EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.
-
Upload
chloe-byrd -
Category
Documents
-
view
212 -
download
0
Transcript of EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.
![Page 1: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/1.jpg)
EUROCONTROL Experimental Centre1
19/04/23
eDEP Presentation
3rd April 2006
![Page 2: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/2.jpg)
EUROCONTROL Experimental Centre2
19/04/23
Contents
eDEP : An overview Introduction ATC simulator overview TWR simulator overview Other functionality
eDEP : SPD overview eDEP & projects Roadmap Questions
![Page 3: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/3.jpg)
EUROCONTROL Experimental Centre3
19/04/23
eDEP : What is it?
EEC (ERIS) ATM prototyping platform broad, representative, but simplified ATM functionality
(AIR, FDPS, CWP) Experimentation support (prep-IPAS, analysis-STORIA, replay) light-weight (200k lines of code versus 2+ million in ACE) small reactive team Flexible & modular Stable & mature (started in 2000) High quality (well documented, regression testing suite)
Technically 100% Java PC based (or Linux & Unix if need be) Modern technology & modern development tools
targeted at research, advanced concept projects small experiments (HF Lab) low cost demonstrators, training
![Page 4: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/4.jpg)
EUROCONTROL Experimental Centre4
19/04/23
ERIS Simulator Solutions
long-term research
advanced concept
Definition
Small-scale simulation
large-scale simulation
Pre-ops (Shadow mode)
Flexibility
Requirements Stability Data Fidelity
Concept Maturity with Time
ESCAPE ACE eDEP
![Page 5: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/5.jpg)
EUROCONTROL Experimental Centre5
19/04/23
eDEP : Website
![Page 6: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/6.jpg)
EUROCONTROL Experimental Centre6
19/04/23
eDEP in the HF Lab
Runs on 2k BARCO Screens Excellent performance (see 2006 Performance study)
![Page 7: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/7.jpg)
EUROCONTROL Experimental Centre7
19/04/23
High Level Architecture View
Simulator systemsTower and ATC
External Data
IPAS Airspace & TrafficBADA A/C PerformanceTAAM Airport Layout dataTAAM Airport Traffic
CFMU Airspace dataCFMU Traffic(TACT) data
External Systems
ESCAPE : on-line gateway
STORIA : data recording & analysis
Live Systems : ASTERIX cat21, 62
![Page 8: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/8.jpg)
EUROCONTROL Experimental Centre8
19/04/23
Contents
eDEP : An overview Introduction ATC simulator overview TWR simulator overview Other functionality
eDEP : SPD overview Usage in 2006 Questions
![Page 9: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/9.jpg)
EUROCONTROL Experimental Centre9
19/04/23
Traffic Generator Piloting Positions, Cockpit
AIR/GRD datalink DTL (CPDLC) ADS-B, TIS-B
GROUND : FDPS : FM/TP, SYSCO, FPM (MONA/PAC) Tools : MTCD, STCA, AMAN, EMAN (Proto) RDPS : IAS
CWP : EATMP & ECHOES Look & Feel Multiple positions Runs on 2k BARCO screens and/or simple
PCs Hybrid positions “unmanned” (automated) positions
![Page 10: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/10.jpg)
EUROCONTROL Experimental Centre10
19/04/23
eCockpit
![Page 11: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/11.jpg)
EUROCONTROL Experimental Centre11
19/04/23
Contents
eDEP : An overview Introduction ATC simulator overview TWR simulator overview Other functionality
eDEP : SPD overview eDEP & projects Questions
![Page 12: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/12.jpg)
EUROCONTROL Experimental Centre12
19/04/23
TWR Functionality
Airport Model Derived from TAAM data LFPG (Paris CGG) used as example Map data (building, taxiway, runway outlines) Logical data
Aprons, gates Taxiways & Taxiway segments
(“LoA” : directions, restrictions, speed limits, junctions) Runways (hold points, protected areas)
Airport “sectors” (i.e. frequencies) Runway controller Taxiway controller Apron controller
![Page 13: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/13.jpg)
EUROCONTROL Experimental Centre13
19/04/23
LFPG Map (Controller Roles/Sectors)
![Page 14: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/14.jpg)
EUROCONTROL Experimental Centre14
19/04/23
TWR Functionality
Aircraft simulation Push-back Taxiing (& intelligent pilot behaviour)
Calculate Shortest legal route to RWY Queuing behaviour (no overtaking) pilots maintain separation (not the controller) “Priority to the right”
Take-off Hold at runway perimeter Line-up Accelerate & Take-off
Landing Normal or fast runway exits
Vehicle simulation
![Page 15: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/15.jpg)
EUROCONTROL Experimental Centre15
19/04/23
TWR Functionality
TWR FPDS FM/TP :
GRD trajectory calculation – shortest legal route GRD Order processing (change RWY, GATE, SID, Taxiway)
Co-ordination between TWR positions Flight Path Monitoring SNET : Runway Incursion Monitoring (RIMCAS)
TWR RDPS TWR CWP
DSI Look & Feel Arrival / Departure traffic lists Trajectory editor / elastic vector
TWR Unmanned CWP Automated responses
TWR standalone or TWR+ATC (APP/ACC)
![Page 16: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/16.jpg)
EUROCONTROL Experimental Centre16
19/04/23
![Page 17: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/17.jpg)
EUROCONTROL Experimental Centre17
19/04/23
Contents
eDEP : An overview Introduction ATC simulator overview TWR simulator overview Other functionality
eDEP : SPD overview eDEP & projects Questions
![Page 18: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/18.jpg)
EUROCONTROL Experimental Centre18
19/04/23
Others
Data import IPAS, TAAM, CFMU
ESCAPE Integration Transparently replace eDEP components with ESCAPE
equivalent (FM/TP, TDM, RDPS) Data recording for analysis
On-line data recording Fed into STORIA (EEC analysis / visualisation tool)
Data recording for replay Replay CWP positions Synchronised with recorded AudioLAN R/T
Traffic editor Tool Scripting Engine (inject R/T, controller orders, pilot orders)
![Page 19: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/19.jpg)
EUROCONTROL Experimental Centre19
19/04/23
eDEP ATC Clients
EVP AMAN Demonstrator DMAN DLR Integration EMAN Concept demonstration SPD (Sector Package 1 Demonstrator)
CORA AVT
ADS-B & TIS-B Demonstrations FARADS/RADES (TCAS RA Experiments) Innovation Business Area (long term R&D) INSTILUX – Radar Training (CBT Package)
![Page 20: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/20.jpg)
EUROCONTROL Experimental Centre20
19/04/23
Contents
eDEP : An overview Introduction ATC simulator overview TWR simulator overview Other functionality
eDEP : SPD overview eDEP & projects Questions
![Page 21: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/21.jpg)
EUROCONTROL Experimental Centre21
19/04/23
SSP Sector Package 1 Demonstrator
SSP Demonstrator for “Sector Package 1” Could become C-ATM prototype demonstrator
Integrating existing eDEP functionality, with ECHOES (G2G) compliance, into a coherent concept demonstrator MTCD, MONA (using ADS-B data), SYSCO, STCA DTL, ADS-B, TIS-B, ASAS 2D TED
SPD relies 90-95% on eDEP core software, with only 5-10% ECHOES “specific”
Therefore, this core software is re-used by EHQ for FASTI Demonstrator
![Page 22: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/22.jpg)
EUROCONTROL Experimental Centre22
19/04/23
![Page 23: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/23.jpg)
EUROCONTROL Experimental Centre23
19/04/23
eDEP Modularity
Strong Module structure
ATC Core Software
ATC Standard Software
Graphics Look & Feel
Live Connections (ASTERIX)
EEC Connections (IPAS..)
Client Specific modules(TCAS, AVT etc )
![Page 24: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/24.jpg)
EUROCONTROL Experimental Centre24
19/04/23
Contents
eDEP : An overview Introduction ATC simulator overview TWR simulator overview Other functionality
eDEP : SPD overview eDEP & projects Questions
![Page 25: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/25.jpg)
EUROCONTROL Experimental Centre25
19/04/23
What Roles has eDEP Fulfilled?
HMI prototypes & HF Studies Functional prototypes Concept demonstrators Airport/TMA/En-Route studies Training / CBT Packages Small scale simulation (1-2 sectors)
![Page 26: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/26.jpg)
EUROCONTROL Experimental Centre26
19/04/23
HMI/HF Studies
CORA2 (2003) Fixed traffic scenarios pre-engineered conflict situations Controller presented with conflict resolutions 3 different HMI / HF approaches:
User centricCollaborativeautomated
![Page 27: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/27.jpg)
EUROCONTROL Experimental Centre27
19/04/23
Functional Prototypes
EVP AMAN Demonstrator
Purpose
• marketing, demonstrations (taken to Rome, EC, Stockholm)
• training package
• prototyping experiments (evaluate different delay sharing strategies)
Developed
•Simple AMAN server (Time to lose/gain, Sequence, time on runway..)
•ACC and APP Positions
•Landing List Window
•Running Arlanda traffic
![Page 28: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/28.jpg)
EUROCONTROL Experimental Centre28
19/04/23
Concept Demonstrator
EMAN
• EMAN HMI Concept demonstrator
• calculates hot-spots based on traffic flows;
• simple classification into green-yellow-red levels;
• provides what-if capabilities
•Change XFL
•Shift Sector exit (loose/gain time)
• test a number of pre-determined alternative routes
• The contract produced
•eDEP Demonstrator
•A number of demonstrator ‘movies’
•HMI Guide
![Page 29: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/29.jpg)
EUROCONTROL Experimental Centre29
19/04/23
En-Route/TMA/Airport Functionality
APT A-SMGCS Level 1-2 Demonstrator Level 3-4 Demonstrator
DMAN DLR DMAN integration
![Page 30: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/30.jpg)
EUROCONTROL Experimental Centre30
19/04/23
Training/CBT
Use EVP AMAN as example
AMAN CBT windows help package
•interactive
•searchable
•screen shots
•movies
•eDEP demos
INSTILUXRadar Vectoring CBT
![Page 31: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/31.jpg)
EUROCONTROL Experimental Centre31
19/04/23
Small Scale Simulation
TCAS RA Downlink simulations (RADE / FARADS) October – Nov 05 (8 week simulation) 3 sectors (1 measured, 2 feed) Connection to TCAS Box Data recording for replay (with R/T) Q1 2006 : Approach simulation
CORA simulation (2003) 5 Controller Working positions
![Page 32: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/32.jpg)
EUROCONTROL Experimental Centre32
19/04/23
Product Roadmap
EEC ERIS eDEP Spin-offs
Candidate (amongst others) for the ESCAPE HMI replacement Test Tool for ESCAPE
eDEP ATC Prototyping platform : maintenance phase eDEP TWR prototyping platform : small developments
EEC Clients DLR DMAN Integration (TWR) SPD Prototyping for C-ATM Episode 3
MSP (June onwards ) Complexity Management (June onwards)
Advanced TWR HMI Demonstrator Other
EHQ FASTI (MTCD, SYSCO, MONA) Demonstrator NATS spin-off work
![Page 33: EUROCONTROL Experimental Centre1 14/10/2015 eDEP Presentation 3 rd April 2006.](https://reader034.fdocuments.in/reader034/viewer/2022051820/56649eb65503460f94bbfb4f/html5/thumbnails/33.jpg)
EUROCONTROL Experimental Centre33
19/04/23
Questions?