    1/33

    Change of mind sets: BIPVa market segment with huge

    potential

    European Union Sustainable Energy Week

    Brussels, January 2007

    Alvaro Ponce Plaza

    CSR Manager - Isofoton

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    2/33

    History

    Main FiguresCommercial PresenceTechnologiesR&DIsofotn is the leader in the development of Solar Energy technology for

    sustainable energy solutions. and is globally committed to Society and

    the Environment.

    The company is comprised of 100% Spanish capital and know-how, andfocuses its manufacturing activity on both solar technologies:Photovoltaic and Thermal, from its headquarters in Spain.

    Isofotn is born in 1981 , in Malaga, where for the first time amanufacturing process of silicon solar cells was established.

    In 1985, we consolidated our activities in Solar Energy by incorporatingthe manufacturing of solar thermal collectors.

    In 2006 our new factory was inaugurated in the Andaluca TechnologyPark with a productive surface of more than 28.000 m2.

    BIPV a market segment with potential:

    Discovering Isofoton

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    3/33

    History

    Main FiguresCommercial PresenceTechnologiesR&D

    Since 1997, we have achieved sustained sales revenue growth

    Our manufacturing and production figures in 2006 positioned us amongstthe leading companies in the sector. Production plans for 2007 are asfollows :

    140 MWth 200,000 m2Thermal

    130 MWpPhotovoltaic

    27,148,3

    72,1 92

    120

    160177

    300

    21,4

    37,954,7

    70

    96 104 88,5

    120

    0

    50

    100

    150

    200

    250

    300

    350

    2000 2001 2002 2003 2004 2005 2006 2007

    MillonsofEuros

    Total Sales External Market Sales

    BIPV a market segment with potential:

    Discovering Isofoton

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    4/33

    Isofotons employment evolution has follow the same path

    History

    Main FiguresCommercial PresenceTechnologiesR&D

    0

    200

    400

    600

    800

    1000

    1200

    1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 (*)

    total Madrid Malaga

    121

    885

    1006

    BIPV a market segment with potential:

    Discovering Isofoton

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    5/33

    HistoryMain FiguresCommercial PresenceTechnologiesR&D

    Subsidiaries and Project Offices

    Isofotn China

    Isoequinoccial (Ecuador)

    Isofotn North America (USA)

    Isofotn Italy

    Isofotn Gemany Isofotn Maroc

    Isotecsol (Dominican Republic)

    Isofotn SA Branch in Bolivia

    Senegal Office

    Isofotn Algeria

    Commercial presence in more than 60 countries

    BIPV a market segment with potential:

    Discovering Isofoton

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    6/33

    History

    Main FiguresCommercial PresenceTechnologiesR&D

    Photovoltaic:

    Monocrystalline Silicon

    Polycrystalline Silicon

    High ConcentrationThermal:

    Flat collectors

    Vacuum tube

    Compact Systems

    BIPV a market segment with potential:

    Discovering Isofoton

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    7/33

    The Value of Research and Development

    At Isofoton we have always had a vocation for innovation, an identity that commits us to researching all

    matters having to do with Solar Energy in order to search for increasingly better and more efficient solutions.

    The R&D department keeps several research streams active which allow it to be ready and equipped todeal with quick industrialization of scientific advances that are achieved, all of this with one sole aim:to take better advantage of the Suns energy.

    This commitment to research has given Isofoton the reputation of being a benchmark reference in alltechnological matters, and has turned research into one of the strategic pillars in the companys growth.

    We work in collaboration with the most prestigious universities and Spanish and Foreign research centres,and we firmly believe in Solar Energys potential.

    Investment on R&D represents 7% of total turnover.

    HistoryMain FiguresCommercial PresenceTechnologiesR&D

    BIPV a market segment with potential:

    Discovering Isofoton

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    8/33

    Spains Solar Legislationon BIPV

    Technical Building CodeFeed in Tariff (RD 661/2007)

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    9/33

    Basic requirements on solar energy in theCTE

    The design and calculations for the solar thermal and solarphotovoltaic installations have to incorporated in the

    general project of the building, like any other installation(lifts, fire safety devices, etc.)

    The project has to bee presented to the local administrationin order to be authorize and the works license be issue.

    The solar installations, as well as other installations of thebuilding, will have to be legalize by the correspondingauthorities of the Autonomous Community.

    BIPV a market segment with potential:

    Technical Building Code

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    10/33

    Solar Thermal

    Consumption of

    hot water

    Indoor Pool

    Solar thermal energywill have to contributebetween 30%-70%

    In new buildings and buildings being rehabilitated, de demand of hot water willdepend on different variables:

    Building demand (l/day)

    Climate zone where it is located

    Type of conventional source of energy to be substitute

    BIPV a market segment with potential:

    Building Technical Code

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    11/33

    Household scenario (homes/year) 250.000 450.000

    Installed Area (m2) 1.583.000 2.554.000

    Substitute energy (tep) 99.983 163.972

    CO2 (t CO2) 375.073 605.311

    (%) 0,5 0,8%

    Repercussion on the total cost of

    the building

    Investment (M) 980 1.620

    Solar Thermal Energy 2007 2010Old buildings New Construction

    BIPV a market segment with potential:

    Building Technical CodeSolar Thermal

    Source: Ministry of Industry

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    12/33

    Para ciertos usos, a

    partir de un determinadotamao, y segn zonaclimtica

    Clculo de potenciamnima de energa solarfotovoltaica a instalar

    In some buildings photovoltaic systems will be incorporated as grid connected

    systems or for auto consumption

    The size of the systems will depend on:

    Climatic zone

    Constructed area Type of building

    Solar Photovoltaic Energy

    BIPV a market segment with potential:

    Building Technical Code

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    13/33

    6,25 100

    Total Installed capacity (MWp) 68 93

    Substitute energy (MWh) 74.800 102.300

    CO2 (tCO2) 45.000 61.400

    (%) 0,15 0,75

    Repercussion on the total cost of

    the building

    Investment (M) 473 651

    Solar Photovoltaic Energy 2008 2010

    Scenario (size of theinstallations kWp)

    BIPV a market segment with potential:

    Building Technical Code

    Source: Ministry of Industry

    Solar Photovoltaic Energy

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    14/33

    Royal Decree 661/2007 of May 26th.It revises the legal and economic Regime set by RD 436/2004

    Renewable energy Plan (2005 2010)

    Establishes an objective of 373 MWp installed by 2010

    Royal Decree 436/2004 of March 12th.Establishes the methodology for updating and systematization of the legaland economic Regime for the activities of electric energy generation byspecial regime.

    Royal Decree 1663/2000 of September 29th.About Grid Connection of photovoltaic installations of low voltage.

    Royal Decree 1955/2000 of December 1st.Regulates the activities of transport, distribution, commercialization, supplyand authorization of the procedures for installation of electric energy.

    Regional Legislation, relates, for example, to the specific procedures toobtain the Prior Inscription to Special Regime (REPE) or the Work License.

    Law 54/97 of the Electric Sector

    BIPV a market segment with potential:

    Feed in Tariff RegulationSolar Photovoltaic Energy

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    15/33

    Larger solar power installations will practically double theirreturns, receiving a guaranteed return on investment of7%, while those under 100 kWp ones will stay the same.Retribution will be as follow:

    P

    100 kW: for the first 25 years 44,0381

    then 35,2305

    100 kW

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    16/33

    Spain market evolution

    Source: CNE.

    141

    490

    349

    97

    44

    221173

    0

    50

    100

    150

    200

    250

    300

    350

    400

    450

    500

    1999 2000 2001 2002 2003 2004 2005 2006 2007

    MW

    Accumulated Capacity Annual Increase

    BIPV a market segment with potential:

    Feed in Tariff RegulationSolar Photovoltaic Energy

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    17/33

    2003 2004 2005 2006 2007 Growth 03-07

    N of Installations 1.554 3.207 5.271 9.533 14.567 837%

    P

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    18/33

    0 2 4 6 8 10 12 14

    Punto dered

    Licenciade obra

    Estudio deImpacto Ambiental

    Verificacin porel distribuidor

    Autorizacinadministrativa

    Acta de Puestaen Marcha

    Registro final enRgimen especial

    MESES

    Elctrica/Distribuidora Comunidades Autnomas Gobiernos Locales

    AvalEjecucin

    Medio Ambiente Entidad Financiera Instalador

    RD 661/2007

    BIPV a market segment with potential:

    Feed in Tariff RegulationSolar Photovoltaic Energy

    BIPV k i h i l

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    19/33

    BIPV a market segment with potential:

    Feed in Tariff Regulation

    New Royal Decree draft

    Simplification of administrative procedures.

    Will came into force after September 28th, 2008.

    Solar Photovoltaic Energy

    BIPV k t t ith t ti l

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    20/33

    0 2 4 6

    Punto dered

    Verificacin porel distribuidor

    Acta de Puestaen Marcha

    Registro final en

    Rgimen especial

    MESESElctrica/Distribuidora Comunidades Autnomas

    Ejecucin

    Instalador

    Autorizacinadministrativa

    Simplification of administrative procedure

    BIPV a market segment with potential:

    Feed in Tariff RegulationSolar Photovoltaic Energy

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    21/33

    BIPV in Isofoton

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    22/33

    Electric generation close to the demand.

    Substitution of building materials.

    Use of thermal collectors and FV modules ascomplement for bioclimatic arquitecture.

    Visual impact: esthetic factor.

    Legislation (Building Technical Code (CTE) Royal Decree 661/07)

    BIPV a market segment with potential:

    BIPV in Isofoton

    BIPV k i h i l

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    23/33

    Integration in rooftops.

    - Slope.- Flat.

    Integration in faades.- Sunshade covers, cantilevers.

    - Blind walls, ventilated faades.- Glass skin, curtain wall, large glazing.

    Others.

    - Pergolas y Parking lots.

    - Urban equipment.- Other Installations.

    BIPV a market segment with potential:

    BIPV in Isofoton

    BIPV k t t ith t ti l

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    24/33

    Superposicin sobrecubierta existente

    Adaptabilidad

    Funciones deestanqueidad

    BIPV a market segment with potential:

    BIPV in Isofoton

    BIPV a market segment with potential

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    25/33

    Cubriciones y sombreado

    Reduccin de la carga trmica.

    Impacto esttico

    BIPV a market segment with potential:

    BIPV in Isofoton

    BIPV a market segment with potential:

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    26/33

    Nuevo concepto esttico defachada

    Gran impacto visual

    Muy adaptable a tecnologasconstructivas ya existentes

    BIPV a market segment with potential:

    BIPV in Isofoton

    BIPV a market segment with potential:

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    27/33

    Adaptabilidad

    Multitud de posibles diseos

    BIPV a market segment with potential:

    BIPV in Isofoton

    BIPV a market segment with potential:

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    28/33

    Versatilidad de materiales y variedad de diseos

    Conexin a red o autnomo

    BIPV a market segment with potential:

    BIPV in Isofoton

    BIPV a market segment with potential:

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    29/33

    Amplio abanico de posibilidades

    Proteccin del sol

    Efectos estticos

    BIPV a market segment with potential:

    BIPV in Isofoton

    BIPV a market segment with potential:

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    30/33

    BIPV a market segment with potential:

    BIPV in Isofoton

    BIPV a market segment with potential:

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    31/33

    ISOFOTON WAS AWARDED THE EUROSOLAR SOLARPRIZE 2007 FOR ITS BIPV INSTALLATION AT ITS FACTORYIN MLAGA.

    g p

    BIPV in Isofoton

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    32/33

  • 8/6/2019 EUSEW08 BIPV 1 AlvaroPonce-Isofoton

    33/33

    Thank you for your attention!!!