Transcript of Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on...
Everglades Protection Area Tributary BasinsEverglades Protection Area Tributary Basins
February 28, 2006February 28, 2006
Third Annual Public Meeting on Implementation Progress
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Introduction and Opening Remarks
Dean Powell
Long-Term Plan UpdateLong-Term Plan Update
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Welcome!Welcome!
Welcome to the third annual public meeting on the Long-Term Plan for Achieving Water Quality Goals of the Everglades (Plan)
Today we will present progress of implementing the Plan and receive comments from the public
Basins Basins AddressedAddressed
#³ #³ #³
%U
&V#³
#³
&V&V&V
%U
%U%U
$T
$T$T
#³
#³#³
$T
$T
&V
#³
&V
&V
$T$T
$T
%U
&V
#³
%U
#³
#³
%U
$T%U
%U
$T
$T
%U
&V
%U
&V &V&V
$T
#³#³
#³
#³
L-8 Basin
S-5A Basin
S-6 BasinS-7 / S-2Basin
S-8 / S-3 BasinC-139 Basin
Feeder CanalBasin
L-28 Basin
C-51W Basin
STA 2
STA 3/4
Wellington/ACMEImprovement District
Basin (Basin B)
STA 1E
L a k e O k e e c h o b e e
A t
l a
n t
i c
O
c e
a n
S-3
S-236
S-4
S-352
S-351S-2
S-190
S-5A
ACME 1DSG-94D
S-6S-10E
G-94B
G-94A
STA 1W
STA 5
STA 6 - Section 2
STA 6
S-8
G-88North SpringsImprovement DistrictBasin
S-150
S-7
S-39
NSID 1
S-140
S-339
S-340
S-151
S-38S-1
44
S-1
45
S-1
46
G-64
S-143S-142S-34
North New RiverCanal Basin
S-337S-31
S-334G-69S-333S-346S-347
G-71
S-9
S-344
S-343A S-343B
S-14
M I A M I - D A D E
M O N R O E
C O L L I E R
B R O W A R D
H E N D R Y
P A L M B E A C H
S-332S-175
S-197
S-18C
B i
s c
a y
n e
B a
y
Everglades
National
Park
WaterConservation
Area 3B
WaterConservation
Area 3A
Water ConservationArea 2B
# G-123#
S-141
$TG-94C
C-11 West Basin
WaterConservation
Area 2A
Water ConservationArea 1
West PalmBeach
FortLauderdale
SOUTH FLORIDA WATER MANAGEMENT DISTRICT
ENVIRONMENTAL RESOURCE REGULATION DEPARTMENTEverglades Stormwater Program
P.O. Box 24680 / 3301 Gun Club RoadWest Palm Beach, Florida 33416-4680
ht tp://www.sfwmd.gov
THE RECIPIENT OF THE ENCLOSED INFORMATION HEREBY ACKNOWLEDGESTHE FOLLOWING:ANY INFORMATION, INCLUDING BUT NOT LIMITED TO SOFTWARE AND DATA,RECEIVED FROM THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT (SFWMD)IN FULFILLMENT OF A PUBLIC RECORDS REQUEST IS PROVIDED "AS IS"WITHOUT WARRANTY OF ANY KIND, AND THE SFWMD EXPRESSLY DISCLAIMS ALLEXPRESS AND IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FORA PARTICULAR PURPOSE. THE SFWMD DOES NOT WARRANT, GUARANTEE, ORMAKE ANY REPRESENTATIONS REGARDING THE USE, OR THE RESULTS OF THEUSE, OF THE INFORMATION PROVIDED TO YOU BY THE SFWMD IN TERMS OFCORRECTNESS, ACCURACY, RELIABILITY, TIMELINESS OR OTHERWISE. THEENTIRE RISK AS TO THE RESULTS AND PERFORMANCE OF ANY INFORMATIONOBTAINED FROM THE SFWMD IS ENTIRELY ASSUMED BY THE RECIPIENT.
Structures that discharge INTOthe EPA
Structures that dischage WITHINthe EPA
Structures that discharge FROMthe EPA
%U
#³
$T&V Other SFWMD Structures
Everglades Protection Area (EPA) : Water ConservationAreas (WCA) 1, 2A, 2B, 3A and 3B,Loxahatchee National Wildlife Refugeand Everglades National Park
S-8 / S-3 Basin
S-7 / S-2 Basin
S-6 Basin
Urban and Tributary Basins
Stormwater Treatment Areas(STAs)
N
EW
S
5 0 5 10 Miles
S-5A Basin
C-51W Basin
C-139 Basin
ERRD/ESP REV. 04-JUN-2001 CMIES SAU x:\ever-gis\ecp\aprfi les\ECP-Basins-cm1.apr Basin Feasibili ty Studies (13 Basins)-L
Seven Everglades Construction Project (ECP) Basins
Six Everglades Stormwater Program (ESP) Basins
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
ECP BasinsECP Basins
Seven ECP Basins S-5A, S-6, S-7, S-8, C-
139 & C-139 Annex, and C-51 West
Grouped into six STA-specific areas (STA-1E, STA-1W, STA-2, STA-3/4, STA-5, STA-6)
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
ESP BasinsESP Basins
Six ESP Basins Acme Improvement
District, Basin B North Springs
Improvement District North New River
Canal C-11 West L-28 Feeder Canal
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Revisions to the Long-Term Plan
February 28, 2006
Long-Term Plan Annual Update
Tracey Piccone, P.E.
Long-Term Plan Update Long-Term Plan Update
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
First minor revision to the Plan was approved on April 15, 2004 Integration with CERP by providing unused funds to
assist with Bolles & Cross Canal project surveying workMajor revisions to Part 2 of the October 27, 2003
version of the Plan were submitted to FDEP in November 2004 Modification of STA Enhancements Addition of STAs on Compartments B and C (Acceler8) Addition of the Regional Feasibility Study (Acceler8) Addition of recreational facilities at all STAs FDEP approved revisions in December 2004
Approved Revisions to Approved Revisions to PlanPlan
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Additional major revisions to Part 2 were submitted to FDEP in November 2005Revisions to STA Enhancements
• STA-1W Cell 1 enhancements schedule revised (1-yr extension from FY06 to FY07)
• G-304 automation schedule revised (1-yr extension from FY05 to FY06)
• STA-3/4 Cell 1B SAV conversion method revised
FDEP approved revisions in December 2005
Approved Revisions to Approved Revisions to PlanPlan
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Proposed Revisions to PlanProposed Revisions to Plan
Current proposal to add Acme Basin B Project to LTP Originally a CERP project with undetermined plan for
addressing runoff Discharges now planned to be treated in STA-1E Project goals consistent with the LTP goals Adding to LTP will allow project completion by
12/2006 (original schedule) and will provide dedicated funding source
Project includes canal improvements, pump stations and a detention area
Capital cost estimate: $27 million (approx.)
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Proposed Revisions to PlanProposed Revisions to Plan
Current proposal to revise following LTP components: Process Development and Engineering (PDE)
components • ECP Operations Monitoring• Analysis and Interpretation• PSTA Investigations• PSTA Demonstration Project STA-3/4• Hydrologic and Hydraulic Assessment• Internal Measurements• Comparative Analysis• Lake Okeechobee Long-Term Trends• Determine Water Quality Relationships in EPA• Adaptive Implementation
ECP Compliance Monitoring
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Proposed Revisions to PlanProposed Revisions to Plan
Proposed revision to ECP Operations Monitoring
Additional interior monitoring associated with the expanded treatment areas for STA-2 and STA-5
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Proposed Revisions to PlanProposed Revisions to Plan
Proposed revisions to Analysis and Interpretation Change to annual reporting of monthly mass-in
mass-out Add baseline sediment cores for expanded treatment
areas Sediment cores for all STAs every 3 years Use either annual vegetation maps or aerial maps Eliminate routine annual vegetation sampling
• Perform on as-needed basis Use Adaptive Implementation for STA optimization Add five years to this project to evaluate expanded
treatment areas
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Proposed Revisions to PlanProposed Revisions to Plan
Proposed revision to PSTA Investigations PSTA field scale project ended FY04 – reduced
funding needed in FY05 and FY06 Add two years and $100,000 per year for tracking
of related PSTA projects to incorporate results from USACE PSTA project in STA-1E
Proposed revision to PSTA Demonstration Project STA-3/4 Add one year to operation and monitoring phase
• Slow start due to delay in telemetry installation
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Proposed Revisions to PlanProposed Revisions to Plan
Proposed revision to Hydrologic and Hydraulic Assessment, Internal Measurements, and Comparative Analysis Date of second tracer dependent upon
completion of STA-2 Cell 3 internal levee Approximate completion date: 2009
earliest to 2011 latest Extend completion dates out accordingly
for these three projects
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Proposed Revisions to PlanProposed Revisions to Plan
Proposed revision to Lake Okeechobee Long-Term Trends Plan recommended activity in FY04 and
FY09 Proposed revision is to conduct ongoing
coordination with Lake Okeechobee staff in FY06 through FY09
Incorporate results into STA performance projections and analyses
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Proposed Revisions to PlanProposed Revisions to Plan
Proposed revision to Determine Water Quality Relationships in EPA Extend completion date by 2 years (from
FY05 to FY07) District to work with FDEP, DOI
consultants, and others to determine relationships
District to provide funding for soil reflux study to provide information for updating & calibrating model(s)
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Proposed Revisions to PlanProposed Revisions to Plan
Proposed revision to Adaptive Implementation Add Real Time Monitoring of Phosphorus at
STA Structures ($150k over 6 years) Add Strategies for Vegetation Management
in STAs ($1.2 million over 5 years) Miscellaneous activities in FY06
• STA-1W Cell 5 drawdown and enhancements
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Everglades Protection Area Tributary BasinsLong-Term Plan for Achieving Water Quality Goals
Proposed revision to ECP Compliance Monitoring Additional compliance monitoring
associated with the expanded treatment area for STA-5
Proposed Revisions to PlanProposed Revisions to Plan