European Strategic Energy Technology Plan (SET-Plan)€¦ · Sustainable Nuclear and Bioenergy EIIs...

12
European Strategic Energy Technology Plan (SET-Plan) towards a powerful European Energy RTD Martin Martin Huemer Huemer European Commission European Commission – DG RTD DG RTD 14 July 2010 14 July 2010 Styrian Styrian Academy Academy Context Context By 2020 By 2020 – the three 20s: the three 20s: 20% reduction in greenhouse gas emissions compared to 1990 levels (30% if global agreement) 20% reduction in global primary energy use (through energy efficiency) 20% of renewable energy in the EU's overall mix (minimum target for bio fuels of 10% of vehicle fuel) By 2050 : indicative 60 to 80% reduction in GHG By 2050 : indicative 60 to 80% reduction in GHG

Transcript of European Strategic Energy Technology Plan (SET-Plan)€¦ · Sustainable Nuclear and Bioenergy EIIs...

Page 1: European Strategic Energy Technology Plan (SET-Plan)€¦ · Sustainable Nuclear and Bioenergy EIIs Launch foreseen at the SET Plan Conference in Brussels, 15-16 November 2010, under

European Strategic Energy Technology Plan (SET-Plan)

towards a powerful European Energy RTD

MartinMartin HuemerHuemerEuropean Commission European Commission –– DG RTDDG RTD

14 July 2010 14 July 2010 StyrianStyrian AcademyAcademy

ContextContext

By 2020 By 2020 –– the three 20s:the three 20s:• 20% reduction in greenhouse gas emissions compared to

1990 levels (30% if global agreement)

• 20% reduction in global primary energy use (through energy efficiency)

• 20% of renewable energy in the EU's overall mix (minimum target for bio fuels of 10% of vehicle fuel)

By 2050 : indicative 60 to 80% reduction in GHGBy 2050 : indicative 60 to 80% reduction in GHG

Page 2: European Strategic Energy Technology Plan (SET-Plan)€¦ · Sustainable Nuclear and Bioenergy EIIs Launch foreseen at the SET Plan Conference in Brussels, 15-16 November 2010, under

Why a SET Plan?Why a SET Plan?

Technology is a key component for the success or Technology is a key component for the success or failure of a European energy policyfailure of a European energy policy

no chance to reach the ambitious goals without a unprecedented stimulation of the development of low carbon energy technologies we need to tackle both short and long term perspective

ST: reinforced research and pro-active support measuresLT: development of new generation of technologies through breakthroughs (FET Basic Research)

no country is strong enough to act alone – a coordinated effort of all stakeholders (MS, EC, industry, research centres, universities, funding organisations, etc.) required

European Energy ResearchEuropean Energy Research--Status QuoStatus Quo

Enormous differences between countriesEnormous differences between countries

1/4 without specific Energy Research Programmeper capita expenditures vary by a factor of 10 (and more)Big differences regarding

priorities and priority setting proceduresprogram implementation (centralised/decentralised)industry participationsignificance of international cooperation

Up to now no strong cooperation between Up to now no strong cooperation between countries (change trough countries (change trough ERANETsERANETs?)?)

only weak links between national and EU only weak links between national and EU programmesprogrammes

Page 3: European Strategic Energy Technology Plan (SET-Plan)€¦ · Sustainable Nuclear and Bioenergy EIIs Launch foreseen at the SET Plan Conference in Brussels, 15-16 November 2010, under

SET Plan measuresSET Plan measures

Steering GroupSteer the implementation of the SET-Plan

Steering GroupSteer the implementation of the SET-Plan

European Industrial Initiatives

(wind, solar, bioenergy, CCS, grids, fission)

European Industrial Initiatives

(wind, solar, bioenergy, CCS, grids, fission)

EERAEU Research

Alliance

EERAEU Research

Alliance

mon

itor

repo

rt

advi

se

Support the

work of

monito

r

SETISInformation

System

SETISInformation

System

EUAEnergy

ResearchPlatform

EUAEnergy

ResearchPlatform

monitor

mon

itor

repo

rtResourcesResources fin

ancial an

d hu

man

fin

ancial an

d hu

man

InternationalInternational cooperation

cooperation

European Industrial InitiativesEuropean Industrial Initiatives

European Industrial Initiatives:European Industrial Initiatives:

European Wind InitiativeSolar Europe InitiativeBio-energy Europe InitiativeEuropean Electricity Grid InitiativeEuropean CO2 capture, transport and storage initiativeSustainable fission initiative (Gen IV)Smart Cities (new)

OnOn--going initiatives: going initiatives:

Fuel cells and hydrogen (JTI)Fusion (ITER)

Page 4: European Strategic Energy Technology Plan (SET-Plan)€¦ · Sustainable Nuclear and Bioenergy EIIs Launch foreseen at the SET Plan Conference in Brussels, 15-16 November 2010, under

Launched the first four EIIs (3 June 2010)Launched the first four EIIs (3 June 2010)

Wind, Solar, CCS and Electricity Grids EIIs

Joint Statement supported by the public (EC, MS) and private side (relevant industry)

All parties committed to support:

-- Technology Roadmaps 2010Technology Roadmaps 2010--20202020

-- Implementation Plans 2010Implementation Plans 2010--20122012

-- Light and nonLight and non--bureaucratic governance structurebureaucratic governance structure

European Industrial InitiativesEuropean Industrial Initiatives

Sustainable Nuclear and Bioenergy EIIs Sustainable Nuclear and Bioenergy EIIs

Launch foreseen at the SET Plan Conference in Brussels, 15-16 November 2010, under the Belgian Presidency

Smart Cities EII in the phase of developing the conceptSmart Cities EII in the phase of developing the conceptTaking stock during the SET Plan Conference in Brussels, 15-16 November 2010, under the Belgian Presidency

Launch foreseen in 2011

European Industrial InitiativesEuropean Industrial Initiatives

Page 5: European Strategic Energy Technology Plan (SET-Plan)€¦ · Sustainable Nuclear and Bioenergy EIIs Launch foreseen at the SET Plan Conference in Brussels, 15-16 November 2010, under

TechnologyTechnology Roadmaps (1)Roadmaps (1)Technological objectives Technological objectives �� Concrete action plans Concrete action plans �� EstimatedEstimatedinvestments needed for the period 2010investments needed for the period 2010--2020 to achieve:2020 to achieve:

Up to 20% of the EU electricity produced by wind energy

Up to 15% of the EU electricity produced by solar energy

50% of networks operate along “smart principle” effectively matching supply and demand

At least 14% of the EU energy mix from cost-competitive, sustainable bio-energy

CCS technologies become cost-competitive within a carbon-pricing environment by 2020-2025

First Generation-IV nuclear reactor prototypes in operation by 2020, allowing commercial deployment by 2040

25 to 30 European cities will be at the forefront of the transition to a low carbon economy

Newturbines

and components

Gridintegration

Enablewind

deployment

Offshorecomponents

Wind resources assessment :5–10 measurement campaigns

Spatial Planning :Development of Spatial Planning instruments

Statistical forecast distribution on wind speed and energy production

Implementation of additional testing facilities and demo

R&D Programme focused on new turbines designs and use of new materials

Testing facilities and demo

Demonstration of a optimised logistic strategy

Results of the public acceptance analysis

2010 2012 2015 2017 2020

EU spatial Planning implemented

Development & testing of new substructures

Demonstration of mass manufacturing processes and procedure for substructures

Two operational sites

Demonstration with wind farm as virtual power plant:Demonstration of long distance HVDC

Offshore flexibility connection to at least 2 countries Demonstration of multi terminal offshore solutions

Publication of an EU 27 MS Wind Atlas

Standardised harbours to service the next generation of wind turbine

Implementation of testing facilities and demo for new turbines, components, manufacturing

processes

Large scale turbine prototype

4 prototypes of new substructures

Development & testing of a large scale turbine prototype (10 – 20 MW)

TechnologyTechnology Roadmaps (2)Roadmaps (2)

Example of th

e Win

d EII

Page 6: European Strategic Energy Technology Plan (SET-Plan)€¦ · Sustainable Nuclear and Bioenergy EIIs Launch foreseen at the SET Plan Conference in Brussels, 15-16 November 2010, under

Implementation Plans 2010 Implementation Plans 2010 –– 2012 of the Electricity Grids, 2012 of the Electricity Grids, Solar, Wind and CCS availableSolar, Wind and CCS available

Coordination between the Electricity Grids Initiative and other Coordination between the Electricity Grids Initiative and other EIIs to ensure:EIIs to ensure:

1. All necessary new requirements concerning grid integration of low-carbon energy sources are addressed

2. RD&D activity overlaps between the initiatives are minimized

Coordination with Solar and Wind InitiativesCoordination with Solar and Wind Initiatives

Cooperation launched with other initiatives (Storage, Cooperation launched with other initiatives (Storage, Electric Car, Smart Buildings)Electric Car, Smart Buildings)

Implementation Plans 2010 Implementation Plans 2010 -- 20122012

Light and nonLight and non--bureaucratic governancebureaucratic governance

EII governance: three levels of intervention:EII governance: three levels of intervention:

Orientation level - SET-Plan Steering Group

Planning and programming level - EII Team

Implementation and operational level – in which activities and projects are carried out

GovernanceGovernance Architecture (1)Architecture (1)

Page 7: European Strategic Energy Technology Plan (SET-Plan)€¦ · Sustainable Nuclear and Bioenergy EIIs Launch foreseen at the SET Plan Conference in Brussels, 15-16 November 2010, under

STEERING GROUPEC - chair

all MS and observer countries + EIBSupported by SETIS

STEERING GROUPSTEERING GROUPECEC -- chair chair

all MS and observer countries + EIBall MS and observer countries + EIBSupported by SETISSupported by SETIS

Orie

ntat

ion

Orie

ntat

ion

leve

lle

vel

Impl

emen

tatio

n an

dIm

plem

enta

tion

and

oper

atio

nal l

evel

oper

atio

nal l

evel

Plan

ning

and

Plan

ning

and

prog

ram

min

g le

vel

prog

ram

min

g le

vel EII TEAM*EII TEAM*EII TEAM*

Industry representativesCommitted CountriesECFinancing Community (e.g.EIB)RTD Community (e.g. EERA)

Endorses IP & indicates availability of programming instruments and budgets

Proposes IP

EU: Framework ProgrammesMS: National Programmes

NER300EERA etc

Industry: co-financing

EU: Framework ProgrammesMS: National Programmes

NER300EERA etc

Industry: co-financing

111 222

333Implements according to existing funding rules and procedures

Actions / ProjectsActions / ProjectsActions / Projects

Reports on the progress of the actions

444

555

Reports on the IP progress

Actions / ProjectsActions / ProjectsActions / Projects

* One EII Team per Initiative

GovernanceGovernance Architecture (2)Architecture (2)

Open to Open to MSsMSs, companies and research institutions of , companies and research institutions of all sizesall sizes

Each financing actor decides on its own contribution Each financing actor decides on its own contribution and modalities, in accordance with own rules and and modalities, in accordance with own rules and proceduresprocedures

Based on available instrumentsBased on available instruments

GovernanceGovernance Architecture (3)Architecture (3)

Page 8: European Strategic Energy Technology Plan (SET-Plan)€¦ · Sustainable Nuclear and Bioenergy EIIs Launch foreseen at the SET Plan Conference in Brussels, 15-16 November 2010, under

AvailableAvailable instrumentsinstruments

EIB loans, RSFF, guarantees, equityLarge projectsEIB

nationalprogrammes,

NER300, structural funds

Supporting domestic industryMS

NER300, ad-hoc arrangements, EERA

etc

Localised shared interestsMS and MS

FP (ERA-NET+), coordinated calls, Art

185…

Large projects, EU added value, shared

interestsEC and MS

FP, CIP-IEEHigh EU added valueEC

InstrumentsProject typologyPublic funding partners

Common EU Roadmapand

Implementation Plan

Common EU reporting, monitoring and assessment – KPIs

'public (MS)'public (MS)--publicpublic(EC)(EC)--privateprivatepartnerships' with partnerships' with a variable a variable geometry, open geometry, open architecturearchitecture

share objectives, share objectives, planning,planning,monitoring and monitoring and reporting tools reporting tools andandimplementationimplementationinstrumentsinstruments

Initiative by a number of leading research institutes (October Initiative by a number of leading research institutes (October 2008):2008):

Total annual turnover approx 1,300 M€

Over 10,000 scientists

Aim: accelerate development of new energy technologies through Aim: accelerate development of new energy technologies through Joint Programmes (JPs):Joint Programmes (JPs):

Strengthen, expand and optimise research capabilities

Harmonisation of national and EC programme

Decrease fragmentation

Launch of the first 4 JPs in June 2010 on PV, Smart Grids, Wind Launch of the first 4 JPs in June 2010 on PV, Smart Grids, Wind and geothermaland geothermal

EuropeanEuropean EnergyEnergy ResearchResearch AllianceAlliance

Page 9: European Strategic Energy Technology Plan (SET-Plan)€¦ · Sustainable Nuclear and Bioenergy EIIs Launch foreseen at the SET Plan Conference in Brussels, 15-16 November 2010, under

So far 13 participating institutions:So far 13 participating institutions:

AIT (AT), ECN (NL), ENEA (IT), ERSE (IT), IWES (DE), JRC (NL), LABEIN (ES), LABORELEC (BE), Risø (DK), SINTEF (NO), TUBITAK (TR), VITO (BE) and VTT (SF)

2 coordinators and 4 Sub2 coordinators and 4 Sub--Programmes for joint research:Programmes for joint research:

Network operation

Energy management

Control system interoperability

Electrical storage technologies

Annual commitment of 52,5 person yearsAnnual commitment of 52,5 person years

JPJP onon SmartSmart GridsGrids

So far 14 participating institutions: So far 14 participating institutions: CEA, CIEMAT, CRES, ECN, ENEA, FhG-ISE, FhG-ISET, FZ-Juelich, IMEC, HZB, Risø, Sintef/IFE, VTT and the Warsaw University of Technology

1 coordinator (ECN) and 5 Sub1 coordinator (ECN) and 5 Sub--Programmes for joint research: Programmes for joint research: Silicon Materials (Inorganic)

Thin film PV

Organic PV

Module Technology

Education and Training and use of Infrastructures

Annual commitment of 111 person yearsAnnual commitment of 111 person years

JPJP onon PVPV

Page 10: European Strategic Energy Technology Plan (SET-Plan)€¦ · Sustainable Nuclear and Bioenergy EIIs Launch foreseen at the SET Plan Conference in Brussels, 15-16 November 2010, under

So far 10 participating institutions: So far 10 participating institutions: CENER, CIEMAT, CRES, ECN, LNEG, ISET1, Risø, SINTEF, University of Porto and the University of Strathclyde

1 coordinator (1 coordinator (RisRisøø) and 5 Sub) and 5 Sub--Programmes for joint research: Programmes for joint research: Wind Conditions

Aerodynamics

Offshore Wind Energy

Grid Integration

Research Facilities

Annual commitment of 125 person yearsAnnual commitment of 125 person years

JPJP onon WindWind

FP7FP7-- Energy ThemeEnergy Theme

Hydrogen and fuel cells

Renewableelectricitygeneration

Renewable fuel production

CO2 capture and storage technologies for zero

emission power generation

Smart energy networks

Clean coal technologies

Renewables for heating and cooling

Energy savings and energy efficiency

Knowledge for energy policy making

Horizontal Programme Actions

Page 11: European Strategic Energy Technology Plan (SET-Plan)€¦ · Sustainable Nuclear and Bioenergy EIIs Launch foreseen at the SET Plan Conference in Brussels, 15-16 November 2010, under

Knowledge and Innovation Communities of the European Institute oKnowledge and Innovation Communities of the European Institute offTechnologies (EIT)Technologies (EIT)

webs of excellence cross-linking education and research to business integrating the whole innovation web and entrepreneurship co-locating peopleworld leaders in their field

�� Sustainable Energy KIC: INNOENERGYSustainable Energy KIC: INNOENERGY35 Partnerslead: Karlsruhe Institute for Technology

Strong links between the KIC and the SET planStrong links between the KIC and the SET planoverlapping objectives KIC members participate in EERAhuman resources considered crucial

The SET Plan and the EITThe SET Plan and the EIT

Strong EU institutional support (Council and Strong EU institutional support (Council and

Parliament)Parliament)

Launch of next EIIs and Joint R&D programmes of Launch of next EIIs and Joint R&D programmes of

EERAEERA

Need a shared effort from EU, Need a shared effort from EU, MSsMSs, Industry and , Industry and

financial community for a successful financial community for a successful

implementationimplementation

Start developing international cooperationStart developing international cooperation

SETSET--Plan Conference in November 2010Plan Conference in November 2010

The SET Plan The SET Plan -- Next stepsNext steps

Page 12: European Strategic Energy Technology Plan (SET-Plan)€¦ · Sustainable Nuclear and Bioenergy EIIs Launch foreseen at the SET Plan Conference in Brussels, 15-16 November 2010, under

Thank you for your attention