SAE Government Industry Meeting | January 25-27, 2017SAE Government Industry Meeting | January 25-27, 2017
Evaluation of OMDB Honeycomb
Barrier Size Reduction
SAE Government Industry Meeting | January 25-27, 2017
Objective
• Determine if the full honeycomb face used in the Offset Deformable Barrier Test Procedure can be replaced with a smaller version of the honeycomb
2
SAE Government Industry Meeting | January 25-27, 2017
Half Honeycomb Barrier
• To make manufacturing easier the honeycomb was not reduced by 50% exactly
3
2.2 m 1.2 mHoneycombsupport
SAE Government Industry Meeting | January 25-27, 2017
Test Procedure
• The OMDB test procedure was followed with the following exceptions– Vehicle is replaced with the FMVSS
No. 301 Moving Contoured Barrier (MCB)
– OMDB impact speed 60 kph– Three axis accelerometer triad
installed at the vehicle’s CG and on the left side frame rail for both the OMDB and MCB
4
OMDB
MCB
SAE Government Industry Meeting | January 25-27, 2017
Methodology
6
• Used CV < 10% to determine if the response is repeatable• Velocity is calculated
– filtering X and Y– Resultant of X and Y– Integrate resultant to get velocity
D. Rhule, H. Rhule and B. Donnelly, "The Process of Evaluation and Documentation of Crash Test Dummies for Part 572 of the Code of Federal Regulations," The 19th International Technical Conference of the Enhanced Safety of Vehicles (ESV), 2005
SAE Government Industry Meeting | January 25-27, 2017
Test Matrix
7
Barrier Type NHTSA Test Number Name
Full9795 * Full 19797 Full 29799 Full 3
Half9796 Half 19798 Half 29800 Half 3
* 301 MCB was damaged, test not used for analysis
SAE Government Industry Meeting | January 25-27, 2017
OMDB CG Resultant Acceleration
8
0
10
20
30
40
50
60
0 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08
Res
ulta
nt A
ccel
erat
ion
Gs
Time (seconds)
Full 2 Full 3 Half 1 Half 2 Half 3
CV=4.6%
SAE Government Industry Meeting | January 25-27, 2017
OMDB CG Resultant Velocity
9
-5
0
5
10
15
20
25
30
35
40
45
0 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08
Res
ulta
nt V
eloc
ity (k
ph)
Time (seconds)
Full 2 Full 3 Half 1 Half 2 Half 3
CV=7.2%
SAE Government Industry Meeting | January 25-27, 2017
OMDB Left Side Resultant Velocity
10
-5
0
5
10
15
20
25
30
35
40
0 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08
Res
ulta
nt V
eloc
ity (k
ph)
Time (seconds)
Full 2 Full 3 Half 1 Half 2 Half 3
CV=1.3%
SAE Government Industry Meeting | January 25-27, 2017
MCB CG Resultant Acceleration
11
0
5
10
15
20
25
30
35
40
45
50
0 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08
Res
ulta
nt A
ccel
erat
ion
Gs
Time (seconds)
Full 2 Full 3 Half 1 Half 2 Half 3
CV=9.1%
SAE Government Industry Meeting | January 25-27, 2017
MCB CG Resultant Velocity
12
0
5
10
15
20
25
30
35
40
45
50
0 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08
Res
ulta
nt V
eloc
ity (k
ph)
Time (seconds)
Full 2 Full 3 Half 1 Half 2 Half 3
CV=7.3%
SAE Government Industry Meeting | January 25-27, 2017
MCB Left Side Resultant Acceleration
13
0
5
10
15
20
25
30
35
40
45
0 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08
Res
ulta
nt A
ccel
erat
ion
Gs
Time (seconds)
Full 2 Full 3 Half 1 Half 2 Half 3
CV=4.0%
SAE Government Industry Meeting | January 25-27, 2017
MCB Left Side Resultant Velocity
14
0
5
10
15
20
25
30
35
40
45
50
0 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08
Res
ulta
nt V
eloc
ity (k
ph)
Time (seconds)
Full 2 Full 3 Half 1 Half 2 Half 3
CV=5.4%
SAE Government Industry Meeting | January 25-27, 2017
MCB Rotation About the Z-axis
15
-2
0
2
4
6
8
10
12
0 0.05 0.1 0.15 0.2 0.25 0.3 0.35
Rot
atio
n (d
egre
es)
Time (seconds)
Full 2 Full 3 Half 1 Half 2 Half 3
CV=5.3%
SAE Government Industry Meeting | January 25-27, 2017
Honeycomb Crush Row 7
17
-50
0
50
100
150
200
250
0 200 400 600 800 1000 1200 1400
Hon
eyco
mb
X C
rush
Row
7 (m
m)
Honeycomb Y Position (mm)
Full 2 Full 3 Half 1 Half 2 Half 3
CV=6.2%
SAE Government Industry Meeting | January 25-27, 2017
Honeycomb Crush Row 9
18
-50
0
50
100
150
200
250
0 200 400 600 800 1000 1200 1400
Hon
eyco
mb
X C
rush
Row
9 (m
m)
Honeycomb Y Position (mm)
Full 2 Full 3 Half 1 Half 2 Half 3
CV=8.4%