Technology Plan Trimble County Public Schools Bedford, Kentucky http://www.education.ky.gov Creation Date:12/21/2012 District Tech Committee Approval: 3/26/2013 Trimble Co. Board of Education Approval: 4/17/2013 KY Dept. of Education Approval: Plan Start Date: July 1, 2013 Plan Expiration Date: September 30, 2014

Transcript of Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access...

Page 1: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Technology Plan Trimble County Public Schools

Bedford, Kentucky

http://www.education.ky.gov

Creation Date:12/21/2012District Tech Committee Approval: 3/26/2013

Trimble Co. Board of Education Approval: 4/17/2013KY Dept. of Education Approval:

Plan Start Date: July 1, 2013Plan Expiration Date: September 30, 2014

Page 2: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Acknowledgments

District Technology Staff Rod Smothers – CIOFrank McCane – Network Admin.

School Technology Coordinators Bonesta Cifranik – BESLisa Fryman – MESLinda Liter/Tanya Black – TCMSDawn Haney- TCHS

School Library Media Specialists Laurie Jennings –BESVacant – MESLinda Liter – TCMSDawn Haney - TCHS

TeachersKim Williams - BESNatalie Green - TCHSSteve Gamble - TCMSBecky Phillips - MES

Additional District Contributors Rebecca Moore, Instr. SupervisorRachael Adams, TCHS Prin.Mike Genton, TCMS Prin.Debbie Beeles, BES Prin.Sharon James, MES Prin.

ParentsMelissa Burkhardt -BESCarla Kidwell - TCHSMike Staley -TCMSJodie Ginn - MES

i

Page 3: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Table of Contents

EXECUTIVE SUMMARY.................................................................................................2

PLANNING PROCESS AND METHODOLOGY..............................................................2

CURRENT TECHNOLOGY AND RESOURCES.............................................................3

CURRICULUM AND INSTRUCTIONAL INTEGRATION GOALS..................................7

CURRICULUM AND INSTRUCTIONAL INTEGRATION GOALS – EVALUATION.....17

STUDENT TECHNOLOGY LITERACY GOALS...........................................................19

STUDENT TECHNOLOGY LITERACY GOALS – EVALUATION................................23

STAFF TRAINING/PROFESSIONAL DEVELOPMENT GOALS..................................24

STAFF TRAINING/PROFESSIONAL DEVELOPMENT GOALS – EVALUATION.......28

TECHNOLOGY GOALS................................................................................................29

TECHNOLOGY GOALS – EVALUATION.....................................................................37

BUDGET SUMMARY....................................................................................................38

ATTACHMENTS/APPENDICES (OPTIONAL)..............................................................45

i

Page 4: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Executive Summary

As our schools shift to internet based applications, we realize that our network will bear the burden of delivering this instruction. Currently, 3 of 4 schools are connected to the network hub via Gigabit and the 4th is on 20MB fiber. However, the connection we have to the state (internet) is only 10MB which is a limiting factor with regard to internet-based instruction. In summer 2012, we received erate discounts and local commitments that allowed us to replace all of our old switches and install district-wide wireless service with transparent proxy. Our greatest needs now (from an infrastructure standpoint) are VOIP and video distribution.Parents receive newsletters designed to keep them abreast of school developments and they have access to our district and school websites where they can find more information. Our web host is now providing blogging capability and we’re encouraging faculty to begin using that feature..Our student information system (which is internet based) provides a parent portal. This is popular with parents because of the ability to check grades. We’ll continue to encourage parents to use this resource as a way to increase parental involvement. We are using the SIS to register students for classes.We continue to emphasize instructional needs as the driving force behind technology planning. Our formative assessments through Discovery Education Assessment are revealing areas that we can strengthen with new software applications and innovative teaching strategies. Professional development will assist in efficient use of these new tools as we improve our instructional relationship with our students.

Planning Process and Methodology

The District Tech Committee is made up of members of the School Tech Committees. School Tech Committees are advised to determine instructional weaknesses by

2

Page 5: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

reviewing assessment results. The School Tech plans should address those areas of need. The School Tech Committees create their own school plans which are approved by the Site Based Committees. Then the District Plan is written from the combined school plans with additional plans based on District Wide infrastructure and instructional needs. The District Committee approves the plan for presentation to the Board of Education. The Board reviews the plan and has final approval. The plan is evaluated informally on a constant basis and formally once a year. The District Tech Committee is responsible for reviewing and revising the plan.The District Plan is then reviewed by the Office Of Education Technology to insure compliance with the requirements of the USF program which provides discounts for telecommunications services and certain eligible “internal connections” (hardware).

TECH VISION AND GOALS – RESULTS of 2012/2013

Goal Strategy Progress

1 Replace switches 100% - Completed

2 1:1 Computing 40% - We have wireless throughout the district but we rely on personal devices for access.

3 Video Distribution None

4 VOIP None

5 Cabling 100% for wireless

Video Distribution and VOIP remain goals for 2013/2014.

Current Technology and ResourcesMESMilton Elementary has a network in place, phones, security system, hardware and software that are needed for daily instruction. All switches are new as of summer 2012 but we need greater bandwidth for our web-based applications. There is an indication that the state may provide additional bandwidth into the district summer of 2013 but until

3

Page 6: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

that happens, the 10MB bottleneck into the district renders superfluous any additional bandwidth between the network hub and MES. This Time-Warner provided fiber is currently at 20MB for a school of 20 teachers and 280 students. We have 29 computers in the computer lab, each classroom has a teacher machine and at least 2 student machines and we have a wireless cart with 13 laptops. Training for the technical staff is provided by our network administrator.

During the 2013-2014 school year, Milton Elementary School will be implementing/utilizing P.A.S., Smartboard, Study Island, Math Magician, aaamath.com, Success Net and RTI to increase student achievement across all grade levels in all subject areas. Teachers will continue to use Smartboards, document cameras, and Discovery Education to develop more effective teaching strategies. All teachers will use School Pointe to keep an updated class webpage. Parents can also access Trimble County web page and Infinite Campus. Parents will also receive individual P.A.S. scores throughout the school year. At different times throughout the school year, the community will be invited to visit the webpage via the school digital sign.

BESCurrent technology at Bedford Elementary includes Smart Board technologies, two stationary computer laboratories 55 student computers, 15 laptops, 29 projectors, 25 Smart Boards, 18 document cameras, 13 student response systems, 9 student computers in Library, and each class room has a teacher computer and 2 student computers in grades kindergarten to third grade. Available software as well as web base programs includes Study Island, Education City, Fast Math, Accelerated Math, Math Magician, Study Dog, Discover Education, and Pearson Reading Street Series. Each class has 40 minutes of computer lab twice weekly. The students use Discovery Education PAS testing in reading, math, science, and social studies three times a year.

TCMSTCMS has one computer lab that provides approximately 46 computers for student use. The library has 30 student computers. All classrooms have at least on teacher computer while some have from one to eight student computers. All classrooms have smart boards and mounted projectors. ( Excluding the art room). They use a projector off a cart. We have two sets of classroom I-pods. Every teacher has an I-pad, and the hardware required to project the I-pad image on the Smartboard screen. There are two scanners, digital cameras, one digital magnifier, and four document cameras.

There are five AP units. The three math teachers have writing pads. We have three airliners. We also have the Turning point student response system for each classroom.

All switches in the building are new. New computers/monitors will be added each year so that there is rotation of up to date computers. We will continue to pay for software license on all programs that we use.

TCHS

4

Page 7: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Trimble County High school currently has 3 computer labs available to all students. Lab 206 has 27 new computers. The 33 computers in lab 219 are no longer used as a language lab, but are open for classes to use for multimedia purposes throughout the day. Lab102 has 30 computers which can be used 1st, 4th, 6th and 7th periods due to the Spanish classroom also being located in the lab. There is a Business lab and Technology lab for students in those respective courses. Credit Recovery has 18 computers for students to work on online courses through JCPS. There are also 18 computers for student use in the library. There is a mobile wireless laptop lab of 32 student computers which can be checked out by faculty. TCHS has 11 I Pads for use by Independent Chemistry students. Each classroom has a projector or smart TV that can be connected to a computer. There is also a projector system in the cafeteria and library. There are two terminal services computers in ACEP and five terminal services workstations in the chemistry lab. All Special Education teachers and the principals, counselor and one teacher have laptops. All other teachers have a desktop computer. There is a laptop for the publication of the Trimble Educator and a MAC desktop for video production in the media class.Currently, the Business lab is in need of upgraded computers. We added RAM in order to allow those computers to run Office 2010; however they need faster processors and larger hard drives to continue to be able to run newer software. The Technology Education lab recently upgraded most of the computers. However, all computers could not be upgraded because the old software is not compatible with the new computers. The old software is no longer supported and needs to be upgraded. At that time, the computers that will run it will need to be upgraded as well. The monitors in Lab 102 are blurry and hard to read and need to be replaced.We are providing students and faculty with more smart classrooms. We currently have smartboards in fifteen classrooms. More teachers need to be trained on how to best implement interactive activities into instruction so that the smartboards can be used to their full potential. We also need to obtain other interactive equipment such as student response systems and document cameras. As we begin thinking about providing a one to one ratio for students, we need to investigate schools who are successfully improving student performance and the practices they use to effectively use laptops with students.Cable TV is no longer available in our building due to weak signal strength. New cabling is needed throughout the building if we are going to use Cable in the Classroom and KET for instructional purposes or in order to have any in house feed.

DistrictWe have about 760 computers and I-pads. This includes 108 computers purchased summer of 2012. Based on our typical replacement cycles, we still need to be able to replace 100-200 of these devices in any one year. We need to make plans for securing the funding to handle this large turnover of computers.All of our switches were replaced summer of 2012 through e-rate funding and local money. These switches are capable of carrying the voice and video that we eventually hope to move to the data network. The 10MB connection to the internet provided by the state continues to be a concern. We have more and more web-based instructional applications and more of our

5

Page 8: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

administrative apps are moving in that direction as well. We are using MUNIS in the cloud now and that puts more stress on instructional use of our 10MB connection.Our telephone system is about 15 years old and we’re going to be investigating a number of options but VOIP is at the top of that list right now.Our television signals at two schools are very limited due to infrastructure/equipment problems. At another school about 50% of the classrooms have a viable video connection. One school is able to get four channels to every room and they are pushed through the ceiling mounted projectors.We have adequate wireless access after a district-wide installation of access points in the summer of 2012. We generally are able to get on the wireless network anywhere in the schools but we may need more AP’s if we ever try to get whole classrooms connected simultaneously.

6

Page 9: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Curriculum and Instructional Integration GoalsGoal 1Increase student ACT scores

Action Plan: Projects/ActivitiesProject/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

E PREP Student ACT scores increase

ACT scores 2014 Rachael Adams KERA Instruction

ACT Online Prep Student ACT scores increase

ACT SCORES 2014 Rachael Adams KERA Instructional

Goal 2Increase student skills in geometry.

Action Plan: Strategies/ActivitiesStrategy/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

Geometer’s Sketchpad

Improve geometry skills through reinforcement and/or enrichment

Geometry gradesGeometry questions on standardized tests

2013 Rachael AdamsDavid St. Louis

KETS

Goal 3Provide accelerated classes to students

7

Page 10: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Action Plan: Strategies/ActivitiesStrategy/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

KET Students have access to upper level and AP classes not currently offered at Trimble County High School

Students enrolled in classes

ongoing Kerri Stewart KERA Instructional

BAVEL Students have access to upper level and AP classes not currently offered at Trimble County High School

Students enrolled in classes

ongoing Kerri Stewart ???

Goal 4Provide remedial classes to students

Action Plan: Strategies/ActivitiesStrategy/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

JCPS E School Students receive credits they have previously failed

Increased graduation rate/ decreased retention rate

ongoing Rachael AdamsKerri Stewart

TCBOE

Goal 5Curriculum

8

Page 11: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Action Plan: Projects/ActivitiesProject/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

Math Carnegie Math book projected

Learning targets School year Math Teacher KERA

Literature Document Camera to project literature

Learning target School year Literature Teacher

Turning Point Total class participation in classroom curriculum

Turning point system

School year Teachers

Goal 6Instruction

Action Plan: Strategies/ActivitiesStrategy/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

Document Cameras

Use student work examples

Class participation,grade

School year Teachers

I pads Using Apps, with core content

Learning targets School year Teachers KETS, KERA

I pods Reading and apps that correlate to core content

Learning target School year Teachers

Goal 7

9

Page 12: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Students will be assessed on the new common core standards through technology.

Action Plan: Projects/ActivitiesProject/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

Study Island will be used to differentiate students on various levels where they can go at their own pace.

To increase all students in Math and Reading at their own pace.

Student achievement will be increased on yearly state wide test.

On-going All teachers $3000.00$1000.00 (KETS)$2000.00 (MarketDay Fund Raiser)

Goal 8Teachers will use the Smart board/document cameras to support and enhance instruction in order to increase student achievement.

Action Plan: Strategies/ActivitiesStrategy/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

Using the SMART board, teachers will exemplify and illustrate new text, skills and concepts.

Students interact with the SMART board/document cameras and become more engaged in their learning.

Greater student participation in class and greater student achievement.

On-going Teachers N/A

Goal 9School Pointe – Teachers will use School Pointe to create a webpage that will keep parents informed of important information.

10

Page 13: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Action Plan: Strategies/ActivitiesStrategy/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

Teacher web pages will be updated weekly.

Parents will be informed of student homework, schedule, class newsletters and tests.

Parent feedback On-going Teachers $720.00 (KETS)

Goal 10P.A.S. (Discovery Education) – Teachers will use P.A.S. results to drive instruction. Action Plan: Strategies/Activities

Strategy/Activity Instructional Outcome

Indicator Timeline Person(s) Responsible

Funding Source

PAS benchmark assessment test will be given to K-5 students 3 times a year. The test results will be utilized to determine areas of intervention.

Students will improve on PAS assessment ultimately improving student performance. Students will be given additional instruction in novice and apprentice areas through RTI groups.

Student achievement will be increased as measured by PAS assessment and RTI probes.

On-going TeachersLisa Fryman

District money

Goal 11Upgrade and maintain technology assessment programs to improve and strengthen student learning through multiple intelligence strategies, differentiated instruction, and computer aided skills practice; as well as provide accelerated feedback assessments.

11

Page 14: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Action Plan: Projects/ActivitiesProject/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

Research and prepare to secure a Video Distribution System

Allows media access into classrooms

Teacher/Student knowledge of multi-media resources

July 1, 2013-June 30, 2014

Staff E-rate and local funds

Continued access of and increased communication through Study Island and Education City

Students will exercise independent practice and be assessed on Kentucky Common Core State Standards; as well as, use Study Island and Education City communication capabilities to reflect and respond to each other and to their teachers.

Weekly reports are e-mailed to the teacher, which include: student progress, student mastery, and analysis describing critical areas.

July 1, 2013-June 30, 2014

Staff Title 1

Continued assessment using Accelerated Math to supplement math instruction

Students assessed using multiple strategies which will strengthen learning of multiple intelligences and allow student guided progress.

Student Progress Reports

July 1, 2013-June 30, 2014

Staff KETS

Continued assessment using Study Dog and clicker systems

Student comprehension will increase through consistent computer based curriculum and

Immediate feedback on student common core knowledge and drives instruction to form

July 1, 2013-June 30, 2014

Staff KETS

12

Page 15: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

assessment. RTI groups.Continued access of Pearson Reading Streets

Student comprehension will increase through consistent computer based curriculum and assessment.

Drive instruction to form RTI groups and increase student common core knowledge.

July 1, 2013-June 30, 2014

Staff District Funds

Continued use of AM Support

Staff support to ensure proper use of available software, data collection, and generated report

Increased use and analysis of student data collection and reports generated through the available software

July 1, 2013-June 30, 2014

Staff KETS

Continued and increased use of Fast Math Technical Support and Tools

Student progress will be monitored and assessed to determine effective strategies for increased learning. Differentiation will be incorporated for individual learning.

Students are continually assessed on their math facts based on speed and accuracy.

July 1, 2013-June 30, 2014

Staff KETS

Acquire additional Smart boards (3)

Use of smart board technology to improve academic performance and promote student interaction in every learning environment available at BES.

Teachers provide assessments through internet access to give results of learning outcomes.

July 1, 2013-June 30, 2014

Staff KETS

Acquire classroom printers

Teacher access to immediate computer generated resources to

Teacher utilization of printed resources to improve student

July 1, 2013-June 30, 2014

Staff KETS/Technology

13

Page 16: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

enhance student learning and performance

learning.

Update and maintain accessibility to United Streaming

Students will excel from the virtual experiences available from United Streaming and benefit from the use of multiple intelligence strategies that are available through this resource

Formative assessments and exit slips will determine the learning outcomes of a selected resource.

July 1, 2013-June 30, 2014

Staff KETS

Implement virtual field trips

Students will use technology to connect with learning opportunities available outside of the classroom, city, county, state, and possibly the country.

Teachers assess the students based on the objectives of the field trip whether it be a field trip for a specified subject or across the curriculum. Assessments include formative and summative.

July 1, 2013-June 30, 2014

Staff KETS

Investigate virtual classrooms

Students will use technology to connect with others beyond BES and gain perspectives from their peers around the country.

Students make real world connections through comparison and journaling.

July 1, 2013-June 30, 2014

Staff KETS

Integrate student email

Students will utilize e-mail to communicate with others from a learning

Through utilization teachers assess students by emailing results of assessments or

July 1, 2013-June 30, 2014

Staff KETS

14

Page 17: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

perspective and increase awareness of the importance reflection and sharing with written words rather than face to face conversation.

emailing lessons to the students. Students e-mail teachers for questions on specified projects.

Utilize current programs to enhance student knowledge of technology software

Students will create publications using current technology and become proficient with the tools available through that software.

Varied products completed by students through the use of PPT, Excel, Publisher, Word, and Smart Notebook

July 1, 2013-June 30, 2014

Staff KETS

Implement keyboarding skills using free web base program

Students will show improved performance of keyboarding skills that will allow them to communicate through technology without physical restraint.

Teachers assess the students weekly on hand placement, speed, and fluency of the student’s keyboarding skills.

July 1, 2013-June 30, 2014

Staff KETS

Increase virtual hardware and software: Ipods, Skype, Webcams, videoconferencing

Students will use technology to connect with the world outside of BES and become familiar with real-life technology skills needed to be successful in today’s business environment.

Virtual testing of curriculum. Whether it be an reading comprehension exam on the i-pod, an oral exam across Skype, or formative assessment on a webinar.

July 1, 2013-June 30, 2014

Staff KETS

Utilize YouTube Students will Integration of July 1, 2013-June Staff KETS

15

Page 18: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

technology across curricula to heighten student awareness of multimedia resources

experience different types of media offered through YouTube that will provide learning to support multiple intelligences; as well as, an outlet for student evaluation of media with a plethora of resources.

technology for multiple intelligences and differentiation into the curricula; Evaluation of multiple types of media

30, 2014

Continued and advanced use SchoolPointe (Web Page) to its maximum capabilities

Support instruction, communication with parents, and provide an outlet for reflection and response from parents, teachers, and students.

Through parent, student, staff, and stakeholder surveys.

July 1, 2013-June 30, 2014

Staff KETS

Discovery Education PAS testing will be given to K-5 students three times a year. The test results will be utilized to determine area of intervention.

Students will improve on Discovery Education PAS testing to improve student performance. Students will be given additional instruction in novice and apprentice areas through RTI groups.

Student improving will be increase as measured by Discovery Education PAS testing and RTI probes.

July 1, 2013-June 30, 2014

Staff, Barbara Schaum, & Bonesta Cifranik

District Money

Curriculum and Instructional Integration Goals – EvaluationBES

16

Page 19: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

The Technology team, technology coordinator, and the principal will use documentation when monitoring instructional activities utilizing technology usage. The technology team will analyze the data and discuss new and creative means being implemented in the classroom. Any adjustments needed to assist a struggling technology user will be discussed and a solution will be derived. A summative outcome will be deliberated at the staff meeting. Through indicators teachers will have continuous access to student progress, technology usage, multi media resources, and a beautiful array of evaluation tools to ensure the success of students learning targets. The Technology team will present, model, and assist with implementation to staff members as well as stakeholders.Surveys will be utilized to assess the infrastructure. Surveys will also be implemented after technology professional development to ensure the success of any learning outcomes. All evaluation data will be presented to staff members, board members, and district wide technology administrators.

TCMSNew programs and old will continue to be evaluated for effectiveness and continued or discontinued. Teachers will know what works for them and their students. District wide policies will be followed and added to in order to improve student achievement.

MESStudy Island, RTI probes and Discovery Education are programs used for development and utilization of innovative strategies. Study Island is aligned with the common core standards. The principal will complete an I/I check once every 9 weeks to monitor progress toward these goals. The principal will have a conference with any teacher who is not meeting these expectations.

TCHSWith the state no longer providing KVHS we were unable to enroll students in any online AP or dual credit courses.. This allows students the opportunity to take rigorous courses that are not offered at Trimble County High School. We are currently exploring the possibility of offering dual credit courses online. Students who meet the criteria for alternative school are enrolled in JCPS E school for completion of Kentucky Core Academic Standards courses needed for graduation. There are currently 15 students enrolled in E School. They have completed a significant number of credit hours and two students have met all requirements for graduation.We are re-subscribing to E PREP which will be used weekly by all Juniors and will be available to all students on their own time.

17

Page 20: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Student Technology Literacy Goals

Goal 1Computer SkillsAction Plan: Strategies/Activities

Strategy/Activity Instructional Outcome

Indicator Timeline Person(s) Responsible

Funding Source

Lab Keyboarding skills Grades School year Tonya Black

Math labs Higher scores on NCLB scores

Print out School year Math Teachers KERA

Class presentations

Proficient use of technology and information

Grades, Rubic School year Teachers

Goal 2ClassroomAction Plan: Strategies/Activities

Strategy/Activity Instructional Outcome

Indicator Timeline Person(s) Responsible

Funding Source

Smart Board Student/teacher Learning targets School year Teacher

Document Cameras

Classroom involvement in student work

Learning targets School year Teachers KERA/Library

Turning Point Monitoring student knowledge.

Standard base unit print out

School year Teacher

18

Page 21: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

I Pads Collaboration with smart board, Using apps with core content

Learning targets School year Teacher

Goal 3Keyboarding – Intermediate students will be taught keyboarding skills during computer lab. Action Plan: Strategies/Activities

Strategy/Activity Instructional Outcome

Indicator Timeline Person(s) Responsible

Funding Source

Students in grades 3-5 will improve typing skills through successful keyboarding and word documents.

Students will become proficient typists by knowing correct keys.

Students will be assessed on letter/keyboard identification.

On-going Lisa Fryman N/A

Goal 4Microsoft Applications – Students will be introduced to different Microsoft applications during computer lab. Action Plan: Strategies/Activities

Strategy/Activity Instructional Outcome

Indicator Timeline Person(s) Responsible

Funding Source

Students will be introduced to Microsoft Applications such as Word documents, Powerpoint, and Excel spreadsheets.

Students will be able to incorporate Microsoft applications into their projects.

Students skill level will be increased in technology.

On-going TeachersLisa Fryman

$1404.50

19

Page 22: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Goal 5Our goal is to foster student engagement using updated wireless technology in a literary atmosphere including resources both within and outside of the classroom:

Strategy/Activity Instructional Outcome

Indicator Timeline Person(s) Responsible

Funding Source

Work with students to create entries on teacher webpage blogs and other technological outlets

Student awareness will increased as to available technology uses for communication

Blog entries created by students as well as other technological outlets

July 1, 2013 – June 30, 2014

Technology Committee

KETS/Technology

Students to utilize multimedia resources that are available in order to develop strategies to interpret information presented visually, orally, or quantitatively.

Student will be able to interpret information presented visually, orally, or quantitatively

Increased viewing of available technology as indicated by a computer monitoring system; through the production of multimedia demonstrations

July 1, 2013- June 30, 2014

Staff KETS/Technology

Obtain 16 additional laptops

Allow students the freedom to participate in group or independent learning activities using technology communications

Increase availability of portable technology without limiting time constraints

July 1, 2013 – June 31, 2014

Staff KETS/Technology

Obtain 3 class sets of 30 IPads on portable carts

Create engaging audio recordings of stories that demonstrate fluent reading at an understanding pace by making real world connections

Increased fluency rate

July 1, 2013 – June 31, 2014

Staff KETS/Technology

20

Page 23: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Replace outdated projectors

Provide unlimited access to technology in the classroom to improve academic performance

Unrestricted accessibility

July 1, 2013 – June 31, 2014

Technology Administration Team

KETS/Technology

Use Study Dog and Pearson Reading Streets as an RTI Tier 2 Intervention

Students will use targeted computer software to improve fluency phonemic awareness through RTI technology based strategies

Student Progress Reports; improved phonemic awareness as noted in ongoing RTI assessment; increased rate of fluency through weekly probes

July 1, 2013-June 30, 2014

Staff KETS

Library System Support

Student use of technology to identify and retrieve information

To continually track the placement of specified literature, not currently checked out or currently checked out.

July 1,2013-June 30, 2014

Staff KETS

Accelerated MathPearson Reading Streets

Support direct and independent learning in the content area

Student Progress Reports

July 1, 2013-June 30, 2014

Staff KETS/Technology

Use of media technology

Exploring how technology is used in a variety of careers

Teachers and students will display information from multiple print and digital sources to document learning

Staff KETS/Technology

Student Technology Literacy Goals – Evaluation

21

Page 24: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

BESEvaluating tools will include self-assessments, rubrics, multimedia demonstrations, displaying of information, increased fluency rates and improved phonemic awareness. Through data collection and analysis the technology team, administrator, and technology coordinator will evaluate the effectiveness of student technology literacy skills.

MESAll classes at Milton Elementary have computer lab bi-weekly for forty minutes each time. Students will be fluent in Microsoft applications such as powerpoint, word documents and spreadsheets. Microsoft Office will be the instructional material needed to accomplish this goal. Students will be monitored to make sure they are mastering theses skills. If not, they will continue to work on them. Technology night will be held in the spring with parents filling out surveys.

TCMSAs always we will put student achievement first. As a staff we will strive to encourage students to go beyond their expectations and achieve the knowledge that will move them forward in a changing society. All technology we use is to introduce, reinforce or evaluate student knowledge.

TCHS None Provided

22

Page 25: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Staff Training/Professional Development GoalsGoal 1Use technology to improve teaching and support a technology enriched atmosphere by contributing to salaries, professional development costs, and other miscellaneous expenses to utilize technology to fullest capacity throughout the school.

Action Plan: Strategies/ActivitiesStrategy/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

Increase student technology coordinator salaryand hours

Advanced execution of technology practices from a professional coordinator

Increased technology integration in classroom setting

July 1, 2013-June 30, 2014

Staff KETS/Technology

Schedule and execute professional development including the attendance of five staff members to the KETS Conference

Qualified and technologically educated staff to support and share instruction strategies throughout the school.

Multimedia presentation of learned knowledge available to all staff members

July 1, 2013-June 30, 2014

Staff Title II D

Maintain and improve smart board training

Qualified and technologically educated staff to support and share instruction strategies throughout the school.

Technology team walk through and a check list/questions and answer list to ensure all staff is secure utilizing Smart Boards and have the maximum resources available. A common folder

July 1, 2013-June 30, 2014

Staff Title II D

23

Page 26: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

providing a variety of Smart Board strategies/resources available on the school wide drive.

Maintain and enhance other areas of technology that may require additional expenses

Improved Academic Performance and support instruction in technology.

Leadership, stakeholders, technology team, and staff surveys asking about the maintenance of technology and any other pertinent information needed.

July 1, 2013-June 30, 2014

Staff KETS

Utilize Infinite Campus to assist in collaboration between home and school environment

Increase parent involvement and support of classroom instruction

Parent portal; progress, grade, and attendance reports, teacher documentation

July 1, 2013 – June 30, 2014

Counselor/Staff KETS

Maintain and improve Discovery Education PAS Testing

Increase collaboration and support for teachers and students

Students testing results.

July 1, 2013 – June 30, 2014

Counselor/Staff District Money

Goal 2Document Cameras

24

Page 27: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Action Plan: Strategies/ActivitiesStrategy/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

Additional document cameras will be purchased for those teachers who do not have them.

Students will be more responsive and interact more with the document cameras and become more engaged in their learning.

Greater student participation in class and greater student achievement.

On-going Amy Teater $845.00 (KETS)

Goal 3Training

Action Plan: Strategies/ActivitiesStrategy/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

Presenters Teachers aware of technology use

Stand base unit School year Teacher

Peers Using knowledge available

Teacher meeting and committees

School year Teacher

Goal 4Professional Development

Action Plan: Strategies/Activities

25

Page 28: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Strategy/Activity Instructional Outcome

Indicator Timeline Person(s) Responsible

Funding Source

Teacher Conferences

Awareness of new equipment and software

Pamphlets, handouts

School year Tonya Black, Linda Liter

KETS

Middle school Conf.

Teacher and Peers sharing ideas

Handouts, Ideas School year 5 teachers KERA

Goal 5Effectively incorporate E PREP software into the curriculum in order to increase overall ACT scores. Teachers need to be trained and an implementation plan needs to be developed to effectively use E PREP to prepare students for the ACT.

Strategy/Activity Instructional Outcome

Indicator Timeline Person(s) Responsible

Funding Source

E PREP Training/Implementation

Train teachers to effectively use E PREP software to improve student achievement on the ACT

PD attendanceIncrease of scores on ACT

Ongoing Rachael Adams PDKETS

Goal 6Provide training to teachers on how to more effectively incorporate interactive activities into instruction and more fully use “smart” technologies.

Action Plan: Strategies/ActivitiesStrategy/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

Smartboard Training

Teachers will develop interactive

Lesson plans with interactive

Ongoing Dawn HaneyRachael Adams

PDKETS

26

Page 29: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Smartboard lessons Smartboard lessons

Staff Training/Professional Development Goals – Evaluation

BES

Sending teachers and technology coordinator to conferences to ensure the most updated technology is being implemented within the classroom. The technology team will introduce to teachers blog sites, websites, and multimedia resources. Surveys to ensure professional development training is appropriate and essential to technology development.

MES

Teachers will be evaluated using the teacher technology standards. Training will be provided through conferences. Training for the technical staff will be provided through our network administrator. All teachers are required to fill out a professional development sheet.

TCMS

District and school tech personal will continue to attend conferences and meetings to stay abreast of new ideas. List serves and peer communication will keep us informed of changing ideas.

TCHS

1. The staff is currently proficient in the use of daily instructional and organizational technology including Infinite Campus, email, Microsoft office, and Internet Explorer. As TCHS acquires SMART technology devices and Apple devices, the staff is trained accordingly – funds provided. As routine programs change (IC, Office, etc.), the staff is supported in house rather than via professional development due to funding obstacles.

2. A current priority is to train staff in the advanced use of SMART devices, specifically the SMART Board. After the initial free training, the school has struggled to provide adequate funding for advanced training. Previously, the school had a teacher who was a certified trainer that would help for free. This is not the case now.

3. Most of our training is through support as needed due to a lack of funding. The training is documented through signatures. If there is outside training, certification slips from the training provide documentation.

4. Any and all technology training is derived directly from the Curriculum portion of this plan. This year, for instance, two teachers attended an Apple training to learn of more effective instructional uses for the iPad. All trainings offered relate directly to the goals above.

5. There are no “technical staff” supervised by TCHS.6. Funds provided, documentation of PD sessions and trainings will serve as evidence of adherence to this plan. A measure of effectiveness for

each is listed in the plan above. The evaluation is simply the recognition of success or failure using the indicators for each individual goal.

27

Page 30: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Technology Goals

Goal 1Obtain required equipment to maintain and extend the existing technology infrastructure and apply updates/upgrades as needed to improve and encourage the implementation of the latest versions of updated technology in instruction including: workstations, servers, telecommunications, wireless technology, and topology.

28

Page 31: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Strategy/Activity Instructional Outcome

Indicator Timeline Person(s) Responsible

Funding Source

Secure and replace data switches and patch cables as needed

Increased technology access in classrooms

Increased speed of technology access

July 1, 2013 – June 31, 2014

Technology Administration Team

E-rate and local funds

Acquire additional RAM

Maximum capability to support compatible existing and updated software to promote student learning and technological awareness as well as increase technology access in the classrooms and throughout the building

Immediate user access to high speed technology; student use of terminology regarding log-ins and computer hardware

July 1, 2013 – June 30, 2014

Technology Administration Team

E-rate and local funds

Acquire digital and flip cameras

Increased instructional support, teacher/student accountability, and communication

Students will display information from multiple print and digital sources to document authentic learning

July 1, 2013 – June 31, 2014

Staff KETS/Technology

Acquire student response systems

Increased instructional support, student interaction, and student accountability; as well as, improved student performance and

Accelerated assessment feedback using system generated graphs to increase student performance

July 1, 2013 – June 31, 2014

Staff KETS/Technology

29

Page 32: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

accelerated assessment feedback

Acquire special area document cameras

Updated equipment compatible with smart board technology to allow increased access to special area classroom resources and encourage student interaction.

Student interaction with immediate feedback of student performance

July 1, 2013 – June 31, 2014

Staff KETS/Technology

Obtain additional workstations in Lab 204; a minimum of 30 workstations required

Available workstations for every student in order to promote student access to school technology resources

Workstations to reflect student population

July 1, 2013 – June 31, 2014

Technology Administration Team

KETS/Technology

Goal 2Office Campus Agreement

Action Plan: Strategies/ActivitiesStrategy/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

Keep agreement up to date for Windows

All computers will be updated with

Student achievement will

On-going Lisa Fryman $1404.50

30

Page 33: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

and Office upgrades.

current software as it becomes available.

increase on the yearly state wide testing.

Goal 3Accelerated Reader/STAR Reading

Action Plan: Strategies/ActivitiesStrategy/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

Students will use Renaissance Learning website to take Star Early Literacy, STAR and AR tests.

Students will receive an instructional reading level score and practice comprehensive strategies.

AR scoresReading Level ScoresProgress ReportsRTI probes

On-going All teachers $2034.90($784.90) KETS($1000.00) PTO($250.00) Box Tops

Goal 4Software

Action Plan: Strategies/ActivitiesStrategy/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

Carnegie Achieve NCLB Scores 2012-2014 Math teachers KERA

Study Island Remediation/Class Scores 2012-2014 Grades 6-8 KERA

31

Page 34: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

support teachers

Goal 5Hardware

Action Plan: Strategies/ActivitiesStrategy/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

Document Cameras

Project student work in order to make learning/teaching connections

Student involvement/teachStand base units

School year Teachers KERA/Library funds KETS funds

Computers To have computers with RAM enough to run software in a timely manner

More efficient use of time in classroom

School year Teachers KETS

New Hardware Twentieth Century Technology

Equipment ordered as needed per teacher/student needs.

School year Tech Coordinator:Tonya Black

KETS

Goal 6Staff Development

32

Page 35: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Action Plan: Strategies/ActivitiesStrategy/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

Teacher Conf. New Ideas Brochures, handouts

Feb. 2013 Linda Liter/Tonya Black

KETS

Peers Teachers sharing ways to use technology

E-mails, Committee meetings, staff meetings

School year TCMS staff

Presenters Aware of uses of technology

Visits by presenters as indicated by the staff

School year Librarian/Principal KERA

Goal 7Parent Involvement

Action Plan: Strategies/ActivitiesStrategy/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

E-mail/Web page Communication with parents and the community

Feedback from parents to principal and teachers

School year Staff

Infinite Campus Parents made aware of student

Number of parents hitting the site

School year Staff KERA ($7.00 per student)

33

Page 36: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

performance

ILP Parent Awareness of student interest

Print outs and choice of high school courses

School year Andrea Howerton/ Tonya Black/Holly Hance

KERA

Goal 8Provide every student and staff member with the most advanced technology possible.

Action Plan: Strategies/ActivitiesStrategy/Activity Instructional

OutcomeIndicator Timeline Person(s)

ResponsibleFunding Source

Create Smart Classrooms (to include Smartboards, document cameras, student response systems, interactive pads)

Engage students in interactive learning activities

Number of “Smart” classrooms

Ongoing Dawn Haney KETS

One to one computer or I Pad ratio for students and faculty

Provide new technology and digital content to all students

Computer:student ratio

ongoing Dawn HaneyRachael Adams

KETSTextbook Funds

Goal 9Provide students and staff with most current software and databases.

Action Plan: Strategies/ActivitiesStrategy/Activity Instructional Indicator Timeline Person(s) Funding Source

34

Page 37: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Outcome ResponsibleMicrosoft Campus Agreement

Have access to newest versions of Windows and Office products

Version of Windows and Office on computers

OngoingUpdate computers as new versions are released

Dawn HaneyRod SmothersFrank McCane

KETS

Kentucky Virtual Library

Provide students and faculty access to online journals and periodicals

Online subscription access

yearly Dawn Haney TCBOE

Follett Library Software

Provide students and faculty with access to library holdings

Library software on all computers

yearly Dawn HaneyFrank McCane

KETS/KERA

Infinite Campus Provide students, parents, and faculty access to grades and student records online

Access to Infinite Campus

yearly Rod Smothers KETS

Learning Management Systems

Investigate different systems such as Moodle and Blackboard to implement in classrooms

Compare different learning management systems to determine what best meets the needs of TCHS

2013 Dawn HaneyJennifer LoganOther faculty

KETS

Technology Goals – Evaluation

BESTechnology is monitored yearly by a review of the technology plan, CSIP, and data collected throughout the year. The technology component of the certified evaluation process is reviewed with upcoming professional development plans. Technology and professional development are embedded and ongoing through professional growth plans and CSIP.

35

Page 38: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

MESStudents will be using Microsoft applications, AR, to be technology literate. Hardware and software will be up to date so the students will have access to the latest technology. Computers, licenses and wireless access will be needed to maintain our current instructional environment. Teachers will use the Renaissance Learning Dashboard to measure the percentage of students at Milton Elementary who are readers at each grade level and who are using Accelerated Reader and STAR Reading.

TCMSTCMS will continue toward upgrading and adding new technology to the school and curriculum as needed, indicated by test scores and student yearly achievement. District Technology Committee will keep us informed as to over all school achievement toward our goal as a district. Software and equipment will be dictated by teacher use and student achievement as an individual school.We will strive to meet new ideas and implementation with an open mind. Limited resources will influence when and how fast we move into new and different avenues. Our goal is to become a wirless school with up to date computers. This involves replacing the thin clients in the math room. Servers and switches as needed and videoing close circuit throughout the school, Laptop/Ipods, computers for all students, and an automated phone service for parent contact.

TCHS1. As evident, all goals and indicators above demonstrate a commitment to expansion of the role of technology in our school,

specifically new technology that shows promise, and old technology that has data to support its impact.2. The TCHS STC works directly with the CIO for TCPS to ensure compatibility.3. Infrastructure upgrades as mentioned earlier in this plan.4. Mentioned at each goal in the “Indicator” column

Budget Summary

BEDFORD ELEMENTARY SCHOOL

Acquired Technologies and Professional Development

Ed Tech Competitive

Title IID

Ed Tech Formula Title

IIDE-Rate NCLB/other than

Title IID KETS Other (Specify)

36

Page 39: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Infinite Campus $2,486.14 $6.31 per student (394 students)

FTE $1,669.50 24 full-time employees, 5 non-

faculty, 5 part-time, .5 faculty

Study Island/Education City Bundle

$9,000.00 Title 1

Accelerated Math $1,130.50 Licenses (266 Students 2-5 Gr. X $4.25)

SchoolPointe Web Page $720.00 Licenses

Discovery Education PAS Training

District Money

Follett Library System Support

$729.00 Licenses

AM Support, Hosting Fee, PD Training

$4,294.00 1 Time fee when purchased

Acquired Technologies and Professional Development

Ed Tech Competitive Title IID

Ed Tech Formula Title IID

E-Rate NCLB/other than Title IID

KETS Other (Specify)

Bookkeeper software $185.00 Licenses

Fast Math Technical Support

$525.00 Title 1

STC salary $500.00

PD KETS conference $800 Title II

PD training – Smart board $300.00

37

Page 40: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Data Switch $1,530.00

Patch cables $200.00Digital cameras $500.00Flip Cameras (2) $600.00Document Cameras Special Areas (4 )

$4,770.00

15 student workstations $6,000.00Smart boards (3) $10,000.00Video Distribution System $5,000

Laptops (16) $16,528.00I-pods (90) $22,500.00Webcams (25) $2,500.00Video Conference Software

$5,000.00

Replacement Projectors (20)

$20,000.00

Student Response systems (7)

$13,000.00

USB Headphones $60.00Scanners (6) $1,000.00Classroom telephone replacement

$80.00

Classroom printer replacement

$400.00

38

Page 41: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Maintenance on Dukane $1,000.00Miscellaneous on Technology

$2,000.00

TOTAL$6,452.43 Yrly

$117,952.14 Yrly$9,525.00 Yrly

$10,325.00

MILTON ELEMENTARY SCHOOL

Acquired Technologies and Professional Development

Ed Tech Competitive

Title IID

Ed Tech Formula Title

IIDE-Rate NCLB/other than

Title IID KETS Other (Specify)

School Pointe (web page) 720.00

Microsoft Applications 1404.50

Infinite Campus 1568.00

Document Cameras 845.00

Accelerated Reader/STAR Reading/STAR Early Literacy

784.90 1000.00 (PTO)250.00 (Box Tops)

Study Island 1000.00 2000.00 Market Day fund raiser

TOTAL $6322.40

TRIMBLE COUNTY MIDDLE SCHOOLAcquired Technologies and Professional Development

Ed Tech Competitive

Title IID

Ed Tech Formula Title

IIDE-Rate NCLB/other than

Title IID KETS Other (Specify)

SHI (Microsoft License) $1713

39

Page 42: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Follett $729

Infinite Campus $2,600.00

KETC $450

Kentucky School Media Association for teachers OCT 2013

$1000.00

Carnegie $13,000.00

Study Island $2000.00

Wish List:

Switches $1027.

New Computers/Monitors $2500/$100

Ipads/Tablets Classroom sets $500/each

Document Cameras (2) $650/each

TOTAL $1027 $10,000 $15,000/year

TRIMBLE COUNTY HIGH SCHOOLAcquired Technologies and Professional Development

Ed Tech Competitive

Title IID

Ed Tech Formula Title

IIDE-Rate NCLB/other than

Title IID KETS Other (Specify)

Microsoft Campus Agreement $2000

Kentucky Virtual Library $1500 Board General Funds

Infinite Campus $3000

Follett Library Software $440

40

Page 43: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Learning Management Systems

Web Hosting $720

JCPCS Online School $7320 Fund I

Discovery Education $4000 Fund I

E PREP $600 TCHS General Fund

Student Response Systems $12,500

Smartboard Training

KTLC Conference

Replace Teacher Machines $5000

Replace Monitors $3500

TOTAL $27,160

TRIMBLE COUNTY SCHOOLS – DISTRICT TECHNOLOGY INITIATIVES

Acquired Technologies and Professional Development

Ed Tech Competitive

Title IID

Ed Tech Formula Title

IIDE-Rate NCLB/other than

Title IID KETS Other (Specify)

100 student comp. and monitors $52,000General Fund

MAP Assessment $25,000 Fund 1

ESchool $175 per student Expulsion paid for

by Board and credit recovery

41

Page 44: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

paid for by TCHS 12 slots

purchased annually

KYVHS $330/class Paid by student partial

reimbursement by Board

KYVL $1500 Board general funds

PD KYSTE conference $300

Video Distribution $95,992  $20,362 KERA

Voice Over Internet Protocol$83,064  $17,620 KERA 

Wireless $77,217  $16,379 KERA 

Local Phone Service $9900 $2100 KERA

Long Distance Service $2228 $472 KERA

Dark Fiber BOE to TCHS $3861 $819 KERA

Metro Ethernet to MES $24,750 $5250 KERA

PRI for VOIP $5940 $1260 KERA

Web Hosting $2145 $455 KERA

42

Page 45: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

TOTAL $305,097 $300 $145,647

43

Page 46: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Budget Summary – Narrative

Bedford Elementary School

The primary focus of Bedford Elementary is to provide all students with access to technology by providing hardware such laptops, ipods, and conferencing equipment. We are also focusing on software licensing to ensure student use of technology to learn, communicate, increase productivity, and become 21st century technology literate.

Milton Elementary School

Estimated KETS money for 2013-2014 is $7312.00

School Point (web page) $720.00Microsoft Applications $1404.50Infinite Campus $1568.00Document Cameras $845.00AR/STAR/STAR $784.90Early LiteracyStudy Island $1000.00Total $ $6322.40

Balance of $989.60 left over will be used for purchasing any other technical items that are needed (example.. USB TV boxes, switch boxes, etc)

Trimble County Middle School

The budget is clearly stated in the budget summary. The items listed are in order of priority. The technology budget is what we hope to accomplish in the coming years. Any additional monies would be used for our wish list according to what was needed.

Trimble County High School

As in years past, the school will continue to work directly with the district through the CIO to acquire the technology necessary to validate this plan if funds are available.

44

Page 47: Evaluation Plan Format - Trimble County Schools FY14 DIST…  · Web viewParents can also access Trimble County ... New cabling is needed throughout the building if we are going

Trimble County Schools – District-wide

The acquisition of more than 100 new computers, all new switches, and district-wide wireless in the summer of 2012 has pushed VOIP and Video distribution to the forefront of our budget needs. We still need to purchase additional WAP’s for our wireless network but that need is secondary until the number of personally owned devices increases.

Finally, we plan to apply for the following erate eligible services:Web HostingVOIPVideo DistributionLocal Phone ServiceLong DistancePRI for VOIPDark FiberMetro Ethernet

45