Evaluation

download Evaluation

of 6

description

Building Load

Transcript of Evaluation

  • EVALUATION SHEET FOR NOMINATIONS RECEIVED

    S No Criteria

    1 PROJECT IDENTIFICATION/ BUILDING NAME

    2 BUILT UP AREA CONFIRMED WITH OWNER

    3 AIR CONDITIONED AREA

    4 Type and description of Air Conditioning used

    5 Total installed tonnage

    6 Total peak operating tonnage

    7 Avearge Load (TR.hours / Year) - Design

    8 Avearge Load (TR.hours / Year) - Actual from BAS

    9 Annual Power Consumption - Design

    10 Annual Power Consumption - Actual from BAS

    11 Energy Performance Index

    12 Occupant Numbers

    13 Occupant Density

    14 Building working hours per day

    15 IEQ Initiatives ( Pl describe )Fresh Air - Is it as per ASHRAE 62.1 ? Is 30 % Additional fresh air considered ?Filtration system for fresh airType and condition of filters.Toilet exhaust systemAre CO 2 levels monitored ?Noise level in conditioned area.Noise level outside AC Plant RoomLighting levels in all areas

    16 Energy Saving Initiatives( Please describe )

  • 17 Innovative techniques used in the building( Please describe )

    18 Is there an operational BMS ?

    19 Does the BMS record all energy related data andis this data used for conserving energy use( Please describe )

    20 Are there renewable energy sources used forpowering the building ? Please specify and givedetails.

    21 What is the renewable energy used for in thebuiding ?

    22 Does the building comply with all Fire Safetycodes ?

    23 Are Stairwells/ Elevator Shafts and Elevator lobbyspressurised ?

    24 Does the building have a documented maintenanceschedule ?

    25 Is the waste water generated in the building fullyrecycled and reused ?

    26 What do the occupants (Other than owner/ operator)feel about the building.( Interview 5/6 persons working in the building andrecord their views )

  • EVALUATION SHEET FOR NOMINATIONS RECEIVED

    Units

    TR

    TR

    TRh/Year

    TRh/Year

    KWh/Year

    KWh/Year

    No.

    Persons/Sq.M

    Hours

    M2

    M2

    KWh/M2. Year

  • Yes/No

  • EVALUATION SHEET FOR NOMINATIONS RECEIVED

    Remarks

  • Send