PRoACC Proposal - Mangrove Ecosystem Under Climate Change Conditions
Eureca European Ecosystem Assessment Proposal 3 March 2008.
-
Upload
rose-scott -
Category
Documents
-
view
217 -
download
0
description
Transcript of Eureca European Ecosystem Assessment Proposal 3 March 2008.
![Page 1: Eureca European Ecosystem Assessment Proposal 3 March 2008.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b857f8b9ab0599bc72b/html5/thumbnails/1.jpg)
Eureca – European Ecosystem AssessmentProposal 3 March 2008
![Page 2: Eureca European Ecosystem Assessment Proposal 3 March 2008.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b857f8b9ab0599bc72b/html5/thumbnails/2.jpg)
MA follow-up• Strategic goals
• Improving the knowledge base regarding ecosystem functioning and services
• Developing and applying tools for political decision making at European level
• Outreach to stakeholders• Priorities for sub-global assessments
• Significant ecosystem degradation or risk of future degradation • Demand from the country or region concerned• Opportunities to influence a decision-making process • Link to ongoing initiatives for environmental integration into
policies• Committed leader
• EURECA aims at getting formally acknowledged as SGA
![Page 3: Eureca European Ecosystem Assessment Proposal 3 March 2008.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b857f8b9ab0599bc72b/html5/thumbnails/3.jpg)
Expert meeting 28/29 January• Involve stakeholders as early as possible• Add value to country initiatives• Preference for storyline-based approach with
biodiversity areas (option 1) or selected ecosystem services (option 2)as starting point)
• Yet comprehensiveness needed (not only focus on certain ecosystems)
![Page 4: Eureca European Ecosystem Assessment Proposal 3 March 2008.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b857f8b9ab0599bc72b/html5/thumbnails/4.jpg)
Approach• Storyline-based assessment• Integrated accounting framework (long-term)• Capacity building
![Page 5: Eureca European Ecosystem Assessment Proposal 3 March 2008.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b857f8b9ab0599bc72b/html5/thumbnails/5.jpg)
Methods
‘Economic valuation techniques will be combined with dedicated scenario development and ecosystem accounting. The scenarios will describe alternative pathways into the future, leading to alternative uses of the selected ecosystem resources. The economic assessment will, on the basis of case studies, analyse the costs and benefits of the different use options provided by the scenarios. Ecosystem accounting will finally provide a spatial framework to extrapolate the case study findings to the European level and enable calculation of economic consequences of land use change (and alternative use of ecosystem resources). Models will play a synthesizing and integrative role throughout the eureca process, complementing the data collection, supporting the scenarios building and enhancing the valuation/accounting.’
EURECA project plan draft 18-12-2007 / background doc expert meeting January 2008
![Page 6: Eureca European Ecosystem Assessment Proposal 3 March 2008.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b857f8b9ab0599bc72b/html5/thumbnails/6.jpg)
Methods (2)ecological analysisindicator-based (e.g. SEBI)
distribution and trends of habitats and speciesthreats / pressures
ecosystem resilience scenario developmentalternative pathways into the future
DPSIR modelling spatially explicit output (distribution habitats /
species)economic valuation(NB: per scenario)
identification of relevant ecosystem services value of marketed and non-marketed services
costs of relevant policy measurescost-benefit analysis under discounting over the
scenario period. ecosystem accountingstocks (land cover units, species)
flows of related ecosystem servicesmodelling economic parameters (upscaling /
benefit transfer)
![Page 7: Eureca European Ecosystem Assessment Proposal 3 March 2008.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b857f8b9ab0599bc72b/html5/thumbnails/7.jpg)
Modular setup• Pathfinder
• Europe-wide background picture• Status and trends of European biodiversity (SEBI-based)• Pathways into the future (scenarios, prospective study)• Methods handbook / matrix of ecosystems and services• No integral economic valuation of change!
• Spotmeters• Zooming in on areas/services of interest• Analysing consequences of context changes (on basis of
scenarios)• Exploring resilience• Exploring policy options• Assessing economic costs and benefits
• Integrator • Overall assessment / conclusion
![Page 8: Eureca European Ecosystem Assessment Proposal 3 March 2008.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b857f8b9ab0599bc72b/html5/thumbnails/8.jpg)
Storyline based assessmentSpotmeters• Food for Thought Food, fuel and the fate of the landscape • Fish Behind the Net Exploiting the marine environment • Natura2morrow Significance and robustness of the Natura2000
network • Peak performance Mountain ecosystems under pressure
• Breaking the waves Biodiversity and flood prevention (scheduled to start 2009)
![Page 9: Eureca European Ecosystem Assessment Proposal 3 March 2008.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b857f8b9ab0599bc72b/html5/thumbnails/9.jpg)
Internal process
PathfinderSpotmeter
Spotmeter
Spotmeter
Spotmeter
Spotmeter
Accounting
Integral accounting
(selected services)
Partial story-line based analysis
(selected issues / regions)
Integrator
CORINE
SEBI
![Page 10: Eureca European Ecosystem Assessment Proposal 3 March 2008.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b857f8b9ab0599bc72b/html5/thumbnails/10.jpg)
Stakeholder process
Pathfinder framework
Vulnerability maps
Status and trends
Methodology guideline
Scenarios
Storyline development
Biodiversity assessment
Spotmeter development
Economic valuation
Policy options
Integrator
Synthesis
Recommendations
Conclusions
Stakeholders
SEBI
Countries
Topic stakeholders
countriesReachout event Reachout eventStartup event
![Page 11: Eureca European Ecosystem Assessment Proposal 3 March 2008.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b857f8b9ab0599bc72b/html5/thumbnails/11.jpg)
Timetable 2008-20132008 2009 2010 2011 2012 2013
Biodiversity Comm.
2nd progress report
4th pr. rep. 2010 eval.
7th pr. report 6th EAP eval.
Marine strat.
Entry into force
Initial assessment
CFP Revision
WFD River basin rep.
CAP Health Check
Commission proposal
Reg. policy Ex post eval. ProposalNatura2000
Art. 17 reporting
Possible guideline art.10 coherence
Poss. revision HD / BD
Climate change
Communication on adaptation
Bioenergy Sust. criteriaCohesion Green paperBudget rev.
Budget ’14-’20
Alp./Carp. C
Pathfinder Integrator
Food for ThoughtBraking the waves
Fish behind the Net
Natura2morrow
Peak Performance
SEBI report
SoER
CC rep.Biofuels rep.
CAP report
![Page 12: Eureca European Ecosystem Assessment Proposal 3 March 2008.](https://reader036.fdocuments.in/reader036/viewer/2022082510/5a4d1b857f8b9ab0599bc72b/html5/thumbnails/12.jpg)
Links to MA follow-up strategy• Improving the knowledge base regarding ecosystem
functioning and services • SEBI integration, Country contributions
• Developing and applying tools for political decision making at European level • Close link to main policy frameworks and
timetable (CAP, CFP, Energy, WFD, BAP)• Outreach to stakeholders
• Spotmeter storylines as basis for outreach, can be combined with audiovisuals