EVENT REQUIREMENTS
SUMMARY
October 2012
GXG Event Requirements_RFP_d5_2012_10_03
X GAMES
X GAMES EVENT REQUIREMENTS
INTRODUCTION
Event requirements are based on hosting an entire X Games event. ESPN will contact all interested cities to discuss city/entity proposals and hosting options.
CONTENTS
• Managemento Local Organizing Committee & Staffing
• Facilitieso Sport Course Space Requirements & Other Facilities
• Services & Equipment
2GXG Event Requirements_RFP_d5_2012_10_03
3
MANAGEMENTLOCAL ORGANIZING COMMITTEE & STAFFING
GXG Event Requirements_RFP_d5_2012_10_03
MANAGEMENT
Local Organizing Committee:
•Executive Management - Key executives responsible for Event Management, Commercial Operations, Business Operations, Facility Management. Interface with ESPN Event Teams.
•Functional Areas - Sports & Competition*, Medical, Logistics, Event Production, Event Operations, Safety, Security, Sustainability, Information Technology, Sponsorship Management, Event Marketing, Event Merchandise Sales, Content Strategy*, TV Production & Operations*, Media Relations, Finance & Administration, Transportation, Accommodations, Food & Beverage.
* ESPN responsibility
Staffing:
•Event Staffing: Provide sufficient number of permanent, temporary, and volunteer staff to plan, organize, and manage the event.
4GXG Event Requirements_RFP_d5_2012_10_03
5
FACILITIES
SPORT COURSE SPACE REQUIREMENTS & OTHER FACILITIES
GXG Event Requirements_RFP_d5_2012_10_03
FACILITIESSport Course Space Requirements: Traditional summer sports - Skateboard, BMX Freestyle, Moto X, Rally Car
See Sample Maps page 12 & 13
6
Skateboard/BMX Vert Street Park Big AirKey Dimensions
100’ x 100’ (30m x 30m) footprint
150’ x 180’ (46m x 55m) smooth, flat concrete surface
100’ x 150’ (30m x 45m) footprint
60’ x 370’ (85’h clearance), 18.3m x 113m (26m h
clearance)
Key Features
Prefabricated Ramp with 11.5’ (3.5m) transitions and 2’ (.6m) vert, riders
flow wall to wall combining lip tricks and
big air
Custom built concrete plaza that includes a combination of
stair sets, banks, and ledges
Custom built concrete park that includes smooth bowls
with hips, gaps, flats and ledges to provide a smooth
transition based course
60’-80’ (18.3m-24.5m) high roll-in, choosing to launch over
a gap 50 or 70 feet long (15.25m - 21.5m) and
continuing into a 27 foot (8.25m) quarter-pipe
Moto X
Step Up Best Trick/Best Whip Freestyle/Speed & Style/ Racing/Enduro
Key Dimensions
50’ x 200’ (15.25m x 61m) indoor arena
50’ x 300’ (15.25m x 91.5m) indoor arena
300’ x 400’ (91.5m x 122m) outdoor stadium
Key Features Course consists of a short run in, vertical dirt ramp and
an adjustable high bar
Course consists of a dirt landing with metal take off ramps. Riders hit a
single ramp and perform maneuvers such as body variables, back flips and
combo tricks
Course consists of multiple dirt jumps & metal ramps of varying lengths and angles
Rally Car
Racing/RallyCross
Key Dimensions
1,000’ (305m) dirt track, 3,000’ (915m) asphalt track
Key Features Course on asphalt and dirt roads featuring high speed straight-a-ways, technical turns and large dirt gap jump
Sports are not limited to the above.
GXG Event Requirements_RFP_d5_2012_10_03
7
Snowboard/Ski*
Snowmobile*
Snocross/Freestyle
Key Dimensions Total area of 13,680 sq meters
Key Features Flat to moderate (beginning skier) terrain with jumps, rollers, gaps
Big Air X Course Slopestyle SuperPipeKey Dimensions
Length: 245 metersVertical Drop: 75 meters
Length: 1,335 metersElevation: 2,651 metersVertical Drop: 210 meters
Length: 670 metersVerical Drop: 105 meters
Length: 172 metersWidth: 20 metersHeight: 18-degree pitch
Key Features Jump/KickerLarge Landing
JumpsBanked TurnsRollersGaps
RailsKickersJumpsGaps
Competition Quality Lighting
Sports are not limited to the above.
*Snow-covered alpine ski trails in close proximity to each other and the base area
FACILITIES - continued
GXG Event Requirements_RFP_d5_2012_10_03
Sport Course Space Requirements: Traditional winter sports - Snowboard, Skiing, Snowmobile. Rally Car to be included at future winter events.
Rally Car
Racing/RallyCross
Key Dimensions
4,000’ (1,220m) snow/ice track
Key Features Course on snow, ice, track featuring high speed straight-a-ways, technical turns and large dirt gap jump
Other Facilities:
•Venues: Multiple venues to accommodate 5,000 to 20,000 spectators. Amenities to include restrooms, concessions, parking, security, etc. (Access to venues is needed for four to six weeks in total, from course load-in to load-out).
Competition: Venues to accommodate Course Space Requirements (see slide 6, 7). Cultural Elements: Venues to conduct cultural elements in music, style, and film.
•Compounds: TV (250m x 130m), Logistics, Vendor, Rally, and Moto equipment & storage locations (50m x 50m each). One (1) area (25m x 25m) for Sponsor equipment and storage
•Offices & Meeting Rooms: Sufficient climate-controlled work space and office equipment for 300 event & TV staff, 30 vendors.
•Media Center: Location for Press Conferences and sufficient office equipment, work space, and hospitality for 200 accredited media.
•Hospitality Space: Sufficient, climate-controlled lounge and catering facilities for Sponsors/VIPs (200), Athletes/Team Managers (560), Podium Club (200), Suite Guests (varies).
•Staff Catering: Climate-controlled dining and kitchen facilities to serve 1,000 meals/day.
•X Fest: 60m x 60m interactive sponsor village.
•Parking: 420 total reserved parking spaces – 400 vehicle spaces and 20 truck spaces. 4,000 parking spaces for spectators.
•Vehicle and Equipment Access: Required from the back of house staging areas to the competition courses at each venue.
•Accommodation: Staff: 275 single occupancy hotel rooms at peak (minimum 3 star). Average 7 nights totaling
4,000+ room nights, over a 6 week period. VIP: 100 single occupancy hotel rooms at peak (minimum 4 star). Average of 4 nights totaling 420 room nights, over a 7 day period.
FACILITIES - continued
GXG Event Requirements_RFP_d5_2012_10_03
9
SERVICES & EQUIPMENT
GXG Event Requirements_RFP_d5_2012_10_03
SERVICES & EQUIPMENT Services:
•Transportation: Shuttle service for athletes, VIPs, staff and media to/from accommodation. Shuttle service for spectators to and from parking location. Airport Transfers for all athletes, VIPs, and staff.
•Utilities and Municipal Services: Utilities: power, water, phone, internet, etc. required at specified venue locations. Services: transit system, emergency services, police, fire, sanitation.
•Guest Services: Event Staff to assist guests with event information, attractions, services, schedules, etc.
10
Equipment:
•Equipment: Variety of handling equipment including: straight mast and reach forklifts, loaders, skid steers, water truck, street cleaner (Access to equipment is needed for four to six weeks in total, from course load-in to load-out).
Specialty Equipment: Dependent on sport: concrete pump, crane, snow cats, winch cats, zaugg cutter, and excavator. On Venue Uphill Transportation: Adequate numbers of all terrain vehicles/snowmobiles for staff & athletes requiring on-course transport.
GXG Event Requirements_RFP_d5_2012_10_03
VENUE MAPS - SAMPLES
11GXG Event Requirements_RFP_d5_2012_10_03
X GAMES ASPEN - SAMPLE VENUE MAP
12GXG Event Requirements_RFP_d5_2012_10_03
X GAMES LA - SAMPLE VENUE MAP
13GXG Event Requirements_RFP_d5_2012_10_03