have installed drip edge install shingles � ush to drip edge.
BEGIN
1
TABS UP
Shingle overlaps roof decking.
1" (2,5 cm) overhangpast roof deck.
1" (2,5 cm) overhang or � ush with drip edge.
(4) Nails
BACK OF SHEDFRONT OF SHED
NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
Familiarize yourself with a 3-Tab Shingle.
SHINGLE NAIL PATTERN
1"(2,5 cm)
NAILS
Sealing Strip 1"(2,5 cm)
1/2"(1,3 cm)
Full Rain Slot
Half A Rain Slot
NotchNotch
72
Beginning at front of shed, install � rst row of shingles with notch at 1" past roof edge or � ush with drip edge.22
FRONT OF SHED BACK OF
SHED
BACK OF SHED
Notch- or -
Drip Edge
Notch
Roof Deck
1"(2,5 cm)
Flush with starter row.
Flush with starter row.
Continue installing rows of shingles by staggering at front.
4
SHINGLEScontinued...
Install second row of shingles � ush at top of � rst row's rain slots. Ensure 1" overhang or � ush to drip edge at front, stagger each row.
3
1"(2,5 cm)
1"(2,5 cm)
FRONT OF SHED
FRONT OF SHED
Flush with rain slots. Flush with rain slots.
Notch
Notch
73
You have � nished shingling your roof. Proceed to capping the ridge.FINISH
9
Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife.
Repeat steps 1 - 5 to shingle the opposite side of your roof. Trim shingles at ridge.
Once both sides are shingled you need to trim ends. Strike a chalk line 1" from edge.
Using your shingle hooked blade carefully cut shingles along chalk line.
5
6
7
8
SHINGLEScontinued...
• If more than 5" to rain slot you must install another row of shingles.
5"(12,7 cm)or less.
5"(12,7 cm) MAX.
Top of rain slot.
Cut Off.CUT
74
SHINGLES - RIDGE CAP
• You will � nish off the top of the roof with a ridge cap made from shingles.
Note: • You will need about 30 - 32 cut pieces.
Cut shingles into THREE pieces. Hint: Use cut-off pieces � rst.
Score shingle,then snap-off angled cut.
Install � rst ridge cap � ush to shingles at front, as shown.
Install second ridge cap 5" back, as shown.
2
3
BEGIN
1
2"(5 cm)
2"(5 cm)
2"(5 cm)
2"(5 cm)
2"(5 cm)
2"(5 cm
Top of slot.Weather Seal
Flush
(1) Nail per side through weather seal.
(1) Nail per side through weather seal.
5"12,7 cm
FRONT OF SHED
FRONT OF SHED
Flush
30 to 32Pieces
75
SHINGLES - RIDGE CAPcontinued...
Continue installing ridge cap to back of roof.
Make sure there is 4" between the shingle-color and edge of shingles.
When you have 4" minimum of shingle color cut one piece to cap your roof.
Install � ush to shingles.
4
5
6
7
(2) Nails per side.
You have � nished your ridge cap.FINISH
8
Cut at top of rain slot.
Flush to shingles
Trim cap off � ush to shingles
Cap
4"(10 cm)
76
WARRANTY B a cky a rd S tor a ge S ol u tion s , LLC w a rr a nt s the following: 1. Every prod u ct i s w a rr a nted from defect s in workm a n s hip a nd m a n u f a ct u ring for one ye a r. 2. All h a rdw a re a nd met a l component s a re w a rr a nted for two ye a r s . 3 . Trim i s w a rr a nted for 15 yea r s . 4. W a fer b o a rd s iding a nd s he a thing i s w a rr a nted for two ye a r s . 5. S m a rt S ide™ s iding i s w a rr a nted for 15 yea r s on a ll M a rco s erie s bu ilding s a nd 15 ye a r s on a ll Premier S erie s bu ilding s . 6. Tim b er s erie s bu ilding s’ s iding a nd trim a re w a rr a nted for 10 ye a r s . 7. S ol a r S hed window s a re w a rr a nted for 1 ye a r. 8 . Ced a r l u m b er i s w a rr a nted for 15 ye a r s . 9. Ced a r door s a nd Ced a r G a rden Center a re w a rr a nted for 10 ye a r s . 10. Met a l roof i s w a rr a nted for 25 ye a r s .
B a cky a rd S tor a ge S ol u tion s , LLC will rep a ir, repl a ce or p a y for the a ffected p a rt. In no event s h a ll B a cky a rd S tor a ge S ol u tion s , LLC p ay the co s t of l ab or or in s t a ll a tion or a ny other co s t s rel a ted thereto. All w a rr a ntie s a re from d a te of p u rch as e. If a c as h ref u nd i s p a id on a n a ffected p a rt, it will b e pror a ted from the d a te of p u rch as e.
CONDITION S The w a rr a nty i s effective only when: 1. The u nit h as b een erected in a ccord a nce with the ass em b ly in s tr u ction s . 2. The u nit h as b een properly s hingled a nd p a inted or s t a ined a nd re as on ab ly a nd reg u l a rly m a int a ined there a fter. 3 . The f a il u re occ u r s when the u nit i s owned b y the origin a l p u rch as er. 4. B a cky a rd S tor a ge S ol u tion s , LLC h as received the w a rr a nty regi s tr a tion c a rd within thirty ( 3 0) d a y s of p u rch as e a nd notific ation
of the f a il u re in writing within the w a rr a nty period s pecified ab ove. 5. B a cky a rd S tor a ge S ol u tion s , LLC h as h a d re as on ab le opport u nity d u ring the s ixty (60) d a y s following receipt of notific ation
to in s pect a nd verify the f a il u re prior to commencement of a ny rep a ir work.
REQUIREMENT S S tora g e Buildin gs & Playhou s e s To v a lid a te yo u r w a rr a nty, it i s nece ssa ry to properly m a int a in yo u r B a cky a rd S tor a ge S ol u tion s , LLC u nit; s hingle the roof a nd p a int or s olid-colored s t a in the s iding us ing 100% a crylic l a tex exterior prod u ct with a minim u m of two (2) co a t s within thirty ( 3 0) d a y s of ass em b ly;
ab ove a ll door s a nd a ll horizont a l a nd vertic a l trim b o a rd s ; p a int a nd s e a l a ll expo s ed edge s , s ide s a nd f a ce s of S m a rt S ide™ and w a fer b o a rd s iding to incl u de a ll exterior w a ll s a nd a ll s ide s a nd a ll edge s of door s .
Gazebo s , Per g ola s & Timber Buildin gs To v a lid a te yo u r w a rr a nty, it i s nece ssa ry to properly m a int a in yo u r B a cky a rd S tor a ge S ol u tion s , LLC u nit. Thi s incl u de s tre a ting all of the expo s ed ced a r a nd pine su rf a ce s on yo u r g a ze b o or tim b er bu ilding with a n exterior gr a de wood pre s erv a tive, a n exterior oil- bas ed s emi-tr a n s p a rent s t a in, a n a crylic l a tex exterior p a int or a n a crylic l a tex s olid color exterior s t a in within 3 0 d a y s of ass em b ly a nd as needed there a fter to m a int a in yo u r w a rr a nty.
Keep veget a tion trimmed a w a y from bu ilding a nd m a ke su re s iding p a nel s a nd trim do not come in cont a ct with m asonry or cement. The minim u m gro u nd cle a r a nce for s iding m us t b e one h a lf inch (½ inch) from concrete s l ab or two a nd one h a lf inche s (2 ½ ” ) from the ground when bu ilding i s erected or con s tr u cted on a tre a ted wood floor kit. W a ter from s prinkler s m us t b e kept off u nit. In no event will B a cky a rd
events, acts or omi ss ion s b eyond o u r control incl u ding, bu t not limited to, mi sus e or improper ass em b ly, improper m a inten a nce (which le a d s to rot or dec a y) a nd a ct s of God. B a cky a rd S tor a ge S ol u tion s , LLC will not b e held re s pon s i b le for a ny l ab or co s t s inc urred
to con s tr u ct your unit. Thi s w a rr a nty give s yo u cert a in s pecific right s th a t v a ry from s t a te to s ta te.
CLAIM PROCEDURE To m a ke a cl a im u nder thi s w a rr a nty, yo u c a n either c a ll 1- 888 - 8 27-9056 or prep a re a letter. Ple as e h a ve re a dy the inform a tion b elow when you c a ll or incl u de the inform a tion when writing: 1. The model a nd s ize of the prod u ct. 2. A li s t of the p a rt( s ) for which the cl a im i s m a de. 3 . Proof of p u rch as e of the B a cky a rd S tor a ge S ol u tion s , LLC item, as s hown on the origin a l invoice. 4. R u n code, as li s ted on the yellow w a rr a nty c a rd enclo s ed in the prod u ct p a ck a ge.
M a il the ab ove inform a tion to: B a cky a rd S tor a ge S ol u tion s , LLC Attn: C us tomer S ervice 1000 Terne s Monroe, MI 4 8162
Limited Conditional Warranty *
*WARRANTY TERM S MAY VARY OUT S IDE THE U. S .A. IMPORTANT: Thi s i s your warranty certificate. Plea s e complete and mail your warranty card to properly validate your warranty.
S tor a ge S ol u tion s , LLC b e re s pon s i b le for a ny indirect, incident a l, con s e qu enti a l or s peci a l d a m a ge s nor for f a il u re( s ) th a t a re c aus ed by eventually
caulk